Distributor for concrete supply and replacement method of the same
The concrete supply distributor simplifies the reloading process by using movable outriggers and a lifting drive mechanism to switch support between floor slabs, reducing the need for large cranes and lowering costs.
Patent Information
- Application Number
- JP2023061747
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-05
- Publication Date
- 2024-10-18
AI Technical Summary
Conventional concrete supply distributors require large, high-power cranes for reloading, complicating the process and increasing costs due to the need for specialized equipment.
A concrete supply distributor with a base device, mast device, and boom device, featuring movable outriggers and a lifting drive mechanism that allows the distributor to be rearranged by switching support between floor slabs using a combination of outriggers and a lifting drive device, reducing the need for large cranes.
Simplifies the reloading process by allowing the distributor to be rearranged using a lifting drive device alone or in combination with a crane, eliminating the need for large, high-output cranes and reducing costs.
Smart Images

Figure 2024148540000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a concrete supply distributor comprising a base device, a mast device having a mast body supported by the base device and extending vertically as a main frame, and a boom device mounted on the mast device. [Background technology]
[0002] The above-mentioned concrete supply distributor is conventionally known, as described in, for example, Patent Document 1. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-193494 A Summary of the Invention [Problem to be solved by the invention]
[0004] The distributor in Patent Document 1 is used to efficiently supply large amounts of ready mixed concrete to a construction site, for example, when the reinforced concrete framework of a high-rise or mid-rise building is constructed in sequence from the lower floors to the upper floors. In this case, although it is not explicitly stated in Patent Document 1, for example, after constructing the first to third floor slabs stacked vertically and their associated walls, the entire distributor is lifted only by a crane, and a process is carried out in which the base device of the distributor is transferred from the first floor slab to the second or third floor slab (called "re-loading" at the construction site), and the support height of the distributor is successively raised as the floor height of the framework increases.
[0005] However, the above-mentioned distributor replacement process requires the special preparation of a large, high-power crane device capable of lifting the entire distributor by itself, which makes the replacement process more complicated and increases costs.
[0006] The present invention has been proposed in view of the above, and has an object to provide a concrete supply distributor and a method for replacing the same that can solve the problems of the conventional structure with a simple structure. [Means for solving the problem]
[0007] In order to achieve the above-mentioned object, the present invention provides a concrete supply distributor comprising a base device, a mast assembly having a mast body supported by the base device and extending in the vertical direction as its main frame, and a boom device mounted on the mast assembly, the first feature of which is that it comprises an upper base supported on the outer periphery of the mast body so as to be slidable in the vertical direction, a plurality of upper outriggers each supported by the upper base and movable between a predetermined first storage position and a first deployed position protruding outward from the outer periphery of the upper base, a lifting drive device interposed between the upper base and the mast body and capable of driving one of the upper base and the mast body to be raised and lowered relative to the other, a lower base fixed to the lower end of the mast body, and a plurality of lower outriggers each supported by the lower base and movable between a predetermined second storage position and a second deployed position protruding outward from the outer periphery of the lower base.
[0008] The present invention also provides a method for changing a concrete supply distributor, which lifts a concrete supply distributor having a first feature so that the supporting partner of the lower base is switched from a first floor slab to a second floor slab that has a first through hole through which the lower base can pass and is located above the first floor slab, the method comprising the steps of: moving the upper outriggers to the first storage position from a state in which the lower base is supported on the first floor slab via the lower outriggers at the second deployment position, and the upper base is supported on the second floor slab via the upper outriggers at the first deployment position; and then driving the upper base up relative to the mast body by the lifting drive device so that the upper base is supported on the first floor slab via the upper outriggers at the first deployment position. a step of placing the upper base at a predetermined position at approximately the same level as the upper surface of a third floor slab having a second through hole through which an upper base can be passed; then a step of moving the upper outriggers to the first deployed position and supporting the upper base on the third floor slab via the upper outriggers; further a step of moving the lower outriggers to the second stored position, and then driving the mast body and the lower base up relative to the upper base by the lifting drive device to place the lower base at a predetermined position at approximately the same level as the upper surface of the second floor slab; and then a step of moving the lower outriggers to the second deployed position and supporting the lower base on the second floor slab via the lower outriggers.
[0009] The third feature of the present invention is that in a concrete supply distributor comprising a base device, a mast assembly having a mast body supported by the base device and extending in the vertical direction as its main frame, and a boom device mounted on the mast assembly, the distributor comprises an upper base fixed to the mast body, a plurality of outriggers each supported by the upper base and movable between a predetermined storage position and a deployed position extending outward from the outer periphery of the upper base, a lower base having a support portion supportable on a support body, a connecting device for detachably connecting the lower base to the lower end of the mast body, and a lifting drive device that can be installed between the mast body and the lower base and can drive the mast body to rise and fall relative to the lower base when the connection is released.
[0010] The present invention also provides a method for changing a concrete supply distributor having a third feature, which lifts the lower base so that the supporting partner of the lower base is switched from a first floor slab to a second floor slab located above the first floor slab, the method comprising the steps of: moving the outriggers to the stored position from a state in which the lower base is supported on the first floor slab via the support parts, and the upper base is supported on the second floor slab via the outriggers in the deployed position, and releasing the connection between the lower end of the mast body and the lower base by the connection device; and lifting the mast body to the lower base by the lifting drive device installed between the mast body and the lower base. a step of lifting the upper base relative to the mast base and placing the upper base at a predetermined position at approximately the same level as an upper surface of a third floor slab having a through hole through which the upper base can pass; a step of moving the outriggers to the deployed position and supporting the upper base on the third floor slab via the outriggers; and a step of removing the lifting drive device from between the mast body and the lower base, and then moving the lower base from above the first floor slab to above the second floor slab in a state separated and independent from the mast body, supporting the lower base on the second floor slab via the support part, and reconnecting the lower base to the lower end of the mast body with the connecting device. Effect of the Invention
[0011] According to the first and second features of the present invention, with the lower base supported on the first floor slab and the upper base supported on the second floor slab, the upper outriggers are moved to a first storage position, and then the upper base is raised relative to the mast body by the lifting drive device to place the upper base in a predetermined position at approximately the same level as the top surface of a third floor slab having a second through hole through which the upper base can pass, and then the upper outriggers are moved to a first deployment position to support the upper base on the third floor slab via the upper outriggers, and then After the lower outriggers are moved to the second storage position, the mast body and the lower base are raised by the lifting drive device relative to the upper base, the lower base is placed at a predetermined position at approximately the same level as the top surface of the second floor slab, and then the lower outriggers are moved to the second deployment position, and the lower base is supported on the second floor slab via the lower outriggers, so that the distributor can be relocated so that the support partner of the lower base and the upper base is switched from the first and second floor slabs to the second and third floor slabs above, respectively. Therefore, the relocation process can be performed by using the lifting drive device alone, which is interposed between the upper base and the mast body, or by using the lifting drive device together with a crane, and by using the lifting drive device attached to the distributor (i.e., interposed between the mast body and the upper base) in this way, the relocation process is simplified compared to the conventional method in which the entire distributor is lifted only by an external crane. Furthermore, even if a crane is used in combination, the use of the lifting drive device eliminates the need for a large, high-power crane device, which contributes to cost reduction.
[0012] According to the third and fourth features, in a state in which the lower base is supported on the first floor slab and the upper base is supported on the second floor slab, the outriggers are moved to the stored position and the connection between the lower end of the mast body and the lower base by the connection device is released, and a lifting drive device is installed between the mast body and the lower base, and the lifting drive device is used to lift the mast body relative to the lower base to place the upper base in a predetermined position at approximately the same level as the top surface of the third floor slab having a second through hole through which the upper base can pass, and then the outriggers are moved to the deployed position. Then, the mast body is moved from the first floor slab to the second floor slab, the upper base is supported on the third floor slab via the outriggers, and the lifting drive device is removed from between the mast body and the lower base. The lower base is then moved from the first floor slab to the second floor slab while being separated and independent from the mast body, and the lower base is supported on the second floor slab via the support part and connected to the lower end of the mast body by the connecting device. This allows the distributor to be relocated so that the support partners of the lower base and upper base are switched from the first and second floor slabs to the second and third floor slabs above, respectively. Therefore, the relocation process can be performed by using only the lifting drive device that can drive the mast body to lift and lower relative to the lower base, or by using the lifting drive device and a crane in combination. By using the lifting drive device attached to the distributor (i.e., that can be installed between the mast body and the lower base), the relocation process can be simplified compared to the conventional method in which the entire distributor is lifted only by an external crane. Furthermore, even if a crane is used in combination, the use of the lifting drive device eliminates the need for a large, high-power crane device, which contributes to cost reduction. [Brief description of the drawings]
[0013] [Figure 1] FIG. 1 is an overall vertical cross-sectional view showing an example of an operating state of a distributor according to a first embodiment of the present invention; [Diagram 2] A side view showing the joint between the lower base supported on the first floor slab via the lower outrigger and the lower part of the mast device and its surroundings (an enlarged side view of the 2X arrow part in Figure 1). [Diagram 3]A partially cutaway side view showing the connection between the upper base supported on the second floor slab via the upper outrigger and the middle part of the mast device and its surroundings (a partially cutaway enlarged side view of the 3X arrow in Figure 1). [Figure 4] Horizontal cross section taken along line 4X-4X in Figure 2 [Diagram 5] Horizontal cross section taken along line 5X-5X in Figure 3. [Figure 6] FIG. 1 is a process explanatory diagram showing an example of a distributor replacement process according to the first embodiment; [Figure 7] FIG. 1 is a vertical cross-sectional view showing an example of an operating state of a distributor according to a second embodiment of the present invention (corresponding to FIG. 1); [Figure 8] A side view showing the joint between the lower base supported on the first floor slab via the lower outrigger and the lower part of the mast device and its surroundings (a partially broken enlarged side view of the 8X arrow in FIG. 7). [Figure 9] A side view showing the connection between the upper base supported on the second floor slab via the upper outrigger and the middle part of the mast device and its surroundings (an enlarged side view of the 9X arrow part in FIG. 7). [Figure 10] Horizontal cross section taken along line 10X-10X in Figure 8. [Figure 11] Horizontal cross section taken along line 11X-11X in Fig. 9 [Figure 12] 10A and 10B are plan and side views, respectively, showing an example in which the lifting drive device A2 is set between the lower base and the mast body (with the lifting cylinder in a contracted state). [Figure 13] FIG. 6 is a process explanatory diagram showing an example of a distributor replacement process according to the second embodiment; [Figure 14] 14 is a side view corresponding to FIG. 2 showing the mounting structure of the lower outrigger according to the first reference embodiment (viewed in the direction of the arrow 14X in FIG. 15) [Figure 15] FIG. 15 is an overall plan view showing the lower base in a state in which the lower outriggers of the first reference embodiment are in the deployed position (a horizontal cross-sectional view taken along line 15X-15X in FIG. 14 ). [Figure 16]FIG. 15 is a cross-sectional view showing a state immediately before some of the lower outriggers are inserted into the support holes after being removed from the lower base in the first reference embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] First, a first embodiment of the present invention will be specifically described below with reference to FIGS. 1 to 6. FIG.
[0015] The concrete supply distributor DS is used to receive ready mixed concrete for constructing various parts of the structure (such as floor slabs and walls) at a construction site such as a building from a concrete pump (not shown) placed on the ground at the site, and supply it to various parts of the casting site located at an elevated position. An example of its use is shown in Figure 1.
[0016] This distributor DS comprises a base device 10 that is placed on and fixed to the upper surfaces of floor slabs FS1 to FS3 of each story and functions as a base, a height-adjustable mast device 20 that is supported in an upright position by this base device 10, and a boom device 30 that is mounted on the mast device 20. Next, an example of each of the devices 10, 20, and 30 will be described in order.
[0017] 2 to 5, the base device 10 includes an upper base 11 and a lower base 12 each of which is made up of a rigid frame having a flat rectangular parallelepiped shape and can be fixed to the mast device 20 at intervals from top to bottom, a plurality of upper outriggers R1 (four in this embodiment) for ensuring a long support span for the upper base 11 and stabilizing support of the upper base 11, and a plurality of lower outriggers R2 (four in this embodiment) for ensuring a long support span for the lower base 12 and stabilizing support of the lower base 12. Thus, the upper base 11 and the lower base 12 cooperate with each other to function as the main frame of the base device 10.
[0018] 3 and 5, the upper outrigger R1 is supported on the four corners of the upper base 11 (specifically, an upper wall 11t and a lower wall 11b described later) via a pivot P1 and is rotatable about a vertical axis between a predetermined first storage position R1i along a side wall 11s of the upper base 11 and a first deployed position R1o protruding outward from the outer periphery of the upper base 11. On the other hand, the lower outrigger R2, like the upper outrigger R1, is supported on the four corners of the lower base 12 (specifically, an upper wall 12t and a lower wall 12b described later) via a pivot P2 and is rotatable about a vertical axis between a predetermined second storage position R2i along a side wall 12s of the lower base 12 and a second deployed position R2o protruding outward from the outer periphery of the lower base 12.
[0019] The upper and lower bases 11 and 12 have basically the same skeletal structure, and are constructed of a hollow rigid frame formed of a plurality of metal frame plates, with the outer edge being formed into a substantially polygonal shape (substantially square in the embodiment) in a plan view. The side walls 11s and 12s of the upper and lower bases 11 and 12 are offset inward from the outer edges of the upper walls 11t and 12t and the lower walls 11b and 12b. The outer surfaces of the side walls 11s and 12s, the lower surfaces of the upper walls 11t and 12t, and the upper surfaces of the lower walls 11b and 12b define storage spaces for the upper and lower outriggers R1 and R2 at the first and second storage positions R1i and R2i.
[0020] The upper and lower ends of the pivots P1, P2 of the upper and lower outriggers R1, R2 are supported by the upper walls 11t, 12t and the lower walls 11b, 12b of the upper and lower bases 11, 12, respectively. Thus, the upper and lower outriggers R1, R2 can be rotated manually by an operator. Furthermore, between the upper and lower outriggers R1, R2 and the upper and lower bases 11, 12, there are provided conventionally known fixing means (not shown, for example, removable pins, through bolts, etc.) which can fix the upper and lower outriggers R1, R2 at any time to the first and second stored positions R1i, R2i and the first and second deployed positions R1o, R2o.
[0021] Incidentally, the upper and lower outriggers R1, R2 may be rotated forcibly by using an actuator instead of manually.
[0022] In the embodiment, the first and second deployed positions R1o, R2o of the upper and lower outriggers R1, R2 can selectively take any of the deployed positions extending along one side wall 11s, 12s, the deployed positions extending perpendicular to the side wall 11s, 12s, and the deployed positions extending diagonally, as illustrated by the chain lines in Figures 4 and 5. The fixing means is configured to be able to fix the upper and lower outriggers R1, R2 in any deployed position.
[0023] The deployment position is appropriately selected depending on the usage environment of the distributor DS (for example, the shapes of the elevator halls FS1h to FS3h of the floor slabs FS1 to Fs3, the weight balance of the distributor DS, etc.).
[0024] Meanwhile, a support cylinder 12a is fixed to the center of the lower base 12 to support the lower part of the mast assembly 20 (specifically, the lower end part of the lowermost mast body 21 described later) in a detachable manner. The lower end of this support cylinder 12a is placed on and fixed to the bottom wall 12b of the lower base 12, and its outer circumferential surface is fitted into and supported by a cylindrical support body 13 fixed to the lower base 12. The support cylinder 12a is formed in a square tube shape having substantially the same cross-sectional shape as the mast body 21, and its upper end penetrates an upper wall 12t of the lower base 12 and protrudes upward.
[0025] Incidentally, a through hole (not shown) is provided in the upper wall 12t and the bottom wall 12b of the lower base 12 around the support cylinder portion 12a for passing a concrete feed pipe (not shown) which will be described later.
[0026] Furthermore, a number of connecting blocks Bd are fixed at intervals in the circumferential direction to the outer periphery of the upper end of the support cylinder 12a, which protrudes upward from the upper surface of the upper wall 12t. The lower end of the lowermost mast body 21 and the support cylinder 12a (and therefore the lower base 12) are connected to each other via these connecting blocks Bd, a number of connecting blocks Bu fixed to the outer periphery of the lower end of the lowermost mast body 21, and connecting means (e.g., bolts) that detachably connect the blocks Bd, Bu, as described below.
[0027] In this connected state, the opposing surfaces of the upper and lower connecting blocks Bu, Bd come into contact with each other, and the contacting surfaces engage with each other in a concave-convex manner so as to suppress circumferential and radial positional deviations between the lowermost mast body 21 and the support cylinder 12a. This concave-convex engagement makes it easy to position the lowermost mast body 21 on the support cylinder 12a (and therefore the lower base 12), and also reliably prevents the mast body 21 from being displaced in the direction along the contacting surfaces.
[0028] The upper base 11 has an upper wall 11t, a side wall 11s and a lower wall 11b which are basically the same as the upper wall 12t, a side wall 12s and a lower wall 12b of the lower base 12. However, functional parts corresponding to the cylindrical support 13 and the support cylinder portion 12a of the lower base 12 are omitted, and instead, a slide support cylinder 23 which is square in plan view and surrounds the entire circumference of the mast body 21 to a large extent (i.e., to a degree that can reasonably avoid interference with the connecting blocks Bu, Bd between the mast bodies 21) is disposed so as to integrally connect (e.g., weld) the upper wall 11t and the bottom wall 11b on the inner side of the side wall 11s. The function of the slide support cylinder 23 in connection with the mast body 21 will be specifically described later.
[0029] The upper and lower bases 11, 12 are placed and fixed on floor slabs FS1 to FS3 serving as supports via a plurality of upper and lower outriggers R1, R2, which are formed to be slightly smaller than the through holes (e.g., elevator halls FS1h to FS3h) formed through the floor slabs FS1 to FS3. Therefore, the upper and lower bases 11, 12 can pass vertically through the elevator halls FS1h to FS3h when the upper and lower outriggers R1, R2 are in the first and second storage positions R1i, R2i.
[0030] Next, an example of a mast assembly 20 will be described mainly with reference to FIGS.
[0031] The mast assembly 20 is divided into a plurality of mast bodies 21 which are supported in an upright position on the base assembly 10 and connected to each other in a vertical row to form the main frame of the mast assembly 20. By increasing the number of connections of the mast bodies 21, the overall length (and therefore the overall height) of the mast assembly 20 can be increased (higher). A boom assembly 30 is mounted on the upper portion of the mast assembly 20 (i.e., the upper end portion of the uppermost mast body 21).
[0032] These mast bodies 21 are basically composed of hollow cylinders with the same cross section, and in this embodiment, they have a sturdy closed cross section structure with a rectangular cross section. A workbench 24 is fixed to the top of the uppermost mast body 21, allowing workers to safely perform various tasks (e.g., assembly, inspection, maintenance, etc.). Furthermore, concrete feed pipes connected to concrete pumps and work ladders (not shown) are supported at appropriate locations on the periphery of each mast body 21 as needed.
[0033] In addition, the adjacent ends of a pair of vertically adjacent mast bodies 21 are detachably connected by a connecting mechanism similar to the connecting mechanism between the lower end of the lowest mast body 21 and the support cylinder portion 12a of the lower base 12 described above (i.e., the multiple connecting blocks Bd, Bu and bolts).
[0034] Meanwhile, a pair of lifting drive devices A1 capable of driving one of the upper base 11 and the mast body 21 to lift and lower relative to the other are interposed between the mast body 21 and the upper base 11. In this embodiment, the lifting drive device A1 includes an outward rack 41 that is integrally provided on a pair of parallel outer surfaces (particularly the outer surfaces at positions avoiding the connecting blocks Bd, Bu) of the mast body 21 and extends long in the vertical direction, a drive gear 42 that is rotatably supported on the upper base 11 so as to mesh with the rack 41, and a motor unit 43 that can rotate the drive gear 42 in two directions, forward and reverse.
[0035] When the motor unit 43 rotates the drive gear 42 in either the forward or reverse direction, the meshing position between the drive gear 42 and the rack 41 moves relatively upward or downward, thereby driving the mast body 21 and the upper base 11 to rise and fall relatively in the vertical direction.
[0036] The motor unit 43 may be of any type, such as an electric type, a hydraulic type, or a pneumatic type.
[0037] The motor unit 43 is stored and fixed in the upper base 11, and also serves as a bearing on one side of the drive gear 42. Furthermore, a pair of side walls of the slide support cylinder 23 that face the rack 41 are each provided with a window hole 23o (see FIGS. 3 and 5) for avoiding interference with the drive gear 42.
[0038] Furthermore, on the inner surfaces of a pair of side walls of the slide support cylinder 23 on the side where the window hole 23o is not provided, lifting guide devices G that slidably guide the mast body 21 up and down are provided respectively. In this embodiment, each of these lifting guide devices G includes a support bracket 23b fixed to the inner surfaces of the pair of side walls, and a guide roller 23r rotatably supported by the support bracket 23b. Note that the lifting guide devices G may be another guide means, for example, a sliding guide block with a low friction coefficient that is fixed to the inner surfaces of the pair of side walls of the slide support cylinder 23 and slidably contacts the outer circumferential surface of the mast body 21.
[0039] Thus, by cooperation between each pair of lift drive devices A1 and lift guide devices G, the lift posture of the upper base 11 which is fitted and supported on the outer periphery of the mast body 21 via the slide support tube 23 so as to be liftable is stabilized.
[0040] The lifting drive device A1 is not limited to the above-described structure of the embodiment (i.e., a motor-driven rack and pinion mechanism), but may be any lifting drive means capable of forcibly raising and lowering the mast body 21 relative to the upper base 11. For example, a lifting drive means may be used in which a winding transmission belt of a motor-driven winding transmission mechanism (e.g., a chain mechanism or the like) disposed vertically within the mast body 21 is engaged with a driven member fixed to the upper base 11.
[0041] Next, an example of a boom device 30 will be described mainly with reference to Fig. 1. The boom device 30 includes a boom train BT consisting of a plurality of booms B1-B4 arranged in series with one another and pivotally connected to one another so that they can be bent and swung, and a boom support base BS that is attached to the upper part of the mast device 20 (specifically, the upper end part of the uppermost mast body 21) and supports the first boom B1, which is the most proximal side in the boom train BT, so that it can be raised and lowered by means of a horizontal pivot J1.
[0042] The boom support base BS comprises a fixed base 31 fixed to the upper part of the mast assembly 20, and a swivel base 32 supported on the fixed base 31 so as to be rotatable about a vertical axis, and a swivel drive unit capable of driving the swivel base 32 is interposed between the fixed base 31 and the swivel base 32. The structure of this swivel drive unit is well known in the technical field of crane equipment with multi-stage booms, so further explanation will be omitted.
[0043] The lower end of the fixed base 31 is composed of a square cylinder 31a having approximately the same cross-sectional shape as the mast body 21, and the lower end of the square cylinder 31a and the upper end of the topmost mast body 21 are detachably connected by a connecting mechanism similar to the connecting mechanism between the lower end of the lowest mast body 21 and the support cylinder portion 12a of the lower base 12 described above (i.e., the multiple connecting blocks Bd, Bu and bolts).
[0044] In the boom train BT, a hydraulic cylinder C1 is interposed between the first boom B1 and the boom support base BS, which forcibly raises and lowers the first boom B1 relative to the boom support base BS. Hydraulic cylinders C2 to C4 are interposed between adjacent booms in the boom train BT (i.e., between the first boom B1 at the base end and the next second boom B2, between the second boom B2 and the next third boom B3, and between the third boom B3 and the tip-most fourth boom B4), respectively, directly or via a link mechanism, which forcibly raise and lower the booms.
[0045] A hydraulic supply device installed on the boom support base BS (fixed base 31 described later) is connected to each of the hydraulic cylinders C1-C4 via hydraulic piping (not shown) routed along the boom row BT. Supply and discharge control of the operating oil pressure between this hydraulic supply device and each of the hydraulic cylinders C1-C4 is performed based on an operator's operation input. The configuration of the hydraulic control system is also conventionally well known in the technical field of multi-boom crane equipment.
[0046] Further, a flexible blow-out tube 37 capable of blowing out ready mixed concrete from its tip is attached to the tip of the fourth boom B4. The base end of this blow-out tube 37 and the downstream end of the aforementioned concrete feed pipe (not shown) supported along the mast body 21 are connected via a first relay pipe 38 provided across the inside and outside of the boom support base BS, and a second relay pipe 39 supported by each of the booms B1-B4 of the boom row BT and disposed along each of the booms B1-B4.
[0047] The second relay pipe 39 is bent at a folded portion midway through the hollow pivots J2 to J4 which serve as pivotal connections between the adjacent booms B1, B2; B2, B3; B3, B4, and is routed along the adjacent booms B1 to B4.
[0048] Moreover, the upstream end of the second relay pipe 39 and the downstream end of the first relay pipe 38 are connected via a joint that connects them to be relatively rotatable around the axis of the pivot J1. Also, joints that connect the upstream pipe section and the downstream pipe section to be relatively rotatable are respectively provided midway along the second relay pipe 39, particularly near each of the turning portions. Therefore, these joints enable the second relay pipe 39 to smoothly follow the raising and lowering rotation and bending swing of the first boom B1 and the bending and swinging of adjacent booms B1, B2; B2, B3; B3, B4.
[0049] Meanwhile, the fixed base 31 is provided with a plurality of, i.e., four, first mounting parts T1, which are conventionally known and used when hoisting the fixed base 31 with a crane. More specifically, the first mounting parts T1 are used when hoisting the boom device 30 with a crane device (not shown) via the first cords 51 in a state in which the boom row BT is folded and in a vertical position (see Figs. 6 and 13) or a horizontal position (see Figs. 1 and 7), and at that time, the lower end parts of the first cords 51 are detachably engaged with each of the first mounting parts T1 via a conventionally known engagement / disengagement mechanism.
[0050] In particular, in this embodiment, two pairs of first mounting parts T1 arranged at intervals in a predetermined direction (hereinafter simply referred to as the width direction of the boom row BT) along the axis of the pivot J1 of the base of the first boom B1 are disposed on the fixed base 31 at intervals in a horizontal direction perpendicular to the width direction (i.e., four locations in total on the front, back, left and right sides of the fixed base 31). It is to be noted that three or more pairs of first mounting parts T1 may be provided. It is to be noted that instead of providing the first mounting parts T1 on the fixed base 31, they may be provided directly on the swivel base 32 or via a support member such as a bracket.
[0051] In addition, a second mounting portion T2 (see Figure 1) is provided, if necessary, midway along the first boom B1. The second mounting portion T2 is used when the boom row BT is in a horizontal position and lifts the boom device 30 via a second rope (not shown) using a crane device, and can be connected to the second rope.
[0052] Next, the operation of the first embodiment will be described. When the distributor DS of this embodiment is used, for example, at a construction site of a building, the reinforced concrete floor slabs FS1 and FS2 of the lower floors (for example, the first and second floors) are constructed in advance. Then, an assembly process of assembling and installing the distributor DS on the floor slabs FS1 and FS2 and a process of constructing the upper floor floor slab FS3 and related walls based on the pouring of ready mixed concrete using the installed distributor DS are sequentially performed.
[0053] When the upper floor slabs FS3, etc. are constructed in this way, a process is carried out in which the entire distributor DS is sequentially transferred onto the upper floor slabs (e.g., FS2, FS3) in order to construct the upper floor slabs FS3, etc. (This process is called "re-laying" on-site.) The above-mentioned distributor DS assembly process and re-laying process will be explained in order. [Assembly process] 1 shows the state immediately after the distributor DS is installed on the floor slabs FS1 and FS2 in this assembly process. In this assembly process, first, only the lower base 12 of the base device 10 is suspended by a crane and lowered to approximately the same level as the first floor slab FS1, and the lower outrigger R2 deployed to the second deployment position R2o is placed on the first floor slab FS1, and this lower outrigger R2 is fixed to the first floor slab FS1 using a conventionally known fixing means (e.g., U-bolt, anchor bolt, etc.). Next, the mast device 20, which has been assembled in advance at a different location, is suspended by a crane and mounted and fixed on the lower base 12 (support cylinder portion 12a). At this time, since the upper base 11 is already fixed to the mast body 21 (the lowest mast body 21 in the illustrated example), the upper outrigger R1 is deployed from this upper base 11 to the first deployment position R1o and placed on the second floor slab FS2, and then fixed onto the second floor slab FS2 using the conventionally known fixing means.
[0054] Thereafter, the boom device 30, which has been assembled in advance at a different location, is suspended by a crane and mounted and fixed to the upper end of the mast device 20, and then the necessary piping work related to the pumping of ready-mixed concrete is carried out. Thus, ready-mixed concrete is ready to be pumped and supplied from the concrete pump on the ground to the concrete feed pipe (not shown), the first and second relay pipes 38 and 39, and the blow-out tube 37 in that order.
[0055] In this way, the installation of the distributor DS on the floor slabs FS1 and FS2 of the lower floors is completed, and from this state, the distributor DS can supply ready mixed concrete to a desired casting location from the blow-out tube 37 at the end of the boom train BT by appropriately bending the booms B1 to B4 of the boom train BT relative to each other and rotating the swivel base 32 (and therefore the boom train BT). This makes it possible to build the floor slab FS3 and walls of the next floor.
[0056] When the upper floor slab FS3 and wall bodies are thus built up, the next step of the re-laying process is performed in which the distributor DS is re-placed, for example, on the floor slabs FS2 and FS3 in order to build the upper floor slab FS4 (not shown), etc. This re-laying process will be described mainly with reference to FIG. [Refilling process] This process starts with the lower base 12 fixed and supported on the first floor slab FS1 via the lower outrigger R2 at the second deployment position R2o, and the upper base 11 fixed and supported on the second floor slab FS2 via the upper outrigger R1 at the first deployment position R1o, as shown in Fig. 6(A). First, the upstream end of the concrete feed pipe (not shown) supported on the mast body 21 is disconnected from the concrete pressure feed pipe connected to the concrete pump, and then, as shown in Fig. 6(B), the upper outrigger R1 is released from its fixation on the second floor slab FS2, and the upper outrigger R1 is moved to the first storage position R1i.
[0057] Thereafter, as shown by the white arrow in Figure 6 (B), the upper base 11 is raised relative to the mast body 21 by the lifting drive device A1, and the upper base 11 is placed at a predetermined position at approximately the same level as the top surface of the third floor slab FS3, which has a second through hole FS3h through which the upper base 11 can pass, and from that state, the upper outrigger R1 is moved to the first deployed position R1o and placed on and fixed to the third floor slab FS3 (the state of Figures 6 (C) (D)).
[0058] Thus, the upper base 11 is supported and fixed on the third floor slab FS3 via the upper outriggers R1o. Then, from this state, the mast body 21 (and therefore the lower base 12 fixed to the mast body 21) is raised by the lifting drive device A1 relative to the upper base 11 as shown by the outline arrow in Fig. 6(D). This raise drive places the lower base 12 at a predetermined position at approximately the same level as the upper surface of the second floor slab FS2, and from that state, the lower outriggers R2 are moved to the second deployed position R2o and placed on and fixed to the second floor slab FS2 (state in Fig. 6(E)). As a result, the lower base 11 is supported and fixed on the second floor slab FS2 via the lower outriggers R2.
[0059] In this way, the lower base 12 of the base device 10 is transferred (re-piled) layer by layer onto the second floor slab FS2, and the upper base 11 is transferred (re-piled) onto the third floor slab FS3. After that, by reconnecting the concrete pressure pipe extending from the concrete pump to the upstream end of the concrete feed pipe on the mast body 21 side, it becomes possible to pressure-feed and supply ready-mixed concrete to the first and second relay pipes 38, 39 and the blow-out tube 37 in sequence.
[0060] Thus, the distributor DS is finished with its work of transferring concrete to the upper floors. From this state, the distributor DS can supply ready mixed concrete to the desired casting location on the upper floors from the blow-out tube 37 at the end of the boom train BT by laying down the first boom B1 of the boom train BT as shown by the chain line in FIG. 6(E), appropriately bending the booms B1-B4 from each other, and rotating the swivel base 32 (and therefore the boom train BT). This makes it possible to build the floor slab FS4 and walls of the upper floors. By sequentially performing the above-mentioned transfer process as the floor slabs rise, it becomes possible to construct mid-rise and high-rise buildings using the same distributor DS.
[0061] 6(A) to 6(E), in the first embodiment, the folded boom row BT is raised and swung up until it assumes a substantially vertical position, and in this state, the connected portions at the lower ends of the four first cords 51 are respectively connected to the four first mounting portions T1 of the boom support base BS (fixed base 31).Then, the connected portions at the upper ends of the first cords 51 are hooked onto a crane hook 80, and the entire distributor DS in the vertical position is suspended by a crane.
[0062] This is because, when the mast body 21 and the upper base 11 are relatively raised and lowered by the lifting drive device A1, a crane device is used in combination at the same time, thereby further stabilizing the posture of the distributor DS during the lifting drive.
[0063] Incidentally, even when a crane device is used in combination in this way, the special installation and use of the lifting drive device A1 eliminates the need for a large, high-power crane device as in the prior art, thereby achieving cost reduction.
[0064] According to the first embodiment described above, with the lower base 12 supported on the first floor slab FS1 and the upper base 11 supported on the second floor slab FS2, the upper outrigger R1 is moved to the first storage position R1i, and then the upper base 11 is raised relative to the mast body 21 by the lifting drive device A1 to place the upper base 11 at a predetermined position at approximately the same level as the top surface of the third floor slab FS3 having the second through-hole elevator hall FS3h through which the upper base 11 can pass, and then the upper outrigger R1 is moved to the first deployment position R1o. The mast body 21 and the lower base 12 are then driven to rise relative to the upper base 11 by the lifting drive device A1 to place the lower base 12 in a predetermined position at approximately the same level as the top surface of the second floor slab FS2, and then the lower outriggers R2 are moved to the second deployed position R2o to support the lower base 12 on the second floor slab FS2 via the lower outriggers R2.
[0065] This allows the distributor DS to be repositioned so that the support partners of the lower base 12 and upper base 11 are switched from the first and second floor slabs FS1 and FS2 to the upper second and third floor slabs FS2 and FS3, respectively.
[0066] Thus, the reloading process can be performed by using only the lifting drive device A1 interposed between the upper base 11 and the mast body 21, or by using the lifting drive device A1 in combination with a crane, and by using the lifting drive device A1 attached to the distributor DS (i.e., interposed between the mast body 21 and the upper base 11) in this way, the reloading process is simplified compared to the conventional method in which the entire distributor DS is lifted only by an external crane device. Also, even if a crane device is used in combination, the use of the lifting drive device A1 makes a large, high-power crane device unnecessary, thereby reducing costs.
[0067] 7 to 13 show a second embodiment of the present invention.
[0068] In this second embodiment, the base device 10 of the distributor DS comprises an upper base 11 fixed to the vertical middle part of the mast device 20, a plurality of upper outriggers R1 each supported by the upper base 11 and movable between a predetermined storage position R1i and a deployed position R1o projecting outward from the outer periphery of the upper base 11, and a lower base 12 to which lower outriggers R2' are fixed in a deployed state outward. The lower outriggers R2' function as a support part that can be supported by a support body (e.g., floor slabs FS1 to FS3) that is to support the distributor DS, i.e., a support part related to the third and fourth features of the present invention.
[0069] Furthermore, the above-mentioned support part is not limited to the lower outrigger R2' fixed to the lower base 12 as in the second embodiment, but may be any support part provided on the lower base 12 so as to be capable of being supported by at least the supporting body (e.g., floor slabs FS1 to FS3).For example, the lower outrigger R2' may be omitted, and instead, the lower base 12 itself may be enlarged and made larger so that its outer periphery functions as the support part.
[0070] Alternatively, a movable lower outrigger R2 that can move between a deployed position R2o and a stored position R2i, similar to the lower outrigger R2 of the first embodiment, may be used as the support part.In this case, when the lower base 12 is moved onto the upper floor slab FS2 in a separate and independent state from the mast body 21 in the replacement process described below, the lower outrigger R2 can be compactly stored in the stored position R2i as a support part, which has the advantage of simplifying the movement and handling of the lower base 12.
[0071] In the second embodiment, the upper base 11 is basically constructed of a vertically flat rectangular rigid frame similar to that of the upper base 11 of the first embodiment, except that the main parts of the lifting drive device A1 (rack 41, drive gear 42, motor unit 43, slide support frame 23, lifting guide device G, etc.) are not provided between the upper base 11 and the mast main body 21, and a fixed support cylinder 15 that is fitted and fixed to the outer periphery of the mast main body 21 at the vertical intermediate part of the mast device 20 is fixedly installed in the center of the upper base 11. The movable support structure of the upper outrigger R1 in this upper base 11, which can be deployed and stored, is similar to the movable support structure of the upper outrigger R1 in the first embodiment, so a description thereof will be omitted.
[0072] On the other hand, the lower base 12 of the second embodiment is basically configured as a vertically flat rectangular parallelepiped rigid frame similar to the lower base 11 of the first embodiment. However, as described later, in order to enable the lifting drive device A2 to be installed between the lowermost mast body 21 and the lower base 12, the structure of the upper wall 12t and the support cylinder portion 12a differs from that of the first embodiment, and the base of the lower outrigger R2' serving as a support portion is fixed to the side wall 12s of the lower base 12 by an appropriate fixing means (for example, an L-shaped flange 18 fixed to the base is fixed to the side wall 11s by bolting or welding, etc.).
[0073] Furthermore, the distributor DS of the second embodiment includes a coupling device Z that couples the lower base 12 and the lower end of the mast body 21 in a manner that allows them to be attached and detached as required, and a lifting and lowering drive device A2 that can be installed between the lowermost mast body 21 and the lower base 12 and that can drive the mast body 21 to rise and fall relative to the lower base 12. Next, specific examples of the coupling device Z and the lifting and lowering drive device A2 will be described in order.
[0074] As is clear from Fig. 8, the connecting device Z comprises a connecting tube 61 having a rectangular cross section, which is fitted to the outer periphery of the mast body 21 so as to be slidable up and down and removable from below, and a plurality of fasteners 62 which detachably connect the connecting tube 61 to the mast body 21 and the support tube portion 12a when the connecting tube 61 is in a predetermined lower limit position (see Figs. 7 and 8). In this case, the predetermined lower limit position refers to a position in which the connecting tube 61 straddles the lower end of the lowermost mast body 21 and the upper end of the support tube portion 12a fixed to the lower base 12, which protrudes above the upper wall 12t, as is clear from Figs. 7 and 8, and at this time, the lower end of the connecting tube 61 engages with the upper wall 12t of the lower base 12 to restrict the lower limit.
[0075] The above-mentioned fastener 62 has a nut 62n fixed to the inner surfaces of the mast body 21 and the support tube portion 12a, and a bolt 62b that can be screwed into the nut 62n from the outside of the connecting tube 61 through each bolt insertion hole 62h of the connecting tube 61 and the mast body 21 or the support tube portion 12a.
[0076] When the lower end of the lowest mast body 21 and the upper end of the support tube 12a are butted against each other and the connecting tube 61 is in the above-mentioned predetermined lower limit position, the bolt 62b of the fastener 62 is screwed into the nut 62n and tightened, thereby connecting the mast body 21 and the support tube 12a (lower base 12) via the fastener 62. This connected state can be released at any time by loosening and removing the bolt 62b.
[0077] 12, the lifting drive device A2 mainly comprises a hydraulically or pneumatically operated lifting cylinder 50 that can be installed in an upright position between the lowest mast body 21 and the lower base 12, and a telescopic cylinder that can be extended and retracted in multiple stages is used as the lifting cylinder 50. A base member 52 that is rectangular in plan view is fixed to the base end (lower end) of a base cylinder 51 that has the maximum diameter of the lifting cylinder 50. The base member 52 is fitted into a plurality of support recesses 12ta provided on the upper surface of the upper wall 12t of the lower base 12, and is detachably fixed to the upper wall 12t by a plurality of bolts 53 that are screwed into screw holes 12tb provided in the upper wall 12t.
[0078] A tip 55a of a connecting frame 55, which is T-shaped in plan view, is rotatably supported on the tip (upper end) of the piston rod 54, which has the smallest diameter, of the lifting cylinder 50. A base 55b of the connecting frame 55 abuts against the outer walls facing in each of the four directions of the mast main body 21, and is detachably connected to the outer walls by a plurality of fasteners 56. The fasteners 56 have nuts 56n fixed to the inner surface of the outer wall of the mast main body 21, and bolts 56b that can be screwed into the nuts 56n from the outside of the connecting frame 55 through the base 55b of the connecting frame 55 and each bolt insertion hole 56h in the outer wall of the mast main body 21.
[0079] Thus, even when the lower end of the lowermost mast body 21 is connected to the support cylinder part 12 of the lower base 12 via the connecting device Z, the base end of the base cylinder 51 of the lifting cylinder 50 can be detachably connected at any time to the upper wall 12t of the lower base 12 via the pedestal member 52 and the bolt 53, and the tip end of the piston rod 54 with the smallest diameter can be detachably connected at any time to the four outer side walls of the mast body 21 via the connecting frame 55 and the connecting device 56. These connected states are the set states of the lifting drive device A2.
[0080] The lifting drive device A2 is not limited to the above-mentioned structure of the second embodiment (i.e., the lifting cylinder 50 and the mechanism for detachably connecting it between the mast body 21 and the lower base 12), but may be any lifting drive means capable of forcibly driving the lower base 12 to rise relative to the mast body 21. For example, a multi-stage jack device in which a plurality of jack devices are connected in series vertically to ensure a long lifting stroke may be used as the lifting drive device A2.
[0081] The assembly process of the distributor DS in the second embodiment is basically the same as the assembly process of the first embodiment, so the description will be omitted. Next, an example of the reloading process in the second embodiment will be described mainly with reference to FIG. [Refilling process of the second embodiment] 13(A), the work begins with the lower base 12 fixed and supported on the first floor slab FS1 via the lower outriggers R2' as supports, and the upper base 11 fixed and supported on the second floor slab FS2 via the upper outriggers R1 in the deployed position R1o. At this starting point, the lowermost mast body 21 and the lower base 12 are connected via the connecting device Z, and the lifting drive device A2 is not yet installed between the mast body 21 and the lower base 12.
[0082] First, the upstream end of the concrete feed pipe (not shown) supported on the mast body 21 is disconnected from the concrete pressure pipe connected to the concrete pump, and then, as shown in Figure 13(B), the lifting drive device A2 is set between the lowermost mast body 21 and the lower base 12. In this set state, the lifting cylinder 50 is placed in the most contracted state shown in Figures 12 and 13(B), connecting the mast body 21 and the lower base 12.
[0083] In parallel with the setting operation of the lifting drive device A2, or before or after the setting operation, the upper outrigger R1 of the upper base 11 is moved to the storage position Ri, and then the connection by the connecting device Z between the lowermost mast body 21 and the lower base 12 is released. Note that the timing of the operation of moving the upper outrigger R1 of the upper base 11 to the storage position Ri and the operation of releasing the connection by the connecting device Z between the lowermost mast body 21 and the lower base 12 may be performed in the reverse order to that described above (i.e., the latter operation precedes the former operation) or approximately simultaneously.
[0084] Next, as shown in Figure 13 (C), the mast body 21 is raised relative to the lower base 12 by the lifting drive device A2 (i.e., the lifting cylinder 50 is extended) to place the upper base 11 at a predetermined position approximately at the same level as the top surface of the third floor slab FS3, which has a second through hole FS3h through which the upper base 11 can pass, and from that state, the upper outrigger R1 is moved to the first deployed position R1o and placed on and fixed on the third floor slab FS3.
[0085] Thus, the upper base 11 is supported and fixed on the third floor slab FS3 via the upper outrigger R1o. Then, in this state, the lifting cylinder 50 is disconnected from the mast body 21 and the lower base 12 and contracted to remove the lifting drive device A2 from the lower base 12 and the mast body 21, and the connecting tube 61 of the coupling device Z is fitted into the lowermost mast body 21 from its lower end, and this fitted state is temporarily maintained by an appropriate temporary fixing means (for example, a temporary fixing stopper pin, stopper bolt, etc. that is detachably attached to the mast body 21 and can be engaged with the connecting tube 61) not shown.
[0086] Next, as can be seen in Figure 13 (D), the lower base 12 is separated and independent from the mast body 21 and moved onto the second floor slab FS2 on the upper level by a moving means not shown (e.g., a small crane, a small work vehicle equipped with a lifting device, etc.).
[0087] Due to this movement, the lower base 12 is supported on the second floor slab FS2 via the lower outriggers R2' as supports, and in order to maintain this state, the lower outriggers R2' are fixed onto the second floor slab FS2. In parallel with this fixing operation, or before or after, as is clear from Figure 13(E), the lower base 12 and the lowermost mast body 21 are reconnected by the connecting device Z including the connecting tube 61 that has been released from the temporarily fixed state.
[0088] In this way, the lower base 12 of the base device 10 is transferred (re-piled) layer by layer onto the second floor slab FS2, and the upper base 11 is transferred (re-piled) onto the third floor slab FS3. After that, by reconnecting the concrete pressure pipe extending from the concrete pump to the upstream end of the concrete feed pipe on the mast body 21 side, it becomes possible to pressure-feed and supply ready-mixed concrete to the first and second relay pipes 38, 39 and the blow-out tube 37 in sequence.
[0089] Thus, the distributor DS is finished with its work of transferring concrete to the upper floors. From this state, the distributor DS can supply ready mixed concrete to the desired casting location on the upper floors from the blow-out tube 37 at the end of the boom train BT by laying down the first boom B1 of the boom train BT as shown by the chain line in FIG. 13(E), appropriately bending the booms B1-B4 from each other, and rotating the swivel base 32 (and therefore the boom train BT). This makes it possible to build the floor slab FS4 and walls of the upper floors. By sequentially performing the above-mentioned transfer process as the floor slabs rise, it becomes possible to construct mid-rise and high-rise buildings using the same distributor DS.
[0090] 13(A) to 13(E), the folded boom row BT is raised and swung up until it is in a substantially vertical position, and in this state, the connected portions at the lower ends of the four first cords 51 are respectively connected to the four first mounting portions T1 of the boom support base BS (fixed base 31).Then, the connected portions at the upper ends of the first cords 51 are hooked onto a crane hook 80, and the entire distributor DS in the vertical position is suspended by a crane device.
[0091] This is because, by using a crane device in combination with the lifting drive device A2 to lift and lower the mast body 21 relative to the lower base 12, the position of the distributor DS can be further stabilized during lifting. Even when a crane device is used in combination in this way, the special installation and use of the lifting drive device A2 eliminates the need for a large, high-power crane device as in the prior art, thereby reducing costs.
[0092] According to the second embodiment described above, with the lower base 12 supported on the first floor slab FS1 and the upper base 11 supported on the second floor slab FS2, the upper outrigger R1 is moved to the storage position R1i, and the connection between the lower end of the mast body 21 and the lower base 12 by the connection device Z is released. In addition, the lifting and lowering drive device A2 is installed between the mast body 21 and the lower base 12, and the mast body 21 is raised relative to the lower base 12 by the lifting and lowering drive device A2 to a position approximately flush with the top surface of the third floor slab FS3 having the second through hole FS3h through which the upper base 11 can pass. The upper base 11 is placed in a predetermined position, then the outriggers R1 are moved to the deployed position R1o so that the upper base 11 is supported on the third floor slab FS3 via the upper outriggers R1. Furthermore, the lifting drive device A2 is removed from between the mast body 21 and the lower base 12, and the lower base 12 is then moved from the first floor slab FS1 to the second floor slab FS2 in a state separated and independent from the mast body 21, so that the lower base 12 is supported on the second floor slab FS2 via the lower outriggers R' as a support part, and the lower base 12 is connected to the lower end of the mast body 21.
[0093] This allows the distributor DS to be repositioned so that the support partners of the lower base 12 and upper base 11 are switched from the first and second floor slabs FS1 and FS2 to the upper second and third floor slabs FS2 and FS3, respectively.
[0094] Thus, the reloading process can be performed by using only the lifting drive device A2 that can raise and lower the mast body 21 relative to the lower base 12, or by using the lifting drive device A2 in combination with a crane, and by using the lifting drive device A2 attached to the distributor DS (i.e., capable of being installed between the mast body 21 and the lower base 12) in this way, the reloading process is simplified compared to the conventional method in which the entire distributor DS is lifted only by an external crane. Also, even if a crane is used in combination, the use of the lifting drive device A2 eliminates the need for a large, high-power crane device, which contributes to cost reduction.
[0095] In the first embodiment described above, each of the multiple upper and lower outriggers R1, R2 is supported by the upper and lower bases 11, 12 so as to be movable between a deployed position R1o, R2o that projects outward from the upper and lower bases 11, 12, and a stored position R1i, R2i that is closer to the inside than that. However, a distributor DS which differs from the first embodiment only in the mounting structure of the upper and lower outriggers R1, R2 to the upper and lower bases 11, 12 and has the same other configurations as the first embodiment will be described below as a "first reference embodiment". In other words, in the "first reference embodiment," the upper and lower outriggers R1, R2 are removably connected to the upper and lower bases 11, 12 and can be held in the deployed positions R1o, R2o in this connected state. This is the only point that differs from the first embodiment in which the upper and lower outriggers R1, R2 are supported by the upper and lower bases 11, 12 and are movable between the deployed positions R1o, R2o and the stored positions R1i, R2i.
[0096] In the second embodiment described above, each of the multiple upper outriggers R1 is supported on the upper base 11 so as to be movable between the deployed position R1o and the stored position R1i, but a distributor DS which differs from the second embodiment only in the mounting structure of the upper outriggers R1 to the upper base 11 and has the same other configurations as the second embodiment will be described below as a "second reference embodiment." That is, in the "second reference embodiment," the upper outriggers R1 are detachably coupled to the upper base 11 and can be held in the deployed position R1o in this coupled state, and only in this respect does it differ from the second embodiment in which the upper outriggers R1 are supported on the upper base 11 so as to be movable between the deployed position R1o and the stored position R1i.
[0097] Next, a mounting structure of the lower outrigger R2 to the lower base 11 in the first reference embodiment will be described with reference to Figs.
[0098] The lower base 12 of the first reference embodiment is formed of a hollow rigid frame made of a plurality of metal frame plates as in the first embodiment, and the outer edge is formed in a substantially polygonal shape (substantially rectangular, particularly square, in the embodiment) in a plan view. A support cylinder 12a is fixed to the center of the lower base 12, and the support cylinder 12a is similar in structure and form to the first embodiment. The upper end of the support cylinder 12a and the lower end of the lowermost mast body 21 are detachably connected to each other by a connecting means using connecting blocks Bd and Bu similar to those in the first embodiment.
[0099] Each of the lower outriggers R2 is formed into a solid square rod or hollow square tube having a rectangular cross section and closed both ends. The bases Rb of the lower outriggers R2 are inserted removably into the first and second support holes 12h1, 12h2 provided in the lower base 12, and are detachably coupled to each other via coupling devices Z1.
[0100] On the other hand, the outer peripheral wall of the lower base 12 has an outer edge that is rectangular in plan view, and has four outer peripheral corners 12c that are bent into an L shape in plan view, and four straight sides that connect adjacent outer peripheral corners 12c in the circumferential direction, i.e., side walls 12s. An insertion port o1 for the first support hole 12h1 opens in each outer peripheral corner 12c, and an insertion port o2 for the second support hole 12h2 opens in the center of each side wall 12s.
[0101] In order to provide the above-mentioned first and second support holes 12h1, 12h2 in the lower base 12, a plurality of mounting holes 121, 122 that open at positions where the insertion ports o1, o2 are to be provided are formed in the outer peripheral corners 12c and side wall 12s of the lower base 12, and the opening ends of bottomed cylindrical first and second support hole forming walls 61, 62, whose inner surfaces become the first and second support holes 12h1, 12h2, are fixed (for example, welded) to the periphery of the mounting holes 121, 122. The first and second support hole forming walls 61, 62 are also fixed (for example, welded) to the bottom wall 12b of the lower base 12 as necessary.
[0102] Then, by fixing the first and second support hole forming walls 61, 62 to the lower base 12, the first and second support holes 12h1, 12h2 are formed in the lower base 12, respectively.
[0103] The sizes of the multiple lower outriggers R2 and the multiple first and second support holes 12h1, 12h2 are set to the same size so that any lower outrigger R2 can be inserted into or removed from any of the support holes 12h1, 12h2.
[0104] Thus, by inserting the base portions Rb of each lower outrigger R2 into the first and second support holes 12h1, 12h2 and placing the coupling device Z1 in the coupled state, the lower outrigger R2 can be held in the deployed position Ro in which the tip portions Ra extend far outward beyond the outer periphery of the lower base 12. Furthermore, when the lower outrigger R2 is not in use, the lower outrigger R2 can be separated and made separate from the lower base 12 by switching the coupling device Z1 to the uncoupled state and removing the base portions Rb from the first and second support holes 12h1, 12h2.
[0105] When removing or attaching the lower outrigger R2 to the lower base 12 described above, the work of inserting and removing the base Rb into the first and second support holes 12h1, 12h2 can be performed manually, for example, by an operator holding the lower outrigger R2 in his or her hand, and the operation of attaching and detaching the connecting device Z1 between the lower base 12 and the lower outrigger R2 can also be performed manually, for example, by removing and retightening the bolt b1.
[0106] Therefore, in this separated state, the lower outriggers R2 can be stored or transported separately from the lower base 12, which is convenient, and even if the lower outriggers R2 are made long and large, there is no need to worry about the lower outriggers R2 interfering with other objects when the distributor DS is loaded onto a vehicle or moved around the construction site (for example, during reloading work), making work easier.
[0107] In addition, the connecting device Z1 of the first reference embodiment is composed of, for example, at least one bolt b1 that penetrates from above through the upper wall 12t of the lower base 12 and the lower outrigger R2 in the deployed position Ro and is screwed into the bottom wall 12b of the lower base 12, and a threaded bolt hole 12bg provided in the bottom wall 12b.
[0108] The structure of the coupling device Z1 is not limited to that of the first reference embodiment, and may be any structure that can detachably couple at least the base Rb of the lower outrigger R2 to the lower base 12. For example, the coupling device Z1 may have a locking pin that penetrates the upper wall 12t and the bottom wall 12b of the lower base 12 and the base Rb of the lower outrigger R2 in the deployed position Ro from above in a skewer-like manner to lock the base Rb to the lower base 12 so as not to be detached, and a locking means for the locking pin (for example, a locking pin such as a split pin).
[0109] Incidentally, although illustrations and explanations are omitted, the detachable mounting structure of the upper outrigger R1 to the upper base 11 in the first reference embodiment is similar to the detachable mounting structure of the lower outrigger R2 to the lower base 12 in the first reference embodiment. However, since the lifting drive device A1 (motor unit 43, drive gear 42, etc.) is housed in the upper base 11 in the first reference embodiment, the first and second support hole forming walls 61, 62 (first and second support holes 12h1, 12h2) are installed in the upper base 11 at positions that can avoid interference with the lifting drive device A1.
[0110] In addition, although illustrations and explanations are omitted, the detachable mounting structure of the upper outrigger R1 to the upper base 11 in the second reference embodiment is similar to the detachable mounting structure of the lower outrigger R2 to the lower base 12 described above in the first reference embodiment.
[0111] According to the first and second reference embodiments described above, the upper and lower outriggers R1, R2 can be coupled to and held in deployed positions R1o, R2o protruding from the upper and lower bases 11, 12 by the coupling device Z1 with their bases Rb inserted into the respective support holes 11h1, 11h2. When not in use, the upper and lower outriggers R1, R2 can be separated from the upper and lower bases 11, 12 by releasing the coupled state of the coupling device Z1 (i.e., removing the bolt B1) and removing the bases Rb from the respective support holes 11h1, 11h2, and can be handled as separate parts. For example, the upper and lower outriggers R1, R2 can be stored and transported separately from the upper and lower bases 11, 12.
[0112] Thus, even if the upper and lower outriggers R1, R2 are made long and large, there is no need to worry about the upper and lower outriggers R1, R2 interfering with other objects when the distributor DS is loaded onto a vehicle or moved around the construction site (for example, during reloading work), making work extremely easy. Also, by being able to reasonably make the upper and lower outriggers R1, R2 long while avoiding interference with other objects in this way, the support span of the upper and lower outriggers R1, R2 with respect to the upper and lower bases 11, 12 can be secured long, and the support can be stabilized.
[0113] Furthermore, even if the weight of the upper and lower outriggers R1, R2 is increased by lengthening them, the increase in weight of the base device 10 is suppressed when the outriggers are detached from the upper and lower bases 11, 12 and separated, so weight constraints when the distributor DS is loaded onto a vehicle or moved around a construction site are also reduced.
[0114] In the first and second reference embodiments, the insertion openings o1, o2 of the first and second support holes 11h1, 11h2 open at each of the outer circumferential corners of the upper and lower bases 11, 12 and at each of the sidewalls connecting the outer circumferential corners adjacent to each other in the circumferential direction. This allows the number of support holes 11h1, 11h2 in the upper and lower bases 11, 12 and the opening directions to be set in a variety of ways by utilizing the planar shape (polygonal shape) of the base main body 11, so that a plurality of outriggers R1, R2 required for stable support of the upper and lower bases 11, 12 can be appropriately selected according to the work environment of the construction site (e.g., the shape and size of the elevator halls FS1h to FS3h, the weight balance of the distributor DS, etc.), and the selected outriggers R1, R2 can be extended from the outer periphery of the upper and lower bases 11, 12 in the optimal position and direction for stable support.
[0115] As described above, the distributor DS of the first reference embodiment differs from the distributor DS of the first embodiment only in the mounting structure of the upper and lower outriggers R1, R2 to the upper and lower bases 11, 12, and the transfer process also has basically the same process procedure, except that the upper and lower outriggers R1, R2 are moved between the deployed positions R1o, R2o and the stored positions R1i, R2i (first embodiment) or are detached (first reference embodiment).
[0116] That is, the technical features of the distributor DS and its redistribution method of the first reference embodiment are similar to the first and second features of the present invention corresponding to the first embodiment, respectively, and are configured as follows.
[0117] [Distributor of the First Reference Embodiment] "A concrete supply distributor including a base device (10), a mast device (20) having a main frame of a mast body (21) supported by the base device (10) and extending in the vertical direction, and a boom device (30) mounted on the mast device (20), a distributor comprising: an upper base (11) supported on the outer periphery of the mast body (21) so as to be slidable in the vertical direction; a plurality of upper outriggers (R1) each detachably coupled to the upper base (11) and capable of being held in a first deployed position (R1o) projecting outward from the upper base (11) by the coupling; an elevation drive device (A1) interposed between a predetermined first storage position (R1i) and the upper base (11) and the mast body (21) and capable of driving one of the upper base (11) and the mast body (21) to elevate and lower relative to the other; a lower base (12) fixed to the lower end of the mast body (21); and a plurality of lower outriggers (R2) each detachably coupled to the lower base (12) and capable of being held in a second deployed position (R2o) projecting outward from the lower base (12) by the coupling. [Method of replacing distributor of first reference embodiment] "A method for changing a concrete supply distributor, the method comprising: lifting a concrete supply distributor so that a supporting partner of the lower base (12) is changed from a first floor slab (FS1) to a second floor slab (FS2) that has a first through hole (FS2h) through which the lower base (12) can pass and is present above the first floor slab (FS1), a step of removing the upper outrigger (R1) from the upper base (11) while the lower base (12) is supported on the first floor slab (FS1) via the lower outrigger (R2) at the second deployment position (R2o) and the upper base (11) is supported on the second floor slab (FS2) via the upper outrigger (R1) at the first deployment position (R1o); Next, a step of driving the upper base (11) upwardly relative to the mast body (21) by the lifting drive device (A1) to place the upper base (11) at a predetermined position at approximately the same level as an upper surface of a third floor slab (FS3) having a second through hole (FS3h) through which the upper base (11) can pass; Next, a process of holding the upper outrigger (R1) in the first deployed position (R1o) by reconnecting the upper outrigger (R1) to the upper base (11) and supporting the upper base (11) on the third floor slab (FS3) via the upper outrigger (R1o); a step of removing the lower outrigger (R2) from the lower base (12), and then raising the mast body (21) and the lower base (12) relative to the upper base (11) by the lifting drive device (A1) to place the lower base (12) at a predetermined position at approximately the same level as the upper surface of the second floor slab (FS2); and thereafter, reconnecting the lower outriggers (R2) to the lower base (12) to hold them in the second deployed position (R2o), and supporting the lower base (11) on the second floor slab (FS2) via the lower outriggers (R2). Thus, according to the first reference embodiment, it is possible to achieve effects equivalent to those of the invention according to the first and second features of the present invention corresponding to the first embodiment.
[0118] As described above, the distributor DS of the second reference embodiment differs from the distributor DS of the second embodiment only in the mounting structure of the upper outrigger R1 to the upper base 11, and even in the transfer process, the process procedure is basically the same, except that the upper outrigger R1 is moved between the deployed position R1o and the stored position R1i (second embodiment) or is detached (second reference embodiment).
[0119] That is, the technical features of the distributor DS and its redistribution method of the second reference embodiment are similar to the third and fourth features of the present invention corresponding to the second embodiment, respectively, and are configured as follows.
[0120] [Distributor of the Second Reference Embodiment] "A concrete supply distributor including a base device (10), a mast device (20) having a main frame of a mast body (21) supported by the base device (10) and extending in the vertical direction, and a boom device (30) mounted on the mast device (20), a distributor comprising: an upper base (11) fixed to the mast body (21); a plurality of outriggers (R1) each detachably coupled to the upper base (11) and capable of being held in a deployed position (R1o) projecting outward from the upper base (11) by the coupling; a lower base (12) having a support portion (R2') capable of being supported on supports (FS1 to FS3); a coupling device (Z) for detachably coupling the lower base (12) to a lower end portion of the mast body (21); and a lifting drive device (A2) that can be installed between the mast body (21) and the lower base (12) and that can lift and lower the mast body (21) relative to the lower base (12) when the coupling by the coupling device (Z) is released. [Method of replacing distributor of second reference embodiment] "A method for changing a distributor for supplying concrete, the method comprising: lifting the distributor so that the support of the lower base (12) is switched from a first floor slab (FS1) to a second floor slab (FS2) located above the first floor slab (FS1), a step of removing the outriggers (R1) from the upper base (11) and releasing the connection between the lower end of the mast body (21) and the lower base (12) by the connecting device (Z) from a state in which the lower base (12) is supported on the first floor slab (FS1) via the support parts (R2') and the upper base (11) is supported on the second floor slab (FS2) via the outriggers (R1) in the deployed position (R1o); a step of driving the mast body (21) upward relative to the lower base (12) by the lifting drive device (A2) installed between the mast body (21) and the lower base (12) to place the upper base (11) at a predetermined position at approximately the same level as an upper surface of a third floor slab (FS3) having a through hole (FS3h) through which the upper base (11) can pass; Next, a process of holding the outrigger (R1) in the deployed position (R1o) by reconnecting the outrigger (R1) to the upper base (11) and supporting the upper base (11) on the third floor slab (FS3) via the outrigger (R1); and after removing the lifting drive device (A2) from between the mast body (21) and the lower base (12), moving the lower base (12) from the first floor slab (FS1) onto the second floor slab (FS2) in a state where the lower base (12) is separated and independent from the mast body (21), supporting the lower base (11) on the second floor slab (FS2) via the support part (R2'), and reconnecting the lower base (11) to the lower end of the mast body (21) with the connecting device (Z). Thus, according to the second reference embodiment, it is possible to achieve effects equivalent to those of the invention according to the third and fourth features of the present invention corresponding to the second embodiment.
[0121] Although the embodiment of the present invention has been described above, the present invention is not limited to the embodiment, and various embodiments can be implemented within the scope of the present invention.
[0122] For example, in the first embodiment, when the mast main body 21 and the upper base 11 are raised and lowered relative to each other by the lifting drive device A1, a crane device capable of lifting the distributor DS is used in combination to further stabilize the posture of the distributor DS. However, in cases where the usage situation and environment are such that the posture of the distributor DS can be stabilized without using the crane device, the use of the crane device may be omitted, and the mast main body 21 and the upper base 11 may be raised and lowered relative to each other by using the lifting drive device A1 alone.
[0123] In the second embodiment, when the mast body 21 is forcibly raised relative to the lower base 12 by the lifting drive device A2, a crane device capable of lifting the distributor DS is used in combination at the same time to further stabilize the posture of the distributor DS. However, in the case of a usage situation or environment in which the posture of the distributor DS can be stabilized without using a crane device, the use of the crane device may be omitted, and the mast body 21 may be raised relative to the lower base 12 by using only the lifting drive device A2.
[0124] In the first and second embodiments, the upper and lower outriggers R1, R2 are sized to be entirely accommodated within the upper and lower bases 11, 12 at the first and second storage positions R1i, R2i, but the upper and lower outriggers R1, R2 may be sized to be mostly accommodated within the upper and lower bases 11, 12 at the first and second storage positions R1i, R2i (i.e., part of the outriggers protrude outward from the upper and lower bases 11, 12). However, the amount of protrusion is set to a small amount so that the upper and lower outriggers R1, R2 at the first and second storage positions R1i, R2i do not interfere with other objects (for example, the opening edges of the elevator halls FS1h-FS3h of the floor slabs FS1-FS3) when the distributor DS is reloaded.
[0125] In addition, in the first and second embodiments, the size of the upper and lower bases 11, 12 of the distributor DS is formed smaller than the size of the elevator halls FS1h to FS3h in each floor slab FS1 to FS3 where the distributor DS is rearranged, so that the elevator halls FS1h to FS3h can be used for rearrangement. However, if the elevator halls FS1h to FS3h are not used for rearrangement (for example, if each floor slab FS1 to FS3 has a through hole larger than the size of the elevator halls FS1h to FS3h), the size of the upper and lower bases 11, 12 may be formed larger than the elevator halls FS1h to FS3h.
[0126] In addition, in the first and second embodiments, the outriggers R1, R2, R2' in the deployed position Ro are fixed to the floor slabs FS1 to FS3 using conventionally known fixing means (e.g., U-bolts, anchor bolts, etc.), but in an operating environment in which the distributor DS can be maintained in a stable position without specially fixing the outriggers R1, R2, R2' to the floor slabs FS1 to FS3, this fixation may be omitted.
[0127] In the first and second embodiments, the upper and lower outriggers R1, R2 are supported by the upper and lower bases 11, 12 so as to be rotatable about a vertical axis between the first and second storage positions R1i, R2i and the first and second deployment positions R1o, R2o, but the upper and lower outriggers R1, R2 may be supported by the upper and lower bases 11, 12 so as to be rotatable about a horizontal axis between the first and second storage positions R1i, R2i and the first and second deployment positions R1o, R2o. Alternatively, the upper and lower outriggers R1, R2 may be supported by the upper and lower bases 11, 12 so as to be slidable between the first and second storage positions R1i, R2i and the first and second deployment positions R1o, R2o.
[0128] In the first and second embodiments, the mast device 20 is formed by two mast bodies 21 connected to each other in a columnar shape, and the boom device 30 is mounted on the base device 10 via the mast device 20. However, depending on the work conditions at the site, the length of the mast body 21, and the work conditions at the site, the mast device 20 may be formed by one mast body 21, or the mast device 20 may be formed by connecting three or more mast bodies 21 in a vertical row.
[0129] In the first and second embodiments, the connecting blocks Bd, Bu are fixed to the outer peripheries of the adjacent ends of the adjacent mast bodies 21 at intervals in the circumferential direction, are vertically adjacent to each other, face each other and abut against each other in the vertical direction, and the abutting surfaces are connected to each other by a connecting means such as a bolt, but the connecting means may be other than bolts (for example, welding, caulking, pinning, etc.). Also, the connecting blocks Bd, Bu may be adjacent to each other in the circumferential direction of the mast body 21, face each other and abut against each other in the circumferential direction, and the abutting surfaces may be connected to each other by a connecting means such as a bolt, and in this case, the bolts or fixing pins that connect the abutting surfaces to each other are oriented horizontally (i.e., facing in the circumferential direction).
[0130] In addition, in the first and second embodiments, the boom train BT of the boom device 30 is shown as being composed of first to fourth booms B1 to B4 arranged in series and capable of bending and swinging relative to each other, but the boom train BT only needs to connect at least two booms and is not limited to the number of booms in the embodiments.
[0131] In the first and second embodiments, in carrying out the "reloading process" of the distributor DS, the boom device 30 in the vertical position is hoisted by a crane via the first rope 51 as shown in Fig. 6 and Fig. 13. However, even if the boom device 30 is hoisted by a crane via the first rope 51 or a second rope (not shown) while in a horizontal position, the reloading work may be carried out with the boom device 30 in the horizontal position, provided that the boom device 30 does not interfere with an already constructed structure (e.g., a floor slab on the upper layer, etc.).
[0132] In the reference embodiment, the work of inserting and removing the bases Rb of the outriggers R1, R2 into and from the support holes 12h1, 12h2 is performed solely manually by on-site workers; however, if necessary, the insertion and removal work may be assisted by an auxiliary means (e.g., a mobile small crane) or a small vehicle (e.g., a forklift, etc.).
[0133] In the reference embodiment, the cross-sectional shape of the outriggers R1, R2 is rectangular, but the cross-sectional shape of the outriggers R1, R2 is not limited to that of the first and second embodiments, and may be, for example, a triangular cross-sectional shape, a polygonal shape having pentagons or more sides, or a circular cross-sectional shape. The outriggers R1, R2 may be a solid columnar shape or a hollow cylindrical shape.
[0134] In the reference embodiment, one support hole 12h2 is provided at the same height in each of the side wall portions 11s, 12s of the upper and lower bases 11, 12. However, depending on the size of the side wall portion 12s and the outriggers R1, R2, multiple support holes 12h2 at the same height may be provided in each of the side wall portions 11s, 12s, or multiple support holes 12h2 at different heights may be provided.
[0135] In the reference embodiment, support holes 12h1, 12h2 are provided in both the outer peripheral corners 12c and the side wall portions 12s of the outer periphery of the upper and lower bases 11, 12. However, support holes may be provided only in either the outer peripheral corners 12c or the side wall portions 12s (for example, only in the outer peripheral corners 12c or only in the side wall portions 12s). [Explanation of symbols]
[0136] A1, A2: Lifting drive unit DS...Distributor FS1~FS3: 1st~3rd floor slabs as supports FS2h: First through hole (first embodiment) FS3h: second through hole (first embodiment), through hole (second embodiment) R1: Upper outrigger (first embodiment), upper outrigger as outrigger (second embodiment) R1i: first storage position (first embodiment), storage position (second embodiment) R1o: First deployed position (first embodiment), deployed position (second embodiment) R2: Lower outrigger (first embodiment) R2i: Second storage position (first embodiment) R2o: Second deployment position (first embodiment) R2': Lower outrigger as a support part (second embodiment) Z...Coupling device 10. Base device 11...Upper base 12 Lower base 21 Mast body 30. Boom device
Claims
1. A concrete supply distributor includes a base device (10), a mast device (20) having a main frame formed of a mast body (21) supported by the base device (10) and extending in the vertical direction, and a boom device (30) mounted on the mast device (20), a first storage position (R1i) and a first deployed position (R1o) extending outward from the outer periphery of the upper base (11); a lifting drive device (A1) interposed between the upper base (11) and the mast body (21) and capable of driving one of the upper base (11) and the mast body (21) to lift and lower relatively to the other; a lower base (12) fixed to the lower end of the mast body (21); and a plurality of lower outriggers (R2) supported by the lower base (12) and movable between a predetermined second storage position (R2i) and a second deployed position (R2o) extending outward from the outer periphery of the lower base (12).
2. A method for changing a concrete supply distributor according to claim 1, comprising lifting the lower base (12) so that a supporting partner of the lower base (12) is changed from a first floor slab (FS1) to a second floor slab (FS2) that has a first through hole (FS2h) through which the lower base (12) can pass and is located above the first floor slab (FS1), a step of moving the upper outrigger (R1) to the first storage position (R1i) from a state in which the lower base (12) is supported on the first floor slab (FS1) via the lower outrigger (R2) at the second deployment position (R2o) and the upper base (11) is supported on the second floor slab (FS2) via the upper outrigger (R1) at the first deployment position (R1o); Next, a step of driving the upper base (11) upward relative to the mast body (21) by the lifting drive device (A1) to place the upper base (11) at a predetermined position at approximately the same level as an upper surface of a third floor slab (FS3) having a second through hole (FS3h) through which the upper base (11) can pass; Next, a step of moving the upper outrigger (R1) to the first deployment position (R1o) and supporting the upper base (11) on the third floor slab (FS3) via the upper outrigger (R1o); a step of moving the lower outrigger (R2) to the second storage position (R2i), and then driving the mast body (21) and the lower base (12) upward relative to the upper base (11) by the lifting drive device (A1) to place the lower base (12) at a predetermined position at approximately the same level as the upper surface of the second floor slab (FS2); Thereafter, the lower outrigger (R2) is moved to the second deployment position (R2o) to support the lower base (11) on the second floor slab (FS2) via the lower outrigger (R2). A method for replacing a distributor for supplying concrete, comprising:
3. A concrete supply distributor includes a base device (10), a mast device (20) having a main frame formed of a mast body (21) supported by the base device (10) and extending in the vertical direction, and a boom device (30) mounted on the mast device (20), a lower base (12) having a support portion (R2') that can be supported on supports (FS1 to FS3); a connecting device (Z) that detachably connects the lower base (12) to the lower end of the mast body (21); and a lifting drive device (A2) that can be installed between the mast body (21) and the lower base (12) and that can drive the mast body (21) to lift and lower relative to the lower base (12) when the connection is released.
4. A method for changing a concrete supply distributor according to claim 3, comprising lifting the lower base (12) so that a supporting partner of the lower base (12) is switched from a first floor slab (FS1) to a second floor slab (FS2) located above the first floor slab (FS1), a step of moving the outriggers (R1) to the stored position (R1i) from a state in which the lower base (12) is supported on the first floor slab (FS1) via the support parts (R2') and the upper base (11) is supported on the second floor slab (FS2) via the outriggers (R1) in the deployed position (R1o), and releasing the connection between the lower end of the mast body (21) and the lower base (12) by the connection device (Z); a step of driving the mast body (21) upwardly relative to the lower base (12) by the lifting drive device (A2) installed between the mast body (21) and the lower base (12) to place the upper base (11) at a predetermined position at approximately the same level as the top surface of a third floor slab (FS3) having a through hole (FS3h) through which the upper base (11) can pass; Next, a process of moving the outrigger (R1) to the deployed position (R1o) and supporting the upper base (11) on the third floor slab (FS3) via the outrigger (R1); a step of removing the lifting drive device (A2) from between the mast body (21) and the lower base (12), and then moving the lower base (12) from the first floor slab (FS1) to the second floor slab (FS2) while the lower base (12) is separated and independent from the mast body (21), supporting the lower base (11) on the second floor slab (FS2) via the support part (R2'), and reconnecting the lower base (11) to the lower end of the mast body (21) with the connecting device (Z); A method for replacing a distributor for supplying concrete, comprising: