Construction machine alarm system

The construction machine alarm system uses Bluetooth and UWB communication to detect worker proximity, ensuring safety and workability by outputting tailored alarms based on movement direction, addressing the trade-off between safety and efficiency in existing systems.

JP2024148556AActive Publication Date: 2024-10-18HIATACHI POWER SOLUTIONS CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023061771
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-05
Publication Date
2024-10-18
Estimated Expiration
2043-04-05

AI Technical Summary

Technical Problem

Existing construction machine alarm systems either prioritize safety by narrowing the alarm area, impairing workability, or widen the area to maintain efficiency, compromising safety.

Method used

A construction machine alarm system that outputs alarms based on the worker's proximity in the direction of the machine's movement, using a base unit and slave unit with Bluetooth and UWB communication to detect the worker's location in different management areas, ensuring safety while allowing work continuity.

Benefits of technology

Ensures worker safety without reducing work efficiency by providing distinct alarms for different proximity levels, allowing operators to adjust operations accordingly.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024148556000001_ABST
    Figure 2024148556000001_ABST
Patent Text Reader

Abstract

To provide a construction machine alarm system to secure safety of an operator while maximally considering workability.SOLUTION: A construction machine alarm system of the invention outputs an alarm signal according to the presence of an operator in a traveling direction of a construction machine 1. The construction machine alarm system comprises: a slave unit 4 attached to an operator 6; a master unit 2 that is attached to the construction machine and manages a presence position of the slave unit; and a master unit antenna 3 that is attached to the construction machine and connected to the master unit and detects the presence position of the slave unit in at least one of a forward direction and a backward direction of the construction machine. The master unit determines whether the slave unit is present in a first management area spaced apart from the master unit antenna by a prescribed distance or a second management area closer to the master unit antenna than the first management area based on the presence position of the slave unit, and outputs an alarm.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a construction machine alarm system. [Background technology]

[0002] At construction sites, collision accidents between construction machinery and workers can occur. The cause of these accidents is that the operator of the construction machinery neglects his / her duty of care, or the worker is carelessly within the working radius of the construction machinery. For this reason, various alarm systems have been devised to prevent collision accidents between construction machinery and workers.

[0003] For example, Patent Document 1 discloses an alarm device in which an infrared transmitter is attached to a worker and an infrared receiver is attached to construction machinery, and an alarm is issued if the worker is present in an alarm area away from the construction machinery. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2002-212981 A Summary of the Invention [Problem to be solved by the invention]

[0005] According to the warning device of Patent Document 1, it is possible to issue a warning when a worker is in the warning area, and the safety of the worker can be ensured. However, since the warning area is set to only one level, the setting range of the warning area affects safety and workability.

[0006] In the alarm device of Patent Document 1, if the alarm area is narrowed to prioritize workability, the alarm will not be sounded unless the worker is very close to the construction machinery, compromising safety, and if the alarm area is widened to prioritize safety, the alarm will be sounded at a location far away from the construction machinery, compromising workability.

[0007] An object of the present invention is to ensure the safety of workers while giving maximum consideration to workability. [Means for solving the problem]

[0008] In order to solve the above problems, the construction machinery warning system of the present invention is a construction machinery warning system that outputs a warning signal in response to the presence of a worker in the direction of travel of the construction machine, and comprises a sub-unit worn by the worker, a parent unit that is mounted on the construction machine and manages the location of the sub-unit, and a parent unit antenna that is mounted on the construction machine and connected to the parent unit and detects the location of the sub-unit in at least one of the forward and reverse directions of the construction machine, and is characterized in that the parent unit determines whether the sub-unit is present in a first management area that is a predetermined distance away from the parent unit antenna, or a second management area that is closer to the parent unit antenna than the first management area, based on the location of the sub-unit, and outputs a warning. Effect of the Invention

[0009] According to the present invention, construction machinery can be operated while taking operability into maximum consideration and ensuring the safety of the worker. [Brief description of the drawings]

[0010] [Figure 1] 1 is a schematic diagram showing an overview of a construction machine alarm system according to a first embodiment. [Diagram 2] FIG. 2 is a diagram showing an example of the configuration of a master unit compatible with a smart tag. [Diagram 3] FIG. 11 is a diagram illustrating a change of the second management area according to driving information. [Figure 4] FIG. 4 is a flow chart illustrating the operation of the construction machine alarm system. [Diagram 5] FIG. 2 is a diagram illustrating an example of the configuration of a storage unit of a parent device. [Figure 6] FIG. 4 is a diagram showing an example of a display on a display unit of a parent unit. [Figure 7] FIG. 11 is a schematic diagram showing an overview of a construction machine alarm system according to a second embodiment. [Figure 8] FIG. 11 is a diagram for explaining a management area according to the second embodiment. [Figure 9] FIG. 11 is a diagram illustrating a change of the second management area according to driving information in the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] Below, we will explain in detail the construction machinery alarm system, which is an embodiment of the present invention, in which a first management area and a second management area are set in a specified range in both the forward and reverse directions of the construction machinery, or in a specified range that includes the operating area of ​​an attachment (working device) such as a bucket of the construction machinery, and a first alarm signal is output when a worker is present in the first management area, and a second alarm signal is output when a worker is present in the second management area.

[0012] When the construction machinery warning system of the embodiment outputs a first warning signal, the operator of the construction machinery knows that a worker is approaching the construction machinery, but because the worker is not close enough to come into contact with the construction machinery, the operator does not stop the work but continues the work with caution. Furthermore, when a second warning signal is output, the operator of the construction machinery knows that the worker has come dangerously close to the construction machinery, and stops the construction machinery.

[0013] The construction machinery alarm system of the embodiment allows the operator of the construction machinery to ensure the safety of the worker without reducing workability. EXAMPLES

[0014] FIG. 1 is a schematic diagram showing an overview of a construction machine alarm system according to an embodiment that ensures the safety of an operator when a construction machine 1 is moving forward and backward.

[0015] The construction machinery alarm system of this embodiment is composed of a parent unit 2 installed on a construction machinery 1, a parent unit antenna (parent unit antenna front side 3f and parent unit antenna rear side 3r) connected to the parent unit 2, at least one child unit 4 carried by a worker 6, and a child unit antenna 5 connected to the child unit 4.

[0016] The master unit antenna and the slave unit antenna 5 may be configured separately from the master unit 2 and the slave unit 4, respectively, or may be configured to be built-in.

[0017] In order to detect the positional relationship between the worker 6 and the construction machine 1, the master unit 2 locates the position of the slave unit 4 carried by the worker using the master unit antenna and the slave unit antenna 5 of the slave unit 4. At this time, in the construction machinery alarm system, the slave unit 4 located in front of the construction machinery 1 is located using the front side of the master unit antenna 3f, and the slave unit 4 located behind the construction machinery 1 is located using the rear side of the master unit antenna 3r.

[0018] The construction machinery alarm system sets a first management area (first management area front side 7f and first management area rear side 7r) and a second management area (second management area front side 8f and second management area rear side 8r) inside the first management area (closer to the parent unit antenna) based on the parent unit antenna (parent unit antenna front side 3f and parent unit antenna rear side 3r).

[0019] Then, the positioned slave unit 4 determines whether it is located in the first management area or the second management area, and outputs an alarm if the worker 6 is present in the first management area or the second management area.

[0020] The second control area is an area where the worker 6 is too close to the construction machine 1 to work, and a warning to suspend work is output as it is a dangerous area where there is a possibility of contact due to the movement of the construction machine 1. The first control area is located outside the second control area, and is an area where the worker can continue working, but where a warning or monitoring alarm is output.

[0021] In FIG. 1, the first control area is a semicircular area, but it may be a rectangular area like the second control area in accordance with the forward and backward movement of the construction machine.

[0022] In addition, the construction machinery alarm system may set alarm areas (alarm area front 9f and alarm area rear 9r) based on the parent unit antenna (parent unit antenna front 3f and parent unit antenna rear 3r) to determine whether the child unit 4 is located in the first management area or the second management area, monitor the location of the worker, and output an alarm depending on the management area in which it is located.

[0023] That is, when the slave unit 4 is present in the warning area, processing is performed to output a warning. The alarm area has the same shape as the first management area or a shape that includes the first management area.

[0024] In Fig. 1, the parent unit antenna is composed of the parent unit antenna front side 3f and the parent unit antenna rear side 3r, and the parent unit is positioned, but this is due to the antenna directivity of the parent unit antenna, and an antenna is provided in each direction. Instead of this configuration, an omnidirectional antenna may be used, the antenna direction may be switched between front and rear, or a directional antenna may be rotated.

[0025] Specifically, the child device 4 and the child device antenna 5 are smart tags that support the Bluetooth (registered trademark) short-range wireless communication standard and UWB (Ultra Wide Band: ultra-wideband wireless communication standard), and are configured to include the child device antenna 5. This child device 4 (smart tag) is determined to be in proximity by the parent device 2 using Bluetooth (first communication) and is positioned using UWB (second communication).

[0026] FIG. 2 is a diagram showing an example of the configuration of the master unit 2 compatible with a smart tag. The front side 3f of the parent unit antenna and the rear side 3r of the parent unit antenna are equipped with a Bluetooth antenna 32 and UWB antennas 31, 33 arranged at a predetermined distance apart, and the parent unit 2 locates the position of the smart tag relative to the parent unit antenna based on the spacing between the UWB antennas 31, 33 and the distance from each of the UWB antennas 31, 33 to the smart tag.

[0027] In detail, the smart tag has two UWB antennas, receives radio waves transmitted from the UWB antenna 31 or 33, and calculates the angle and distance by TWR (Two Way Ranging) based on AoA (Angle of Arrival) and ToF (Time of Flight).Then, the calculated angle and distance are notified to the parent unit 2 by Bluetooth communication.

[0028] The angle and distance calculation function of the smart tag is enabled by Bluetooth communication or UWB communication and is set to stop after a predetermined period of operation, thereby reducing power consumption due to UWB communication.

[0029] The master unit 2 comprises a UWB transceiver unit 21 , a Bluetooth transceiver unit 22 , a Bluetooth pairing unit 23 , a communication control unit 24 , a UWB positioning unit 25 , an alarm processing unit 26 , a memory unit 27 , a display unit 28 and an operating information acquisition unit 29 .

[0030] The UWB transceiver 21 performs UWB communication with the smart tag via UWB antennas 31 and 33 . The Bluetooth transceiver 22 performs Bluetooth communication with the smart tag via a Bluetooth antenna 32 .

[0031] The BT pairing unit 23 is a processing unit that performs initial settings so that the smart tag and the parent unit 2 can communicate with each other via Bluetooth, and performs registration of mutual identifiers and exchange and storage of encryption keys for communication. Identification information of the paired smart tag (child unit 4) is stored in a storage unit 27, which will be described later.

[0032] The communication control unit 24 controls Bluetooth communication with the smart tag, notifies the UWB positioning unit 25 described later of the connection / disconnection of the smart tag, and controls the start / end of positioning by instructing the smart tag to enable / disable UWB communication.

[0033] In detail, the communication control unit 24 receives an advertising packet periodically sent by the smart tag via the BT transceiver unit 22, and if the identifier included in the advertising packet is an identifier stored in the memory unit 27 described later, it determines that the smart tag is a previously paired smart tag, and sends a connection request to the smart tag via the BT transceiver unit 22 to connect the Bluetooth communication (first wireless communication) between the smart tag and the parent unit 2.

[0034] At this time, the reception range of the advertising packet is the warning area (the front side 9f of the warning area and the rear side 9r of the warning area), and the communication control unit 24 determines that the smart tag is present in the warning area when Bluetooth communication with the smart tag is in a connected state.

[0035] The UWB positioning unit 25 is a control unit that performs positioning of the smart tag by controlling the UWB transceiver unit 21. When the UWB positioning unit 25 is notified of the connection of the smart tag from the communication control unit 24, it enables the UWB communication of the smart tag in order to perform positioning of the smart tag, and causes the UWB transceiver unit 21 to emit UWB radio waves from the UWB antennas 31 and 33, while notifying the smart tag via the communication control unit 24 to calculate the angle of arrival of the UWB radio waves and measure the distance based on the propagation time of the UWB radio waves.

[0036] Then, the UWB positioning unit 25 calculates the position of the smart tag relative to the parent antenna as the base point, based on the angle and distance information acquired from the smart tag by the communication control unit 24. The UWB positioning unit 25 periodically performs positioning of the smart tag, and when notified by the communication control unit 24 of disconnection of Bluetooth communication of the smart tag, disables the UWB communication of the smart tag and stops positioning of the smart tag.

[0037] When the smart tag (child unit 4) worn by the worker 6 is present in the alarm area (front side 9f of the alarm area and rear side 9b of the alarm area), the communication control unit 24 of the parent unit 2 starts Bluetooth communication (first wireless communication), and the UWB positioning unit 25 positions the smart tag using UWB communication (second wireless communication) to monitor the location of the worker, thereby reducing power consumption due to UWB communication of the smart tag.

[0038] The alarm processing unit 26 determines whether the smart tag positioned by the UWB positioning unit 25 is included in either the first management area (the front side 7f of the first management area and the rear side 7r of the first management area) or the second management area (the front side 8f of the second management area and the rear side 8r of the second management area).

[0039] Then, the alarm processing unit 26 judges that the worker 6 is present in the management area including the smart tag, and issues a warning to the display unit 28. The operator of the construction machine 1 can ascertain the management area in which the worker is present by the display unit 28, so that the safety of the worker can be ensured without deteriorating workability.

[0040] The storage unit 27, the details of which are shown in FIG. 5, is a storage unit that stores the identifier of the smart tag (child unit 4) paired with the worker 6 and worker information associated with the smart tag identifier.

[0041] The display unit 28, details of which are explained in Figure 6, displays a list of workers present in the first management area (the front side 7f of the first management area and the rear side 7r of the first management area) or the second management area (the front side 8f of the second management area and the rear side 8r of the second management area).

[0042] The driving information acquisition unit 29, details of which will be described later, acquires driving information indicating the driving status of the construction machine 1, either stopped, proceeding forward, or proceeding backward. The acquired driving information is then notified to the alarm processing unit 26, which changes the second management area (the second management area front side 8f and the second management area rear side 8r) according to the driving information.

[0043] FIG. 3 is a diagram for explaining the change of the rear side 8r of the second management area in accordance with the driving information. In the construction machinery alarm system of the embodiment, the size of the set range of the second management area is changed depending on the operating conditions of the construction machinery 1 so as to ensure the safety of the worker and enable the worker to continue working as much as possible.

[0044] The master unit 2 acquires from the construction machine 1 driving information indicating the driving status of the construction machine 1, which is either stopped, moving forward, or moving backward.

[0045] When the parent unit 2 receives a stopped signal from the construction machine 1 as operation information, it sets a first range 8r1, which is close to the rear side 3r of the parent unit antenna, as the rear side 8r of the second management area, and increases the range in which the worker 6 can continue working (the area marked with a white star). When the parent unit 2 receives a signal from the construction machine 1 as driving information that the machine is moving in reverse, it sets a second range 8r2 at the rear of the second management area 8r, which is a long distance from the rear of the parent unit antenna 3r, and increases the range in which the worker 6 cannot continue working (the area marked with a black star).

[0046] Although not shown in the figure, when the parent unit 2 receives a stopped signal from the construction machine 1 as operation information, it sets a first range 8f1, which is a short distance from the front side 3f of the parent unit antenna, as the front side 8f of the second management area, thereby enlarging the range in which the worker 6 can continue working. When the parent unit 2 receives a signal from the construction machine 1 as driving information indicating that the machine is moving forward, a second range 8f2 that is a long distance from the parent unit antenna front side 3f is set in front of the second management area 8f, thereby increasing the range in which the worker 6 cannot continue working.

[0047] The first ranges 8r1, 8f1 and the second ranges 8r2, 8f2 are set by conducting a test run prior to starting operation of the construction machine 1, taking into consideration the size of the work site and the work content, and are stored in the memory unit 27 of the parent unit 2.

[0048] In addition, the driving information indicates whether the construction machine 1 is stopped, moving forward, or moving backward. However, for example, the forward or reverse speed value may be used as driving information to change the size of the setting range, or steering information may be used as driving information to change the size of the setting range.

[0049] Next, the operation of the construction machinery alarm system of the embodiment will be described with reference to the flow diagram in Fig. 4. The flow diagram in Fig. 4 shows the slave unit 4 (smart tag) worn by one worker 6, and when monitoring multiple workers 6, the flow diagram in Fig. 4 can be applied to each slave unit 4.

[0050] In step S41, the parent unit 2 (communication control unit 24) determines whether the child unit 4 is present within the front side 9f of the warning area or the rear side 9r of the warning area based on the connection state of Bluetooth communication (first wireless communication) with the child unit 4. If it is determined that the Bluetooth communication is in a connected state and the child unit 4 is present within the front side 9f of the warning area or the rear side 9r of the warning area (Yes in S41), the parent unit 2 proceeds to step S42. If it is determined that the Bluetooth communication is in an unconnected state and the child unit 4 is not present within the front side 9f of the warning area or the rear side 9r of the warning area (No in S41), the parent unit 2 waits.

[0051] In step S42, the master unit 2 (alarm processing unit 26) sets the second management area to the first range or the second range based on the operation information of the construction machine 1 notified from the operation information acquisition unit 29.

[0052] In step S43, the parent device 2 (UWB positioning unit 25) enables UWB communication and notifies the child device 4 to calculate the arrival angle of the UWB radio wave and measure the distance based on the propagation time of the UWB radio wave. The parent device 2 (UWB positioning unit 25) then acquires the measured information from the child device 4, calculates the position, and performs positioning of the child device 4.

[0053] In step S44, the parent unit 2 (alarm processor 26) determines whether the position of the child unit 4 measured in step S43 is within the first management area (first management area front side 7f and first management area rear side 7r). If it is not within the first management area (No in S44), the process proceeds to step S48, and if it is within the first management area (Yes in S44), the process proceeds to step S45.

[0054] In step S45, the parent unit 2 (alarm processor 26) determines whether the position of the child unit 4 measured in step S43 is within the second management area (the front side 8f of the second management area and the rear side 8r of the second management area). If it is not within the second management area (No in S45), the process proceeds to step S47, and if it is within the second management area (Yes in S45), the process proceeds to step S46.

[0055] In step S46, the parent unit 2 (alarm processing unit 26) determines that the worker is in the second management area 8 and that the construction machine cannot continue working, outputs a second alarm, and proceeds to step S48. This second alarm is output to warn the worker 6 to suspend work because it is too close to the construction machine 1 and it is dangerous for the worker 6 to work.

[0056] In step S47, the parent unit 2 (alarm processing unit 26) determines that the worker is present in the first management area 7 and that the construction machine can continue working, outputs a first alarm, and proceeds to step S48. This first alarm output is an alarm that indicates that the worker can continue working but urges caution and monitoring.

[0057] In step S48, the parent unit 2 (communication control unit 24) determines whether the child unit 4 is present within the front side 9f of the warning area or the rear side 9r of the warning area based on the connection state of Bluetooth communication (first wireless communication) with the child unit 4. If the child unit 4 is present within the front side 9f of the warning area or the rear side 9r of the warning area (Yes in S48), the process returns to step S43 and continues the monitoring process of the worker wearing the child unit 4 from step S43 to step S47. The processes from step S43 to step S47 are performed at predetermined intervals.

[0058] When it is determined that the Bluetooth communication with the child device 4 is not connected and the child device 4 is not present within the front warning area 9f or the rear warning area 9r (No in S48), the process ends.

[0059] The second warning output in step S46 and the first warning output in step S47 above allow the operator of the construction machine 1 to recognize that a worker is in the first control area. However, since the distance between the worker and the construction machine in the first control area is not close enough to be dangerous, the operator is allowed to continue working.

[0060] Furthermore, when the worker approaches the construction machine 1 and is in the second control area, a second alarm is output. The second control area is close to the construction machine, and it is difficult to continue working safely. For this reason, the driver can be prompted to take action to ensure the safety of the worker, such as stopping the operation of the construction machine.

[0061] Next, an example of the configuration of the storage unit 27 (see FIG. 2) of the base unit 2 will be described with reference to FIG. The storage unit 27 stores, as child device registration information, an identifier (child device identifier) ​​in Bluetooth communication of the child device 4 worn by an operator who monitors the presence in the management area (alarm area). The identifier of the child device 4 is registered when pairing the child device 4 (smart tag).

[0062] The storage unit 27 also stores information about the worker to be monitored (worker registration information) in association with the identifier of the handset 4 worn by the worker. When master unit 2 detects the presence of slave unit 4 in the management area, the worker information stored in memory unit 27 is extracted in correspondence with the identifier of slave unit 4 present.

[0063] FIG. 6 is a diagram showing an example of a display on the display unit 28 of the parent device 2 (see FIG. 2). When the base unit 2 detects the handset 4 present in the management area, it obtains the worker registration information of the worker wearing the handset 4 from the identifier of the handset 4 and processes the information for display on the display unit 28 as follows.

[0064] (1) When a worker 6 is present at the front side 7f of the first management area, a first alarm is output and the slave unit registration information and the worker's registration information (at least the name) are displayed on the display unit 28 of the master unit 2 as presence information at the front side 7f of the first management area.

[0065] (2) When a worker 6 is present at the rear side 7r of the first management area, a first alarm is output and the slave unit registration information and the worker's registration information (at least the name) are displayed on the display unit 28 of the master unit 2 as presence information of the worker at the rear side 7r of the first management area.

[0066] (3) When the worker 6 is present at the front side 8f of the second management area, a second alarm is output and the slave unit registration information and the worker's registration information (at least the name) are displayed on the display unit 28 of the master unit 2 as presence information at the front side 8f of the second management area.

[0067] (4) When the worker 6 is present at the rear side 8r of the second management area, a second alarm is output and the slave unit registration information and the worker's registration information (at least the name) are displayed on the display unit 28 of the master unit 2 as presence information of the worker 6 at the rear side 8r of the second management area.

[0068] In this way, by grasping the current positions of each of a plurality of workers 6, it is possible to notify each worker individually of the presence of danger and the next action that should be taken.

[0069] Before the worker 6 starts work, the worker registration information is stored in the memory unit 27 of the base unit 2 together with the name of the worker, and is different for each worker 6. Alternatively, the worker registration information is registered in the handset 4 carried by the worker 6 as registration information, and when the handset 4 is connected, the information is stored in the memory unit 27 of the base unit 2 from the handset 4. The worker registration information may be a combination of numbers and English letters, for example. EXAMPLES

[0070] FIG. 7 is a schematic diagram showing an overview of a construction machine alarm system according to an embodiment for ensuring the safety of a worker around an attachment (working implement 10) such as a bucket of the construction machine 1. As shown in FIG.

[0071] The construction machinery warning system of this embodiment is composed of a parent unit 2 installed on the construction machinery 1, a parent unit antenna 3 installed on the work device 10 of the construction machinery 1 and connected to the parent unit 2, at least one child unit 4 carried by a worker 6, and a child unit antenna 5 connected to the child unit 4.

[0072] The parent unit 2 may be configured such that the communication unit and the control unit are separate, or the child unit antenna 5 may be configured to be built into the child unit 4. The parent unit 2 is mounted on the construction machine 1, and the parent unit antenna 3 is omnidirectional and is installed on or in the vicinity of a working device such as a bucket of the construction machine 1. The parent unit antenna 3 may also be configured by combining multiple directional antennas, or may be configured to scan a directional antenna.

[0073] The master unit 2, master unit antenna 3, slave unit 4, and slave unit antenna 5 in the construction machinery alarm system of the embodiment may be configured in the same manner as in the construction machinery alarm system of the embodiment 1, and the master unit 2 operates in the same manner. Only the differences will be described below.

[0074] In order to detect the positional relationship between the worker 6 and the working implement 10 of the construction machine 1, the master unit 2 locates the position of the slave unit 4 carried by the worker using the slave unit antenna 5 of the slave unit 4 and the master unit antenna.

[0075] As shown in Fig. 8, the construction machinery alarm system sets a first control area 7 and a second control area 8 inside the first control area 7 (closer to the parent unit antenna 3) with the parent unit antenna 3 installed on the work equipment 10 as the base point. Note that Fig. 8 shows the control area on a plane where the worker 6 acts, and is a plan view of the construction machinery 1 viewed from above.

[0076] The shapes of the first management area 7 and the second management area 8 are determined based on the range of movement of the working device 10 and the range of rotation of the rotating part that supports the working device 10.

[0077] The construction machinery alarm system determines whether the positioned slave unit 4 is located in the first management area 7 or the second management area 8, and outputs an alarm indicating that the worker 6 is present in the first management area 7 or the second management area 8.

[0078] The second control area is an area where the worker 6 is too close to the work implement 10 of the construction machine 1 to work, and is a dangerous area where there is a possibility of contact due to the operation of the work implement 10, and a warning to suspend work is output. The first control area is located outside the second control area, and is an area where the worker can continue working, but where a warning or monitoring alert is output.

[0079] In FIG. 8, the first management area 7 and the second management area 8 are circular regions, but the shape may be set according to the operating range of the working device 10.

[0080] In addition, the construction machinery alarm system may set an alarm area 9 based on the parent unit antenna 3 to determine whether the child unit 4 is located in a first management area 7 or a second management area 8, monitor the location of the worker, and output an alarm depending on the management area in which the child unit is located.

[0081] That is, a process of outputting an alarm is performed when the slave unit 4 is present in the alarm area 9. The alarm area 9 has the same shape as the first management area 7 or a shape that includes the first management area 7.

[0082] FIG. 9 is a diagram for explaining the change of the second management area 8 in accordance with the driving information. In the construction machinery alarm system of the embodiment, the size of the set range of the second management area is changed depending on the operating conditions of the construction machinery 1 so as to ensure the safety of the worker and enable the worker to continue working as much as possible.

[0083] The master unit 2 acquires from the construction machine 1 operation information indicating either an operation status in which the construction machine 1 and the work implement 10 are stopped, or in which the work implement 10 is in progress.

[0084] When the parent unit 2 receives a stop signal from the construction machine 1 and the work equipment 10 as operation information, it sets a first range 81, which is a short distance from the parent unit antenna 3, as a second management area 8, thereby enlarging the range in which the worker 6 can continue working. When the parent unit 2 acquires a signal indicating that the work device 10 is operating as operation information, a second range 82 that is a long distance from the parent unit antenna 3 is set in the second management area 8, and the range in which the worker 6 cannot continue working is enlarged.

[0085] The first range 81 and the second range 82 are set by conducting a test run prior to starting operation of the construction machine 1, taking into consideration the size of the work site and the work content, and are stored in the memory unit 27 of the parent machine 2.

[0086] In the above, the explanation was divided into a case where the parent unit antenna (parent unit antenna front side 3f and parent unit antenna rear side 3r) is provided on the construction machine 1 and a case where the parent unit antenna is provided on the work implement 10 of the construction machine 1. However, as shown in Fig. 1 (Fig. 3) and Fig. 8, both are the same in that the slave unit 4 is positioned based on the parent unit antenna as a base point, and a different alarm is output depending on whether the slave unit 4 is in the first control area 7 (first control area front side 7f and first control area rear side 7r) or the second control area 8 (second control area front side 8f and second control area rear side 8r).

[0087] Therefore, the present invention is not limited to the above, and can be implemented by providing the master antenna at a location where the distance to the worker 6 changes as the construction machine 1 is operated. Furthermore, a plurality of master unit antennas may be provided on the construction machine 1. Then, the contents of the change in the management area may be changed for each master unit antenna according to the operation information of the construction machine 1. [Explanation of symbols]

[0088] 1. Construction machinery 2 Parent unit 3 Parent unit antenna 3f Parent unit antenna front 3r Rear of parent unit antenna 4 Handset 5 Child unit antenna 6. Workers 7. First Management Area 7F First control area front 7r Back of the first management area 8. Second Administration Area 8F Second control area front 8r Second control area rear 9. Warning Area 9f Front of warning area 9r Rear of warning area 10 Working Equipment

Claims

1. A construction machinery warning system that outputs a warning signal in response to the presence of a worker in the traveling direction of a construction machinery, A sub-unit worn by the worker; A master unit is provided on the construction machine and manages the positions of the slave units; a parent unit antenna that is mounted on the construction machine and connected to the parent unit, for detecting the location of the child unit in at least one of a forward direction and a reverse direction of the construction machine; Equipped with The master determines whether the slave is in a first management area that is a predetermined distance away from the master antenna, or in a second management area that is closer to the master antenna than the first management area, based on the location of the slave, and outputs an alarm. A construction machinery alarm system comprising:

2. The construction machine alarm system according to claim 1, The parent antenna comprises a parent antenna front side mounted toward the forward direction of the construction machine and a parent antenna rear side mounted toward the reverse direction of the construction machine, The alarm is output by the parent unit by determining whether the child unit is present on the front side of a first management area or the front side of a second management area related to the front side of the parent unit antenna, or on the rear side of a first management area or the rear side of a second management area related to the rear side of the parent unit antenna, based on the location of the child unit. A construction machinery alarm system comprising:

3. The construction machine alarm system according to claim 1, The master unit changes the size of the second management area based on the operation information of the construction machine. A construction machinery alarm system comprising:

4. The construction machine alarm system according to claim 3, When the operation information of the construction machine indicates that the machine is moving forward or backward, the parent machine sets the size of the second control area to a second range that is larger than the first range, which is the size of the second control area when the operation information of the construction machine indicates that the machine is stopped. A construction machinery alarm system comprising:

5. The construction machine alarm system according to claim 4, The first range and the second range are set by performing a test run before starting the operation of the construction machine, taking into consideration the size of the work site and the work content, and are stored in the memory unit of the parent machine. A construction machinery alarm system comprising:

6. The construction machine alarm system according to claim 1, The parent unit is When the slave unit is present in the first management area, it is determined that the operation of the construction machine can be continued, and a first alarm is output to prompt caution and monitoring; When the slave unit is present in the second management area, it is determined that it is difficult to continue operating the construction machine, and a second alarm is output to warn of the interruption of work. A construction machinery alarm system comprising:

7. 7. The construction machine alarm system according to claim 6, The parent unit is The registration information of the handset is associated with the name of the worker who wears the handset and stored in the linked manner; When the slave unit is present in the first management area or the second management area, registration information of the slave unit is acquired from the slave unit present in the first management area or the second management area; Extract and display the name of the worker corresponding to the acquired child device registration information A construction machinery alarm system comprising:

8. The construction machine alarm system according to claim 7, The registration information of the slave unit and the name of the worker are stored in the master unit before the worker starts work. A construction machinery alarm system comprising:

9. The construction machine alarm system according to claim 1, The parent unit is setting an alarm area for monitoring the presence of the slave unit; acquiring connection information transmitted from the slave unit through a first wireless communication with the slave unit via the master unit antenna, and determining that the slave unit is present in the warning area when the first wireless communication is established; Initiating a second wireless communication with the slave device; The location of the slave unit in the first management area or the second management area is monitored by the second wireless communication. A construction machinery alarm system comprising:

10. A construction machinery alarm system for monitoring a worker approaching a construction machinery, comprising: a slave unit worn by the worker, which indicates approach to the construction machine by connecting a first wireless communication and detects information regarding the worker's position relative to the construction machine by connecting a second wireless communication; a master antenna for the first wireless communication and the second wireless communication, the master antenna being installed at a position where a distance from the worker changes when the construction machine is in operation; a master unit that monitors the approach of the slave unit by the first wireless communication and the second wireless communication transmitted and received by the master unit antenna; A construction machinery alarm system comprising:

11. The construction machine alarm system according to claim 10, the first wireless communication complies with a short-range wireless communication standard; the second wireless communication is compliant with an ultra-wideband wireless communication standard; The parent unit is When detecting a connection state with the slave unit through the first wireless communication, it is determined that the slave unit is present within a warning area, and the slave unit is notified of the positioning result obtained through the second wireless communication; Calculating a position of the slave unit relative to the master unit based on information regarding the detected position obtained from the slave unit; Identifying the management area in which the slave unit is located based on the calculated position of the slave unit; Outputs an alarm according to the management area where the child unit is located A construction machinery alarm system comprising:

12. The construction machine alarm system according to claim 11, When the master detects the disconnection of the connection with the slave through the first wireless communication and determines that the slave is not present in the warning area, the master stops measuring the position of the slave through the second wireless communication. A construction machinery alarm system comprising:

13. The construction machine alarm system according to claim 11, The management area is A first management area is an area in which the construction machine can continue to be operated; a second management area in which the operation of the construction machine cannot be continued; A construction machinery alarm system comprising:

14. The construction machine alarm system according to claim 13, The size of the second management area is changed according to the operation information of the construction machine. A construction machinery alarm system comprising:

Citation Information

Patent Citations

  • Proximity warning system and conversational communication device to be used

    JP1995168987A

  • Alarm of construction machine

    JP2002212981A

  • Warning system

    JP2009193494A

  • Control system of work machine

    JP2022155218A