Front edge protective layer construction method and front edge protective layer construction device for wind turbine blade
The method and device provide real-time monitoring and management of layer thickness during the construction of protective layers on wind turbine blades, ensuring uniformity and identifying areas needing re-construction, thus enhancing the protective layer's quality and reliability.
Patent Information
- Application Number
- JP2023062702
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-07
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing methods for forming protective layers on wind turbine blades fail to ensure uniform layer thickness and real-time management of layer thickness during the construction process.
A method and device that utilize a displacement meter to measure the level difference between applied and unapplied areas of pass layers, allowing real-time monitoring and management of layer thickness during the construction of a protective layer on wind turbine blades.
Enables real-time understanding and management of layer thickness, ensuring uniformity and identifying areas requiring additional construction, thereby improving the quality and reliability of the protective layer.
Smart Images

Figure 2024149040000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a method and an apparatus for applying a leading edge protective layer to a wind turbine blade. [Background technology]
[0002] As the wind turbine rotor rotates, the wind turbine blades collide with foreign objects in the air (for example, raindrops, dust, etc.) and are eroded, causing erosion in areas including the leading edges of the wind turbine blades. In order to protect the wind turbine blade from this erosion, it is known to form an erosion-resistant protective layer in the relevant region of the wind turbine blade (see Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent Publication No. 2022-175830 Summary of the Invention [Problem to be solved by the invention]
[0004] The protective layer is formed from a plurality of laminated pass layers, and it is preferable that the thickness of the protective layer is uniform over the entire area of the construction region after formation. Therefore, it is desirable to grasp and manage the thickness of the protective layer (the thickness of each pass layer) in real time.
[0005] The present disclosure has been made in consideration of the above circumstances, and aims to provide a leading edge protective layer construction method and leading edge protective layer construction device for a wind turbine blade, which can grasp and manage the layer thickness of the protective layer (the layer thickness of each pass layer) in real time during the construction process. [Means for solving the problem]
[0006] In order to solve the above problems, the wind turbine blade leading edge protective layer application method and leading edge protective layer application device disclosed herein employ the following measures. A leading edge protective layer construction method for a wind turbine blade according to one embodiment of the present disclosure is a leading edge protective layer construction method for constructing a protective layer consisting of multiple pass layers on the leading edge of a wind turbine blade body formed of FRP, in which the step is measured between a pass layer-constructed area where an nth pass layer formed by an nth thermal spraying is constructed, where n is a natural number, and an unconstructed pass layer area where the nth pass layer has not been constructed and is adjacent to the pass layer-constructed area.
[0007] Furthermore, a leading edge protective layer construction device according to one embodiment of the present disclosure is a leading edge protective layer construction device that constructs a protective layer on the leading edge of a wind turbine blade body formed from FRP, and is equipped with a spray gun that sprays a frame containing construction material, and a displacement meter that measures the height of a step, where n is a natural number, the displacement meter measures the step between a pass layer constructed area where the nth pass layer formed by the nth thermal spraying has been constructed, and an unconstructed pass layer area where the nth pass layer has not been constructed and is adjacent to the pass layer constructed area. Effect of the Invention
[0008] During the construction process, the thickness of the protective layer (thickness of each pass layer) can be grasped and managed in real time. [Brief description of the drawings]
[0009] [Figure 1] 1 is a schematic configuration diagram of a wind power generation device using a wind turbine blade on which a protective layer is formed according to a first embodiment of the present disclosure. [Diagram 2] FIG. 2 is a plan view of a wind turbine blade on which a protective layer is formed according to the first embodiment of the present disclosure. [Diagram 3] FIG. 2 is a partially enlarged plan view showing the tip of a wind turbine blade on which a protective layer is formed according to the first embodiment of the present disclosure. [Figure 4] FIG. 2 is a side view of a leading edge protective layer construction device according to the first embodiment of the present disclosure. [Diagram 5] FIG. 5 is a plan view of the leading edge protective layer construction device shown in FIG. 4. [Figure 6] FIG. 6 is a cross-sectional view of the protective layer (in the case of a first pass layer) and the wind turbine blade body taken along the cutting line VI-VI shown in FIG. 5. [Figure 7]FIG. 7 is a cross-sectional view of the protective layer (in the case of the first pass layer to the Nth pass layer) and the wind turbine blade body at the same position as in FIG. 6. [Figure 8] FIG. 7 is a cross-sectional view of a protective layer and a wind turbine blade body in the same position as in FIG. 6 according to a second embodiment. [Figure 9] FIG. 7 is a cross-sectional view of a protective layer and a wind turbine blade body at the same position as in FIG. 6 according to a modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] [First embodiment] Hereinafter, a first embodiment of the present disclosure will be described with reference to the drawings.
[0011] <About the structure of wind turbine blades> As shown in FIG. 1, the wind turbine generator 1 includes a tower 3 erected on an installation surface B, a nacelle 6 installed at the upper end of the tower 3, and a rotor head 4 provided on the nacelle 6 so as to be rotatable around a substantially horizontal axis.
[0012] A plurality of (eg, three) wind turbine blades 5 are attached to the rotor head 4 radially around the rotation axis thereof. As a result, the force of the wind hitting the wind turbine blades 5 from the direction of the rotation axis of the rotor head 4 is converted into power that rotates the rotor head 4 around the rotation axis. The obtained power is converted into electricity by a generator (not shown) and supplied to the outside.
[0013] As shown in FIG. 2, the wind turbine blade 5 extends in a blade span direction D1 along the radial direction relative to the rotor head 4, and has a blade root portion 10 attached to the rotor head 4, a blade tip portion 12 located furthest from the rotor head 4, and an airfoil portion 14 extending between the blade root portion 10 and the blade tip portion 12.
[0014] The wind turbine blade 5 has a leading edge 16 and a trailing edge 18 from the blade root 10 to the blade tip 12 . The outer shape of the wind turbine blade 5 is defined by a ventral side surface 20 which is a pressure surface (positive pressure surface) and a suction side surface 22 which is opposed to the ventral side surface 20 and is a negative pressure surface. The wind turbine blade 5 is made of FRP (Fiber-Reinforced Plastic). Examples of FRP that can be used include carbon fiber reinforced plastic (CFRP) and glass fiber reinforced plastic (GFRP). The overall length of the wind turbine blade 5 from the blade root 10 to the blade tip 12 is in the 100 m class, for example, 80 m to 150 m. A 200 m class wind turbine blade may be used as the wind turbine blade 5 of this embodiment.
[0015] 2 and 3, a protective layer 30 is formed on the wind turbine blade body 5a in a predetermined region (leading edge portion) including the blade tip portion 12 and leading edge 16 of the wind turbine blade 5. The protective layer 30 is formed by a leading edge protective layer construction device 100 (hereinafter simply referred to as "construction device 100") that is moved by a robot or the like (not shown). The application area of the protective layer 30 is indicated by a thick line in FIG. 2 and by cross-hatching in FIG. The construction range of the protective layer 30 in the blade length direction D1 is 20 m to 40 m, preferably about 30 m, from the tip 12a of the blade tip portion 12. Note that the construction range of the protective layer 30 is not limited to this, and is, for example, a range of about 1 / 3 of the total length from the tip of the wind turbine blade 5 in a region where the peripheral speed exceeds 90 m / s.
[0016] The protective layer 30 is made of a material having excellent wear resistance, such as a cermet or a Co (cobalt)-based alloy or other Co alloy. The protective layer 30 is applied, for example, by HVOF (High Velocity Oxy-Fuel) spraying. The protective layer 30 is composed of a plurality of pass layers. Specifically, the protective layer 30 is composed of a first pass layer 31 applied to the surface of the wind turbine blade main body 5a or a base formed on the surface, a second pass layer 32 applied to the first pass layer 31, and so on, stacked from the first pass layer 31 to an N-th pass layer 30N (a pass layer formed in the Nth application) (N: a natural number of 2 or more).
[0017] <About the construction equipment> As shown in FIGS. 4 and 5, the processing device 100 includes a spray gun 110 and a displacement meter 120. The spray gun 110 and the displacement gauge 120 are moved by a robot or the like (not shown) while maintaining a fixed distance from each other.
[0018] The spray gun 110 is a device that ejects a flame 111 containing a processing material 112 and sprays it onto a processing target (the wind turbine blade main body 5a). In Fig. 5, the range of the flame 111 sprayed onto the processing target is referred to as a frame range 113. Here, the flame 111 is a combustion flame of an oxidizing agent containing oxygen and a fuel. The spray gun 110, for example, moves along the blade length direction D1 and sprays the frame 111 containing the application material 112 onto the wind turbine blade main body 5a. At this time, the area to which the application material 112 is applied (sprayed) in one movement (i.e., one pass) of the spray gun 110 along a predetermined direction is referred to as a "pass layer."
[0019] The displacement meter 120 is a device (sensor) that measures a step. For example, as shown in Fig. 5 and Fig. 6, the displacement meter 120 measures the step between the pass layer construction area Ra where the first pass layer 31 is constructed and the pass layer unconstructed area Rb where the first pass layer 31 is not constructed. At this time, the pass layer unconstructed area Rb is adjacent to the first pass layer 31, i.e., the pass layer construction area Ra, in the chord direction D2. Here, the chord direction D2 is a direction that is approximately perpendicular to the span direction D1.
[0020] Here, since one pass layer is a region where the application material 112 is sparsely attached, it may not have a uniform layer thickness along the path direction of the spray gun 110. Therefore, for example, the representative layer thickness of the pass layer may be determined by taking the average of the layer thicknesses at each point along the path direction of the pass layer.
[0021] In this embodiment, the path layer uncoated region Rb is the surface of the wind turbine blade main body 5a or a base formed on the surface.
[0022] As described above, the protective layer 30 is composed of multiple stacked pass layers, so in order to determine the final thickness of the protective layer 30, it is sufficient to measure the step between the pass layer applied area Ra, where the outermost Nth pass layer 30N is formed, and the pass layer unapplied area Rb, as shown in Figure 7. At this time, if the layer thickness of the protective layer 30 at the time each pass layer is formed is grasped by the displacement meter 120, the layer thickness of the nth pass layer can be calculated from the difference between the layer thickness of the protective layer 30 at the time the nth pass layer is formed and the layer thickness of the protective layer 30 at the time the n-1th pass layer is formed (n: natural number). Note that the n-1th pass layer (0th pass layer) when n=1 is the surface of the wind turbine blade main body 5a or a base layer formed on the surface. Furthermore, if the layer thickness of the protective layer 30 at each point in time for each m passes is grasped using the displacement meter 120, the total layer thickness of the pass layers formed in m passes (the layer thickness for m layers) can be calculated from the difference between the layer thickness of the protective layer 30 at the point in time when the nth pass layer is formed and the layer thickness of the protective layer 30 at the point in time when the nm-th pass layer is formed (m: natural number and nm>0).
[0023] Here, since the displacement meter 120 measures the step between the path layer constructed area Ra and the path layer unconstructed area Rb, it is necessary to position the displacement measurement range 121 so as to extend over both the path layer constructed area Ra and the path layer unconstructed area Rb. Specifically, it is preferable that the displacement measurement range 121 is disposed behind the frame range 113 with respect to the traveling direction of the spray gun 110, and at a position offset toward the path layer untreated area Rb from the spray gun 110. In the case of this embodiment, since the spray gun 110 moves along the blade length direction D1, the displacement measurement range 121 is offset toward the path layer untreated area Rb in the blade chord direction D2.
[0024] As described above, by providing the construction device 100 with the displacement meter 120, the layer thickness of each path layer and the layer thickness of the protective layer 30 can be grasped at the same time as construction. That is, the construction can be appropriately managed by grasping in real time the layer thickness of each pass layer and the layer thickness of the protective layer 30 during the construction process. For example, if there is an area where the layer thickness of the protective layer 30 is less than the reference layer thickness value, that area can be identified as a re-construction area that requires additional construction.
[0025] As shown in FIGS. 4 and 5, the processing device 100 may further include a thermometer 130 and a cooling unit 140. The thermometer 130 and the cooling unit 140 are moved by a robot or the like (not shown) while maintaining a fixed distance from the spray gun 110 .
[0026] The thermometer 130 is a device (sensor) that measures the temperature of the protective layer 30 (path layer) in a non-contact manner. It is preferable that the thermometer 130 measures the temperature of the protective layer 30 (path layer) immediately after it has been formed. Therefore, it is preferable to arrange the thermometer 130 so that the temperature measurement range 131 is located immediately behind the frame range 113 with respect to the traveling direction of the spray gun 110. However, if the temperature measurement range 131 is too close to the frame range 113, an accurate temperature measurement will not be possible due to thermal effects from the frame 111. Therefore, it is preferable to position the thermometer 130 so that at least the temperature measurement range 131 does not overlap with the frame range 113.
[0027] The cooling unit 140 is, for example, a device for cooling the protective layer 30 (path layer) by blowing a gas onto the protective layer 30 (path layer). The cooling unit 140 is adapted to change the cooling capacity based on information from the thermometer 130. Specifically, when the measured temperature of the protective layer 30 (path layer) is equal to or higher than a reference temperature value, the cooling capacity is increased by increasing the gas flow rate or lowering the gas temperature. This is because, when forming the (n+1)th path layer on the nth path layer, if the temperature of the nth path layer is high, it is difficult to form the (n+1)th path layer.
[0028] The control of each device constituting the construction device 100, the control of robots, etc., and the calculation of necessary numerical values are executed by a control unit 160. The control unit 160 includes, for example, a CPU (Central Processing Unit: processor), a main memory, a secondary storage, etc. Furthermore, the control unit 160 may include a communication unit for transmitting and receiving information to and from other devices. The main storage device is composed of writable memory such as cache memory and RAM (Random Access Memory), and is used as a working area for reading out programs executed by the CPU and writing data processed by the programs. The secondary storage device is a non-transitory computer readable storage medium, such as a magnetic disk, a magneto-optical disk, a CD-ROM, a DVD-ROM, or a semiconductor memory. A series of processes for realizing various functions is stored in a secondary storage device in the form of a program, for example, and various functions are realized by the CPU reading the program into the main storage device and executing information processing and arithmetic processing. The program may be installed in the secondary storage device in advance, provided in a state stored in a computer-readable storage medium, or distributed via wired or wireless communication means. Examples of computer-readable storage media include magnetic disks, magneto-optical disks, CD-ROMs, DVD-ROMs, and semiconductor memories.
[0029] According to this embodiment, the following effects are obtained. The step between the pass layer applied area Ra where the nth pass layer has been applied and the pass layer unapplied area Rb can be measured as the layer thickness of the protective layer 30 at the stage where the nth application is completed. In addition, the layer thickness of the nth pass layer can also be calculated based on the layer thickness of the protective layer 30 at the end of the nth application and the layer thickness of the protective layer 30 at the end of the n-1th application. In addition, based on the layer thickness of the protective layer 30 at the end of the nth application and the layer thickness of the protective layer 30 at the end of the nmth application, the total layer thickness of the pass layers formed in m passes (the layer thickness for m layers) can also be calculated.
[0030] Furthermore, if an area where the layer thickness of the protective layer 30 is less than the standard layer thickness value is identified as a re-application area requiring additional application, the layer thickness of the protective layer 30 in the re-application area can be made equal to or greater than the standard layer thickness value by performing application again in that re-application area.
[0031] Furthermore, when the measured temperature of the protective layer 30 (nth pass layer) is equal to or higher than the reference temperature value, the cooling capacity for the nth pass layer after the temperature is measured can be increased to reliably cool the range of the nth pass layer that has become hot. If the temperature of the nth pass layer is high when forming the nth+1th pass layer on the nth pass layer, it is difficult to form the nth+1th pass layer, but by reliably cooling the range of the nth pass layer where the temperature is high, the possibility of such a phenomenon occurring can be reduced.
[0032] Furthermore, since the thermometer 130 is disposed so that the temperature measurement range 131 does not overlap with the frame range 113 of the frame 111, the thermal effect that the temperature measurement range 131 receives from the frame 111 can be reduced.
[0033] [Second embodiment] Hereinafter, a second embodiment of the present disclosure will be described with reference to the drawings. In addition, the same components as those in the first embodiment are denoted by the same reference numerals and the description thereof will be omitted.
[0034] In the first embodiment, after forming a row of protective layers 30 along the spanwise direction D1, the spray gun 110 is moved in the chordwise direction D2, and then a row of protective layers 30 along the spanwise direction D1 is formed as the next row of protective layers 30, and this process is repeated thereafter to form protective layers 30 of a specified thickness over the entire application area.
[0035] 8, in this embodiment, after forming a row of first pass layers 31 along the spanwise direction D1, the spray gun 110 is moved in the chordwise direction D2, and a row of first pass layers 31 along the spanwise direction D1 is formed as the next row of first pass layers 31, and this is repeated to form the first pass layers 31 over the entire application range. Then, the second pass layer 32, the third pass layer 33, ... are sequentially laminated by the same process, and finally the protective layer 30 of a predetermined thickness is formed over the entire application range.
[0036] Therefore, when the pass layer being formed is the n-th pass layer, the pass layer unprocessed area Rb in this embodiment is the surface of the n-1th pass layer. Therefore, the step measured by the displacement meter 120 is always the layer thickness of the n-th pass layer. At this time, the thickness of each layer from the first pass layer 31 to the nth pass layer is grasped, and by adding up these layer thicknesses, the layer thickness of the protective layer 30 at the time the nth pass layer is formed can be calculated.
[0037] 9, when the fourth pass layer 34 of the first row L1 is formed, the pass layer applied area Ra is the area where the fourth pass layer 34 is formed, and the pass layer unapplied area Rb is the area where the third pass layer 33 is formed (specifically, the area where the third pass layer 33 of the second row L2 is formed). Then, the displacement meter 120 measures the step between the fourth pass layer 34 and the third pass layer 33, i.e., the layer thickness of the fourth pass layer 34. Moreover, by integrating the thicknesses of each of the layers from the first pass layer 31 to the fourth pass layer 34, the layer thickness of the protective layer 30 at the time when the fourth pass layer 34 is formed can be calculated.
[0038] Only when the path layer being formed is the first path layer 31, the path layer unconstructed region Rb in this embodiment becomes the surface of the wind turbine blade main body 5a or a base formed on the surface.
[0039] According to this embodiment, the following effects are obtained. The step between the pass layer applied area Ra where the nth pass layer has been applied and the pass layer unapplied area Rb can be measured as the layer thickness of the nth pass layer. In addition, the layer thickness of the protective layer 30 at the stage where the nth application is completed can be calculated based on the thickness of each layer from the first pass layer 31 to the nth pass layer.
[0040] [Variations] The first and second embodiments may be combined. For example, as shown in Fig. 9, after forming a row of laminated pass layers along the span direction D1 (in the case of Fig. 9, the first pass layer 31 and the second pass layer 32), the spray gun 110 is moved in the chord direction D2 to form a row of the first pass layer 31 and the second pass layer 32 along the span direction D1 as the next row of the first pass layer 31 and the second pass layer 32, and this is repeated to form the first pass layer 31 and the second pass layer 32 over the entire application range. Then, the third pass layer 33 and the fourth pass layer 34, ... may be laminated in a similar process over the entire application range in two layers, so that the protective layer 30 of a predetermined thickness is finally formed over the entire application range.
[0041] The first pass layer 31 and the second pass layer 32 are formed by, for example, reciprocating movement of a spray gun 110. Alternatively, the path layers may be laminated in succession over the entire construction area in groups of three or more.
[0042] The embodiments described above can be understood, for example, as follows. The leading edge protective layer construction method according to the first aspect of the present disclosure is a quality control method for a protective layer consisting of multiple pass layers that is constructed on a wind turbine blade body (5a) formed from FRP, in which the step is measured between a pass layer constructed area (Ra) where the nth pass layer formed in the nth construction is constructed, and a pass layer unconstructed area (Rb) where the nth pass layer has not been constructed and is adjacent to the pass layer constructed area, where n is a natural number.
[0043] According to the leading edge protective layer construction method of the present embodiment, the step between the area where the pass layer has been constructed and the area where the pass layer has not been constructed is measured. Therefore, for example, when the area where the pass layer has not been constructed is an area where no pass layer has been formed, the layer thickness of the protective layer up to the nth pass layer can be measured, and when the unconstructed area is an area where the n-1th pass layer has been formed, the layer thickness of the nth pass layer can be measured.
[0044] In the first aspect of the leading edge protective layer construction method according to the second aspect of the present disclosure, the pass layer unconstructed area is an area in which the pass layer is not formed, and the step between the pass layer constructed area where the nth pass layer has been constructed and the pass layer unconstructed area is measured as the layer thickness of the protective layer at the stage where the nth construction is completed, and the layer thickness of the nth pass layer is calculated based on the layer thickness of the protective layer at the stage where the nth construction is completed and the layer thickness of the protective layer at the stage where the n-1th construction is completed.
[0045] According to the leading edge protective layer construction method of this embodiment, if the pass layer unconstructed area is an area where a pass layer has not been formed, the step between the pass layer constructed area where the nth pass layer has been constructed and the pass layer unconstructed area can be measured as the layer thickness of the protective layer at the stage where the nth construction is completed. In addition, the layer thickness of the nth pass layer can be calculated based on the layer thickness of the protective layer at the stage where the nth construction is completed and the layer thickness of the protective layer at the stage where the n-1th construction is completed.
[0046] In the first aspect of the leading edge protective layer construction method according to the third aspect of the present disclosure, the pass layer unconstructed area is an area where the n-1th pass layer has been formed, and the step between the pass layer constructed area where the nth pass layer has been constructed and the pass layer unconstructed area is measured as the layer thickness of the nth pass layer, and the layer thickness of the protective layer at the stage where the nth construction is completed is calculated based on each layer thickness from the 1st pass layer to the nth pass layer.
[0047] According to the leading edge protective layer construction method of this embodiment, if the pass layer unconstructed area is the area where the n-1th pass layer is formed, the step between the pass layer constructed area where the nth pass layer is constructed and the pass layer unconstructed area can be measured as the layer thickness of the nth pass layer. Also, based on the layer thicknesses from the 1st pass layer to the nth pass layer, the layer thickness of the protective layer at the stage where the nth construction is completed can be calculated.
[0048] A leading edge protective layer construction method according to a fourth aspect of the present disclosure, in any of the first to third aspects, identifies an area where the layer thickness of the protective layer is less than a reference layer thickness value as a re-construction area requiring additional construction.
[0049] According to the leading edge protective layer construction method of the present embodiment, an area where the layer thickness of the protective layer is less than a reference layer thickness value is identified as a re-construction area requiring additional construction, and by carrying out construction again in the re-construction area, the layer thickness of the protective layer in the re-construction area can be made equal to or greater than the reference layer thickness value.
[0050] A leading edge protective layer construction method according to a fifth aspect of the present disclosure, in any of the first to fourth aspects, measures the temperature of the nth pass layer, and if the measured temperature is equal to or higher than a reference temperature value, increases the cooling capacity for the nth pass layer after the temperature is measured.
[0051] According to the leading edge protective layer construction method of this embodiment, when the measured temperature is equal to or higher than the reference temperature value, the cooling capacity for the nth pass layer after the temperature is measured is increased, so that the range of the nth pass layer that has become high in temperature can be reliably cooled. When forming the nth+1th pass layer on the nth pass layer, if the temperature of the nth pass layer is high, it is difficult to form the nth+1th pass layer, but by reliably cooling the range of the nth pass layer where the temperature is high, the possibility of such a phenomenon occurring can be reduced.
[0052] A construction device according to a sixth aspect of the present disclosure is a construction device (100) that applies a protective layer to a wind turbine blade body formed of FRP, and is equipped with a spray gun (110) that sprays a frame (111) containing a construction material (112), and a displacement meter (120) that measures the height of a step, where n is a natural number, the displacement meter measures the step between a path layer applied area where the nth pass layer formed in the nth construction has been applied, and a path layer unapplied area where the nth pass layer has not been applied and is adjacent to the path layer applied area.
[0053] The construction apparatus according to the seventh aspect of the present disclosure, in the sixth aspect, includes a thermometer (130) for measuring the temperature of the nth pass layer, a cooling section (140) for cooling the nth pass layer after the temperature is measured by the thermometer, and a control section (160), and the control section increases the cooling capacity of the cooling section when the measured temperature is equal to or higher than a reference temperature value.
[0054] An eighth aspect of the present disclosure relates to a construction device in the seventh aspect, in which the thermometer is positioned so that the temperature measurement range (131) does not overlap with the frame range (113) of the frame sprayed from the spray gun.
[0055] According to the construction device of this aspect, the thermometer is positioned so that the temperature measurement range does not overlap with the frame range of the frame, thereby reducing the thermal effect that the temperature measurement range receives from the frame. [Explanation of symbols]
[0056] 1. Wind power generation equipment 3. Tower 4 Rotor Head 5 windmill blade 5a Wind turbine blade body 6. Nacelle 10 Wing root 12 Wing tip (tip) 12a Tip 14 Airfoil section 16 Leading Edge 18 Trailing edge 20 Ventral aspect 22 Dorsal aspect 30 protective layer 31 1st pass layer 32 2nd pass layer 33 3rd pass layer 34 4th pass layer 30N Nth pass layer 100 Construction equipment 110 Spray gun 111 Frame 112 Construction materials 113 Frame Range 120 Displacement Gauge 121 Displacement measurement range 130 Thermometer 131 Temperature Measurement Range 140 Cooling section 160 Control section B Installation surface D1 Span direction D2 Chord direction (chord direction) L1 1st row L2 2nd row Ra pass layer construction area Rb Pass layer unconstructed area
Claims
1. A leading edge protective layer construction method for constructing a protective layer consisting of a plurality of pass layers on a leading edge of a wind turbine blade body formed of FRP, comprising: When n is a natural number, Measure the step between a pass layer applied area where the nth pass layer formed in the nth application is applied and a pass layer unapplied area where the nth pass layer is not applied and is adjacent to the pass layer applied area. Leading edge protective layer construction method.
2. The path layer unapplied region is a region in which the path layer is not formed, The step between the pass layer applied area where the nth pass layer is applied and the pass layer unapplied area is measured as the layer thickness of the protective layer at the stage where the nth application is completed, The thickness of the nth pass layer is calculated based on the thickness of the protective layer at the end of the nth application and the thickness of the protective layer at the end of the n-1th application. The method for applying a leading edge protective layer according to claim 1.
3. The pass layer unapplied region is a region in which the n-1 pass layer is formed, The step between the pass layer applied area where the nth pass layer is applied and the pass layer unapplied area is measured as the layer thickness of the nth pass layer, Based on the thickness of each layer from the first pass layer to the nth pass layer, the layer thickness of the protective layer at the stage where the nth application is completed is calculated. The method for applying a leading edge protective layer according to claim 1.
4. A region where the thickness of the protective layer is less than a reference thickness value is identified as a reapplication region that requires additional application. The method for applying a leading edge protective layer according to claim 1.
5. Measure the temperature of the nth pass layer; If the measured temperature is equal to or greater than the reference temperature, increase the cooling capacity for the nth pass layer after the temperature is measured. The method for applying a leading edge protective layer according to claim 1.
6. A leading edge protective layer construction device that constructs a protective layer on a leading edge of a wind turbine blade body formed of FRP, A spray gun that sprays a frame containing a construction material; A displacement meter that measures the height of a step; Equipped with When n is a natural number, The displacement meter measures a step between a pass layer applied area where an nth pass layer formed by the nth thermal spraying is applied and a pass layer unapplied area where the nth pass layer is not applied and is adjacent to the pass layer applied area. Leading edge protective layer construction device.
7. a thermometer for measuring the temperature of the nth pass layer; a cooling section that cools the nth pass layer after the temperature is measured by the thermometer; A control unit; Equipped with The control unit increases the cooling capacity of the cooling unit when the measured temperature is equal to or higher than a reference temperature value. The leading edge protective layer application device according to claim 6.
8. The thermometer is arranged so that the temperature measurement range does not overlap with the frame range of the frame sprayed from the spray gun. The leading edge protective layer application device according to claim 7.
Citation Information
Patent Citations
Robot system, and method for controlling robot
JP2019162613A
Blade structure and manufacturing method of blade structure
JP2022175830A