Power generation facilities scale calculation program and power generation facilities scale calculation method
The method calculates the optimal scale of power generation facilities by dividing a range into multiple scales, determining power generation and consumption amounts, and using a computer to find the optimal scale, addressing oversizing or undersizing issues and ensuring efficient installation.
Patent Information
- Application Number
- JP2023063244
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-10
- Publication Date
- 2024-10-23
AI Technical Summary
Existing technologies lack a method to evaluate whether power generation facilities are oversized or undersized in relation to power consumption, and fail to consider installation area and protection coordination with existing demand equipment when planning new installations.
A method involving multiple steps to calculate the optimal scale of power generation facilities by dividing a predetermined range into scales, determining annual power generation and consumption amounts, and using a computer to find the optimal scale based on a difference value.
Accurately and efficiently determines the optimal power generation facility scale by considering installation area and electrical constraints, ensuring realistic and efficient installation.
Smart Images

Figure 2024150030000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a power generation facility scale calculation program and a power generation facility scale calculation method for calculating an optimum scale of a power generation facility such as a photovoltaic power generation facility. [Background technology]
[0002] 2. Description of the Related Art In recent years, power generation facilities that utilize natural energy, such as solar power generation systems and wind power generation systems, that do not depend on fossil fuels such as petroleum, have been attracting attention.
[0003] When this type of power generation equipment is introduced, it is known to monitor the power supply so as to maintain a good balance between the power purchased from the so-called power company and the power generated by the introduced power generation equipment.
[0004] For example, Patent Document 1 describes that when a power supply and demand monitoring terminal starts a power provision time period, if the received power is greater than or equal to the reverse flow power, the terminal accumulates the value obtained by subtracting the reverse flow power from the received power as purchased power. When the reverse flow power is greater than the received power, the terminal repeats the operation of accumulating the value obtained by subtracting the received power from the reverse flow power as supplied power until the power provision time period ends, and when a power return time period starts, the terminal repeats the operation of accumulating the value obtained by subtracting the reverse flow power from the received power as returned power if the received power is greater than the reverse flow power, until the power return time period ends or the accumulated returned power exceeds the amount of returnable power. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2008-148382 A Summary of the Invention [Problem to be solved by the invention]
[0006] Patent Document 1 monitors and controls the power demand for power generation facilities that have already been installed. However, it does not suggest evaluating whether the power generation facilities are oversized or undersized in relation to the amount of power consumption. In addition, when installing a power generation facility for self-consumption as an extension to an existing demand facility, it is necessary to plan the facility size through multifaceted consideration based on various conditions such as the available installation area and protection coordination with the existing demand facility.
[0007] In view of the above problems, an object of the present invention is to provide a power generation facility scale calculation program and a power generation facility scale calculation method that are capable of calculating an optimal power generation facility scale. [Means for solving the problem]
[0008] The invention made to solve the above problem is a power generation facility scale calculation program that causes a computer to execute the following steps: a first step of dividing a predetermined scale range, which is set based on the planned installation conditions of the power generation facility, into multiple sections and setting multiple consideration scales for the power generation facility; a second step of obtaining an annual surplus amount based on a time series of annual power generation for each of the multiple consideration scales; a third step of calculating a total annual power generation amount from the time series of annual power generation for each of the multiple consideration scales and calculating an amount of self-consumption power for each of the multiple consideration scales based on the total power generation amount and the surplus amount; and a fourth step of determining an optimal scale from the predetermined scale range based on the difference value between the amount of self-consumption power and the surplus amount for each of the multiple consideration scales. Effect of the Invention
[0009] As described above, the present invention sets multiple consideration scales, and determines the optimal power generation equipment scale from a range of scales including the multiple consideration scales based on an approximation curve of the difference between the self-consumption amount and the surplus amount calculated for each consideration scale, thereby making it possible to accurately and efficiently calculate the optimal power generation equipment scale. [Brief description of the drawings]
[0010] [Figure 1] 1 is a schematic configuration diagram of a computer that executes a power generation facility scale calculation program according to an embodiment of the present invention. [Diagram 2] 2 is a flowchart of the operation of the power generation facility scale calculation program shown in FIG. 1. [Diagram 3] FIG. 3 is an explanatory diagram of step S4 and step S5 shown in FIG. [Figure 4] 13 is a flowchart of a correction operation. [Diagram 5] 1 is a graph showing the relationship between facility size and energy balance. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] An embodiment of the present invention will be described below with reference to the drawings. Fig. 1 is a schematic diagram of a computer that executes a power generation facility scale calculation program according to an embodiment of the present invention. In the following description, the computer is described as a personal computer, but the power generation facility scale calculation program may be executed by a server computer such as a cloud server.
[0012] The computer 100 shown in FIG. 1 includes a CPU 101, a ROM 102, a RAM 103, a storage device 104, a video I / F 105, an input I / F 106, a peripheral device I / F 107, and a network I / F 108.
[0013] The CPU 101 is a central processing unit that executes programs stored in the ROM 102 and the storage device 104 .
[0014] The ROM 102 is a read-only memory that stores programs and data executed when the computer 100 is started up. The RAM 103 is a random access memory that temporarily stores data and the like when the CPU 101 executes various programs and the like. The storage device 104 is a storage device such as a hard disk drive or non-volatile semiconductor memory that stores programs executed by the CPU 101, including a power generation facility scale calculation program 1 described later, and data (information) used by the programs.
[0015] The video I / F 105 is an interface (I / F) for displaying on a display device (not shown) such as a liquid crystal display, and converts the processing results of the CPU 101 and the like into a display format for the display device (not shown) and displays them. The input I / F 106 is connected to an input device such as a keyboard or a mouse, and outputs an input signal from the input device to the CPU 101 and the like. The peripheral device I / F 107 is an expansion I / F such as a USB (Universal Serial Bus), and is connected to external peripheral devices such as a printer or an external HDD. The network I / F 108 is an I / F for connection to an external network such as the Internet, and may be for wired communication or wireless communication.
[0016] The CPU 101 , ROM 102 , RAM 103 , storage device 104 , video I / F 105 , input I / F 106 , peripheral device I / F 107 , and network I / F 108 are interconnected via a bus 109 .
[0017] Next, the power generation facility scale calculation program 1 according to one embodiment of the present invention executed by the CPU 101 of the computer 100 described above will be described with reference to Figs. 2 to 5. Fig. 2 is a flowchart showing the operation of the power generation facility scale calculation program 1. In the following description, the power generation facility targeted by the power generation facility scale calculation program 1 is a photovoltaic power generation system.
[0018] First, the annual power generation amount of an arbitrary facility size (hereinafter referred to as Pi) is calculated (step S1). This Pi is a model case that is set from past performance, etc., based on the installation form and solar radiation attributes of the place (site) where the power generation facility is installed. Here, the facility size is, for example, the number of solar cell panels (also called solar cell modules) in the case of a photovoltaic power generation system. The facility size may be not only the number of panels, but also the number of PCSs (Power Conditioning Sub-systems), but in the following explanation, it will be simply explained as the number of panels for ease of understanding. This Pi is an arbitrary value, so the user of the power generation facility size calculation program may input it while taking into consideration the above-mentioned conditions.
[0019] The annual power generation amount is, for example, the power generation amount for one year in this model case, and is not a total value for the year, but is, for example, data on the time series of the power generation amount for one year. The annual power generation amount is not limited to one year, and may be multiple years (aging). Therefore, the annual power generation amount calculated in the following explanation may also be aging.
[0020] Next, the facility scale (hereinafter referred to as Pa) determined by physical conditions is determined (step S2). The physical conditions are the maximum scale (number of panels) that can be physically installed based on the available installation area of the installation location and the installation form.
[0021] Next, the equipment scale (hereinafter referred to as Pe) determined by the electrical conditions is determined (step S3). The electrical conditions are the upper limit of the scale (number of panels) determined by the existing demand equipment (contracted transformer capacity or contracted power) at the installation site and protection coordination.
[0022] Next, the examination range is determined (step S4). The examination range is determined by extracting the minimum (min) and maximum (max) values from the above-mentioned Pi, Pa, and Pe, and setting the range between the minimum and maximum values.
[0023] That is, among the equipment scale based on the installable area of the planned installation location, the equipment scale based on the electrical constraints of the planned installation location, and the equipment scale of the model case based on arbitrary conditions, the range between the minimum value and the maximum value is divided into a plurality of parts, and a plurality of study scales are set for the power generation equipment.
[0024] Next, the study scale and the annual power generation amount are estimated (step S5). In this step, the range from the minimum value to the maximum value determined in step S4 is divided into n equal parts to set the study scale. This equal division method can be obtained by the following formula (1) when the study scale (sheets) is Pm (m = 1 to n + 1). Pm=(max(Pi,Pa,Pe)-min(Pi,Pa,Pe)) / n×m+min(Pi,Pa,Pe)···(1)
[0025] Note that it is preferable to divide the range from the minimum value to the maximum value into equal parts, but it is not necessary. For example, a specific range within the range from the minimum value to the maximum value may be finely divided, or a specific range may be coarsely divided. That is, the range of a predetermined scale is divided into a plurality of parts, and a plurality of study scales are set for the power generation equipment.
[0026] The annual power generation amount Gm for each study scale can be obtained by the following formula (2) when the annual power generation amount of Pi is Gi. Here, the installation form of the annual power generation amount Gm is the same as that of Pi and is proportional to the equipment scale. Note that the annual power generation amount calculated in this step is the time-series power generation amount. Gm=Gi×Pm / Pi···(2)
[0027] An explanatory diagram of steps S4 and S5 is shown in FIG. 3. FIG. 3 shows the case where Pi < Pa < Pe, and the range from Pi to Pe is divided into n equal parts to obtain the study scales P1 to Pm. Since the time-series annual power generation amount Gi of Pi is known, the time-series annual power generation amounts G1 to Gm of each study scale P1 to Pm can be obtained by formula (2).
[0028] Next, a process analysis is performed on the time-series annual power generation amount calculated for each scale under consideration, and the annual surplus amount is calculated for each scale under consideration (step S6). In this step, the annual surplus amount (time series) is calculated by subtracting the actual power consumption (time series) from the annual power generation amount (time series). Since the surplus amount calculated here is a time-series value, the time-series value is integrated over the year to calculate the annual surplus amount for each scale under consideration. Note that the actual power consumption is the actual value of the time-series annual power consumption (time-series annual power consumption) in the facility where the system is installed, such as a house or building.
[0029] During a certain period of time, if the amount of power generated is less than the amount of power consumed, the surplus will be 0 regardless of the shortfall. In this case, all power generated will be self-consumption, and the shortfall will be covered by other power sources such as commercial power. On the other hand, if the amount of power generated is greater than or equal to the amount of power consumed, the power consumed will be self-consumption, and the amount exceeding the power consumed will be the surplus.
[0030] The process analysis in step S6 may use an external system that shows the effect of self-consumption in relation to the change in the amount of power generated and the change in the amount of power consumed, and the results of that system may be obtained in step S7, which will be described later.
[0031] Next, the annual surplus amount calculated in step S6 is acquired (step S7). That is, in step S7, the annual surplus amount for each of the multiple review scales is acquired based on the time-series annual power generation amount for each of the multiple review scales.
[0032] Next, it is determined whether the variable m is equal to or greater than n+1 (step S8). If the result of the determination is NO, the process returns to step S5, where the variable m is incremented to obtain the annual power generation amount and the annual surplus amount for the next scale of consideration.
[0033] On the other hand, if the result of the judgment is YES, the optimal point in terms of the energy balance condition is found (step S9). The optimal point (optimum scale) here means that, assuming that there is no surplus power sold, the self-consumption is large (not relying on other power sources) and the surplus is small (no excess power generated). Therefore, first, the self-consumption for each scale under consideration is calculated by subtracting the annual surplus R1-Rm from the total annual power generation G1-Gm of the scale under consideration, which is the annual sum of the annual power generation (time series) of the scale under consideration. Then, the scale where the self-consumption minus the annual surplus is the largest can be set.
[0034] In this embodiment, an approximation formula for the power generation amount of self-consumption - annual surplus for each scale of consideration is obtained. That is, the self-consumption - annual surplus for each scale of consideration is curve-approximated to calculate the optimal scale. That is, the inflection point Δf=0 of the approximated curve is set as the optimal point. The scale at this optimal point is set as Pb.
[0035] Next, among Pa, Pe, and Pb, the smallest one is set as the optimum facility scale (provisional) (step S10). If Pb exceeds Pa, the physical conditions are not met and installation is not possible, and if Pb exceeds Pe, the electrical conditions are not met and installation is not possible. Therefore, the smallest value among these is set as the optimum facility scale (provisional). Therefore, when Pb is the smallest, the optimum facility scale (provisional) is determined at the stage of step S9.
[0036] Next, the surplus rate at the optimum facility scale (provisional) calculated in step S10 is calculated from the surplus amount for each scale to be considered, and if it is not acceptable, the operation of correcting it will be described with reference to Fig. 4. The contents of Fig. 4 are also a part of the power generation facility scale calculation program 1.
[0037] First, the surplus rate is set to surplus amount / power generation amount, and an approximation formula for the curve of the average surplus rate against the facility scale is obtained. In other words, the approximation formula is obtained from the surplus rate for each of the above-mentioned considered scales. Then, the surplus rate at the power generation amount of the optimal facility scale (provisional) obtained in step S9 is obtained using the approximation formula (step S11).
[0038] Next, it is determined whether the surplus rate (Rt%) calculated in step S11 is within a predetermined allowable surplus rate (Rr%) (step S12).
[0039] If the surplus rate (Rt%) exceeds the allowable surplus rate (Rr%), the equipment scale (Pr) at the allowable surplus rate is calculated from the approximation formula (step S13). In other words, if the surplus rate is not within a predetermined allowable range, the optimal scale is corrected. Then, the equipment scale (Pr) calculated in step S13 becomes the final optimal equipment scale (step S14).
[0040] In step S13, it may be confirmed that the facility scale (Pr) obtained by correction is within the range of P00 to Pm (maximum value in the range under consideration). Here, P00 indicates the number of panels = 0. For example, if Pr is less than P00, P01 (number of panels = 1) is set as the optimum facility scale. If Pr is equal to or greater than P00 and equal to or less than the maximum value (Pm), Pr is set as the optimum facility scale as is. If Pr exceeds Pm, Pm (maximum value) is set as the optimum facility scale. If Pr is less than P00, the minimum value in the range under consideration (for example, Pi) may be set as the optimum facility scale.
[0041] On the other hand, if the surplus rate (Rt%) is equal to or less than the allowable surplus rate (Rr%), the optimal facility scale (provisional) obtained in step S10 is set as the final optimal facility scale (step S14).
[0042] Figure 5 shows the relationship between the equipment size and energy balance mentioned above. In Figure 5, the vertical axis shows the amount of electricity (kWh) and the horizontal axis shows the equipment size (Kw). This horizontal axis shows the power output from the power generation equipment, not the number of solar panels, but it can be considered to be in proportional relationship with the number of solar panels.
[0043] The solid line in Figure 5 shows the amount of power generated, where Pi is the minimum and Pe is the maximum. The dashed line shows the surplus amount, also called the amount of reverse power flow. The dashed and dotted line shows a curve approximation of self-consumption amount - surplus amount.
[0044] In Figure 5, the point on the solid line corresponding to the equipment scale where the dashed line inflection point (Δf = 0) occurs is the optimal point Pb. If Pa is between Pb and Pe, then Pb is the minimum and therefore the optimal equipment scale (provisional). If Pb exceeds the allowable surplus rate, then the equipment scale Pr at the allowable surplus rate is the final optimal equipment scale Ps.
[0045] As is clear from the above description, the computer 100 functions as a power generation facility scale calculation system, with steps S4 and S5 functioning as the first step, step S7 functioning as the second step, step S9 functioning as the third and fourth step, step S10 functioning as the fifth step, and steps S12 and S13 functioning as the sixth step.
[0046] According to this embodiment, the computer 100 executes step S4 of setting the minimum and maximum values of the equipment scale Pa based on the installation area of the planned installation location, the equipment scale Pe based on the electrical constraints of the planned installation location, and the equipment scale Pi of a model case based on arbitrary conditions, and dividing the range of the minimum and maximum values into multiple equal parts to set multiple study scales, and step S7 of acquiring the annual surplus amount for each of the multiple study scales calculated based on the annual power generation amount (time series) and the actual power consumption (time series).Then, step S9 of calculating the annual total power generation amount from the annual power generation amount of the time series for each of the multiple study scales, calculating the private power consumption amount for each of the multiple study scales based on the annual total power generation amount and the annual surplus amount, performing curve approximation of the difference value between the private power consumption amount and the annual surplus amount, and obtaining the optimal scale of the power generation equipment within the range from the minimum value to the maximum value based on the approximated curve is executed.
[0047] By configuring the power generation facility scale calculation program as described above, multiple consideration scales are set within the range of the minimum and maximum values of Pa, Pe, and Pi, and the optimal power generation facility scale is calculated within the range from the maximum value to the minimum value based on the approximation curve of the difference between the self-consumption amount and the annual surplus amount calculated for each consideration scale, so that the optimal power generation facility scale can be calculated accurately and efficiently.
[0048] Furthermore, the minimum and maximum values of Pa, Pe, and Pi are set as the range of the scale to be considered, so that the scale to be considered can be set taking into consideration the equipment scale that can be physically installed and the equipment scale that can be installed due to the electrical constraints of the planned installation location.
[0049] In addition, if the optimum scale Pb found in step S9 exceeds Pa or Pe, the smaller of Pa and Pe is set as the optimum scale. In this way, it is possible to propose a scale that can be realistically installed.
[0050] In addition, the surplus rate for the power generation amount at the optimum scale obtained in the fourth step is calculated, and if the surplus rate is not within a predetermined allowable range, the optimum scale is corrected. In this way, if the surplus rate is large, it can be corrected to be within an appropriate range.
[0051] In the above embodiment, the solar power generation system has been described, but the present invention can also be applied to other types of power generation equipment, such as wind power generation. In the above embodiment, the equipment parts that directly generate power, such as solar panels and windmills, have been described, but the power generation equipment may also include storage equipment, such as storage batteries. In the case where a storage equipment is present, charging and discharging due to peak shifting acts as a load, and as a result, this is reflected in the amount of self-consumption.
[0052] In addition, in this embodiment, Pa and Pe are used as the scales for setting the scale to be considered, but the scales may be set based on any facility scale based on the planned installation conditions, which are constraints due to the installation form including geographical conditions and equipment conditions.
[0053] Furthermore, the power generation facility scale calculation system of the present invention is not limited to being configured by one computer, but may be configured by multiple computers. In other words, the power generation facility scale calculation program may be divided into multiple programs to be executed by multiple computers.
[0054] The present invention is not limited to the above-described embodiment. In other words, a person skilled in the art can implement the present invention by modifying it in various ways in accordance with conventionally known knowledge without departing from the gist of the present invention. As long as such modifications still include the configuration of the power generation facility scale calculation program and the power generation facility scale calculation method of the present invention, they are of course included in the scope of the present invention. [Explanation of symbols]
[0055] 1 Power generation facility size calculation program 100 Computer (power generation facility size calculation system) S4 Deciding the scope of the study (first step) S5 Estimation of the scale of the study and annual power generation (first step) S7 Acquisition of annual surplus (2nd step) S9 Finding the optimum point under the energy balance conditions (3rd and 4th steps) S10 Optimal facility size (provisional) determination (5th step) S12 Determine whether the surplus rate is within the predetermined allowable surplus rate (6th step) S13 Correction (6th step)
Claims
1. A first step of dividing a range of a predetermined scale set based on planned installation conditions of the power generation facility into a plurality of scales and setting a plurality of study scales for the power generation facility; A second step of acquiring an annual surplus amount based on the time-series annual power generation amount for each of the plurality of considered scales; A third step of calculating a total annual power generation amount from the time-series annual power generation amounts for each of the plurality of review scales, and calculating a self-consumption amount for each of the plurality of review scales based on the total power generation amount and the surplus amount; A fourth step of determining an optimal scale from the predetermined range of scales based on a difference value between the self-power consumption amount and the surplus amount for each of the plurality of considered scales; A power generation facility size calculation program that causes a computer to execute the above.
2. 2. The power generation facility scale calculation program according to claim 1, further comprising a fifth step of causing the computer to execute the following: if the optimum scale calculated in the fourth step exceeds the equipment scale based on the installation area of the planned installation location or the equipment scale based on the electrical constraints of the planned installation location, the smaller of the equipment scale based on the installation area of the planned installation location and the equipment scale based on the electrical constraints of the planned installation location is set as the optimum scale.
3. 3. The power generation facility scale calculation program according to claim 2, further comprising a sixth step of calculating a surplus rate for the power generation amount at the optimum scale calculated in the fifth step, and correcting the optimum scale if the surplus rate is not within a predetermined allowable range.
4. The power generation facility scale calculation program according to claim 1, characterized in that the first step divides the ranges of minimum and maximum values among the facility scale based on the installation area of the planned installation location, the facility scale based on the electrical constraints of the planned installation location, and the facility scale of a model case based on arbitrary conditions into multiple ranges, and sets multiple consideration scales for the power generation facility.
5. A power generation facility size calculation method executed in a power generation facility size calculation system for calculating the size of a power generation facility, A first step of dividing a range of a predetermined scale set based on planned installation conditions of the power generation facility into a plurality of scales and setting a plurality of study scales for the power generation facility; A second step of acquiring an annual surplus amount based on the time-series annual power generation amount for each of the plurality of considered scales; A third step of calculating a total annual power generation amount from the time-series annual power generation amounts for each of the plurality of review scales, and calculating a self-consumption amount for each of the plurality of review scales based on the total power generation amount and the surplus amount; a fourth step of curve-approximating a difference between the amount of self-consumption electricity and the amount of surplus electricity, and determining an optimal scale from the predetermined scale range based on the curve-approximated; A method for calculating the scale of a power generation facility, comprising:
Citation Information
Patent Citations
System and method for supplying information
JP2004062254A
Power generation system evaluation method and power generation system evaluation device
JP2019054584A
Power management system
JP2020171132A
Power supply / demand monitoring terminal, power supply / demand monitoring controller, power supply / demand monitoring control system, power supply / demand monitoring method, power supply / demand monitoring control method, and power supply / demand control method
JP2008148382A