Step board dispersion prevention tool

The stepboard scattering prevention device secures footboards to construction bodies using a main body and fixing members, effectively preventing them from being blown away by winds and enhancing scaffold safety.

JP2024150376APending Publication Date: 2024-10-23TAKASHO
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023063792
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-10
Publication Date
2024-10-23

AI Technical Summary

Technical Problem

Footboards on construction scaffolds are prone to being blown away by strong winds due to their engagement mechanisms failing under wind pressure.

Method used

A stepboard scattering prevention device comprising a main body and a fixing portion that is fixed to the construction body, with members extending downward and horizontally to secure the footboards, preventing them from being blown away.

Benefits of technology

Effectively prevents footboards from flying off during strong winds by securing them to the construction body, reducing labor requirements and ensuring safety on scaffolds.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024150376000001_ABST
    Figure 2024150376000001_ABST
Patent Text Reader

Abstract

To prevent step boards laid on an erection body from dispersing in the case that they are fanned from a lower part due to wind.SOLUTION: A step board dispersion prevention tool 1 comprises: a main body 10 that prevents step boards 120 laid on an erection body 110 mounted to a building structure from dispersing and is placed on the step boards 120 laid on the erection body 110; and a fixed part 20 that is connected to the main body 10 and is fixed to the erection body 110 at a lower surface side of the main body 10. The fixed part 20 comprises: a first member 21 that extends downward from a lower surface of the main body 10; and a second member 22 that is connected to a lower end of the first member 21 and extends to a horizontal direction at a lower side of a shaft member 112 where the step boards 120 are laid in the state that it is attached to the erection body 110.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a device for preventing tread scattering, and more particularly to a device for preventing treads hung on a structure installed on a building from scattering. [Background technology]

[0002] Conventionally, when constructing a building, a scaffold for workers to work on is constructed along the vertical surface of the building's wall, etc. As an example of such a scaffold, Patent Document 1 shows a construction site curing frame that includes an outer vertical frame of a simple frame scaffold erected along the outer wall of the building under construction, an adjustable frame connected to the joint of the inner vertical frame, a telescopic arm connected to the adjustable frame toward the rooftop of the building, and a steel scaffolding plate stretched on the upper surfaces of the adjustable frame and the telescopic arm. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Publication No. 6-57963 Summary of the Invention [Problem to be solved by the invention]

[0004] Meanwhile, the treads of antis and the like have hook-shaped engaging parts at both ends, which are open at the bottom, and are fixed to an erected structure (such as the vertical frame or adjustment frame in Patent Document 1) by hanging them from above. Therefore, if the tread is blown from below by a strong wind, the engaging parts of the tread may come off the erected structure, causing the tread to fly away.

[0005] The present invention aims to prevent a step board hung on an erection structure from flying away when it is blown from below by wind. [Means for solving the problem]

[0006] (1) A tread scattering prevention device that prevents a tread attached to a structure installed on a building from scattering, comprising: A main body that is placed on the footboard that is hung on the erection body; A tread scattering prevention device comprising: a fixing portion connected to the main body and fixed to the installation body on the underside of the main body.

[0007] In the invention (1), the tread scattering prevention device has a main body and a fixing part, and prevents a tread hung on a structure installed on a building from scattering. The main body is placed on a step plate hung on a mounting structure. The fixing portion is connected to the main body and is fixed to a bridging body on the underside of the main body.

[0008] With this, by placing the main body on the step hung on the erection and fixing the fixing part on the underside of the main body to the erection, even if the step is blown from below by the wind, the main body connected to the fixing part fixed to the erection holds down the step, preventing the step from flying away. Therefore, when the tread plate hung on the erection structure is blown from below by the wind, it is possible to prevent the tread plate from flying away.

[0009] (2) The main body is disposed across two of the footboards that are disposed adjacent to each other; The fixing portion is a first member extending downward from a lower surface of the main body; The step scattering prevention device described in (1) is characterized in that it comprises a second member that is connected to the lower end of the first member and extends horizontally of the installation body below the shaft member on which the step is hung when attached to the installation body.

[0010] In the invention of (2), the main body is arranged across two steps that are arranged adjacent to each other. The fixing portion includes a first member and a second member. The first member extends downwardly from the lower surface of the body. The second member is connected to the lower end of the first member, and when attached to the erection structure, extends horizontally below the shaft member on which the footboard is hung.

[0011] Here, in the erected structure, of two treads disposed adjacent to each other, the left end of one tread and the right end of the other tread are hung on one shaft member.

[0012] According to the invention of (2), since the main body is positioned across two adjacent steps, one step scattering prevention device can hold down two adjacent steps, thereby reducing the labor required to prevent scattering of the steps.

[0013] According to the invention of (2), in the fixing part 20, the first member extends downward from the underside of the main body, and the second member extends horizontally below the shaft member to which the step is hung from the lower end of the first member. This ensures that even if the step is blown from below by the wind, the second member is securely caught on the underside of the shaft member of the erected body, and the main body connected to the second member via the first member holds down the step, thereby reliably preventing the step from flying away.

[0014] (3) The fixing portion further includes a third member extending downward from a lower surface of the main body at a position facing the first member, the first member and the second member are attached to the main body so as to be slidable in a direction away from and toward the third member, The fixing portion is fixed to the main body with the shaft member sandwiched between the first member and the third member and the second member positioned below the shaft member.

[0015] In the invention (3), the fixing portion further includes a third member. The third member extends downward from the lower surface of the main body at a position facing the first member. The first member and the second member are attached to the main body so as to be slidable in directions away from and toward the third member. The fixing portion is fixed to the main body in a state in which the shaft member is sandwiched between the first member and the third member and the second member is disposed below the shaft member.

[0016] According to the invention (3), the fixing portion is first placed in a state in which the distance between the tip of the second member and the side surface of the third member is greater than the outer diameter of the shaft member, and the tread scattering prevention device is installed on the installation body so that the shaft member of the installation body is positioned between the first member and the third member. Next, the first member and the second member are moved in a direction approaching the third member so that the shaft member is sandwiched between the sides of the first member and the third member, and the second member is fixed to the main body with the second member positioned below the shaft member.

[0017] As a result, the underside of the main body is positioned on the upper side of the axial member of the erection body, with the sides of the first and third members positioned on either side, and the upper surface of the second member positioned on the lower side, and is surrounded by the tread scattering prevention device. Therefore, even if the tread is blown downward from any direction by the wind, the tread scattering prevention device will not come off the shaft member of the erection body, so the tread can be securely held down by the main body and prevented from scattering. Effect of the Invention

[0018] According to the present invention, when a step board hung on an erection structure is blown from below by wind, the step board can be prevented from flying away. [Brief description of the drawings]

[0019] [Figure 1] FIG. 2 is a diagram illustrating a state in which a step scattering prevention device according to an embodiment of the present invention is applied. [Diagram 2] 1 is a top view of a step scattering prevention device according to an embodiment of the present invention. FIG. [Diagram 3] FIG. 2 is a bottom view of a step scattering prevention device according to an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0020] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the following description, the same components are denoted by the same reference numerals, and the description thereof will be omitted or simplified. FIG. 1 is a diagram illustrating a state in which a step scattering prevention device according to an embodiment of the present invention is applied. A tread scattering prevention device 1 according to an embodiment of the present invention is attached to a scaffolding 100 that is set up on a building structure.

[0021] The scaffolding 100 is, for example, configured as a typical frame scaffolding, and includes a vertically extending construction body 110 and a step 120 that is hung on the construction body 110.

[0022] The erection body 110 includes a vertical member 111 extending in the up-down direction, and an axis member 112 connected to the vertical member 111 and extending in a direction perpendicular to the direction in which the vertical member 111 extends.

[0023] The step board 120 includes a step board body 121 formed in a plate shape, and engagement parts 122 provided on both ends of the step board body 121 and formed in a hook shape with an open lower side.

[0024] In the scaffolding 100, a plurality of erection bodies 110 are arranged in the horizontal direction, and treads 120 are arranged between the adjacent erection bodies 110. For example, three erection bodies 110 are connected by two treads 120. In detail, an engagement part 122 on one end side of the first tread 120 is hung on the shaft member 112 of the erection body 110 at one end. In addition, an engagement part 122 on the other end side of the first tread 120 is hung on the shaft member 112 of the middle erection body 110, and an engagement part 122 on one end side of the second tread 120 is hung on the shaft member 112 of the erection body 110 at the other end. Then, an engagement part 122 on the other end side of the second tread 120 is hung on the shaft member 112 of the erection body 110 at the other end.

[0025] In the scaffolding 100, when the engagement portion 122 of the tread 120 is hooked onto the shaft member 112, a gap S is formed between the side surface of the shaft member 112 and the tread body 121.

[0026] Fig. 1 is a view of the shaft member 112 of the middle installation body 110 in the above example, viewed from the direction in which the shaft member 112 extends. That is, in the example shown in Fig. 1, one shaft member 112 is hooked onto the engagement portions 122 of two treads 120 arranged adjacent to each other.

[0027] In the example shown in FIG. 1, the step scattering prevention device 1 is fixed to one shaft member 112 on which the engagement portions 122 of two such step boards 120 are hooked, and presses down the two step boards 120 from above.

[0028] FIG. 2 is a top view of the step scattering prevention device according to the embodiment of the present invention. As shown in Figs. 1 and 2, the tread scattering prevention device 1 comprises a main body 10 and a fixing part 20, and prevents a tread 120 hung on a mounting structure 110 installed on a building structure from scattering.

[0029] The main body 10 is formed in a plate state and placed on a step 120 hung on a mounting structure 110. In detail, the main body 10 includes a central portion 11 formed in a rectangular shape when viewed from above, and inclined portions 12 formed on both ends of the central portion 11 and inclined downward when the central portion 11 is placed horizontally.

[0030] Although the inclined portion 12 may be omitted, providing the inclined portion 12 as in this embodiment makes it possible to reliably abut both ends of the main body 10 on the upper surface of the tread 120 even if, for example, the central portion 11 is bent or the heights of two adjacent treads 120 are different. This prevents both ends of the main body 10 from lifting off the upper surface of the tread 120, thereby preventing workers working on the scaffolding 100 from tripping over the tread scattering prevention device 1.

[0031] A through hole 11a is formed in the central portion 11, extending in the direction in which the central portion 11 extends. The through hole 11a extends to one side from a position (a position avoiding the shaft member 112 of the scaffolding 100) that is closer to one side than the center of the central portion 11, and is formed with a width that allows only the neck portion of a bolt 24 of the fixing portion 20 described later to be inserted, but does not allow the head portion of the bolt 24 to be inserted.

[0032] FIG. 3 is a bottom view of the step scattering prevention device according to the embodiment of the present invention. As shown in Figures 1 and 3, the fixing part 20 is connected to the central part 11 of the main body 10 and fixed to the installation body 110 on the underside of the main body 10, and comprises a first member 21, a second member 22, a third member 23, and a bolt 24.

[0033] The first member 21 is a plate member formed in a roughly L-shape and has a base portion 211, a downward portion 212, and a rising portion 213.The first member 21 is movable in the direction in which the central portion 11 extends from a position shifted to one side from the center of the central portion 11 of the main body 10, and is movable between a fixed position located at the center of the central portion 11 and an attachment position located on the end side of the central portion 11.

[0034] The base portion 211 has an upper surface facing the lower surface of the central portion 11 of the main body 10, and the upper surface abuts against the lower surface of the central portion 11. The base portion 211 is also provided with an engagement portion 211a that engages with the bolt 24 at a position overlapping with the through hole 11a formed in the central portion 11 of the main body 10. The engagement portion 211a is composed of a hole through which the neck of the bolt 24 can be inserted, and a nut that is fixed to the lower surface of the base portion 211 and screws into the neck of the bolt 24.

[0035] The descending portion 212 is connected to the end of the base portion 211 closest to the center of the main body 10, extends downward from the underside of the main body 10, and abuts against the shaft member 112 of the erection body 110 at a fixed position.

[0036] The rising portion 213 is connected to an end of the base portion 211 in a direction perpendicular to the extension direction of the main body 10, rises upward, and extends along the side surface of the central portion 11 of the main body 10. The rising portion 213 serves as a guide for the movement direction of the first member 21, and also functions as a member that prevents the first member 21 from rotating around the bolt 24.

[0037] The second member 22 is connected to the lower end of the descending portion 212 of the first member 21, and when attached to the installation body 110, it extends horizontally (from the other direction to the one direction in the example shown in FIG. 1) below the shaft member 112 on which the step 120 is hung. The second member 22 is formed so that the width in the direction in which the main body 10 extends is smaller than the gap S between the side surface of the shaft member 112 and the step body 121, and is larger than half the outer diameter of the shaft member 112. The second member 22 is located below the shaft member 112 when the first member 21 is arranged at the fixed position, and is located between the shaft member 112 and the step body 121 of the step 120 when the first member 21 is arranged at the mounting position.

[0038] The third member 23 is a plate member formed in a roughly L-shape and has a fixing portion 231 and a wall portion 232, and is fixed to the central portion 11 of the main body 10 at a position closer to the other side (the opposite side to the first member 21) than the center of the central portion 11 of the main body 10.

[0039] The fixing portion 231 has an upper surface facing the lower surface of the central portion 11 of the main body 10 , and the upper surface is fixed to the lower surface of the central portion 11 .

[0040] The wall portion 232 is connected to the end of the fixing portion 231 that is closest to the center of the main body 10, extends downward from the underside of the main body 10, and abuts against the shaft member 112 of the installation body 110 when the tread scattering prevention device 1 is attached to the installation body 110.

[0041] The bolt 24 is formed of a bolt having a head and a neck, with the head located on the upper surface side of the main body 10 and the neck penetrating the through hole 11a of the main body 10, extending to the lower surface side of the main body 10, and engaging with the engaging part 211a of the fixing part 20 (the neck is screwed into the nut of the engaging part 211a). When the bolt 24 is loosened, the tread scattering prevention device 1 allows the first member 21 and the second member 22 of the fixing part 20 to move relative to the main body 10, and when the bolt 24 is tightened, the first member 21 and the second member 22 are fixed to the main body 10.

[0042] 1, the tread scattering prevention device 1 has the main body 10 disposed across two treads 120 disposed adjacent to each other, but the present invention is not limited to this and may be disposed, for example, only on the upper surface of one tread 120 at the end of the scaffolding 100. In this case, for example, the other side of the central portion 11 may be formed into an L-shape bent downward and this downwardly bent portion may be made to be able to abut against the shaft member 112, thereby omitting the third member 23 of the fixing part 20.

[0043] Next, a method of using the tread scattering prevention device 1 will be described. A worker who attaches the step scattering prevention device 1 to the erected body 110 loosens the bolts 24, places the first member 21 and the second member 22 of the fixing part 20 in the attachment position, and places it on the step 120 hung on the erected body 110. At this time, the worker places the shaft member 112 of the erected body 110 between the first member 21 and the second member 22 and the third member 23, inserts the lowered portion 212 of the first member 21 and the second member 22 into the gap S between the step body 121 of the step 120 on one side and the shaft member 112, and inserts the wall portion 232 of the third member 23 into the gap S between the step body 121 of the step 120 on the other side and the shaft member 112. As a result, the main body 10 is placed on the upper surface of the step 120.

[0044] In this state, the worker moves the first member 21 and the second member 22 toward the shaft member 112, sandwiching the shaft member 112 between the descending portion 212 and the wall portion 232, and tightens the bolt 24. As a result, the fixing portion 20 is fixed to the main body 10 with the shaft member 112 sandwiched between the descending portion 212 and the wall portion 232 and the second member 22 disposed below the shaft member 112. In other words, the step scattering prevention device 1 is fixed to the erected structure 110 with the main body 10 disposed on the upper surface of the step 120, resulting in the state shown in FIG.

[0045] According to this embodiment of the step scattering prevention device 1, the main body 10 is placed on the step 120 hung on the erection body 110, and the fixing part 20 is fixed to the erection body 110 on the underside of the main body 10. Even if the step 120 is blown from below by the wind, the main body 10 connected to the fixing part 20 fixed to the erection body 110 holds down the step 120, thereby preventing the step 120 from scattering. Therefore, when the step board 120 hung on the erection body 110 is blown from below by the wind, it is possible to prevent the step board 120 from flying away.

[0046] Furthermore, according to the step scattering prevention device 1, the main body 10 is positioned across two step boards 120 arranged adjacent to each other, so that one step scattering prevention device 1 can hold down two step boards 120 arranged adjacent to each other, thereby reducing the labor required to prevent the step boards 120 from scattering.

[0047] Furthermore, according to the step scattering prevention device 1, in the fixing part 20, the first member 21 extends downward from the underside of the main body 10, and the second member 22 extends horizontally from the lower end of the first member 21 below the shaft member 112 to which the step 120 is hung. As a result, even if the step 120 is blown from below by the wind, the second member 22 is securely caught on the underside of the shaft member 112 of the erected body 110, and the main body 10, which is connected to the second member 22 via the first member 21, holds down the step 120, thereby reliably preventing the step 120 from scattering.

[0048] In addition, according to the tread scattering prevention device 1, the shaft member 112 of the installation body 110 has the underside of the main body 10 positioned on the upper side, the sides of the first member 21 and the third member 23 positioned on either side, and the upper surface of the second member 22 positioned on the lower side, and is surrounded by the tread scattering prevention device 1. Therefore, even if the step board 120 is blown downward from any direction by the wind, the step board scattering prevention device 1 does not come off the shaft member 112 of the erection body 110, so that the step board 120 is securely held down by the main body 10, and the step board 120 can be prevented from scattering.

[0049] The present invention is not limited to the embodiments, and modifications and improvements within the scope of the present invention that can achieve the object of the present invention are included in the present invention. [Explanation of symbols]

[0050] 1 Stepboard scatter prevention device 10. Main Unit 11 Central part 11a Through hole 12 Slope 20 Fixed part 21 First member 22 Second member 23 Third member 24 Volts 100 Scaffolding 110 Erection structure 111 Vertical Member 112 Shaft member 120 Treadboard 121 Tread body 122 Engagement part 211 Base 211a Engagement part 212 Falling part 213 Rising section 231 Fixation part 232 Wall

Claims

1. A step scattering prevention device that prevents a step hung on a structure installed on a building from scattering, A main body that is placed on the footboard that is hung on the erection body; A tread scattering prevention device comprising: a fixing portion connected to the main body and fixed to the installation body on the underside of the main body.

2. The main body is disposed across two of the step plates disposed adjacent to each other, The fixing portion is a first member extending downward from a lower surface of the body; The step scattering prevention device as described in claim 1, characterized in that it is further characterized by a second member that is connected to the lower end of the first member and extends horizontally below the shaft member on which the step is hung when attached to the erection structure.

3. The fixing portion further includes a third member extending downward from a lower surface of the main body at a position facing the first member, the first member and the second member are attached to the main body so as to be slidable in a direction away from and toward the third member, The step shatter prevention device as described in claim 2, characterized in that the fixing portion is fixed to the main body with the shaft member sandwiched between the first member and the third member and the second member positioned below the shaft member.

Citation Information

Patent Citations

  • Curing frame for construction site

    JP1994057963A