Elevator operation control system and elevator operation control method
The elevator operation control system optimizes flood evacuation operations by predicting user demand and tailoring elevator control methods, improving convenience and reducing flood damage by aligning operations with user needs.
Patent Information
- Application Number
- JP2023063985
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-11
- Publication Date
- 2024-10-24
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing elevator flood management systems do not consider user demands, leading to inconvenience during heavy rain events and prolonged restoration times.
An elevator operation control system that predicts user demand by analyzing past operation data, weather forecasts, and building events to optimize flood evacuation operations, allowing for tailored control methods such as normal operation, continuous operation, or suspension based on time periods.
Enhances user convenience and reduces flood damage risk by strategically managing elevator operations to align with predicted user needs, minimizing disruptions and restoration time.
Smart Images

Figure 2024150927000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to an elevator operation control system and an elevator operation control method. [Background technology]
[0002] Elevators are generally equipped with various devices, such as a door control device that controls the operation of the car doors, and a control panel that controls the elevator's operation and speed. These devices are often installed in the car and in the pit of the elevator shaft. If water gets into the elevator shaft due to a typhoon or heavy rain, the elevator's devices may become flooded and may not function properly.
[0003] Therefore, if an elevator becomes flooded, inconveniences may occur, such as the elevator doors not opening and passengers being trapped in the car, or the car stopping and passengers being unable to use the elevator. In the unlikely event that such inconvenience occurs, information that an abnormality has occurred in the elevator is first transmitted to the elevator maintenance company's monitoring center or service base via an on-call from the customer or a notification from a monitoring terminal. Then, a specialized engineer who received the notification is dispatched to the site and performs work to drain the hoistway, remove moisture from the flooded equipment, or replace parts of the flooded equipment. After that, an inspection of the elevator is performed, safety is confirmed, and restoration work is completed.
[0004] In this way, when water gets into the hoistway and the elevator equipment becomes submerged, the elevator's serviceability is reduced, and complicated recovery work is required, which takes a long time to restore. Therefore, Patent Document 1 proposes a submersion evacuation operation system as an invention for suppressing damage to elevators caused by flooding in the hoistway, which makes it easier for managers to decide to set or cancel submersion evacuation operation.
[0005] In Patent Document 1, when heavy rain is expected due to a typhoon or the like, current weather data and nearby river water level data are acquired, and compared with past flooding information to automatically determine the necessity of flood evacuation operation. Then, based on the result of this determination and the flood evacuation setting status of the surrounding area, a manager performs flood evacuation operation of the corresponding elevator. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] JP 2021-134067 A Summary of the Invention [Problem to be solved by the invention]
[0007] However, the invention disclosed in Patent Document 1 does not take into consideration the demands of elevator users, and therefore has the disadvantage of causing inconvenience during busy hours.
[0008] Therefore, the present invention provides an elevator operation control system and an elevator operation control method that are capable of performing flood evacuation operation that takes into account the needs of elevator users, while improving convenience for elevator users and reducing the risk of flood damage. [Means for solving the problem]
[0009] In order to solve the above problems and achieve the object of the present invention, the elevator operation control system of the present invention is an elevator operation control system capable of setting in advance the date and time for performing flood evacuation operation of an elevator. The elevator operation control system includes an information extraction unit that extracts past elevator operation information and external information including a weather forecast for a set date and time, and calculates a time-slot-based number of users forecast for the set date and time from the past elevator operation information. The system also includes an output unit that outputs the time-slot-based number of users forecast and the external information to a specified display terminal, and an operation setting information input unit that inputs an operation control method for a time slot for the set date and time after outputting the time-slot-based number of users forecast and the external information to the display terminal, and further includes an operation command unit that transmits an operation command based on the operation control method to a target elevator.
[0010] The elevator operation control method of the present invention extracts past elevator operation information and external information including a weather forecast for a set date and time, and calculates a time-slot number of users forecast for the set date and time from the past elevator operation information.The time-slot number of users forecast for the set date and time and the external information are then output to a display terminal.An operation command is then sent to a target elevator based on the time-slot number of users forecast and the operation control method for the time slot that has been input after the external information has been output to the display terminal. Effect of the Invention
[0011] According to the present invention, it is possible to perform flood evacuation operations of elevators taking into account the needs of users, thereby improving convenience for elevator users and reducing the risk of flood damage. [Brief description of the drawings]
[0012] [Figure 1] FIG. 1 is a schematic configuration diagram of an elevator operation control system 100 according to one embodiment of the present invention. [Diagram 2] FIG. 2 is a block diagram showing the configuration of a control system of the elevator system 30 according to one embodiment of the present invention. [Diagram 3] FIG. 13 is a diagram showing a workflow performed by a customer 3 to carry out submergence evacuation operation control. [Figure 4] FIG. 13 is a diagram showing an example of a screen displayed when a customer 3 selects an elevator that is a target for submergence evacuation operation from a customer terminal 4. [Diagram 5] FIG. 5 shows the display screen of the customer terminal 4 to which the transition occurs after the "Select" button 103 in FIG. 4 is selected. [Figure 6] 6 is an example of a screen of the customer terminal 4 to which the screen transitions after the "Flood evacuation operation setting" button 201 in FIG. 5 is selected. [Figure 7] 7 is a diagram showing an example of the configuration of a table 700 in the elevator operation information database 23. FIG. [Figure 8] FIG. 8 is a diagram showing an example of the configuration of a table 800 in the calendar information database 19. [Figure 9] 5 or 6, and is an example of a screen for confirming the setting status of time-zone-specific flood evacuation operation or canceling the setting. [Figure 10] 2 is a configuration example of an operation setting information table 500 stored in the operation setting information database 11. [Figure 11] 6 is a diagram showing an example of a table 600 showing examples of remote operation contents assigned to each remote operation command ID. [Figure 12] 13 is an example of a display screen displayed on a screen of a user mobile terminal 2 owned by a user 1 when a submergence evacuation operation is being performed. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] An example of an elevator operation control system and an elevator control method according to an embodiment of the present invention will be described below with reference to the drawings. Note that the present invention is not limited to the following example. In each of the drawings described below, the same reference numerals are used to denote common members.
[0014] 1. Configuration of elevator operation control system First, an elevator operation control system according to one embodiment of the present invention will be described with reference to the drawings. Fig. 1 is a schematic configuration diagram of an elevator operation control system 100 according to one embodiment of the present invention (hereinafter, referred to as this embodiment). The elevator operation control system 100 of the present invention is a system for controlling a flood evacuation operation for performing an evacuation operation when an elevator is flooded.
[0015] As shown in FIG. 1, the elevator operation control system 100 of this embodiment is mainly composed of an information processing unit 6 configured in a monitoring center 5, a building / elevator information storage unit 13, an external information storage unit 16, an elevator operation information storage unit 22, a communication device 20, and an operation data collection device 21.
[0016] [Information Processing Section] The information processing unit 6 includes an operation setting unit 50, an information extracting unit 12, an operation setting information database 11, and an operation command unit .
[0017] The operation setting unit 50 includes an output unit 7, an information generating unit 8, and an operation setting information input unit 9. The operation setting unit 50 transmits and receives information to and from a user mobile terminal 2 operated by a user 1 and a customer terminal 4 (corresponding to a display terminal of the present invention) operated by a customer 3. Here, the user 1 refers to a person who uses a building in which the target elevator system 30 is installed, and corresponds to, for example, a resident of an apartment building or a user who works in the building. In addition, examples of the user mobile terminal 2 used by the user 1 include a smartphone and a tablet. The user 1 can use the user mobile terminal 2 to check messages within the building, elevator operation information, and the like.
[0018] Meanwhile, the customer 3 refers to an owner or manager of a building in which the target elevator system 30 is installed. The customer terminal 4 operated by the customer 3 may be a personal computer, tablet, smartphone, or the like installed in the building. In this embodiment, as will be described in detail later, the customer 3 inputs necessary information from the customer terminal 4, thereby enabling operation control in response to flooding. The user mobile terminal 2, the customer terminal 4, and the operation setting unit 50 are connected via a communication network such as the Internet.
[0019] The output unit 7 outputs screen data to be displayed on the user mobile terminal 2 and the customer terminal 4. The output unit 7 is connected to the information generation unit 8 so as to be able to transmit and receive information. The information generation unit 8 is connected to the information extraction unit 12 and the operation setting information input unit 9. The information generation unit 8 generates screen data to be displayed on the user mobile terminal 2 and / or the customer terminal 4 based on information received from the information extraction unit 12 and the operation setting information input unit 9 described below. The information generation unit 8 transmits the generated screen data to the output unit 7. The operation setting information input unit 9 is connected to the operation setting information database 11. Based on information input from the customer terminal 4, the operation setting information input unit 9 sets plan information for elevator flood evacuation operation by car number and time period, and registers the plan information in the operation setting information database 11.
[0020] The information extraction unit 12 is connected to the building / elevator information storage unit 13, the external information storage unit 16, and the elevator operation information storage unit 22. The information extraction unit 12 extracts information necessary for setting the flood evacuation operation from each of the building / elevator information storage unit 13, the external information storage unit 16, and the elevator operation information storage unit 22. Specifically, the information extraction unit 12 extracts information on the load capacity of the target elevator from the building / elevator information storage unit 13. In addition, the information extraction unit 12 extracts weather information, event information held in the building, and calendar information from the external information storage unit 16. In addition, the information extraction unit 12 extracts elevator operation information from the elevator operation information storage unit 22. Furthermore, the information extraction unit 12 calculates a time-slot-based user number forecast for the target elevator based on the extracted information. Then, the information extraction unit 12 outputs the calculated time-slot-based user number forecast to the information generation unit 8. The information extracted by the information extracting unit 12 and the method of calculating the predicted number of users by time period will be described in detail later.
[0021] The operation setting information database 11 stores elevator flood evacuation operation plan information for each elevator car and time period input from the customer terminal 4 to the operation setting information input unit 9.
[0022] The operation command unit 10 is connected to an operation setting information database 11. The operation command unit 10 extracts setting information for flood evacuation operation of elevators stored in the operation setting information database 11, and outputs an operation control command based on the setting information for flood evacuation operation to a target elevator.
[0023] [Building and elevator information storage section] The building / elevator information storage unit 13 is a storage unit for storing information on buildings and elevators installed in each building. The building / elevator information storage unit 13 has a building master information database 14 and an elevator information database 15. The building master information database 14 stores information on the buildings it manages. Furthermore, the elevator information database 15 stores equipment information such as the capacity (load) and speed of each elevator. Each piece of information stored in the building master information database 14 and the elevator information database 15 is appropriately extracted by the information extraction unit 12.
[0024] [External information storage section] The external information storage unit 16 is a storage unit for storing information obtained by input from the external terminal 24. The external information storage unit 16 has a weather information database 17, a building event information database 18, and a calendar information database 19. The weather information database 17 stores weather information including hourly precipitation. Furthermore, the weather information database 17 stores weather information for each location based on location information of the managed building. The building event information database 18 stores building maintenance and inspection schedule information, and event schedule information to be held in the customer building. The calendar information database 19 stores information on the day of the week and date, and school holiday information in the neighborhood of the managed building. Each piece of information stored in the weather information database 17, the building event information database 18, and the calendar information database 19 is appropriately extracted by the information extraction unit 12.
[0025] [Elevator operation information storage section] The elevator operation information storage unit 22 includes an elevator operation information database 23 that stores elevator operation information collected by an operation data collection device 21 described below. The elevator operation information database 23 stores the number of elevator operations for each day of the week, date, and time, elevator load data, etc. Each piece of information stored in the elevator operation information database 23 is appropriately extracted by the information extraction unit 12.
[0026] [Operation data collection device] The operation data collecting device 21 collects operation information transmitted from the elevator system 30 via the communication device 20. The various pieces of operation information collected by the operation data collecting device 21 are registered in an elevator operation information database 23 in an elevator operation information storage unit 22.
[0027] [Communication Device] The communication device 20 transmits and receives information to and from an elevator system 30 installed in a building that it manages. The communication device 20 is connected to the elevator system 30 via a high-speed communication network (not shown). In this embodiment, the communication device 20 not only acquires operation information of the elevator system 30 but also transmits operation control commands transmitted from the operation command unit 10 to the elevator system 30.
[0028] 2. Elevator System Configuration Next, a description will be given of the configuration of a control system of the elevator system 30 controlled by the elevator operation control system 100 of this embodiment. Fig. 2 is a block diagram showing the configuration of the control system of the elevator system 30.
[0029] As shown in Fig. 2, the elevator system 30 includes elevators 36-1 to 36-n installed in customer buildings managed by the monitoring center 5, elevator control devices 35-1 to 35-n, remote monitoring devices 32-1 to 32-n, and communication devices 31-1 to 31-n provided for each of the elevators 36-1 to 36-n. Each of the elevators 36-1 to 36-n includes a car, a hoist that drives the car to raise and lower, an operation panel operated by a user, a load detection device that detects the load loaded on the car, and the like. In this embodiment, the elevators 36-1 to 36-n perform flood evacuation operation based on an operation control command transmitted from the monitoring center 5 in addition to normal operation.
[0030] The elevator control devices 35-1 to 35-n control the operation of the elevators 36-1 to 36-n based on information input from the operation panels of the elevators 36-1 to 36-n and operation commands transmitted from the monitoring center 5. The elevator control devices 35-1 to 35-n are also connected to the remote monitoring devices 32-1 to 32-n so as to be able to transmit and receive information. The remote monitoring devices 32-1 to 32-n acquire operation information of the elevators 36-1 to 36-n transmitted from the elevator control devices 35-1 to 35-n. The remote monitoring devices 32-1 to 32-n then store the information in the elevator operation information databases 34-1 to 34-n of the operation information storage units 33-1 to 33-n. The operation information storage units 33-1 to 33-n are composed of, for example, memory cards such as SD cards. The elevator control devices 35-1 to 35-n are also connected to the communication devices 31-1 to 31-n.
[0031] The communication devices 31-1 to 31-n are connected to a high-speed communication network. The communication devices 31-1 to 31-n transmit and receive information to and from the communication device 20 of the monitoring center 5. In this embodiment, the operation information of the elevators 36-1 to 36-n stored in the elevator operation information databases 34-1 to 34-n is transmitted to the monitoring center 5 via the communication devices 31-1 to 31-n. In addition, the communication devices 31-1 to 31-n transmit operation control commands received from the monitoring center 5 to the respective elevator control devices 35-1 to 35-n via the remote monitoring devices 32-1 to 32-n.
[0032] Here, a method of collecting operation information of elevators 36-1 to 36-n periodically performed by operation data collection device 21 in monitoring center 5 will be described. Operation data collection device 21 in monitoring center 5 periodically connects to communication devices 31-1 to 31-n of elevator system 30 via communication device 20 at predetermined time intervals. The frequency of connection of operation data collection device 21 to elevator system 30 can be set appropriately, but may be about once a day, for example.
[0033] In the elevator system 30, after connection from the monitoring center 5, the operation information of the elevators 36-1 to 36-n stored in the elevator operation information databases 34-1 to 34-n of the operation information storage units 33-1 to 33-n is transmitted to the monitoring center 5. Then, the operation information of the elevators 36-1 to 36-n is stored in the elevator operation information database 23 of the elevator operation information storage unit 22 of the monitoring center 5.
[0034] Each of the above-mentioned elevator operation control system 100 and elevator system 30 is controlled and processed under the control of a control processing unit (not shown). Each control processing unit includes, for example, a CPU (Central Processing Unit), a ROM (Read Only Memory), a RAM (Random Access Memory), and a non-volatile storage, each of which is connected to a bus.
[0035] The CPU reads out the program code of the software that realizes each function configured in each part from the ROM, expands it into the RAM, and executes it. Note that the control processing unit may be equipped with a processing device such as an MPU (Micro-Processing Unit) instead of the CPU. Variables, parameters, etc. generated during the calculation process are temporarily written to the RAM.
[0036] Examples of non-volatile storage that can be used include a hard disk drive (HDD), a solid state drive (SSD), a flexible disk, an optical disk, a magneto-optical disk, a CD-ROM, a CD-R, a magnetic tape, and a non-volatile memory card. In addition to an operating system (OS) and various parameters, programs for operating the control processing unit are recorded in the non-volatile storage. The programs may be stored in a ROM.
[0037] The program is stored in the form of a computer-readable program code, and the CPU sequentially executes operations according to the program code. In other words, a ROM or non-volatile storage is used as an example of a computer-readable non-transitory recording medium that stores a program to be executed by a computer.
[0038] 3. Elevator operation control method Next, an elevator operation control method implemented by the elevator operation control system 100 of this embodiment will be described. Fig. 3 is a diagram showing a workflow implemented by the customer 3 to implement flood evacuation operation control. In this embodiment, the elevator control method will be described mainly along the workflow implemented by the customer 3.
[0039] The workflow shown in Figure 3 shows the procedure that Customer 3 will follow to carry out elevator flood evacuation operations when heavy rain due to a typhoon or other event is predicted in the area of a building managed by Customer 3, and there is a risk of flooding in the surrounding area, including the managed building.
[0040] First, in order to carry out flood evacuation operation, the customer 3 selects an elevator that is to be the target of flood evacuation operation from the display screen of the customer terminal 4 (step S1). FIG. 4 is a diagram showing an example of a screen displayed when the customer 3 selects an elevator that is to be the target of flood evacuation operation from the customer terminal 4 in step S1. As shown in FIG. 4, a "Select building equipment to be managed" screen 40 is displayed on the display screen of the customer terminal 4. The "Select building equipment to be managed" screen 40 displays an elevator information display field 101 that can be identified by the building name, elevators installed in the building, and their unit numbers, an elevator selection field 102, and a "Select" button 103 that determines the selected elevator.
[0041] The information displayed on the screen 40 shown in Fig. 4 is, for example, information that is displayed when the customer 3 inputs a customer ID. Based on the input customer ID, the information extraction unit 12 of the monitoring center 5 extracts various pieces of information from the building master information database 14 and the elevator information database 15 of the building / elevator information storage unit 13. Then, based on the various pieces of extracted information, the information generation unit 8 generates information to be displayed on the screen 40 of the customer terminal 4, and the information is displayed.
[0042] In step S1, the customer 3 uses the elevator information display field 101 displayed on the screen 40 in Fig. 4 to confirm the equipment name and elevator number of the elevator in the building to be managed, and selects the elevator to be subject to flood evacuation operation from the elevator selection field 102. After making a selection in the elevator selection field 102, the customer 3 selects the "Select" button 103 on the display screen. The "Select" button 103 is configured so that it can be selected (operated) after a selection has been made in the elevator selection field 102.
[0043] In step S1, by selecting the "Select" button 103, the screen 40 shown in Fig. 4 is transitioned to the next display screen (see Fig. 5). Note that in this embodiment, the customer 3 selects the target elevator from the elevator selection field 102, but if the customer 3 manages multiple buildings, a button that allows the customer 3 to select the target building may be further configured.
[0044] FIG. 5 is a diagram showing the display screen of the customer terminal 4 to which the transition is made after the "Select" button 103 in FIG. 4 is selected. As shown in FIG. 5, the customer terminal 4 displays a screen 41 of the "Elevator Flooding Evacuation Operation Remote Control Setting Menu". The "Elevator Flooding Evacuation Operation Remote Control Setting Menu" screen 41 displays a "Flooding Evacuation Operation Setting" button 201 for the elevator for which flooding evacuation operation is to be set, and a "Check / Cancel Setting Status" button 202 for checking the current elevator setting status and for canceling the setting. In addition, a "Back" button 203 for returning to the previous "Select Building Equipment to be Managed" screen 40 (FIG. 4) is displayed. The "Elevator Flooding Evacuation Operation Remote Control Setting Menu" screen 41 may be set with other necessary menu buttons.
[0045] When setting up flood evacuation operation, customer 3 selects the "Flood evacuation operation setting" button 201 from screen 41 of the "Elevator flood evacuation operation remote control setting menu" (step S2). By selecting the "Flood evacuation operation setting" button 201, information on the elevator that is the target of the flood evacuation operation is input from the customer terminal 4 to the operation setting information input unit 9 of the information processing unit 6 of the monitoring center 5. Then, at the monitoring center 5 side, information to be displayed on the display screen of the customer terminal 4 is generated in the information generation unit 8 of the information processing unit 6, and the information generated by the information generation unit 8 is transmitted to the customer terminal 4 via the output unit 7. The information generated by the information generation unit 8 in association with the operation of step S2 will be described in detail later.
[0046] Fig. 6 is an example of a screen of the customer terminal 4 to which the transition occurs after selecting the "Flood evacuation operation setting" button 201 in Fig. 5. As shown in Fig. 6, after the "Flood evacuation operation setting" button 201 in Fig. 5 is selected, a screen 42 for "Elevator flood evacuation operation plan setting" is displayed.
[0047] As shown in FIG. 6 , the “Elevator Flooding Evacuation Operation Plan Setting” screen 42 displays a “Start Date” pull-down 301, an “End Date” pull-down 302, a “Search” button 303, a “Previous Day” button 304, a “Next Day” button 305, a weather forecast display field 306, a predicted number of elevator occupants display field 307, a congestion level by time period display field 308, flooding evacuation operation setting fields 309 and 310, and a “Next” button 318.
[0048] A "start date" pull-down 301 is a pull-down that allows the user to select a start date for setting the flood evacuation operation. An "end date" pull-down 302 is a pull-down that allows the user to select an end date for setting the flood evacuation operation.
[0049] The "Search" button 303 can be pressed after the start date and end date of the flood evacuation operation have been set, and is a button for starting a search for weather forecasts, elevator occupancy forecasts, and event information for the period from the start date to the end date of the flood evacuation operation. When the "Search" button 303 is pressed, the information extraction unit 12 at the monitoring center 5 extracts various pieces of information from the building / elevator information storage unit 13, the external information storage unit 16, and the elevator operation information storage unit 22. The method of extracting various pieces of information performed at the monitoring center 5 by pressing the "Search" button 303 will be described in detail later.
[0050] It should be noted that until the "Search" button 303 is selected, the weather forecast display field 306, the elevator user number forecast display field 307, the congestion degree by time period display field 308, and the event display field 317 are blank.
[0051] The "Previous Day" button 304 is a button that can change the information displayed on the screen 42 to information for the "previous day" date between the start date and end date of the set flood evacuation operation. In other words, selecting the "Previous Day" button 304 transitions to a screen that displays information for the day before the currently displayed date. The "Next Day" button 305 is a button that can change the information displayed on the screen 42 to information for the "next day" date between the start date and end date of the set flood evacuation operation. In other words, selecting the "next day" button 305 transitions to a screen that displays information for the day after the currently displayed date.
[0052] The weather forecast display field 306 is a field that displays the hourly weather forecast for the currently displayed date between the start date and end date of the set flood evacuation operation. The elevator user count prediction display field 307 is a field that displays the user count prediction for each hour for the currently displayed date between the start date and end date of the set flood evacuation operation, and displays the user count prediction for each hour. The time period congestion degree display field 308 displays the prediction of how crowded the elevator will be by time period.
[0053] In the submergence evacuation operation setting fields 309, 310, check boxes are displayed for selecting the operation control method for each time period for each elevator number selected on the "Select building equipment to be managed" screen in Fig. 4. In this embodiment, there are three types of operation control methods, and any of normal operation, continuous operation, or operation suspension can be set. In the submergence evacuation operation setting fields 309, 310, there are provided normal operation setting fields 311, 314 for selecting normal operation, continuous operation setting fields 312, 315 for selecting continuous operation, and suspended operation setting fields 313, 316 for selecting operation suspension, respectively.
[0054] The normal operation setting fields 311 and 314 are provided with check boxes for selecting normal operation control for performing normal operation without performing flood evacuation operation for each time period. The continuous operation setting fields 312 and 315 are provided with check boxes for selecting a control method for flood evacuation operation for performing continuous operation by changing the waiting floor of the car to the top floor or the like without suspending elevator operation for each time period. The operation suspension setting fields 313 and 316 are provided with check boxes for selecting a control method for flood evacuation operation for performing suspension of elevator operation for each time period by evacuating the car to the top floor or the like. These operation control methods can be set on an hourly basis by selecting each check box, and are configured so that multiple operation setting fields cannot be selected simultaneously for the same time period.
[0055] The check boxes of the normal operation setting fields 311 and 314, the continuous operation setting fields 312 and 315, and the operation suspension setting fields 313 and 316 are configured to be operable after the "search" button 303 is selected. That is, the customer 3 can select each check box after the screen 42 in Fig. 6 is in a state where the customer 3 can check each piece of information in the weather forecast display field 306 for the set period, the elevator user number forecast display field 307, the congestion degree by time period display field 308, and the event display field 317. The operation procedure on the screen 42 in Fig. 6 will be described in detail later.
[0056] The event display field 317 displays events and work plans that will be held in the building between the start date and end date of the set flood evacuation operation.
[0057] The "Next" button 318 is a button that the customer can select after completing the settings on the "Elevator Flooding Evacuation Operation Plan Setting" screen 42, and is a button for transitioning to the next screen.
[0058] Returning to the work flow in Fig. 3, a method of operating the screen 42 in Fig. 6 will be described. After the "Elevator Flooding Evacuation Operation Plan Setting" screen 42 shown in Fig. 6 is displayed, the customer 3 first selects the target period for the flooding evacuation operation by setting any date from the "Start Date" pull-down menu 301 and the "End Date" pull-down menu 302 (step S3). Next, the customer 3 selects the "Search" button 303 from the "Elevator Flooding Evacuation Operation Plan Setting" screen 42 shown in Fig. 6 (step S4). As a result, a weather forecast display field 306, an elevator user number forecast display field 307, and a time-of-day congestion degree display field 308 for the set date (period) are displayed, as shown in Fig. 6.
[0059] Here, a method of extracting each piece of information that is implemented by the information extractor 12 of the monitoring center 5 when the "Search" button 303 is selected on the screen 42 shown in FIG. 6 will be described.
[0060] When the operation setting information input unit 9 detects an input from the "Search" button 303 on the customer terminal 4, a command to extract various information is input to the information extraction unit 12 via the information generation unit 8. The information extraction unit 12 first extracts, from the weather information database 17, a weather forecast corresponding to the start date and end date of the flood evacuation operation set on the screen 42 of FIG. 6. The information extraction unit 12 also extracts operation information of the target elevator from the elevator operation information database 23, and extracts calendar information from the calendar information database 19.
[0061] FIG. 7 is a diagram showing an example of a table configuration of the elevator operation information database 23. A table 700 of the elevator operation information database 23 is composed of the following items: "Elevator ID" 701, "Vehicle number" 702, "Date" 703, "Start time" 704, "End time" 705, "Number of users" 706, "Average waiting time" 707, and "Average occupancy rate" 708. "Elevator ID" 701 is composed of alphanumeric characters that represent the unique identification information of the elevator. "Vehicle number" 702 is composed of an alphanumeric identifier for managing the elevator in the corresponding building. "Date" 703 is the day on which the elevator is in operation. "Start time" 704 is the start time of one unit (one record) of various operation information data to be compiled. "End time" 705 is the end time of one unit (one record) of various operation information data to be compiled.
[0062] "Number of users" 706 is the number of users per unit time, calculated by dividing the elevator's load capacity (kg) per unit time by a person's weight (Japanese standard: 65 kg). "Average waiting time" 707 is the average waiting time (seconds) per unit time, calculated as the average time it takes for a user to press the elevator call button in the elevator hall and for the elevator to arrive. "Average occupancy rate" 708 is the average occupancy rate (%) per unit time, calculated as the average number of people riding in the elevator compared to its capacity.
[0063] 8 is a diagram showing an example of the configuration of a table 800 in the calendar information database 19. The table 800 in the calendar information database 19 is made up of the following items: “Date” 801, “Day of the week” 802, and “School holiday section” 803.
[0064] In the screen 42 shown in FIG. 6, a case will be described in which the start date is set to '2023 / 9 / 1' in the "Start Date" pull-down 301, the end date is set to '2023 / 9 / 3' in the "End Date" pull-down 302, and the "Search" button 303 is selected. In this case, the information extraction unit 12 first refers to the table 800 of the calendar information database 19 shown in FIG. 8. When the "Search" button is selected for the period from the start date to the end date, the information extraction unit 12 refers to records 806, 807, and 808 whose dates match those of the period set in the screen 42 of FIG. 6 and the table 800 shown in FIG. 8. Here, a "record" refers to a collection of data recorded in one row of the table 800. The "record" described below has the same meaning.
[0065] The "day of the week" 802 of these records 806, 807, and 808 are Friday, Saturday, and Sunday, respectively. Next, the information extraction unit 12 extracts data corresponding to Friday to Sunday in the same past few months (approximately three months) as the "day of the week" of the records 806, 807, and 808 from the elevator operation information database 23.
[0066] However, in the case of residential buildings such as apartment buildings, the tendency of the number of users by time period changes when elementary and junior high schools are on long holidays. Therefore, in this embodiment, taking this into consideration, a "school holiday category" 803 is provided in table 800 of calendar information database 19, and "1" is set for days when school is off such as summer vacation, and "0" is set for other days in an external system (not shown), and the data is acquired. In this embodiment, in table 800 shown in FIG. 8, records 709 to 714 in table 700 shown in FIG. 7 that are linked to the date of record 804 on the same day of the week as record 806 and for which "school holiday category" 803 is "0" are extracted. On the other hand, in table 800 shown in FIG. 8, the operation information record on the same date as record 805 is not extracted because "school holiday category" 803 is "1".
[0067] In this way, it is possible to extract information with higher accuracy by setting extraction conditions based on the information in the calendar information database 19. In addition to the long holiday schedules for elementary and junior high schools, items that are expected to change the tendency of the number of users by time period can be added to table 800 of the calendar information database 19. This allows for more accurate prediction of the number of users.
[0068] Next, the information extraction unit 12 extracts the relevant data from the elevator operation information database 23, and then calculates the average number of users and the congestion level for each date and time unit. The average number of users for each time unit calculated here is displayed in the elevator user number forecast display field 307 in Fig. 6. The congestion level displayed in the time-slot congestion level display field 308 in Fig. 6 is determined based on the values of the average waiting time 707 and the average occupancy rate 708 in the elevator operation information table 700 in Fig. 7. In this case, the congestion state is determined according to the degree of congestion, such as crowded, slightly crowded, or unoccupied.
[0069] Then, based on the various information extracted by the information extraction unit 12, the information generation unit 8 generates information to be displayed on the screen 42 of Fig. 6, and transmits the generated information to the customer terminal 4. As a result, the respective information is displayed in a weather forecast display field 306, an elevator user count prediction display field 307, and a time-slot congestion level display field 308 shown in Fig. 6. For example, the weather forecast display field 306 displays a weather forecast and a precipitation prediction for every few hours. The elevator user count prediction display field 307 displays a bar graph showing the predicted number of users. Also, the time-slot congestion level display field 308 displays the congestion level in a different color depending on the congestion situation.
[0070] Furthermore, in the event display field 317 in FIG. 6, inspection information and cleaning information for facilities in the building and various event information scheduled to be carried out on the relevant day, which are obtained from the building event information database 18, are displayed.
[0071] Returning to the work flow of FIG. 4 again, a method of operating the screen 42 of FIG. 6 will be described. The customer 3 sets the operation control method by selecting a check box indicating a desired operation control method for each time period in the submergence evacuation operation setting fields 309, 310 of the screen 42 of FIG. 6 (step S5). For example, when normal operation control is selected, the check boxes in the normal operation setting fields 311, 314 are selected. When the waiting floor is set to the top floor or the like as the submergence evacuation operation control and operation is continued, the check boxes in the continued operation setting fields 312, 315 are selected. When the elevator operation is suspended by evacuating the car to the top floor as the submergence evacuation operation control, the check boxes in the operation suspension setting fields 313, 316 are selected.
[0072] These settings are set by the customer as appropriate, referring to the weather forecast (amount of precipitation) displayed in weather forecast display field 306, the number of users by time period displayed in elevator user number forecast display field 307, and the congestion level displayed in congestion level by time period display field 308. For example, if the user number forecast in elevator user number forecast display field 307 is checked and congestion in the elevators is expected to occur between 7:00 and 9:00 in the morning rush hour, it is possible to cancel flood evacuation operation during that time period only and operate both elevators normally. In this case, the check boxes for the relevant time periods in normal operation setting field 311 for unit 1 and normal operation setting field 314 for unit 2 are selected.
[0073] In addition, for example, during busy periods when the number of users is somewhat high, the waiting floor can be set to the top floor, etc., and flood evacuation operation can be set to continue in Unit 1 and Unit 2. Also, for Unit 2, during non-crowded periods, it is possible to stop the car at the evacuation floor and suspend elevator operation. In this way, in the flood evacuation operation setting fields 309, 310, it is possible to set the operation of Units 1 and 2 separately for each period of time.
[0074] Furthermore, the customer 3 can refer to the time and contents of the event displayed in the event display field 317 of the screen 42 in Fig. 6 for the operation settings. When changing the date and setting, the customer selects the "Previous day" button 304 for displaying information for the day before the displayed date, or the "Next day" button 305 for displaying information for the day after, and changes the date to be set. Note that a function may be provided that allows the data entered in the normal operation setting fields 311 and 314, the continuous operation setting fields 312 and 315, and the operation suspension setting fields 313 and 316 to copy the data of a specified date to another date.
[0075] Then, in the case where flood evacuation operation is to be performed after completing the operation settings on screen 42 of Fig. 6, customer 3 selects the "Next" button 318 on screen 42 of Fig. 6 (step S6). By selecting the "Next" button 318 on screen 42 of Fig. 6, the setting information of the operation control method input on screen 42 of Fig. 6 is input to the operation setting information input unit 9 on the monitoring center 5 side. Then, the operation setting information input unit 9 records the setting information of the operation control method in the operation setting information database 11 and transmits it to the information generation unit 8.
[0076] The information generation unit 8 generates information to be sent to the next customer terminal 4 based on the setting information for the operation control method sent from the operation setting information input unit 9, and sends the generated information to the customer terminal 4. As a result, the screen of the customer terminal 4 transitions from screen 42 in Fig. 6 to screen 43 in Fig. 9. Fig. 9 is an example of a screen to which to transition from screen 42 in Fig. 5 or Fig. 6, and is an example of a screen for checking the setting status of time-zone-specific flood evacuation operation and canceling the setting.
[0077] Here, we will explain screen 43 for "Check elevator flood evacuation operation setting status" shown in Fig. 9. Screen 43 for "Check elevator flood evacuation operation setting status" in Fig. 9 displays a flood evacuation operation execution display field 401. In addition, screen 43 in Fig. 9 displays a "Change settings" button 404, a "Cancel settings" button 405, a "All operations suspended" button 406, and a "Execute flood evacuation operation plan" button 407.
[0078] Flood evacuation operation in progress display field 401 is a field that displays the execution status of flood evacuation operation of the elevator selected in Fig. 6. Flood evacuation operation in progress display field 401 displays the date and time set on screen 42 in Fig. 6 described above, and flood evacuation operation setting status display fields 402 and 403 for each elevator. For example, flood evacuation operation setting status display field 402 displays the operation setting of elevator No. 1, and flood evacuation operation setting display field 403 displays the operation setting of elevator No. 2.
[0079] The submergence evacuation operation setting status display fields 402, 403 display the operation control methods for each time period set by selecting check boxes in the normal operation setting fields 311, 314, the continuous operation setting fields 312, 315, and the suspended operation setting fields 313, 316 on the screen 42 of FIG.
[0080] The "Change Settings" button 404 is a button for changing the settings of the flood evacuation operation. Selecting the "Change Settings" button 404 transitions to screen 42 in Fig. 6. This allows customer 3 to again input settings for the flood evacuation operation from screen 42 in Fig. 6.
[0081] The "cancel settings" button 405 is a button for cancelling all settings of the submergence evacuation operation. By selecting the "cancel settings" button 405, the settings of the submergence evacuation operation of the elevator are cancelled, and all settings related to the submergence evacuation operation are cancelled.
[0082] The "All operations suspended" button 406 is a button for suspending all operations of the targeted elevators. For example, in response to sudden flooding in the surrounding area, selecting the "All operations suspended" button 406 switches to flood evacuation operation, in which the cars of all targeted elevators are evacuated to a floor that will not be affected by flooding, such as the top floor, and elevator operation is suspended. The process of suspending operation of the targeted elevators in response to flooding may be executed in conjunction with a sensor (not shown) that detects flooding installed in the elevator pit.
[0083] The "Execute submergence evacuation operation plan" button 407 is a button for executing submergence evacuation operation with the settings displayed in submergence evacuation operation execution display field 401 of Fig. 9. Therefore, when executing submergence evacuation operation, as shown in the work flow of Fig. 3, the "Execute submergence evacuation operation plan" button 407 is selected (step S7). As a result, submergence evacuation operation is executed during the specified time period with the settings displayed in submergence evacuation operation execution display field 401.
[0084] Here, a description will be given of the control processing executed on the monitoring center 5 side when the "Execute submergence evacuation operation plan" button 407 is selected in step S7 of Fig. 3. When the "Execute submergence evacuation operation plan" button 407 is selected on the customer terminal 4, the operation command unit 10 of the information processing unit 6 on the monitoring center 5 side reads out information on the set submergence evacuation operation from the operation setting information database 11. The setting information for submergence evacuation operation recorded in the operation setting information database 11 is setting information that is set from the screen 42 of Fig. 6 in step S5 and is also recorded in the operation setting information database 11 from the operation setting information input unit 9 at the stage of step S6.
[0085] Then, the operation command unit 10 transmits a predetermined remote control command (operation command) to the elevator system 30 based on the setting information of the operation control method read from the operation setting information database 11.
[0086] 10 is a configuration example of an operation setting information table 500 stored in the operation setting information database 11. The operation setting information table 500 is composed of the following items: “Elevator ID” 501, “Elevator No.” 502, “Start Date” 503, “Start Time” 504, “End Date” 505, “End Time” 506, “Remote Operation Command ID” 507, and “Operation Command Transmission Flag” 508.
[0087] In "Elevator ID" 501, an elevator ID consisting of alphanumeric characters that represents unique identification information of the elevator is recorded. In "Unit" 502, a unit number consisting of an alphanumeric identifier for managing the elevators of the target building is recorded. In "Start Date" 503, a date for starting the submersion evacuation operation specified on screen 42 of FIG. 6 is recorded. In "Start Time" 504, a time for starting the submersion evacuation operation on the corresponding date is recorded. In "End Date" 505, a date for ending the submersion evacuation operation specified on screen 42 of FIG. 6 is recorded. In "End Time" 506, a time for ending the submersion evacuation operation on the corresponding date is recorded. In "Remote Operation Command ID" 507, a remote operation command ID for remotely operating the target elevator (e.g., elevators 36-1 to 36-n in FIG. 2) to perform the submersion evacuation operation.
[0088] FIG. 11 shows an example of the configuration of a table 600 showing examples of remote operation contents assigned to each remote operation command ID. The table 600 shown in FIG. 11 is composed of items of a "remote operation command ID" 601 and a "remote operation content" 602. A unique identification number indicating the operation content, such as "01", "02", or "03", is recorded in the "remote operation command ID" 601. The "remote operation content" 602 records the setting content of the operation control corresponding to the "remote operation command ID" 601. In this embodiment, when the "remote operation command ID" 601 is "01", the "remote operation content" 602 records the setting content of performing a flood evacuation operation in which the elevator operation is not stopped and the waiting floor of the car is changed to the top floor or the like, and the elevator operation is continued. When the "remote operation command ID" 601 is "02", the "remote operation content" 602 records the setting content of performing a flood evacuation operation in which the elevator operation is stopped by evacuating the car to the top floor or the like. When the "remote operation command ID" is "03", the "remote operation content" 602 records the setting content for canceling the flood evacuation operation set for the target elevator and returning it to normal operation.
[0089] 10, the operation command unit 10 reads out the remote operation command content shown in table 600 in Fig. 11 according to the remote operation command ID recorded in "remote operation command ID" 507. Then, the operation command unit 10 transmits the remote operation command based on the remote operation command ID to the remote monitoring devices 32-1 to 32-n of the elevator system 30.
[0090] For example, a case will be described in which the operation command unit 10 transmits an operation command based on the settings shown in the record 511 in Fig. 10. In the record 511, the "elevator ID" 501 is 'T00001-01', the "start date" 503 is '2023 / 09 / 01', the "start time" 504 is '00:00', the "end date" 505 is '2023 / 09 / 01', the "end time" 506 is '07:00', and the "remote remote control command ID" 507 is "01". In this case, a remote command to perform a flood evacuation operation based on the remote control command ID "01" is transmitted from the operation command unit 10 to the elevator system 30 side from 0:00 to 7:00 on September 1, 2023. As a result, for elevators with elevator ID 'T00001-01', flood evacuation operations will be implemented between 0:00 and 7:00 on September 1, 2023, in which elevator service will not be suspended, but the elevator will change its waiting floor to the top floor or other floors and continue to operate. After that, from 7:00 onwards, the elevator will automatically return to normal operation.
[0091] A case will be described in which the operation command unit 10 issues an operation command based on the settings shown in the record 512 in Fig. 10. In the record 512, the "elevator ID" 501 is 'T00002-01', the "start date" 503 is '2023 / 09 / 01', the "start time" 504 is '09:00', the "end date" 505 is '2023 / 09 / 01', the "end time" 506 is '12:00', and the "remote operation command ID" 507 is "02". In this case, a remote command based on the remote operation command ID "02" is transmitted from the operation command unit 10 to the elevator system 30 side from 9:00 to 12:00 on September 1, 2023. As a result, for the elevator with elevator ID 'T00002-01', flood evacuation operations will be implemented between 9:00 and 12:00 on September 1, 2023, in which the car will be evacuated to the top floor or other location and the elevator will be suspended.
[0092] Next, the "operation command transmission flag" 508 in the operation setting information table 500 of Fig. 10 will be described. The "operation command transmission flag" 508 records the transmission status of the remote operation command transmitted from the operation command unit 10. For example, "0" or "1" is recorded in the "operation command transmission flag" 508 as a numerical value indicating the transmission status of the remote operation command. "0" is a value recorded when the remote operation command from the operation command unit 10 has not been transmitted (including non-transmission due to a connection error caused by some reason). "1" is a value recorded when the remote operation command from the operation command unit 10 has already been transmitted.
[0093] When the "Execute flood evacuation operation plan" button 407 is selected on the screen 43 of Fig. 9, the operation command unit 10 sequentially extracts data of records that meet all of the following conditions 1 to 3 from the table shown in Fig. 10. Then, the operation command unit 10 transmits the contents of the remote operation command shown in the records that meet all of the conditions 1 to 3 to the remote monitoring devices 32-1 to 32-n of the elevator system 30. Condition 1: If the start date and time specified in "Start Date" 503 and "Start Time" 504 is before the system date and time Condition 2: If the start date and time specified in "End Date" 505 and "End Time" 506 is after the system date and time Condition 3: When the "operation command transmission flag" 508 is "0" The system date and time corresponds to the current date and time.
[0094] For example, when the "operation command transmission flag" 508 is "1", condition 3 is not satisfied. Therefore, the remote operation commands in the records 511, 512, and 514 in FIG. 10 are not transmitted. On the other hand, when the system date and time is exactly 9:00 on September 1, 2023, the data in the record 515 satisfies all of the conditions 1 to 3. Therefore, the remote operation command having the setting contents shown in the record 515 is transmitted from the operation command unit 10 to the elevator system 30. Note that when the remote operation command in the record 515 is transmitted from the operation command unit 10, the "operation command transmission flag" 508 in the record 515 is rewritten to "1".
[0095] In this manner, the submergence evacuation operation is performed. When the submergence evacuation operation is performed, it is preferable that the user 1 is notified that the submergence evacuation operation is being performed. Fig. 12 shows an example of a display screen that is displayed on the screen of the user mobile terminal 2 owned by the user 1 when the submergence evacuation operation is performed.
[0096] As shown in Fig. 12, a notice display field 901, a relevant period display field 902, and an elevator operation schedule information field 903 are displayed on the screen of a user mobile terminal 2 owned by a user 1. The notice display field 901 displays information informing the user that flood evacuation operation will be performed. The relevant period display field 902 displays the period (start date, end date) during which the flood evacuation operation will be performed. The elevator operation schedule information field 903 displays, for each target elevator, a status by time period, for example, available (normal operation), available (the car waits on the top floor after use), or unavailable (operation suspended).
[0097] In this embodiment, for example, the screen shown in FIG. 12 can be displayed on the user mobile terminal 2 of the user at the timing when the "Execute flood evacuation operation plan" button 407 is selected on the screen 43 of FIG. 9. In this embodiment, at the timing when the "Execute flood evacuation operation plan" button 407 is selected, the information generation unit 8 extracts setting information for flood evacuation operation from the operation setting information database 11 and generates information to be displayed on the user mobile terminal 2. The information related to flood evacuation operation generated by the information generation unit 8 is then transmitted to the user mobile terminal via the output unit 7. As a result, a notification message to that effect is displayed on the user mobile terminal 2, and the contents can be confirmed from a user application or web screen.
[0098] As described above, in this embodiment, the customer 3 can set the elevator flood evacuation operation considering the demand of users by referring to the weather forecast, the building occupancy forecast, and event information. Therefore, in the elevator system, the risk of flood damage can be reduced without reducing the convenience for users.
[0099] Although the elevator operation control system 100 of the present embodiment is mainly configured by the various units configured in the monitoring center 5, the elevator operation control system may also include the customer terminal 4 and the user mobile terminal 2. Furthermore, in the present embodiment, an example has been described in which various information is displayed on the customer terminal 4 and various operations are performed from the customer terminal 4. However, the present invention is not limited to this, and for example, the elevator operation control system may be configured such that various information is displayed on a display terminal installed in the monitoring center 5 and operation setting information is input from the display terminal.
[0100] The above-mentioned embodiment has been described in detail to clearly explain the present invention, and is not necessarily limited to having all of the configurations described. For example, it is possible to replace a part of the configuration of the embodiment with another configuration, and it is also possible to add another configuration to the configuration of the embodiment. Also, it is possible to add, delete, or replace a part of the configuration of the embodiment with another configuration. [Explanation of symbols]
[0101] 1...user, 2...user mobile terminal, 3...customer, 4...customer terminal, 5...monitoring center, 6...information processing unit, 7...output unit, 8...information generation unit, 9...operation setting information input unit, 10...operation command unit, 11...operation setting information database, 12...information extraction unit, 13...building / elevator information storage unit, 14...building master information database, 15...elevator information database, 16...external information storage unit, 17...weather information database, 18...building event information database, 19...calendar information database, 20...communication device, 21...operation data collection device, 22...elevator operation information storage unit, 23...elevator operation information database, 24...external terminal, 30...elevator system
Claims
1. An elevator operation control system capable of setting the date and time for performing flood evacuation operation of an elevator in advance, an information extraction unit that extracts past elevator operation information and external information including a weather forecast for a set date and time, and calculates a time-zone-specific user number forecast for the set date and time from the past elevator operation information; an output unit that outputs the time-zone-specific user number prediction and the external information to a predetermined display terminal; an operation setting information input unit to which an operation control method for each time period at a set date and time is input after the time period-based user number prediction and the external information are output to the display terminal; An operation command unit that transmits an operation command based on the operation control method to a target elevator; An elevator operation control system comprising:
2. The information extraction unit extracts the number of users of the elevator by time period under the same conditions as the set date and time from the past elevator operation information, and calculates the average value of the extracted number of users by time period to calculate the forecast number of users by time period.
2. The elevator operation control system according to claim 1.
3. The external information includes event information scheduled to be held in the building in which the elevator is installed at a set date and time.
3. The elevator operation control system according to claim 2.
4. In the operation setting information input unit, one of the operation control methods is input for each time period: normal operation control for performing normal operation, flood evacuation operation control for changing the waiting floor of the car to the top floor or the like and operating continuously, or flood evacuation operation control for evacuating the car to the top floor or the like and suspending elevator operation.
2. The elevator operation control system according to claim 1.
5. The information extraction unit extracts calendar information including information on the day of the week, date, and holiday information of schools in the neighborhood of the building in which the elevator is installed, and extracts the number of elevator users by time period on a date and time with the same conditions as the set date and time based on the calendar information.
3. The elevator operation control system according to claim 2.
6. Extracting past elevator operation information and external information including a weather forecast for the set date and time, and calculating a time-zone-specific user number forecast for the set date and time from the past elevator operation information; outputting the time-slot-based user forecast for the set date and time and the external information to a display terminal; Transmitting an operation command to a target elevator based on the time-zone-based user count prediction and the operation control method for the time zone that is input after the external information is output to the display terminal. Elevator operation control method.
Citation Information
Patent Citations
Flood evacuation operation system for elevator
JP2021134067A