Wing wall additional reinforcement structure and wing wall additional reinforcement process
Non-shrinkage concrete and mortar are used to efficiently and cost-effectively integrate wing walls with RC frames, addressing time and cost issues while maintaining structural integrity by enhancing adhesive strength and reducing shear strength losses.
Patent Information
- Application Number
- JP2024049780
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-13
- Filing Date
- 2024-03-26
- Publication Date
- 2024-10-25
AI Technical Summary
Existing methods for adding wing walls to reinforced concrete (RC) frames are time-consuming, costly, and result in reduced structural strength due to non-integral formation, leading to increased construction costs and prolonged construction periods.
The use of non-shrinkage mortar or non-shrinkage concrete with adhesive strength to form wing walls and column wrapping parts, eliminating the need for separate concrete pouring and mortar filling steps, and integrating the wing walls with beams and columns for enhanced shear strength.
This approach reduces construction time and costs while maintaining or enhancing the structural integrity of RC frames by ensuring integral formation and increased adhesive strength at interfaces, thereby alleviating shear strength reductions.
Smart Images

Figure 2024152641000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to earthquake-resistant reinforcement design for reinforced concrete buildings (hereinafter referred to as RC buildings), and in particular to a sleeve wall addition reinforcement method that can increase the earthquake resistance of a reinforced concrete structure (hereinafter referred to as RC structure) by installing a new sleeve wall within a structure consisting of a pair of columns and a pair of beams, and to a sleeve wall addition reinforcement structure used therein. [Background technology]
[0002] In reinforced concrete buildings, sleeve walls are sometimes added to a structure consisting of a pair of columns and a pair of beams in order to reinforce the RC frame. Figure 17(a) is a front view showing the appearance of a conventional sleeve wall added to an RC frame, and Figure 17(b) is a flow chart showing the procedure for adding a sleeve wall using the conventional method. As shown in FIG. 17(a), when a sleeve wall 53 is newly installed inside an RC frame 50 consisting of a pair of beams 51, 51 and a pair of columns 52, 52, normal concrete (hereinafter referred to as ready-mixed concrete) is often used. In this case, as shown in FIG. 17(b), a pump truck is first set up (step S1). Next, ready-mixed concrete is filled into a formwork (not shown) previously installed inside the RC frame 50 via the piping of the pump truck, and reinforced concrete 53a is formed (step S2). At this time, a space is generated between the upper beam 51 and the reinforced concrete 53a due to shrinkage of the ready-mixed concrete, so the space is left in advance and non-shrink mortar is filled in the space, and the reinforced concrete 53b consisting of non-shrink mortar and reinforcing bar is formed on the reinforced concrete 53a with the non-shrink mortar. In this case, the part surrounded by the pair of sleeve walls 53, 53 consisting of the reinforced concrete 53a, 53b and the pair of beams 51, 51 becomes an opening 54. In this way, when adding sleeve wall 53 using ready mixed concrete, the space between upper beam 51 and reinforced concrete 53a must be filled with non-shrink mortar after pouring the ready mixed concrete, so in addition to steps S1 and S2, a step of setting up a mortar mixer (step S3) and a step of filling the above-mentioned space with non-shrink mortar (step S4) are required. Therefore, in the conventional construction method of adding sleeve walls using ready mixed concrete, adding sleeve walls is time-consuming, which leads to problems of high construction costs and long construction time. In addition, in the conventional construction method of adding sleeve walls using ready mixed concrete, the sleeve wall 53 and the beam 51 or the sleeve wall 53 and the column 52 are not integrally formed, so the design regulations reduce the strength by about 20%, which poses the problem of a large amount of reinforcement. For example, examples of strength reduction include the strength reduction coefficient n, etc., specified in the "Guidelines and Commentary on Seismic Retrofit Design for Existing Reinforced Concrete Buildings / Japan Building Disaster Prevention Association."
[0003] As an example of a technology for shortening the construction time required to add sleeve walls, Patent Document 1 discloses an invention titled “Method of reinforcing existing columns” that relates to a method of reinforcing existing columns by adding sleeve walls. Using the symbols shown in the drawings of Patent Document 1, the invention disclosed in Patent Document 1 reinforces the existing column 10 by attaching a PC plate (fiber-reinforced high-strength concrete plate) 16, which is manufactured in advance in a factory or the like and then transported to the site, to a section surrounded by an existing column 10, an existing beam 12 connected to the existing column 10, and a slab 14 located below the beam 12. The invention is characterized in that anchor bars 18 are driven into the existing column 10 and the slab 14 along a surface X surrounded by the existing column 10 and the beam 12, and grooves 16a for receiving the anchor bars 18 are provided on the periphery of the PC plate 16. When a PC plate 16 having such a structure is used, the PC plate 16 is fitted into the portion surrounded by the existing columns 10, beams 12, and slab 14 so that the anchor reinforcement 18 is received in the groove 16a, and then the filler 24, such as concrete or mortar, filled in the groove 16a is allowed to harden, thereby integrating the PC plate 16 and the anchor reinforcement 18. In this case, the PC plate 16 manufactured in advance at a factory or the like is used, and therefore no curing period for the sleeve wall at the site is required, thereby shortening the construction period required for adding the sleeve wall.
[0004] Furthermore, Patent Document 2, entitled "Column Structure and Column Reinforcement Method," discloses an invention relating to a method of reinforcing columns with sleeve walls and the column structure. Using the symbols shown in the drawings of Patent Document 2, the invention relating to a column reinforcement method disclosed in Patent Document 2 is characterized in that anchor bars 11 are protruded from the side of an existing column 10, spiral anti-crack bars 12 are arranged in these anchor bars 11, a precast sleeve wall 9 having a joint groove 13 on its joint surface with the column 10 is abutted against the side of the column 10 so that the anchor bars 11 and the anti-crack bars 12 are housed inside the joint groove 13, the front half of the stirrup bars 15 exposed inside the joint groove 13 is inserted into the anchor bars 11, and mortar is injected into the joint groove 13 from the top of the sleeve wall 9. According to this method, the sleeve wall 9 is made of precast material and does not require a curing period on-site, so that earthquake-resistance reinforcement work can be easily carried out in a short period of time. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] Japanese Patent Application Publication No. 9-268774 [Patent Document 2] Patent No. 3444785 Summary of the Invention [Problem to be solved by the invention]
[0006] However, in the invention disclosed in Patent Document 1, a PC slab 16 that has been manufactured in advance at a factory or the like is used, eliminating the need for a curing period for the sleeve wall on-site and shortening the construction time required for adding the sleeve wall. However, since the structure of the PC slab 16 is complex, in addition to the cost of reinforcing the columns being high, there was the problem that it was difficult to transport the PC slab 16 to the installation location inside an existing building that was separated by partitions. In addition, in the invention relating to a column reinforcement method disclosed in Patent Document 2, a precast sleeve wall 9 is used, and therefore no curing period for the sleeve wall 9 is required, as in the case of the invention disclosed in Patent Document 1, and therefore the sleeve wall 9 can be added in a short period of time. However, since the sleeve wall 9 does not have a simple structure, it cannot be manufactured inexpensively, and in addition, there is a problem that the reduction in strength caused by the sleeve wall 9 and the existing column 10 not being formed integrally is not mitigated.
[0007] The present invention has been made in response to such conventional circumstances, and aims to provide a sleeve wall addition reinforcement method and a sleeve wall addition reinforcement structure used therein that are inexpensive to construct, efficiently reinforce RC structures in a short period of time, and can mitigate the reduction in strength after reinforcement. [Means for solving the problem]
[0008] In order to achieve the above object, the first invention is a sleeve wall addition reinforcement structure in which a sleeve wall is added for the purpose of reinforcing an RC frame composed of a pair of columns and a pair of beams, and the sleeve wall has a strength of 1.5 N / mm 2 The present invention is characterized in that it is made of reinforced concrete formed using non-shrink mortar or non-shrink concrete having an adhesive strength of at least 100%. In the first invention, the adhesive strength of the boundary surface between the beam / column and the sleeve wall is high, so that they are close to being formed simultaneously, which has the effect of mitigating the approximately 20% reduction in shear strength required in conventional sleeve wall reinforcement. Also, in the first invention, the sleeve wall is formed of non-shrink mortar or non-shrink concrete, and unlike when the sleeve wall is formed of ready mixed concrete, the construction of the sleeve wall does not require two steps of pouring ready mixed concrete and filling with non-shrink mortar, which has the effect of shortening the construction period and reducing manufacturing costs.
[0009] The second invention is characterized in that in the first invention, a premixed grout composition is used as the non-shrink mortar or non-shrink concrete, which contains cement, an expansive agent, an aggregate, a cement dispersant, a thickener and a foaming agent, in which the aggregate has a content of particles exceeding 4 mm and not exceeding 10 mm of 15 to 45 mass% relative to the total mass of the aggregate, and the content ratio of the aggregate to the mass of the binder (a / B) is 1.8 to 3.0 by mass. In the second invention, the non-shrink mortar or non-shrink concrete has excellent fluidity, does not shrink during construction, has a long-term drying shrinkage rate of 800μ or less, and is unlikely to separate, making it an ideal material for constructing sleeve walls, thereby reliably achieving the effects of the first invention, namely, shortening construction time and reducing manufacturing costs.
[0010] The third invention is characterized in that in the first or second invention, a water absorption regulator is applied to the boundary surfaces between the beams / columns and the sleeve walls. In the third invention, in addition to the effect of the first or second invention, the water absorption control material suppresses water absorption into the surface of the concrete that constitutes the beams, columns and sleeve walls, thereby further enhancing the adhesive strength at the interface between the beams / columns and the sleeve walls.
[0011] The fourth invention is characterized in that it comprises a pillar wrapping part that is installed to surround the pillar, and this pillar wrapping part is made of reinforced concrete formed using the non-shrink mortar or non-shrink concrete of the first or second invention. In the fourth invention, the shear strength of the column is increased by the wrapping, and the sleeve wall and the column are formed integrally, which further mitigates the reduction in the shear strength of the sleeve wall, and the effect exerted on the sleeve wall in the first or second invention is also exerted on the column wrapping portion.
[0012] The fifth invention is a sleeve wall addition reinforcement method for installing a new sleeve wall for the purpose of reinforcing an RC frame composed of a pair of columns and a pair of beams, and includes a post-installed anchor installation process in which one end of the post-installed anchor is inserted into the inside of a hole drilled perpendicularly to the inner wall surface of the column and beam, so that a part of the post-installed anchor is embedded inside the column and beam; and a formwork is installed so as to cover the part of the post-installed anchor protruding from the column or beam, and then a 1.5 N / mm 2 and pouring non-shrink mortar or non-shrink concrete having the above adhesive strength to form a sleeve wall. In the fifth invention, the adhesive strength of the boundary surface between the beam / column and the sleeve wall is high, so that they are close to being formed simultaneously, and the approximately 20% reduction in shear strength required in conventional sleeve wall reinforcement is mitigated. Also, in the fifth invention, the sleeve wall is formed from non-shrink mortar or non-shrink concrete, so unlike when the sleeve wall is formed from ready-mixed concrete, a concrete pump truck or agitator truck is not required. Furthermore, because the construction of the sleeve wall does not require the two steps of pouring ready-mixed concrete and filling with non-shrink mortar, the construction period is shortened and manufacturing costs are reduced.
[0013] The sixth invention is characterized in that the non-shrink mortar or non-shrink concrete in the fifth invention uses a premixed grout composition containing cement, an expansive agent, an aggregate, a cement dispersant, a thickener and a foaming agent, in which the aggregate has a content of particles exceeding 4 mm and not exceeding 10 mm of 15 to 45 mass% relative to the total mass of the aggregate, and the content ratio of the aggregate to the mass of the binder (a / B) is 1.8 to 3.0 by mass. In the sixth invention, the non-shrink mortar or non-shrink concrete has excellent fluidity, does not shrink during construction, has a long-term drying shrinkage rate of 800μ or less, and is unlikely to separate, making it an ideal material for constructing sleeve walls, thereby reliably achieving the effects of the fifth invention, namely, shortening construction time and reducing manufacturing costs.
[0014] The seventh invention is characterized in that in the fifth or sixth invention, a water absorption regulator is applied to the boundary surfaces between the beams / columns and the sleeve walls. In the seventh invention, in addition to the effects of the fifth or sixth invention, the water absorption control material suppresses water absorption into the surface of the concrete that constitutes the beams, columns and sleeve walls, thereby further enhancing the adhesive strength at the interface between the beams / columns and the sleeve walls.
[0015] The eighth invention is characterized in that a pillar wrapping portion is formed using the non-shrink mortar or non-shrink concrete of the fifth or sixth invention so as to surround the pillar. In the eighth invention, the shear strength of the column is increased by the wrapping, and the sleeve wall and the column are formed integrally, which further mitigates the reduction in shear strength of the sleeve wall, and the effect exerted on the sleeve wall in the fifth or sixth invention is also exerted on the column wrapping portion. Effect of the Invention
[0016] By applying the first invention to the reinforcement of an RC frame, it is possible to install sleeve walls efficiently within an RC frame at low cost and in a short period of time, and also to mitigate the reduction in shear strength.
[0017] Since the non-shrink mortar or non-shrink concrete of the second invention is an optimal material for constructing sleeve walls, by applying the second invention to the reinforcement of RC structures, the effect of the first invention, that is, the sleeve walls can be installed efficiently within the RC structure at low cost in a short period of time, and the reduction in shear strength can be mitigated, can be reliably achieved.
[0018] In the third invention, the adhesive strength at the boundary surface between the beam / column and the sleeve wall is further increased, and therefore by applying the third invention to the reinforcement of an RC frame, the effects of the first or second invention are further enhanced, in particular the effect of the first invention, which is that the sleeve wall can be efficiently installed within the RC frame at low cost in a short period of time and the reduction in shear strength can be mitigated.
[0019] By applying the fourth invention to reinforcement of RC structures, the shear strength of the column is increased by the wrapping, and the sleeve wall and column are formed integrally, further mitigating the reduction in shear strength of the sleeve wall, and the effects exerted on the sleeve wall in the first or second invention are also exerted on the column wrapping portion.
[0020] In the fifth invention, since concrete pump trucks and agitator trucks are not required, there is no need to implement measures such as lane restrictions on major roads. In addition, according to the fifth invention, sleeve walls can be installed efficiently in a short period of time within an RC frame at low cost, and the reduction in shear strength can be mitigated.
[0021] Since the non-shrink mortar or non-shrink concrete in the sixth invention is an optimal material for constructing sleeve walls, the sixth invention reliably achieves the effect of the fifth invention, which is that the sleeve walls can be installed efficiently within an RC structure at low cost and in a short period of time, while also mitigating the reduction in shear strength.
[0022] In the seventh invention, the adhesive strength at the boundary surfaces between the beams / columns and the sleeve walls is further enhanced, and therefore, according to the seventh invention, the effects of the fifth or sixth invention are more effectively exhibited, in particular the effect of the fifth invention, which is that the sleeve walls can be efficiently installed in an RC structure at low cost in a short period of time and the reduction in shear strength can be mitigated.
[0023] According to the eighth aspect of the present invention, the effect exerted on the sleeve wall in the fifth or sixth aspect of the present invention is also exerted on the pillar wrapping portion. [Brief description of the drawings]
[0024] [Figure 1] 1A is a front view showing the state in which a sleeve wall addition reinforcement structure relating to an embodiment of the present invention has been constructed within an RC frame, and FIG. 1B is an enlarged view of the area surrounded by the dashed line in FIG. 1A. [Diagram 2] 1(a) is a cross-sectional view taken along line AA in FIG. 1(b), and (b) is a view showing a modified example of FIG. 1(a). [Diagram 3] 1A is a diagram showing a sleeve wall addition reinforcement structure according to an embodiment of the present invention used in combination with a column wrapping reinforcement method, and FIG. 1B is a cross-sectional view taken along line BB in FIG. 1A. [Figure 4] 1 is a flowchart showing the steps of a sleeve wall addition reinforcement method according to an embodiment of the present invention. [Diagram 5] 1A is a front view of the loading test device, FIG. 1B is a front view of the test specimen, and FIG. 1C is a cross-sectional view taken along line CC in FIG. [Figure 6] This is a reinforcement diagram of the test specimen. [Figure 7] This is a reinforcement diagram of the test specimen. [Figure 8] 5(b) are views taken in the directions of arrows E1 and E2 in FIG. 6, respectively, and (c) and (d) are cross-sectional views taken in the directions of arrows DD and CC in FIG. 5(b), respectively. [Figure 9] This is a front view of an RC column and a pair of sleeve walls, showing the positions where strain gauges are attached. [Figure 10] (a) and (b) are cross-sectional views of an RC column and a pair of sleeve walls, showing the attachment positions of strain gauges to wall vertical reinforcement, wall end reinforcement and column main reinforcement at the column base and column head, respectively, and (c) is a cross-sectional view of an RC column and a pair of sleeve walls, showing the attachment positions of strain gauges to adhesive anchors, wall horizontal reinforcement and column hoop reinforcement. [Figure 11] 1(a) and (b) are a front view and a side view, respectively, of the first test piece. [Figure 12] 13(a) and (b) are front and side views, respectively, of the second test specimen. [Figure 13] 1 is a photograph showing the state of the first test piece after the loading test. [Figure 14] 13 is a photograph showing the state of the second test piece after the loading test. [Figure 15] 1 is a graph showing the relationship between the deformation angle and the horizontal load in a first test specimen. [Figure 16] 13 is a graph showing the relationship between the deformation angle and the horizontal load in the second test specimen. [Figure 17] (a) is a front view showing the appearance of a conventional sleeve wall added to an RC frame, and (b) is a flowchart showing the procedure for adding a sleeve wall using the conventional method. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0025] The sleeve wall addition reinforcement structure and sleeve wall addition reinforcement method according to the embodiment of the present invention, as well as their actions and effects, will be specifically described with reference to Figures 1 to 4. Note that, although Figures 1(b), 2(a), 2(b), 3(a) and 3(b) show only one of the pair of sleeve walls in Figure 1(a), the actions and effects of the sleeve wall addition reinforcement structure and sleeve wall addition reinforcement method of the present invention described below with reference to these figures are similarly exerted for the other sleeve wall in Figure 1(a). EXAMPLES
[0026] Fig. 1(a) shows a sleeve wall addition reinforcement structure according to an embodiment of the present invention constructed in an RC frame, and Fig. 1(b) shows an enlarged view of the portion surrounded by a dashed line in Fig. 1(a). Fig. 2(a) is a cross-sectional view taken along line AA in Fig. 1(b), and Fig. 2(b) is a modified example of Fig. 2(a). Fig. 3(a) shows a sleeve wall addition reinforcement structure according to an embodiment of the present invention used in combination with a column wrapping reinforcement method, and Fig. 3(b) is a cross-sectional view taken along line BB in Fig. 3(a). Fig. 4 is a flow chart showing the steps of the sleeve wall addition reinforcement method according to an embodiment of the present invention.
[0027] In order to avoid the figures becoming too complicated, in Fig. 1(a) only some of the post-installed anchors are labeled, and in Fig. 1(b), Fig. 2(a), Fig. 2(b), Fig. 3(a) and Fig. 3(b) only some of the main reinforcement bars, end reinforcement bars, post-installed anchors and ties are labeled. In Fig. 1(b) and Fig. 3(a), the main reinforcement bars and ties inside the columns are omitted, and in Fig. 1(b), Fig. 2(a), Fig. 2(b), Fig. 3(a) and Fig. 3(b), the sleeve walls and column wrapping parts to be added are shown with dashed lines, and in Fig. 2(a), Fig. 2(b) and Fig. 3(b), the cross-sectional parts are not hatched. Furthermore, the components already explained using Fig. 17 are labeled with the same reference numerals, and their explanations are omitted as appropriate.
[0028] As shown in Figures 1(a), 1(b) and 2(a), in the sleeve wall addition reinforcement structure of the present invention, a sleeve wall 1 made of reinforced concrete 1a formed using non-shrink mortar or non-shrink concrete having adhesive properties is installed inside an RC frame 50, instead of conventional reinforced concrete 53a, 53b (see Figure 17(a)) formed from conventional ready mixed concrete and non-shrink mortar. A water absorption regulator is applied to the interface between a pair of beams 51, 51 and a column 52 and the sleeve wall 1 (the joint surfaces between the reinforced concrete 51a constituting the beam 51 and the column 52, respectively, and the reinforced concrete 1a constituting the sleeve wall 1, and the reinforced concrete 52a constituting the beam 51 and the column 52). A part of the post-installed anchors 2 is embedded in the pair of beams 51, 51 and the column 52, and the remaining part of the post-installed anchors 2 is embedded in the reinforced concrete 1a forming the sleeve wall 1. In addition, in the reinforced concrete 1a, a plurality of main reinforcements 3a are arranged parallel to the axial direction of the column 52, and the end reinforcement 4 is arranged near the opening 54 so as to be parallel to the main reinforcements 3a. A plurality of tie bars 5a are arranged horizontally so as to surround the main reinforcements 3a and the end reinforcement 4, and a spiral reinforcement 6 is arranged parallel to the axial direction of the pair of beams 51, 51 and the column 52, respectively. Furthermore, in the reinforced concrete 52a forming the column 52, a plurality of main reinforcements 3b are arranged parallel to the axial direction, and a plurality of tie bars 5b are arranged horizontally so as to surround the main reinforcements 3b.
[0029] Next, the case where the sleeve wall addition reinforcement structure of the present invention is applied to a column with a sleeve wall will be described with reference to FIG. 2(b). As shown in FIG. 2(b), when the sleeve wall 7 is installed in advance on the column 52, the sleeve wall 1 already described with reference to FIG. 2(a) is installed inside the RC frame 50 (see FIG. 1(a)) with the surfaces parallel to the existing sleeve wall 7 and perpendicular to the column 52 joined to each other. However, a part of the existing reinforcing bars 8 embedded in the reinforced concrete 7a forming the sleeve wall 7 is embedded in the pair of beams 51, 51 and the column 52. In addition, a water absorption adjustment material is applied to the interface between the pair of beams 51, 51 and the column 52 and the sleeve wall 1 (the interface between the reinforced concrete 51a and the reinforced concrete 52a forming the beam 51 and the column 52, respectively, and the reinforced concrete 1a forming the sleeve wall 1) and the interface between the sleeve wall 1 and the sleeve wall 7 (the interface between the reinforced concrete 1a and the reinforced concrete 7a).
[0030] Furthermore, a case where the sleeve wall additional reinforcement structure of the present invention is used in combination with a column wrapping reinforcement method will be described with reference to Figs. 3(a) and 3(b). When the sleeve wall addition reinforcement structure of the present invention is used in combination with a column wrapping reinforcement method, in addition to the sleeve wall 1, a column wrapping section 9 made of reinforced concrete 9a is installed surrounding the column 52, as shown in Figures 3(a) and 3(b). However, the reinforced concrete 9a is provided with multiple main reinforcements 3c arranged parallel to the axial direction of the column 52, and multiple hoops 5c arranged horizontally to surround the main reinforcements 3c, and is formed using non-shrink mortar or non-shrink concrete with adhesive strength, just like the reinforced concrete 1a. Also, a water absorption regulator is applied to the interface between the column 52 and the column lining part 9 (the joint surface between the reinforced concrete 52a and the reinforced concrete 9a), just like the reinforced concrete 1a.
[0031] When the sleeve wall 1 and the column lining portion 9 are made of non-shrink mortar or non-shrink concrete, unlike when they are made of ready mixed concrete, concrete pump trucks and agitator trucks are not required. Furthermore, since the two steps of pouring ready mixed concrete and filling with non-shrink mortar (see Figure 17(b)) are not required during construction, the construction period for constructing the sleeve wall 1 is shortened and manufacturing costs are reduced. This makes it possible to install the sleeve wall 1 and the column lining portion 9 inside the RC frame 50 efficiently in a short period of time at low cost.
[0032] For the non-shrink mortar or non-shrink concrete forming the sleeve wall 1 and the column lining portion 9, for example, a commercially available non-shrink mortar with an adhesive strength of 1.5 N / mm 2 The above can be selected and used. In this specification, "non-shrink mortar" refers to a mortar whose expansion rate measured according to the Japan Society of Civil Engineers' standard JSCE-F 542-2013 "Test method for bleeding rate and expansion rate of filling mortar" does not show a negative value. This material is composed of a premix grout composition containing cement, expansive material, aggregate, cement dispersant, thickener, and foaming agent. Specifically, the aggregate of this material contains 15-45% by mass of particles of more than 4 mm and less than 10 mm in size relative to the total mass of the aggregate, and the aggregate content ratio (a / B) relative to the mass of the binder is 1.8-3.0 in mass ratio. The binder (B) includes cement, gypsum, pozzolans such as silica fume and metakaolin, latent hydraulic substances such as blast furnace slag powder, and expansive materials. This material preferably contains 40-65% by mass of particles of more than 0.3 mm and less than 4 mm in size relative to the total mass of the aggregate, 30-55% by mass of particles of more than 0.3 mm and less than 2.5 mm in size, 1-45% by mass of particles of 0.3 mm or less, and 10% by mass or less of particles of 0.15 mm or less in size, and preferably contains 1-10% by mass of expansive material and 0.01-5% by mass of cement dispersant relative to the total mass of the premix grout composition.
[0033] This material does not shrink during construction, has a long-term drying shrinkage rate of 800μ or less, has excellent fluidity, and is not susceptible to material separation, making it ideal for construction of sleeve walls 1 and column wrapping parts 9. Therefore, when sleeve walls 1 and column wrapping parts 9 are formed using this material, the aforementioned effect of being able to install sleeve walls 1 and column wrapping parts 9 efficiently and in a short period of time at low cost is reliably achieved. In addition, this material has an adhesive strength (a load is applied to two adherends, and the load at which the adhesive breaks is divided by the adhesive area) of 1.5 N / mm 2 For the above reasons, when the sleeve wall 1 shown in Figures 2(a) and 2(b) or the column wrapping part 9 shown in Figures 3(a) and 3(b) is formed using this material, the adhesive strength is increased at the joint surface between the reinforced concrete 51a and the reinforced concrete 52a constituting the pair of beams 51, 51 and the column 52 and the reinforced concrete 1a, the joint surface between the reinforced concrete 1a and the reinforced concrete 7a, and the joint surface between the reinforced concrete 9a and the reinforced concrete 52a. As a result, the pair of beams 51, 51 and the column 52 and the sleeve wall 1 and the column wrapping part 9 are formed simultaneously, which alleviates the approximately 20% reduction in shear strength required for conventional sleeve wall reinforcement.
[0034] In addition, a commercially available water absorption regulator can be used for the boundary surfaces between the pair of beams 51, 51 and columns 52 and the sleeve wall 1, the boundary surface between the sleeve wall 1 and the sleeve wall 7, and the boundary surface between the column wrapping part 9 and the column 52 shown in Figures 1(b), 2(a), 2(b), 3(a), and 3(b). For example, acrylic resin, epoxy resin, vinyl ester resin, and urethane resin can be used. When this material is applied to the above-mentioned boundary surfaces, water absorption into the surfaces of the reinforced concrete 51a, 52a, 1a, 7a, and 9a constituting the beam 51, column 52, sleeve wall 1, sleeve wall 7, and column wrapping part 9, respectively, is suppressed, and the adhesive strength at the boundary surfaces between the pair of beams 51, 51, columns 52 and the sleeve wall 1, the boundary surface between the sleeve wall 1 and the sleeve wall 7, and the boundary surface between the column wrapping part 9 and the column 52 is further increased. This further enhances the effect of enabling the sleeve wall 1 and the column wrapping portion 9 to be installed efficiently and at low cost in a short period of time, while mitigating the reduction in shear strength.
[0035] Next, a sleeve wall addition reinforcement method according to an embodiment of the present invention will be described with reference to FIG. First, multiple holes (not shown directly, but these are the reinforced concrete 51a, 52a surfaces that come into contact with the outer circumferential surface of the post-installed anchor 2 shown in FIG. 1(b)) are drilled perpendicular to the inner wall surfaces (surfaces facing the opening 54 in FIG. 1(a)) of a pair of beams 51, 51 and column 52, and after filling the interiors with adhesive, one end of the post-installed anchor 2 is inserted into each. This results in a state in which portions of the multiple post-installed anchors 2 are embedded inside the pair of beams 51, 51 and column 52 (step S1 in FIG. 4).
[0036] After the adhesive filled in the hole into which one end of the post-installed anchor 2 is inserted has sufficiently hardened, a formwork (not shown) is installed so as to cover the portion of the post-installed anchor 2 protruding from the column 52 or the pair of beams 51, 51, and then non-shrink mortar or non-shrink concrete having adhesive power is poured into the formwork (steps S2 and S3 in FIG. 4). Then, the poured non-shrink mortar or non-shrink concrete is hardened to form reinforced concrete 1a, and the formwork is dismantled (steps S4 and S5 in FIG. 4). In this way, the sleeve wall 1 made of reinforced concrete 1a is formed. In the process of steps S2 to S5 for forming the sleeve wall 1, the column wrapping portion 9 shown in FIG. 3(a) and FIG. 3(b) can also be formed simultaneously with the sleeve wall 1. In this way, in the sleeve wall addition reinforcement method of the present invention, the sleeve wall 1 and the column wrapping portion 9 are formed from non-shrink mortar or non-shrink concrete, so unlike when the sleeve wall 1 and the column wrapping portion 9 are formed from ready-mixed concrete, concrete pump trucks and agitator trucks are not required. Therefore, measures such as lane restrictions on main roads do not need to be taken. In addition, since the construction of the sleeve wall 1 and the column wrapping portion 9 does not require the two steps of pouring ready-mixed concrete and filling with non-shrink mortar (see Figure 17(b)), it is possible to shorten the construction period and reduce manufacturing costs.
[0037] The non-shrink mortar or non-shrink concrete poured into the formwork in step S3 can be the above-mentioned. This material does not shrink during construction, has a long-term drying shrinkage rate of 800μ or less, has excellent fluidity, and is unlikely to separate, making it the most suitable for construction of the sleeve wall 1 and the column wrapping portion 9. If this material is used, it is possible to install the sleeve wall 1 and the column wrapping portion 9 efficiently and at low cost in a short period of time. In addition, this material has an adhesive strength (a load is applied to two adherends, and the load at which the adhesive breaks is divided by the adhesive area) of 1.5 N / mm 2 For the above reasons, when this material is used, the adhesive strength is increased at the joint surfaces of the reinforced concrete 51a and 52a constituting the pair of beams 51, 51 and column 52, respectively, and the reinforced concrete 1a, the joint surface of the reinforced concrete 1a and the reinforced concrete 7a, and the joint surface of the reinforced concrete 9a and the reinforced concrete 52a. As a result, the pair of beams 51, 51 and column 52, and the sleeve wall 1 and the column wrapping portion 9 are formed almost simultaneously, which has the effect of mitigating the approximately 20% reduction in shear strength required in conventional sleeve wall reinforcement.
[0038] In addition, it is preferable to apply the above-mentioned water absorption adjusting material to the boundary surfaces between the pair of beams 51, 51 and column 52 and the sleeve wall 1, the boundary surface between the sleeve wall 1 and the sleeve wall 7, and the boundary surface between the column wrapping part 9 and the column 52. This suppresses water absorption into the surfaces of the reinforced concrete 51a, 52a, 1a, 7a, and 9a constituting the beam 51, column 52, sleeve wall 1, sleeve wall 7, and column wrapping part 9, respectively, and as a result, the adhesive strength is further increased at the boundary surfaces between the pair of beams 51, 51, column 52 and the sleeve wall 1, the boundary surface between the sleeve wall 1 and the sleeve wall 7, and the boundary surface between the column wrapping part 9 and the column 52. Therefore, according to the sleeve wall addition reinforcement construction method of the present invention, it is possible to install the sleeve wall 1 and the column wrapping part 9 efficiently at low cost in a short period of time and to mitigate the reduction in shear strength.
[0039] Next, the results of a load test performed on a specimen equipped with the sleeve wall additional reinforcement structure of the present invention will be described with reference to Figures 5 to 16. Figure 5(a) is a front view of the load test device 10, Figure 5(b) is a front view of the specimen 18, and Figure 5(c) is a cross-sectional view taken along the CC line in Figure 5(b). As shown in Fig. 5(a), the load test device 10 includes a pair of reaction beams 12, 12 that are vertically erected with respect to the upper surface 11a of the foundation beam 11 on which the test body 18 is installed and whose upper ends 12a are connected to each other via a cross beam 13, a load beam 14 that is installed between the pair of reaction beams 12, 12 so as to form an L shape and sandwich the test body 18 together with the foundation beam 11 from above and below, a horizontal jack 15 that moves the load beam 14 back and forth in the horizontal direction, a vertical jack 16 whose upper end 16a and lower end 16b are fixed to the lower surface 13a of the cross beam 13 and the upper surface 14a of the load beam 14, respectively, and a pair of pantograph mechanisms 17, 17 installed on the upper surface 14a of the load beam 14. The stroke of the horizontal jack 15 is 230 mm for pushing and 270 mm for pulling. The stroke of the vertical jack 16 is 115 mm for pushing and 185 mm for pulling. As shown in Figures 5(b) and 5(c), the test specimen 18 is in the shape of a rectangular parallelepiped, and an upper stub 20 and a lower stub 21 made of reinforced concrete formed using ready mixed concrete are installed at an upper end 19a and a lower end 19b, respectively, so as to be perpendicular to a column member (corresponding to column 52 shown in Figure 1(a) hereinafter referred to as RC column 19) also made of reinforced concrete formed using ready mixed concrete, and the upper stub 20 and the lower stub 21 (corresponding to a pair of beams 51, 51 shown in Figure 1) are connected via a pair of sleeve walls 22, 22 (corresponding to sleeve wall 1 shown in Figure 1(a)) installed on a pair of side surfaces 19c, 19c of the RC column 19 that are parallel to each other.
[0040] Fig. 6 and Fig. 7 are reinforcement diagrams of the test specimen 18. Fig. 8(a) and Fig. 8(b) are views in the direction of arrow E1 and the direction of arrow E2 in Fig. 6, respectively, and Fig. 8(c) and Fig. 8(d) are cross-sectional views in the direction of arrow DD and the direction of arrow CC in Fig. 5(b), respectively. Fig. 9 is a front view of the RC column 19 and a pair of sleeve walls 22, 22 showing the attachment positions of the strain gauges, Fig. 10(a) and Fig. 10(b) are cross-sectional views of the RC column 19 and a pair of sleeve walls 22, 22 showing the attachment positions of the strain gauges to the adhesive anchors 23 and the column main reinforcements 27 at the base and the head, respectively, and Fig. 10(c) is a cross-sectional view of the RC column 19 and a pair of sleeve walls 22, 22 showing the attachment positions of the strain gauges to the adhesive anchors 23, the wall cross reinforcements 26, and the column hoop reinforcements 28. In order to avoid complicating the drawings, the reinforcement in one specimen 18 is shown separately in Figures 6 and 7, and some of the reinforcement shown in solid lines are labeled with reference numerals in Figures 6 to 10. In Figure 9, the reference numeral for the strain gauge placed at the back of the page is shown in parentheses after the reference numeral for the strain gauge placed at the front of the page, and in Figure 10, the reference numeral for the reinforcement to which the strain gauge is attached is shown in parentheses after the reference numeral for the strain gauge, and the reinforcement is shown in bold.
[0041] As shown in Fig. 6, some of the adhesive anchors 23 (corresponding to the post-installed anchors 2 shown in Fig. 1(b)) are embedded in the upper stub 20, the lower stub 21 and the RC column 19, and the remaining parts of the adhesive anchors 23 are embedded in the sleeve wall 22. Also, as shown in Figs. 7 and 8(d), the sleeve wall 22 has a plurality of wall vertical reinforcements 24 (corresponding to the main reinforcements 3a shown in Fig. 1(b)) arranged parallel to the axial direction of the RC column 19, and wall end reinforcements 25 (corresponding to the end reinforcements 4 shown in Fig. 2(a)) are arranged on the side furthest from the RC column 19 so as to be parallel to the wall vertical reinforcements 24. Furthermore, a plurality of wall horizontal reinforcements 26 (corresponding to the tie bars 5a shown in Fig. 1(b)) are arranged horizontally to surround the wall vertical reinforcements 24 and wall end reinforcements 25, and a plurality of column main reinforcements 27 (corresponding to the main reinforcements 3b shown in Fig. 2(a)) are arranged parallel to the axial direction in the RC column 19, and a plurality of column hoop reinforcements 28 (corresponding to the tie bars 5b shown in Fig. 2(a)) are arranged horizontally to surround the column main reinforcements 27. And in the sleeve wall 22, width stop U-shaped reinforcements 29 are arranged near the upper stub 20 and the lower stub 21.
[0042] The specifications of the reinforcing bars and steel materials are shown in Table 1. [Table 1]
[0043] As shown in Fig. 7 and Fig. 8(a) and Fig. 8(b), a plurality of stub main reinforcements 30a, 30b are arranged above and below the upper stub 20 and the lower stub 21, respectively, parallel to the longitudinal direction, and a plurality of stirrups 31 are arranged to surround the stub main reinforcements 30a, 30b. A plurality of PVC pipes 32 are embedded in the upper stub 20 and the lower stub 21 parallel to the axial direction of the RC column 19. PC steel bars (not shown) are inserted into the PVC pipes 32 when the test specimen 18 is fixed to the load beam 14 and the foundation beam 11 of the load test device 10. In the loading test conducted this time, in order to grasp the overall stress state of the test specimen 18 and the presence or absence of yielding of the reinforcing bars, strain gauges were attached to the reinforcing bars to measure their strain. Specifically, as shown in Figure 9 and Figures 10(a) to 10(c), strain gauges WA1 to 16 and strain gauges C1 to 8 were attached to the adhesive anchors 23 and column main reinforcements 27 installed parallel to the axial direction of the RC column 19. In addition, strain gauges CA1 to 6, strain gauges WS1 to 6 and strain gauges CS1 to 6 were attached to the adhesive anchors 23, wall cross reinforcements 26 and column hoop reinforcements 28 installed perpendicular to the axial direction of the RC column 19.
[0044] In this loading test, as shown in Figures 11 and 12, not only a test specimen equipped with the sleeve-wall additional reinforcement structure of the present invention (hereinafter referred to as the first test specimen 18a), but also a test specimen equipped with the sleeve-wall additional reinforcement structure according to the conventional technology (hereinafter referred to as the second test specimen 18b) was used for comparison. Figures 11(a) and 11(b) are front and side views of the first test specimen 18a, and Figures 12(a) and 12(b) are front and side views of the second test specimen 18b. The first test specimen 18a has a pair of sleeve walls 22, 22 made of reinforced concrete 33a formed using adhesive non-shrink mortar or non-shrink concrete (see Figures 11(a) and 11(b)), and the boundaries between the upper stub 20 and the lower stub 21 and the sleeve wall 22 have been roughened and then coated with a water absorption adjustment material. On the other hand, the second test specimen 18b has a pair of sleeve walls 22, 22 constructed from reinforced concrete 33b formed from ready mixed concrete and reinforced concrete 33c formed from non-shrink mortar (see Figures 12(a) and 12(b)).
[0045] The first test body 18a and the second test body 18b having such a structure were installed on the load test device 10, and then while the rotation of the upper stub 20 was restrained by the pantograph mechanism 17, horizontal and vertical loads were applied by the horizontal jack 15 and the vertical jack 16, respectively, and the vertical extension and horizontal displacement of the RC column 19 and the pair of sleeve walls 22, 22 relative to the lower stub 21, as well as the vertical displacement between the RC column 19 and the pair of sleeve walls 22, 22, were measured by a displacement meter attached to the RC column 19. The horizontal and vertical loads were measured by load cells attached to the horizontal jack 15 and the vertical jack 16, respectively. The load was applied by gradually increasing the load with alternating positive and negative forces, and the horizontal displacement of the RC column 19 and the pair of sleeve walls 22, 22 relative to the bottom stub 21 was controlled by the deformation angle R (rad) divided by the height (1100 mm) of the RC column 19. The target displacement amounts for each cycle were R = 1 / 500, 1 / 250, 1 / 150, 1 / 100, 1 / 67, 1 / 50, and 1 / 33.
[0046] 13 and 14 are photographs showing the state of the first test body 18a and the second test body 18b after the load test, respectively. In the first specimen 18a, the expansion of shear cracks was observed in the RC column 19, but the cover concrete did not fall off and the rebar was not exposed. In addition, while the RC column 19 had failed in shear, the sleeve wall 22 did not show any significant expansion of the shear crack width or any crushing at the top or bottom, and no shear failure occurred (see Figure 13). On the other hand, in the second specimen 18b, not only was the shear crack expanding in the RC column 19, but the cover concrete had spalled off and the rebar had become exposed, and damage had progressed significantly. As for the sleeve wall 22, the width of the shear crack had expanded significantly, while concrete spalling and shear failure (crushing) had occurred at the top and bottom (see Figure 14). In other words, in the second test specimen 18b, the RC column 19 and the pair of sleeve walls 22, 22 both suffered shear failure, whereas in the first test specimen 18a, damage to the RC column 19 and the pair of sleeve walls 22, 22 was suppressed.
[0047] 15 and 16 are graphs showing the relationship between the deformation angle and the horizontal load in the first test body 18a and the second test body 18b, respectively. 15 and 16, on the positive load side, the strength of the first specimen 18a tends to be slightly higher than that of the second specimen 18b, but when the deformation angle is smaller than 0.01 rad, the curves show almost the same curves, whereas when the deformation angle is larger than 0.01 rad, a large difference in strength occurs between the two specimens. That is, in the second specimen 18b, shear failure of the RC column 19 and shear failure of the sleeve wall 22 occurred in sequence, resulting in a large decrease in strength, whereas in the first specimen 18a, shear failure of the RC column 19 occurred but not of the sleeve wall 22, so that the decrease in strength is kept very small and the specimen has a large deformation performance. Even on the negative load side, the strength of the first specimen 18a is higher than that of the second specimen 18b. In particular, when the deformation angle becomes larger than 0.01 rad, the second test specimen 18b exhibits a large decrease in yield strength, similar to the case of the positive load side. [Industrial Applicability]
[0048] INDUSTRIAL APPLICABILITY The sleeve wall addition reinforcement structure and sleeve wall addition reinforcement construction method of the present invention are applicable when installing new sleeve walls for the purpose of reinforcing the RC frame of an RC building. [Explanation of symbols]
[0049] 1...Sleeve wall 1a...Reinforced concrete 2...Post-installed anchor 3a-3c...Main bar 4...End reinforcement bar 5a-5c...Hoop 6...Spiral bar 7...Sleeve wall 7a...Reinforced concrete 8...Existing bar 9...Column wrapping section 9a...Reinforced concrete 10...Loading test device 11...Foundation beam 11a...Top surface 12...Reaction beam 12a...Top end 13...Horizontal beam 13a...Bottom surface 14...Loading beam 14a...Top surface 15...Horizontal jack 16...Vertical jack 16a...Top end 16b...Bottom end 17...Pantograph mechanism 18...Test specimen 18a...First test specimen 18b...Second test specimen 19...RC column 19a...Top end 19b...Bottom end 19c...Side surface 20...Upper stub 21...Lower stub 22...Sleeve wall 23...Adhesive anchor 24...Vertical wall reinforcement 25...Wall end reinforcement 26...Horizontal wall reinforcement 27...Column main reinforcement 28...Column hoop reinforcement 29...Width stop U-shaped reinforcement 30a, 30b...Stub main reinforcement 31...Stirrup reinforcement 32...PVC pipe 33a-33c...Reinforced concrete 50...Framework 51...Beam 51a...Reinforced concrete 52...Column 52a...Reinforced concrete 53...Sleeve wall 53a, 53b...Reinforced concrete 54...Opening C1-C8...Strain gauge CA1-CA6...Strain gauge CS1-CS6...Strain gauge WA1-WA16...Strain gauge WS1-WS6...Strain gauge
Claims
1. A sleeve wall addition reinforcement structure in which a sleeve wall is added for the purpose of reinforcing an RC frame composed of a pair of columns and a pair of beams, The sleeve wall has a strength of 1.5 N / mm 2 A sleeve wall extension reinforcement structure characterized by being made of reinforced concrete formed using non-shrink mortar or non-shrink concrete having the above adhesive strength.
2. The sleeve wall extension reinforcement structure described in claim 1, characterized in that the non-shrink mortar or the non-shrink concrete is a premixed grout composition containing cement, an expansive material, an aggregate, a cement dispersant, a thickener and a foaming agent, the aggregate having a particle content of more than 4 mm and less than 10 mm of 15 to 45 mass% relative to the total aggregate mass, and a content ratio of the aggregate to the mass of the binder (a / B) of 1.8 to 3.0 by mass.
3. 3. The sleeve wall extension reinforcement structure according to claim 1, wherein a water absorption adjusting material is applied to the boundary surfaces of the beams and columns and the sleeve wall.
4. A pillar winding section is provided so as to surround the pillar, 3. The sleeve wall extension reinforcement structure according to claim 1, wherein the column wrapping portion is made of the reinforced concrete formed using the non-shrink mortar or the non-shrink concrete.
5. A sleeve wall addition reinforcement method for reinforcing an RC frame consisting of a pair of columns and a pair of beams by installing a new sleeve wall, a post-installed anchor installation process in which one end of a post-installed anchor is inserted into a hole drilled perpendicularly to an inner wall surface of the column and the beam, so that a part of the post-installed anchor is embedded in the column and the beam; After a formwork is installed so as to cover the portion of the post-installed anchor protruding from the column or beam, a tension of 1.5 N / mm is applied to the inside of the formwork. 2 and pouring non-shrink mortar or non-shrink concrete having the above adhesive strength to form the sleeve wall.
6. The sleeve wall extension reinforcement method according to claim 5, characterized in that a premixed grout composition is used as the non-shrink mortar or the non-shrink concrete, which contains cement, an expansive material, an aggregate, a cement dispersant, a thickener and a foaming agent, and the aggregate has a content of particles exceeding 4 mm and not exceeding 10 mm of 15 to 45 mass% relative to the total mass of the aggregate, and the content ratio of the aggregate to the mass of the binder (a / B) is 1.8 to 3.0 by mass.
7. The sleeve wall extension reinforcement construction method according to claim 5 or 6, characterized in that a water absorption adjustment material is applied to the boundary surfaces between the beams and columns and the sleeve wall.
8. The sleeve wall addition reinforcement method according to claim 5 or claim 6, characterized in that a column wrapping portion is formed using the non-shrink mortar or the non-shrink concrete so as to surround the column.
Citation Information
Patent Citations
Reinforcing method for existing column
JP1997268774A
Column structure and column reinforcement method
JP3444785B2