Control method and system for operating electrical component

The method and system control electrical components to adjust energy transfer rates based on reference and fast-acting power functions, addressing grid imbalances and economic barriers, allowing simultaneous participation in frequency response and peak price avoidance services, thereby enhancing grid stability and profitability.

JP2024152769AActive Publication Date: 2024-10-25OPEN ENERGI LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2024130151
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2019-05-03
Filing Date
2024-08-06
Publication Date
2024-10-25
Estimated Expiration
2040-04-30

AI Technical Summary

Technical Problem

Existing power grids face challenges in maintaining predictable supply levels due to the inherent unreliability of renewable energy sources, leading to imbalances between power generation and consumption, which are exacerbated by economic barriers and incompatible pricing strategies that discourage simultaneous participation in frequency response and peak price avoidance services.

Method used

A method and system for controlling electrical components connected to the power grid that allows them to adjust energy transfer rates based on a reference and fast-acting power function, enabling simultaneous participation in frequency response and peak price avoidance services by deriving the reference power function from slow-operating functions and using surrogate variables to manage energy storage within acceptable limits.

Benefits of technology

Enables electrical components to efficiently participate in both frequency response and peak price avoidance services, minimizing economic costs and operational impacts while maintaining grid stability and profitability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024152769000001_ABST
    Figure 2024152769000001_ABST
Patent Text Reader

Abstract

To provide a control method and system for controlling operations of electrical components coupled to an electrical supply network to enable a plurality of components to simultaneously participate in two different power consuming and generating means.SOLUTION: A component is either a generator or a load of a type capable of storing energy internally and is operable over a range of power levels from 0 to a maximum power CD, (a) the component is operated for a certain period of time by adjusting the rate of energy transfer between the component and the supply network according to a reference value power function B(t), and (b) a high-speed operation power function F(t) is superimposed on the reference value power function and the component is simultaneously operated for a certain period of time so as to adjust the rate of energy transfer between the component and the supply network according to the high-speed operating power function F(t).SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method and a system adapted to control the operation of electrical components (both generators and loads) coupled to the electricity grid, in order to allow the simultaneous participation of multiple components in two different electricity consumption or generation means. It is particularly relevant for types of electrical loads that have some mechanisms for storing energy during peak price periods or periods when penalties arise for any other reason, and thus tend to operate to minimize energy consumption. It is also relevant for generators that are able to store and hold power, and that make it possible to schedule the time when the generated power is fed into the grid in order to maximize revenue. The present invention allows such implementations to be compatible with the provision of services that help regulate the supply and demand of electricity. [Background technology]

[0002] In any power distribution grid, it is important to coordinate the power fed into the grid with the power taken from the grid. Any imbalance, even for a short period of time, can result in a variety of problems ranging from reduced efficiency of power transmission and unpredictable fluctuations in power supply to more serious effects such as power outages.

[0003] Current electricity distribution networks, such as the UK's National Grid, regulate with sufficient precision down to the second. Any imbalance between the amount of electricity generated and the amount of electricity consumed by the grid loads is evident in the deviation of the operating characteristics of the electricity supply from its intended set point. Monitoring such a parameter makes it possible to detect and therefore correct the imbalance. Usually, that parameter is the frequency of the electricity supplied by the Grid, which is monitored for this purpose. In the UK, the electricity mains are supplied at 50Hz. If the collection of grid loads takes more power than is supplied, the frequency drops. Roughly speaking, this effect can be seen when an increase in the load on the generators causes them to run (spin) slower. Conversely, if the imbalance is caused by excess generation, the frequency rises above the nominal value of 50Hz.

[0004] There are several factors that can lead to imbalances in the power grid. They can be on the supply side (e.g., a technical problem occurs in a generator) or on the demand side (e.g., a surge in demand occurs during a televised sporting event). In either case, a correction can be applied by adjusting the power generated or consumed. Typically, to correct on the supply side, the grid has available a backup system of assets (generators) that can be brought online or disconnected from the grid on demand. On the demand side, the grid also has a mechanism that allows at least one selected load of the grid to operate at a different power level. The response can be dynamic, operating in response to second-by-second changes in the operating frequency, or non-dynamic, usually a separate service triggered in response to a given frequency deviation. In the UK, the provider of the Grid's regulating service performs the monitoring of frequency deviations itself. In other jurisdictions, the grid operator itself monitors the imbalance signals and communicates with the provider, directly indicating the regulating service required. Financial incentives are offered by network operators to generators and loads that are prepared or capable of providing regulation services.

[0005] With the transition from 100% coal-fired generation to renewables, the challenge of maintaining predictable supply levels becomes more difficult. Generally, power plants will be taken offline only in the case of relatively unlikely faults, but renewable resources are fundamentally less reliable. When there is little wind, wind farms are less productive. In particular, in high winds, wind farms may need to be shut down. When it is cloudy, solar power produces less electricity, and hydroelectric power is also weather dependent. Supply levels, as well as demand, become more difficult to predict. This drives an increased demand for regulation to be provided by the demand side of the grid. Overall, there is a need for adaptive regulation systems that respond rapidly to imbalances.

[0006] At a practical level, power grids need to incorporate various mechanisms for power regulation. In the context of the present invention, a distinction is drawn between components of that mechanism that are capable of operating with fully variable power consumption. Components include, for example, batteries and their binary elements, such as refrigeration devices that can only operate at two power levels (on and off). Both of these components can provide regulation services to the power grid, but the mechanisms are different.

[0007] One power regulation mechanism using a battery system is described in US Patent Application Publication No. 2016 / 0013676. To address deviations in the grid frequency from a nominal value, the battery increases or decreases the power supplied to (or drawn from) the grid. The battery has the capacity to store charge and thus energy internally. Thus, a measurement of the battery's state of charge (SoC) provides an indication of the battery's availability in response to a grid imbalance. Generally, a battery involved in a frequency response service provides this service continuously, provided that the battery's state of charge does not vary outside a predetermined range.

[0008] Another mechanism can be provided by groups of loads that can operate at reduced power for short periods without significant degradation in performance. Typically, the aggregate response of subgroups of responsive loads that are available contributes to supply and demand regulation. Subgroups are selected such that reduced power is required from individual loads only during limited periods. This mechanism allows a portfolio of electric assets to participate in responsive services as a group, but the individual assets themselves do not meet the technical criteria set by the grid to provide such services.

[0009] Exemplary methods for facilitating the participation of binary loads in frequency response services are described in GB 2361118, WO 2006 / 128709, and WO 2013 / 017896 ("Open Energi's FFR Algorithm"). All of these documents describe selection algorithms that can be used to determine which loads from a large group of binary loads provide the required response at any given time. The group of loads is controlled by an autonomous device that operates independently of external control. When the control device detects an imbalance in the power grid frequency, the control device varies the power consumed by the integrated electrical loads to address the detected imbalance across the grid. The power consumption varies by allowing the energy stored in the loads to vary. That is, each load has an energy storage capacity that varies with the duty cycle of the load. The energy storage capacity of the electrical loads allows for occasional adjustment of the energy consumption of the loads without significantly impairing the operational performance of the electrical loads. For each electric load, a threshold of energy storage capacity is applied when the electric load is available to contribute to responsive load service.

[0010] Using the prior art algorithms described above, the selection of electrical loads for delivering responsive load service in response to detection of a grid imbalance is done by using frequency triggering thresholds that are assigned to each load by a control device. The thresholds may vary smoothly or individually over time and may be determined taking into account several factors such as the amount of energy stored in the load at the time a response is required, the amount of time since the load was last required to provide responsive load service, and the nature of recent fluctuations in grid frequency.

[0011] As the number and variety of electrical components available to participate in regulating services increases, a better balance can be struck between providing the service to the grid and minimizing any adverse effects on the normal operating behavior of each component. Additionally, there are many industrial processes that draw large amounts of power from the grid, and where these could provide an opportunity to provide responsive load services, the benefits of the grid would be significant.

[0012] However, there are serious economic barriers to implementing frequency response services for some components that may be connected to the grid, which arise from electricity pricing strategies that, for example, generally make it more costly for loads to consume electricity at certain peak times. This encourages many loads of a type that are capable of storing energy reserves to engage in "peak price avoidance" or "revenue stacking" behaviors. That is, the strategies increase their power consumption just before the peak period to allow the stored energy to increase towards its maximum allowed value. During peak periods, these energy reserves are taken from the grid rather than electricity. The reduction in electricity consumption during peak periods allows for an overall reduction in the economic cost of operating the load.

[0013] Similar considerations arise with respect to the type of generator that can store and vary the amount of energy stored. For example, it is often desirable to utilize the energy storage capacity of a battery to ensure that power is delivered to the grid at a time when it is most financially advantageous to do so, and as with loads, this may not be compatible with the operation of a frequency response service.

[0014] In the prior art battery storage system of US Patent Application Publication No. 2016 / 0013676, an improvement to the basic frequency response service is described that makes it more likely that the battery state of charge will be maintained within a range in which response service can be provided. This is achieved by allowing the battery to be charged / discharged when the battery state of charge leaves the central range, and by making frequency response adjustments to the power level of the charging or discharging operation. However, this is an internal management system that has limited application to storage batteries and does not consider the impact of providing frequency response service on ideal state of charge management. [Prior art documents] [Patent documents]

[0015] [Patent Document 1] US Patent Application Publication No. 2016 / 0013676 [Patent Document 2] GB Patent Application Publication No. 2361118 [Patent Document 3] International Publication No. 2006 / 128709 [Patent Document 4] International Publication No. 2013 / 017896 Summary of the Invention [Problem to be solved by the invention]

[0016] At the same time, a need is seen for alternative implementations of the system that responds to network imbalances that allow for the participation of components that operate according to some other power consumption scheme. [Means for solving the problem]

[0017] The present invention provides a method for controlling, depending on circumstances, the operation of a component connected to a power supply network, the component being either a generator or a load of a type capable of storing energy internally. The method comprises the steps of: (a) operating a component over a period of time, adjusting within the period of time a rate at which energy is transferred between the component and the grid in accordance with a reference power function B(t); (b) simultaneously operating the component over a period of time to adjust the rate at which energy is transferred between the component and the grid in accordance with a fast action power function F(t), such that the fast action power function F(t) is superimposed on the baseline power function; the reference power function B(t) is derived from the slow operating power function D(t), and when adjusting the rate at which energy is transferred between the component and the grid in accordance with the slow operating power function D(t), the component will economically benefit from fluctuations in the current electricity tariff of the grid or in values ​​that can be derived directly or indirectly from the grid's electricity supply; and Adjustments made to the rate at which energy is transferred between components and the grid in accordance with the fast action power function F(t) are adjustments that respond to, for example, imbalances between power generation and power consumption through the power grid.

[0018] With the present invention, the fast operating power function F(t) is superimposed on the reference value power function B(t), which is further derived from the slow operating power function D(t). This allows the component (generator or load) to simultaneously follow two different power consumption measures, determining the reference value function B(t) such that the cost of deviating from the slow operating power function D(t) is acceptable. In particular, the slow operating power function D(t) is determined by monetary forces within the electricity market. For example, its value can be the current price, leading to measures such as avoiding peak prices. Alternatively, its value can be based on market derivatives, such as the amount of fines imposed on load operators who violate their contractual obligations to the network. The load operator then tries and limits actions that avoid or reduce the exposure of the fine.

[0019] 0~Maximum power C DFor a variable speed generator or load that is operable over a range of power levels, regulation in response to grid imbalances provides a maximum power C D The reference power function B(t) may be set to be equal to the slow operating power function D(t), provided there is a high probability that the slow operating power function B(t) is significantly smaller than the maximum power C D Any range of δC D If not within (δ≪1), then B(t) may be set equal to the slow operating power function D(t), and if D(t) is within this range, then B(t) is set equal to δC D or (1-δ)C D It is set to one of the following:

[0020] Alternative embodiments of the method of the present invention are either "off" or "on" and thus have two power levels (0 and C D ) in which each of the binary elements is one of a group of components that operate together to provide service responsive to network imbalances, and the responsive duties are distributed around the group such that each component provides only the responsive service intermittently with a high probability. In this embodiment, the baseline power function B(t) is derived from both the slow operating power function D(t) and also from past values ​​of the fast operating power function F(t).

[0021] Using this embodiment, the time period preferably includes a series of consecutive decision periods, and for each decision period k=1 to N, the average value D of the low speed operation power function D(t) over the decision period is calculated. k Following the determination of , a criterion function B(t) is derived using a number of steps, the number of steps being: (a) Decision period T k into a series of contiguous subintervals; (b) Subinterval period s m For each of (m=1 to M), the subinterval period s m At the start of the step, the component is not responsive to network imbalances, (i) the average total power transfer P between the component and the grid before the start of the subinterval periodk and determining (ii) the average total power transfer P determined in (i) of step (b) before the subinterval. k is the average value D of the low-speed operation power function D(t) over the decision period. k Compare with (iii)P k >D k If , set the criterion function B(t) to zero in that subinterval, and k <D k In this case, the reference function B(t) is set to the maximum power C D and performing the steps of not responding.

[0022] In this manner, the effect of F(t) is mitigated by determining the value of B(t) for each successive subinterval in a manner that takes into account the power consumption contributions of all past subintervals, such that over the determination period, deviations from the ideal slow operating power function are limited to those exhibited by a single subinterval.

[0023] Furthermore, the subinterval period s m At the beginning of the subinterval s, if the component responds to a network imbalance, m The reference power function B(t) is preferably m-1 The reference value of the power function B(t) is set to the same value as the reference power function B(t).

[0024] In a second aspect, the present invention provides a method for operating a component connected to a power grid, the method comprising adjusting a rate of transferring energy between the component and the power grid in accordance with a power function P(t), the power function comprising two components, a fast operating power function F(t) and a reference power function B(t), the reference function B(t) being derived by the following steps: (a) Decision period T k The average value D of the low-speed operation power function D(t) over the k and deriving (b) Decision period T k A series of consecutive subintervals s m(m=1 to M), (c) Subinterval period s m (m=1~M), (i) subinterval period s m If F(t) ≠ 0 at the beginning of the subinterval, then keep the value of B(t) unchanged in that subinterval (B m =B m-1 ), otherwise, (ii) Partial interval period T k Within the range and its subinterval period s m Before the start of k and determining (iii) Subinterval s m Before the average total power transfer P determined in step (c)(ii), k is the average value D of the low-speed operation power function D(t) over the decision period. k Compare with (iv)P k >D k In the case of m Set to zero and P k <D k In the case of m Maximum power C D otherwise, leave the criterion function unchanged in the subinterval (B m =B m-1 ) steps.

[0025] 1. A method of controlling the operation of a non-battery component connected to a power grid, the component being either a generator or a load of a type capable of storing energy therein, the method comprising: (a) monitoring a physical parameter of the component indicative of an amount of energy stored therein; (b) deriving a proxy variable φ, where 0≦φ≦1, from the measured physical parameters, the proxy variable φ representing the fraction of stored energy held in the energy reservoir at any one time; (c) controlling operation of the component in accordance with a slow operating power function D(t) when the proxy variable φ has a value between an upper limit value and a lower limit value, whereby adjusting the rate at which energy is transferred between the component and the grid in accordance with the slow operating power function D(t) will cause the component to economically benefit from fluctuations in the current electricity tariff of the grid or from fluctuations in a value that can be derived directly or indirectly from the grid's power supply; (d) if the proxy variable φ has a value outside the range of the upper limit or the lower limit, operating the component at an operating power that is in accordance with returning the parameter to a value between the upper limit and the lower limit.

[0026] Using the proxy as an indication of the energy stored in the load allows the adjustment of the power consumption of the component to be separate from adjustments based on detailed knowledge of the component operation. In this way, the proxy is analogous to a battery state of charge. This provides great flexibility in applying the power consumption function to all kinds of generators and loads. Furthermore, the proxy model is flexible when applied to systems where two or more parameters should be used appropriately to provide an indication of the energy storage of the component. In such cases, the overall proxy can be defined as the product of the proxy for each individual parameter.

[0027] In an alternative aspect, the present invention provides a method of controlling the operation of a component connected to a power supply network, the component being either a generator or a load of a type capable of storing energy therein, the method comprising the steps of: (a) monitoring a physical parameter of the component indicative of an amount of energy stored therein; (b) controlling operation of the component when the parameter has a value between the upper and lower limits according to the method described above; (c) if the parameter has a value outside the upper or lower limit, operating the component at an operating power in accordance with which the parameter is returned to a value between the upper and lower limits.

[0028] In this aspect, the invention provides a convenient approach for ensuring that simultaneous operation of a component according to two power consumption measures does not cause the component to operate outside its acceptable parameters.

[0029] Preferably, the method is based on the use of a proxy variable φ, where 0≦φ≦1, is derived for the component, the proxy variable representing the fraction of storable energy held in the energy reservoir at any one time and derived from the measured physical parameter, whereby limits of component operation are defined in terms of the proxy variable.

[0030] In another aspect, the present invention provides a system for controlling the operation of a component connected to a power grid, the component being either a generator or a load of a type capable of storing energy therein, the system comprising: an industrial process controller configured to exercise direct control of the operation of the components and to monitor process parameters; a central demand server configured to derive a slow operating power function D(t), such that when adjusting a rate at which energy is transferred between the component and the grid in accordance with the slow operating power function D(t), the component will economically benefit from fluctuations in the current electricity price of the grid or in values ​​that can be derived directly or indirectly from the grid's power supply; an indicator configured to provide a signal indicative of an imbalance in power provided through the grid; a local device controller associated with the industrial process controller and the component, receiving a signal indicating an imbalance in the power provided from the indicator via the network and receiving a slow operating power function D(t) from a central demand server; Deriving a reference power function B(t) from the low speed operation power function D(t); Deriving a fast operating power function F(t) from a signal indicative of an imbalance in power provided through the network; and a local device controller configured to provide instructions to the industrial process controller to operate the component and adjust the rate at which energy is transferred between the component and the grid according to a fast action power function F(t) superimposed on a baseline power function B(t).

[0031] In another aspect, the present invention provides a local device controller associated with an industrial process controller configured to exercise direct control of the operation of a component connected to a power grid, the component being either a generator or a load of a type capable of storing energy therein, the local device controller comprising: receiving a signal indicating an imbalance in power provided from the indicator via the network and receiving a slow operating power function D(t) from a central server; Deriving a reference power function B(t) from the low speed operation power function D(t); Deriving a fast operating power function F(t) from a signal indicative of an imbalance in power provided through the network; providing instructions to an industrial process controller to operate the component and adjust a rate of transferring energy between the component and the grid according to a fast operating power function F(t) superimposed on a baseline power function B(t); A slow operating power function D(t) is derived such that the component benefits economically from fluctuations in the price of electricity delivered by the grid over the course of a day when the component adjusts the rate at which it transmits energy between the component and the grid in accordance with this function D(t).

[0032] The invention will now be described in detail, by way of example only, with reference to the accompanying drawings, in which: [Brief description of the drawings]

[0033] [Figure 1] 1 illustrates a power supply system incorporating a reactive load that may be operated with a power consumer according to the present invention; [Figure 2a]1 is a representative graph of power consumption versus time for a collection of load devices or groups of devices that provide frequency response services to a grid. [Figure 2b] 1 is a representative graph of power consumption versus time for a load device implementing peak price avoidance. [Diagram 3] 4 is a flow chart depicting the process steps involved in implementing a dual power consumption measure of an electrical load. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0034] An electrical power supply system, generally designated 10, is shown in Figure 1. The electrical power supply system 10 includes one or more electrical power generators 12 and a number of electrical loads 14, 16. The electrical power generator 12 supplies electrical energy to the electrical loads 14, 16 via an electrical power distribution grid 18 (hereinafter "grid 18").

[0035] In this particular embodiment, the generator is not considered to provide service in accordance with the present invention. This is not because the generator is useless, but simply for convenience. It will be apparent to one skilled in the art that the present invention can be practiced with a generator if it meets the appropriate performance criteria. However, in the following, the description focuses on load operation.

[0036] Although depicted together in FIG. 1, the several power generators 12 are not considered to be of the same type. One may be a coal power plant, while the other may be a wind farm, a hydroelectric generator, or any of several known systems capable of generating electricity and supplying it to the grid. Generally, each generator works with a grid manager to supply a set amount of electricity to the grid. This set amount may be adjusted according to the generator's contractual requirements to provide some regulation to the power grid.

[0037] Additionally, the electrical loads 14, 16 are inherently different. Generally, they draw power from the grid on demand, and only a limited subset are capable of providing responsive services and addressing grid imbalances. Capable electrical loads, however, may adapt individually or as a collection of multiple loads operating collectively to provide responsive load services that adapt to help regulate grid supply and demand.

[0038] With respect to electrical loads, the present invention is primarily concerned with loads that consume significant amounts of electricity. This includes, for example, industrial processes, electric vehicles, and heating and cooling systems. However, the present invention does not provide any technical reason why loads that consume less electricity cannot be implemented, making it unlikely that the economic benefits of such loads would outweigh the costs.

[0039] There is clearly a financial incentive for electrical loads to minimize the power taken from the grid when costs are high. As a result of increased consumption just prior to a peak period, loads that have some form of internal energy storage capacity can utilize their accumulated energy reserves during peak price periods. A simple example would be a battery, allowing for variation in the charge level it holds while still preserving the battery's ability to supply power to the grid. Another example would be a Building Management System (BMS) that maintains a building temperature within a range around a nominal set point. The system can therefore be thought of as storing energy if the building temperature is above the minimum of this range.

[0040] The loads 14, 16 shown in Figure 1 are industrial process loads having the capacity to store energy. Of course, other loads and load types may also be connected to the grid, but these are not shown in the figure. The industrial process loads 14, 16 are all associated with a local industrial process controller 20, 22, which is generally responsible for controlling and monitoring the operation of the loads. To this end, the industrial process controller 20, 22 includes or is in communication with a suitably positioned detector 24 that is configured to monitor a parameter indicative of the amount of energy stored in the load. This allows the process controller to ensure that the amount of energy stored is maintained within an acceptable range throughout the process.

[0041] The details of the detector 24 depend on the particular industrial process that serves the load 14. The detector 24 is necessarily adapted to measure a parameter that depends on the load characteristics, specifically the form in which energy is stored in the load. Using the above example, a battery would have a controller adapted to infer the instantaneous state of charge (SoC) from observing the voltages that charge or discharge the battery. On the other hand, the detector 24 in a building management system would include a thermometer, thermocouple, or similar device that measures the temperature of the building being controlled. With other industrial process loads where more than one parameter is required to provide a reliable indication of energy storage, it may be appropriate to have more than one detector 24 associated with each of the industrial process controllers 20, 22.

[0042] The difference between the two types of loads and controllers shown in FIG. 1 is that the first type 14, 20 is adapted to participate in the responsive load service being provided to the network 18. The other loads 16, 22 are not. In this embodiment, the responsive industrial load 14 is assumed to be a binary load among a group of responsive loads that collectively provide service. The loads 14 in the group can be the same or different. Regardless of the details of the group membership, whenever a response to an imbalance is requested, a single load or subgroup of loads is requested to provide a response on behalf of the group. There are many selection algorithms known in the prior art that can be employed to determine which particular load or subgroup of loads will provide a response at any given time. A non-limiting example of the above is provided by Open Energi's FFR algorithm. The selection can be made based on past response requests made to each load, load internal parameters, and the degree of imbalance detected on the network. The details of these algorithms are not critical to the present invention as they are influenced by them. Most attempt to distribute the response demand evenly among a group of loads, ensuring that each load incurs a similar cost in terms of degradation of normal operating performance. In such situations, the typical period of a responsive load "switch", i.e., the time required for a particular load in the portfolio to adjust its consumption as a result of a network imbalance, can take several minutes.

[0043] An algorithm for binary load operation suitable for use with the present invention is one that results in the impact of low utilization of each of the individual loads within any "decision" period as an inference of an even distribution of demand. In this context, the decision period is of a longer duration than that of a typical responsive load switch, but is significantly shorter than one day (24 hours). For example, a decision period of 30 minutes is appropriate for FFR. For a portfolio of binary loads spanning a long period (many decision periods), the demand made to the group for response service as a whole is always only a small fraction of the total electricity consumption of the group. The present invention, which allows implementing response services together with some other slow-acting electricity consumption means, further requires that the fraction of time within any decision period that an individual load is required to provide response service is short. This is true for the algorithms described in the prior art mentioned above, but is not typical.

[0044] For non-binary or variable speed loads, the requirements are different. Such loads continuously adjust their operating power to accommodate network imbalances. Thus, the loads are not part of a portfolio of loads where each load is only required to provide response intermittently. Rather, the low utilization condition in this case is to always provide response service using only a small fraction of the load's total electrical consumption.

[0045] Each of the responsive loads 14 and the industrial process controller 20 is associated with a local responsive load controller 26. The responsive load controller 26 is connected to and communicates with the process controller 20, and they work together. The local responsive load controller 26 includes or is connected to a frequency monitor 28, which is adapted to monitor the power frequency provided by the network. The term "local" is used to indicate that the controller 26 is physically near or even integral to the load 14 being controlled. With components intended to respond to network 18 imbalances in seconds, it is important to minimize communication delays. In some embodiments (not shown), multiple electrical loads 14 may be controlled together as a group by a single load controller 26.

[0046] While monitoring temporal variations in frequency is currently the preferred approach to detect power supply imbalances across the grid 18, alternative monitors adapted to detect variations in other characteristics of the grid 18 indicative of imbalances in power supplied across the grid 18 are envisioned and may replace the frequency monitor 28. In alternative embodiments appropriate for markets such as the PJM grid in the United States and the AEMO grid in Australia, the frequency monitor 28 may be replaced by a receiver. Both of these grids are self-monitoring for grid operators to detect imbalances. The algorithms determining the degree of imbalance or at least the degree of correction required may be more complex than simply monitoring how far the grid frequency deviates from a nominal value. For example, they may include factors that consider the rate of change of frequency. However, once an imbalance is detected, the grid responds by sending a signal to any loads that are required to adjust their power consumption. The present invention allows for any responsiveness algorithm to be implemented that ensures with a high probability that any individual load is required to provide responsive service only for a small fraction of the time within the determined period.

[0047] The local load controller 26 is adapted to send commands regarding the load power consumption to the industrial process controller 20. If it requires an adjustment of the power consumption, for whatever reason, this may be implemented by the process controller 20, provided that the load energy storage is maintained within an acceptable operating range. If the load energy storage is outside this range or if the adjustment of the power consumption requested by the local load controller 26 is found to be outside this range, the industrial process controller 20 will not respond to the signal of the local load controller 26, and will then operate the load 14 independently. Furthermore, it will signal the local load controller 26 that the load 14 is not available to provide responsive load service.

[0048] The local load controller 26 is also adapted to monitor the network frequency, which is detected by a frequency monitor 28 or otherwise.

[0049] In this embodiment of the invention, the loads provide their responsive service according to an algorithm that assigns a trigger frequency to each load in the portfolio. The distribution of the demand response is ensured by the uniform reallocation of the trigger frequencies. Thus, the local load controller 26 is also adapted to maintain information regarding the trigger frequency at which the load 14 switches from normal operation to operation responsive to the network frequency deviation. If the network frequency deviates from its nominal value to an extent that exceeds the load's trigger frequency, the local load controller 26 sends a signal to the industrial process controller 20 that responsive service is required and indicates the level of response (if necessary). Similarly, the local load controller determines when the responsive load service will not require and notify the industrial process controller 20 to revert to a level of past operation. The industrial process controller 20 is adapted to report load handling parameters (e.g., stored energy reserves) to the local load controller 26.

[0050] The local load controller 26 includes a communication interface adapted for bidirectional communication. This allows data exchange over the network between the local load controller 26 and the remote central demand server 30. The central demand server 30 may communicate with multiple local load controllers 26. The data signals transmitted by the central demand server 30 relate to power management according to relatively slow changing criteria. In this embodiment of the invention, it relates to peak price avoidance measures. Unlike responsive load services, the adjustments of power consumption made in relation to peak price avoidance are known days, weeks or months in advance. In comparison, any time delays in information transmission over the network are negligible. This means that a single central demand server 30 may provide information on power adjustments over the network to many local load controllers 26. The required adjustment patterns are tailored to the specific operating requirements of each of the loads 14, which will be explained in more detail below. The data provided by the local load controllers 26 to the central demand server 30 may include, for example, information on the instantaneous total power consumed by the loads. Over time, this allows the central demand server 30 to record and analyze load power consumption patterns, thus enabling verification of responsive loads, the success of peak price avoidance measures, and the like.

[0051] 2 illustrates graphically the variation of power consumption patterns over several hours for a load for (a) a demand side frequency response service and (b) a peak price avoidance scheme during operation. Each of the graphs 34, 36 plots the power consumption by a variable speed load device (or an aggregate group of binary loads) against the hours of the day.

[0052] With reference to FIG. 2a, it is noted that operators of many distribution systems in Europe and elsewhere require stabilization measures to be initiated as soon as the grid frequency deviates from a target frequency of 50 Hz by more than 0.01 Hz. In the system 10, the grid frequency is monitored by a frequency monitor 28. If the grid frequency rises to 50.01 Hz or falls to 49.99 Hz, this threshold is noted and at least one of the load controllers 26 responds by adjusting the power consumption of each of the loads 14 to address the frequency deviation. In the UK, providers of responsive load services are required to meet several specific performance criteria. For example, to meet the conditions of stable frequency response (FFR), the provider is required to be online within 10 or 30 seconds of detecting a frequency deviation and to be available to provide a minimum of 1 MW of responsive energy. Improved frequency response (EFR) is a service that can provide full power regulation in 1 second (or less) to register a frequency deviation. As grid frequency is monitored on a second-by-second basis, UK FFR and EFR providers potentially vary their aggregate load power consumption on similar time scales. This is reflected in the rapid fluctuations in the total power consumption24 of aggregate devices operating FFR services, as observed in Figure 2a.

[0053] Referring to FIG. 2b, the power consumption of an exemplary load operating with peak price avoidance is shown. For this grid system, electricity consumed from 4:00 pm to 7:00 pm is more costly than other times during the day. The normal power consumption levels of this load for which the system operates up to specification are those shown from 2:00 pm to 3:00 pm and from 7:00 pm to 8:00 pm. However, at 3:00 pm, the device operates at maximum power for an hour. This allows for a sufficient reserve of energy to be stored that can provide for the load to operate at zero power consumption during the peak hours of 4:00 pm to 7:00 pm. The load then returns to normal operating power. Of course, this is merely an example of a behavior that allows for peak price avoidance. The specific details depend on the load involved. For example, a load may operate at maximum power for longer than an hour, requiring the entire energy reserve to be accumulated. The energy reserve may not be sufficient to maintain operation at zero power consumption throughout the entire peak period, and thus some form of reduced power operation is required. Additionally, to boost depleting energy stores, the load may operate at a higher power consumption after the peak period. Regardless of the specific details, it can be seen that peak price avoidance results in a slowly time-varying power consumption profile 36.

[0054] Peak price avoidance is not the only behavior that slow-operating variable power consumption results in. In this context, "slow operation" means that "fast operation" can change from second to second, while "slow operation" should usually be a change of only a fraction of once every 30 minutes. In most distribution networks, multiple markets are offered to purchase power and rights to request flexible responses from both generators and loads. Incentives and penalties are given to providers to encourage operation within contractual limits. While the involvement of responsive frequency markets requires rapid responses, some other markets only require power consumption to vary in slow-operating patterns. For example, to participate in day-ahead optimization, power is purchased at a price set one day before use, and thus the operating power level is set to match the purchased amount. The adjustment mechanism service provides manually commanded responses that correct forecast errors and unexpected losses in generation or demand. These types of variations are made known at some point in advance. Other means of requesting slow-operating power consumption profiles include Project TERRE, imbalance tracking, DNO control signals, among many others known to those skilled in the art.

[0055] In the past, it was not considered possible for loads involved in peak price avoidance to simultaneously participate in frequency response services. This prevents operators of such loads from enjoying the financial benefits of these markets. It also means that the loads tend to use capacity to provide other services to the grid that are compatible with the slow-acting function, reducing their ability to provide services such as FFR, which in turn impairs the quality of the regulation services that can be provided to the grid. Similarly, some generators may operate with variable capacity to input power to the grid according to the slow-acting market function. Until now, such generators have also not been able to simultaneously participate in frequency response services such as FFR.

[0056] However, with the present invention, such loads and generators (particularly those that have the capacity to store energy in some form) can be involved in both implementations at the same time. The present invention has different embodiments depending on whether the component (load or generator) is capable of operating with fully variable power consumption or whether the component is a binary element. Implementations of the present invention for both situations are described in detail below.

[0057] However, broadly speaking, a load is free to engage in implementations such as FFR that result in fast operating variations in power consumption F(t), while at the same time aiming to follow slow operating measures, provided that small deviations from the ideal slow operating power consumption are permitted. To ensure that deviations remain small, the slow operating reference power consumption B(t) should be derived such that, on average, the total power consumed by assets implementing FFR matches the total power that would be consumed with high probability if not implementing FFR and following the slow operating measures alone.

[0058] The above references to "high probability" mean that for a load that provides an FFR at a fixed time, the probability tends to 1 as that time period tends to infinity.

[0059] Using function B(t), the instantaneous total power consumed at time t by a load undergoing FFR is It can be expressed as P(t) = B(t) + F(t).

[0060] That is, the instantaneous power can be modeled as a superposition of two functions: a slow operating reference value function B(t) and a fast operating FFR term F(t). This model is valid, subject to a correction algorithm for deriving B(t) due to various constraints on both the average power and the instantaneous power variations of the binary assets involved as variable speed assets providing FFR or as one of a group of assets providing responsive load services.

[0061] For example, the power consumption profile required by the slow-acting means, which avoids consumption during peak prices, is called the slow-acting demand profile and is denoted D(t). A simple approach should be exercised: set a reference value function B(t) equal to the slow-acting demand profile D(t), so that the total power consumed by the load is D(t)+F(t). If the deviation from the ideal demand profile is significant, the costs become significant with respect to any benefits resulting from implementing the means according to F(t). Moreover, in the case of binary loads, the errors become significant. Such loads can only be "on" or "off". If both measures simultaneously require the load to be "on", the superposition results in a situation in which the load consumes twice its maximum power, which is obviously impossible. The load is therefore forced to deviate from one of the measures it follows and is most likely to incur a fine.

[0062] An alternative approach (following the present invention) uses a derived function B(t) as the baseline power consumption profile instead of D(t). B(t) is constrained to provide a high probability that over a predefined period (decision period) the total amount of power consumed by the load is the same as the power that would have been consumed if the load operated according to the slow operating demand profile. The period is chosen to be significantly longer than the typical period during which frequency response power adjustment is required, and short compared to the length of time that power consumption adjustment is required for the slow operating demand profile. The period of frequency response adjustment depends, of course, on the details of the algorithm used, but is typically around 1-3 minutes. As a result, it allows the load to freely engage (for example) the FFR, but also needs to follow the baseline profile subject to the above mentioned constraining. Thus, if the day is divided into a series of consecutive decision periods and this means proceeds through each decision period through the course of the day, the result is that although there are some short-term deviations from the ideal slow operating demand profile caused by the engagement of the FFR, the results are minimal over each decision period. Thus, the overall cost to the load of engaging both power adjustment means remains low.

[0063] As noted above, the implementation of the minimum-cost targeted power consumption means differs depending on whether the load is capable of operating with variable power consumption or whether the load simply needs to be either on or off. Examples of algorithms used according to the invention in these different scenarios are described separately below.

[0064] Variable Speed ​​Demand Assets A variable-speed demand asset is a load that has the ability to consume electricity at a configurable rate, i.e., its instantaneous power consumption is P(t), where 0≦P(t)≦C D , C D is the maximum power consumption of the load.

[0065] With reference to FIG. 1 and the case of a variable speed load 14, the steps of operating the load 14 so that it can simultaneously participate in two other power conditioning measures will now be described. During preparation, the central demand server 30 is informed of or has access to a database of stored information related to a slow speed operating demand profile D(t). With respect to peak price avoidance, this includes the cost of electricity throughout the day. It also includes historical data that is specific to the type of load or load 14 being operated according to the present invention. These may be obtained from the local industrial process controller 20 and thus may be load specific or may be generally defined for the same type of load. Such data includes operational constraints such as, but not limited to, variations in stored energy reserves as a function of operating power. More details are described below with respect to an exemplary industrial process. From this data, the central demand server calculates an optimization of the slow speed operating demand profile D(t) that provides the lowest operating cost subject to the operating constraints of the load 14. This demand profile D(t) is derived assuming that this is the only power conditioning measure involved in the load. The central demand server 30 may be configured to provide optimization of the demand profile D(t) for one or more loads 14 connected to the network 18 .

[0066] If two or more loads are operated under the control of the demand server 30, the optimized demand profile D(t) is transmitted to each of the local responsive load controllers 26 or local responsive load controllers 26 via the network. The local responsive load controllers 26 for the variable speed loads set the reference value function B(t). C D -Δ <D(t)≦C D If B(t)=C D -Δ If 0≦D(t)<Δ, then B(t)=Δ Otherwise, B(t)=D(t).

[0067] Δ is a small constant (≪C D ), the origin of the constant becomes clear below. So far, such a simple superposition of D(t) and F(t) is thought to be quite expensive; thus, it is somewhat surprising that this approach works. The approach is made only when D(t) approaches zero or full operating power, which cannot be directly used as a reference function, and makes a small adjustment Δ. If the reactive load demand occurs during off periods or periods of operation at maximum capacity, this small adjustment is only necessary to leave some headroom.

[0068] The local frequency monitor 28 provides an indication of the grid frequency to the responsive load controller 26. The local load controller 26 calculates any adjustments in load power consumption that need to be made according to the detected frequency deviation, as is known in the art of responsive load service. That is, the local load controller 26 calculates F(t).

[0069] The local reactive load controller 26 then commands the local industrial process controller 20 to operate the load according to the profile such that the load draws power from the grid. P(t)=B(t)+F(t)

[0070] This operating means allows the load's baseline consumption to closely follow the slow operating signal while simultaneously allowing full participation of FFR services. Only the baseline consumption deviates from the slow operating demand profile when the load may be operated at approximately full power or approximately zero power.

[0071] It should be noted that by operating a load according to a superposition of two power consumption profiles, simultaneous participation in two different services depends on the following three conditions being met: The load is a variable speed load and thus there are no limitations on the power adjustments that can be made, provided that the consumption is kept within the limits. The fast operating function F(t) satisfies low utilization conditions. -F(t) satisfies the mean reversion condition.

[0072] Low utilization means that whenever an asset is required to provide frequency response service F(t), the magnitude of the power adjustment request is likely to be a small fraction of the total power available. |F(t)|≦δC D Here, with high probability, δ<<1.

[0073] In practice, it is recognized that, in general, for variable speed loads, FFR utilization is approximately 6%, which represents only a small perturbation in the power consumption profile of the assets. That is, the small fraction of capacity used to provide the FFR response is typically 6% (δ~0.06) of the FFR availability provided. Other algorithms may be used to implement FFR (or other frequency response services) with different utilization factors, but with δ≪1, these other algorithms also satisfy the low utilization condition.

[0074] While the low utilization condition applies to the instantaneous frequency response power adjustments, the mean reversion condition relates to the behavior of the response F(t) over the long term of operation T. At any given instantaneous response, the F(t) adjustments can be positive (increased load) or negative (increased generation). Thus, over the period T, the result is that on some occasions the response adjustments are positive and on other occasions they are negative. Ideally, over the decision period T, the responsive service is energy neutral, i.e., the average value of F(t) is zero. In practice, this is rarely the case, and the average value of F(t) over this period is bounded by the value ε. The mean reversion condition requires that the average value of the responsive power adjustments made over the decision period T (i.e., ε) should, with high probability, be small, such as a small fraction of the utilized power. That is,

[0075]

number

[0076] That is, the average responsive power adjustment over ε is significantly less than the maximum power adjustment that is likely to have been made at any point over the long period T for a load at utilization factor δ.

[0077] Over the course of the decision period T, F(t) is positive at some times and negative at other times, so that the mean reversion condition is primarily satisfied.

[0078] It will be recalled that the baseline function B(t) is set equal to the slow operating demand function D(t) for a variable speed demand asset when the demand function does not approach the maximum or minimum power consumption of the asset. When D(t) approaches these limits, B(t) is displaced from D(t) by an amount Δ, the value of Δ being selected such that sufficient headroom is left for the asset to provide frequency response service F(t), if required to do so. When the asset satisfies the low utilization condition, the value of F(t) at any point in time is ΔC D (δ≪1) is unlikely to be exceeded. As a result, only δC DIf δ<<1, then we must set Δ<<C D and thus, this adjustment in B(t) represents only a small deviation from the ideal demand profile.

[0079] In an alternative embodiment, the criterion function is such that the function is C D or even approaching zero. In this scenario, at the point when a load operates close to these limits, it needs to be removed from the portfolio of loads available to provide response regulation. That is, when the reference value is C D If , then the load cannot provide regulation services when high frequency grid excursions occur, but is still available to reduce power consumption in response to low frequency excursions. Similarly, if the load is operating at a zero power reference, then it cannot provide response services to low frequency excursions, but is available to participate in the response when the grid frequency becomes significantly higher.

[0080] Which of these alternative embodiments is preferred will be determined primarily by economic cost, considering whether the penalty for not utilizing responsive load service exceeds the increased cost of deviation of the amount Δ from the ideal slow operating demand function.

[0081] In general, the asset is free to respond to any demand F(t) that may occur over a period T(P T The average power consumption of an asset operating according to a reference function B(t) that follows a slow operating demand profile over a period of time is given by:

[0082]

number

[0083] As mentioned above, the average value of F(t) over a period T will be less than or equal to a value ε (a small value) provided that the mean reversion condition holds. That is,

[0084]

number

[0085] Here, B T is the average value of the base term over this period T. T is the ideal average low-speed operating demand profile D T B to ensure that it matches T When is derived, the result is that the cost of operating the load 14 according to this algorithm has a small deviation (ε) from the ideal average power consumption profile. This quite often represents an acceptable cost that is outweighed by the benefits involved in responsive load service.

[0086] Non-variable speed demand assets For non-variable speed demand assets, the power taken by the load can only be one of two values ​​(zero or full operating capacity). Examples of such loads are compressors (for refrigeration) and relay-operated industrial heaters, such as bitumen tanks. These loads cannot effectively participate in both peak price avoidance and frequency response services (such as FFR) by simple superposition of both power consumption profiles. The asset is either on or off, and thus, when the asset is on and responding to an FFR request, F(t) is equal to C D is equal to.

[0087] As detailed above, the algorithm by which the baseline function B(t) was derived for variable speed assets required a fast operating function F(t) to satisfy low utilization conditions. It is the function that, with high probability, |F(t)|≦δC D , δ≪1.

[0088] Obviously, for non-variable speed assets, this condition does not hold. If a responsive switch is required, then δ=1. Furthermore, it is not possible to derive the reference function B(t) separately from the unpredictability of F(t). Since an asset cannot operate at a power greater than full power, the condition B(t)+F(t)≦C Dmust be satisfied, and thus B(t) must respond to changes in F(t). That is, a more complex algorithm is required to derive the criterion function B(t).

[0089] However, for non-variable speed assets, the mean reversion condition holds. This is satisfied primarily as a result of two factors: - if over the course of a decision period T, F(t) is positive at some times and negative at other times, then -If a single load is involved in an element of a responsive group in an FFR (or similar) market, then this load will almost certainly only be required to provide a response intermittently, and this means that for only a small fraction of the period T, F(t) will be non-zero (provided that the FFR algorithm demonstrating group behavior ensures a sufficiently even distribution around the responsive group).

[0090] For loads 14 that are non-variable speed assets, the method begins as in the variable speed case to derive a reference value function B(t). The central demand server 30 calculates an optimization of a low speed operating demand profile D(t) that provides the lowest operating cost subject to the operating constraints of the loads 14. This demand profile D(t) is derived assuming that this is the only power conditioning measure involving the loads. The central demand server 30 may be configured to provide an optimization of the demand profile D(t) for one or more loads 14 connected to the network 18.

[0091] A flow chart illustrating the steps involved in implementing a power consumption measure that allows both engagement of a fast acting service F(t) (e.g., FFR) and compliance with a slow acting demand profile D(t) derived by a central demand server 30 is set forth in Figure 3. For ease of reference, it is assumed that the fast acting service F(t) is an FFR, but this is by way of example only and not limitation.

[0092] In a first step 40, the day is divided into N decision periods (starting at time tk (k=1,2,.....N,N+1)(t N+1 The length of each decision period is not required to be equal, but in practice a decision period of 30 minutes is valid for FFR and peak price avoidance, in accordance with the rules of the UK electricity market.

[0093] In a second step 42, for each decision period, the central demand server 30 calculates the average power consumption at which the loads 14 would operate if they were to follow only the slow operating demand profile. That is, over the kth decision period, the average demand power consumption D k is given by the following formula:

[0094]

number

[0095] This average demand profile D k ∀k is sent to the local reactive load controller 26 .

[0096] Over the next series of steps, the local responsive load controller 26 controls the load P k The average power consumption of D k Based on the requirement that the length of the decision period T k For each decision period, function B k As shown above, the load 14 is a quantity C D power consumption or off. That is, at any given instant t, P(t) can be either 0 or C D Therefore, D k In order to limit the average power consumption over the kth decision period up to the kth decision period, the load 14 k That is, over the kth decision period, B k =D k ,∀ k Derive B(t) so that

[0097] The load is therefore driven in a modulated on / off pattern such that, over the length of the determined period, the total duration of the "on" phase matches the desired slow operating demand function.

[0098] In this derivation of B(t), we ignore the contribution of F(t) to the total power consumption, as with variable speed assets. For variable speed assets, the cost results in a small deviation ε from the ideal demand power consumption profile, as shown above. This cost has been found to be acceptably low in situations where F(t) satisfies low utilization and mean reversion conditions. That is, when F(t) consumes a small fraction of the power that is available, F(t) is as likely to be positive as negative.

[0099] For non-variable speed assets, F(t) must consume all available power if it is non-zero. Let B(t) be D k Deriving it solely from , over the kth decision period, means that

[0100]

number

[0101] It can be easily seen that the contribution provided by the F(t) term can be significant if the asset is required to provide an FFR response switch during this period. k The "on" time is not required to be significantly longer in response to an FFR requirement that increases demand, such that P is significantly greater than the ideal value. Similarly, if a network imbalance requires a decrease in demand on the asset and a decrease in "on" time during the decision period, P k The value of can be significantly smaller than that required to follow an ideal slow-running demand profile. The asset may then not store enough energy throughout the peak price period. Therefore, it is also necessary to derive B(t) in a way that takes into account the consequences of any FFR switches that occur during the decision period.

[0102] In step 44, the local reactive load controller 26 starts its algorithm to calculate B(t) over the kth decision period. Each decision period is divided into modulation subintervals. The modulation subintervals of the kth decision period are each a time s j (t k ≦s j <t k+1 ) and time s j+1 (s j j+1 ≦t k+1 ) if we ignore the effect of F(t), e.g., by switching an asset "on" in one subinterval and "off" in the next, switching "on", "off", etc., and by switching the asset "on" for a small fraction of the decision period in which it is "on", D k We can derive B(t) by setting the duration of the subintervals such that the average consumption of F(t) is 1. However, ignoring F(t) introduces errors that compound only over subsequent decision periods. To avoid this, we employ a system of dynamic allocation of subintervals.

[0103] For the first subinterval s1, B(s1) is C D or 0 (44), and the appropriate command is sent to the industrial process controller 20 (46). This setting is determined by random assignment or k ≧0.5C D If (0 otherwise), then B(s1)=C D ​etc. Every I minutes thereafter, the method performs one subinterval allocation loop; i.e., the value of B(t) is determined for the next (mth) subinterval. This triggers the local responsive load controller to check, in step 48, whether the load 14 is currently providing responsive load service. If so, nothing changes and the load 14 remains free to participate in FFR in the next subinterval. If the FFR requirement is not set "on" for the load 14, then, in step 50, the average total power consumption of the load over all past subintervals of the kth decision period is either calculated or otherwise obtained by the responsive load controller 26. For the mth subinterval, the average total power consumption up to this subinterval is given by:

[0104]

number

[0105] Here, λ j is a function that has a value of 1 if the load is "on" in the jth subinterval and a value of 0 otherwise.

[0106] This value of the average power consumption of the load over the determination period up to that point may be obtained in a number of ways. In the case of FFR, the industrial process controller 20 continuously monitors the load power consumption and provides this actual data to the responsive load controller 26, allowing the responsive load controller 26 to extract the required information. In other embodiments, the responsive load controller 26 is configured to store instruction data which it communicates to the industrial process controller 20. The responsive load controller 26 may then use this stored historical data to calculate the average total power consumption of the load over all past subintervals, assuming it is acting according to these instructions. If for any reason the industrial process controller 20 disables the responsive load controller 26, for example if the stored energy reserves are insufficient, this information is communicated by the industrial process controller 20, allowing the responsive load controller 26 to adjust its calculations accordingly.

[0107] In step 52, the slow operating demand profile (D k ), the average power consumption (P k ) is compared to the ideal average power that the load 14 would be consuming. If the load 14 uses too much power, then in the mth subinterval, B(t) is set to 0 in step 54. On the other hand, if the power required by the load 14 is insufficient, then in the mth subinterval, B(t) is set to C D (56). In either case, the value of B(t) for the subinterval is sent by the responsive load controller 26 to the local process controller 20 (58). Over the duration of the mth subinterval, the local process controller 20 ensures that the load 14 operates according to the determined value of B(t), unless this is overridden by any FFR requirements. If, in step 52, the average power draw is found to be equal to the ideal demand function, no action is taken. The process then waits a further I minutes to complete the iteration of the subinterval allocation loop 48-58 and, if applicable, determines B(t) for the (m+1)th subinterval and the commanded load 14 operation. This procedure continues until the end of the decision period.

[0108] If B(t) is determined according to this algorithm, then with high probability, P k is maintained close to its target value. The length of the subinterval is selected according to the decision period and possibly also according to the requirements of the particular load 14.

[0109] Clearly, as with variable speed assets, there is some cost associated with deviation from the slower speed demand function by enabling engagement of a fast acting response service such as FFR. This cost needs to be determined. If the cost is significant, loads that periodically operate measures such as peak price avoidance may not be willing to employ this technology to enable engagement of both this measure and FFR at the same time.

[0110] As noted above, low utilization conditions are maintained for non-variable speed assets. However, for a group of assets involved in FFR, e.g., according to the algorithm described in WO 2006 / 128709, the time since a particular asset was required to adjust its energy consumption in response to a grid frequency deviation is taken into account in determining the likelihood of response to a possible future deviation. This results in that over a sufficiently long period S, the FFR response represents a relatively small perturbation with respect to normal operating behavior. Thus, the resulting change in total power consumption caused by the FFR response over the period S is also small. That is,

[0111]

number

[0112] There exists a value of S such that δ<< 1. This weak low utilization condition, which is obeyed when FFT cutoffs for the reference occur irregularly, is satisfied for each subinterval, as explained with respect to FIG. DThis means that the dynamic allocation of} values ​​makes it possible to derive B(t) such that errors introduced in one (or more) subintervals by the requirement to provide frequency response services are corrected in subsequent subintervals with high probability.

[0113] Without considering F(t), we use the allocation rules described in Figure 3 to determine the decision period T k The average power consumption over a period of time is value D k For example, if the ideal demand is 0.7C, D Consider the situation where: The algorithm operates the load according to the modulation pattern set out in Table 1 below.

[0114] [Table 1]

[0115] To help you understand, P k While the value of P can vary significantly over the first few modulation subintervals, its value tends to fluctuate around the ideal value of 70% in subsequent subintervals. Subsequent subintervals are driven by P when the operating power of the load in each subinterval represents a small, insignificant fraction of the total power consumed. k This results in a small percentage change increase relative to

[0116] At any point, if the load is required to initiate an FFR switch and F(t) becomes nonzero, the algorithm modulates the load's behavior to compensate. Again, as the number of subintervals following the subinterval where the switch occurs increases, D k This improves recovery from

[0117] For example, 0.7C as shown above D Consider a situation in which a load attempting to follow the average demand profile of is required to undergo an FFR switch to zero power for half the duration of the sixth subinterval s6. The load behavior is then described in Table 2 below.

[0118] [Table 2]

[0119] As can be seen, the average power is different after the switch, but according to the seventh subinterval, which is the first subinterval that can be compensated, the average power consumption remains within 6% of its ideal value.

[0120] It is understood that this is just one particular example given to clarify the behavior of the algorithm in compensating loads that provide responsive load services in addition to following a slow acting demand profile. However, the general principles apply. The F(t) switches are compensated within a small number of subintervals. The more subintervals that exist in a decision period, the better the convergence of the average power consumed in that period to the average value of the slow acting demand function.

[0121] The average reference value function B in the kth decision period k Returning to the derivation of , this gives the slow operating demand function D over this period. k However, it will be recalled that the ideal slow-speed operating demand profile is set equal to the average value of 0 or C over this period. D If the demand function D(t) approaches one of the limits, there is no capacity left to participate in the FFR (or, at least, not in one direction). For variable speed assets, if the demand function D(t) approaches one of the limits, B(t) decreases by a value δC away from the limit. D For non-variable speed assets, B k A similar approach is used when deriving B. However, in this case k Since is the average value of the reference function that is of primary interest, a more appropriate adjustment factor to use in this case is the frequency response function F over this decision period. k This is the quantity ε derived above. Under the condition that the mean reversion condition holds, ε is a relatively small value (≪C D ).

[0122] The decision period used in the calculations above is set to 30 minutes. This is primarily because that decision period complies with the rules of the UK energy market. Longer or shorter periods may be used as well, provided that the period remains significantly longer than the length of a typical FFR switch. There is no impact to making the decision period longer, since it will take longer to correct the reference function in response to the FFR, but will correct more FFR switches. The worst case scenario of an FFR switch occurring at the end of the decision period occurs with similar frequency. Also, a shorter decision period will have little impact unless its length approaches the length of a typical FFR switch. In this situation, there is insufficient time to correct for the effect of any FFR switch.

[0123] Power generation assets Although the above algorithms are described with respect to application to demand assets, it will be apparent to one skilled in the art that the algorithms can be utilized for generators as well. There are times when it is financially advantageous for a generator to feed energy into the grid, which can provide a slow operating demand profile. A generator that can step up or down its output can simultaneously participate in response services, with appropriate adjustments in the direction electricity flows, if the generator follows the algorithms described herein.

[0124] Load Energy Storage Example When implementing the above algorithms (both variable speed and non-variable speed), it is important to track the amount of energy reserve stored in the asset. If the asset has sufficient reserve to operate with a non-ideal energy consumption for the required period, it may be possible for the asset to only engage in any variable consumption means.

[0125] 1, the industrial process controller 20 includes or is in communication with a detector 24 that is configured to monitor a parameter indicative of the amount of energy stored within the load. That is, for each generator or load system operated in accordance with the present invention, it is necessary to derive a measurable parameter of the system that serves as a "proxy" for the energy stored within the system and held in reserve to enable operation in accordance with the variable power consumption measures. This proxy variable is monitored by the detector and communicated to the industrial process controller 20. If the proxy variable exceeds a safe limit, the industrial process controller 20 will override the responsive load controller 26 and return the load (or generator) to its ideal operating power level.

[0126] Some non-limiting examples of proxies are now described for different systems that may be included in a portfolio of assets operating in accordance with the present invention. By analogy with a battery energy storage system and measuring the state of charge (SoC) of that system, the proxies for each alternative system are real numbers between 0 and 1 that represent a fraction of the storable energy currently stored in the system.

[0127] A bitumen tank is an insulated cylindrical container that is partially filled with liquid bitumen. For safety and quality assurance reasons, the temperature of the tank is limited to a lower threshold T min and the upper threshold T max Bitumen tanks are generally highly insulated, which allows the tank to store energy for long periods by converting this energy into heat, but if the temperature of the bitumen tank exceeds T min and T max In this case, the tank temperature and the threshold temperature can be used to define a suitable proxy variable φ.

[0128]

number

[0129] Building management systems typically define a temperature setpoint, T, that corresponds to the ideal temperature to maintain the building at. set In practice, the temperature is allowed to drop or rise by an amount ΔT below or above this set point without the system changing behavior. set -ΔT to T set +ΔT, which results in an effective deadband that lengthens to +ΔT, allowing the energy stored in the system to fluctuate. If the heating system is "on", we will raise the temperature so that the heating system enters the deadband, and then the heating will be turned off until the temperature is high enough to move out of the deadband. Thus, given the current building temperature, T, and the setpoint, T set , and the width of the dead zone 2ΔT are used to define a proxy variable φ of this system.

[0130]

number

[0131] Activated sludge process (ASP) is a type of industrial process used in wastewater treatment. The process involves the biological breakdown of the organic content and contaminants in sewage by bacteria and protozoa. Air or oxygen is bubbled through the raw sewage to remove the bacteria. Various parameters are monitored and controlled during the process: -Dissolved oxygen levels need to be maintained to support the bacteria. - Sludge volume index provides an indication of the settling characteristics of the sludge. -Levels of ammonia, a water contaminant, provide an early indication of the need for any process adjustments due to the environmental sensitivity of nitrogen-combining bacteria.

[0132] Arguably, the level of ammonia is the most important variable, since violation of the approved level leads to substantial fines. For this reason, the simplest proxy variables for the use of variable power operation of the ASP are the current ammonia level L and the maximum permitted limit L. max It is based on.

[0133]

number

[0134] However, in these processes, dissolved oxygen D is also important. If dissolved oxygen D falls to a low enough value, bacteria may die and lower concentrations of bacteria will reduce the efficiency of the process. If the variable demand case is based only on ammonia levels, a situation may arise where ammonia levels are low, making it possible to turn the process off for a period of time. However, during this "off" time, oxygen is not being blown into the sludge, resulting in a drop in oxygen levels as the oxygen is used up by the bacteria. This obviously runs the risk of killing bacteria, with serious consequences for the water treatment process.

[0135] A composite surrogate must be defined when there are two (or more) critical parameters that need to be considered when defining the safe operating limits for the process. In this case, similarly, only a surrogate for the dissolved oxygen level should be derived. The dissolved oxygen level D should be calculated to reflect the rate at which low dissolved oxygen levels can cause damage to the bacteria, and the minimum threshold D min We construct a surrogate function so that as we approach , the function approaches zero rapidly. When the oxygen level is far from the threshold, the surrogate will be close to 1. A suitable function is

[0136]

number

[0137] where C is a constant used to parameterize how aggressively the function should approach zero.

[0138] A proxy value representing the fraction of energy stored in the overall system as a fraction of the energy that is available is then set to the product of the two proxy functions.

[0139]

number

[0140] In some examples, it is demonstrated how a proxy variable for the state of charge can be derived to provide an indicator of the instantaneous capacity of an industrial system and regulate its power consumption in order to allow the involvement of instruments that take advantage of electricity market conditions. Obviously, the details of the indicator depend on the specifics of the industrial process involved. Which governing variable can be used to indicate the processing capacity to use the system's own resources when not taking power from the grid? In systems such as ASP, the variable used is the product of two different processing parameters. This approach can be extrapolated to processes where two, three or even four or more indicators need to be maintained between determined upper or lower thresholds.

[0141] The state of charge proxy φ is a parameter that may prove useful for many elements of the above-described embodiments of the present invention. This single parameter provides a ready indicator of the amount of stored energy reserves and thus the ability of the load 14 to respond to power adjustments required to address network imbalances. It allows for mapping of the state of charge proxy φ of a particular load 14 to load power consumption according to its variations over time. This allows the central demand server 30 to tailor the slow operating demand profile provided to each load based on the requirement that the state of charge proxy φ of that load should be maintained within a defined range. Furthermore, this ensures that the load operates within its normal operating range despite any power adjustments made according to network conditions. Furthermore, monitoring the state of charge proxy φ allows for decisions by the industrial process controller 20 as to when a load 14 is unavailable for responsive load service, i.e., when the industrial process controller 20 overrides commands from the local load controllers 26. Finally, it provides a single parameter that allows for the implementation of responsive load service according to a single algorithm, regardless of the details of the industrial process being operated by each load in the portfolio.

[0142] Although the above described embodiments of the invention are all implemented using loads that adjust their power consumption in response to market conditions, the embodiments of the invention apply equally to generators that are able to adjust the power fed into the grid in response to market conditions. For example, a water treatment plant based on anaerobic digestion of sewage leads to the production of biogas. This biogas is converted into electrical and thermal energy by a gas engine, and any electrical energy obtained in excess of the energy required to operate the plant is sold to the grid. Many such generators are fitted with buffering techniques such as gas bags. The amount of buffering gas is an indication of the potential of the generator to provide electricity. Furthermore, it is required that the buffering gas is maintained below a pressure threshold that limits the energy storage capacity. That is, this parameter can be used as a proxy for the state of charge of the system. Thus, a process can be monitored when it simultaneously operates a power generation means according to the invention.

Claims

1. A method for controlling the operation of a component connected to a power grid, said component being either a generator or a load of a type capable of storing energy internally, and capable of controlling a power supply between 0 and a maximum power C D and the method is operable over a range of power levels, (a) operating the component over a period of time, adjusting, within the period of time, a rate at which energy is transferred between the component and the grid in accordance with a baseline power function B(t); (b) simultaneously operating the component over the period of time to adjust a rate of energy transfer between the component and the grid in accordance with a fast action power function F(t), the fast action power function F(t) being superimposed on the baseline power function; The reference power function B(t) is derived from a slow operating power function D(t), and the reference power function B(t) is set to be equal to the slow operating power function D(t), provided that D(t) is equal to 0 or the maximum power C(t). D Any range of δC D For conditions not in (δ<<1), the equality holds, and if the D(t) is in the range, then the B(t) is equal to or less than δC D Or (1-δ)C D and adjusting the rate at which energy is transferred between the component and the grid in accordance with the slow operating power function D(t), the component will economically benefit from fluctuations in the current electricity tariff of the grid or in values ​​that can be derived directly or indirectly from the power supply of the grid; and The adjustments made to the rate of energy transfer between the component and the grid in accordance with the fast action power function F(t) are adjustments that respond to and address imbalances in the amount of power generated and consumed through the power grid, and these adjustments are made to the maximum power C D The method is set such that there is a high probability that .DELTA..times ...

2. A method for controlling the operation of a non-battery component connected to a power grid, said component being either a generator or a load of a type capable of storing energy internally, and capable of controlling a power supply between 0 and a maximum power C D and the method is operable over a range of power levels, (a) monitoring a physical parameter of said component indicative of an amount of energy stored therein; (b) deriving a proxy variable φ, where 0≦φ≦1, from the measured physical parameters, the proxy variable φ representing a fraction of the stored energy held in the energy reservoir at any one time; (c) controlling the operation of the component according to a slow operating power function D(t) when the proxy variable φ has a value between an upper limit value and a lower limit value, whereby when adjusting the rate of energy transfer between the component and the grid according to the slow operating power function D(t), the component will economically benefit from fluctuations in the current electricity price of the grid or in values ​​that can be derived directly or indirectly from the power supply of the grid; (d) if the proxy variable φ has a value outside the range of the upper limit value or the lower limit value, operating the component at an operating power according to returning the parameter to a value between the upper limit value and the lower limit value; A method comprising:

3. 3. The method of claim 2, wherein a proxy variable φ, where 0≦φ≦1, is derived for the component, the proxy variable representing a fraction of the stored energy held in the energy reservoir at any one time, and is derived from the measured physical parameter, whereby limits of component operation are defined in terms of the proxy variable.

4. The method according to any one of claims 1 to 3, wherein the component is an electrical generator.

5. The method according to any one of claims 1 to 3, wherein the component is a load.

6. A system for controlling the operation of a component (14) connected to a power grid (18), said component (14) being either a generator or a load of a type capable of storing energy internally, and having a power output of 0 to a maximum power C D and the system is operable at a range of power levels, an industrial process controller (20) configured to exercise direct control over the operation of the component (14) and to monitor process parameters; a central demand server (30) configured to derive a slow operating power function D(t), such that when adjusting a rate of transmitting energy between the component (14) and the grid (18) according to the slow operating power function D(t), the component (14) will economically benefit from fluctuations in the current electricity tariff of the grid or from fluctuations in values ​​that can be derived directly or indirectly from the power supply of the grid (18); an indicator (28) configured to provide a signal indicative of an imbalance in power provided through the network (18); a local device controller (26) associated with the industrial process controller (20) and the component (14), receiving the signal indicative of an imbalance in the power supply from the indicator (28) via the network (18) and receiving the slow operating power function D(t) from the central demand server (30); deriving a reference power function B(t) from the slow operating power function D(t), the reference power function B(t) being set to be equal to the slow operating power function D(t), provided that D(t) is equal to 0 or the maximum power C(t); D Any range of δC D For conditions not in (δ<<1), the equality holds, and if the D(t) is in the range, then the B(t) is equal to or less than δC D Or (1-δ)C D deriving a reference power function B(t) from the low speed operation power function D(t), the reference power function B(t) being set to one of deriving a fast operating power function F(t) from said signal indicative of an imbalance in power delivered through said network (18); a local device controller (26) configured to provide instructions to the industrial process controller (20) for operating the component (14) and adjust the rate of energy transfer between the component and the grid according to the fast operating power function F(t) superimposed on the baseline power function B(t); A system comprising:

7. A local device controller (26) associated with an industrial process controller (20) configured to exercise direct control of the operation of a component (14) connected to a power grid (18), the component (14) being either a generator or a load of a type capable of storing energy internally, and configured to operate at a power supply voltage between 0 and a maximum power C D and the local device controller (26) is operable at a range of power levels of: receiving a signal indicative of an imbalance in the power supplied from an indicator (28) via the network (18) and receiving a slow operating power function D(t) from a central server (30); deriving a reference power function B(t) from the slow operating power function D(t), the reference power function B(t) being set to be equal to the slow operating power function D(t), provided that D(t) is equal to 0 or the maximum power C(t); D Any range of δC D For conditions not in (δ<<1), the equality holds, and if the D(t) is in the range, then the B(t) is equal to or less than δC D Or (1-δ)C D deriving a reference power function B(t) from the low speed operation power function D(t), the reference power function B(t) being set to one of deriving a fast operating power function F(t) from said signal indicative of an imbalance in power delivered through said network (18); providing instructions to the industrial process controller (20) to operate the component (14) and adjust the rate of energy transfer between the component and the grid according to the fast operating power function F(t) superimposed on the baseline power function B(t); The slow operating power function D(t) is derived such that the component (14) economically benefits from fluctuations in the price of electricity delivered by the grid over the course of a day when adjusting the rate of transmitting energy between the component and the grid in accordance with the function D(t).

8. The controller of claim 7, wherein the component (14) is a generator.

9. The controller of claim 7, wherein the component (14) is a load.

Citation Information

Patent Citations

  • Procedure for supply control and storage of power provided by a renewable energy generation plant

    US20130006431A1

  • Water heater control system and storage-type electric water heater

    WO2017090180A1

  • Energy management system

    WO2018197887A1

  • Responsive load system

    GB2361118A

  • Frequency regulation method, frequency regulation apparatus, and storage battery system

    US20160013676A1