Operation plan creation device, operation plan creation method, operation plan creation program and method of producing hydrogen

The operation plan creation device optimizes hydrogen production in microgrids by treating renewable and non-renewable energy sources separately, ensuring hydrogen is produced from renewable energy, reducing emissions and energy loss.

JP2024154254AActive Publication Date: 2024-10-30IHI CORP
View PDF 23 Cites 0 Cited by

Patent Information

Application Number
JP2023067989
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-18
Publication Date
2024-10-30
Estimated Expiration
2043-04-18

AI Technical Summary

Technical Problem

Existing technologies fail to ensure that hydrogen produced by water electrolysis is derived from renewable energy, leading to increased CO2 emissions and energy loss, and lack an effective mechanism to optimize hydrogen production in microgrids.

Method used

An operation plan creation device and method that treats renewable and non-renewable energy sources separately, formulating an operation plan to supply power to a power receiving device in a desired manner, optimizing hydrogen production by using renewable energy and minimizing non-renewable energy usage.

Benefits of technology

The solution allows for the production of hydrogen using only renewable energy, reducing CO2 emissions and energy loss, while ensuring the required amount of hydrogen is produced efficiently.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024154254000001_ABST
    Figure 2024154254000001_ABST
Patent Text Reader

Abstract

To create an operation plan capable of setting power to be provided to a power receiving device to a desired aspect and achieving a target requested by a power system.SOLUTION: An operation plan creation device 1 is applied to a power system consuming first power obtained from a first energy source (photovoltaic power generation device) and second power obtained from a second energy source (external system). The operation plan creation device comprises: a predicted value designation unit 11 designating a predicted value of power to be supplied as the first power from the first energy source to the power system; a constraint condition designation unit 12 designating a constraint condition which includes a term indicating the first power and a term indicating the second power, and separately treats the first power and the second power; a target function designation unit 13 for designating a target function formulating a target requested by the power system; and an optimization computation unit 15 obtaining an operation plan for the power system by solving a problem defined by the predicted value of the power to be supplied, the constraint condition and the target function.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an operation plan creating device, an operation plan creating method, an operation plan creating program, and a method for producing hydrogen. [Background technology]

[0002] A so-called microgrid includes elements that supply energy and elements that consume energy. Some of the elements that supply energy use renewable energy as their energy source. Some of the elements that supply energy use non-renewable energy as their energy source. Another element that consumes energy to obtain an output is a water electrolysis device. Hydrogen generated by the water electrolysis device may be used in place of fossil fuels in gas turbine power generation equipment or the like installed on the same site as the water electrolysis device. Hydrogen generated by the water electrolysis device may be used in place of fossil fuels in gas turbine power generation equipment or the like installed at a location distant from the water electrolysis device.

[0003] These forms of hydrogen use aim to reduce CO2 emissions from the use of fossil fuels. In that sense, the hydrogen produced by water electrolysis equipment is required to be derived from renewable energy. Hydrogen that does not emit CO2, that is, hydrogen derived from renewable or nuclear energy, is sometimes called "green hydrogen." On the other hand, hydrogen derived from fossil fuels and other sources rather than from renewable or nuclear energy is sometimes called "black hydrogen."

[0004] Patent Documents 1 to 4 disclose techniques relating to the operation of a microgrid that combines renewable energy and a water electrolysis device.

[0005] Patent Document 1 provides a planning support device for an energy system equipped with renewable energy and a hydrogen production device. Patent Document 2 provides an economical operation method for producing hydrogen using surplus electricity in the entire energy system. Patent Document 3 provides a technology that can identify energy supply sources when storing energy from multiple energy supply sources. Patent Document 4 provides a market trading system that distinguishes between renewable energy and non-renewable energy. For example, paragraph 0043 of Patent Document 4 describes battery charging and discharging that distinguishes between renewable energy and non-renewable energy. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] Patent Publication No. 2022-94118 [Patent Document 2] JP 2022-170429 A [Patent Document 3] Patent Publication No. 2021-108536 [Patent Document 4] Patent Publication No. 2022-176535 Summary of the Invention [Problem to be solved by the invention]

[0007] The power supplied to a power system, such as a microgrid, may include power derived from renewable energy sources and power not derived from renewable energy sources. In this case, in order to call hydrogen produced by a water electrolysis device "green hydrogen," it is important to know whether the power supplied to the water electrolysis device is renewable energy-derived power or non-renewable energy-derived power.

[0008] In Patent Document 1 and Patent Document 2, the electricity used to produce hydrogen is not considered to be renewable energy or not. When considering the operation of generating hydrogen economically, the possibility that the contribution of electricity derived from fossil fuels will be large cannot be denied. If the ratio of electricity derived from fossil fuels to the electricity used to generate hydrogen is large, it will not contribute to reducing CO2 emissions. Furthermore, assuming an energy conversion process in which electricity is generated from fossil fuels, hydrogen is generated using that electricity, and electricity is obtained using that hydrogen, energy losses occur during these conversion processes. As a result, there is a possibility that the amount of CO2 emitted per final generated electricity will increase. Therefore, when considering using hydrogen as a substitute for fossil fuels, a mechanism for generating hydrogen economically as in Patent Document 1 and Patent Document 2 is insufficient.

[0009] Furthermore, the water electrolysis device is also required to produce a desired amount of hydrogen.

[0010] By using Patent Document 3 and Patent Document 4, renewable energy and non-renewable energy can be distinguished and selectively charged into the storage battery. Furthermore, by using Patent Document 3 and Patent Document 4, renewable energy and non-renewable energy can be distinguished and selectively discharged from the storage battery. Therefore, it is possible to computationally guarantee that the power used in the water electrolysis device is derived from renewable energy. However, as described in paragraphs 0002, 0004, and 0005 of Patent Document 3, the technology of Patent Document 3 aims to visualize and distinguish the flow of power. In other words, the technology of Patent Document 3 does not optimize the operation plan taking into account the time axis. Patent Document 4 does not mention a specific method for charging and discharging the storage battery for renewable energy and non-renewable energy. Therefore, when the technologies of Patent Documents 3 and 4 are applied to a power system including a water electrolysis device, a problem occurs in that the production of the required amount of hydrogen is not achieved.

[0011] The present invention aims to provide an operation plan creation device, an operation plan creation method, an operation plan creation program, and a method for producing hydrogen, which create an operation plan that can provide power to a power receiving device in a desired manner and achieve the objectives required of the power system. [Means for solving the problem]

[0012] One embodiment of the present invention is an operation plan creation device applied to a power system that consumes a first power obtained from a first energy source and a second power obtained from a second energy source different from the first energy source, the power system including a power receiving device and including a predicted value designation unit that designates a predicted value of power supply to be supplied to the power system from the first energy source as the first power, a constraint condition designation unit that designates constraint conditions regarding the operation of the power system that include a term indicating the first power and a term indicating the second power and that treat the first power and the second power separately, an objective function designation unit that designates an objective function that formulates an objective required of the power system, and an optimization calculation unit that obtains an operation plan for the power system by solving a problem defined by the predicted value of power supply, the constraint condition, and the objective function.

[0013] Another aspect of the present invention is an operation plan creation method applied to a power system that consumes a first power obtained from a first energy source and a second power obtained from a second energy source different from the first energy source, the power system including a power receiving device, comprising: specifying a predicted value of power supply to be supplied to the power system from the first energy source as the first power; specifying constraints for operation of the power system including a term indicating the first power and a term indicating the second power, and treating the first power and the second power separately; specifying an objective function that formulates an objective required of the power system; and obtaining an operation plan for the power system by solving a problem defined by the predicted value of power supply, the constraints, and the objective function.

[0014] Yet another aspect of the present invention is an operation plan creation program applied to a power system that consumes a first power obtained from a first energy source and a second power obtained from a second energy source different from the first energy source, the power system including a power receiving device, the program causing a computer to execute the following steps: specifying a predicted value of power supply to be supplied to the power system from the first energy source as the first power; specifying constraint conditions for operation of the power system that include a term indicating the first power and a term indicating the second power and that distinguish between the first power and the second power; an objective function designation unit that specifies an objective function that formulates an objective required of the power system; and obtaining an operation plan for the power system by solving a problem defined by the predicted value of power supply, the constraint conditions, and the objective function.

[0015] The operation plan creation device, the operation plan creation method, and the operation plan creation program specify a constraint condition for the operation of a power system, which includes a term indicating a first power and a term indicating a second power, and which distinguishes between the first power and the second power. Then, an objective function that formulates a predicted value of power supply, the constraint condition, and an objective required for the power system is solved. As a result, an operation plan can be obtained that can make the power provided to the power receiving device in a desired mode and achieve the objective required for the power system.

[0016] In the above operation plan creation device, the constraint condition designation unit may designate a first constraint condition, which is a constraint condition, and the first constraint condition may set only the first power as the power to be supplied to the power receiving device. With this configuration, it is possible to realize a mode in which only the first power is supplied to the power receiving device as a mode of power provided to the power receiving device.

[0017] In the above operation plan creation device, the constraint condition designation unit may designate a second constraint condition as a constraint condition, and the second constraint condition may designate a ratio of the first power to a total value of power supplied to the power receiving device. With this configuration, it is possible to realize a mode of supplying the first power at a desired ratio to the power receiving device as a mode of power provided to the power receiving device.

[0018] In the above operation plan creation device, the power receiving device may consume a first power, and the constraint condition designation unit may designate a consumption rate of the first power with respect to a total value of power consumed by the power receiving device or an amount of the first power consumed by the power receiving device. With this configuration, an operation plan can be obtained in which the consumption rate of the first power or the consumption amount of the first power is a desired value.

[0019] In the above operation plan creation device, the power receiving device may consume a first power, and the objective function designation unit may set, as the objective function, a function including at least one of a consumption rate of the first power to a total value of power consumed by the power receiving device or a consumption amount of the first power consumed by the power receiving device. With this configuration, an objective function that sets the consumption rate of the first power or the consumption amount of the first power in a desired mode can be obtained.

[0020] In the above operation plan creation device, the power receiving device may consume a first power, and the optimization calculation unit may solve, as an optimization problem, a problem of maximizing a consumption rate or a consumption amount for a function including at least one of a consumption rate of the first power to a total value of power consumed by the power receiving device or a consumption amount of the first power consumed by the power receiving device. With this configuration, an operation plan that maximizes the consumption rate of the first power or the consumption amount of the first power can be obtained.

[0021] In the above operation plan creation device, the power receiving device may store the first power, and the constraint condition designation unit may designate a storage ratio of the first power to a total value of power stored in the power receiving device or a storage amount of the first power stored in the power receiving device. With this configuration, an operation plan can be obtained in which the storage ratio of the first power or the storage amount of the first power is set to a desired value.

[0022] In the above operation plan creation device, the power receiving device may store the first power, and the objective function designation unit may set, as the objective function, a function including at least one of a storage ratio of the first power to a total value of power stored in the power receiving device or a storage amount of the first power stored in the power receiving device. With this configuration, an objective function that sets the storage ratio of the first power or the storage amount of the first power in a desired mode can be obtained.

[0023] In the above operation plan creation device, the power receiving device may store the first power, and the optimization calculation unit may solve, as an optimization problem, a problem of maximizing a storage ratio or a storage amount of the first power stored in the power receiving device for a function including at least one of a storage ratio of the first power to a total value of power stored in the power receiving device or a storage amount of the first power stored in the power receiving device. With this configuration, it is possible to obtain an operation plan that maximizes the storage ratio of the first power or the storage amount of the first power.

[0024] In the above operation plan creation device, the objective function designation unit may designate a first objective function that is an objective function, and the first objective function may be an objective required for the power system to minimize the second power obtained from the second energy source to satisfy the power demand of the power system. With this configuration, it is possible to obtain an operation plan that minimizes the second power obtained from the second energy source to satisfy the power demand of the power system.

[0025] In the above operation plan creation device, the objective function designation unit may designate a second objective function that is an objective function, and the second objective function may be an objective required for the power system to maximize an output output by the power receiving device as a result of receiving at least the first power. With this configuration, it is possible to obtain an operation plan that maximizes the output output by the power receiving device.

[0026] In the above operation plan creation device, the objective function designation unit may designate a third objective function that is an objective function, and the third objective function may have at least one of minimizing the cost of operating the power system, maximizing the profit from the operation of the power system, and minimizing the amount of carbon dioxide emitted by the operation of the power system. With this configuration, it is possible to obtain an operation plan that achieves at least one of minimizing the cost of operating the power system, maximizing the profit from the operation of the power system, and minimizing the amount of carbon dioxide emitted by the operation of the power system.

[0027] In the above operation plan creation device, the objective function designation unit may set the amount of carbon dioxide emission associated with the generation of the first electric power by a first formula, and set the amount of carbon dioxide emission associated with the generation of the second electric power by a second formula different from the first formula. With this configuration as well, it is possible to obtain an operation plan that can achieve the objective required for the power system.

[0028] In the above operation plan creation device, the first energy source may output the first power based on renewable energy. With this configuration, the first power can be so-called green power.

[0029] In the above operation plan creation device, the power system may include a water electrolysis device as the power receiving device. With this configuration, the power system can produce hydrogen.

[0030] In the above operation plan creation device, the power system may include a storage battery as the power receiving device. With this configuration, the power system can perform a function of storing power.

[0031] The above operation plan creation device may further include an optimization result output unit that generates display information for displaying the operation plan based on the operation plan, and the optimization result output unit may display the power supplied to the power receiving device in a manner in which the first power and the second power can be distinguished. With this configuration, the operation plan can be presented in a manner in which the first power and the second power can be distinguished.

[0032] In the above operation plan creation device, the first power may be power that does not involve carbon dioxide emissions when generated. With this configuration, the first power can be so-called green power.

[0033] In the above operation plan creation device, the second electric power may be electric power that is accompanied by carbon dioxide emissions when generated. With this configuration, the first electric power can be so-called black electric power.

[0034] Yet another aspect of the present invention is a method for producing hydrogen using a hydrogen production system that consumes a first electric power obtained from a first energy source and a second electric power obtained from a second energy source different from the first energy source, the hydrogen production system having a hydrogen production unit that obtains hydrogen using at least the first electric power, the method comprising: specifying a predicted value of electric power supply to be supplied to the hydrogen production unit as the first electric power from the first energy source; specifying constraints for operation of the hydrogen production unit, including a term indicating the first electric power and a term indicating the second electric power, which treat the first electric power and the second electric power separately; specifying an objective function that formulates the objective required of the hydrogen production unit; and obtaining an operating plan for the hydrogen production unit by solving a problem defined by the predicted value of electric power supply, the constraints, and the objective function.

[0035] According to this method for producing hydrogen, the power provided to the hydrogen production unit can be adjusted in a desired manner and can be operated based on an operating plan that can achieve the objectives required of the hydrogen system. Effect of the Invention

[0036] According to the present invention, it is possible to provide an operation plan creation device, an operation plan creation method, an operation plan creation program, and a method for producing hydrogen, which create an operation plan that can provide power to a power receiving device in a desired manner and achieve the objectives required of the power system. [Brief description of the drawings]

[0037] [Figure 1] FIG. 1 is a diagram illustrating a microgrid to which an operation plan obtained by an operation plan creation device of an embodiment is applied. [Diagram 2] FIG. 2 is a diagram illustrating a functional configuration of the operation plan creation device. [Diagram 3] FIG. 3 is a diagram illustrating an example of a hardware configuration of the operation plan creation device. [Figure 4] FIG. 4 is a flow diagram of an operation plan creating method executed by the operation plan creating device of the embodiment. [Diagram 5] Figure 5(a) is a table showing the meaning of the symbol definitions (overall) for the supply and demand planning problem. Figure 5(b) is a table showing the meaning of the symbol definitions (system) for the supply and demand planning problem. Figure 5(c) is a table showing the meaning of the symbol definitions (electricity demand) for the supply and demand planning problem. Figure 5(d) is a table showing the meaning of the symbol definitions (hydrogen demand) for the supply and demand planning problem. Figure 5(e) is a table showing the meaning of the symbol definitions (photovoltaic power generation) for the supply and demand planning problem. [Figure 6] Figure 6(a) is a table showing the meaning of the symbol definition (storage battery) for the supply and demand planning problem. Figure 6(b) is a table showing the meaning of the symbol definition (water electrolysis device) for the supply and demand planning problem. [Figure 7] FIG. 7 is a diagram illustrating another example of a microgrid to which an operation plan obtained by the operation plan creation device of the embodiment is applied. [Figure 8] FIG. 8 is a table showing examples of numerical values ​​used in the calculation examples. [Figure 9] FIG. 9 is a graph showing the change in the supply and demand balance of green electricity. [Figure 10] Figure 10 is a graph showing the change in the supply and demand balance of black electricity. [Figure 11] FIG. 11 is a graph showing the trends in the breakdown of green electricity / black electricity used to cover electricity demand. [Figure 12] FIG. 12 is a graph showing the transition of the charge / discharge power of the storage battery. [Figure 13] FIG. 13 is a graph showing the transition of the remaining charge of the storage battery. [Figure 14] FIG. 14 is a diagram showing another example of a system to which an operation plan obtained by an operation plan creating device is applied. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0038] Hereinafter, an embodiment of the present invention will be described in detail with reference to the accompanying drawings. In the description of the drawings, the same elements are given the same reference numerals, and duplicated explanations will be omitted.

[0039] 1 shows an example of the configuration of a microgrid 2 (power system, hydrogen production system). The microgrid 2 is connected to an external system 3. The microgrid 2 includes a solar power generation device 21 (first energy source), a storage battery 22 (power receiving device), a water electrolysis device 23 (power receiving device, hydrogen production device), and a power demand 24. In other words, the microgrid 2 is a hydrogen production system capable of producing hydrogen.

[0040] Figure 1 illustrates the flow of electricity, dividing it into green electricity (first electricity) and black electricity (second electricity). Green electricity is electricity that does not emit CO2 when generated. Black electricity is electricity that does emit CO2.

[0041] The microgrid 2 includes a green power line LG for green power and a black power line LB for black power. The green power line LG is connected to a green branch line LG1 connected to a solar power generation device 21, a green branch line LG2 connected to a storage battery 22, a green branch line LG3 connected to a water electrolysis device 23, and a green branch line LG4 connected to a power demand 24. The black power line LB is connected to a black branch line LB1 connected to an external system 3, a black branch line LB2 connected to the storage battery 22, and a black branch line LB4 connected to the power demand 24.

[0042] The only source of green electricity is the solar power generation device 21. Electricity received from the external system 3 (second energy source) is treated as black electricity.

[0043] The storage battery 22 can be charged with both green electricity and black electricity and can also be discharged. The electricity demand 24 may be filled with only green electricity or only black electricity. The electricity demand 24 may also be filled with both green electricity and black electricity. The water electrolysis device 23 that generates hydrogen can be filled with only green electricity.

[0044] Optimization of the operation plan of the microgrid 2 means, first, satisfying the demand for power generated in the microgrid 2 in each time period. Furthermore, optimization of the operation plan of the microgrid 2 means, second, minimizing the power receiving cost while satisfying the constraint of producing the required amount of hydrogen throughout the planning period. The optimization of the operation plan of the microgrid 2 may be satisfied by achieving at least one of the first objective and the second objective.

[0045] The configuration of the microgrid 2 may have many variations other than that shown in FIG. 1. For example, it may be a microgrid that is not connected to the external grid 3 (such as a remote island). Even if it is connected to the external grid 3, if the received power is guaranteed to be green power, the received power may be considered as green power. The received power may be a mixture of green power and black power at a certain ratio. For example, it may be 20% green power and 80% black power by purchasing non-fossil certificates for 20% of the total received power. In addition, the above ratio may be determined in optimizing the operation plan. For example, it may be determined what percentage of the received power is green power in optimizing the operation plan.

[0046] Instead of the solar power generation device 21, which is a renewable energy power generation device, a wind power generation device or a hydroelectric power generation device may be applied. The renewable energy power generation device may be a combination of these power generation devices. Other examples of green power supply sources include geothermal power generation devices, biomass power generation devices, and generators (such as fuel cells) that generate power by consuming CO2-free fuel. In addition, the power generated by the generator may be set to be a mixture of green power and black power at a certain ratio.

[0047] An example of the supply source of black power is the external system 3. Further, an example of the supply source of black power is equipment that consumes fossil fuels, such as a gas turbine or a gas engine.

[0048] In addition, it is possible to consider power sources that do not actually emit zero CO2 as green electricity by paying a carbon tax, etc. In other words, the distinction between green electricity and black electricity does not need to be strictly equivalent depending on whether or not there is actual CO2 emission during power generation.

[0049] The storage battery 22 is not particularly limited in its type. For example, examples of the storage battery 22 include general-type secondary batteries such as lead acid batteries, lithium ion secondary batteries, all-solid-state batteries, nickel-hydrogen batteries, nickel-cadmium batteries, nickel-iron batteries (Edison batteries), nickel-zinc batteries, silver oxide-zinc batteries, and cobalt-titanium lithium secondary batteries. Examples of liquid circulation type secondary batteries include redox flow batteries, zinc-chlorine batteries, and zinc-bromine batteries. Examples of mechanical charge type secondary batteries include aluminum-air batteries, air-zinc batteries, and air-iron batteries. Examples of high-temperature operation type secondary batteries include sodium-sulfur batteries (NAS batteries) and lithium-iron sulfide batteries. Examples of electron trap type storage batteries include semiconductor secondary batteries.

[0050] In addition, a storage battery (secondary battery) is a general term for a device capable of charging and / or discharging power. The storage battery 22 also includes a PCS that converts the direct current of the storage battery 22 to alternating current and a device that monitors the remaining charge of the storage battery 22. The storage battery 22 can also be replaced with an energy storage device having a similar function, such as a capacitor or flywheel, a compressed air energy storage (CAES) facility, a pumped-storage power generation facility, or a heat storage power generation facility that temporarily stores electricity as heat and reconverts the heat into electricity when needed.

[0051] There are also variations in the flow of green electricity and black electricity. For example, charging of black electricity to the storage battery 22 may be prohibited. The water electrolysis device 23 may be allowed to use black electricity up to a certain rate.

[0052] There is also no limitation on the type of the water electrolysis device 23. The water electrolysis device 23 may be an alkaline water electrolysis device. The water electrolysis device 23 may be a polymer membrane water electrolysis device.

[0053] Regarding the operational objectives of Microgrid 2, in addition to minimizing the power receiving cost, a variety of objectives may be considered, such as maximizing the amount of hydrogen produced, maximizing the efficiency of hydrogen production, minimizing the hydrogen production cost, minimizing the amount of power received, maximizing the energy self-sufficiency rate, and minimizing the amount of power generation suppression.

[0054] [Operation plan creation device] 2 shows an example of the configuration of the operation plan creation device 1 (operation plan creation unit). The operation plan creation device 1 determines an optimal operation plan for the energy equipment (group) included in the microgrid 2. According to the operation plan output by the operation plan creation device 1, the power provided to the water electrolysis device 23 can be set in a desired manner, thereby realizing an embodiment in which green power is supplied to the water electrolysis device 23 and black power is not supplied. Furthermore, according to the operation plan output by the operation plan creation device 1, the microgrid 2 can be caused to perform a desired operation, thereby realizing an embodiment in which the water electrolysis device 23 produces a desired amount of hydrogen.

[0055] Incidentally, setting the power provided to the water electrolysis device 23 to a desired mode includes a mode in which only green power is supplied to the water electrolysis device 23. In the embodiment, a mode in which only green power is supplied to the water electrolysis device 23 is described as an example, but the present invention is not limited to this. A mode in which both green power and black power are supplied to the water electrolysis device 23 is also included. In the latter case, the proportion of green power in the power supplied to the water electrolysis device 23 is made greater than a predetermined proportion. In other words, in the latter case, the proportion of black power in the power supplied to the water electrolysis device 23 is made smaller than a predetermined proportion. Such other examples will be described as modified examples as appropriate.

[0056] As shown in FIG. 2, the microgrid 2 includes, as functional components, a predicted value specification unit 11, a constraint condition specification unit 12, an objective function specification unit 13, an equipment characteristics database 14, an optimization calculation unit 15, and an optimization result output unit 16.

[0057] The predicted value designation unit 11 can designate a predicted value of the power demand 24 and a predicted value of the renewable energy power generation corresponding to each time period (e.g., in 30-minute intervals) of the planning period (typically, the last 1 day, 3 days, 7 days, etc.). When the fluctuation of the power demand is small, the predicted value may be some fixed value, such as setting the predicted value of the power demand 24 to the average value of the past month. When the fluctuation of the renewable energy is small, such as geothermal power generation, some fixed value may be used as the predicted value. Furthermore, the predicted value may be calculated using a statistical method or an artificial intelligence technique based on weather forecast data or past performance data. In addition, when the power demand 24 can be planned in advance based on the operation plan of the power-using equipment equipped in the microgrid 2, the planned value may be used as the predicted value.

[0058] In this embodiment, "designation" includes input by a user using an input device such as a keyboard, reception of information by the computer 100 constituting the operation plan creation device 1 via a recording medium or a communication line, and further generation of further information by the computer 100 using the information received by the computer 100.

[0059] The constraint condition specification unit 12 and the objective function specification unit 13 specify constraint conditions and objective functions by reading a file or by the user's input operation on the screen. The constraint condition specification unit 12 can specify, for example, upper and lower limits of the power generated by each energy device or upper and lower limits of the remaining charge of the storage battery 22. The objective function specification unit 13 can indirectly specify the objective function in optimization by specifying the unit price of electricity, etc. The equipment characteristics database 14 stores models of energy equipment to be optimized and / or parameters of the energy equipment. The equipment characteristics database 14 stores, for example, mathematical expressions related to efficiency and their parameters.

[0060] The optimization calculation unit 15 obtains a supply and demand plan that maximizes and / or minimizes a predetermined objective function while satisfying various constraint conditions based on the parameters exemplified below. The supply and demand plan refers to the load allocation of each device in response to the energy demand at each time. The predicted value specified by the predicted value specification unit 11. Constraint conditions specified by the constraint condition specification unit 12. The objective function specified in the objective function specification unit 13. Energy equipment models and their parameters stored in the equipment characteristics database 14.

[0061] The optimization result output unit 16 outputs the supply and demand plan calculated by the optimization calculation unit 15 in an appropriate manner, such as on the screen and / or as a file.

[0062] The information specified by the "prediction value specification unit 11," "constraint condition specification unit 12," and "objective function specification unit 13" varies depending on the target of application of the operation plan creation device 1 and its situation. For example, in a case where a generator is included as an energy device, the "constraint condition specification unit 12" may specify information on constraints regarding start / stop and efficiency curves. The "objective function specification unit 13" may specify information on fuel costs. In addition, in the above-mentioned embodiment, the electricity rate unit price is specified by the "objective function specification unit 13" as a known value. In a case where the electricity rate unit price changes depending on the supply and demand situation, the prediction unit may predict the electricity rate unit price and the result may be used.

[0063] The operation plan creation device 1 is typically realized in a single computer. However, the operation plan creation device 1 has a degree of freedom in terms of its form, for example, each component may be arranged on a different computer. The effect of the operation plan creation device 1 does not change regardless of the configuration of the computer.

[0064] 2 is a functional diagram of the operation plan creation device 1. However, only the functions intended by the operation plan creation device 1 (operation plan creation function) are described. Other functions, such as the state monitoring function of the water electrolysis device 23 and the storage battery 22, the operation command function, the trend data storage function, and the demand monitoring function, are omitted. Communication between the operation plan creation device 1 and each device may be wired communication such as analog signals or Ethernet (registered trademark), or may be wireless communication. In addition, the communication protocol may be modbus / TCP or ECHONET Lite (registered trademark).

[0065] The hardware configuration of the operation plan creation device 1 will be described with reference to Fig. 3. The computer 100 has a processor 101 which is a CPU (Central Processing Unit), a main memory unit 102, an auxiliary memory unit 103, an external communication unit 104, an operation unit 105, and an output unit 106. The operation plan creation device 1 is configured by one or more computers 100 which are configured by these hardware units and software such as programs.

[0066] When the operation plan creation device 1 is configured by a plurality of computers 100, these computers 100 may be connected locally or via a communication network such as the Internet or an intranet. By this connection, one operation plan creation device 1 is logically constructed.

[0067] The processor 101 executes an operating system, application programs, and the like. The main memory unit 102 is composed of a ROM (Read Only Memory) and a RAM (Random Access Memory). The auxiliary memory unit 103 is a storage medium composed of a hard disk, a flash memory, and the like. The auxiliary memory unit 103 generally stores a larger amount of data than the main memory unit 102. At least a part of each unit constituting the operation plan creation device 1 is realized by the auxiliary memory unit 103. For example, the database shown in FIG. 2 may be realized by the auxiliary memory unit 103. At least a part of each unit constituting the operation plan creation device 1 may be realized by the external communication unit 104. The operation unit 105 is composed of a keyboard, a mouse, a touch panel, a microphone for voice input, and the like. The output unit 106 is composed of a display, a printer, and the like. For example, the operation plan creation device 1 may display an operation plan, etc. on a display, etc.

[0068] The auxiliary storage unit 103 stores in advance the operation plan creation program P1 and data necessary for processing. The operation plan creation program P1 causes the computer 100 to execute each functional element of the operation plan creation device 1. For example, the operation plan creation program P1 is read by the processor 101 or the main storage unit 102, and causes at least one of the processor 101, the main storage unit 102, the auxiliary storage unit 103, the external communication unit 104, the operation unit 105, and the output unit 106 to operate. For example, the operation plan creation program P1 reads and writes data in the main storage unit 102 and the auxiliary storage unit 103.

[0069] The operation plan creation program P1 may be provided in a state of being recorded on a tangible recording medium such as a CD-ROM, a DVD-ROM, a semiconductor memory, etc. The operation plan creation program P1 may be provided as a data signal via a communication network.

[0070] [Operation plan creation method and operation plan creation program] Fig. 4 shows an operation procedure of the operation plan creation device 1. A part or all of the operations of steps S1 to S6 shown in Fig. 4 are executed by an operation plan creation program P1 stored in the auxiliary storage unit 103 of the computer 100 shown in Fig. 3. The operation plan creation program P1 is executed by the processor 101 of the computer 100, thereby realizing the functional configuration shown in Fig. 2.

[0071] The method for creating an operation plan includes an operation of specifying a predicted value (step S1), an operation of specifying constraint conditions (step S2), an operation of specifying an objective function (step S3), an operation of reading equipment characteristics (step S4), an operation of performing an optimization calculation (step S5), and an operation of outputting the results of the optimization calculation (step S6).

[0072] An operation of specifying a predicted value (step S1) is performed by the predicted value specifying unit 11. An operation of specifying a constraint condition (step S2) is performed by the constraint condition specifying unit 12. An operation of specifying an objective function (step S3) is performed by the objective function specifying unit 13. An operation of reading equipment characteristics (step S4) is performed by the equipment characteristics database 14. An optimization calculation is performed (step S5) by the optimization calculation unit 15. An operation of outputting the result of the optimization calculation (step S6) is performed by the optimization result output unit 16. The specific operations at each step are as described in the explanation of the operation plan creation device 1 above.

[0073] The processes shown in steps S1 to S4 are independent of each other. That is, the processes shown in steps S1 to S4 do not necessarily have to be executed in the order shown in FIG. 4. For example, the processes in steps S1 to S4 may be executed in the order of steps S1, S2, S3, and S4. The processes in steps S1 to S4 may be executed in the order of steps S4, S3, S2, and S1. The processes in steps S1 to S4 may be executed in parallel.

[0074] The operation plan obtained by the processes of steps S1, S2, S3, and S4 may be used, for example, as an operation plan for the microgrid 2 on the following day. The operation plan may also be used as a corrected plan for the current day. By correcting the plan each time by reflecting the latest predicted values, it becomes possible to perform an operation that is robust against prediction errors of photovoltaic power generation and / or power demand.

[0075] The operation plan creation device 1 solves the problems of the conventional technology by devising a formulation of the optimization problem in "Step S6: Executing optimization calculation." Symbols used in the following description are defined as shown in the tables in FIG. 5 and FIG. 6.

[0076] When the breakdown of green power and black power is known, the initial remaining charge is set according to that breakdown. When it is not known, a conservative evaluation can be made by, for example, treating all of the green power as black power.

[0077] Based on the definitions of symbols shown in the tables in Figures 5(a), 5(b), 5(c), 5(d), 6(a) and 6(b), the supply and demand planning problem is formulated as follows:

[0078] [Restrictions] Equations (1) and (2) relate to the supply and demand balance. Equation (1) defines that the demand and supply of black electricity are equal. Equation (2) defines that the demand and supply of green electricity are equal.

number

number

[0079] Equation (3) relates to the external grid 3. Equation (3) defines that only power can be received from the external grid 3, and power cannot be sold (reverse power flow).

number

[0080] Equation (4) relates to the electricity demand 24. Equation (4) defines that the demand for electricity is met by black electricity and green electricity.

number

[0081] Equation (5) relates to hydrogen demand. Equation (5) defines that the hydrogen demand is met by hydrogen produced in the water electrolysis unit 23.

number

[0082] It is not necessary for the demand for hydrogen to match the supply. For example, if the supply of hydrogen exceeds the demand for hydrogen, the option of discarding hydrogen may be taken. If the demand for hydrogen does not need to match the supply, formula (5) can be replaced with formula (5A).

number

[0083] Equations (6) to (9) relate to the storage battery 22. Equations (6) to (9) define that charging and discharging cannot be performed simultaneously, and that the charging power and discharging power are non-negative and equal to or less than a specified upper limit value.

number

number

number

number

[0084] Equations (10) and (11) relate to the charge and discharge dynamics.

number

number

[0085] Equation (12) relates to upper and lower constraints on the state of charge.

number

[0086] Equations (13) and (14) relate to the water electrolysis device 23. Equation (13) defines the relationship between the input power and the hydrogen production rate. Equation (14) relates to the input power during shutdown and startup.

number

number

[0087] [Objective function] Equation (15) is the objective function. Equation (15) defines the minimization of the power receiving cost.

number

[0088] Based on the above constraint conditions and objective function definitions, the operation plan optimization problem for microgrid 2 is defined as follows.

number

[0089] By solving the optimization problem (PG), an operation plan can be obtained that meets the necessary electricity demand24, produces hydrogen using only green electricity, and minimizes the cost of receiving electricity. The optimization problem (PG) belongs to a class of problems called mixed integer programming problems, and the branch-and-bound method can be used to find the exact optimal solution.

[0090] [Variations of constraints and objective functions] The formulation of the optimization problem itself can be modified in many ways. For example, it may be modified according to the facility configuration (type and number of devices), or it may be modified so as to take into account the upper limit of power reception in each time period and the shortest and longest continuous operation times of the water electrolysis apparatus 23 as various constraints required for operation.

[0091] In addition to minimizing costs, other objective functions that may be considered include maximizing the amount of hydrogen produced, minimizing the amount of electricity received, and minimizing the amount of CO2 emissions.

[0092] When maximizing the amount of hydrogen production, instead of removing the equality constraint described in equation (5), the left side of the equation (below) can be used as the objective function. However, in this case, the optimization problem needs to be solved as a maximization problem.

number

[0093] In other words, the objective function specifying unit 13 may specify an objective function that sets, as an objective required for the microgrid 2, maximization of the output of the water electrolysis device 23 as a result of receiving at least green electricity. With this configuration, it is possible to set, as an objective required for the microgrid 2, maximization of the amount of hydrogen production output by the water electrolysis device 23.

[0094] To minimize the amount of power received, the cost coefficient (c k ) can be used as the objective function.

number

[0095] To minimize the amount of CO2 emissions, the cost coefficient (c k ) into an appropriate CO2 emission factor (g k The objective function can be calculated by changing the CO2 emission factor (CO2) into the CO2 emission factor (t-CO2 kWh) (see below).

number

[0096] In addition, in the case of a configuration including a generator, the objective function may include a term related to fuel costs. Furthermore, a weighted sum of these multiple objective functions may be considered. In addition, in the case of a configuration including a generator, when minimizing the amount of CO2 emissions is considered, different CO2 emission coefficients may be applied to the generator and the received power.

[0097] [Variation 1 regarding restrictions on the distinction between green electricity and black electricity] The distinction between green power and black power may be made stricter. In this embodiment, it is assumed that it is sufficient that an appropriate amount of green power is supplied at the time when the water electrolysis device 23 is operated. In other words, in this embodiment, the power supplied to the microgrid 2 at a certain time is allowed to include both green power and black power. In contrast, a constraint may be set such that the total amount of power supplied to the water electrolysis device 23 and the power demand 24 of the microgrid 2 at the time when the water electrolysis device 23 is operated is green power. To achieve this, a 0-1 variable shown in equation (17) may be introduced, and the constraints shown in equations (18) and (19) may be added.

number

number

number

[0098] Equation (18) is the case where all the electricity supplied is green electricity (z k Green = 1), the allocation of black power to the power demand 24 must be zero. k Ely =1), all of the electricity supplied must be green electricity (z k Green =1).

[0099] In other words, the constraint condition specifying unit 12 may specify a restrictive constraint condition that sets only green power as the power to be supplied to the water electrolysis device 23. The restrictive constraint condition includes a condition (equation (18)) that when all power supplied to the microgrid 2 at a given time is green power, the microgrid 2 does not receive black power from the external grid 3, and a condition (equation (19)) that the water electrolysis device 23 receives only green power at a time when the water electrolysis device 23 is operating, which is included in the given time. With this configuration, it is possible to realize a mode in which only green power is supplied to the water electrolysis device 23.

[0100] [Variation 2 regarding restrictions on the distinction between green electricity and black electricity] Conversely, the constraint on the distinction between green power and black power may be relaxed slightly. For example, while allowing the use of black power to generate hydrogen, a constraint may be set that the ratio or amount of green power must be a certain level or higher. The ratio or amount of green power itself may be maximized as an objective function. By performing optimization under such conditions, it is possible to minimize or reduce the amount of CO2 emissions per unit amount of hydrogen generated to a certain level or lower. In this case, as shown in FIG. 7, the microgrid 2A further includes a black branch line LB3 that supplies black power to the water electrolysis device 23. Then, the equations related to the optimization problem expressed by equations (1) to (16) are modified as follows.

[0101] Equation (1), which defines that the demand and supply of black electricity are equal, is modified as equation (20).

number

[0102] Equation (5), which defines that the hydrogen demand is met by the hydrogen produced in the water electrolysis device 23, is modified as shown in equation (21).

number

[0103] Equation (13), which defines the relationship between the input power to the water electrolysis device 23 and the hydrogen production rate, is modified as shown in equations (22) and (23).

number

number

[0104] Equation (14) that defines the input power when the water electrolysis device 23 is stopped and started is modified as shown in equation (24).

number

[0105] The symbols included in formulas (20) to (24) have the following meanings. [Table 1]

[0106] The above variations can be realized by setting constraints on the variables shown in Table 1. The above variations can also be realized by incorporating these as objective functions. Of course, constraints on the amount of green hydrogen produced and the amount of black hydrogen produced can be considered, in addition to constraints and maximization / minimization of the electricity used for hydrogen generation. Furthermore, maximization of the amount of green hydrogen produced and minimization of the amount of black hydrogen produced can be considered.

[0107] In other words, the constraint condition specification unit 12 may specify an allowable constraint condition for setting green electricity and black electricity as electricity to be supplied to the water electrolysis device 23. With this configuration, it is possible to realize a mode of supplying green electricity and black electricity to the water electrolysis device 23 as an electricity mode provided to the water electrolysis device 23.

[0108] For example, it is assumed that the power supplied to the microgrid 2 includes green power and black power, and that both green power and black power can be supplied to the water electrolysis device 23. In this case, if optimizing the amount of hydrogen production is the only constraint and purpose for creating an operation plan, the power supplied to the water electrolysis device 23 is green power and black power at a ratio corresponding to the ratio of green power to black power in the power supplied to the microgrid 2. For example, if the ratio corresponding to the ratio of green power to black power in the power supplied to the microgrid 2 is 5:5, the ratio of green power to black power supplied to the water electrolysis device 23 is also evaluated to be 5:5.

[0109] In contrast, by adding constraints on the power supplied to the water electrolysis device 23 as in this embodiment, it is possible to set the ratio of green power to black power in the power supplied to the water electrolysis device 23 independently, without being influenced by the ratio of green power to black power in the power supplied to the microgrid 2.

[0110] For example, even if the ratio of green power to black power in the power supplied to the microgrid 2 is 5:5, it is possible to set the ratio of green power to black power supplied to the water electrolysis device 23 to 9:1.

[0111] [Variations regarding other constraints and objective functions] Constraints may also be set for the electricity stored in the storage battery 22 so that the ratio or amount of green electricity is at a certain level or higher, and the ratio or amount may be maximized as an objective function. There may be multiple water electrolysis devices 23 and multiple storage batteries 22, and the above-mentioned constraints and maximization may be considered for only some of them. All of these can be easily formulated within the framework of a mixed integer programming problem by applying the formulations described above.

[0112] [Effects] The operation plan creation device 1 is applied to a microgrid 2 that consumes green power obtained from a solar power generation device 21 and black power obtained from an external system 3 different from the solar power generation device 21. The microgrid 2 includes at least one of a water electrolysis device 23 and a storage battery 22. The operation plan creation device 1 includes a predicted value designation unit 11 that designates a predicted value of power supply to be supplied to the microgrid 2 as green power from the solar power generation device 21, a constraint condition designation unit 12 that designates a constraint condition for handling green power and black power separately with respect to the operation of the microgrid 2, including a term indicating green power and a term indicating black power, an objective function designation unit 13 that designates an objective function that formulates an objective required of the microgrid 2, and an optimization calculation unit 15 that obtains an operation plan for the microgrid 2 by solving a problem defined by the predicted value of power supply, the constraint condition, and the objective function.

[0113] The operation plan creation method is applied to a microgrid 2 that consumes green power obtained from a solar power generation device 21 and black power obtained from an external system 3 different from the solar power generation device 21. The microgrid 2 includes at least one of a water electrolysis device 23 and a storage battery 22. The operation plan creation method includes the steps of specifying a predicted value of power supply to be supplied to the microgrid 2 as green power from the solar power generation device 21 (step S1), specifying a constraint condition for handling the green power and the black power separately with respect to the operation of the microgrid 2, including a term indicating green power and a term indicating black power (step S2), specifying an objective function that formulates an objective required of the microgrid 2 (step S3), and obtaining an operation plan for the microgrid 2 by solving a problem defined by the predicted value of power supply, the constraint condition, and the objective function (step S5).

[0114] The operation plan creation program P1 is applied to a microgrid 2 that consumes green power obtained from a solar power generation device 21 and black power obtained from an external system 3 different from the solar power generation device 21. The microgrid 2 includes at least one of a water electrolysis device 23 and a storage battery 22. The operation plan creation program P1 causes a computer 100 to execute the following operations: specifying a predicted value of power supply to be supplied to the microgrid 2 as green power from the solar power generation device 21; specifying a constraint condition for handling green power and black power separately, including a term indicating green power and a term indicating black power, regarding the operation of the microgrid 2; specifying an objective function in which an objective required of the microgrid 2 is formulated, and obtaining an operation plan for the microgrid 2 by solving a problem defined by the predicted value of power supply, the constraint condition, and the objective function.

[0115] The operation plan creation device 1, the operation plan creation method, and the operation plan creation program P1 specify constraint conditions for handling green power and black power separately, including a term indicating green power and a term indicating black power, with respect to the operation of the microgrid 2. Then, an objective function that formulates the predicted value of power supply, the constraint conditions, and the objective required for the microgrid 2 is solved. As a result, an operation plan can be obtained that can provide the power provided to the water electrolysis device 23 in a desired mode and achieve the objective required for the microgrid 2.

[0116] The method for producing hydrogen produces hydrogen using a hydrogen production system that consumes green power obtained from a solar power generation device 21 and black power obtained from an external system 3 different from the solar power generation device 21. The hydrogen production system includes a water electrolysis device 23 that obtains hydrogen using at least green power. The method for producing hydrogen includes the steps of: specifying a predicted value of power supply to be supplied to a microgrid 2 as green power from the solar power generation device 21 (step S1); specifying a constraint condition for handling green power and black power separately for operation of the microgrid 2, including a term indicating green power and a term indicating black power (step S2); specifying an objective function that formulates an objective required of the microgrid 2 (step S3); and obtaining an operation plan for the microgrid 2 by solving a problem defined by the predicted value of power supply, the constraint condition, and the objective function (step S5).

[0117] According to this method for producing hydrogen, the power provided to at least one of the water electrolysis device 23 and the storage battery 22 can be adjusted in a desired manner, and the hydrogen production system can be operated based on an operation plan that can achieve the objectives required of the system.

[0118] The constraint condition specification unit 12 specifies a first constraint condition, which is a constraint condition. The first constraint condition may be set to set only green electricity as the power to be supplied to at least one of the water electrolysis device 23 and the storage battery 22. With this configuration, it is possible to realize a mode in which only green electricity is supplied to the water electrolysis device 23 as the mode of power provided to the water electrolysis device 23.

[0119] The constraint condition specification unit 12 specifies a second constraint condition, which is a constraint condition. The second constraint condition may specify a ratio of green power to the total value of power supplied to at least one of the water electrolysis device 23 and the storage battery 22. With this configuration, it is possible to realize a mode of power provided to the water electrolysis device 23 in which a desired ratio of green power is supplied to the water electrolysis device 23.

[0120] The water electrolysis device 23 consumes green electricity. The constraint condition specification unit 12 may specify a consumption rate of green electricity relative to the total electricity consumed by the water electrolysis device 23, or an amount of green electricity consumed by the water electrolysis device 23. This configuration makes it possible to obtain an operation plan that sets the consumption rate of green electricity or the amount of green electricity consumption to a desired value.

[0121] The water electrolysis device 23 consumes green electricity. The objective function specification unit 13 may set, as the objective function, a function including at least one of the green electricity consumption rate relative to the total electricity consumed by the water electrolysis device 23 or the amount of green electricity consumed by the water electrolysis device 23. This configuration makes it possible to obtain an objective function that sets the green electricity consumption rate or the amount of green electricity consumption in a desired mode.

[0122] The water electrolysis device 23 consumes green electricity. The optimization calculation unit 15 may solve, as an optimization problem, a problem of maximizing the consumption rate or the consumption amount for a function including at least one of the consumption rate of green electricity to the total value of electricity consumed by the water electrolysis device 23 or the consumption amount of green electricity consumed by the water electrolysis device 23. With this configuration, it is possible to obtain an operation plan that maximizes the consumption rate or the consumption amount of green electricity.

[0123] The storage battery 22 stores green power. The constraint condition designation unit 12 may designate a storage ratio of green power to a total value of power stored in the storage battery 22 or a storage amount of green power stored in the storage battery 22. According to this configuration, it is possible to obtain an operation plan that sets the storage ratio of green power or the storage amount of green power to a desired value.

[0124] The storage battery 22 stores green power. The objective function designation unit 13 may set, as the objective function, a function including at least one of the storage ratio of green power to the total value of power stored in the storage battery 22 or the storage amount of green power stored in the storage battery 22. According to this configuration, it is possible to obtain an objective function that sets the storage ratio of green power or the storage amount of green power in a desired mode.

[0125] The storage battery 22 stores green power. The optimization calculation unit 15 may solve, as an optimization problem, a problem of maximizing the storage ratio or storage amount for a function including at least one of the storage ratio of green power to the total value of power stored in the storage battery 22 or the storage amount of green power stored in the storage battery 22. With this configuration, it is possible to obtain an operation plan that maximizes the storage ratio or storage amount of green power.

[0126] The objective function designation unit 13 designates a first objective function which is an objective function. The first objective function may be an objective required for the microgrid 2 to minimize the black power obtained from the external grid 3 in order to satisfy the power demand of the microgrid 2. With this configuration, it is possible to obtain an operation plan for minimizing the black power obtained from the external grid 3 in order to satisfy the power demand of the microgrid 2.

[0127] The objective function specifying unit 13 specifies a second objective function, which is an objective function. The second objective function may be set as an objective required for the microgrid 2 to maximize the output of the water electrolysis device 23 as a result of receiving at least green power. With this configuration, an operation plan for maximizing the amount of hydrogen output by the water electrolysis device 23 can be obtained.

[0128] The objective function designation unit 13 designates a third objective function which is an objective function. The third objective function may have at least one of minimizing the cost of operating the microgrid 2, maximizing the profit from the operation of the microgrid 2, and minimizing the amount of carbon dioxide emitted by the operation of the microgrid 2. With this configuration, it is possible to obtain an operation plan which achieves at least one of minimizing the cost of operating the microgrid 2, maximizing the profit from the operation of the microgrid 2, and minimizing the amount of carbon dioxide emitted by the operation of the microgrid 2.

[0129] The objective function designation unit 13 sets the amount of carbon dioxide emission associated with the generation of green power using a first formula. The amount of carbon dioxide emission associated with the generation of black power may be set using a second formula different from the first formula. With this configuration as well, an operation plan capable of achieving the objective required for the microgrid 2 can be obtained.

[0130] The solar power generation device 21 outputs green power based on renewable energy. With this configuration, the green power can be so-called green power.

[0131] The microgrid 2 includes a water electrolysis device as a power receiving device. With this configuration, the microgrid 2 can produce hydrogen.

[0132] The microgrid 2 includes a storage battery as a power receiving device. With this configuration, the microgrid 2 can perform the function of storing power.

[0133] The operation plan creation device 1 further includes an optimization result output unit 16 that generates display information for displaying the operation plan based on the operation plan. The optimization result output unit 16 displays the power supplied to the water electrolysis device 23 in a manner that allows green power and black power to be distinguished. With this configuration, it is possible to present the operation plan in a manner that allows green power and black power to be distinguished.

[0134] The first power is power that does not emit carbon dioxide when generated. With this configuration, the first power can be so-called green power.

[0135] The second electric power is electric power that is accompanied by carbon dioxide emissions when generated. With this configuration, the second electric power can be so-called black electric power.

[0136] [Calculation example] As an example showing the effects of the operation plan creation device 1, the operation plan creation method, and the operation plan creation program of the embodiment, operation plans calculated under the conditions shown in FIG. 8 are shown in FIGS. 9 to 13. In the calculation example, the water electrolysis device 23 can be started only after 12:00. FIG. 9 shows the transition of the supply and demand balance of green electricity. As shown in FIG. 9, it can be seen that the green electricity required for hydrogen production is appropriated to the water electrolysis device 23 during the time period when the water electrolysis device 23 is in operation. Under the conditions of the calculation example, when attempting to achieve a given amount of hydrogen production, the solar power generated after 12:00 (when the water electrolysis device 23 becomes available) is insufficient. In response to this, the plan is to charge the storage battery 22 with solar power in the morning, and operate the water electrolysis device 23 using the discharged power from the storage battery 22 in the evening (after 18:00).

[0137] Fig. 10 shows the transition of the supply and demand balance of black power. It can be seen that black power is used in the form of receiving power from the external grid 3 to meet the demand for power during the nighttime when the solar power generation device 21 does not generate power.

[0138] Figure 11 shows the breakdown of green electricity and black electricity that covers the electricity demand of Microgrid 2 during each time period. As explained above, it can be seen that green electricity is mainly used during the day and black electricity is mainly used at night.

[0139] 12 and 13 respectively show the trends in the charging / discharging power and remaining charge of the storage battery 22. It can be seen that the plan is to discharge black power first in the morning and then charge green power generated by the solar power generation system 21 instead, in order to operate the water electrolysis system 23 using green power from the evening onwards. The trend of the operation plan described above is appropriate for the purpose of all the power allocated to the water electrolysis system 23 being green power.

[0140] [Variations] The above describes examples of the operation plan creation device 1, the operation plan creation method, and the operation plan creation program of the present disclosure. The operation plan creation device 1, the operation plan creation method, and the operation plan creation program of the present disclosure may be implemented in various forms without being limited to the above examples.

[0141] The operation plan creation device 1 of the embodiment has been described as creating an operation plan for a water electrolysis device 23, which is an example of a power receiving device. The power receiving device is not limited to the water electrolysis device 23. Since carbon-free itself has added value, there is a high demand for operating devices using only green electricity. For example, the power receiving device may be an electric boiler. The power receiving device may be an electric furnace that melts scrap iron. The power receiving device may be an electrolysis / electric refining device that produces crude iron from iron ore. The power receiving device may be other chemical process devices such as methanation, plastic processing devices such as rolling, food processing devices, distillation devices, and heat treatment furnaces such as surface heat treatment.

[0142] The application of the operation plan created by the operation plan creation device 1 may be to a device other than the water electrolysis device 23 as long as it is a device that consumes electricity. The application of the operation plan may be, for example, an information processing device that can be executed or put on standby at any time and concentrates calculation processing during a time period when it is desired to consume electricity (putting the information processing device on standby when it is not desired to consume electricity). The information processing device may be a computer that performs blockchain Proof of Work (PoW).

[0143] In the embodiment, there is one each of the storage battery 22 and the water electrolysis device 23. There may be multiple storage batteries 22, and there may also be multiple water electrolysis devices 23. The mixed integer programming problem (PG) can be easily extended to multiple units. Furthermore, even in cases where there is only the storage battery 22 or only the water electrolysis device 23, the operation plan creation device 1, the operation plan creation method, and the operation plan creation program are applicable. In the embodiment, the operation plans for the storage battery 22 and the water electrolysis device 23 are created simultaneously. However, it is not necessary to create the operation plans for the storage battery 22 and the water electrolysis device 23 simultaneously. For example, the operation plan for one of the storage battery 22 and the water electrolysis device 23 may be created by a system other than the operation plan creation device 1, and the operation plan for the other may be created by the operation plan creation device 1 using the above-mentioned mathematical programming method.

[0144] In the embodiment, there is one each of the storage battery 22 and the water electrolysis device 23. There may be multiple storage batteries 22, and there may also be multiple water electrolysis devices 23. It is easy to extend the mixed integer programming problem (PG) to a multiple number of devices. Furthermore, even in cases where there is only the storage battery 22 or only the water electrolysis device 23, the operation plan creation device 1, the operation plan creation method, and the operation plan creation program disclosed herein are applicable.

[0145] In the embodiment, as shown in FIG. 1, the photovoltaic power generation device 21, the storage battery 22, and the water electrolysis device 23, which are examples of renewable energy power generation devices, are all present in one microgrid 2. However, the system to which the operation plan obtained by the operation plan creation device 1, the operation plan creation method, and the operation plan creation program is applied is not limited to the microgrid 2. For example, the operation plan can be applied to a power system in which each facility is virtually connected via an external system 3, as shown in FIG. 14. That is, the operation plan obtained by the operation plan creation device 1, the operation plan creation method, and the operation plan creation program may be applied to a group of devices connected in the manner shown in FIG. 14 as a virtual microgrid 2B. The power system 1B includes a photovoltaic power generation system 21B owned by a power generation company A, a water electrolysis device 23B owned by a company B, and a storage battery 22B owned by a company C. The photovoltaic power generation system 21B, the water electrolysis device 23B, and the storage battery 22B are connected via the external system 3. That is, the companies that own each system may be different. In this case, the contract between each business operator may be a transaction via the electricity market or a bilateral transaction.

[0146] In the embodiment, the mathematical programming problem is formulated as a mixed integer programming problem (PG), but is not limited to this. For example, it may be formulated as a nonlinear programming problem. For example, a genetic algorithm (GA) or particle swarm optimization (PSO) may be used as an algorithm for solving the nonlinear programming problem. Since it is known that it is difficult to obtain a global optimal solution for a nonlinear programming problem, a form for obtaining a quasi-optimal solution (approximate solution) may be used.

[0147] In the embodiment, the relation between the hydrogen production flow rate and the power consumption amount is a linear expression, but it may be a higher order relation, or may be a non-linear map.

[0148] In the embodiment, hydrogen storage such as in a high-pressure hydrogen tank is not taken into consideration, but it is also possible to create an operation plan taking into consideration the tank capacity and subjecting it to upper and lower limit constraints.

[0149] The computing resources do not need to be on-site, but can be in the cloud.

[0150] The created operation plan may instruct or advise workers on all or part of the operation plan by displaying a monitor, turning on a lamp, sounding an alarm, sending an email, or the like. The operation plan creation device 1 may automatically operate the water electrolysis device 23 or charge / discharge the storage battery 22 at the relevant time based on the operation plan. Only one of the devices may be operated. The use of the operation plan is not limited to operating these devices, and may be used for bidding on the electricity market or applying for self-consignment of electricity, and for issuing demand response commands and making response decisions to avoid a tight electricity supply. The schedule of the hydrogen production amount may be transmitted to another system that manages the hydrogen production amount.

[0151] In the embodiment, the system that exchanges energy with the outside is called a "microgrid 2" for convenience, but the form is not necessarily limited to a single factory or business site. For example, it may be an industrial park that bundles multiple factories.

[0152] [Note] The operation plan creating device, the operation plan creating method, and the operation plan creating program include the following configuration.

[0153] The present disclosure relates to an operation plan creation device that is applied to a power system that consumes a first power obtained from a first energy source and a second power obtained from a second energy source different from the first energy source, The power system includes a power receiving device. a predicted value designation unit that designates a predicted value of power supply to be supplied from the first energy source to the power system as the first power; a constraint condition specification unit that specifies a constraint condition regarding operation of the power system, the constraint condition including a term indicating the first power and a term indicating the second power, and that distinguishes between the first power and the second power; an objective function designation unit that designates an objective function that formulates an objective required for the power system; and an optimization calculation unit that obtains an operation plan for the power system by solving a problem defined by the predicted value of the power supply, the constraint condition, and the objective function."

[0154] This disclosure further describes, [2] "the constraint condition designation unit designates a first constraint condition which is the constraint condition, The operation plan creation device according to the above-mentioned [1], wherein the first constraint condition is to set only the first power as the power to be supplied to the power receiving device.

[0155] This disclosure further describes, [3] "the constraint condition designation unit designates a second constraint condition which is the constraint condition, The operation plan creation device according to the above-mentioned [1], wherein the second constraint condition specifies a ratio of the first power to a total value of power supplied to the power receiving devices.”

[0156] The present disclosure further provides, [4] "the power receiving device consumes the first power, The operation plan creation device according to any one of the above [1] to [3], wherein the constraint condition designation unit designates a consumption rate of the first power with respect to a total value of power consumed by the power receiving device or a consumption amount of the first power consumed by the power receiving device."

[0157] The present disclosure states, [5] "the power receiving device consumes the first power, The operation plan creation device according to any one of the above [1] to [3], wherein the objective function designation unit sets, as the objective function, a function including at least one of a consumption rate of the first power to a total value of power consumed by the power receiving device or a consumption amount of the first power consumed by the power receiving device."

[0158] The present disclosure states, [6] "the power receiving device consumes the first power, The operation plan creation device according to any one of the above [1] to [3], wherein the optimization calculation unit solves, as an optimization problem, a problem of maximizing a consumption ratio or an amount of the first power consumed by the power receiving device for a function including at least one of a consumption ratio of the first power to a total value of power consumed by the power receiving device or an amount of the first power consumed by the power receiving device."

[0159] The disclosure states, [7] "The power receiving device stores the first power, The operation plan creation device according to any one of the above [1] to [3], wherein the constraint condition designation unit designates a storage ratio of the first power to a total value of power stored in the power receiving device or a storage amount of the first power stored in the power receiving device."

[0160] The disclosure states, [8] "The power receiving device stores the first power, The operation plan creation device according to any one of the above [1] to [3], wherein the objective function designation unit sets, as the objective function, a function including at least one of a storage ratio of the first power to a total value of power stored by the power receiving device or a storage amount of the first power stored by the power receiving device."

[0161] The disclosure states, [9] "The power receiving device stores the first power, The operation plan creation device according to any one of the above [1] to [3], wherein the optimization calculation unit solves, as an optimization problem, a problem of maximizing a storage ratio or a storage amount of the first power stored by the power receiving device for a function including at least one of the storage ratio or the storage amount of the first power with respect to a total value of power stored by the power receiving device."

[0162] This disclosure states,

[10] "The objective function designation unit designates a first objective function which is the objective function, The operation plan creation device according to any one of the above [1] to [3], wherein the first objective function is an objective required for the power system to minimize the second power obtained from the second energy source in order to satisfy the power demand of the power system."

[0163] This disclosure states,

[11] "The objective function designation unit designates a second objective function that is the objective function, The operation plan creation device according to any one of the above [1] to [3], wherein the second objective function is an objective required for the power system to maximize a product output by the power receiving device as a result of receiving at least the first power."

[0164] The present disclosure further describes,

[12] "the objective function designation unit designates a third objective function which is the objective function, The operation plan creation device according to any one of the above [1] to [3], wherein the third objective function has an objective of at least one of minimizing the cost of operating the power system, maximizing the profit from the operation of the power system, and minimizing the amount of carbon dioxide emitted by the operation of the power system."

[0165] The present disclosure is

[13] "an operation plan creation device according to any one of the above [1] to

[12] , wherein the objective function designation unit sets the amount of carbon dioxide emission associated with the generation of the first electric power using a first formula, and sets the amount of carbon dioxide emission associated with the generation of the second electric power using a second formula different from the first formula."

[0166] The present disclosure is

[14] "The operation plan creation device according to any one of [1] to

[13] above, wherein the first energy source outputs the first electric power based on renewable energy."

[0167] The present disclosure relates to

[15] "the operation plan creation device according to any one of [1] to

[14] above, wherein the power system includes a water electrolysis device as the power receiving device."

[0168] The present disclosure relates to

[16] "the operation plan creation device according to any one of [1] to

[15] above, wherein the power system includes a storage battery as the power receiving device."

[0169] The present disclosure further includes,

[17] "an optimization result output unit that generates display information for displaying the operation plan based on the operation plan, The operation plan creation device according to any one of the above [1] to

[16] , wherein the optimization result output unit displays the power supplied to the power receiving device in a manner that allows the first power and the second power to be distinguished from each other.

[0170] The present disclosure relates to

[18] "the operation plan creation device according to any one of the above [1] to

[17] , wherein the first electric power is electric power that does not involve carbon dioxide emission when generated."

[0171] The present disclosure relates to

[19] "the operation plan creation device according to any one of the above [1] to

[18] , wherein the second electric power is electric power that is accompanied by carbon dioxide emission during power generation."

[0172] The present disclosure relates to a method for creating an operation plan for a power system that consumes a first power obtained from a first energy source and a second power obtained from a second energy source different from the first energy source, The power system includes a power receiving device. specifying a forecast of electrical power supply to be provided to the electrical power system from the first energy source as the first electrical power; Specifying a constraint condition regarding operation of the power system, the constraint condition including a term indicating the first power and a term indicating the second power, and treating the first power and the second power in a differentiated manner; Specifying an objective function that formulates an objective required for the power system; and obtaining an operation plan for the power system by solving a problem defined by the power supply forecast, the constraints, and the objective function."

[0173] The present disclosure relates to

[21] "an operation plan creation program applied to a power system consuming a first power obtained from a first energy source and a second power obtained from a second energy source different from the first energy source, The power system includes a power receiving device. specifying a forecast of electrical power supply to be provided to the electrical power system from the first energy source as the first electrical power; Specifying a constraint condition regarding operation of the power system, the constraint condition including a term indicating the first power and a term indicating the second power, and treating the first power and the second power in a differentiated manner; an objective function designation unit that designates an objective function that formulates an objective required for the power system; and obtaining an operation plan for the power system by solving a problem defined by the predicted value of the power supply, the constraint conditions, and the objective function."

[0174] The present disclosure provides a method for producing hydrogen using a hydrogen production system that consumes a first electric power obtained from a first energy source and a second electric power obtained from a second energy source different from the first energy source, The hydrogen production system includes a hydrogen production unit that obtains hydrogen by using at least the first electric power, Specifying a predicted value of power supply to be supplied to the hydrogen production unit as the first power from the first energy source; Specifying a constraint condition regarding the operation of the hydrogen production unit, the constraint condition including a term indicating the first power and a term indicating the second power, and distinguishing between the first power and the second power; Specifying an objective function that formulates an objective required for the hydrogen production unit; and obtaining an operation plan for the hydrogen production unit by solving a problem defined by the predicted value of the power supply, the constraints, and the objective function."

[0175] [others] The operation plan creation device 1, operation plan creation method, and operation plan creation program disclosed herein promote the development of technology that uses hydrogen and hydrides derived from renewable energy as fuels instead of fossil fuels in order to reduce CO2 emissions. By applying the operation plan creation device 1, operation plan creation method, and operation plan creation program disclosed herein, it is possible to suppress unnecessary CO2 emissions that may occur during hydrogen generation. The operation plan creation device 1, operation plan creation method, and operation plan creation program disclosed herein contribute to Goal 13 of the Sustainable Development Goals (SDGs) led by the United Nations. Goal 13: "Take urgent action to combat climate change and its impacts." [Explanation of symbols]

[0176] 1 Operation plan creation device (operation plan creation unit) 2,2A Microgrid (power system, hydrogen production system) 3 External system (second energy source) 11 Prediction value specification section 12 Constraint specification section 13 Objective function specification part 15 Optimization Calculation Section 21 Solar power generation equipment (first energy source) 22 Storage battery (power receiving device) 23 Water electrolysis equipment (power receiving device, hydrogen production section) 24 Electricity demand 100 Computers P1 Operation plan creation program

Claims

1. An operation plan creation device applied to a power system that consumes a first power obtained from a first energy source and a second power obtained from a second energy source different from the first energy source, The power system includes a power receiving device. a predicted value designation unit that designates a predicted value of power supply to be supplied as the first power from the first energy source to the power system; a constraint condition specification unit that specifies a constraint condition regarding operation of the power system, the constraint condition including a term indicating the first power and a term indicating the second power, the constraint condition being used to distinguish between the first power and the second power; an objective function designation unit that designates an objective function that formulates an objective required for the power system; an optimization calculation unit that obtains an operation plan for the power system by solving a problem defined by the predicted value of power supply, the constraint condition, and the objective function.

2. the constraint condition designation unit designates a first constraint condition which is the constraint condition; The operation plan creation device according to claim 1 , wherein the first constraint condition sets only the first power as the power to be supplied to the power receiving device.

3. the constraint condition designation unit designates a second constraint condition which is the constraint condition; The operation plan creation device according to claim 1 , wherein the second constraint condition specifies a ratio of the first power to a total value of power supplied to the power receiving devices.

4. the power receiving device consumes the first power, The operation plan creation device according to any one of claims 1 to 3, wherein the constraint condition designation unit designates a consumption ratio of the first power to a total value of power consumed by the power receiving device or a consumption amount of the first power consumed by the power receiving device.

5. the power receiving device consumes the first power, The operation plan creation device according to any one of claims 1 to 3, wherein the objective function designation unit sets, as the objective function, a function including at least one of a consumption ratio of the first power to a total value of the power consumed by the power receiving device or a consumption amount of the first power consumed by the power receiving device.

6. the power receiving device consumes the first power, The operation plan creation device according to any one of claims 1 to 3, wherein the optimization calculation unit solves, as an optimization problem, a problem of maximizing a consumption ratio or a consumption amount of the first power consumed by the power receiving device for a function including at least one of the consumption ratio of the first power to a total value of the power consumed by the power receiving device or the consumption amount of the first power consumed by the power receiving device.

7. the power receiving device stores the first power, The operation plan creation device according to any one of claims 1 to 3, wherein the constraint condition designation unit designates a storage ratio of the first power relative to a total value of power stored by the power receiving device or a storage amount of the first power stored by the power receiving device.

8. the power receiving device stores the first power, The operation plan creation device according to any one of claims 1 to 3, wherein the objective function designation unit sets a function including at least one of a storage ratio of the first power to a total value of power stored by the power receiving device or a storage amount of the first power stored by the power receiving device as the objective function.

9. the power receiving device stores the first power, The operation plan creation device according to any one of claims 1 to 3, wherein the optimization calculation unit solves, as an optimization problem, a problem of maximizing a storage ratio or a storage amount of the first power stored by the power receiving device for a function including at least one of the storage ratio of the first power to a total value of the power stored by the power receiving device or the storage amount of the first power stored by the power receiving device.

10. the objective function designation unit designates a first objective function which is the objective function; The operation plan creation device according to any one of claims 1 to 3, wherein the first objective function is an objective required for the power system to minimize the second power obtained from the second energy source in order to meet the power demand of the power system.

11. the objective function designation unit designates a second objective function which is the objective function; The second objective function is an objective required for the power system to maximize a product output by the power receiving device as a result of receiving at least the first power. The operation plan creation device according to any one of claims 1 to 3.

12. the objective function designation unit designates a third objective function that is the objective function; The operation plan creation device according to any one of claims 1 to 3, wherein the third objective function has an objective of at least one of minimizing a cost of operating the power system, maximizing a profit from the operation of the power system, and minimizing an amount of carbon dioxide emitted by the operation of the power system.

13. 2. The operation plan creation device according to claim 1, wherein the objective function designation unit sets the amount of carbon dioxide emission associated with the generation of the first electric power using a first formula, and sets the amount of carbon dioxide emission associated with the generation of the second electric power using a second formula different from the first formula.

14. The operation plan creation device according to claim 1 , wherein the first energy source outputs the first electric power based on renewable energy.

15. The operation plan creation device according to claim 1 , wherein the power system includes a water electrolysis device as the power receiving device.

16. The operation plan creation device according to claim 1 , wherein the power system includes a storage battery as the power receiving device.

17. An optimization result output unit that generates display information for displaying the operation plan based on the operation plan, The operation plan creation device according to claim 1 , wherein the optimization result output unit displays the power supplied to the power receiving device in a manner that allows the first power and the second power to be distinguished from each other.

18. The operation plan creation device according to claim 1 , wherein the first electric power is electric power that does not involve carbon dioxide emission when generated.

19. The operation plan creation device according to claim 1 , wherein the second electric power is electric power that is accompanied by carbon dioxide emission during power generation.

20. An operation plan creation method applied to a power system consuming a first power obtained from a first energy source and a second power obtained from a second energy source different from the first energy source, the method comprising: The power system includes a power receiving device. specifying a forecast of electrical power supply to be provided to the electrical power system from the first energy source as the first electrical power; Specifying a constraint condition regarding operation of the power system, the constraint condition including a term indicating the first power and a term indicating the second power, and treating the first power and the second power in a differentiated manner; an objective function designation unit that designates an objective function that formulates an objective required for the power system; and obtaining an operation plan for the power system by solving a problem defined by the power supply forecast, the constraints and the objective function.

21. An operation plan creation program applied to a power system that consumes a first power obtained from a first energy source and a second power obtained from a second energy source different from the first energy source, The power system includes a power receiving device. specifying a forecast of electrical power supply to be provided to the electrical power system from the first energy source as the first electrical power; Specifying a constraint condition regarding operation of the power system, the constraint condition including a term indicating the first power and a term indicating the second power, and treating the first power and the second power in a differentiated manner; Specifying an objective function that formulates an objective required for the power system; and obtaining an operation plan for the power system by solving a problem defined by the predicted value of the power supply, the constraint conditions, and the objective function.

22. A method for producing hydrogen using a hydrogen production system that consumes a first electric power obtained from a first energy source and a second electric power obtained from a second energy source different from the first energy source, comprising: The hydrogen production system includes a hydrogen production unit that obtains hydrogen by using at least the first electric power, Specifying a predicted value of power supply to be supplied to the hydrogen production unit as the first power from the first energy source; Specifying a constraint condition regarding the operation of the hydrogen production unit, the constraint condition including a term indicating the first power and a term indicating the second power, and distinguishing between the first power and the second power; Specifying an objective function that formulates an objective required for the hydrogen production unit; and obtaining an operating plan for the hydrogen production unit by solving a problem defined by the forecasted value of the power supply, the constraints, and the objective function.

Citation Information

Patent Citations

  • Power grid system

    JP2007143364A

  • Power management system

    JP2012095397A

  • Power management device for storage battery, power management program, and recording medium

    JP2013176182A

  • Energy management system, power supply and demand plan optimization method, and power supply and demand plan optimization program

    JP2016040997A

  • Energy system optimization apparatus

    JP2019185089A