Inspection level management system and inspection level management program
The inspection level management system optimizes inspection processes by adjusting levels based on delivery timelines, processing amounts, and material characteristics to prevent delays and maintain quality in printed matter production.
Patent Information
- Application Number
- JP2023069620
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-20
- Publication Date
- 2024-10-31
AI Technical Summary
Delays in the delivery of ordered printed matter are a common issue due to inefficient inspection processes.
An inspection level management system that adjusts inspection levels based on the number of days remaining until delivery, processing amount, and characteristics of the printed matter, including ink and paper colors, to optimize inspection time and prevent delays.
The system effectively suppresses delivery delays by accurately setting inspection levels, maintaining quality, and ensuring timely completion of printed matter.
Smart Images

Figure 2024155161000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to an inspection level management system and an inspection level management program. [Background technology]
[0002] Patent Document 1 discloses an inspection management device having a control unit and a memory unit, in which a first master in which an inspection pattern is registered for each destination, which is a combination of a customer and a delivery destination, and a second master in which a plurality of inspection items are registered for each inspection pattern, and the control unit is characterized by having an inspection result input means for inputting inspection performance data including inspection results of predetermined inspection items for each produced product, an order input means for inputting order information including the destination and the product, and an additional inspection determination means for acquiring an inspection pattern from the first master using the destination and product of the order information as keys, acquiring inspection items from the second master using the acquired inspection pattern as a key, comparing the inspection items in the acquired second master with inspection items in the inspection performance data for the product, and determining that an additional inspection is necessary if there is an inspection item among the inspection items in the acquired second master that does not exist in the inspection items in the inspection performance data. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent Publication No. 2022-97221 Summary of the Invention [Problem to be solved by the invention]
[0004] The present disclosure aims to reduce delays in delivery of ordered printed matter. [Means for solving the problem]
[0005] The inspection level management system of a first embodiment has a processor that, when the remaining number of days until the delivery date of a printed matter resulting from an ordered printing job is equal to or greater than a predetermined standard number of working days, sets the inspection level for the printed matter to a predetermined first inspection level, and, when the remaining number of days is less than the standard number of working days, lowers the inspection level for the printed matter from the first inspection level to a second inspection level that results in a shorter delivery period than the first inspection level, and outputs the set second inspection level.
[0006] In the inspection level management system of the second aspect, in the first aspect, the processor adjusts the standard number of work days in accordance with a processing volume determined from the received printing job.
[0007] In the inspection level management system of the third aspect, in the second aspect, the processing volume includes at least one of the printing man-hours corresponding to the amount of the printed matter to be delivered, and the post-processing man-hours until the printed matter is completed after inspection.
[0008] In the inspection level management system of the fourth aspect, in the third aspect, the printing man-hours and the post-processing man-hours are each expressed by a plurality of units, and the greater the processing volume, the greater the number of working days associated with each of the units, and when the number of working days corresponding to the processing volume differs among the units of the received printing work, the processor sets the largest number of working days as the standard number of working days.
[0009] In the inspection level management system of the fifth aspect, in the first aspect, the processor adjusts the amount of reduction in the inspection level according to the characteristics of the ordered printed matter.
[0010] In a sixth aspect of the inspection level management system, in the fifth aspect, the characteristics include at least one of an ink color used to draw the printed matter and a paper color, which is the color of the paper on which the printed matter is made.
[0011] In the seventh aspect of the inspection level management system, in the sixth aspect, a reduction range of the inspection level is associated with each of a plurality of colors that can be the ink color and each of a plurality of colors that can be the paper color, and when the reduction range corresponding to the ink color of the printed matter differs from the reduction range corresponding to the paper color, the processor reduces the inspection level by the smallest reduction range.
[0012] In the inspection level management system of the eighth aspect, in the first aspect, the processor adjusts the extent of reduction in the inspection level in stages according to the remaining number of days so that the smaller the remaining number of days, the greater the extent of reduction in the inspection level.
[0013] In the inspection level management system of the ninth aspect, in the eighth aspect, the processor calculates a step-by-step day range by dividing the standard working days by the number of steps to be reduced, calculates a unit reduction range by dividing a preset maximum reduction range by the number of steps to be reduced, and reduces the first inspection level by the unit reduction range when the remaining days correspond to the first of multiple stages, reduces the first inspection level by the unit reduction range when the remaining days correspond to the midpoint between the first and last stages of multiple stages so that the first inspection level increases by one unit reduction range as the stage moves from the first stage to the last stage, and reduces the first inspection level by the maximum reduction range when the remaining days correspond to the last stage of multiple stages.
[0014] The inspection level management program of the tenth aspect causes a processor of the inspection level management system to execute the following processes: when the remaining number of days until the delivery date of a printed matter resulting from an ordered printing job is equal to or greater than a predetermined standard number of working days, set the inspection level for the printed matter to a predetermined first inspection level; when the remaining number of days is less than the standard number of working days, lower the inspection level for the printed matter from the first inspection level to a second inspection level which shortens the production period compared to the first inspection level; and output the set second inspection level. Effect of the Invention
[0015] According to the configuration of the first aspect, it is possible to suppress delays in delivery of ordered printed matter.
[0016] According to the configuration of the second aspect, the accuracy of setting the standard number of working days is improved.
[0017] According to the configuration of the third aspect, the accuracy of setting the standard number of working days is improved.
[0018] According to the fourth aspect, the delay suppression effect is greater than when a reference number of work days is set to a number of work days that is smaller than the other numbers.
[0019] According to the configuration of the fifth aspect, the accuracy of setting the reduction range is improved.
[0020] According to the configuration of the sixth aspect, the accuracy of setting the reduction range is improved.
[0021] According to the configuration of the seventh aspect, it is easier to maintain the inspection quality compared to a case where the inspection level is lowered by a larger amount than the others.
[0022] According to the configuration of the eighth aspect, the accuracy of setting the reduction range is improved.
[0023] According to the configuration of the ninth aspect, the accuracy of setting the reduction range is improved.
[0024] According to the configuration of the tenth aspect, it is possible to suppress delays in the delivery of ordered printed matter. [Brief description of the drawings]
[0025] [Figure 1] 1 is a block diagram showing a configuration of an inspection level management system according to a first embodiment. [Diagram 2] 1 is a block diagram illustrating an inspection level management device of an inspection level management system according to a first embodiment. [Diagram 3]5 is a flowchart illustrating an example of an inspection level management process executed in the inspection level management device according to the first embodiment. [Figure 4] 13 is an example of a condition setting screen in the inspection level management process according to the first embodiment. [Diagram 5] 10 is a flowchart illustrating an example of an inspection level management process executed in the inspection level management device according to the second embodiment. [Figure 6] 13 is an example of a condition setting screen in the inspection level management process according to the second embodiment. [Figure 7] 13 is a flowchart illustrating an example of an inspection level management process executed in the inspection level management device according to the third embodiment. [Figure 8] 13 is an example of a condition setting screen in the inspection level management process according to the third embodiment. [Figure 9] 13 is a flowchart illustrating an example of an inspection level management process executed in the inspection level management device according to the fourth embodiment. [Figure 10] 13 is an example of a condition setting screen in an inspection level management process according to the fourth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0026] Hereinafter, an example of an embodiment according to the present disclosure will be described with reference to the drawings.
[0027] First Embodiment <Inspection level management system> First, an example of an inspection level management system 100 according to this embodiment will be described with reference to Fig. 1 and Fig. 2. As shown in Fig. 1, the inspection level management system 100 according to this embodiment includes an inspection level management device 10, an order management device 20, a printing device 30, and an inspection device 40. Note that the "system" in this embodiment includes both a system composed of multiple devices and a system composed of a single device.
[0028] (Order management device) The order management device 20 is connected to the inspection level management device 10. The order management device 20 transmits order contents, including information such as the delivery date of the printed matter ordered from outside, the printing sample, and the delivery destination, to the inspection level management device 10. Note that, although the present embodiment illustrates a case in which one inspection level management device 10 is connected to one order management device 20, in the present disclosure, a plurality of inspection level management devices may be connected to one order management device. In addition, in this specification, the connection between the devices may be formed in a wireless state or in a wired state, unless otherwise specified.
[0029] The printed matter of the present embodiment includes, for example, one or more flat sheet-like printed matter such as magazines, flyers, etc. In this disclosure, the printed matter is not limited to flat printed matter, and does not exclude three-dimensional printed matter including a printed portion, such as a shirt or a box.
[0030] (Inspection level management device) The inspection level management device 10 transmits an instruction to the printing device 30 to perform printing work (i.e., a job) of the ordered printed matter based on the order contents received from the order management device 20. It also transmits an instruction to the inspection device 40 to inspect the printed matter printed by the printing device 30. The inspection level management device 10 of this embodiment lowers the inspection level of the inspection performed by the inspection device 40 in accordance with the number of days remaining until the due date of the ordered job.
[0031] (Printing device) The printing device 30 is connected to the inspection level management device 10. The printing device 30 prints a printed matter based on a job instruction received from the inspection level management device 10. The printed matter is printed based on a print sample presented by a customer who places an order, or by the order management device 20. The printed matter is sent to the inspection device 40. Note that, although the present embodiment illustrates a case in which one printing device 30 is connected to one inspection level management device 10, in the present disclosure, a plurality of printing devices may be connected to one inspection level management device.
[0032] (Inspection equipment) The inspection device 40 is connected to the inspection level management device 10. The inspection device 40 inspects the printed matter sent from the printing device 30. The inspection is a task for confirming the identity with the printing sample, that is, reproducibility. As the inspection level, a plurality of inspection levels can be set according to the area of the part to be inspected of the printed matter, the number of parts to be inspected in one printed matter, the working time for one part to be inspected, etc.
[0033] In this embodiment, the length of "days" is used as a unit for measuring work time, such as the standard number of work days and the number of remaining days, but this disclosure is not limited to this. Other lengths, such as "hours," "minutes," and "seconds," may be used as units for measuring work time. For example, when "hours" are used, it can be expressed as "standard work time" and "remaining time." Furthermore, in this disclosure, each of "days," "hours," "minutes," and "seconds" may be expressed comprehensively as "standard work time" and "remaining time."
[0034] 2, an inspection level management device 10, which is an example of an inspection level management device, includes a CPU (Central Processing Unit: processor) 11, a ROM (Read Only Memory) 12, a RAM (Random Access Memory) 13, a storage 14, a user interface 15, and a communication interface 16. Each component is connected to each other via a bus 17 so as to be able to communicate with each other.
[0035] The CPU 11 is a central processing unit that executes various programs and controls each part. That is, the CPU 11 reads a program from the ROM 12 or the storage 14, and executes the program using the RAM 13 as a working area. The CPU 11 controls each of the above configurations and performs various arithmetic processing according to the program recorded in the ROM 12 or the storage 14. The CPU 11 is a processor of the present disclosure. The inspection level management device has at least one processor.
[0036] In this embodiment, an inspection level management program is stored in the ROM 12 or the storage 14. The inspection level management program is a calculation program for managing the power supply of the electronic device.
[0037] The ROM 12 stores various programs and various data. The RAM 13 temporarily stores programs or data as a working area. The storage 14 is configured with an HDD (Hard Disk Drive) or an SSD (Solid State Drive) and stores various programs including an operating system and various data.
[0038] The user interface 15 is an interface used when a user uses the inspection level management device 10. The user interface 15 may include at least one of a liquid crystal display equipped with a touch panel that allows the user to perform touch operations, a voice input receiving unit that receives voice input by the user, and a button that can be pressed by the user, for example. The display unit of this embodiment is an example of the user interface 15. Note that the user interface 15 is not essential.
[0039] The communication interface 16 is an interface for the inspection level management device 10 to communicate with other devices, and uses standards such as Ethernet (registered trademark), FDDI, and Wi-Fi (registered trademark).
[0040] When executing the inspection level management program, the inspection level management device 10 realizes various functions using the above hardware resources. As functional configurations realized by the inspection level management device 10, the inspection level management device 10 has a condition setting unit, a job order receiving unit, a remaining days calculation unit, a days determination unit, and an inspection level allocation unit. Each functional configuration is realized by the CPU 11 reading and executing the inspection level management program stored in the ROM 12 or the storage 14.
[0041] <Inspection level management process> Next, an example of an inspection level management process executed in the inspection level management system according to this embodiment will be described with reference to FIGS.
[0042] First, the condition setting unit of the inspection level management device 10 sets the standard number of work days and the reduction range of the first inspection level as conditions, as shown in step S10 in Fig. 3. The first inspection level is set in advance according to, for example, an empirical rule. Fig. 4 shows an example of a condition setting screen on an interface for performing the condition setting process of this embodiment. The set standard number of work days and reduction range of the first inspection level are stored in the inspection level management device 10.
[0043] Next, the job order receiving unit receives the job as shown in step S20 in Fig. 3. Next, the remaining days calculation unit calculates the number of remaining working days until the job's due date as shown in step S30 in Fig. 3. Specifically, for example, the value of the date of the day on which the inspection level management process is performed may be subtracted from the value of the due date.
[0044] The day when the inspection level management process is performed is not included in the remaining days. The printing work starts after the inspection level management process. Therefore, the day after the day when the inspection level management process is performed is the starting day for the remaining days, that is, the first day of the printing work. For example, even if the inspection level management process is performed in the morning of the first day of the six-day standard work days and the printing work can start in the afternoon of the day when the inspection level management process is performed, the remaining days are defined as five days.
[0045] Next, the number of days determination unit determines whether the number of remaining days until the due date is less than the standard number of working days, as shown in step S40 in Fig. 3. If the number of remaining days until the due date of the printed matter of the received job is less than the standard number of working days, the determination is YES, and the process proceeds to step S50.
[0046] Then, in step S50, the inspection level allocation unit lowers the inspection level for the printed matter from the first inspection level to a second inspection level that has a shorter construction period than the first inspection level. The inspection level allocation unit also allocates the second inspection level to the job. The inspection level management device 10 then outputs the set second inspection level to the outside, for example, using the user interface 15 in FIG. 2.
[0047] On the other hand, in step S40, if the remaining number of days is equal to or greater than the predetermined standard number of work days, the result is NO and the process ends. Although not shown in the figure, the inspection level allocation unit sets the inspection level for the printed matter to a predetermined first inspection level. The inspection level allocation unit also allocates the first inspection level to the job. Then, the inspection level management device 10 outputs the set first inspection level to the outside.
[0048] (Operation of the first embodiment) In the first embodiment, when the number of days remaining until the delivery date of the printed matter of the received job is less than the standard number of work days, the inspection level management system 100 sets the inspection level for the printed matter by lowering it from the first inspection level to the second inspection level, which has a shorter work period than the first inspection level. This makes it possible to suppress delays in the delivery date of the received printed matter.
[0049] Second Embodiment Next, the configuration of an inspection level management system according to a second embodiment will be described with reference to Fig. 5 to Fig. 6. Note that parts configured in the same manner as in the first embodiment are given the same reference numerals and descriptions thereof will be omitted as appropriate.
[0050] <Inspection level management system> In the second embodiment, the inspection level management device of the inspection level management system further includes an inter-unit work days comparison unit and a standard work days adjustment unit as functional configurations realized by the inspection level management device. The other configurations in the second embodiment are the same as the corresponding configurations in the first embodiment, so duplicated explanations will be omitted.
[0051] <Inspection level management process> The inspection level management system according to the second embodiment is different from the first embodiment in that the inspection level management process further adjusts the standard number of working days according to the processing volume determined from the received job.
[0052] Specifically, the processing volume determined from a job includes printing man-hours, post-processing man-hours, etc. Printing man-hours refer to the man-hours related to the printing work itself of the job, such as the total number of pages, the number of copies, etc. The total number of pages and the number of copies are multiple units that represent printing man-hours. Post-processing man-hours include the man-hours of various tasks that arise after the inspection work and are performed for shipment. Examples of post-processing man-hours include tasks such as cutting by imposition and packing. Cutting and packing by imposition are multiple units that represent post-processing man-hours. Note that in the present disclosure, the man-hours for inspection work before cutting may be included in the processing volume determined from the job. By including the man-hours for inspection work before cutting in the processing volume determined from the job, the inspection quality can be further improved.
[0053] In the second embodiment, the processing amount includes at least one of the printing man-hours corresponding to the amount of printed matter to be delivered and the post-processing man-hours from inspection to completion of the printed matter. Note that in the present disclosure, the processing amount is not limited to the printing man-hours and the post-processing man-hours, and other elements may be adopted.
[0054] As shown in step S10A in Fig. 5, the condition setting unit further sets a correspondence table of job elements in addition to the standard number of working days and the reduction range of the first inspection level. In the correspondence table, the number of working days is associated with each of a plurality of units representing the printing man-hours of a job. The condition setting screen in Fig. 6 illustrates an example in which the total number of pages and the number of copies, both of which are job elements, are linked to the corresponding number of days as a plurality of units representing the printing man-hours. The units of the total number of pages and the number of copies are each associated with a larger number of working days as the processing volume increases.
[0055] 5, the inter-unit work days comparison unit uses the correspondence table to compare the work days corresponding to the processing volume in each unit of the received job. If the work days corresponding to the processing volume in each unit of the received job are different, the result is YES and the process proceeds to step S22A.
[0056] Then, in step S22A, the standard work days adjustment unit sets the largest number of work days as the standard work days. Note that in the present disclosure, the method of setting the largest number of work days as the standard work days is not essential. For example, it is not prohibited to adopt another number of work days, such as the second largest number of work days, taking into further consideration the remaining number of days.
[0057] On the other hand, in step S21A, if the number of work days corresponding to the processing volume is the same for each unit of the received job, the result is NO and the process proceeds to step S30. The process after step S30 is the same as that of the first embodiment described with reference to FIG. 3, and therefore the description will be omitted.
[0058] (Operation of the second embodiment) In the second embodiment, as in the first embodiment, delays in delivery of ordered printed matter can be suppressed.
[0059] In the second embodiment, the inspection level management system 100 adjusts the standard number of working days in accordance with the processing volume determined from the received job, thereby improving the accuracy of setting the standard number of working days.
[0060] In the second embodiment, the throughput includes at least one of the printing man-hours corresponding to the amount of printed matter to be delivered and the post-processing man-hours from inspection to completion of the printed matter. This improves the accuracy of setting the standard work days.
[0061] In the second embodiment, the printing man-hours and post-processing man-hours are each expressed by a plurality of units. The larger the processing volume, the larger the number of working days is associated with each unit. If the number of working days corresponding to the processing volume differs among the units of the received job, the inspection level management system 100 sets the largest number of working days as the standard number of working days. This provides a higher effect in suppressing delays than when a smaller number of working days is set as the standard number of working days.
[0062] Third Embodiment Next, the configuration of an inspection level management system according to a third embodiment will be described with reference to Fig. 7 and Fig. 8. Note that parts configured in the same manner as in the first embodiment are given the same reference numerals and descriptions thereof will be omitted as appropriate.
[0063] <Inspection level management system> In the third embodiment, the inspection level management device of the inspection level management system further includes a reduction range comparison unit and a reduction range adjustment unit as functional configurations realized by the inspection level management device. The other configurations in the third embodiment are the same as the corresponding configurations in the first embodiment, so that the overlapping explanations will be omitted.
[0064] <Inspection level management process> The inspection level management system according to the third embodiment differs from the first embodiment in that the inspection level management process adjusts the degree of reduction in the inspection level according to the characteristics of the ordered printed matter.
[0065] In the third embodiment, the characteristics include at least one of the ink color used to draw the printed matter and the paper color, which is the color of the paper on which the printed matter is printed. Note that in the present disclosure, the characteristics of the printed matter are not limited to the ink color and the paper color, and other elements may be adopted. In addition to the type of color, the amount of color may be included as a characteristic.
[0066] As shown in step S10B in Fig. 7, the condition setting unit further sets a correspondence table of job elements in addition to the standard number of work days and the reduction range of the first inspection level. In the correspondence table, the reduction range of the inspection level is associated with each of a plurality of possible ink colors and each of a plurality of possible paper colors. The condition setting screen in Fig. 8 illustrates an example in which the ink color and the paper color, both of which are job elements, are linked to the corresponding reduction range as characteristics.
[0067] In addition, in the top row of the correspondence table in Fig. 8, "spot color" as an ink color means a color that includes at least one of the following colors: gold, silver, and fluorescent color, as well as a color other than the four primary colors of printing (cyan, magenta, yellow, and black). When a spot color is included in a printing sample, reproducing the spot color in the printed matter is more difficult than reproducing a color other than the spot color.
[0068] Also, in the second row from the top of the correspondence table in Fig. 8, "color" as the ink color means that it includes colors that are not monochrome consisting of white or black. Also, in the top row of the correspondence table in Fig. 8, "red, blue, green" as the paper color means that it includes at least one of red, blue, and green. For each of the ink colors and paper colors, the longer the inspection work time, the larger the reduction range is associated with the color.
[0069] 7, the reduction range comparison unit uses the correspondence table to compare the reduction range corresponding to the ink color of the printed matter of the received job with the reduction range corresponding to the paper color. If the reduction range corresponding to the ink color of the printed matter of the received job differs from the reduction range corresponding to the paper color, the result is YES, and the process proceeds to step S22B.
[0070] Then, in step S22B, the reduction adjustment unit sets the smallest reduction as the reduction in the inspection level of the scheduled inspection. Note that in the present disclosure, the method of reducing the inspection level by the smallest reduction is not essential. For example, it is not prohibited to adopt another reduction, such as the second smallest reduction, taking into further consideration the remaining number of days.
[0071] On the other hand, in step S21B, if the reduction width corresponding to the ink color of the printed matter of the received job and the reduction width corresponding to the paper color are the same, the result is NO and the process proceeds to step S30. The process after step S30 is the same as that of the first embodiment described with reference to FIG. 3, and therefore the description will be omitted.
[0072] (Operation of the third embodiment) In the third embodiment, as in the first embodiment, delays in delivery of ordered printed matter can be suppressed.
[0073] In the third embodiment, the inspection level management system 100 adjusts the amount of reduction in the inspection level depending on the characteristics of the ordered printed matter, thereby improving the accuracy of setting the amount of reduction.
[0074] In the third embodiment, the characteristics include at least one of the ink color used to draw the printed matter and the paper color, which is the color of the paper on which the printed matter is to be printed, thereby improving the accuracy of setting the reduction width.
[0075] In the third embodiment, a reduction range of the inspection level is associated with each of a plurality of colors that can be ink colors and each of a plurality of colors that can be paper colors. When the reduction range corresponding to the ink color of the printed matter differs from the reduction range corresponding to the paper color, the inspection level management system 100 reduces the inspection level by the smallest reduction range. This makes it easier to maintain the inspection quality compared to when the inspection level is reduced by a larger reduction range than the others.
[0076] Fourth Embodiment Next, the configuration of an inspection level management system according to a fourth embodiment will be described with reference to Fig. 9 to Fig. 10. Note that parts configured in the same manner as in the first embodiment are given the same reference numerals and descriptions thereof will be omitted as appropriate.
[0077] <Inspection level management system> In the fourth embodiment, the functional configuration realized by the inspection level management device of the inspection level management system is common to the corresponding configuration in the first embodiment, so that a duplicated description will be omitted.
[0078] <Inspection level management process> The inspection level management system of the fourth embodiment differs from the first embodiment in that the inspection level management process further adjusts the degree of reduction in the inspection level in stages according to the remaining number of days, so that the reduction in the inspection level becomes greater as the remaining number of days becomes fewer.
[0079] As shown in step S10C in Fig. 9, the condition setting unit pre-sets the standard number of working days, the maximum reduction amount of the first inspection level, and the number of steps to reduce. In the first embodiment, the reduction amount of the first inspection level is set, but in the fourth embodiment, the maximum reduction amount of the first inspection level is set. The number of steps to reduce is a numerical value that divides the standard number of working days. The condition setting screen in Fig. 10 exemplifies a numerical value of 3 set as the maximum reduction amount and a numerical value of 3 set as the number of steps to reduce when the standard number of working days is 6 days.
[0080] 9, the condition setting unit calculates the stepwise range of days by dividing the standard number of work days by the number of steps to decrease, and calculates the unit decrease range by dividing the maximum decrease range by the number of steps to decrease.
[0081] For example, in the case of the condition settings exemplified in FIG. 10, the standard number of working days is divided by 6, the number of stages of reduction, 3, to calculate a stepwise range of days of 2. Also, the maximum reduction range of 3 is divided by 3, the number of stages of reduction, to calculate a unit reduction range of 1. Therefore, the standard number of working days of 6 is divided into 3, each of which is 2 days. Also, when inspection level management processing is performed in the first stages of the 1st and 2nd days of the standard number of working days of 6, the value applied as the unit reduction range of the inspection level is the unit reduction range of 1.
[0082] Additionally, if inspection level management processing is performed in the middle stages of the 3rd and 4th days of the 6-day standard working days, the value applied as the inspection level reduction is 2, obtained by adding the unit reduction of 1 to the reduction of 1 in the first stage. Additionally, if inspection level management processing is performed in the final stages of the 5th and 6th days of the 6-day standard working days, the value applied as the inspection level reduction is 3, obtained by adding the unit reduction of 1 to the reduction of 2 in the middle stage.
[0083] The processing of steps S20 to S40 is the same as that of the first embodiment described with reference to Fig. 3, and therefore the description will be omitted. Then, as shown in step S50C in Fig. 9, the inspection level allocation unit reduces the first inspection level to the second inspection level by the reduction amount set according to the remaining number of days, and allocates the reduced level to the job. Specifically, when the remaining number of days corresponds to the first stage among a plurality of stages, the inspection level allocation unit reduces the first inspection level by the unit reduction amount.
[0084] When the remaining number of days corresponds to the middle between the first and last stages of the multiple stages, the inspection level allocation unit reduces the first inspection level by increasing the unit reduction width by one stage from the first stage toward the last stage. When the remaining number of days corresponds to the last stage of the multiple stages, the inspection level allocation unit reduces the first inspection level to the second inspection level by the maximum reduction width.
[0085] For example, in the condition settings exemplified in Fig. 10, if the number of remaining days is 5 or 6 at the time the inspection level management process is performed, the first inspection level is lowered by the reduction amount of 1 in the first stage. If the number of remaining days decreases to 3 or 4 as time passes, the first inspection level is lowered by the reduction amount of 2 in the middle stage. If the number of remaining days decreases by 1 or 2 days, the first inspection level is lowered by the reduction amount of 3 in the middle stage.
[0086] The method of gradually adjusting the extent of reduction in the inspection level according to the number of remaining days so that the extent of reduction in the inspection level increases as the number of remaining days decreases is not limited to the method of this embodiment. In the present disclosure, for example, other methods may be adopted, such as setting stages with different number of days.
[0087] (Function of the Fourth Embodiment) In the fourth embodiment, as in the first embodiment, delays in delivery of ordered printed matter can be suppressed.
[0088] In the fourth embodiment, the inspection level management system 100 adjusts the reduction amount in stages according to the remaining number of days so that the reduction amount of the inspection level increases as the remaining number of days decreases. This improves the accuracy of setting the reduction amount.
[0089] In the fourth embodiment, the inspection level management system 100 calculates the stepwise day width by dividing the standard work days by the number of steps to be reduced, and calculates the unit reduction width by dividing the maximum reduction width by the number of steps to be reduced. When the remaining days correspond to the first stage of the multiple stages, the inspection level management system 100 reduces the first inspection level by the unit reduction width. When the remaining days correspond to the center between the first stage and the last stage of the multiple stages, the inspection level management system 100 reduces the first inspection level so that it increases by one unit reduction width as the stage moves from the first stage side to the last stage side. When the remaining days correspond to the last stage of the multiple stages, the inspection level management system 100 reduces the first inspection level by the maximum reduction width. This improves the accuracy of setting the reduction width.
[0090] <Other embodiments> The present disclosure is not limited to the above-described embodiment, and various modifications, changes, and improvements are possible without departing from the spirit and scope of the present disclosure. For example, the above-described embodiment and modifications may be appropriately combined to form a configuration.
[0091] Also, for example, in the present disclosure, the inspection level management process executed by the CPU 11 by reading the software (program) in the above embodiment may be executed by various processors other than the CPU. Examples of the processor in this case include a PLD (Programmable Logic Device) such as an FPGA (Field-Programmable Gate Array) whose circuit configuration can be changed after manufacture, and a dedicated electric circuit such as an ASIC (Application Specific Integrated Circuit) that is a processor having a circuit configuration designed exclusively for executing a specific process.
[0092] The inspection level management process may be executed by one of these various processors, or may be executed by a combination of two or more processors of the same or different types (e.g., a plurality of FPGAs, a combination of a CPU and an FPGA, etc.) The hardware structure of these various processors is, more specifically, an electric circuit that combines circuit elements such as semiconductor elements.
[0093] In addition, in each of the above embodiments, the inspection level management program is described as being pre-stored (installed) in the ROM 12 or the storage 14, but the present invention is not limited to this. The program may be provided in a form recorded on a recording medium such as a CD-ROM (Compact Disk Read Only Memory), a DVD-ROM (Digital Versatile Disk Read Only Memory), or a USB (Universal Serial Bus) memory. The program may also be downloaded from an external device via a network.
[0094] The present disclosure includes various embodiments not described above, and the technical scope of the present disclosure is defined only by the invention-specifying matters in the claims that are appropriate from the above description.
[0095] <Additional Notes> (((1))) A processor is included. The processor, When the number of remaining days until the delivery date of the printed matter resulting from the received printing work is equal to or greater than a predetermined standard number of work days, an inspection level for the printed matter is set to a predetermined first inspection level; When the remaining number of days is less than the standard number of work days, an inspection level for the printed matter is lowered from the first inspection level to a second inspection level that has a shorter construction period than the first inspection level, and outputting the set second inspection level; Inspection level management system.
[0096] (((2))) The processor, adjusting the standard number of work days according to a processing volume determined from the received printing work; 1. An inspection level management device as described in (((1))).
[0097] (((3))) The processing volume includes at least one of a printing man-hour corresponding to the amount of the printed matter to be delivered and a post-processing man-hour from inspection to completion of the printed matter. An inspection level management device as described in (((2))).
[0098] (((4))) The printing man-hours and the post-processing man-hours are each expressed in a plurality of units, A larger number of working days is associated with each of the units as the processing volume increases, The processor, When the number of working days corresponding to the processing volume differs among the units of the received printing work, the largest number of working days is set as the standard number of working days. An inspection level management device as described in (((3))).
[0099] (((5))) The processor, adjusting the degree of reduction in the inspection level according to the characteristics of the ordered printed matter; 1. An inspection level management device as described in (((1))).
[0100] (((6))) The characteristics include at least one of an ink color used to draw the printed matter and a paper color, which is the color of the paper on which the printed matter is printed. An inspection level management device as described in (((5))).
[0101] (((7))) the lowering range of the inspection level is associated with each of a plurality of colors that can be the ink color and each of a plurality of colors that can be the paper color; The processor, When the reduction amount corresponding to the ink color of the printed matter differs from the reduction amount corresponding to the paper color, the inspection level is reduced by the smallest reduction amount. An inspection level management device as described in (((6))).
[0102] (((8))) The processor, The extent of the reduction is gradually adjusted according to the remaining number of days so that the extent of the reduction in the inspection level is greater as the remaining number of days is smaller. 1. An inspection level management device as described in (((1))).
[0103] (((9))) The processor, Calculate the step-by-step range of days by dividing the standard number of work days by the number of steps to lower the standard number of work days, Calculate a unit reduction amount by dividing a preset maximum reduction amount by the number of reduction steps; If the remaining days correspond to a first stage among a plurality of stages, the first inspection level is reduced by the unit reduction amount; When the remaining number of days corresponds to the middle between the first stage and the last stage among a plurality of stages, the first inspection level is decreased so as to increase by one unit decrease width as the stage moves from the first stage side to the last stage side, If the remaining days correspond to the last stage among a plurality of stages, the first inspection level is reduced by the maximum reduction amount. An inspection level management device as described in (((8))).
[0104] (((10))) The processor of the inspection level management system a process of setting an inspection level for the printed matter to a predetermined first inspection level when the remaining number of days until the delivery date of the printed matter resulting from the received printing work is equal to or greater than a predetermined standard number of work days; If the remaining number of days is less than the standard number of work days, a process of lowering an inspection level for the printed matter from the first inspection level to a second inspection level that has a shorter construction period than the first inspection level and setting the second inspection level; A process of outputting the set second inspection level; An inspection level management program that executes the following:
[0105] According to the configuration (((1))), delays in the delivery of ordered printed matter can be reduced.
[0106] The configuration (((2))) improves the accuracy of setting the standard number of working days.
[0107] The configuration (((3))) improves the accuracy of setting the standard number of working days.
[0108] The configuration (((4))) is more effective in suppressing delays than when a smaller number of working days is set as the reference number of working days.
[0109] According to the configuration (((5))), the accuracy of setting the reduction amount is improved.
[0110] According to the configuration (((6))), the accuracy of setting the reduction amount is improved.
[0111] The configuration of (((7))) makes it easier to maintain inspection quality compared to lowering the inspection level by a larger amount than in the other cases.
[0112] According to the configuration (((8))), the accuracy of setting the reduction amount is improved.
[0113] According to the configuration (((9))), the accuracy of setting the reduction amount is improved.
[0114] According to the configuration (((10))), delays in the delivery of ordered printed matter can be reduced. [Explanation of symbols]
[0115] 10 Inspection level management device 14. Storage 15 User Interface 16 Communication Interface 17 Bus 20 Order Management Device 30 Printing device 40 Inspection Equipment 100 Inspection Level Management System
Claims
1. A processor is included. The processor, When the number of remaining days until the delivery date of the printed matter resulting from the received printing work is equal to or greater than a predetermined standard number of work days, an inspection level for the printed matter is set to a predetermined first inspection level; When the remaining number of days is less than the standard number of work days, an inspection level for the printed matter is lowered from the first inspection level to a second inspection level that has a shorter construction period than the first inspection level, and set; outputting the set second inspection level; Inspection level management system.
2. The processor, adjusting the standard number of work days according to a processing volume determined from the received printing work; The inspection level management system according to claim 1 .
3. The processing volume includes at least one of a printing man-hour corresponding to the amount of the printed matter to be delivered and a post-processing man-hour from inspection to completion of the printed matter. The inspection level management system according to claim 2 .
4. The printing man-hours and the post-processing man-hours are each expressed in a plurality of units, A larger number of working days is associated with each of the units as the processing volume increases, The processor, When the number of working days corresponding to the processing volume differs among the units of the received printing work, the largest number of working days is set as the standard number of working days. The inspection level management system according to claim 3 .
5. The processor, adjusting the degree of reduction in the inspection level according to the characteristics of the ordered printed matter; The inspection level management system according to claim 1 .
6. The characteristics include at least one of an ink color used to draw the printed matter and a paper color, which is the color of the paper on which the printed matter is printed. The inspection level management system according to claim 5.
7. the lowering range of the inspection level is associated with each of a plurality of colors that can be the ink color and each of a plurality of colors that can be the paper color; The processor, When the reduction amount corresponding to the ink color of the printed matter differs from the reduction amount corresponding to the paper color, the inspection level is reduced by the smallest reduction amount. The inspection level management system according to claim 6.
8. The processor, The extent of the reduction is gradually adjusted according to the remaining number of days so that the extent of the reduction in the inspection level is greater as the remaining number of days is smaller. The inspection level management system according to claim 1 .
9. The processor, Calculate the step-by-step range of days by dividing the standard number of work days by the number of steps to lower the standard number of work days, Calculate a unit reduction amount by dividing a preset maximum reduction amount by the number of reduction steps; If the remaining days correspond to a first stage among a plurality of stages, the first inspection level is decreased by the unit decrease amount; When the remaining number of days corresponds to the middle between the first stage and the last stage among a plurality of stages, the first inspection level is decreased so as to increase by one unit decrease width as the stage moves from the first stage side to the last stage side, If the remaining days correspond to the last stage among a plurality of stages, the first inspection level is reduced by the maximum reduction amount. The inspection level management system according to claim 8.
10. The processor of the inspection level management system a process of setting an inspection level for the printed matter to a predetermined first inspection level when the remaining number of days until the delivery date of the printed matter resulting from the received printing work is equal to or greater than a predetermined standard number of work days; a process of lowering an inspection level for the printed matter from the first inspection level to a second inspection level that has a shorter construction period than the first inspection level when the remaining number of days is less than the standard number of work days; A process of outputting the set second inspection level; An inspection level management program that executes the following:
Citation Information
Patent Citations
Inspection management apparatus, inspection management method, and inspection management program
JP2022097221A