Water heater management system
The water heater management system addresses the issue of inefficient boiling operations in conventional systems by controlling power consumption and temperatures to maintain consistent hot water supply and efficiency.
Patent Information
- Application Number
- JP2023071482
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-25
- Publication Date
- 2024-11-07
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Conventional hot water systems with hot water storage type water heaters continue to operate if the hot water output temperature does not reach the target value, leading to decreased COP during boiling and no supply of hot water at specified temperatures.
A water heater management system that includes a management device to control the boiling operations of multiple hot water storage type water heaters, adjusting power consumption and boiling temperatures to prevent hot water below the target temperature from entering the storage tank, and optimizing the boiling operations based on demand response and heat storage levels.
Prevents hot water at a temperature lower than the target from entering the storage tank, ensuring consistent hot water supply and maintaining COP efficiency by optimizing the boiling operations of individual water heaters.
Smart Images

Figure 2024157238000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a water heater management system. [Background technology]
[0002] The following Patent Document 1 discloses a hot water supply system including a water heater installed in each of a plurality of residences and a cloud server, in which each of the water heaters includes an operation control means for controlling a water heating operation according to a water heating schedule notified from the cloud server, and an end time notification means for calculating an end time of the water heating operation and notifying the cloud server of the calculated end time each time a predetermined condition is satisfied. The cloud server includes a schedule notification means for creating a water heating schedule for the water heating operation of each of the water heaters based on a transition of power demand in a predetermined time period in the plurality of residences and an operation history of each of the water heaters, and notifying each of the water heaters of the created water heating schedule, and an updated schedule notification means for updating the water heating schedule of each of the water heaters as necessary based on the end time notified from each of the water heaters, and notifying the water heater of the updated water heating schedule. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-169789 A Summary of the Invention [Problem to be solved by the invention]
[0004] In conventional hot water supply systems, if there is a storage type hot water heater whose outlet temperature has not reached the target value, the system will continue to operate, resulting in issues such as a lack of hot water, where there is no hot water at or above the specified temperature in the hot water storage tank, or a decrease in the COP during heating.
[0005] The present disclosure has been made to solve the above-mentioned problems. An object of the present disclosure is to provide a water heater management system that can prevent hot water at a temperature lower than a target temperature from flowing into a hot water storage tank. [Means for solving the problem]
[0006] The water heater management system of the present disclosure is a water heater management system comprising a plurality of storage type water heaters and a management device that manages the boiling operation of the plurality of storage type water heaters, and the management device is configured to perform a first process of sending an input instruction value, which is a command value for the amount of power consumption of the storage type water heaters, to the plurality of storage type water heaters, a second process of stopping the boiling operation of a storage type water heater among the plurality of storage type water heaters whose boiling temperature has not reached a target value, and a third process of sending an input instruction value recalculated based on the total number of storage type water heaters excluding the storage type water heaters that are stopped in the second process to the plurality of storage type water heaters. Effect of the Invention
[0007] According to the present disclosure, it is possible to provide a water heater management system that can prevent hot water at a temperature lower than a target temperature from flowing into a hot water storage tank. [Brief description of the drawings]
[0008] [Figure 1] 1 is a diagram showing a water heater management system according to a first embodiment. [Diagram 2] 4 is a flowchart showing a control operation according to the first embodiment. [Diagram 3] FIG. 2 is a diagram illustrating an example of a configuration for implementing the functions of a management device and a control device in the first embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] Hereinafter, the embodiments will be described with reference to the drawings. In each drawing, the same reference numerals are used to denote common or corresponding elements, and the description is simplified or omitted. The configurations shown in the embodiments below are examples of the technical ideas related to the present disclosure, and may be combined with other known technologies, or multiple technical ideas described in the present disclosure may be combined. In addition, it is also possible to omit or modify a part of the configuration without departing from the gist of the present disclosure.
[0010] Embodiment 1 FIG. 1 is a diagram showing a water heater management system according to a first embodiment. The water heater management system 1 includes a plurality of storage type water heaters 2 and a management device 3 that manages the plurality of storage type water heaters 2. Each storage type water heater 2 includes a hot water storage unit 4 having a hot water storage tank, a heat pump type heat source unit 5, and a control device 50. The management device 3 can communicate with the control device 50 of each storage type water heater 2. The management device 3 controls the control device 50 of each storage type water heater 2 in an integrated manner. The management device 3 may be a platform such as an IoT platform. FIG. 1 shows an example in which the management device 3 manages four storage type water heaters 2. The number of storage type water heaters 2 managed by the management device 3 may be five or more. The plurality of storage type water heaters 2 may be installed in an apartment building receiving high-voltage collective power.
[0011] The storage type water heater 2 can perform a boiling operation in which hot water heated by the heat source unit 5 flows into the hot water storage tank in the hot water storage unit 4. The temperature of the hot water flowing out from the heat source unit 5 during the boiling operation is referred to as the "boiling temperature."
[0012] The heat source device 5 corresponds to a heating means capable of changing its heating capacity. The heating capacity [W] is the amount of heat given to water per hour. The hot water storage unit 4 stores the hot water heated by the heat source device 5 in a hot water storage tank. The control device 50 can grasp the amount of hot water and heat stored in the hot water storage tank by a plurality of hot water storage temperature sensors attached to the hot water storage tank.
[0013] The control device 50 of each storage type water heater 2 has a function of controlling the amount of power consumption per hour to be equal to an indicated value. The control device 50 stores operation information such as the heating capacity, amount of heat used for heating, heating temperature, amount of hot water used, and heat storage amount set value for each predetermined time during heating operation for each storage type water heater 2 during a predetermined period in the past. The heat storage amount set value for each predetermined time corresponds to the target heat storage amount of the storage type water heater 2. The control device 50 may calculate the target heat storage amount based on the amount of hot water used during a predetermined period in the past.
[0014] The management device 3 controls the start and end of the heating operation of the multiple storage type hot water heaters 2.
[0015] The control device 50 of each storage type water heater 2 is equipped with a means for grasping the amount of power consumed per hour during boiling operation, and is capable of adjusting the heating capacity or boiling temperature so that the amount of power consumed per hour during boiling operation is equal to the target amount of power consumption.
[0016] In a demand response that controls energy resources on the consumer side to change the power demand pattern, the water heater management system 1 can perform boiling operation of each storage type water heater 2 according to the power consumption target value from the aggregator 100. The aggregator 100 adjusts energy supply and demand in response to requests from the power company.
[0017] Based on the planned amount of power usage received from the aggregator 100, the management device 3 manages the heating operation of the multiple storage type hot water heaters 2 so that the planned amount of power is consumed in a predetermined time period.
[0018] In this embodiment, the management device 3 adjusts the heating operation of the multiple storage type water heaters 2 based on the planned power usage for the day so that the planned amount of power is consumed within a specified time. In demand response, the management device 3 performs a first process of transmitting an input instruction value, which is a command value for the amount of power consumed by the storage type water heaters 2, to the multiple storage type water heaters 2. The input instruction value is the amount of power consumed per unit time. The input instruction value may be a value calculated, for example, by the following formula. Input indication value = Planned power usage / Number of storage-type water heaters 2 in operation (1)
[0019] In the storage type hot water heater 2 that has received the input instruction value, the control device 50 adjusts the heating capacity or the boiling temperature so that the amount of power consumption per hour during the boiling operation becomes equal to the input instruction value.
[0020] In the demand response, the management device 3 executes a second process of stopping the heating operation of a storage type hot water heater 2 whose heating temperature has not reached the target value among the multiple storage type hot water heaters 2. The heating temperature is calculated by the following formula. Power consumption per hour ∝ Heating capacity = Water flow rate × Specific heat of water × (Boiling temperature – Inlet water temperature)
[0021] In the storage type water heater 2 in which the pressure loss of the water circuit between the hot water storage unit 4 and the heat source unit 5 is low, when the heating capacity is limited, even if the pump rotation speed is set to the lower limit, the water flow rate is large, so the boiling temperature may not reach the target value. The storage type water heater 2 whose boiling temperature does not reach the target value transmits that information to the management device 3. Alternatively, the management device 3 may check the boiling temperature of each storage type water heater 2 and check whether it has reached the target value. Then, the management device 3 performs a second process to stop the boiling operation of the storage type water heater 2 whose boiling temperature has not reached the target boiling temperature among the multiple storage type water heaters 2. This makes it possible to prevent hot water at a temperature lower than the target boiling temperature from flowing into the hot water storage tank, thereby preventing hot water shortage and preventing a decrease in COP during boiling operation.
[0022] Furthermore, the management device 3 performs a third process of transmitting an input instruction value recalculated according to the total number of storage type hot water heaters 2 excluding the storage type hot water heaters 2 stopped in the second process to the multiple storage type hot water heaters 2. For example, the management device may set the input instruction value as a value obtained by dividing the planned power usage by the total number of storage type hot water heaters 2 excluding the storage type hot water heaters 2 stopped in the second process. This makes it possible to consume the planned power usage.
[0023] In the demand response, the management device 3 may be configured to perform a fourth process at regular time intervals (for example, every 30 minutes) to stop the heating operation of the storage type water heater 2 with the largest heat storage amount or the storage type water heater 2 with the smallest difference obtained by subtracting the current heat storage amount from the target heat storage amount among the storage type water heaters 2 in the heating operation, and a fifth process to start the heating operation of the storage type water heater 2 with the smallest heat storage amount or the storage type water heater 2 with the largest difference obtained by subtracting the current heat storage amount from the target heat storage amount among the storage type water heaters 2 in the heating operation stop. This makes it possible to stop the operation of the storage type water heater 2 with a large heat storage amount and start the operation of the storage type water heater 2 with a small heat storage amount, thereby making it possible to equalize the amount of heat storage.
[0024] If the heating temperature of the storage type water heater 2 that has started heating operation in the above-mentioned fifth process does not reach the target heating temperature, the management device 3 may stop operation of the storage type water heater 2 and start heating operation of the storage type water heater 2 with the second smallest heat storage amount, or the storage type water heater 2 with the second largest difference obtained by subtracting the current heat storage amount from the target heat storage amount.
[0025] Also, in the demand response, the management device 3 may be configured to perform a fourth process of stopping the heating operation of the multiple storage type water heaters 2 in the heating operation at regular intervals in order of the storage type water heaters 2 having the largest amount of heat storage or in order of the smallest difference obtained by subtracting the current amount of heat storage from the target amount of heat storage, and a fifth process of starting the heating operation of the multiple storage type water heaters 2 in the order of the storage type water heaters 2 having the smallest amount of heat storage or in order of the largest difference obtained by subtracting the current amount of heat storage from the target amount of heat storage. This makes it possible to stop the operation of the multiple storage type water heaters 2 having the largest amount of heat storage and start the operation of the multiple storage type water heaters 2 having the smallest amount of heat storage, thereby making it possible to equalize the amount of heat storage.
[0026] The management device 3 recalculates the input instruction value according to the above formula (1) in accordance with the total number of storage type water heaters 2 performing the water heating operation, including the multiple storage type water heaters 2 that start the water heating operation in the fifth process, and transmits the recalculated input instruction value to each storage type water heater 2. This makes it possible to consume the planned power consumption amount.
[0027] The number of storage type water heaters 2 that start the boiling operation in the fifth process may be smaller than the number of storage type water heaters 2 that stop the boiling operation in the fourth process. This increases the input instruction value per unit and increases the heating capacity, making it possible to suppress the occurrence of storage type water heaters 2 whose boiling temperature does not reach the target boiling temperature.
[0028] The time period during which the management device 3 gives the input instruction value is called the input instruction time period. The input instruction time period is the time period during which the demand response is implemented. If the management device 3 expects that the storage type water heater 2 whose heating temperature has not reached the target value can secure the target heat storage amount by performing heating operation with a heating capacity equal to or less than the maximum capacity between the end time of the input instruction time period and a predetermined time, the management device 3 may stop the heating operation of the storage type water heater 2 until the end time of the input instruction time period. The predetermined time is the time when a large amount of hot water is used, and may be, for example, 19:00. The storage type water heater 2 that can achieve the target heat storage amount by the heating operation between the end time of the input instruction time period and the predetermined time does not need to perform the heating operation during the demand response time period. If the start and stop of the heating operation are repeated during the demand response time period, the COP decreases. Therefore, the storage type hot water heater 2, which does not need to perform heating operation during the demand response time period, can be kept stopped, thereby preventing a decrease in COP due to repeated starting and stopping.
[0029] Fig. 2 is a flowchart showing the control operation according to embodiment 1. The control operation of this embodiment will be described below with reference to the flowchart in Fig. 2. In step S1, the management device 3 sends an input instruction value for the amount of power consumption to the control device 50 of each storage type hot water heater 2 based on the planned power consumption and the number of target storage type hot water heaters 2.
[0030] In step S2, the management device 3 acquires information on the target heating temperature and the current heating temperature of each storage type water heater 2 at regular intervals after a predetermined time has elapsed. The reason for acquiring information after a predetermined time has elapsed is that it takes time for the refrigeration cycle to stabilize after the heat pump is started.
[0031] In step S3, the management device 3 compares the target heating temperature and the current heating temperature of each storage type water heater 2. If there is a storage type water heater 2 whose current heating temperature is lower than the target heating temperature, the process proceeds to step S4, and if the current heating temperatures of all storage type water heaters 2 have reached the target heating temperatures, the process proceeds to step S6.
[0032] In step S4, the management device 3 sends a stop instruction to the storage type water heaters 2 whose current heating temperature is lower than the target heating temperature. Furthermore, in step S5, the number of water heaters whose current heating temperature has reached the target heating temperature is used to recalculate the input instruction value = planned power consumption / number of storage type water heaters 2 that have reached the target heating temperature. After that, the process returns to step S1, and the management device 3 sends an input instruction value to each storage type water heater 2 whose current heating temperature has reached the target heating temperature.
[0033] In step S6, the management device 3 determines whether the current time has passed the specific time at which the planned power consumption amount is consumed. If the specific time has passed, the control ends, and if it is within the specific time, the control returns to step S2 and continues from step S2 onwards.
[0034] As a result of the above, it is possible to make the boiling temperature of each hot water storage type water heater 2 reach the target boiling temperature while consuming the planned amount of power consumption within a specific time.
[0035] Here, after a predetermined time has elapsed since the power consumption instruction value, i.e., the input instruction value, is recalculated in step S5, and the process returns to step S1 to transmit the power consumption instruction again, the management device 3 grasps the current heat storage amount and the target heat storage amount of each storage type hot water heater 2, stops the storage type hot water heater 2 with the largest heat storage amount or the storage type hot water heater 2 with the smallest difference between the target heat storage amount and the current heat storage amount, and transmits an instruction to start boiling operation to the storage type hot water heater 2 to which the stop instruction was sent in step S4. At this time, multiple storage type hot water heaters 2 in descending order of the heat storage amount of the largest, or multiple units in descending order of the difference from the smallest to the smallest, may be stopped, and multiple units in descending order of the heat storage amount from the smallest to the smallest, or multiple units in descending order of the difference from the largest to the largest (multiple units may be the same number). This makes it possible to provide an opportunity to ensure a minimum amount of heat storage for the entire target consisting of multiple units within a specific time.
[0036] In the above example, the number of storage type water heaters 2 to be instructed to start heating may be reduced in comparison with the stopped storage type water heaters 2. This increases the amount of power consumed by each storage type water heater 2, and increases the heating capacity per unit. In other words, it increases the possibility that the target heating temperature can be achieved with the water flow rate when the pump rotation speed is at a minimum.
[0037] If the management device 3 determines that the hot water storage type water heater 2 stopped in step S4 will operate at or below its maximum heating capacity from the end of the time period for which the input instruction is given until the time when a large amount of hot water will be used, for example, 7 pm, and will achieve the target amount of stored heat, the management device 3 may continue to send an instruction to stop operation until the end of the input instruction time period. This makes it possible to ensure the necessary amount of stored heat while preventing an increase in the number of startup operations with low COP during the input instruction time period.
[0038] FIG. 3 is a diagram showing an example of a configuration for realizing the functions of the management device 3 and the control device 50 in the first embodiment. Each function of the management device 3 and the control device 50 is realized by, for example, a processing circuit. The processing circuit may be dedicated hardware 600. The processing circuit may include a processor 601 and a memory 602. A part of the processing circuit may be formed as the dedicated hardware 600, and the processing circuit may further include the processor 601 and the memory 602. In the example shown in FIG. 3, a part of the processing circuit is formed as the dedicated hardware 600. Also, in the example shown in FIG. 3, the processing circuit further includes the processor 601 and the memory 602 in addition to the dedicated hardware 600.
[0039] The processing circuitry of which at least one portion is dedicated hardware 600 may be, for example, a single circuit, multiple circuits, a programmed processor, parallel programmed processors, an ASIC, an FPGA, or a combination thereof.
[0040] When the processing circuit includes at least one processor 601 and at least one memory 602, the functions of each part of the management device 3 and the control device 50 are realized by software, firmware, or a combination of software and firmware.
[0041] The software and firmware are written as programs and stored in memory 602. The processor 601 realizes the functions of each unit by reading and executing the programs stored in memory 602. The processor 601 is also called a CPU (Central Processing Unit), central processing unit, processing unit, arithmetic unit, microprocessor, microcomputer, or DSP. The memory 602 corresponds to, for example, a non-volatile or volatile semiconductor memory such as RAM, ROM, flash memory, EPROM, and EEPROM, or a magnetic disk, a flexible disk, an optical disk, a compact disk, a mini disk, and a DVD.
[0042] In this way, the processing circuit can realize the functions of the management device 3 and the control device 50 by hardware, software, firmware, or a combination of these. Note that each function of the management device 3 and the control device 50 may be realized by cooperation between multiple devices, or may be realized by a single device. Also, at least a part of each function of the management device 3 and the control device 50 may be implemented in a server on an external network.
[0043] Various aspects of the present disclosure are summarized below as appendices.
[0044] (Appendix 1) A plurality of hot water storage type water heaters; A management device that manages the heating operation of the plurality of hot water storage type water heaters; A water heater management system comprising: The management device includes: A first process of transmitting an input instruction value, which is an instruction value for an amount of power consumption of the storage type hot water heater, to the plurality of the storage type hot water heaters; A second process of stopping a boiling operation of a storage type hot water heater whose boiling temperature has not reached a target value among the plurality of storage type hot water heaters; a third process of transmitting the input instruction value recalculated according to the total number of the storage type hot water heaters excluding the storage type hot water heaters to be stopped in the second process to the plurality of storage type hot water heaters; A water heater management system configured to implement the above. (Appendix 2) The water heater management system described in Appendix 1, wherein the management device is configured to perform a fourth process of stopping, at regular time intervals, the boiling operation of the storage type water heater with the largest heat storage capacity among the storage type water heaters currently in boiling operation, or the storage type water heater with the smallest difference obtained by subtracting the current heat storage capacity from the target heat storage capacity, and a fifth process of starting the boiling operation of the storage type water heater with the smallest heat storage capacity among the storage type water heaters currently in boiling operation, or the storage type water heater with the largest difference obtained by subtracting the current heat storage capacity from the target heat storage capacity. (Appendix 3) The water heater management system described in Appendix 1 or Appendix 2, wherein the management device is configured to perform a fourth process of stopping the boiling operation of multiple storage type water heaters at regular intervals, in order of the storage type water heater with the largest amount of heat storage or the smallest difference obtained by subtracting the current amount of heat storage from the target amount of heat storage, and a fifth process of starting the boiling operation of multiple storage type water heaters in order of the storage type water heater with the smallest amount of heat storage or the largest difference obtained by subtracting the current amount of heat storage from the target amount of heat storage. (Appendix 4) The water heater management system described in Appendix 3, wherein the management device recalculates the input instruction value depending on the total number of the storage type water heaters performing boiling operation, including multiple storage type water heaters that start boiling operation in the fifth process. (Appendix 5) A water heater management system as described in Appendix 3 or Appendix 4, wherein the management device reduces the number of storage type water heaters that start the boiling operation in the fifth process compared to the number of storage type water heaters that stop the boiling operation in the fourth process. (Appendix 6) A water heater management system as described in any one of Appendix 1 to Appendix 4, wherein the management device stops the heating operation of the storage type water heater until the end time of the input instruction time period when the input instruction value is given and the storage type water heater whose heating temperature has not reached the target value is expected to be able to secure the target heat storage amount between the end time of the input instruction time period and a specified time. [Explanation of symbols]
[0045] 1 water heater management system, 2 storage type water heater, 3 management device, 4 storage unit, 5 heat source device, 50 control device, 100 aggregator, 600 dedicated hardware, 601 processor, 602 memory
Claims
1. A plurality of hot water storage type water heaters; A management device that manages the heating operation of the plurality of hot water storage type water heaters; A water heater management system comprising: The management device includes: A first process of transmitting an input instruction value, which is an instruction value for an amount of power consumption of the storage type hot water heater, to the plurality of the storage type hot water heaters; A second process of stopping a boiling operation of a storage type hot water heater whose boiling temperature has not reached a target value among the plurality of storage type hot water heaters; a third process of transmitting the input instruction value recalculated according to the total number of the storage type hot water heaters excluding the storage type hot water heaters to be stopped in the second process to the plurality of storage type hot water heaters; A water heater management system configured to implement the above.
2. The water heater management system of claim 1, wherein the management device is configured to perform a fourth process at regular intervals to stop the boiling operation of the storage type water heater with the largest heat storage capacity among the storage type water heaters currently in boiling operation, or the storage type water heater with the smallest difference obtained by subtracting the current heat storage capacity from the target heat storage capacity, and a fifth process to start the boiling operation of the storage type water heater with the smallest heat storage capacity among the storage type water heaters currently in boiling operation, or the storage type water heater with the largest difference obtained by subtracting the current heat storage capacity from the target heat storage capacity.
3. The water heater management system of claim 1 or claim 2, wherein the management device is configured to perform a fourth process of stopping the boiling operation of multiple storage type water heaters at regular intervals, in order of the storage type water heater with the largest amount of heat storage or the smallest difference obtained by subtracting the current amount of heat storage from the target amount of heat storage, and a fifth process of starting the boiling operation of multiple storage type water heaters in order of the storage type water heater with the smallest amount of heat storage or the largest difference obtained by subtracting the current amount of heat storage from the target amount of heat storage.
4. The water heater management system of claim 3, wherein the management device recalculates the input instruction value depending on the total number of the storage type water heaters performing boiling operation, including a plurality of the storage type water heaters that start boiling operation in the fifth process.
5. The water heater management system described in claim 3, wherein the management device reduces the number of storage type water heaters that start the boiling operation in the fifth process compared to the number of storage type water heaters that stop the boiling operation in the fourth process.
6. A water heater management system as described in claim 1 or claim 2, wherein the management device stops the heating operation of the storage type water heater until the end time of the input instruction time period when the management device determines that the storage type water heater whose heating temperature has not reached the target value will be able to secure the target heat storage amount between the end time of the input instruction time period during which the input instruction value is provided and a specified time.
Citation Information
Patent Citations
Hot water system, cloud server, boiling schedule management method and program
JP2020169789A
