System controlling power consumption of building and method and elevator

The building power consumption control system addresses the challenge of reducing power usage and ensuring emergency evacuation by managing occupancy information and power distribution, enhancing energy efficiency and accessibility for individuals with mobility issues.

JP2024158133APending Publication Date: 2024-11-08HITACHI LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2023073077
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-27
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Existing technologies face challenges in reducing power consumption in buildings while ensuring that individuals with mobility issues can evacuate using elevators during emergencies, particularly in the context of power outages.

Method used

A building power consumption control system that records occupancy information to manage power usage based on the number of people in the building, including those with mobility issues, and controls power supply to ensure efficient evacuation during emergencies.

Benefits of technology

The system reduces power consumption during normal times and enables safe evacuation of individuals with mobility issues by optimizing power distribution and elevator operation during emergencies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024158133000001_ABST
    Figure 2024158133000001_ABST
Patent Text Reader

Abstract

To provide a technique capable of reducing the power consumption of a building in a normal time, while enabling evacuation of a person having difficulty in self-movement by an elevator in an emergency.SOLUTION: A building power consumption control system is a system that controls the power consumption of a building, comprises an in-building person information recording part that records in-building person information that is information indicating the number of persons on each floor of the building, and controls the power consumption of the building based on the in-building peron information.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a system for controlling the power consumption of a building. [Background technology]

[0002] Generally, elevators are installed in mid- to high-rise buildings (hereinafter referred to as "buildings") as a means of going up and down to other floors. These elevators are essential from the perspective of barrier-free access for people who have difficulty going up and down within a building by themselves, such as wheelchair users and the elderly (hereinafter referred to as "people who have difficulty moving on their own").

[0003] However, for example, when a power outage occurs due to a large-scale natural disaster, it is normal for the movement up and down within a building using the majority of general elevators to be significantly restricted. Therefore, various technologies have been proposed to smoothly and reliably evacuate and rescue people who have difficulty moving on their own and are left behind in a building using elevators even in such a case, i.e., during a disaster (e.g., Patent Documents 1 and 2). [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2011-116520 A [Patent Document 2] JP 2011-178483 A Summary of the Invention [Problem to be solved by the invention]

[0005] In recent years, in order to realize a carbon-neutral society, there has been an increasing demand for energy conservation in buildings, including the power consumption of various building facilities.

[0006] From this perspective, it is difficult to reduce the building's power consumption during normal times to meet the demand for energy conservation, while at the same time enabling people who have difficulty moving on their own to evacuate by elevator in an emergency such as a disaster using existing technology, and so the development of new technology was awaited.

[0007] The present invention has been made in consideration of the above problems, and aims to reduce the power consumption of the building during normal times while enabling people with difficulty in moving on their own to evacuate using elevators in an emergency. The objective of the present invention is to provide a technology that makes it possible to [Means for solving the problem]

[0008] The building power consumption control system of the present invention is a system for controlling the power consumption of a building, and is equipped with an occupant information recording unit that records occupant information, which is information representing the number of people on each floor of the building, and controls the power consumption of the building based on the occupant information.

[0009] Other problems and solutions disclosed in the present application will be made clear in the section of the description of the invention and the drawings. Effect of the Invention

[0010] According to the present invention, it is possible to reduce the power consumption of the building during normal times while enabling people who have difficulty moving on their own to evacuate using elevators in emergencies. [Brief description of the drawings]

[0011] [Figure 1] 1 is a diagram showing an example of the configuration of an entire system including a building power consumption control system according to an embodiment. [Diagram 2] FIG. 2 is a diagram showing an example of the operation of the building power consumption control system according to the embodiment. [Diagram 3] 1 is a flowchart showing an example of a flow of processing executed by the building power consumption control system. [Figure 4]10 is a flowchart showing an example of the flow of a normal power supply control process. [Diagram 5] 10 is a flowchart showing an example of the flow of a normal load control process. [Figure 6] FIG. 13 is a diagram showing an example of an evacuation priority display in an emergency. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] In the following description, an "interface unit" may refer to one or more interface devices. The one or more interface devices may be at least one of the following: One or more I / O (Input / Output) interface devices. The I / O (Input / Output) interface devices are interface devices to at least one of the I / O devices and a remote display computer. The I / O interface device to the display computer may be a communications interface device. The at least one I / O device may be a user interface device, e.g., either an input device such as a keyboard and pointing device, or an output device such as a display device. One or more communication interface devices. The one or more communication interface devices may be one or more homogeneous communication interface devices (e.g., one or more NICs (Network Interface Cards)) or two or more heterogeneous communication interface devices (e.g., a NIC and an HBA (Host Bus Adapter)).

[0013] In the following description, a "memory" refers to one or more memory devices, which are an example of one or more storage devices, and may typically be a primary storage device. At least one memory device in the memory may be a volatile memory device or a non-volatile memory device.

[0014] In the following description, a "persistent storage device" may be one or more persistent storage devices, which are an example of one or more persistent storage devices. A persistent storage device may typically be a non-volatile storage device (e.g., an auxiliary storage device), and more specifically, may be, for example, a hard disk drive (HDD), a solid state drive (SSD), a non-volatile memory express (NVME) drive, or a storage class memory (SCM).

[0015] Also, in the following description, "storage device" may be at least memory, including memory and persistent storage device.

[0016] Furthermore, in the following description, a "processor" may be one or more processor devices. The at least one processor device may typically be a microprocessor device such as a CPU (Central Processing Unit), but may also be other types of processor devices such as a GPU (Graphics Processing Unit). The at least one processor device may be a single-core or multi-core. The at least one processor device may be a processor core. The at least one processor device may also be a broader processor device such as a circuit that is a collection of gate arrays written in a hardware description language that performs part or all of the processing (e.g., an FPGA (Field-Programmable Gate Array), a CPLD (Complex Programmable Logic Device), or an ASIC (Application Specific Integrated Circuit)).

[0017] In the following description, information that provides an output for an input may be described using expressions such as "xxx table," but the information may be a table of any structure, or may be a neural network that generates an output for an input, or a learning model such as a genetic algorithm or random forest. Therefore, the "xxx table" may be referred to as "xxx information." In the following description, the structure of each table is an example, and one table may be divided into two or more tables, or all or part of two or more tables may be one table.

[0018] In the following description, functions may be described using the expression "yyy unit", but the functions may be realized by one or more computer programs being executed by a processor, or by one or more hardware circuits (e.g., FPGA or ASIC), or by a combination thereof. When a function is realized by a program being executed by a processor, the function may be at least a part of the processor, since the specified processing is performed using a storage device and / or an interface device, etc., as appropriate. Processing described with a function as the subject may be processing performed by a processor or a device having the processor. A program may be installed from a program source. The program source may be, for example, a program distribution computer or a computer-readable recording medium (e.g., a non-transitory recording medium). The description of each function is an example, and multiple functions may be combined into one function, or one function may be divided into multiple functions.

[0019] In the following description, a process may be described with a "program" as the subject, but the process described with a program as the subject may be a process performed by a processor or a device having the processor. Two or more programs may be realized as one program, and one program may be realized as two or more programs.

[0020] Furthermore, in the following description, a "building power consumption control system" may be a system composed of one or more physical computers, or may include a system (e.g., a cloud computing system) realized on a group of physical computing resources (e.g., a cloud platform). When the building power consumption control system "displays" the display information, it may mean displaying the display information on a display device possessed by the computer, or the computer may transmit the display information to a display computer (in the latter case, the display information is displayed by the display computer).

[0021] Hereinafter, the present embodiment will be described in detail with reference to the drawings.

[0022] In the following description, the same or similar components will be denoted by common reference symbols, and redundant description may be omitted.

[0023] In addition, when there are multiple elements having the same or similar functions, the multiple elements may be described by using the same reference numerals with different subscripts in order to distinguish between them. On the other hand, when there is no need to distinguish between the multiple elements, the subscripts may be omitted.

[0024] <Configuration example of building power consumption control system 100> First, a configuration example of a building power consumption control system 100 according to this embodiment will be described with reference to Figures 1 and 2. Figure 1 is a diagram that shows an example of the configuration of an entire system including the building power consumption control system 100. Also, Figure 2 is a diagram that shows an example of the operation of the building power consumption control system 100.

[0025] (Example of the overall system configuration) The building power consumption control system 100 of this embodiment is a computer system capable of controlling the power consumption of a building 10 that is the object of control, and is realized by a computer device or a server device having the respective configurations described below.

[0026] The following description of this embodiment will be given using as an example a case in which the building power consumption control system 100 controls the power consumption of a 10-story building 10 equipped with three elevators 30, namely, elevator A 30a, elevator B 30b, and elevator C 30c.

[0027] As illustrated in FIG. 1, the building power consumption control system 100 is connected to an elevator control device 31 (described in detail below) that controls the operation of an elevator 30 installed in the building 10, so that data can be exchanged between the elevator control device 31 and the elevator control device 31 via an appropriate communication network such as the Internet or a dedicated line.

[0028] Similarly, as illustrated in FIG. 1, the building power consumption control system 100 is also connected to the control systems of various building facilities that are the main power loads on each floor, such as air conditioning units 60a, 60b, 60c,..., 60n (hereinafter collectively referred to as "air conditioning units 60" when referred to collectively or when no distinction is made) and lighting units 70a, 70b, 70c,..., 70n (hereinafter collectively referred to as "lighting units 70" when referred to collectively or when no distinction is made), via an appropriate communication network such as the Internet or a dedicated line, so as to be able to communicate data with each other.

[0029] 1, the building power consumption control system 100 includes a power supply control system 20 that controls power supply to the building 10 from various power supply sources such as a power storage device (hereinafter also referred to as "in-building power storage device") 41 installed inside the building 10, a power generation device 42 such as a solar power generation device or a small wind power generation device installed on the roof or outer wall of the building 10, a system power source 51 that supplies power from outside the building 10, and an electric vehicle 52 equipped with a power storage device as a power source, which are connected to each other via a communication network so as to be able to perform data communication. The power supply control system 20 is also connected to the above-mentioned elevator control device 31 and various building equipment control systems so as to be able to perform data communication with each other via an appropriate communication network such as the Internet or a dedicated line. Here, the power supply control system 20 has a function of power supply control, but since the power supply circuit is composed of a general power electronics device, the description thereof will be omitted in this specification, and the control function will be described.

[0030] The building power consumption control system 100, the elevator control device 31, and the power supply control system 20 are connected to the communication network by wires via well-known communication devices (not shown), but may be connected wirelessly.

[0031] Furthermore, a user terminal (not shown), such as a laptop PC, tablet, or smartphone, owned by a management staff member of the building 10 who is a user of the building power consumption control system 100, may be connected to the building power consumption control system 100 so as to be able to communicate data with each other via an appropriate communication network such as the Internet or a dedicated line. In this case, the user terminal and the communication network may be connected wirelessly or by wire.

[0032] In the present embodiment, the building power consumption control system 100 has been described as being composed of one device, as illustrated in Fig. 1. However, for example, the building power consumption control system 100 may be composed of multiple devices.

[0033] In the present embodiment, as illustrated in Fig. 1, the building power consumption control system 100, the elevator control device 31, and the power supply control system 20 have been described as being separate devices. However, the building power consumption control system 100, the elevator control device 31, and / or the power supply control system 20 may be configured as the same device. In this case, the building power consumption control system may be configured as a system including, for example, the elevator control device 31 and / or the power supply control system 20. Also, for example, the building power consumption control system may be configured to include some or all of the functions performed by the elevator control device 31 and / or the power supply control system 20.

[0034] (Example of hardware configuration of building power consumption control system 100) Next, an example of the hardware configuration of the building power consumption control system 100 according to this embodiment will be described.

[0035] The building power consumption control system 100 of this embodiment is realized by one general-purpose computer device. In the following description, it is assumed that the building power consumption control system 100 is realized by one general-purpose computer device including one or more processors, one or more storage devices, one or more interface devices, and wired or wireless communication lines (none of which are shown) connecting them.

[0036] That is, the building power consumption control system 100 has a storage device consisting of a persistent storage device and a memory, an interface device, and a processor connected thereto.

[0037] The persistent storage device is an auxiliary storage device made up of a non-volatile storage element such as a flash memory. Specific examples of persistent storage devices include a solid state drive (SSD) and a hard disk drive (HDD). The persistent storage device stores at least a building power consumption control program. The building power consumption control program is a computer program for implementing functions required for the building power consumption control system 100.

[0038] In other words, by executing the building power consumption control program by the processor, various processes are performed, including the normal power supply control process (described in detail later in relation to Figures 3-4) and the normal load control process (described in detail later in relation to Figures 4-5).

[0039] The building power consumption control program may be installed from a program source. The program source may be, for example, a program distribution computer or a computer-readable recording medium. The building power consumption control program may be configured by a device driver, an operating system, various application programs located at higher layers thereof, and a library that provides common functions to these programs. Furthermore, two or more programs may be realized as one building power consumption control program, and one building power consumption control program may be realized as two or more programs.

[0040] The memory is a primary storage device mainly composed of volatile storage elements such as RAM (Random Access Memory). The memory temporarily stores data representing various information read from a persistent storage device and various data acquired from the elevator control device 31 and / or the power supply control system 20.

[0041] The processor is a processor device such as a CPU (Central Processing Unit) and various co-processors. This processor loads a building power consumption control program into memory and executes it to perform overall control of the building power consumption control system 100 itself, and also manages the control unit 110 that performs various processes such as calculation processing and judgment processing.

[0042] The interface apparatus includes a communication interface device that connects to a communication network and communicates with other apparatuses, terminals, etc., and an I / O interface device.

[0043] (Example of functional block of building power consumption control system 100) Next, an example of blocks of various functions provided in the building power consumption control system 100 according to this embodiment will be described with reference to Figures 1 and 2. Note that each block described below does not represent a hardware configuration, but represents a functional block.

[0044] The building power consumption control system 100 is configured to include the following functional blocks: a control unit 110, a storage unit 120, a communication unit (not shown), and a user interface unit (none of which are shown) made up of an input unit and an output unit.

[0045] The control unit 110 executes various data processing based on the programs and data stored in the memory unit 120 and the data acquired by the communication unit. The control unit 110 also executes various processes for controlling power supply and load based on occupant information stored in the occupant information memory unit 210 described later, and various processes for issuing control commands to each load. The control unit 110 also functions as an interface between the memory unit 120 and the communication unit.

[0046] As shown in FIG. 2, the control unit 110 has functional blocks of a minimum required power consumption calculation unit 111, an available discharge amount calculation unit 112, and a power supply control unit 113.

[0047] The minimum required power consumption calculation unit 111 executes a process for calculating the minimum required power consumption.

[0048] The available discharge amount calculation unit 112 executes a process for calculating the available discharge amount.

[0049] The power supply control unit 113 executes various processes for controlling the power supply to the power loads and the power supply sources described above. The power supply control unit 113 executes these processes in cooperation with the control unit of the power supply control system 20. The power supply control unit 113 can also execute these processes independently.

[0050] The control unit 110 is configured using a processor, and can realize these functional blocks by executing a predetermined building power consumption control program. Note that instead of a processor, the control unit 110 may be configured using a logic circuit such as an FPGA (Field Programmable Gate Array). The control unit 110 may also be configured by combining a processor and a logic circuit.

[0051] The storage unit 120 is configured using a storage device consisting of, for example, a persistent storage device and a memory, and stores a program that supplies various processing commands to the control unit 110, and data representing various information used in the processing executed by the control unit 110.

[0052] The storage unit 120 includes a resident information storage unit 210 as a functional block.

[0053] The occupant information storage unit 210 stores occupant information, which is information regarding the number of people in the building 10. The occupant information storage unit 210 stores this occupant information by storing it in a occupant information table exemplified in Figs. 1 and 2. The occupant information table is a table for managing occupant information. The occupant information table has a record for each floor of the building 10. The record indicates, for example, the floor number of the building 10, the total number of occupants on that floor, and the number of occupants on that floor who have difficulty moving on their own. The number of people who have difficulty moving on their own is further divided into the number of wheelchair users (hereinafter referred to as "wheelchair users") and the number of people who have pre-registered (hereinafter referred to as "pre-registered people"). That is, the occupant information table manages the number of various occupants, mainly people with difficulty moving on their own, for each floor by linking and recording the floor number of the building 10 with the total number of occupants on that floor and the number of people with difficulty moving on their own. According to the example shown in Figures 1 and 2, the occupant information table records that there are 15 occupants on the second floor of the building 10, one of whom is a wheelchair user, and two of whom are pre-registered people who have previously registered as having difficulty moving on their own.

[0054] 2, the occupant information is generated by the control unit 110 of the building power consumption control system 100 from information on the number of people entering and exiting a floor obtained from the entrance and exit management devices 80a, 80b, 80c, . . . 80n (hereinafter, when they are collectively referred to or when there is no particular distinction to be made, they will be collectively referred to as "entrance and exit management devices 80") installed on each floor of the building 10, and information on the number of people getting on and off and the usage status of each elevator (30a, 30b, 30c) obtained from the corresponding elevator control devices (31a, 31b, 31c). Information on the usage status of the elevators (30a, 30b, 30c) is obtained by the control unit 110 of the building power consumption control system 100 from the history of input operations to the wheelchair call devices 38 installed near the landings on each floor, images taken by a camera in the elevator car 33, etc.

[0055] The occupant information is updated every time there is a change in the number of people for any item. This ensures that the latest occupant information is always stored in the occupant information storage unit 210.

[0056] In addition, the control unit 110 of the building power consumption control system 100 may automatically perform the above-mentioned pre-registration of persons with difficulty moving on their own based on information obtained from the entrance / exit management device 80 and information regarding hall call registration obtained from the elevator control devices (31a, 31b, 31c).

[0057] The control unit 110 can execute various processes including the normal power supply control process (described in detail below with reference to Figs. 3-4) and the normal load control process (described in detail below with reference to Figs. 4-5) by reading and writing this information in the storage unit 120. That is, the building power consumption control system 100 performs power supply control and load control based on the above occupant information stored in the occupant information storage unit 210.

[0058] The communication unit is responsible for communication processing with other devices such as the elevator control device 31 and the power supply control system 20 via the Internet (an example of a communication network). The communication unit is configured using, for example, a NIC (Network Interface Card) or an HBA (Host Bus Adapter).

[0059] The user interface unit (not shown) includes functional blocks of an input unit and an output unit.

[0060] The input unit is responsible for input-related processes such as accepting input operations from the user among processes related to the user interface. The input unit is configured using, for example, a keyboard, a pointing device, a touch panel, etc., and detects various operations from the user.

[0061] The output unit is responsible for output-related processes such as displaying various screens on a display device, outputting audio, etc. The output unit is configured using, for example, a liquid crystal display, a touch screen, etc.

[0062] In other words, each component of the building power consumption control system 100 is realized by hardware including a processor, storage devices such as memory and persistent storage devices, wired or wireless communication lines and interface devices that connect them, and software that is stored in the storage devices and supplies processing instructions to the computing unit.

[0063] In this embodiment, the functions of the building power consumption control system 100 have been described as being integrally realized by a single computer device. However, these functions may be realized by a plurality of computers or server devices connected to each other. Furthermore, the building power consumption control system 100 may be configured to include a general-purpose computer device such as a laptop PC and a web browser installed thereon, or may be configured to include a web server and various portable devices.

[0064] Furthermore, the building power consumption control system 100 may have other functions in addition to the various functions described above.

[0065] (Example of configuration of elevator control device 31) The elevator control device 31 of this embodiment is a computer system for controlling the operation of an elevator 30 having one or more elevator cars, and is realized by a plurality of computer devices and / or control boards each having the configuration described below.

[0066] This elevator control device 31 is configured to include, for example, an overall management unit, a car control unit, and a hall terminal individual control unit, as well as a communication network that connects these units so that they can communicate with each other via various dedicated lines for control, the Internet, etc.

[0067] The overall control unit is, for example, installed in a control room of the building 10 in which the elevator 30 that is the object of control of the elevator control device 31 is installed, and is an information processing terminal that controls the entire elevator 30. In other words, the overall control unit controls all the elevators (30a, 30b, 30c) that constitute the elevator 30.

[0068] The overall control unit is configured to include the functional blocks of a display unit and a communication unit.

[0069] The display unit is responsible for output processing, including displaying various screens on a display device, among other processes related to the user interface. The display unit is configured using, for example, a liquid crystal display, a touch screen, or the like.

[0070] The communication unit is responsible for communication processing with other devices such as a unit control unit provided for each elevator 30, which is performed via a communication line (an example of a communication network) such as a LAN (Local Area Network) or a dedicated line. The communication unit is configured using, for example, a NIC (Network Interface Card), an HBA (Host Bus Adapter), etc.

[0071] The unit control unit executes various processes related to the control of the unit to be controlled.

[0072] The car control unit is composed of the following functional blocks: a communication interface unit, a motor control unit, a car control unit, and a hall terminal overall control unit.

[0073] The communication interface unit is responsible for communication processing with other devices such as the overall management unit and hall terminal individual control units (not shown) that are provided corresponding to hall terminals (not shown) installed at the boarding area of ​​the relevant machine on each hall floor and control the corresponding hall terminals, via communication lines (one example of a communication network) such as a LAN (Local Area Network) or a dedicated line. The communication interface unit is configured using, for example, a NIC (Network Interface Card) or an HBA (Host Bus Adapter).

[0074] The motor control unit executes processes related to the control of various elevator drive devices, including the motor 32 which is the power source of the elevator. The motor 32 winds a rope 35 attached to the car 33 and a weight 34 to raise and lower the car 33. The motor control unit controls the operation of the motor 32 so that the car 33 stops at a landing floor where a hall call is registered or a destination floor where a destination call is registered. The operation of the motor control unit is controlled by the car control unit. The motor 32 operates according to a program read from a program storage unit (not shown).

[0075] The car control unit executes various processes related to the control of the car 33 of the relevant car. The car 33 rises and falls in an elevator shaft (not shown) provided in the relevant building 10. The car control unit controls various car operations of the car 33, including the rising and lowering operations. Other car operations include, for example, lighting of a lantern that notifies the arrival of the car 33 on the hall floor, setting of a destination call in response to registration of a destination floor button in the car 33, and opening and closing control of the car door of the car 33.

[0076] The hall terminal overall control unit executes various processes related to the control of the hall terminal installed at the platform of the relevant machine on each hall floor in cooperation with the hall terminal individual control unit corresponding to the hall terminal. The hall terminal is installed at the platform of the relevant machine on each hall floor of the building 10, and is used by users to register hall calls. The hall terminal overall control unit acquires hall call information registered in the hall terminal, and outputs the hall call information to the car control unit. The hall terminal overall control unit may also output information indicating that a hall button (37a to 37c in FIG. 6) has been pressed to the car control unit.

[0077] The hall terminal individual control unit is provided corresponding to each hall terminal installed at the platform of the corresponding machine on each hall floor. The hall terminal individual control unit executes various processes for controlling the corresponding hall terminal.

[0078] The input / output control unit controls components of the hall terminal, such as the hall button 37 for registering hall calls and an indicator that displays the floor number of the moving car 33, as well as hall lanterns connected to the hall terminal that light up to notify users when the car 33 has arrived at a hall floor.

[0079] The power supply monitoring unit monitors the power supply that supplies power to the hall terminal individual control unit and / or the hall terminal.

[0080] The above description of each function is merely an example, and multiple functions may be combined into one function, or one function may be divided into multiple functions.

[0081] For example, in this embodiment, the overall management unit and the unit control unit are described as being separate devices connected to each other via a communication network, but the overall management unit and the unit control unit may be configured as the same device.

[0082] Furthermore, the elevator control device 31 may have other functions in addition to the various functions described above. For example, the elevator control device 31 may be configured to include some of the functions of the power supply control system 20, which will be described later.

[0083] (Example of functional block of power supply control system 20) Next, an example of blocks of various functions included in the power supply control system 20 according to this embodiment will be described. Note that each block described below does not represent a hardware configuration but represents a functional block.

[0084] The power supply control system 20 of this embodiment is a computer system for controlling power supply to various building facilities in the building 10, and is realized by a plurality of computer devices and / or control boards each having the configuration described below.

[0085] The power supply control system 20 includes functional blocks, namely, a control unit, a storage unit, a communication unit, and a user interface unit including an input unit and an output unit (none of which are shown).

[0086] The control unit executes various data processing based on the programs and data stored in the memory unit and the data acquired by the communication unit. The control unit also executes processing to control power supply to the power loads and power supply sources described above in cooperation with the power supply control unit 113 of the building power consumption control system 100. The control unit can also execute the power supply control processing to the power loads and power supply sources independently. The control unit also functions as an interface for the memory unit and the communication unit.

[0087] The control unit is configured using a processor, and can realize these functional blocks by executing a predetermined program. Note that instead of a processor, the control unit may be configured using a logic circuit such as an FPGA (Field Programmable Gate Array). The control unit may also be configured by combining a processor and a logic circuit.

[0088] The storage unit is configured using a storage device consisting of, for example, a persistent storage device and a memory, and stores a program that supplies various processing commands to the control unit, and data representing various information used in the processing executed by the control unit. The control unit can execute various processes by reading and writing this information in the storage unit.

[0089] The communication unit is responsible for communication processing with other devices such as the building power consumption control system 100 via the Internet (an example of a communication network). The communication unit is configured using, for example, a network interface card (NIC) or a host bus adapter (HBA).

[0090] The user interface unit (not shown) includes functional blocks of an input unit (not shown) and an output unit (not shown).

[0091] The input unit is responsible for input-related processes such as accepting input operations from the user among processes related to the user interface. The input unit is configured using, for example, a touch panel, and detects various operations from the user.

[0092] The output unit is responsible for output-related processes such as displaying various screens on a display device, outputting audio, etc. The output unit is configured using, for example, a touch screen, a liquid crystal display, etc.

[0093] The above description of each function is merely an example, and multiple functions may be combined into one function, or one function may be divided into multiple functions.

[0094] Furthermore, the power supply control system 20 may have other functions in addition to the various functions described above. For example, the power supply control system 20 may be configured to include some of the above-mentioned functions of the elevator control device 31.

[0095] (Example of operation of building power consumption control system 100) Next, an example of the operation of each component of building power consumption control system 100 will be described with reference to FIG.

[0096] 2, the building power consumption control system 100 acquires occupant information based on entrance / exit information acquired from an entrance / exit management device 80 on each floor of the building 10 and the number of people getting on and off the elevator 30, and stores the information in the occupant information storage unit 210. The occupant information is updated every time there is a change in the number of people. This ensures that the latest occupant information is always stored in the occupant information storage unit 210.

[0097] Furthermore, the building power consumption control system 100 outputs charge / discharge commands to the power supply control system 20 by the respective functional units, that is, the minimum required power consumption calculation unit 111, the available discharge amount calculation unit 112, and the power supply control unit 113 described above.

[0098] First, the minimum required power consumption calculation unit 111 calculates the minimum amount of power required for people with difficulty moving on their own to move to an evacuation floor from the information on people present in the building, information on the specifications of the elevator 30, and information on the car position.

[0099] Next, the available discharge amount calculation unit 112 calculates the available discharge amount by taking into consideration the required power consumption calculated by the minimum required power consumption calculation unit 111, the remaining amount of stored power in the power storage device 41, and the amount of power generated by the power generation device 42 predicted based on a weather forecast. As described above, the power generation device 42 according to this embodiment is a solar power generation device or a small wind power generation device installed on the rooftop or outer wall of the building 10. Therefore, the amount of power generated by the power generation device 42 has been described here as being predicted based on a weather forecast. However, when the power generation device installed in the building 10 generates power using another power generation method, the building power consumption control system 100 according to this embodiment predicts the amount of power generated by the power generation device based on another appropriate index.

[0100] Furthermore, the power supply control unit 113 executes a process of deriving a charge / discharge command based on power rate information that changes for each time period.

[0101] The power supply control unit 113 may execute a process of deriving a charge / discharge command based on the amount of carbon dioxide emission for each time period, instead of the power rate information.

[0102] Furthermore, when the derived charging command and discharging command tend to be contradictory, the power supply control unit 113 may optimize the two commands by a method such as weighting them in advance in the control.

[0103] <Processing flow example> Next, each process executed in the building power consumption control system 100 according to this embodiment will be described with reference to FIGS.

[0104] (Building power consumption control processing) FIG. 3 is a flowchart showing an example of the flow of a building power consumption control process executed by the building power consumption control system 100 according to this embodiment.

[0105] In step S9, the control unit 110 of the building power consumption control system 100 executes a process to determine whether or not an emergency (power outage) occurs. This determination process is executed for each control cycle. If it is determined in step S9 that an emergency (power outage) occurs (step S9: Y), the process proceeds to step S991 to issue an emergency air conditioning and lighting command, which will be described later. This is to reduce the load power in the building 10. On the other hand, if it is determined in step S9 that an emergency (no power outage) does not occur (step S9: N), the process proceeds to step S91 to perform normal power supply control (described in detail later in relation to FIG. 4).

[0106] In step S991, the control unit 110 of the building power consumption control system 100 executes processing to issue an emergency air conditioning and lighting command. This is because when a power outage of a certain length of time is expected, power consumption can be reduced by operating a minimum number of air conditioners 60 and lighting devices 70 only on evacuation floors that have been determined in advance according to the number of people present in the building. When the control unit 110 of the building power consumption control system 100 completes the processing in step S991, it proceeds to step S992.

[0107] In step S992, the control unit 110 of the building power consumption control system 100 executes a process to issue a command to lift up or lower the person who has difficulty moving by himself / herself. When the process in step S992 is completed, the control unit 110 of the building power consumption control system 100 proceeds to step S993.

[0108] In step S993, the control unit 110 of the building power consumption control system 100 executes a control process to cause the elevator 30 to perform an operation for lifting and lowering people who have difficulty moving by themselves. When the process in step S993 is completed, the control unit 110 of the building power consumption control system 100 proceeds to step S994.

[0109] In step S994, control unit 110 of building power consumption control system 100 executes a process of instructing power storage device 41 to discharge, as emergency power supply control. When control unit 110 of building power consumption control system 100 completes the process in step S994, the process returns to step S9 again.

[0110] On the other hand, when the normal-time power supply control process in step S91 is completed, the control unit 110 of the building power consumption control system 100 also returns to step S9. Details of this normal-time power supply control process will be described later with reference to FIG.

[0111] (Normal power supply control processing) 4 is a flowchart showing an example of the flow of the normal power supply control process performed in this embodiment. As described above, this normal power supply control process is a process executed by the control unit 110 of the building power consumption control system 100 in step S91 of FIG.

[0112] In step S911, the control unit 110 of the building power consumption control system 100 executes a process for reading power information. Upon completing the process in step S911, the control unit 110 of the building power consumption control system 100 proceeds to step S9121.

[0113] In step S9121, the control unit 110 of the building power consumption control system 100 executes a process for reading information relating to a weather forecast. Upon completing the process in step S9121, the control unit 110 of the building power consumption control system 100 proceeds to step S9122.

[0114] In step S9122, the control unit 110 of the building power consumption control system 100 executes a process of calculating the amount of power generated in the building 10. Note that the power information, the information on the weather forecast, and the information on the amount of power generated in the building 10 do not change frequently. Therefore, each process of steps S911 to S9122 is executed at an update cycle of, for example, every 30 minutes. When the process of step S9122 is completed, the control unit 110 of the building power consumption control system 100 proceeds to step S9131.

[0115] In step S9131, control unit 110 of building power consumption control system 100 executes a process for reading occupant information. Upon completing the process in step S9131, control unit 110 of building power consumption control system 100 proceeds to step S9132.

[0116] In step S9132, the control unit 110 of the building power consumption control system 100 executes a process to determine whether or not there has been a change in the occupant information. If it is determined that there has been a change in the occupant information (step S9132: Y), the process proceeds to step S914 to calculate the amount of power estimated to be required to operate the air conditioners 60 and the lighting devices 70 in an emergency based on the new occupant information. On the other hand, if it is determined that there has been no change in the occupant information (step S9132: N), the occupant information is not updated and the process proceeds to step S9161.

[0117] In step S914, the control unit 110 of the building power consumption control system 100 executes a process of calculating, based on the new occupant information, the amount of power assumed to be required to operate the air conditioners 60 and the lighting devices 70 in an emergency. Upon completing the process in step S914, the control unit 110 of the building power consumption control system 100 proceeds to step S9151.

[0118] In step S9151, control unit 110 of building power consumption control system 100 executes a process of identifying the number of people who have difficulty moving on their own from information indicating the number of people and their characteristics on each floor included in the occupant information. Control unit 110 of building power consumption control system 100 may also identify the locations, characteristics, etc. of people who have difficulty moving on their own. When control unit 110 of building power consumption control system 100 completes the process in step S9151, it proceeds to step S9152.

[0119] In step S9152, the control unit 110 of the building power consumption control system 100 executes a process of calculating and updating the amount of power (required power for movement) required for the movement of the elevator 30. Note that the required power consumption changes depending on the current car position of the elevator 30, but information regarding changes in the car position is not subject to updating here. By performing the calculation assuming that the elevator car 33 is located on the reference floor or evacuation floor, it is possible to secure energy sufficient to rescue a person who has difficulty moving on his / her own. However, in the case of a long journey such as in a high-rise building, the calculated amount of power required for movement may have a considerable margin compared to the amount of power actually required. In that case, it is preferable to include a step of acquiring car position information from the elevator control device 31 in the calculation. When the process in step S9152 is completed, the control unit 110 of the building power consumption control system 100 proceeds to step S9161.

[0120] In step S9161, the control unit 110 of the building power consumption control system 100 executes a process of calculating the minimum amount of power required (minimum required amount of power) in the building 10. When the process in step S9161 is completed, the control unit 110 of the building power consumption control system 100 proceeds to step S9162.

[0121] In step S9162, the control unit 110 of the building power consumption control system 100 executes a process of calculating the minimum remaining amount of stored power (minimum remaining amount of stored power) taking into account the amount of power generation in the building calculated in step S9122. When the control unit 110 of the building power consumption control system 100 completes the process in step S9162, the control unit 110 proceeds to step S9163.

[0122] In step S9163, the control unit 110 of the building power consumption control system 100 executes a process of calculating an available discharge amount (usable discharge amount) by comparing the minimum remaining amount of stored power calculated in step S9162 with the current remaining amount of stored power. When the control unit 110 of the building power consumption control system 100 completes the process in step S9163, it proceeds to step S92.

[0123] In step S92, the control unit 110 of the building power consumption control system 100 executes a normal load control process. Details of this normal load control process will be described later with reference to Fig. 5. When the control unit 110 of the building power consumption control system 100 completes the process in step S92, the control unit 110 proceeds to step S917.

[0124] In step S917, the control unit 110 of the building power consumption control system 100 executes a process of issuing a charge / discharge command as a power supply control process, taking into account the contents of the normal load control process in step S92. When the control unit 110 of the building power consumption control system 100 completes the process in step S917, the control unit 110 proceeds to step S918.

[0125] In step S918, the control unit 110 of the building power consumption control system 100 executes a process to determine whether or not an update period has arrived. Here, since the occupant information changes successively, it is preferable to update it at short intervals, for example, every few seconds, but it is sufficient to update the power information every 30 minutes or so. Therefore, in this embodiment, 30 minutes is set as the initial value of this update period. If 30 minutes have already passed and it is determined that it is the update period (step S918: Y), the process returns to step S991 again to continue executing (continuing) the normal power supply control process. On the other hand, if 30 minutes have not passed and it is determined that it is not the update period (step S918: N), the process returns to step S9131 again to read the occupant information again.

[0126] This makes it possible to reliably evacuate people who have difficulty moving on their own in an emergency, and by controlling the power supply from outside the building 10 during normal times, it is possible to reduce carbon dioxide emissions, power bills, etc.

[0127] In the description of this embodiment, the update period set as the initial value in the building power consumption control system 100 is 30 minutes, but this update period may be any value that takes into account the respective properties and characteristics of the occupant information and power information, and the specific value can be changed by the designer as appropriate within that range.

[0128] In addition, in the description of this embodiment, it has been described that changes in the car position are not updated in the processing of step S9152, but the control unit 110 of the building power consumption control system 100 can also take changes in the car position into account when updating. Strictly speaking, the amount of power required for the movement of the elevator 30 changes depending on the car position. Therefore, when changes in the car position are also taken into account when updating, the building power consumption control system 100 can more accurately calculate the amount of power required.

[0129] (Normal load control processing) 5 is a flowchart showing an example of the flow of normal load control processing performed in this embodiment. This normal load control processing is processing for performing power saving control mainly based on information about people present in the building.

[0130] In step S921, control unit 110 of building power consumption control system 100 executes a process of predicting the movement of occupants based on occupant information and group management information used to control elevators 30. Upon completing the process in step S921, control unit 110 of building power consumption control system 100 proceeds to step S922.

[0131] In step S922, the control unit 110 of the building power consumption control system 100 executes a process to determine whether or not there are excess elevators 30, based on the movement of occupants estimated in step S921. If it is determined that there are excess elevators 30 (step S922: Y), the process proceeds to step S923 to perform elevator power-saving operation control, such as stopping some of the elevators. On the other hand, if it is determined that there are no excess elevators 30 (step S922: N), the process proceeds to step S924 without performing elevator power-saving operation control.

[0132] In step S923, control unit 110 of building power consumption control system 100 executes elevator power saving operation control processing such as stopping the operation of some of the elevators. When control unit 110 of building power consumption control system 100 completes the processing in step S923, it proceeds to step S924.

[0133] In step S924, the control unit 110 of the building power consumption control system 100 executes processing to perform power saving control of the elevators 30, air conditioners 60, lighting devices 70, etc. in accordance with the distribution of the number of people present on each floor. The control unit 110 of the building power consumption control system 100 also performs load control in conjunction with the power saving control. When the processing in step S924 is completed, the control unit 110 of the building power consumption control system 100 returns to step S921 again to continue executing (continuing) the normal load control processing.

[0134] By adding normal load control, electricity charges during normal times can be reduced even more effectively.

[0135] FIG. 6 is a diagram showing an example of an evacuation priority display in an emergency.

[0136] 6, at the landing of elevator 30 at the floor where the person with difficulty moving on his / her own is located, there are provided display devices (36a, 36b, 36c) corresponding to each of the elevators (30a, 30b, 30c) of the elevator 30, hall buttons (37a, 37b, 37c) for calling the corresponding elevators (30a, 30b, 30c) to the landing, and a wheelchair call device 38. In the case of this elevator 30, elevator A 30a in which the wheelchair call device 38 is installed is the wheelchair-accessible elevator 30.

[0137] As illustrated in FIG. 6, in an emergency, in order to reduce power consumption as much as possible, two of the three elevators (30a, 30b, 30c), namely, elevator B 30b and elevator C 30c, are stopped, and only elevator A 30a, which is a wheelchair-accessible elevator 30, is operated for evacuation. Therefore, the display devices (36b, 36c) corresponding to the two stopped elevators (30b, 30c) display "emergency stop." On the other hand, as illustrated in FIG. 6, the display device 36a corresponding to elevator A 30a, which continues to operate for the evacuation of people with difficulty moving on their own, displays "evacuation priority." This makes it possible to prevent non-target people from getting on elevator A 30a of the elevator 30 that continues to operate for the evacuation of people with difficulty moving on their own. Note that the display may be appropriately made, and the specific display content can be set arbitrarily by the designer. For example, the display may be made by other wording such as "for evacuation only."

[0138] It is technically possible to further reduce power consumption by turning off the display devices (36b, 36c) corresponding to the stopped elevators (30b, 30c) and turning off the display itself. However, the power consumption caused by turning on the display devices (36b, 36c) is smaller than the power consumption caused by continuing to operate the two stopped elevators (30b, 30c). Therefore, the control unit 110 of the building power consumption control system 100 cooperates with the control unit of the elevator control device 31 to turn on the display devices (36b, 36c) at least until the movement of the people who have difficulty moving on their own on the floor has been completed to the evacuation floor.

[0139] Also, a mechanism may be added so that only those with difficulty in moving on their own can board the elevator. For example, by making an audio announcement at the elevator hall in addition to the display, it is possible to further prevent non-eligible persons from boarding elevator A 30a of the elevator 30 that continues to operate for the evacuation of those with difficulty in moving on their own.

[0140] In addition, for example, if each user has a call registration (on a smart device owned by the user, etc.), it will be possible to smoothly guide them by notifying them, allowing for a smooth evacuation.

[0141] The above-described embodiment of the present invention can be summarized as follows.

[0142] (1) The building power consumption control system 100 is a system for controlling the power consumption of a building 10, and includes an occupant information storage unit 210 that records occupant information, which is information indicating the number of people on each floor of the building, and controls the power consumption of the building based on the occupant information. As a result, the building power consumption control system 100 can reduce the power consumption of the building 10 during normal times while enabling people who have difficulty moving on their own to evacuate using the elevators 30 in an emergency.

[0143] (2) Information on occupants includes the number of people who have difficulty moving around on their own.

[0144] (3) Information on occupants includes the number of wheelchair users.

[0145] (4) The building 10 further includes a power supply control unit 113 that controls the power supply to the building 10.

[0146] (5) The power supply control unit 113 controls the power rate related to the power supply from the commercial grid as an objective function.

[0147] (6) The power supply control unit 113 controls the amount of carbon dioxide emissions that occur due to power consumption as an objective function.

[0148] (7) The power supply control unit 113 performs control after securing the energy necessary for the evacuation of people in the building when power from the commercial grid is stopped.

[0149] (8) The energy required for the evacuation of occupants includes the energy required for occupants who have difficulty moving on their own, among the occupant information, to move by elevator 30 (elevator) to a floor where they can evacuate.

[0150] (9) Control the power load within the building 10 based on information about the people present.

[0151] (10) The power loads within the building 10 include at least one of air conditioning units 60, lighting units 70, and elevators 30.

[0152] (11) The elevator 30 is operated by the building power consumption control system 100 to guide people who have difficulty moving on their own to the evacuation floor when evacuation is necessary.

[0153] The present invention is not limited to the above-described embodiment, and can be implemented using any components without departing from the spirit of the present invention.

[0154] The above-mentioned embodiments, examples, and modifications are merely examples, and the present invention is not limited to these contents as long as the characteristics of the invention are not impaired. In addition, although various embodiments, examples, and modifications have been described above, the present invention is not limited to these contents. Other aspects that are conceivable within the scope of the technical idea of ​​the present invention are also included in the scope of the present invention.

[0155] In the above figures, the control lines and information lines are shown as those considered necessary for the explanation, and do not necessarily show all the control lines and information lines in the actual implementation. For example, it may be considered that almost all the components are actually connected to each other.

[0156] The above-described layout of the functional units of the building power consumption control system 100 is merely an example. The layout of the functional units can be changed to an optimal layout in terms of the performance, processing efficiency, communication efficiency, and the like, of the hardware and software included in the building power consumption control system 100. [Explanation of symbols]

[0157] 100: Building power consumption control system

Claims

1. A building power consumption control system for controlling power consumption in a building, comprising: a resident information storage unit that records resident information, which is information indicating the number of people on each floor of the building; The power consumption of the building is controlled based on the information of the people present in the building. Building power consumption control system.

2. The building power consumption control system according to claim 1 , wherein the information on occupants includes a number of people who have difficulty moving on their own.

3. The building power consumption control system according to claim 2 , wherein the occupancy information includes the number of wheelchair users.

4. The building power consumption control system according to claim 1 , further comprising a power supply control unit that controls the power supply to the building.

5. The building power consumption control system according to claim 4 , wherein the power supply control unit performs control using a power rate related to power supplied from a commercial grid as an objective function.

6. The building power consumption control system according to claim 4 , wherein the power supply control unit controls the amount of carbon dioxide emissions caused by power consumption as an objective function.

7. The building power consumption control system according to claim 5 , wherein the power supply control unit performs control after securing energy necessary for evacuation of people in the building in a state where power from the commercial grid is stopped.

8. The building power consumption control system of claim 7, wherein the energy required for the evacuation of the occupants includes the energy required for occupants who have difficulty moving on their own, among the occupant information, to move by elevator to a floor where they can evacuate.

9. The building power consumption control system according to claim 1 , further comprising: a power consumption control section for controlling a power load in the building based on the information on occupants.

10. The building power consumption control system according to claim 9 , wherein the power loads in the building include at least one of an air conditioner, a lighting device, and an elevator.

11. 3. An elevator that is operated by the building power consumption control system according to claim 2, when evacuation is necessary, to board the person who has difficulty moving on his / her own using a guidance means and move the person to an evacuation floor.

12. A building power consumption control method for controlling power consumption in a building, comprising: A computer having at least a processor and a storage device, Recording occupancy information, which is information indicating the number of people on each floor of the building; The power consumption of the building is controlled based on the information of the people present in the building. Building power consumption control method.

Citation Information

Patent Citations

  • Elevator control device

    JP2011116520A

  • Evacuation support system of elevator

    JP2011178483A