Game device and game system
The gaming device and system predict depreciation and operation contribution periods of gaming machines using calculation and AI, addressing the planning challenges of new machine operations in conventional systems.
Patent Information
- Application Number
- JP2023076475
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-08
- Publication Date
- 2024-11-20
AI Technical Summary
Conventional gaming systems lack effective methods to predict and manage the depreciation and operation contribution periods of gaming machines, making it difficult for managers to plan the operation of new machines.
A gaming device and system that calculates the cumulative number of game values using a first calculation means to determine the depreciation period and operation contribution period of gaming machines, outputting this information through a specifying and outputting means, and utilizing AI for enhanced prediction accuracy.
Enables managers to easily formulate operation plans for new machines by predicting depreciation and operation contribution periods, allowing for informed decisions on machine acquisition and management.
Smart Images

Figure 2024161652000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a gaming device and a gaming system capable of managing information regarding gaming machines installed in a gaming arcade. [Background technology]
[0002] 2. Description of the Related Art Gaming devices and gaming systems capable of managing information relating to gaming machines installed in gaming arcades are known. For example, Patent Document 1 discloses a gaming system that displays a graph showing the operating rate and price fluctuations in the used machine market for machines installed in the arcade. According to the gaming system described above, the manager of an amusement arcade can easily consider selling or purchasing additional machines installed in his / her arcade based on the degree of operation and the price on the secondhand machine market. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-14668 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, there is room for improvement in conventional systems. [Means for solving the problem]
[0005] In order to achieve the above-mentioned object, the gaming device of the present invention is a gaming device capable of managing information regarding gaming machines that can be introduced into an amusement facility and played by using gaming value, and is configured to include a first calculation means capable of calculating a cumulative gaming value number, which is a cumulative number of gaming values predicted to be used in the gaming machine, a first time determination means capable of determining a first time when the cumulative gaming value number calculated by the first calculation means is predicted to reach a specific gaming value number, which is a gaming value number corresponding to the original cost of the gaming machine, and a first output means capable of outputting information regarding the first time. [Brief description of the drawings]
[0006] [Figure 1] 1 is a schematic diagram of a gaming system according to one embodiment of the present invention. [Diagram 2] 2 is a block diagram showing the hardware configuration of a hall computer. FIG. [Diagram 3] FIG. 2 is a block diagram showing a hardware configuration of a server. [Figure 4] 1 is a chart showing an example of information (game information, specification information, etc.) regarding each gaming machine. [Diagram 5] 13 is a flowchart showing a depreciation analysis process. [Figure 6] 1 is an example of a setting screen that can be displayed on a hall computer. [Figure 7] 1 is a depreciation weekly graph. [Figure 8] 13 is a flowchart showing an operation contribution analysis process. [Figure 9] This is a graph showing the week of operation contribution. [Figure 10] 1 is a flowchart showing a depreciation analysis process using AI. [Figure 11] 11 is a flowchart illustrating an operation contribution analysis process using AI. [Figure 12] 12 is a graph showing the operation contribution week based on the processing of FIG. 11 . [Figure 13] This is a graph showing both depreciation weeks and operating contribution weeks. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0007] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a schematic diagram of a gaming system according to one embodiment of the present invention. As shown in FIG. 1, the gaming system of this embodiment is composed of gaming machines 1 installed in each gaming parlor (store), a hall computer 4 capable of acquiring, compiling, and outputting information (game information) relating to the gaming machines 1, a server 6 capable of acquiring, compiling, and outputting information (game information, specification information, etc.) relating to the gaming machines 1 installed in each store by communicating with the hall computer 4 etc. on a regular or irregular basis, and a terminal device 7 such as a smartphone or personal computer used by a store manager, for example. In this gaming system, the server 6 outputs graph information showing the depreciation period and operation contribution period for new models (models not yet introduced) based on information (game information, specification information, etc.) about the gaming machines 1 installed in each store, and enables the graph to be displayed on the hall computer 4 or terminal device 7.
[0008] As shown in FIG. 1, each store is equipped with gaming machines 1 (pachinko machines 1a and pachislot machines 1b). A rental machine 2 (2a for pachinko machines, 2b for pachislot machines) that rents gaming media to players is arranged adjacent to the gaming machine 1, and players play in the following order. For example, when starting a game, a player inserts cash or a predetermined card into the lending machine 2 arranged corresponding to the gaming machine 1, and lends gaming media by performing a predetermined lending operation. The lent gaming media is then inserted into the gaming machine 1. In the pachinko machine 1a, a player operates a launch handle to launch game balls, which are game media, into a game area, and when the launched game balls enter a predetermined winning hole, a predetermined number of game balls are paid out. In the pachislot machine 1b, the player inserts a medal as the gaming medium and operates the start lever, causing multiple reels displaying predetermined pictures, letters, numbers, and other designs to begin rotating. The reels can be stopped by pressing multiple stop buttons corresponding to each reel at any time, and a predetermined number of medals are paid out according to the arrangement of the designs on the stopped reels. A rental rate for the gaming machine 1 is set for each store. For example, depending on the store, there are pachinko machines 1a (1 yen pachinko) with a rental rate of 1 game ball per ball of 1 yen, and there are pachinko machines 1a (4 yen pachinko) with a rental rate of 1 game ball per ball of 4 yen. In addition, there are pachislot machines 1b (5 yen slots) with a medal rental rate of 5 yen per medal, and pachislot machines 1b (20 yen slots) with a medal rental rate of 20 yen per medal. The gaming machine 1 and the rental machine 2 are communicatively connected to a hall computer 4 via a LAN 3 and a relay device (not shown), and various gaming signals are transmitted from the gaming machine 1 and the rental machine 2 to the hall computer 4. The gaming signals include an out signal that is output in response to the number of gaming media inserted into gaming machine 1, a safe signal that is output in response to the number of gaming media paid out from gaming machine 1, and a lending signal that is output in response to a lending operation at lending machine 2.
[0009] The hall computer 4 is an information processing device that operates according to a program, and is communicatively connected to the gaming machines 1 via a LAN 3, and is communicatively connected to a server 6 via a public line 5 such as the Internet. As shown in FIG. 2, the hall computer 4 includes a memory unit 41, a communication unit 42, an operation unit 43, a display unit 44, and a control unit 45. The storage unit 41 is configured with a storage medium (for example, a ROM, a RAM (memory), a hard disk, an SSD, etc.) capable of storing programs and data for executing various functions of the hall computer 4. The storage unit 41 stores information (game information, specification information, etc.) about the gaming machines 1 installed in the own store. For example, for each gaming machine, game information such as out or safe, and specification information such as PS classification, model, rental rate, setting value, operation start date (introduction date), sales group, category, manufacturer, model type, cost price, and gross profit on balls are stored. The communication unit 42 is connected to the server 6 via the public line 5 so as to be able to communicate with each other. As a result, the communication unit 42 transmits to the server 6 information (game information, specification information, etc.) relating to the gaming machine 1 installed in the own store. The operation unit 43 is an operation means such as a keyboard and a mouse. The display unit 44 is a display means such as a liquid crystal display. The display unit 44 can display graphs relating to depreciation weeks and operation contribution weeks. The hall computer 4 is equipped with software (browser) that displays the information received from the server 6 in a viewable manner. Therefore, a graph relating to the depreciation week and the operation contribution week can be displayed on the display unit 44 using the functions of the browser.
[0010] The control unit 45 is composed of a CPU and the like, and performs the following operations by reading and executing the programs stored in the storage unit 41. Specifically, game information regarding all the gaming machines 1 installed in the store can be acquired, calculated, and compiled. For example, the hall computer 4 inputs game signals output from the pachinko machine 1a, the pachislot machine 2b and the rental machine 2, and calculates and tallys up game information such as out or safe, and can also tally up each piece of game information by categories such as PS classification, machine type, rental rate, setting value, operation start date, sales group, category, manufacturer, machine type, cost price, gross profit on balls, and send the tally to the server 6.
[0011] The terminal device 7 is, for example, a smartphone or a personal computer used by a store manager. The terminal device 7 has almost the same configuration as the hall computer 4. Although not shown, the terminal device 7 includes a storage unit, a communication unit, an operation unit, a display unit 71, and a control unit. The terminal device 7 is equipped with software (browser) that displays the information received from the server 6 in a viewable manner, and the browser's functions make it possible to display graphs relating to depreciation weeks and operation contribution weeks on the display unit 71. Description of the other components will be omitted.
[0012] The server 6 is an example of a gaming device of the present invention, which predicts the depreciation period and operation contribution period of new models, and transmits graph information including the prediction results to the hall computer 4 and the terminal device 7. The server 6 is an information processing device that operates according to a program, and is communicably connected to the hall computer 4 and terminal devices 7 via a public line 5 such as the Internet. As shown in FIG. 3, the server 6 includes a storage unit 61, a communication unit 62, and a control unit 63.
[0013] The storage unit 61 is configured with a storage medium (for example, a ROM, a RAM (memory), a hard disk, an SSD, etc.) capable of storing programs and data for executing various functions of the server 6. The storage unit 61 manages (stores) information (game information, specification information, etc.) about the gaming machines 1 of each arcade received from each gaming arcade (hall computer 4) throughout the country (prefectures). FIG. 4 is an example of information stored in the storage unit 61 regarding the gaming machines 1 of each arcade. The memory unit 61 stores, for each gaming machine 1, game information such as out or safe, and specification information such as PS classification, model name, rental rate, setting value, operation start date, sales group, category, manufacturer, model type, cost price, and gross profit on balls. The communication unit 62 transmits and receives various information related to the gaming machines 1 installed in each gaming facility nationwide to and from the terminal devices 7 and the hall computer 4. "PS classification" is information indicating whether the machine is a pachislot machine 1b or a pachinko machine 1a. In the case of the pachislot machine 1b, the "machine type" includes normal type (A type), AT type, ART type, A+ART type, Okinawa slot type, etc., while in the case of the pachinko machine 1a, the "sweet digital type", "max type", "middle type", "light middle type", "wing type", etc. For example, in the case of six stages, the "set value" is numerical information from 1 to 6. It is not limited to six stages, but may be five stages or less, and does not have to be numerical information as long as the stages are specified. "Category information" is information that indicates various categorization information (for example, the series name given to a series of models, the names of affiliated manga / anime or singers, original names when classified uniquely, etc.).
[0014] The control unit 63 is composed of a CPU and the like, and executes various processes by reading and executing programs stored in the storage unit 61. For example, the total outs for each week that has elapsed since the date of implementation (hereinafter also referred to as the “weekly total outs”) are tallied, and the tallied results are stored in the memory unit 61. In addition, depreciation analysis and operation contribution analysis are performed for new models that have not yet been introduced. In this way, the server 6 is a gaming device capable of managing information about gaming machines that can be installed in an amusement facility and on which games can be played by using gaming values.
[0015] (Depreciation Analysis Processing) Explain the depreciation analysis process. In the depreciation analysis process, the control unit 63 functions as a first calculation means to calculate the accumulated number of game values, which is the accumulated number of game values predicted to be used in the gaming machine. The "number of gaming values" is the number of gaming media (out) that are predicted to be inserted into an unintroduced gaming machine 1 such as a new model. Specifically, the first calculation means calculates the cumulative number of outs (number of playing values) predicted to be used in an unintroduced gaming machine 1 (cumulative outs (predicted)) based on the outs (number of playing values) used in an introduced gaming machine 1. The gaming value number is not limited to outs, and other gaming value information such as the difference number or the amount of money inserted may be used. The control unit 63 functions as a first time period specification means, and specifies a first time period when the cumulative play value number (out cumulative (prediction)) calculated by the first calculation means is predicted to reach a specific play value number, which is a play value number corresponding to the cost of the gaming machine 1. In other words, for each gaming machine 1, the control unit 63 predicts the time when the depreciation (cost) of the gaming machine 1 will be amortized. Then, the control unit 63 functions as a first output means, and outputs information relating to the first period. Specifically, as the "first period," the time when the cumulative outs (forecast) of the new gaming machine 1 will reach its original cost (for example, the depreciation week) is notified to the hall computer 4 and terminal device 7 and displayed; and as the "information relating to the first period," the number of depreciation weeks (the number of weeks from the installation date to the depreciation week) is notified to the hall computer 4 and terminal device 7 and displayed. The "period" is not limited to a week, but may be other periods such as a day or a month. The specific process of the depreciation analysis process will be described with reference to the flowchart shown in FIG.
[0016] FIG. 5 is a flowchart showing the depreciation analysis process. As shown in the figure, in the depreciation analysis process, first, a target model is selected (S11). For example, this can be done by a store manager operating the hall computer 4. FIG. 6 is an example of a setting screen (Web screen) displayed on the display unit 44 of the hall computer 4. The setting screen displays, for each model named "New Models X to Z," the "Sales Group," "Cost," "Gross Margin," and "Start Date of Operation," and the store manager can select any model as the target model by operating the operation unit 43 while looking at this screen. In this embodiment, it is assumed that "new model X" is selected as the target model. In response to the selection of the target model "new model X", the server 6 stores in the storage unit 61 information indicating that the target model is "new model X". This makes it possible to identify the "sales group," "cost," "gross profit," and "start date of operation" for model X.
[0017] Next, the server 6 calculates the number of outs y1 required for depreciation for the new model X (S12). In other words, the number of outs (depreciation number of outs y1) corresponding to the cost price (purchase price) of the new model X is calculated. Specifically, the depreciation out number y1 is calculated based on the following formula 1. y1=x1 / x2...Equation 1 (x1: cost price (yen / unit), x2: gross profit (yen / out)) The server 6 calculates the depreciation out quantity y1 of the new model X as 2,500,000 (=500,000 / 0.2) since the cost x1 of the new model X is 500,000 yen / unit and the gross profit x2 is 0.2 yen / out.
[0018] Next, the server 6 calculates the outs (performance) of models related to the new model X (hereinafter, referred to as related models) among the models that have already been introduced (S13). In this example, it is assumed that models A to E that have the same rate (same rental rate) as model X and have been introduced within the last six months are selected as related models. If the number of models A through E nationwide is M, the average weekly out totals (actual results) for models A through E are calculated as follows: If the total outs for the first week after the introduction of models A to E (from the introduction date to one week after introduction) are a: Average outs for the first week (actual) = a / M If the total outs for the second week after the introduction of models A to E (the period from the first week to the second week after the introduction) are b: Average total outs for the second week (actual) = b / M ... If the total outage for the Nth week after the introduction of models A to E (the period from "N-1" week to N weeks after the introduction) is n: Average total outage for the Nth week (actual) = n / M In other words, the total outs (actual results) for each installed model for each week is calculated. In addition, the average of the total outs at a store or affiliated stores may be calculated instead of the national average.
[0019] Next, the server 6 calculates the out (prediction) of the new model X (S14). Specifically, the total out (actual results) from the 1st week to the Nth week calculated in S13 is set as the total out (forecast) for each week of the new model X. Specifically, it is as follows. -Total outs in the first week after the introduction of new model X (forecast): a / M - Total outs in the second week after the introduction of new model X (forecast): b / M ... -Total outs in the Nth week after the introduction of new model X (prediction): n / M
[0020] Next, the server 6 calculates the out cumulative (predicted) y2 of the new model X (S15). Specifically, the calculation is performed as follows using the calculation result of S14. Cumulative outs (forecast) for the first week after the introduction of new model X: y2=a / M - Cumulative outs (forecast) for the second week after the introduction of new model X: y2=a / M+b / M ... · Cumulative outs (forecast) for the Nth week after the introduction of new model X: y2=a / M+b / M+···+n / M
[0021] Next, the server 6 identifies the depreciation week (S16). Specifically, the first week that satisfies y1≦y2 is identified as the depreciation week. In this embodiment, the cumulative out (forecast) y2 up to the eighth week after the introduction of the new model X is 2,511,000, and since y1 is the first to exceed 2,500,000, the eighth week after the introduction is identified as the depreciation week. That is, if the implementation date is March 1, 2024, the week of May 3, 2024 would be identified as the depreciation week. The depreciation week may be determined by multiplying y2 by a predetermined coefficient (depreciation rate).
[0022] Next, the server 6 creates a graph (S17). Specifically, a depreciation weekly graph is created. The server 6 transmits the generated graph information to the hall computer 4. This makes it possible to display the graph on the display unit 44 of the hall computer 4. Figure 7 is a depreciation weekly graph. As shown in FIG. 7, in the depreciation week graph, the horizontal axis represents the time elapsed from the implementation date (weekly information), and the vertical axis represents the out-cumulative (forecast) y2. Then, the cumulative (forecast) outs y2 of new model X are plotted for each week and shown as a line (solid line). The depreciation week graph shown in FIG. 7 displays information indicating that the depreciation week, that is, the first week that satisfies y1≦y2, is the week of May 3, 2024. For example, the depreciation week "week of May 3, 2024" is surrounded by a frame, the cumulative out (forecast) at that time "2511000" is surrounded by a circle, and the position on the solid line is displayed as a dot. A graph can be generated that identifies the depreciation weeks. For example, the period from the introduction date of the new model "March 1, 2024" to the depreciation week "the week of May 3, 2024" is displayed with an arrow as the "number of depreciation weeks."
[0023] This allows the store manager to forecast depreciation dates and facilitates operational planning. In addition, the ball gross profit (setting value and nail adjustment) for new models can be set by referring to the graph, which prevents the settings from becoming dependent on one person.
[0024] (Operation contribution analysis processing) The operation contribution analysis process will be described. In the operation contribution analysis process, the control unit 63 functions as a second calculation means to calculate the number of gaming values predicted to be used in the gaming machine. The control unit 63 functions as a second time period determination means, thereby determining a second time period when the number of play values calculated by the second calculation means is predicted to reach the corresponding number of play values of the entire specific gaming machine. Then, the control unit 63 functions as a second output means, and outputs information relating to the second period. The specific process of the operation contribution analysis process will be described with reference to the flowchart shown in FIG.
[0025] FIG. 8 is a flowchart showing the operation contribution analysis process. As shown in the figure, in the operation contribution analysis process, first, a target model is selected (S21), which is the same process as S11 in FIG. For example, this can be done by a store manager operating the hall computer 4. FIG. 6 is an example of a setting screen (Web screen) displayed on the display unit 44 of the hall computer 4. The setting screen displays, for each model named "New Models X to Z," the "Sales Group," "Cost," "Gross Margin," and "Start Date of Operation," and the store manager can select any model as the target model by operating the operation unit 43 while looking at this screen. In this embodiment, it is assumed that "new model X" is selected as the target model. In response to the selection of the target machine type "new machine type X", the server 6 stores information indicating that the target machine type is "new machine type X" in the storage unit 61. Note that the game information of machine type X and specification information such as "sales group", "cost", "gross profit on balls", and "operation start date" are stored in the storage unit 61 in advance.
[0026] Next, the server 6 calculates the outs (achievements) of models (related models) related to the new model X among the models that have already been introduced (S22). In this example, it is assumed that models A to E that have the same rate (same rental rate) as model X and have been introduced within the last six months are selected as related models. If the number of models A through E nationwide is M, the average (actual) weekly out totals for models A through E are calculated as follows: If the total outs for the first week after the introduction of models A to E (from the introduction date to one week after introduction) are a: Average of the total outs for the first week (actual) = a / M If the total outs for the second week after the introduction of models A to E (the period from the first week to the second week after the introduction) are b: Average of the total outs for the second week (actual results) = b / M ... If the total outs for the Nth week after the introduction of models A to E (the period from "N-1" week to N weeks after the introduction) are n: Average of the total outs for the Nth week (actual results) = n / M
[0027] Next, the server 6 calculates the out (prediction) y3 of the new model X (S23). Specifically, the average (actual results) of the total outs from the first week to the Nth week calculated in S22 is set as the weekly outs (prediction) y3 of the new model X. Specifically, it is as follows. - Average outage in the first week after introduction of new model X (forecast) y3:a / M - Average outage in the second week after the introduction of new model X (forecast) y3:b / M ... - Average outage (forecast) y3:n / M in the Nth week after the introduction of new model X
[0028] Next, the server 6 calculates the national average out y4 of the new model X and a model related to the new model (related model) (S24). Specifically, if the total nationwide out-of-pocket sales for a model with the same rate as new model X in the most recent month is W, the national average out-of-pocket sales y4 is calculated as y4 = W / 4. In addition, the out-time is not limited to the most recent month, but may be, for example, the most recent two months or the national average out-time for a specific period.
[0029] Next, the server 6 identifies the operation contribution week (S25). Specifically, the first week that satisfies y3≦y4 is identified as the operation contribution week. For example, if y4=360,000 and the out-average (forecast) of new model X falls below 360,000 for the first time in the week of April 19, 2024, that week is identified as the operation contribution week. This is because, although the number of outs for a new model exceeds the national average when it is first introduced, as time passes after its introduction, the number of outs often decreases and falls below the national average. In other words, when the number of outs of a new model exceeds the national average number of outs, it can be determined that it is contributing to operation, and when the number of outs of a new model is below the national average number of outs, it is determined that it is not contributing to operation, so the week that corresponds to this critical point is identified as the week that contributes to operation.
[0030] Next, the server 6 creates a graph (S26). Specifically, an operation contribution week graph is created. The server 6 transmits the generated graph information to the hall computer 4. This makes it possible to display the graph on the display unit 44 of the hall computer 4. Figure 9 is a graph of the week of operation contribution. As shown in FIG. 9, in the operation contribution week graph, the horizontal axis represents the time elapsed from the implementation date (weekly information), and the vertical axis represents out. Then, the out average (forecast) y3 of new model X is plotted on a weekly basis and shown as a line (solid line), along with the national average out (latest) y4. The operating contribution week will be the first week that satisfies y3≦y4: "the week of April 19, 2024." For example, the operating contribution week "April 19, 2024" is surrounded by a frame, and its location on the solid line is displayed as a dot. In addition, the period from the introduction date of new model X "March 1, 2024" to the operation contribution week "the week of May 3, 2024" is displayed with an arrow as the number of operation contribution weeks.
[0031] This allows the store manager to predict when the utilization contribution will change, making it easier to create operational plans. In addition, the ball gross profit (setting value and nail adjustment) for new models can be set by referring to the graph, which prevents the settings from becoming dependent on one person.
[0032] The depreciation analysis process and the operation contribution analysis process can also be performed using AI (Artificial Intelligence), for example, machine learning such as deep learning.
[0033] (About depreciation analysis processing using AI) Figure 10 is a flowchart showing the depreciation analysis process using AI. As shown in Fig. 10, in the depreciation analysis process using AI, first, a target model is selected (S31), which is the same process as S11 in Fig. 5. In this embodiment, it is assumed that "new model X" is selected as the target model. In response to the selection of the target machine type "new machine type X", the server 6 stores information indicating that the target machine type is "new machine type X" in the storage unit 61. Note that the game information of machine type X and specification information such as "sales group", "cost", "gross profit on balls", and "operation start date" are stored in the storage unit 61 in advance. Next, the server 6 calculates the number of outs y1 required for depreciation for the new model X (S32). Since this is the same process as S12, a detailed description will be omitted.
[0034] Next, the server 6 generates an out-prediction model M1 for the new model X (S33). Specifically, the correlation is learned between the weekly out total (actual performance) of the introduced model stored in the memory unit 63, the weekly information indicating the week from the introduction date, and the characteristic information (specification information). "Weekly out total (actual results)" refers to, for example, the out total (actual results) for each of the first week, second week, ..., Nth week from the implementation date. The characteristic information is information indicating characteristics of the gaming machine 1 such as its model name, manufacturer name, PS classification, model type, information on whether or not there is a stage setting, setting values, cabinet image, category name, etc., such as its appearance and playability. The characteristic information may also include the day of the week, holidays, weather, and local characteristics. For example, since out is inferred to have a correlation with time series information, it can also be learned by linking it to time series information. This makes it possible to generate a trained model (out total prediction model M1) that can output the out total (prediction) for each of the 1st, 2nd, and . . . Nth weeks from the introduction date (March 1, 2024) by inputting the feature information and week information (1st week, 2nd week, .... Nth week) of new model X.
[0035] Next, the server 6 calculates the out (prediction) of the new model X (S34). Specifically, the out-total prediction model M1 generated in S33 is made to output the out-total (predicted): w1, w2, ... wn for the first, second, ... Nth week of March 2024 for new model X.
[0036] Next, the server 6 calculates the out cumulative total (prediction) y2 of the new model X (S35). Specifically, the calculation is performed as follows using the calculation result of S34. Cumulative outs (forecast) of new model X until the first week of March 2024 y2 = w1 - Cumulative outs (forecast) of new model X until the second week of March 2024 y2 = w2 ... · Cumulative outs of new model X until the Nth week of March 2024 (forecast) y2 = w1 + w2 + ··· + wn
[0037] Next, the server 6 identifies the depreciation week (S36). Since this is the same process as S16 in FIG. 5, a description thereof will be omitted. Then, the server 6 creates a graph (S37). Since this is the same process as S17 in FIG. 5, the description will be omitted.
[0038] (About operation contribution analysis processing using AI) FIG. 11 is a flowchart showing the operation contribution analysis process using AI. 11, in the AI-based operation contribution analysis process, first, a target model is selected (S41). This is the same process as S11 in FIG. 5. In this embodiment, it is assumed that "new model X" is selected as the target model. In response to the selection of the target machine type "new machine type X", the server 6 stores information indicating that the target machine type is "new machine type X" in the storage unit 61. Note that the game information of machine type X and specification information such as "sales group", "cost", "gross profit on balls", and "operation start date" are stored in the storage unit 61 in advance.
[0039] Next, the server 6 generates an out-prediction model M1 for the new model X (S42). This is the same process as S33 in FIG. 10, so a description thereof will be omitted.
[0040] Next, the server 6 generates a national average out-of-stock prediction model M2 for the new model X and related models (S43). Specifically, from among the introduced models stored in memory unit 63, models with the same rental rate as new model X are extracted as related models, and the correlation between the weekly information and past weekly out-of-pocket totals (actual results) is learned to generate a national average out-of-pocket prediction model M2 capable of outputting future weekly national average out-of-pocket totals (predictions). In other words, by inputting the weekly information, a trained model M2 is generated that can output the national average out total (prediction) for the first, second, ..., Nth week from the implementation date (March 1, 2024). In addition to or instead of the lending rate, other characteristic information may also be used as the learning target.
[0041] Next, the server 6 causes the model M1 to output the out (prediction) y3' of the new model X (S44). Specifically, the out prediction model M1 generated in S42 is caused to output the out totals (predictions) for the first, second, ....Nth week of March 2024.
[0042] Next, the server 6 causes the model M2 to output the national average out (prediction) y4' (S45). Specifically, the national average out model M2 generated in S43 is made to output the national average out totals (forecast) for the first, second, and Nth weeks of March 2024.
[0043] Next, the server 6 identifies the operation contribution week (S46). Specifically, the week in which the out of model X output in S44 is predicted to reach the national average out output in S45 is specified. This is because the number of outs for a new model exceeds the national average when it is first introduced, but as time passes after its introduction, the number of outs decreases, and in many cases it ends up falling below the national average.
[0044] Then, the server 6 creates a graph (S47). This is the same process as S26 in FIG. Specifically, as shown in FIG. 12, the weekly out total (forecast) y3' of new model X is plotted and represented by a broken line (solid line), and the weekly national average out total (forecast) y4' is plotted. Then, the first week that satisfies y3'≦y4': "the week of April 19, 2024" is displayed as the operation contribution week. For example, the operating contribution week "April 19, 2024" is surrounded by a frame, and its location on the solid line is displayed as a dot. In addition, the period from the new model's introduction date "March 1, 2024" to the operation contribution week "the week of May 3, 2024" is displayed with an arrow as the number of operation contribution weeks.
[0045] In this way, in the present invention, depreciation analysis processing and operation contribution analysis processing can be performed using AI. This makes it possible to predict operation with high accuracy without any manual processing. This makes it easy to plan the operation of new models.
[0046] A graph showing the results of the depreciation analysis and a graph showing the results of the operation contribution analysis can also be created together. FIG. 13 is an example of a graph summarizing the depreciation analysis results and the operation contribution analysis results. Such a graph allows the depreciation period and the operation contribution period to be confirmed at a glance. This will make it even easier to create operational plans for new models.
[0047] As described above, the server 6 (gaming device) and gaming system of the present invention are equipped with a first calculation means capable of calculating an accumulated out (prediction) (accumulated gaming value number), which is the accumulated number of outs (play value numbers) predicted to be used in the gaming machine 1, a first period determination means capable of determining a depreciation week (first period) in which the accumulated gaming value number calculated by the first calculation means is predicted to reach a specific gaming value number, which is a gaming value number corresponding to the original cost of the gaming machine 1, and a first output means capable of outputting information relating to the first period. In addition, the first calculation means calculates the cumulative outs (prediction) (cumulative number of play values) predicted to be used in an unintroduced model X (gaming machine 1) based on the actual number of outs (number of play values) used in an introduced model (gaming machine 1). The first output means is also capable of displaying, in a graph, the depreciation weeks and the number of depreciation weeks, which are the period from the introduction of the gaming machine to the first time period. In addition, the server 6 (gaming device) and gaming system of the present invention are equipped with a second calculation means capable of calculating the out (prediction) (number of gaming values) predicted to be used in the gaming machine 1, a second period determination means capable of determining the operation contribution week (second period) in which the number of gaming values calculated by the second calculation means is predicted to reach the national average out (the corresponding number of gaming values of all specific gaming machines), and a second output means capable of outputting information regarding the second period. The second output means is capable of displaying, in a graph, the operation contribution weeks and the number of operation contribution weeks, which are the period from the introduction of the gaming machine 1 to the second period. This makes it easy to create an operation plan for a model that has not yet started operation, i.e., a new model. For example, if the period of operational contribution is long or the depreciation period is short, longer operation periods can be anticipated by lowering the gross profit margin (for example, by widening the navel nail or setting it higher). Conversely, if the period of operational contribution is short or the depreciation period is long, the gross profit margin can be increased (for example, by narrowing the navel nail or setting it lower) so that depreciation can be carried out during periods of high operating rates. In contrast, with the gaming system of conventional technology (Patent Publication No. 2020-14668), store managers could easily consider selling or purchasing additional machines installed in their store based on the level of operation and prices on the used machine market. However, in conventional gaming systems, it has been difficult to create operational plans for new machine types. According to the present invention, since an operation plan for a new model can be easily made, it is possible to solve some or all of the problems of the conventional art.
[0048] Although the preferred embodiments of the present invention have been described above, it goes without saying that the present invention is not limited to the above-described embodiments, and various modifications can be made within the scope of the present invention. For example, sales and the like may be included in the gaming information. In addition, the configuration and method for generating a model M capable of outputting a predicted operation value for any model by using actual operation values for all models in all stores has been explained. However, it is also possible to generate a model capable of outputting a predicted operation value for a target gaming machine 1 (a gaming machine of a specific store, model, manufacturer, model type, rental rate, etc.) by using actual operation values for the target gaming machine 1. The present invention can also be applied to so-called enclosed gaming machines that can execute games using pseudo gaming media in data format, without using actual gaming media such as medals or gaming balls. In addition, outages and the like may be predicted not only for new models but also for models that have already been introduced. [Explanation of symbols]
[0049] 1. Gaming machines 4 Hole Computer 44 Display section 6 Server 61 Storage section 62 Communications Department 63 Control Unit 7 Terminal Equipment 71 Display section M1 New Model Out Prediction Model M2 National average out prediction model
Claims
1. A gaming device capable of managing information regarding a gaming machine that can be introduced into an amusement facility and that can be played by using a gaming value, A first calculation means for calculating a cumulative gaming value number which is a cumulative total of gaming value numbers predicted to be used in the gaming machine; A first time specifying means for specifying a first time when the cumulative number of game values calculated by the first calculation means is predicted to reach a specific number of game values, which is a number of game values corresponding to the original cost of the gaming machine; A first output means capable of outputting information relating to the first period. A gaming device comprising:
2. The first calculation means The accumulated number of gaming values predicted to be used in unintroduced gaming machines can be calculated based on the number of gaming values used in introduced gaming machines.
2. The gaming device according to claim 1.
3. The first output means is The period from the introduction of the gaming machine to the first period can be displayed in a graph.
2. The gaming device according to claim 1.
4. A gaming device capable of managing information regarding a gaming machine that can be introduced into an amusement facility and that can be played by using a gaming value, A second calculation means capable of calculating a number of gaming values predicted to be used in the gaming machine; A second time specifying means for specifying a second time when the number of game values calculated by the second calculation means is predicted to reach the number of game values corresponding to the specific gaming machines; and a second output means capable of outputting information relating to the second time period. A gaming device comprising:
5. The second output means is The period from the introduction of the gaming machine to the second time period can be displayed in a graph.
5. The gaming device according to claim 4.
6. The number of game values is the number of game media inserted in a game on the gaming machine.
5. The gaming device according to claim 1 or 4.
7. A gaming system including a gaming machine that can be introduced into an amusement facility and can be played by using a gaming value, and a gaming device that can manage information about the gaming machine, A first calculation means for calculating a cumulative gaming value number which is a cumulative total of gaming value numbers predicted to be used in the gaming machine; A first time specifying means for specifying a first time when the cumulative number of game values calculated by the first calculation means is predicted to reach a specific number of game values, which is a number of game values corresponding to the original cost of the gaming machine; A first output means capable of outputting information relating to the first period; A gaming system comprising:
Citation Information
Patent Citations
Device for games
JP2020014668A