Piping protection structure, piping structure and piping installation method
The piping protection structure uses a mooring section with seabed weights and floats to maintain piping in a floating state, addressing the high cost of underwater installation and enhancing protection and repair efficiency.
Patent Information
- Application Number
- JP2023077944
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-10
- Publication Date
- 2024-11-21
AI Technical Summary
The installation of piping systems underwater for offshore aquaculture is costly due to the need for multiple half-split pipes to protect against seabed obstacles, particularly rocky areas.
A piping protection structure that includes a mooring section with a weight section on the seabed and connecting sections, along with floats to maintain the piping in a floating state, allowing it to be installed with reduced complexity and cost.
The structure effectively protects piping from seabed hazards while reducing installation costs by maintaining the piping in a floating state, simplifying the installation process, and facilitating easier repair and identification of damage.
Smart Images

Figure 2024162441000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a piping protection structure for protecting piping that transports air, a piping structure, and a piping installation method. [Background technology]
[0002] Conventionally, a pair of half pipes has been known as a protective structure for a long body such as a cable or a water intake pipe that is installed on the seabed (see, for example, Patent Document 1). When attaching such a protective structure to a long body, an operator dives into the sea, places the long body between the pair of half pipes, and fixes the pair of half pipes together with bolts or the like.
[0003] In recent years, large-scale offshore aquaculture has been developed, and there exists a transport system for transporting feed to a group of fish cages offshore, the transport system comprising a feed storage tank installed on land or at sea, a pipe extending from the feed storage tank to the vicinity of the fish cages, and an air source for supplying compressed air into the pipe (see, for example, Patent Document 2). In such a transport system, the feed is transported by air current inside the pipe. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Patent No. 6363283 [Patent Document 2] JP 2018-011572 A Summary of the Invention [Problem to be solved by the invention]
[0005] In the transportation system described in Patent Document 2, the pipes are mainly arranged on the sea surface, but the present inventors are considering installing the pipes underwater where they are less susceptible to external influences such as weather and ships. Normally, when installing pipes underwater, it is considered to use a pair of half pipes as described in Patent Document 1 to protect the pipes from rocks on the seabed. However, in order to protect the pipes over a certain length, it is necessary to prepare a large number of half pipes, which increases the cost of installation.
[0006] An object of the present invention is to provide a piping protection structure, a piping structure, and a piping installation method that can protect piping that transports air from the seabed at low cost. [Means for solving the problem]
[0007] A piping protection structure according to one embodiment of the present invention is a structure for protecting a piping that transports air from the seabed, and includes a mooring portion for mooring the piping floating in the sea at a position vertically above and away from the seabed.
[0008] In one aspect of the present invention, it is preferable that the mooring portion comprises a weight portion placed on the seabed along the longitudinal direction of the piping, and a plurality of connecting portions connecting between the weight portion and the piping.
[0009] In one aspect of the present invention, the weight portion is preferably a chain arranged along the longitudinal direction of the pipe relative to the seabed.
[0010] A piping protection structure according to one embodiment of the present invention further includes a plurality of floats attached to the piping, and it is preferable that the plurality of floats have buoyancy that enables the piping to float in the sea in the event that seawater enters the piping. In addition, in one aspect of the present invention, it is preferable that the plurality of floats have buoyancy that enables the pipe to float in the sea when the pipe is filled with seawater. In addition, in one aspect of the present invention, it is preferable that the multiple floats have buoyancy that enables the pipe to float in the sea when seawater fills the pipe and aquatic organisms are attached to the pipe.
[0011] In one aspect of the present invention, it is preferable that an attachment position of the float relative to the pipe in the longitudinal direction of the pipe coincides with a connection position of the connection part relative to the pipe.
[0012] In one aspect of the present invention, it is preferable that the piping is arranged from a non-rocky area to a rocky area, and in the multiple connecting portions, the vertical length of the connecting portion between the piping and the weight portion is adjusted so as to gradually become longer from the non-rocky area toward the rocky area.
[0013] In one aspect of the present invention, it is preferable that an exposed space exists between adjacent connection portions in the longitudinal direction of the pipe, allowing an outer surface of the pipe to be exposed to the sea.
[0014] A piping structure according to one embodiment of the present invention comprises the above-mentioned piping protection structure, a first piping as the piping to which the piping protection structure is attached, a second piping connected continuously to the first piping and to which the piping protection structure is not attached, a second weight portion arranged on the seabed along the longitudinal direction of the second pipe, and a plurality of second connecting portions connecting the second pipe and the second weight portion, wherein the distance between the second pipe and the second weight portion is shorter than the distance between the first pipe and the weight portion of the piping protection structure.
[0015] In one aspect of the present invention, it is preferable that each end of the first pipe and the second pipe have a flange portion connected to each other.
[0016] In one aspect of the present invention, the first weight portion and the second weight portion, which are placed on the seabed along the longitudinal direction of the first pipe, are each separate chains, and it is preferable that the weight per unit length of the first weight portion is greater than the weight per unit length of the second weight portion.
[0017] A piping installation method according to one embodiment of the present invention includes an assembly process on land, in which a piping structure is assembled by attaching the above-mentioned piping protection structure to the piping and a construction float is attached to the piping structure, a placement process of placing the piping structure in an installation area with the piping structure floating on the sea surface by the construction float, and a lowering process of lowering the piping structure in the installation area by detaching the construction float from the piping structure.
[0018] In one aspect of the present invention, it is preferable that the installation area is within a sea area in which common fishing rights have been established. Effect of the Invention
[0019] The piping protection structure of the present invention can protect the piping from the seabed such as rocks by keeping the piping floating in the sea. In addition, the piping protection structure of the present invention is simpler than the conventional protection structure using a half pipe, and therefore can reduce costs. [Brief description of the drawings]
[0020] [Figure 1] 1 is a diagram showing an aquaculture system in which a piping protection structure according to one embodiment of the present invention is used. [Diagram 2] 1 is a schematic diagram showing a pipe protection structure according to an embodiment of the present invention; [Diagram 3] 5A to 5C are schematic diagrams illustrating a piping installation method according to the present embodiment. [Figure 4] FIG. 11 is a schematic diagram showing a pipe protection structure according to a modified example of the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0021] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. [Aquaculture system] The piping protection structure 10 of this embodiment is capable of protecting the piping 20 of an aquaculture system 100 as shown in Fig. 1. The aquaculture system 100 will be briefly described below.
[0022] 1, the aquaculture system 100 includes a plurality of cages 101 arranged on the sea and a transport device 102 that transports feed to the cages 101. The plurality of cages 101 are arranged in any sea area to form a group of cages. The transport device 102 includes a feeding base 103 installed on a land or sea facility, a pipe 20 extending from the feeding base 103 to the seabed near the group of cages, a branching device 104 provided at the tip of the pipe 20, and a plurality of supply pipes 105 extending from the branching device 104 to each cage 101.
[0023] The feeding base 103 includes a storage tank 106 for storing feed, and an airflow generator 107 for forming a transport airflow inside the piping 20. The storage tank 106 is configured as a so-called silo or the like, and stores granular feed therein and supplies the feed at predetermined amounts to the piping 20. The airflow generator 107 is configured as a compressor driven by an electric motor or an engine, and supplies compressed air into the piping 20.
[0024] The branching device 104 connects a supply pipe 105 selected by a control unit (not shown) to the piping 20. The supply pipe 105 is provided corresponding to each of the fish cages 101, extends from the branching device 104 to the corresponding fish cage 101, and has a discharge unit 105A that discharges feed into the fish cage 101.
[0025] In the above-mentioned aquaculture system 100, the feed supplied from the storage tank 106 to the piping 20 is transported by the air current formed in the piping 20. Then, the air current transported feed is supplied to the fish cage 101 corresponding to the supply pipe 105 selected by the branching device 104 through the supply pipe 105.
[0026] [Piping of aquaculture system] The piping 20 of the aquaculture system 100 of this embodiment is made of a synthetic resin such as high-density polyethylene. It is preferable that this piping 20 can float alone in the sea with a carrier air current flowing through the inside of the piping 20.
[0027] The piping 20 extends from the feeding base 103 into the sea and is mainly arranged along the seabed. The seabed on which the piping 20 is arranged has a rocky area R1 where reefs, rubble, etc. exist that are likely to damage the piping 20, and a non-rocky area R2 such as sandy area that is unlikely to damage the piping 20. For this reason, the piping 20 includes a first piping 21 that passes through the rocky area R1, and a second piping 22 that is connected to the first piping 21 and arranged in the non-rocky area R2. The respective ends of the first piping 21 and the second piping 22 have flange portions 211, 221 that are connected to each other (see FIG. 2). The range and number of first pipes 21 in the pipe 20 are determined according to the range and number of rocky areas R1 on the seabed in which the pipe 20 is arranged.
[0028] The first pipe 21 is moored at a position vertically above the seabed by a pipe protection structure 10 described later. When a non-rocky area R2 exists adjacent to the rocky area R1, it is preferable that the end of the first pipe 21 passing through the rocky area R1 is disposed in the non-rocky area R2.
[0029] The second pipe 22 is moored in the sea by an arbitrary installation structure 30. The installation structure 30 of this embodiment includes a weight portion 31 arranged along the longitudinal direction of the second pipe 22 on the seabed, and a plurality of connecting portions 32 connecting the second pipe 22 and the weight portion 31. Weight 31 corresponds to the second weight of the present invention and has a weight capable of mooring second pipe 22. Weight 31 in this embodiment is a chain. Connection 32 corresponds to the second connection of the present invention and is, for example, a rope that connects second pipe 22 and weight 31. The vertical distance between the second piping 22 and the weight portion 31 is not particularly limited, but it is preferable that it is shorter than the vertical distance between the first piping 21 and the weight portion 12 in the piping protection structure 10 described later, and the second piping 22 and the weight portion 31 may be in contact.
[0030] The “longitudinal direction” of the first pipe 21 or the second pipe 22 corresponds to the extension direction of the pipe 20. The first pipe 21, the pipe protection structure 10, the second pipe 22, and the installation structure 30 are collectively referred to as a piping structure 110.
[0031] [Piping protection structure] The pipe protection structure 10 of this embodiment protects the first pipe 21 from the seabed of the rocky area R1. The pipe protection structure 10 of this embodiment will be described below.
[0032] 2, the pipe protection structure 10 includes a mooring part 11 that moor the first pipe 21 floating in the sea at a position vertically above the seabed. The mooring part 11 includes a weight part 12 that is arranged on the seabed along the longitudinal direction of the first pipe 21, and a plurality of connecting parts 13 that connect the first pipe 21 and the weight part 12.
[0033] The weight 12 is a chain disposed along the longitudinal direction of the first pipe 21 relative to the seabed. The weight 12 corresponds to the weight (first weight) of the present invention, and has a weight capable of mooring the first pipe 21 to which the float 14 described below is attached. The weight 12 is a chain separate from the weight 31 described above, and the weight per unit length of the weight 12 is greater than the weight per unit length of the weight 31. For example, when the weights 12 and 31 are made of the same material, the wire diameter of the chain constituting the weight 12 is greater than the wire diameter of the chain constituting the weight 31.
[0034] The connecting part 13 is, for example, a rope that connects the first pipe 21 and the weight part 12. The vertical length L of the connecting part 13 between the first pipe 21 and the weight part 12 is adjusted so that the first pipe 21 is positioned at a desired height from the seabed. For example, as shown in FIG. 2, the length L of the connecting portion 13 increases for each pitch of the connecting portion 13 from each end of the first pipe 21 arranged in the non-rocky area R2 toward the rocky area R1. In addition, in the center part of the longitudinal direction of the first pipe 21, the length L of the connecting portion 13 is constant in the multiple connecting portions 13. Here, it is preferable that the length L of the connecting portion 13 in the center part of the longitudinal direction of the first pipe 21 is adjusted to such an extent that the first pipe 21 does not come into contact with the seabed (for example, about 1 to 2 m) even when the first pipe 21 is swaying up and down due to the water current. The first pipe 21 may be bent to form an arc shape that is convex vertically upward by being moored by these connecting portions 13, or may be formed in an arc shape in advance. The pitch of the links 13 is preferably constant, but may be adjusted depending on tidal currents and seabed conditions.
[0035] The pipe protection structure 10 of this embodiment further includes a plurality of floats 14 attached to the first pipe 21. These floats 14 apply an upward force to the first pipe 21, enabling the first pipe 21 to float in the sea even when the first pipe 21 becomes heavier than normal. Note that the normal state of the first pipe 21 refers to a state in which the inside is filled with air due to a carrying air current or the like, and the first pipe 21 can float without the buoyancy of the floats 14.
[0036] One example of a case in which the first pipe 21 becomes heavier than normal is when an abnormality occurs, such as a hole being opened somewhere in the pipe 20 (see FIG. 1), causing seawater to flow into (or fill) the pipe 20. Therefore, it is preferable that the buoyancy of the float 14 is greater than half the sum of the weight of the first pipe 21 between the floats 14 on either side of the float 14 and the weight of seawater inside the first pipe 21.
[0037] Another example of the first pipe 21 becoming heavier than normal is when, over time, aquatic organisms such as barnacles attach to the first pipe 21. Therefore, it is preferable that the buoyancy of the float 14 is greater than half the total weight of the first pipe 21 between the floats 14 on both sides of the float 14, the weight of the seawater inside the first pipe 21, and the weight of the aquatic organisms expected to attach to the first pipe 21.
[0038] In the longitudinal direction of the first pipe 21, the attachment position of the float 14 relative to the first pipe 21 coincides with the connection position of the connection part 13 relative to the first pipe 21. In addition, in the longitudinal direction of the first pipe 21, the attachment pitch P of the float 14 relative to the first pipe 21 is not particularly limited, but is equal to the connection pitch of the connection part 13 relative to the first pipe 21. Specifically, the attachment pitch P of the float 14 relative to the first pipe 21 is preferably adjusted to a degree (e.g., 2 m) that can suppress the swinging of the first pipe 21 between adjacent floats 14 or between an end of the first pipe 21 and the float 14 adjacent to that end.
[0039] The above-described pipe protection structure 10 is attached to the first pipe 21 in a state where it does not substantially cover the first pipe 21. In other words, in the pipe protection structure 10, a wide exposure space 15 for exposing the first pipe 21 to the sea is secured between the connecting portions 13 adjacent to each other in the longitudinal direction of the first pipe 21.
[0040] [Effects of this embodiment] As described above, the piping protection structure 10 of this embodiment is a structure that protects the first piping 21, which is a piping that transports air current, from the seabed, and is equipped with a mooring portion 11 that moor the first piping 21 floating in the sea at a position vertically upward away from the seabed. In such a configuration, the first pipe 21 can be maintained in a floating state in the sea, so that the first pipe 21 can be protected from the seabed such as rocks. In addition, the pipe protection structure 10 of the present embodiment is simpler than a conventional protection structure using a half-split pipe, so that the cost can be reduced.
[0041] In this embodiment, the mooring section 11 includes a weight section 12 that is placed on the seabed along the longitudinal direction of the first pipe 21, and a plurality of connecting sections 13 that connect the weight section 12 and the first pipe 21 together. In this configuration, the first pipe 21 floating in the sea can be suitably moored. For example, by adjusting the arrangement of the weight portion 12, the first pipe 21 can be placed at a desired planar position on the seabed. In addition, by adjusting the length of each of the multiple connecting portions 13, the first pipe 21 can be placed at a desired height position from the seabed.
[0042] In this embodiment, the weight portion 12 is a chain that is disposed along the longitudinal direction of the first pipe 21 relative to the seabed. According to this configuration, weight 12 has a continuous shape and does not roll on the seabed like a concrete block. Therefore, weight 12 can be easily installed along the longitudinal direction of first piping 21.
[0043] The pipe protection structure 10 of the present embodiment further includes a plurality of floats 14 attached to the first pipe 21, and the plurality of floats 14 have buoyancy for floating the first pipe 21 in the sea when seawater enters the first pipe 21. In particular, in the present embodiment, the plurality of floats 14 have buoyancy for floating the first pipe 21 in the sea even when the first pipe 21 is filled with seawater, or when the first pipe 21 is filled with seawater and aquatic organisms are attached to the first pipe 21. In this configuration, even if the weight of the first pipe 21 increases more than usual, the first pipe 21 can be maintained floating in the sea. This effectively prevents the first pipe 21 from coming into contact with the seabed, such as rocks.
[0044] In this embodiment, the attachment position of the float 14 relative to the first pipe 21 in the longitudinal direction of the first pipe 21 coincides with the connection position of the connection part 13 relative to the first pipe 21. In such a configuration, the bending moment applied to the first pipe 21 can be suppressed, and therefore the durability of the first pipe 21 can be improved.
[0045] In this embodiment, the first piping 21 is arranged from the non-rocky area R2 to the rocky area R1, and in the multiple connecting portions 13, the length L of the connecting portion 13 between the first piping 21 and the weight portion 12 is adjusted so that it gradually becomes longer from the non-rocky area R2 to the rocky area R1. In this configuration, the first pipe 21 can be positioned so that it does not come into contact with the seabed of the rocky area R1, while preventing excessive bending of the first pipe 21.
[0046] The piping 20 of this embodiment is used in the aquaculture system 100, and therefore the feed transported by the air current comes into contact with the inner wall surface of the piping 20. For this reason, there is a possibility that holes will develop in the piping 20 as the piping 20 deteriorates over time. The pair of half pipes, which is a conventional pipe protection structure, covers the outer surface of the pipe, so if a hole is made in the pipe, it is difficult to identify the location of the hole. In addition, when attaching a repair cover around the hole in the pipe, it is time-consuming because the pipe must be lifted from the seabed, the pair of half pipes must be removed, and then the repair cover must be attached. On the other hand, in the pipe protection structure 10 of the present embodiment, an exposed space 15 that exposes the outer surface of the first pipe 21 to the sea is present between the connecting portions 13 adjacent to each other in the longitudinal direction of the first pipe 21. Therefore, if a hole is formed in the first pipe 21, the position of the hole in the first pipe 21 can be identified from the exposed space 15. Furthermore, when attaching a repair cover around the hole in the first pipe 21, there is no need to lift up the first pipe 21, and the repair cover can be attached to the first pipe 21 from the exposed space 15, which reduces the effort required for repair compared to the conventional method.
[0047] The piping structure 110 of this embodiment comprises the above-mentioned first piping 21, piping protection structure 10, second piping 22 and installation structure 30, and the distance between the second piping 22 and the weight portion 31 is shorter than the distance between the first piping 21 and the weight portion 12. In this configuration, the first pipe 21, which is the part of the pipe 20 that needs to be protected, can be placed sufficiently away from the seabed, while the second pipe 22, which is the part of the pipe 20 that does not need to be protected, can be placed close to the seabed. This makes it possible to suppress the effect of the water flow on the second pipe 22 and maintain the placement of the pipe 20 in an optimal manner.
[0048] In this embodiment, the first pipe 21 and the second pipe 22 have flange portions 211 and 221 at their respective ends, which are connected to each other. In such a configuration, when manufacturing the piping structure 110, the piping 20 is formed by flange-connecting the first piping 21 and the second piping 22. Here, before the piping 20 is formed, the first piping 21 and the second piping 22 are in a separated state, and therefore, handling is easy.
[0049] In this embodiment, weights 12 and 31 are separate chains, and the weight per unit length of weight 12 is greater than the weight per unit length of weight 31. In this configuration, since the weights 12 and 31 are separate chains, it is easy to attach the weights 12 and 31 to the first pipe 21 and the second pipe 22, respectively. In addition, chains having a necessary and sufficient weight per unit length can be used for the weights 12 and 31. For example, the weight 12 requires weight for mooring the first pipe 21 floating in the sea, but the weight 31 does not require as much weight as the weight 12 because it moors the second pipe 22 placed near the seabed. Therefore, by making the weight 31 lighter than the weight 12, the overall cost can be reduced.
[0050] [Piping installation method] Hereinafter, an example of a method for installing the piping 20 of this embodiment will be described with reference to FIG. First, on land, the piping protection structure 10 and the installation structure 30 are attached to the piping 20 to assemble the piping structure 110, and the construction float 40 is attached to this piping structure 110 (assembly process).
[0051] Next, as shown in Fig. 3, the piping structure 110 assembled on land is towed by ship 50 and placed in the installation sea area (placement process). At this time, the piping structure 110 is placed in the installation sea area while floating on the sea surface by construction floats 40. In addition, of the piping 20, the first pipe 21 is placed on the sea surface corresponding to the rocky area R1, and the second pipe 22 is placed on the sea surface corresponding to the non-rocky area R2. The first pipe 21 and the weight portion 12 may be integrally tied together by a rope or the like.
[0052] Thereafter, the construction float 40 is separated from the piping structure 110, and the piping structure 110 is lowered toward the seabed of the installation sea area (lowering step). In this manner, the piping structure 110 is installed in the installation sea area.
[0053] In the above-mentioned pipe installation method, the pipe protection structure 10 and the installation structure 30 are attached to the pipe 20 on land, so that there is almost no need for workers to perform underwater work. This makes it possible to reduce the cost of underwater work.
[0054] In this embodiment, the sea area where the first pipe 21 is installed is preferably a place where the tidal current is a maximum of 2 knots or less. That is, the sea area where the first pipe 21 is installed is preferably an offshore sea area where the tidal current is relatively gentle. This can suppress excessive rocking of the first pipe 21 floating in the sea, and improve the durability of the pipe 20.
[0055] In this embodiment, the sea area where the first pipe 21 is installed is preferably within a sea area where a common fishing right is established. This makes it possible to identify the parties who use the sea area where the first pipe 21 is installed, and makes it easy to adjust so that fishing nets and anchors are not installed near the first pipe 21.
[0056] [Variations] The present invention is not limited to the above-described embodiment, and modifications within the scope of the present invention are included in the present invention.
[0057] In the above embodiment, the weight portion 12 is a single chain, but the weight portion 12 may be a plurality of chains. For example, as shown in Fig. 4, weight portion 12 according to a modified example may include two chains 12A, 12B arranged in parallel with a gap between them. In this case, chains 12A, 12B are arranged on both sides of first piping 21 in a plan view as shown in Fig. 4. Furthermore, multiple connecting portions 13 connect chains 12A, 12B to first piping 21, respectively. In such a modified example, horizontal shaking of first piping 21 can be suppressed.
[0058] In the above embodiment, the weight portion 12 is not limited to a chain. For example, the weight portion 12 may be a plurality of concrete blocks arranged on the seabed along the longitudinal direction of the first pipe 21.
[0059] In the above embodiment, the connecting portion 13 is not limited to being a rope. For example, the connecting portion 13 may be a wire or any long member.
[0060] In the above embodiment, the mounting position of the float 14 relative to the first piping 21, the buoyancy of the float 14, the mounting position of the connecting part 13 relative to the first piping 21, and the length of the connecting part 13, etc., can be changed as appropriate depending on the specific structure of the first piping 21 and the specific conditions of the sea area in which the first piping 21 is placed. For example, in the above embodiment, when the rigidity of the first pipe 21 is high, the mounting position of the float 14 relative to the first pipe 21 does not have to coincide with the connecting position of the connecting part 13 relative to the first pipe 21. Furthermore, the number of floats 14 attached to the first pipe 21 may be less than the number of connecting parts 13 attached to the first pipe 21. In this case, the mounting pitch P of the floats 14 relative to the first pipe 21 may be an integer multiple of the connecting pitch of the connecting parts 13 relative to the first pipe 21. Alternatively, the number of floats 14 attached to the first pipe 21 may be greater than the number of connecting parts 13 attached to the first pipe 21. In this case, the attachment pitch P of the floats 14 to the first pipe 21 may be "1 / integer" times the connection pitch of the connecting parts 13 to the first pipe 21.
[0061] In the embodiment, the pipe protection structure 10 does not have to include the multiple floats 14. Even with such a modified example, it is possible to prevent the first pipe 21 from contacting the seabed, such as rocks, under normal circumstances.
[0062] In the above embodiment, the mooring portion 11 is configured to include the weight portion 12 that keeps the first pipe 21, which is a buoyant body, floating in the sea, but the present invention is not limited to this. For example, the mooring section 11 according to the modified example may be configured to include a buoyant body that keeps the first pipe 21, which is a sinking body, floating in the sea, instead of the weight section 12. In this case, the first pipe 21 is arranged in a state of being suspended in the sea from the buoyant body via the connecting section. The buoyant body is a float moored to the seabed or the like. Even with such a modified example, the first pipe 21 is moored in a floating state in the sea, so that the first pipe 21 can be protected from the seabed, such as rocks.
[0063] In the above embodiment, a case where the piping 20 of the aquaculture system 100 is protected is described, but the present invention is not limited thereto. In other words, the present invention can be used to protect any piping that transports air. [Explanation of symbols]
[0064] 10...piping protection structure, 11...mooring part, 12...weight part, 12A, 12B...chain, 13...connecting part, 14...float, 15...exposed space, 20...piping, 21...first piping, 211...flange part, 221...flange part, 22...second piping, 30...installation structure, 31...weight part, 32...connecting part, 40...construction float, 50...ship, 100...aquaculture system, 101...fish cage, 102...transportation device, 103...feeding base, 104...branching device, 110...piping structure, 105...supply pipe, 105A...discharge part, 106...storage tank, 107...airflow generating device, R1...rocky area, R2...non-rocky area.
Claims
1. A structure for protecting a pipe for conveying air from the seabed, A pipe protection structure comprising a mooring portion that moor the pipe floating in the sea at a position vertically above the seabed.
2. The mooring portion is A weight portion is disposed on the seabed along a longitudinal direction of the pipe; The pipe protection structure according to claim 1 , further comprising: a plurality of connecting portions that connect the weight portion and the pipe.
3. The pipe protection structure according to claim 2 , wherein the weight portion is a chain arranged along a longitudinal direction of the pipe relative to the seabed.
4. Further comprising a plurality of floats attached to the piping; The pipe protection structure according to claim 2 , wherein the floats have buoyancy that enables the pipe to float in the sea when seawater enters the pipe.
5. The pipe protection structure according to claim 4 , wherein the plurality of floats have buoyancy that enables the pipe to float in the sea when the pipe is filled with seawater.
6. 5. The pipe protection structure according to claim 4, wherein the floats have buoyancy that enables the pipe to float in the sea when seawater fills the pipe and aquatic organisms are attached to the pipe.
7. The pipe protection structure according to claim 4 , wherein an attachment position of the float relative to the pipe coincides with a connection position of the connection part relative to the pipe in a longitudinal direction of the pipe.
8. The piping is arranged from a non-rocky area to a rocky area, The piping protection structure according to claim 2 , wherein in the plurality of connecting portions, the vertical length of the connecting portion between the piping and the weight portion is adjusted so as to gradually become longer from the non-rocky area toward the rocky area.
9. The pipe protection structure according to claim 2 , wherein an exposed space is present between the connecting portions adjacent to each other in the longitudinal direction of the pipe, allowing an outer surface of the pipe to be exposed to the sea.
10. The pipe protection structure according to claim 2 , a first pipe as the pipe to which the pipe protection structure is attached; a second pipe connected continuously to the first pipe and to which the pipe protection structure is not attached; A second weight portion is disposed on the seabed along a longitudinal direction of the second pipe; a plurality of second connection portions connecting the second pipe and the second weight portion; A piping structure, wherein a distance between the second pipe and the second weight portion is shorter than a distance between the first pipe and the weight portion.
11. The piping structure according to claim 10 , wherein each end of the first pipe and the second pipe has a flange portion connected to each other.
12. The first weight portion and the second weight portion as the weight portion arranged on the seabed along the longitudinal direction of the first pipe are separate chains, The piping structure according to claim 10 , wherein a weight per unit length of the first weight portion is greater than a weight per unit length of the second weight portion.
13. an assembly process of assembling a piping structure by attaching the piping protection structure according to claim 1 to the piping on land, and attaching an installation float to the piping structure; an arrangement step of arranging the piping structure in an installation sea area in a state where the piping structure is floated on the sea surface by the construction float; a lowering step of lowering the piping structure by detaching the construction float from the piping structure in the installation sea area; A piping installation method including:
14. The piping installation method according to claim 13, wherein the installation area is within an area in which a common fishing right has been established.
Citation Information
Patent Citations
Method and device for laying submarine pipeline
JP1983061383A
Structure of intake pipeline
JP1989216190A
Water bottom part installation jig for pipeline, and water bottom part installation method for pipeline
JP2000297881A
Method of laying large tube in deep water
JP2002098262A
Branch device, conveying device and conveying method
JP2022133535A