Power generation installation control system, power generation installation control method, and power generation installation control program
The power generation equipment control system addresses the challenge of output curtailment by adjusting output rates and charging/discharging plans to minimize waste of renewable energy and maintain grid balance.
Patent Information
- Application Number
- JP2023079883
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-15
- Publication Date
- 2024-11-27
AI Technical Summary
Conventional power generation systems face challenges in achieving both output suppression according to curtailment instructions and preventing the waste of renewable energy, as excess power is often discarded during output curtailment.
A power generation equipment control system that includes a storage battery, a storage battery control unit, and a renewable energy power source, which adjusts the output rate and charging/discharging plan to charge excess power to the storage battery, optimizing power output to the grid and minimizing waste.
The system effectively curtails output while maximizing the utilization of renewable energy by charging excess power to storage batteries, thereby reducing waste and maintaining grid balance.
Smart Images

Figure 2024164422000001_ABST
Abstract
Description
[Technical field]
[0001] An embodiment of the present invention relates to a power generation facility control system, a power generation facility control method, and a power generation facility control program. [Background technology]
[0002] As renewable energy becomes more widespread, the amount of output suppression of power output to the power grid is on the rise. For example, output suppression information indicating an output suppression instruction is transmitted from a power transmission and distribution company to a power generation facility by online control via a network or the like. On the power generation facility side, during the restricted period indicated by the output suppression instruction, the excess amount of power generated that exceeds the suppressed output amount indicated by the output suppression instruction is discarded. Even if the power generation facility is equipped with a storage battery, in the case of online control, the PCS (Power Conditioning System), which controls the output rate of renewable energy to the power grid, performs output restriction processing, so that the storage battery is not charged and renewable energy may be discarded. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2019-13143 A Summary of the Invention [Problem to be solved by the invention]
[0004] For this reason, in the conventional technology, it has been difficult to achieve both output suppression in response to an output suppression instruction and suppression of waste of renewable energy.
[0005] An object of the present invention is to provide a power generation equipment control system, a power generation equipment control method, and a power generation equipment control program that can achieve both output suppression in response to an output suppression instruction and suppression of waste of renewable energy. [Means for solving the problem]
[0006] The power generation equipment control system of the embodiment includes a storage battery, a storage battery control unit that controls charging and discharging of the storage battery, a renewable energy power source, and an output rate control unit that controls an output rate of power output from the renewable energy power source to the storage battery and the power grid. A reception unit that receives output suppression information that represents an output suppression instruction for power output to a power grid from a power generation equipment having the storage battery, the power generation equipment having the renewable energy power source, and an adjustment unit that, when the output suppression information is received, adjusts at least one of the output rate and a charge / discharge plan of the storage battery according to a power generation plan represented by a contracted power amount in an energy trading market so that an excess amount of power generated that exceeds the suppressed output amount represented by the output suppression information is charged to the storage battery. A power generation equipment control unit that controls the output rate control unit and the storage battery control unit based on a final output rate and a final charge / discharge plan that includes at least one of an adjusted output rate, which is the adjusted output rate, and an adjusted charge / discharge plan, which is the adjusted charge / discharge plan. [Brief description of the drawings]
[0007] [Figure 1] 1 is a diagram illustrating an example of an overview of a power system according to an embodiment. [Diagram 2] 1 is a diagram illustrating an example of a functional configuration of a power generation facility control system and a power generation facility 20 according to an embodiment. [Diagram 3] 2 is an explanatory diagram of an example of information handled by the power generation facility control system. [Figure 4] 11A to 11C are diagrams illustrating a specific example of adjustment processing by an adjustment unit. [Diagram 5] 4 is a flowchart showing an example of a flow of information processing executed by the power generation facility control system of the embodiment. [Figure 6] 11A to 11C are diagrams illustrating examples of various timing patterns having different timings for receiving output suppression information. [Figure 7] FIG. 2 is a hardware configuration diagram of an example of a power generation facility control system according to an embodiment and a modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0008] Hereinafter, an embodiment of a power generation facility control system, a power generation facility control method, and a power generation facility control program according to the present invention will be described with reference to the drawings. In the following, the time may refer to a moment in time or a time span of a unit time. The unit time is, for example, 30 minutes.
[0009] FIG. 1 is a diagram showing an example of an outline of a power system 1 according to this embodiment.
[0010] The power system 1 includes a power generation equipment control system 10 and one or more power generation equipment 20. In this embodiment, the power system 1 is described assuming a configuration including a plurality of power generation equipment 20. The plurality of power generation equipment 20 constitute a part of a power generation BG (balancing group) 4. The power generation BG 4 may further include a power plant, a storage battery, and the like. Electric power output from the power generation equipment 20 is supplied to a power grid 3.
[0011] The power generation facility control system 10 creates a power generation plan for PV (Photovoltaics) 21 provided in each of the multiple power generation facilities 20, creates a charge / discharge plan for the storage battery 23, and performs adjustment processing, which will be described later. The power generation facility control system 10 creates a power generation plan, creates a charge / discharge plan, and performs adjustment processing, which will be described later, for each of the multiple power generation facilities 20.
[0012] The power generation facility control system 10 is provided, for example, in an aggregator 2. The aggregator 2 predicts the amount of power generated by each of a plurality of power generation facilities 20, and sells the power in the power trading market 5 and directly trades power with consumers. The aggregator 2 also contributes to load leveling of the power system 3 by controlling the amount of power generated by each of the power generation facilities 20 based on the power generation plan of the power generation facilities 20.
[0013] The power generation facility 20 includes a PV 21, a PVPCS (Photovoltaics Power Conditioning System) 22, a storage battery 23, and a storage battery PCS (Power Conditioning System) 24.
[0014] PV21 is a photovoltaic power generation device, an example of a renewable energy source. The photovoltaic power generation device is equipped with a solar panel. A solar panel is an assembly of cells, in which n-type and p-type semiconductor wafer cells such as single crystal silicon are arranged in series and in parallel, and converts light energy into electricity through the photovoltaic effect.
[0015] The power generation facility 20 may be configured to include a renewable energy power source. Therefore, the power generation facility 20 may be configured to include a power generation device that utilizes the environment or resources present in nature, such as geothermal energy, wind, or water, instead of the PV 21. In addition, a mixture of multiple types of renewable energy power sources may be used. In this embodiment, a configuration in which the power generation facility 20 includes the PV 21, which is a solar power generation device, as a renewable energy power source will be described as an example.
[0016] The PVPCS 22 is an output rate control unit that controls the output rate of power output from the PV 21 toward the storage battery 23 and the power system 3. In this embodiment, the output rate of power output from the PVPCS 22 toward the storage battery 23 and the power system 3 may be referred to as a PVPCS output rate. Also, the output amount of power output from the PVPCS 22 toward the storage battery 23 and the power system 3 may be referred to as a PVPCS output amount.
[0017] The PVPCS 22 converts the DC power generated by the PV 21 into AC power and supplies it to the power grid 3. The PVPCS 22 also supplies the DC power generated by the PV 21 to the storage battery 23 in accordance with the control by the power generation equipment control system 10 described later.
[0018] The storage battery 23 charges and discharges power. In particular, the storage battery 25 is charged with power generated by the PV 21. The storage battery 23 is charged by being supplied with the power generated by the PV 21 via the PVPCS 22 and the storage battery PCS 24. That is, the storage battery 23 of the power generation facility 20 is charged only from the PV 21.
[0019] The storage battery 23 is, for example, a capacitor in which positive and negative electrodes are alternately stacked with a separator interposed between the electrodes, a storage battery such as a lithium battery, or a hydrogen power storage device that generates and stores hydrogen by electrolysis of water.
[0020] The storage battery PCS 24 is a battery control unit that controls charging and discharging of the storage battery 23. The storage battery 23 has its charging amount and discharging amount controlled by the control of the storage battery PCS 24.
[0021] The system 6 of the power transmission and distribution company transmits output suppression information to the power generation facility 20 by online control in order to maintain the supply and demand balance of the power grid 3. For example, the system 6 of the power transmission and distribution company transmits the output suppression information to the power generation facility 20 directly or via the power generation facility control system 10.
[0022] The output suppression information is information that represents an output suppression instruction for the electric power output from the power generation facility 20 to the electric power grid 3. In detail, the output suppression information is information that represents a suppression output rate during a restriction period in which the output from the power generation facility 20 should be restricted.
[0023] The suppressed output rate represents an upper limit of output per unit time. The suppressed output rate is represented, for example, by a ratio of the upper limit of output to the rated output of the PVPCS 22 provided in the power generation facility 20. Specifically, a suppressed output rate of 0% means that the amount of output to the power grid 3 is zero. A suppressed output rate of 50% means that 50% of the rated output of the PVPCS 22 is set as the upper limit of output. Note that in this embodiment, the suppressed output rate will be described as a ratio of the upper limit of output to the rated output of the PVPCS 22. However, the suppressed output rate may be a ratio of the upper limit of output to the power generation plan, or the like, and is not limited to a value relative to the rated output of the PVPCS 22.
[0024] In this embodiment, the power generation equipment control system 10 performs the following steps for each of the multiple power generation equipment 20: creating a power generation plan, creating a charge / discharge plan, and adjusting at least one of the charge / discharge plan and the PVPCS output rate in accordance with output suppression information.
[0025] The power generation equipment control system 10 is a PC (Personal Computer) or the like, and has a hardware configuration utilizing a normal computer equipped with a CPU (Central Processing Unit), memory, an HDD (Hard Disk Drive), a communication interface (I / F), a display device such as a display, and input devices such as a keyboard and a mouse.
[0026] FIG. 2 is a diagram showing an example of a functional configuration of the power generation facility control system 10 and the power generation facility 20 according to this embodiment.
[0027] The power generation facility 20 includes a PV 21, a PVPCS 22, a storage battery 23, and a storage battery PCS 24. As described above, the PVPCS 22 controls the PVPCS output rate, which is the output rate of power output from the PV 21 to the storage battery 23 and the power system 3. The PVPCS 22 controls the PVPCS output rate per unit time. The storage battery PCS 24 controls charging and discharging of the storage battery 23 per unit time. The unit time is a management time managed by the power system 1. In this embodiment, a form in which the unit time is 30 minutes will be described as an example. However, the unit time is not limited to 30 minutes.
[0028] The PVPCS 22 and storage battery PCS 24 of the power generation equipment 20 control the PV 21 and storage battery 23 under control of the power generation equipment control system 10. In detail, the PVPCS 22 controls the PVPCS output rate per unit time so as to achieve the final PVPCS output rate received from the power generation equipment control system 10. The storage battery PCS 24 controls the charge / discharge amount of the storage battery 23 in accordance with the final charge / discharge plan received from the power generation equipment control system 10. The final PVPCS output rate and the final charge / discharge plan, as well as the details of the control thereof, will be described later.
[0029] The PVPCS 22 and the storage battery PCS 24 of the power generation facility 20 output the actual value of the amount of power generated by the PV 21 per unit time, the charging capacity of the storage battery 23, etc. to the power generation facility control system 10. The charging capacity of the storage battery 23 is the amount of power (kWh) that the storage battery 23 can charge within a unit time. The charging capacity of the storage battery 23 is determined by the capacity of the storage battery 23, the current remaining charge, and the charging output (kW) of the storage battery 23.
[0030] Next, the power generation facility control system 10 will be described.
[0031] The power generation facility control system 10 is a PC (Personal Computer) or the like, and has a hardware configuration using a normal computer equipped with a CPU (Central Processing Unit), a memory, an HDD (Hard Disk Drive), a communication interface (I / F), a display device such as a display, and an input device such as a keyboard, a mouse, etc. The power generation facility control system 10 may be configured with multiple PCs or multiple CPUs.
[0032] The power generation equipment control system 10 includes a communication unit 11, an input unit 12, a display unit 13, a storage unit 14, and a control unit 15. The communication unit 11, the input unit 12, the display unit 13, the storage unit 14, and the control unit 15 are communicatively connected to each other via a bus or the like.
[0033] The communication unit 11 communicates with the power generation facility 20. The communication unit 11 also communicates with the electricity trading market 5, the electricity transmission and distribution company system 6, the cross-regional organization, and external information processing devices and the like via a network.
[0034] The input unit 12 is an input device such as a keyboard that accepts operation input by a user. The display unit 13 is a display that displays various information. The storage unit 14 stores various information. The storage unit 14 is, for example, a HDD or a memory.
[0035] The control unit 15 is a calculation unit that executes information processing, and includes a plan creation unit 15A, a reception unit 15B, an adjustment unit 15C, and a power generation equipment control unit 15D.
[0036] At least one of the plan creation unit 15A, the reception unit 15B, the adjustment unit 15C, and the power generation equipment control unit 15D is realized, for example, by one or more processors. For example, each of the above units may be realized by having a processor such as a CPU execute a program, that is, by software. Each of the above units may be realized by a processor such as a dedicated IC (Integrated Circuit), that is, by hardware. Each of the above units may be realized by using both software and hardware. When multiple processors are used, each processor may realize one of the units, or may realize two or more of the units.
[0037] The plan creation unit 15A creates a power generation plan and a charge / discharge plan for the power generation facility 20.
[0038] In detail, the plan creation unit 15A derives a predicted power generation amount value of the PV 21. The predicted power generation amount value is a predicted value of the power generation amount of the PV 21 per unit time. The plan creation unit 15A derives the predicted power generation amount value per unit time based on an actual measured value of the power generation amount of the PV 21 acquired from the power generation facility 20, meteorological information such as the amount of sunlight, etc. Note that the plan creation unit 15A may derive the predicted power generation amount value by acquiring the predicted power generation amount value from a prediction system for the power generation amount of the PV 21, the input unit 12, the memory unit 14, or the like.
[0039] Then, the plan creation unit 15A calculates a power generation plan and a charge / discharge plan that maximizes the predicted value of the electricity selling revenue, based on the predicted value of the power generation amount per unit time of the PV 21 and the electricity selling price.
[0040] The power selling price is the selling price per unit time of the power output from the PV 21. The power selling price may be either a predicted trading price value in the power trading market 5 or a trading price determined in advance by a contract. In the present embodiment, a form in which the power selling price is a predicted trading price value per unit time will be described as an example. The plan creation unit 15A may derive the power selling price by, for example, acquiring the power selling price from the power trading market 5 or the like.
[0041] The charge and discharge plan that maximizes the predicted value of the electricity selling revenue is a charge and discharge plan in which the storage battery 23 is charged with the electricity generated by the PV 21 during a time period when the electricity selling price is low, and the charged electricity is supplied to the power grid 3 during a time period when the electricity selling price is high. Such a charge and discharge plan that maximizes the predicted value of the electricity selling revenue may be called a time shift plan or the like. In this embodiment, the plan creation unit 15A creates a charge and discharge plan for 24 hours of the next day as an example. The plan creation unit 15A may create a charge and discharge plan that maximizes the predicted value of the electricity selling revenue of the PV 21 by a known method based on the predicted power generation amount and the electricity selling price.
[0042] The charge / discharge plan represents the amount of charge or discharge per unit time. When describing the charge amount and the discharge amount collectively, they are referred to as the charge / discharge amount. In this embodiment, the charge / discharge plan will be described as showing an amount of power represented by a negative value when showing the amount of charge, showing an amount of power represented by a positive value when showing the amount of discharge, and showing an amount of power of "zero" when showing no charge / discharge.
[0043] The plan creation unit 15A determines the amount of power to be sold per unit time as a selling bidding plan based on the power generation forecast value and the charging / discharging plan. The plan creation unit 15A makes a selling bid for the amount of power to be sold represented by the determined selling bidding plan to the power trading market 5. The contracted amount of power, which is the amount of power to be sold that is contracted in the power trading market 5, is determined per unit time by the bidding to the power trading market 5. The plan creation unit 15A creates a group of contracted amounts of power for each unit time in one day as a power generation plan. That is, when the unit time is 30 minutes, the plan creation unit 15A creates a group of contracted amounts of power for each unit time for 48 frames per day as a power generation plan.
[0044] Furthermore, when the contracted amount of energy becomes an amount of energy different from the amount of energy sold represented by the selling bidding plan, the plan creation unit 15A creates a charge / discharge plan by correcting the charge / discharge plan according to the contracted amount of energy. Therefore, through these processes, the plan creation unit 15A creates a power generation plan represented by the contracted amount of energy in the energy trading market 5, and a charge / discharge plan for the storage battery 23 according to the power generation plan.
[0045] The reception unit 15B receives output suppression information representing an instruction to suppress output of electric power output from the power generation facility 20 to the power grid 3. As described above, the system 6 of the power transmission and distribution company transmits the output suppression information to the power generation facility 20 by online control. For example, the system 6 of the power transmission and distribution company transmits the output suppression information to the power generation facility 20 directly or via the power generation facility control system 10.
[0046] For this reason, the reception unit 15B receives output suppression information for the power generation facility 20 directly from the system 6 of the power transmission and distribution company, or from the system 6 of the power transmission and distribution company via the power generation facility 20. Note that the reception unit 15B may receive the output suppression information input by a user's operation instruction of the input unit 12 from the input unit 12. Furthermore, the reception unit 15B may receive the output suppression information by reading the output suppression information stored in the storage unit 14.
[0047] When the reception unit 15B receives output suppression information, the adjustment unit 15C adjusts at least one of the PVPCS output rate of the PVPCS 22 and the charge / discharge plan of the storage battery 23 according to the power generation plan represented by the contracted power amount in the power trading market 5 so that the excess power generation amount exceeding the suppressed output amount represented by the output suppression information is charged to the storage battery 23.
[0048] FIG. 3 is an explanatory diagram of an example of information handled by the power generation facility control system 10. As shown in FIG.
[0049] The plan creation unit 15A uses the predicted power generation amount for each unit time to create a power generation plan consisting of a group of contracted power amounts for each unit time by the power trading market 5, and a charge / discharge plan that specifies the charge amount, discharge amount, or no charge / discharge for each unit time. The reception unit 15B also receives output suppression information that indicates a suppression output rate for each unit time. Figure 3 shows an example in which the unit time is 30 minutes and one day is composed of 48 frames.
[0050] The adjustment unit 15C adjusts at least one of the PVPCS output rate and the charge / discharge plan so that the excess power generation amount that exceeds the suppressed output amount represented by the output suppression information is charged to the storage battery 23 for each unit time. However, if it is expected that the excess power generation amount will not occur, no adjustment is made.
[0051] As shown in Fig. 3, for a unit time in which the charge / discharge amount represented by the charge / discharge plan represents "charging", it is possible to adjust the PVPCS output amount to include the charge amount charged to the storage battery 23. For this reason, the adjustment unit 15C adjusts the PVPCS output rate by calculating backwards from the charge / discharge amount represented by the charge / discharge plan. For example, if the rated output of the PVPCS 22 is 1000 kW, and for a unit time in which charging is performed at an output of 500 kW in the charge / discharge plan, the adjustment unit 15C can adjust the PVPCS output rate to 50% regardless of the suppression output rate represented by the output suppression information.
[0052] Returning to FIG. 2, we continue the explanation.
[0053] In detail, first, the adjustment unit 15C determines whether or not it is necessary to adjust at least one of the PVPCS output rate and the charge / discharge plan by the following determination process.
[0054] Adjusting the PVPCS output rate means adjusting the PVPCS output rate of the PVPCS 22 to an adjusted PVPCS output rate that is a value different from the suppressed output rate represented by the output suppression information. In detail, adjusting the PVPCS output rate means adjusting the output rate (PVPCS output rate) of power output from the PVPCS 22 to the power grid 3 and the storage battery 23 to a value different from the suppressed output rate of power output from the power generation facility 20 to the power grid 3 represented by the output suppression information.
[0055] Adjusting the charge / discharge plan means adjusting the charge / discharge amount represented by the charge / discharge plan to a charge / discharge amount different from the charge / discharge plan.
[0056] When the charge / discharge plan represents charging to the storage battery 23, and the sum of the contracted amount of power represented by the power generation plan and the amount of charge represented by a negative value by the charge / discharge plan is greater than the suppressed output amount represented by the output suppression information, the adjustment unit 15C determines that adjustment of at least one of the PVPCS output rate and the charge / discharge plan is necessary.
[0057] The suppressed output amount is the output amount from the PVPCS 22 after being suppressed to the suppressed output rate represented by the output suppression information, and represents the maximum output amount (kWh) per unit time at the suppressed output rate. As described above, the suppressed output rate is represented by, for example, the ratio of the output upper limit to the rated output (kW) of the PVPCS 22 provided in the power generation facility 20. For this reason, the adjustment unit 15C converts the rated output (kW) of the PVPCS 22 into the rated output per unit time (30 minutes), and further multiplies the rated output by the suppressed output rate included in the output suppression information to calculate the multiplication result as the suppressed output amount and use it for processing. In detail, the adjustment unit 15C may calculate the suppressed output amount by the following formula (1).
[0058] Suppressed output amount = Maximum output amount (kWh) per unit time (30 minutes) at suppressed output rate =PVPCS22 rated output (kW) x (suppressed output rate (%) / 100) / 2 ...Equation (1)
[0059] Then, when the following formula (A) is satisfied, the adjustment unit 15C determines that adjustment of at least one of the PVPCS output rate and the charge / discharge plan is necessary.
[0060] In the case where the charge / discharge amount represented by the charge / discharge plan is <0 and the charge / discharge plan represents charging to the storage battery 23: Power generation plan + charging amount > suppressed output amount ··· formula (A)
[0061] In detail, the "power generation plan" in the formula (A) represents the contracted amount of power represented by the power generation plan.
[0062] In addition, when the charge / discharge plan indicates no charging or discharging to the storage battery 23 and the contracted amount of power represented by the power generation plan is greater than the suppressed output amount represented by the output suppression information, the adjustment unit 15C determines that adjustment of at least one of the PVPCS output rate and the charge / discharge plan is necessary.
[0063] Specifically, when the following formula (B) is satisfied, the adjustment unit 15C determines that it is necessary to adjust at least one of the PVPCS output rate and the charge / discharge plan.
[0064] When the charge / discharge amount represented by the charge / discharge plan is ≧0 and the charge / discharge plan represents no charge / discharge or discharge to the storage battery 23: Contracted power amount represented by the power generation plan > Curtailed output amount Equation (B)
[0065] When the adjustment unit 15C determines that it is necessary to adjust at least one of the PVPCS output rate and the charge / discharge plan, it executes an adjustment process for adjusting at least one of the PVPCS output rate and the charge / discharge plan of the storage battery 23.
[0066] In detail, when the adjustment unit 15C determines that it is necessary to adjust at least one of the PVPCS output rate and the charge / discharge plan, the adjustment unit 15C adjusts at least one of the PVPCS output rate and the charge / discharge plan of the storage battery 23 by individual calculation based on the state of the power generation plan and the charge / discharge plan for each unit time. In this embodiment, the adjustment unit 15C executes an adjustment process to adjust at least one of the PVPCS output rate and the charge / discharge plan of the storage battery 23 by individual calculation based on the state of the power generation plan and the charge / discharge plan for each unit time represented by each of the following patterns 1 to 4.
[0067] Pattern 1: First, we will explain pattern 1. Pattern 1 is assumed to be a case where the contracted amount of power represented by the power generation plan is a value (a value exceeding 0) that represents power sale, the charge / discharge amount represented by the charge / discharge plan does not represent charging or discharging, and the adjustment unit 15C determines that at least one of the PVPCS output rate and the charge / discharge plan needs to be adjusted.
[0068] In this case, the adjustment unit 15C calculates an adjusted charge / discharge plan in which the charge / discharge plan is adjusted so that the excess power generation amount, which is the minimum (the smaller value) of the first subtraction result obtained by subtracting the suppressed output amount represented by the output suppression information from the agreed power amount, and the charging reserve capacity of the storage battery 23, is charged to the storage battery 23.
[0069] In addition, the adjustment unit 15C calculates the adjusted PVPCS output rate by subtracting the suppressed output amount from the agreed power amount and adding the charge / discharge amount represented by the adjusted charge / discharge plan to the calculated result, and then subtracting the result from the agreed power amount, and setting the result as the adjusted PVPCS output amount output from the PV 21 to the storage battery 23 and the power system 3.
[0070] That is, in the case of pattern 1, the adjustment unit 15C calculates the adjusted charge / discharge plan and the adjusted PVPCS output rate by the following formulas (C) and (D).
[0071] Adjusted charge / discharge plan (kWh) = min (contracted power amount - suppressed output amount, charging capacity) x -1 ...Formula (C) Adjusted PVPCS output rate = ((contracted power amount - (contracted power amount - suppressed output amount + charge / discharge amount represented by the adjusted charge / discharge plan)) / (rated output of PVPCS22 / 2)) x 100 ...Formula (D)
[0072] In the case of pattern 1, if control is performed to simply match the PVPCS output rate to the suppressed output rate indicated by the output suppression instruction, there is a possibility that the excess power generation amount that exceeds the suppressed output amount will be discarded.
[0073] Therefore, the adjustment unit 15C uses the above formula (C) and formula (D) to calculate the adjusted charge / discharge plan and the adjusted PVPCS output rate. Through these calculations, the adjustment unit 15C generates an adjusted charge / discharge plan in which the charge / discharge plan is adjusted so that the power of the excess power generation amount to be discarded is charged to the storage battery 23 while satisfying the suppression output rate to the power grid 3 represented by the output suppression instruction. Furthermore, if the charging capacity is sufficient, the adjustment unit 15C calculates an adjusted PVPCS output rate in which the PVPCS output rate is adjusted so that the output of the contracted power amount represented by the power generation plan is maintained. However, depending on the charging capacity, it may not be possible to charge all of the power of the excess power generation amount to the storage battery 23. In this case, the adjustment unit 15C may adjust the adjusted PVPCS output rate to be further lowered.
[0074] Pattern 2: Next, a description will be given of pattern 2. A case is assumed as pattern 2 in which the contracted amount of power represented by the power generation plan is a value (i.e., 0 or less) that does not represent power sale, the charge / discharge amount represented by the charge / discharge plan represents charging, and the adjustment unit 15C determines that at least one of the PVPCS output rate and the charge / discharge plan of the storage battery 23 needs to be adjusted.
[0075] In this case, the adjustment unit 15C calculates an adjusted PVPCS output rate, which sets the charge / discharge amount represented by the charge / discharge plan as the adjusted PVPCS output amount output from the PV 21 to the storage battery 23 and the power grid 3. In this case, the adjustment unit 15C does not adjust the charge / discharge plan. The adjusted PVPCS output amount is the PVPCS output amount after adjustment.
[0076] That is, in the case of pattern 2, the adjustment unit 15C does not adjust the charge / discharge plan, and calculates the adjusted PVPCS output rate by the following formula (E).
[0077] Adjusted PVPCS output rate = (charge / discharge amount represented by charge / discharge plan / (rated output of PVPCS22 / 2)) × 100 × -1 Formula (E)
[0078] In the case of pattern 2, if control is performed to simply match the PVPCS output rate to the suppression output rate represented by the output suppression instruction, it may become impossible to execute charge / discharge control in accordance with the charge / discharge plan that maximizes trading profits in accordance with the power generation plan represented by the contracted power volume.
[0079] Therefore, the adjustment unit 15C calculates the adjusted PVPCS output rate using the above formula (E). Through these calculations, the adjustment unit 15C calculates the adjusted PVPCS output rate by adjusting the PVPCS output rate so that the charge / discharge control according to the charge / discharge plan can be executed while satisfying the suppression output rate to the power grid 3 represented by the output suppression instruction.
[0080] Pattern 3: Next, a description will be given of pattern 3. A case is assumed as pattern 3 in which the contracted amount of power represented by the power generation plan is a value (a value exceeding 0) representing power sale, the amount of charge / discharge represented by the charge / discharge plan represents charging, and the adjustment unit 15C determines that at least one of the PVPCS output rate and the charge / discharge plan needs to be adjusted.
[0081] In the case of pattern 3, when the suppressed output amount represented by the output suppression information is equal to or greater than the contracted power amount, the adjustment unit 15C calculates an adjusted PVPCS output rate, which is the result of subtracting the charging amount represented by a negative value in the charge / discharge plan from the contracted power amount, and sets the result as the adjusted PVPCS output amount output from the PV 21 to the storage battery 23 and the power system 3.
[0082] That is, in pattern 3, when the suppressed output amount represented by the output suppression information is equal to or greater than the contracted power amount, the adjustment unit 15C does not adjust the charge / discharge plan, and calculates the adjusted PVPCS output rate by the following formula (F).
[0083] If the suppressed output amount is greater than or equal to the contracted power amount, Adjusted PVPCS output rate = (contracted power amount - charging amount represented by charge / discharge plan) / (rated output of PVPCS22 / 2)) × 100 Formula (F)
[0084] On the other hand, in the case of pattern 3, when the suppressed output amount represented by the output suppression information is less than the contracted power amount, the adjustment unit 15C calculates an adjusted charge / discharge plan by adjusting the charge / discharge plan so that the excess power generation amount, which is the sum of the minimum (the smaller value) of the first subtraction result obtained by subtracting the suppressed output amount represented by the output suppression information from the contracted power amount and the charging reserve of the storage battery 23, and the charge / discharge amount represented by the charge / discharge plan, is charged to the storage battery 23.
[0085] In addition, the adjustment unit 15C calculates the adjusted PVPCS output rate by subtracting a second addition value between the suppressed output amount and the charge / discharge amount represented by the adjusted charge / discharge plan from a first addition value between the charge / discharge amount represented by the charge / discharge plan and the agreed power amount, and setting the adjusted PVPCS output rate to a second subtraction result obtained by subtracting the charge / discharge amount represented by the charge / discharge plan from the agreed power amount.
[0086] That is, in pattern 3, when the suppressed output amount represented by the output suppression information is less than the contracted power amount, the adjustment unit 15C calculates the adjusted charge / discharge plan and the adjusted PVPCS output rate using the following formulas (G) and (H).
[0087] If the suppressed output amount is less than the contracted power amount, Adjusted charge / discharge plan (kWh) = Charge / discharge amount represented by the charge / discharge plan + min((contracted power amount - suppressed output amount), charging margin) ··· Equation (G) Adjusted PVPCS output rate = (contracted power amount - charge / discharge amount represented by the charge / discharge plan - (charge / discharge amount represented by the charge / discharge plan + contracted power amount - suppressed output amount + charge / discharge amount represented by the adjusted charge / discharge plan)) / (rated output of PVPCS22 / 2)) x 100 ...Formula (H)
[0088] In the case of pattern 3, if control is performed to simply match the PVPCS output rate to the suppression output rate represented by the output suppression instruction, it may become impossible to execute charge / discharge control in accordance with the charge / discharge plan that maximizes trading profits in accordance with the power generation plan represented by the contracted power volume.
[0089] Therefore, the adjustment unit 15C calculates the adjusted PVPCS output rate using formula (F) if the suppressed output amount is greater than or equal to the contracted power amount, and calculates the adjusted charge / discharge plan and the adjusted PVPCS output rate using formulas (G) and (H) if the suppressed output amount is less than the contracted power amount.
[0090] Through these calculations, the adjustment unit 15C calculates an adjusted PVPCS output rate and an adjusted charge / discharge plan in which the PVPCS output rate is adjusted so that the excess power generation amount to be discarded is charged to the storage battery 23 while satisfying the suppression output rate to the power grid 3 represented by the output suppression instruction, and charge / discharge control according to the charge / discharge plan can be executed. Furthermore, if the charging capacity is sufficient, the adjustment unit 15C calculates an adjusted PVPCS output rate in which the PVPCS output rate is adjusted so that the output of the contracted amount of power represented by the power generation plan is maintained. However, depending on the charging capacity, it may not be possible to charge all of the excess power generation amount to the storage battery 23. In this case, the adjustment unit 15C may adjust the adjusted PVPCS output rate to be further lowered.
[0091] Pattern 4: Next, a description will be given of pattern 4. A case where the contracted amount of power represented by the power generation plan is a value (a value exceeding 0) representing power sale, the charge / discharge amount represented by the charge / discharge plan represents discharging, and the adjustment unit 15C determines that at least one of the PVPCS output rate and the charge / discharge plan of the storage battery 23 needs to be adjusted is assumed as pattern 4.
[0092] In this case, the adjustment unit 15C calculates a value obtained by subtracting the suppressed output amount from the contracted power amount from the discharge amount represented by the charge and discharge plan as the adjusted charge and discharge plan.
[0093] Then, when the adjusted charge / discharge plan represents a discharge, the adjustment unit 15C calculates the adjusted PVPCS output rate by subtracting the discharge amount represented by a positive value in the charge / discharge plan from the agreed amount of power, and adding the charge / discharge amount represented by the adjusted charge / discharge plan to the subtraction result, and setting the added result as the adjusted PVPCS output amount.
[0094] In addition, when the adjusted charge / discharge plan represents charging, the adjustment unit 15C calculates an adjusted PVPCS output rate by subtracting the discharge amount represented by a positive value in the charge / discharge plan from the contracted amount of power, and setting the result as the adjusted PVPCS output amount.
[0095] That is, in the case of pattern 4, the adjustment unit 15C calculates the adjusted charge / discharge plan by the following formula (I). Also, the adjustment unit 15C calculates the adjusted output rate by the following formula (J) or (K).
[0096] Adjusted charge / discharge plan (kWh) = charge / discharge amount represented by the charge / discharge plan - (contracted power amount - suppressed output amount) Formula (I)
[0097] When the adjusted charge / discharge schedule represented by formula (I) indicates discharge: Adjusted PVPCS output rate = ((contracted power amount - charge / discharge amount represented by charge / discharge plan + charge / discharge amount represented by adjusted charge / discharge plan) / rated output of PVPCS22) x 100 x 2 ...Formula (J)
[0098] When the adjusted charge / discharge schedule represented by formula (I) indicates charging: Adjusted PVPCS output rate = ((contracted power amount - charge / discharge amount represented by charge / discharge plan) / rated output of PVPCS22) × 100 × 2 Formula (K)
[0099] In the above formula, "contracted power amount - charging / discharging amount represented by the charge / discharge plan" means the power generation amount of the PV 21. In addition, "contracted power amount - charging / discharging amount represented by the charge / discharge plan + charging / discharging amount represented by the adjusted charge / discharge plan" and "contracted power amount - charging / discharging amount represented by the charge / discharge plan", which are the numerators of the fractions represented by the above formulas (J) and (K), respectively, represent the adjusted PVPCS output amount.
[0100] In the case of pattern 4, if control is performed to simply match the PVPCS output rate to the suppression output rate represented by the output suppression instruction, it may become impossible to execute charge / discharge control in accordance with the charge / discharge plan that maximizes trading profits in accordance with the power generation plan represented by the contracted power volume.
[0101] Therefore, the adjustment unit 15C calculates the adjusted charge / discharge plan using the above formula (I), and calculates the adjusted PVPCS output rate using formula (J) or formula (K) depending on the calculation result of formula (I). Through these calculations, the adjustment unit 15C calculates the adjusted PVPCS output rate and the adjusted charge / discharge plan in which the PVPCS output rate is adjusted so that the suppression output rate to the power grid 3 represented by the output suppression instruction is satisfied, the excess power generation amount to be discarded is charged to the storage battery 23, and the charge / discharge control according to the charge / discharge plan can be executed.
[0102] In this way, the adjustment unit 15C performs an adjustment process to adjust at least one of the PVPCS output rate and the charge / discharge plan of the storage battery 23 for each unit time by individual calculations based on the state of the power generation plan and the charge / discharge plan for each unit time represented by each of patterns 1 to 4.
[0103] Then, the adjustment unit 15C outputs the adjusted PVPCS output rate and the adjusted charge / discharge plan to the power generation equipment control unit 15D as the final PVPCS output rate and the final charge / discharge plan, respectively.
[0104] When the charge / discharge plan is not adjusted in Pattern 1 to Pattern 4, the adjustment unit 15C may output the charge / discharge plan to the power generation equipment control unit 15D as a final charge / discharge plan.
[0105] Furthermore, when the states of the power generation plan and the charge / discharge plan are not represented by any of the patterns of Pattern 1 to Pattern 4, the adjustment unit 15C does not adjust the PVPCS output rate and the charge / discharge plan, and outputs the suppression output rate and the charge / discharge plan represented by the output suppression information as they are as the final PVPCS output rate and the final charge / discharge plan, respectively, to the power generation equipment control unit 15D. A case in which the states of the power generation plan and the charge / discharge plan are not represented by any of the patterns of Pattern 1 to Pattern 4 is, for example, a case in which the contracted amount of power is zero, there is no power selling plan, and the charge / discharge amount represented by the charge / discharge plan is zero, i.e., there is no charge / discharge plan.
[0106] A specific example of the adjustment process performed by the adjustment unit 15C will be described.
[0107] Fig. 4 is a diagram showing a specific example of the adjustment process by the adjustment unit 15C. Fig. 4 shows five types of states of the power generation plan and the charge / discharge plan: no power sale and no charge / discharge, power sale and no charge / discharge, no power sale and charging, power sale and charging, and power sale and discharging. Fig. 4 shows the final charge / discharge plan and the final PVPCS output rate calculated for each of these types of states according to the contracted amount of power, the amount of charge / discharge represented by the charge / discharge plan, and the suppression output rate represented by the output suppression information. Fig. 4 shows an example in which the rated output of the PVPCS 22 is 1000 kWh.
[0108] In addition, in Figure 4, for each of states A to M, if the adjusted PVPCS output rate obtained by adjusting the suppression output rate represented by the output suppression information is set as the final PVPCS output rate, or if the adjusted charge / discharge plan obtained by adjusting the charge / discharge amount represented by the charge / discharge plan is set as the final charge / discharge plan, the adjustment status is indicated as "Yes," and if no adjustment is made, the adjustment status is indicated as "No."
[0109] As shown in Figure 4, in the case of state A, there is no power selling and no charging or discharging, so the adjustment unit 15C calculates the suppression output rate represented by the output suppression information as the final PVPCS output rate without adjusting it, and calculates the charging and discharging amount represented by the charging and discharging plan as the final charging and discharging plan without adjusting it.
[0110] In the case of state B, if the suppressed output rate of 60% represented by the output suppression information is used as the final PVPCS output rate, only 300 kWh can be discharged (sold). Furthermore, if the PV 21 generates 400 kWh, which is the contracted power generation amount, 100 kWh will be discarded. Therefore, the adjustment unit 15C performs the above adjustment process to calculate, as the final charge / discharge plan, an adjusted charge / discharge plan in which the charge / discharge amount is adjusted so that the excess power generation amount of 100 kWh is charged to the storage battery 23. Furthermore, the adjustment unit 15C calculates, as the final PVPCS output rate, a post-adjustment PVPCS output rate of 80%, which is a value different from the suppressed output rate of 60% represented by the output suppression information.
[0111] In the case of state C, even if the suppressed output rate represented by the output suppression information is 60%, the PVPCS 22 is capable of PVPCS output of 200 kWh, so the adjustment unit 15C does not perform adjustment processing. That is, in the case of state C, the adjustment unit 15C calculates the suppressed output rate represented by the output suppression information as it is as the final PVPCS output rate, and calculates the charge / discharge plan as it is as the final charge / discharge plan.
[0112] In the case of state D, if the suppressed output rate represented by the output suppression information is 20%, only 100 kWh can be charged to the storage battery 23. Therefore, the adjustment unit 15C performs the above adjustment process to calculate a post-adjustment PVPCS output rate of 60%, which is a value different from the suppressed output rate of 20% represented by the output suppression information, as the final PVPCS output rate. By setting the final PVPCS output rate to 60%, it becomes possible to charge the storage battery 23 with 300 kWh of power in accordance with the charge and discharge plan.
[0113] In the case of state E, since the suppression output rate represented by the output suppression information is 80%, 400 kWh of power can be charged to the storage battery 23. Since the PVPCS 22 is capable of PVPCS output of 200 kWh, the adjustment unit 15C does not perform adjustment processing. That is, in the case of state E, the adjustment unit 15C calculates the suppression output rate represented by the output suppression information as it is as the final PVPCS output rate, and calculates the charge / discharge plan as it is as the final charge / discharge plan.
[0114] In the case of state F, if the suppression output rate represented by the output suppression information is 50%, the PVPCS output amount is a maximum of 250 kWh, so the contracted amount of power can be secured. It is also possible to charge the remaining 100 kWh to the storage battery 23. Therefore, the adjustment unit 15C calculates, by the above adjustment process, a post-adjustment PVPCS output rate of 60%, which is a value different from the suppression output rate of 50% represented by the output suppression information, as the final PVPCS output rate. As a result, the adjustment unit 15C adjusts the PVPCS output amount to 300 kWh. In this case, the adjustment unit 15C does not adjust the charge / discharge plan.
[0115] In the case of state G, if the suppression output rate of 20% represented by the output suppression information is used as the final PVPCS output rate, the PVPCS output amount will be a maximum of 100 kWh, and it will be impossible to sell the contracted amount of power of 200 kWh. Therefore, the adjustment unit 15C performs the above adjustment process to calculate the adjusted PVPCS output rate of 60%, which is a value different from the suppression output rate of 20% represented by the output suppression information, as the final PVPCS output rate. In addition, the adjustment unit 15C performs the above adjustment process to calculate, as the final charge / discharge plan, an adjusted charge / discharge plan in which the charge / discharge amount is adjusted so that the excess power generation amount of 200 kWh is charged to the storage battery 23.
[0116] In the case of state H, since the suppressed output rate represented by the output suppression information is 80%, 400 kWh of power can be charged to the storage battery 23, and therefore the PVPCS 22 is capable of PVPCS output for 200 kWh, so the adjustment unit 15C does not perform adjustment processing. That is, in the case of state H, the adjustment unit 15C calculates the suppressed output rate represented by the output suppression information as it is as the final PVPCS output rate, and calculates the charge / discharge plan as it is as the final charge / discharge plan.
[0117] In the case of state I, if the suppression output rate of 30% represented by the output suppression information is used as the final PVPCS output rate, the PVPCS output amount will be a maximum of 150 kWh, and it will not be possible to discharge 300 kW represented by the charge / discharge plan. Therefore, by performing the above adjustment process, the adjustment unit 15C derives, as the final charge / discharge plan, an adjusted charge / discharge plan in which 150 kWh is left in the storage battery 23 without being discharged and the charge / discharge amount is adjusted to discharge 150 kWh.
[0118] In the case of state J, the suppressed output rate represented by the output suppression information is 90%, so the PVPCS output amount is a maximum of 450 kWh. Therefore, in this case, the adjustment unit 15C does not perform adjustment processing. That is, in the case of state J, the adjustment unit 15C calculates the suppressed output rate represented by the output suppression information as the final PVPCS output rate as it is, and calculates the charge / discharge plan as it is, as the final charge / discharge plan.
[0119] In the case of state K, if the suppression output rate of 40% represented by the output suppression information is used as the final PVPCS output rate, the maximum PVPCS output amount will be 200 kWh. In this case, since the power generation amount of PV 21 is 150 kWh and the discharge amount of storage battery 23 is 150 kWh, storage battery 23 can discharge 50 kWh. Therefore, by performing the above adjustment process, adjustment unit 15C calculates an adjusted charge / discharge plan in which the charge / discharge amount is adjusted so that 50 kWh is discharged from storage battery 23 as the final charge / discharge plan.
[0120] In the case of state L, the adjustment unit 15C does not perform the adjustment process. That is, in the case of state J, the adjustment unit 15C calculates the suppression output rate represented by the output suppression information as the final PVPCS output rate as it is, and calculates the charge / discharge plan as it is as the final charge / discharge plan.
[0121] In the case of state M, if the suppressed output rate of 20% represented by the output suppression information is used as the final PVPCS output rate, only 100 kWh of the discharge amount of 150 kWh represented by the charge / discharge plan can be discharged. Since the PV 21 is expected to generate 150 kWh of power, the adjustment unit 15C calculates, as the final charge / discharge plan, an adjusted charge / discharge plan in which the charge / discharge amount is adjusted by the above adjustment process so that 50 kWh is charged to the storage battery 23. In addition, by performing the above adjustment process, the adjustment unit 15C calculates, as the final PVPCS output rate, a post-adjustment PVPCS output rate of 30%, which is a value different from the suppressed output rate of 20% represented by the output suppression information.
[0122] The description will continue by returning to Fig. 2. Next, the power generation facility control unit 15D will be described.
[0123] The power generation equipment control unit 15D controls the storage batteries PCS24 and PVPCS22 of the power generation equipment 20 based on a final PVPCS output rate and a final charge / discharge plan that includes at least one of the adjusted PVPCS output rate, which is the adjusted PVPCS output rate, and the adjusted charge / discharge plan, which is the adjusted charge / discharge plan.
[0124] In other words, when the adjustment process of the charge / discharge plan is performed by the adjustment unit 15C, the power generation equipment control unit 15D controls the storage battery PCS24 by setting the adjusted charge / discharge plan as the final charge / discharge plan, and when the adjustment process of the charge / discharge plan is not performed, by setting the charge / discharge plan as the final charge / discharge plan.
[0125] In detail, the power generation equipment control unit 15D outputs the final charge / discharge plan calculated for each unit time to the storage battery PCS 24. Upon receiving the final charge / discharge plan, the storage battery PCS 24 controls the charge / discharge of the storage battery 23 so that the charge / discharge amount is the amount represented by the final charge / discharge plan.
[0126] In addition, when the adjustment unit 15C performs an adjustment process on the PVPCS output rate, the power generation equipment control unit 15D controls the PVPCS 22 by setting the adjusted PVPCS output rate as the final PVPCS output rate, and when the adjustment process on the PVPCS output rate is not performed, by setting the suppressed output rate represented by the output suppression information as the final PVPCS output rate.
[0127] In detail, the power generation equipment control unit 15D outputs the final PVPCS power output rate calculated for each unit time to the PVPCS 22. Upon receiving the final PVPCS power output rate, the PVPCS 22 controls the PVPCS power output rate so that the PVPCS power output rate becomes the received final PVPCS power output rate.
[0128] Therefore, at least one of the charge / discharge plan and the PVPCS output rate according to the power generation plan represented by the contracted power amount in the power trading market 5 is adjusted so that the excess power generation amount exceeding the suppressed output amount represented by the output suppression information is charged to the storage battery 23. Then, the PVPCS 22 and the storage battery PCS 24 are controlled based on the final PVPCS output rate and the final charge / discharge plan including at least one of the adjusted PVPCS output rate and the adjusted charge / discharge plan.
[0129] Next, an example of the flow of information processing executed by the power generation facility control system 10 of this embodiment will be described.
[0130] FIG. 5 is a flowchart showing an example of the flow of information processing executed by the power generation facility control system 10 of this embodiment.
[0131] The plan creation unit 15A creates a power generation plan and a charge / discharge plan for the power generation facility 20 (step S100). The plan creation unit 15A creates a power generation plan represented by the contracted amount of power in the power trading market 5, and a charge / discharge plan for the storage battery 23 according to the power generation plan.
[0132] The reception unit 15B receives output suppression information representing an instruction to suppress the output of electric power output from the power generation facility 20 to the electric power system 3 (step S102).
[0133] The adjustment unit 15C executes an adjustment process to adjust at least one of the PVPCS output rate and the charge / discharge plan based on the power generation plan and the charge / discharge plan created in step S100 so that the excess power generation amount that exceeds the suppressed output amount represented by the output suppression information received in step S102 is charged to the storage battery 23 (step S104).
[0134] The power generation facility control unit 15D controls the storage battery PCS 24 and the PVPCS 22 of the power generation facility 20 based on the final PVPCS output rate and the final charge / discharge plan including at least one of the adjusted PVPCS output rate, which is the PVPCS output rate adjusted in step S104, and the adjusted charge / discharge plan, which is the adjusted charge / discharge plan (step S106). Then, this routine ends.
[0135] As described above, the power generation facility control system 10 of the present embodiment includes a reception unit 15B, an adjustment unit 15C, and a power generation facility control unit 15D. The reception unit 15B receives output suppression information representing an output suppression instruction of power output from a power generation facility 20 including a storage battery 23, a storage battery PCS 24 (storage battery control unit) that controls charging and discharging of the storage battery 23, a PV 21 (renewable energy power source), and a PVPCS 22 (output rate control unit) that controls a PVPCS output rate (output rate) of power output from the PV 21 to the storage battery 23 and the power system 3. When the adjustment unit 15C receives the output suppression information, the adjustment unit 15C adjusts at least one of the PVPCS output rate and the charge / discharge plan of the storage battery 23 according to the power generation plan represented by the contracted power amount of the power trading market 5 so that the power of the excess power generation amount exceeding the suppressed output amount represented by the output suppression information is charged to the storage battery 23. The power generation equipment control unit 15D controls the PVPCS 22 and the storage battery PCS 24 based on a final PVPCS output rate (final output rate) and a final charge / discharge plan, which includes at least one of the adjusted PVPCS output rate, which is the adjusted PVPCS output rate, and the adjusted charge / discharge plan, which is the adjusted charge / discharge plan.
[0136] Therefore, for example, when the suppression output rate represented by the output suppression information is 40%, the adjustment unit 15C can adjust at least one of the PVPCS output rate and the charging / discharging plan of the storage battery 23 according to the power generation plan represented by the contracted power amount in the electricity trading market 5 so that the final PVPCS output rate is 100%, 60% of the final PVPCS output rate is charged to the storage battery 23, and 40% is output to the power grid 3.
[0137] Here, in the conventional technology, the excess power generation amount exceeding the suppression output amount indicated by the output suppression instruction may be discarded. Even if the power generation facility is equipped with a storage battery, in the case of online control, the PCS that controls the output rate of the renewable energy to the power grid performs output restriction processing, so that the storage battery 23 is not charged and the renewable energy may be discarded.
[0138] On the other hand, in the power generation equipment control system 10 of this embodiment, when the adjustment unit 15C receives output suppression information, it adjusts at least one of the PVPCS output rate and the charge / discharge plan of the storage battery 23 according to the power generation plan represented by the contracted power amount in the power trading market 5 so that the excess power generation amount exceeding the suppressed output amount represented by the output suppression information is charged to the storage battery 23. The power generation equipment control unit 15D controls the storage battery PCS24 and the PVPCS22 based on the final PVPCS output rate and the final charge / discharge plan including at least one of the adjusted PVPCS output rate, which is the adjusted PVPCS output rate, and the adjusted charge / discharge plan, which is the adjusted charge / discharge plan.
[0139] Therefore, in the power generation equipment control system 10 of this embodiment, while realizing a suppression output rate for the power grid 3 in response to an output suppression instruction, it is possible to control so that the excess power generation amount that exceeds the suppression output amount represented by the suppression output rate is charged to the storage battery 23.
[0140] Therefore, the power generation facility control system 10 of this embodiment can achieve both output suppression in response to an output suppression instruction and suppression of waste of renewable energy.
[0141] Furthermore, the power generation facility control system 10 of this embodiment adjusts at least one of the PVPCS output rate and the charge / discharge plan of the storage battery 23 according to the power generation plan represented by the contracted amount of power in the power trading market 5. Therefore, the power generation facility control system 10 of this embodiment can control the storage battery PCS 24 and the PVPCS 22 while taking into account the contracted amount of power.
[0142] Therefore, in addition to the above-mentioned effects, the power generation facility control system 10 of the present embodiment can suppress an increase in imbalance during output suppression.
[0143] (Variation 1) In the above embodiment, the plan creation unit 15A creates a charge / discharge plan for 24 hours for the next day, receives output suppression information at a timing after the charge / discharge plan is created, and executes the adjustment process. However, the timing of receiving the output suppression information is not limited.
[0144] FIG. 6 is a diagram illustrating an example of various timing patterns having different timings for receiving output suppression information.
[0145] For example, as shown in timing pattern A, the plan creation unit 15A creates a power generation plan and a charge / discharge plan for 24 hours (48 frames) for the next day (present day) at 8:00 a.m. on the previous day. As described above, the power generation plan and the charge / discharge plan are created according to the contracted power amount determined by a sell bid to the power trading market 5 such as a spot market based on the derivation of a power generation forecast value, the creation of a charge / discharge plan which is a time shift operation plan, and the creation of a spot bidding plan which is a sell bid plan. Then, assume that the reception unit 15B receives output suppression information on the previous day after the spot market is closed. In this case, as described in the above embodiment, the adjustment unit 15C performs the above-mentioned adjustment process based on the power generation plan, the charge / discharge plan created on the previous day, and the received output suppression information.
[0146] Also, for example, as shown in timing pattern B, a case where output suppression information is received on the day is assumed. In this case, similarly to timing pattern A, the adjustment unit 15C may perform the above-mentioned adjustment process based on the power generation plan, charge / discharge plan, and received output suppression information created on the previous day. However, the adjustment unit 15C executes the above-mentioned adjustment process only for each time slot of the unit time after the timing at which the output suppression information is received.
[0147] Also, for example, as shown in timing pattern C, the reception unit 15B may receive the output suppression information before the plan creation unit 15A creates a power generation plan and a charge / discharge plan for the next 24 hours. In this case, the adjustment unit 15C may create a power generation plan and a charge / discharge plan for the next 24 hours taking into account the output suppression information. That is, in the case of timing pattern C, the adjustment unit 15C may create a charge / discharge plan for the storage battery 23 according to the power generation plan represented by the PVPCS output rate and the contracted power amount of the power trading market 5, which is adjusted so that the power of the excess power generation amount that exceeds the suppressed output amount represented by the output suppression information is charged to the storage battery 23.
[0148] (Variation 2) As described above, the plan creation unit 15A creates a charge / discharge plan based on the predicted power generation amount. However, there are cases where the actual measured value of the power generation amount of the PV 21 is different from the predicted power generation amount.
[0149] Therefore, the adjustment unit 15C may further adjust the charge / discharge plan created by the plan creation unit 15A based on the actual value of the amount of power generated by the PV 21.
[0150] Specifically, the adjustment unit 15C may execute the following process in addition to the adjustment process described in the above embodiment.
[0151] When the actual value is greater than the predicted power generation amount, the excess power generation amount that exceeds the suppressed output amount represented by the output suppression information will be greater than expected. Therefore, in this case, the adjustment unit 15C monitors the actual value in real time, and when the actual value is greater than the predicted power generation amount, the charge / discharge plan is further adjusted to increase the charge amount of the storage battery 23 by the amount of power difference between the actual value and the predicted power generation amount.
[0152] In addition, when the actual value is smaller than the predicted power generation amount, the excess power generation amount that exceeds the suppressed output amount represented by the output suppression information is less than expected. Therefore, in this case, the adjustment unit 15C monitors the actual value in real time, and when the actual value is smaller than the predicted power generation amount, it is sufficient to control so as not to further adjust the charge / discharge plan.
[0153] (Variation 3) In the above embodiment, the reception unit 15B is assumed to receive the output suppression information once on the previous day. However, the reception unit 15B may receive the output suppression information multiple times. In this case, the adjustment unit 15C may execute the above adjustment process to adjust at least one of the PVPCS output rate and the charge / discharge plan each time the output suppression information is received. (Variation 4) In the above embodiment, the plan creation unit 15A creates a power generation plan and a charge / discharge plan for the next 24 hours based on the power generation prediction value. However, the accuracy of the power generation prediction value tends to improve as it approaches the actual supply and demand cross section. Therefore, the closer it is to the actual supply and demand cross section, the more likely it is that the plan creation unit 15A can create a power generation plan and a charge / discharge plan with high accuracy.
[0154] Therefore, the plan creation unit 15A may create a power generation plan and a charge / discharge plan based on the power generation prediction value as of the previous day, and may update the power generation plan and the charge / discharge plan by creating the power generation plan and the charge / discharge plan using the latest power generation prediction value once or multiple times on the day. Then, the adjustment unit 15C may execute the above adjustment process of adjusting at least one of the PVPCS output rate and the charge / discharge plan every time the power generation plan is updated.
[0155] By updating the power generation plan and the charge / discharge plan by the plan creation unit 15A, in addition to the effects of the above embodiment, it becomes possible to further reduce the wasted power of the PV 21 and charge it into the storage battery 23.
[0156] (Variation 5) In the above embodiment, a configuration in which one power generation facility 20 includes one PV 21 and one storage battery 23 has been described as an example (see FIG. 1 and FIG. 2). However, one power generation facility 20 may include a plurality of PVs 21 and a plurality of storage batteries 23. In this case, one PVPCS 22 provided in the power generation facility 20 may collectively regard the plurality of PVs 21 as one PV 21 and perform the above control. Also, one storage battery PCS 24 provided in the power generation facility 20 may collectively regard the plurality of storage batteries 23 as one storage battery 23 and perform the above control. Similarly, the power generation facility control system 10 may regard the plurality of PVs 21 provided in the power generation facility 20 as one PV 21 and the plurality of storage batteries 23 as one storage battery 23, and perform the same processing as in the above embodiment.
[0157] For example, the charging capacity used during the adjustment process may be the total value of the charging capacity of the multiple storage batteries 23. Then, the power generation equipment control unit 15D and the storage battery PCS 24 may control the multiple storage batteries 23 by allocating a charging and discharging plan to the multiple storage batteries 23. This allocation may be made by apportioning the output, capacity, or the like of each of the multiple storage batteries 23.
[0158] (Variation 6) In the above embodiment, it is assumed that the energy trading market 5 is a spot market that closes by 10:00 a.m. on the previous day. However, the energy trading market 5 may be an afore-hours market where buying and selling is possible on the same day. When the energy trading market 5 is an afore-hours market, the power generation plan that indicates the contracted amount of power is updated according to the contract on the day.
[0159] Therefore, the adjustment unit 15C may re-execute the adjustment process for adjusting at least one of the PVPCS output rate and the charge / discharge plan every time the power generation plan is updated.
[0160] (Variation 7) In the above embodiment, the plan creation unit 15A generates the charge / discharge plan as a time shift plan as an example. However, the plan creation unit 15A may generate a charge / discharge plan corresponding to an imbalance avoidance operation for controlling the charge / discharge of the storage battery 23 so as to reduce the imbalance.
[0161] In this case, the adjustment unit 15C may execute the same adjustment process as in the above embodiment for the charge amount represented by the charge / discharge plan. Also, the adjustment unit 15C may adjust the discharge amount represented by the charge / discharge plan so that the total value of the discharge amount and the contracted power amount does not exceed the suppression output rate represented by the output suppression information.
[0162] (Variation 8) The power generation facility control system 10 of the above embodiment can also perform the same control as above on a substitute power generation facility for the power generation facility 20, thereby enabling online substitute control.
[0163] Next, an example of a hardware configuration of the power generation facility control system 10 according to the above embodiment and the modified example will be described.
[0164] FIG. 7 is a hardware configuration diagram of an example of the power generation facility control system 10 according to the above embodiment and the modified example.
[0165] The power generation equipment control system 10 of the above embodiment and modified example has a hardware configuration utilizing a conventional computer, in which a CPU (Central Processing Unit) 81, a ROM (Read Only Memory) 82, a RAM (Random Access Memory) 83, a communication I / F 84, etc. are interconnected via a bus 85.
[0166] The CPU 81 is a calculation device that controls the power generation equipment control system 10 of the above embodiment and modified example. The ROM 82 stores programs and the like that realize various processes by the CPU 81. Although a CPU is used for the description here, a GPU (Graphics Processing Unit) may be used as the calculation device that controls the power generation equipment control system 10. The RAM 83 stores data necessary for various processes by the CPU 81. The communication I / F 84 is an interface for transmitting and receiving data.
[0167] In the power generation facility control system 10 of the above embodiment and modification, the CPU 81 reads a program from the ROM 82 onto the RAM 83 and executes it, thereby realizing each of the above functions on the computer.
[0168] The programs for executing the above-mentioned processes executed in the power generation equipment control system 10 of the above-mentioned embodiment and modification may be stored in an HDD (hard disk drive). Also, the programs for executing the above-mentioned processes executed in the power generation equipment control system 10 of the above-mentioned embodiment may be provided by being pre-installed in the ROM 82.
[0169] The programs for executing the above processes executed in the power generation equipment control system 10 of the above embodiment and modification may be stored in a computer-readable storage medium such as a CD-ROM, CD-R, memory card, DVD (Digital Versatile Disk), or flexible disk (FD) in an installable or executable format file and provided as a computer program product. The programs for executing the above processes executed in the power generation equipment control system 10 of the above embodiment and modification may be stored on a computer connected to a network such as the Internet and provided by downloading the programs via the network. The programs for executing the above processes executed in the power generation equipment control system 10 of the above embodiment and modification may be provided or distributed via a network such as the Internet.
[0170] Although the embodiment of the present invention has been described above, this embodiment is presented as an example and is not intended to limit the scope of the invention. This new embodiment can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the gist of the invention. This embodiment and its modifications are included in the scope and gist of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]
[0171] 10...power generation equipment control system, 15B...reception unit, 15C...adjustment unit, 15D...power generation equipment control unit, 20...power generation equipment, 21...PV, 22...PVPCS, 23...storage battery, 24...storage battery PCS
Claims
1. a reception unit that receives output suppression information representing an output suppression instruction for electric power output to a power grid from a power generation facility including a storage battery, a storage battery control unit that controls charging and discharging of the storage battery, a renewable energy power source, and an output rate control unit that controls an output rate of electric power output from the renewable energy power source to the storage battery and the power grid; an adjustment unit that adjusts at least one of the output rate and a charge / discharge plan of the storage battery according to a power generation plan represented by a contracted amount of power in an electricity trading market, when the output suppression information is received, so that an excess amount of power generated that exceeds a suppressed output amount represented by the output suppression information is charged to the storage battery; A power generation facility control unit that controls the output rate control unit and the storage battery control unit based on a final output rate and a final charge / discharge plan including at least one of an adjusted output rate, which is the adjusted output rate, and an adjusted charge / discharge plan, which is the adjusted charge / discharge plan; A power generation equipment control system comprising:
2. The adjustment unit is When the charge / discharge plan represents charging to the storage battery, and the sum of the contracted amount of power represented by the power generation plan and the amount of charge represented by a negative value by the charge / discharge plan is greater than the suppressed output amount, determining that it is necessary to adjust at least one of the output rate and the charge / discharge plan, and adjusting at least one of the output rate and the charge / discharge plan. The power generation facility control system according to claim 1 .
3. The adjustment unit is When the charge / discharge plan indicates no charge / discharge or discharge to the storage battery, and the contracted amount of power indicated by the power generation plan is greater than the suppressed output amount, determining that at least one of the output rate and the charge / discharge plan needs to be adjusted, and adjusting at least one of the output rate and the charge / discharge plan. The power generation facility control system according to claim 1 .
4. The adjustment unit is When the contracted amount of power represented by the power generation plan is a value representing power sale, the charge / discharge amount represented by the charge / discharge plan does not indicate charging and discharging, and it is determined that at least one of the output rate and the charge / discharge plan needs to be adjusted, calculating the adjusted charge / discharge plan by adjusting the charge / discharge plan so that the excess power generation amount, which is the minimum value between a first subtraction result obtained by subtracting the suppressed output amount from the contracted power amount and a charging margin of the storage battery, is charged to the storage battery; Calculate the adjusted output rate by subtracting the suppressed output amount from the contracted power amount and adding the charge / discharge amount represented by the adjusted charge / discharge plan to the contracted power amount, and then subtracting the result from the contracted power amount as the adjusted output amount output from the renewable energy power source to the storage battery and the power grid. The power generation facility control system according to claim 2 or 3.
5. The adjustment unit is When it is determined that the contracted amount of power represented by the power generation plan is a value that does not represent a power sale, the charge / discharge amount represented by the charge / discharge plan represents a charge, and at least one of the output rate and the charge / discharge plan needs to be adjusted, A charge / discharge amount represented by the charge / discharge plan is set as an adjusted output amount output from the renewable energy power source to the storage battery and the power grid, and the adjusted output rate is calculated. The power generation facility control system according to claim 2 or 3.
6. The adjustment unit is When it is determined that the contracted amount of power represented by the power generation plan is a value representing power sale, the charge / discharge amount represented by the charge / discharge plan indicates charging, and at least one of the output rate and the charge / discharge plan needs to be adjusted, When the suppressed output amount is equal to or greater than the contracted power amount, a subtraction result obtained by subtracting a charging amount represented by a negative value in the charge / discharge plan from the contracted power amount is set as an adjusted output amount output from the renewable energy power source to the storage battery and the power grid, and the adjusted output rate is calculated. The power generation facility control system according to claim 2 or 3.
7. The adjustment unit is When it is determined that the contracted amount of power represented by the power generation plan is a value representing power sale, the charge / discharge amount represented by the charge / discharge plan indicates charging, and at least one of the output rate and the charge / discharge plan needs to be adjusted, When the suppressed output amount represented by the output suppression information is less than the contracted power amount, calculate the adjusted charge / discharge plan by adjusting the charge / discharge plan so that the excess power generation amount, which is the sum of the minimum value of a first subtraction result obtained by subtracting the suppressed output amount represented by the output suppression information from the contracted power amount and the charging margin of the storage battery, and the charge / discharge amount represented by the charge / discharge plan, is charged to the storage battery; a first subtraction result obtained by subtracting a second sum of the suppressed output amount and the charge / discharge amount represented by the adjusted charge / discharge plan from a first sum of the charge / discharge amount represented by the charge / discharge plan and the contracted power amount, and a second subtraction result obtained by subtracting the charge / discharge amount represented by the charge / discharge plan from the contracted power amount, the first subtraction result being an adjusted output amount output from the renewable energy power source to the storage battery and the power grid, and the adjusted output rate is calculated; The power generation facility control system according to claim 2 or 3.
8. The adjustment unit is When it is determined that the contracted amount of power represented by the power generation plan is a value representing power sale, the charge / discharge amount represented by the charge / discharge plan indicates discharge, and at least one of the output rate and the charge / discharge plan of the storage battery needs to be adjusted, Calculating a value obtained by subtracting the suppressed output amount from the contracted power amount from a discharge amount represented by the charge and discharge plan as the adjusted charge and discharge plan; When the adjusted charge / discharge plan represents a discharge, an adjusted output rate is calculated by adding a charge / discharge amount represented by the adjusted charge / discharge plan to the subtraction result obtained by subtracting a discharge amount represented by a positive value by the charge / discharge plan from the contracted power amount, and setting the result as an adjusted output amount output from the renewable energy power source to the storage battery and the power grid; When the adjusted charge / discharge plan indicates charging, the adjusted output amount is determined by subtracting the discharge amount represented by a positive value in the charge / discharge plan from the contracted power amount, and the adjusted output rate is calculated. The power generation facility control system according to claim 2 or 3.
9. The adjustment unit is Further adjusting the charge / discharge plan based on the actual value of the amount of power generated by the renewable energy power source; The power generation facility control system according to claim 1 .
10. The adjustment unit is adjusting at least one of the output rate and the charge / discharge plan every time the output suppression information is received; The power generation facility control system according to claim 1 .
11. The adjustment unit is adjusting at least one of the output rate and the charge / discharge plan every time the power generation plan is updated; The power generation facility control system according to claim 1 .
12. The adjustment unit is receiving the output suppression information from the power transmission and distribution company system or the power transmission and distribution company system via the power generation facility; The power generation facility control system according to claim 1 .
13. A power generation facility control method executed in a power generation facility control system, comprising: receiving output suppression information representing an output suppression instruction for electric power output from a power generation facility including a storage battery, a storage battery control unit that controls charging and discharging of the storage battery, a renewable energy power source, and an output rate control unit that controls an output rate of electric power output from the renewable energy power source to the storage battery and the electric power grid; a step of adjusting at least one of the output rate and a charge / discharge plan of the storage battery according to a power generation plan represented by a contracted amount of power in an electricity trading market, when the output suppression information is received, so that an excess amount of power generated that exceeds a suppressed output amount represented by the output suppression information is charged to the storage battery; Controlling the output rate control unit and the storage battery control unit based on a final output rate and a final charge / discharge plan including at least one of an adjusted output rate, which is the adjusted output rate, and an adjusted charge / discharge plan, which is the adjusted charge / discharge plan; A power generation facility control method comprising:
14. A power generation facility control program for causing a computer to execute the program, receiving output suppression information representing an output suppression instruction for electric power output from a power generation facility including a storage battery, a storage battery control unit that controls charging and discharging of the storage battery, a renewable energy power source, and an output rate control unit that controls an output rate of electric power output from the renewable energy power source to the storage battery and the electric power grid; a step of adjusting at least one of the output rate and a charge / discharge plan of the storage battery according to a power generation plan represented by a contracted amount of power in an electricity trading market, when the output suppression information is received, so that an excess amount of power generated that exceeds a suppressed output amount represented by the output suppression information is charged to the storage battery; Controlling the output rate control unit and the storage battery control unit based on a final output rate and a final charge / discharge plan including at least one of an adjusted output rate, which is the adjusted output rate, and an adjusted charge / discharge plan, which is the adjusted charge / discharge plan; A power generation equipment control program including:
Citation Information
Patent Citations
Power management system and power management method
JP2018207689A
Control system and control method
JP2023096123A
Management device and control method
WO2017130307A1
Control system and control method
WO2020012834A1
Power management device and power management method
WO2023027139A1
Cited By
Electromagnetic wave shielding sheet, shielding processed wafer, semiconductor device, and method for manufacturing same
CN121035104A
Electromagnetic wave shielding sheet, shielding processed wafer, semiconductor device, and method for manufacturing the same
CN121035104B