Pump device
The pump device efficiently distributes operating time across multiple pumps by switching when a continuous operation time exceeds a threshold, addressing inefficiencies in existing methods.
Patent Information
- Application Number
- JP2023081732
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-17
- Publication Date
- 2024-11-28
AI Technical Summary
Existing operation time smoothing control methods prioritize starting units with short operation times, leading to inefficiencies when a specific pump operates continuously for a long time, making it difficult to achieve efficient time smoothing.
A pump device with multiple pumps, a calculation section, and a smoothing section that calculates cumulative operating time, switching to another pump when the continuous operation time exceeds a threshold, thereby distributing the load efficiently.
Enables efficient operation time smoothing by switching pumps when a continuous operation time exceeds a threshold, ensuring balanced wear and tear across pumps.
Smart Images

Figure 2024165485000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a technique for smoothing control of a pump device. [Background technology]
[0002] Generally, pump devices are known that perform alternating operation in which multiple pumps are driven alternately, and parallel operation in which multiple pumps are driven simultaneously. In this type of pump device, multiple pumps are operated by switching between them, so that the cumulative operation time of each pump varies depending on the frequency of starting and stopping and the state of switching between pumps. Therefore, a control method for smoothing operation time is known that changes the switching order of each pump to avoid concentrating operation on a specific pump and distribute the wear of parts (see, for example, Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2000-045982 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, general operation time smoothing control is a function that prioritizes starting pumps with fewer operating hours or fewer operating frequency during pump operation, and does not assume a case where a specific pump continues to operate for a long time. Therefore, when a pump operates continuously for a long time, there is a problem that operation time smoothing control cannot be implemented efficiently. An object of the present invention is to efficiently realize driving time smoothing. [Means for solving the problem]
[0005] The pump device according to the present embodiment includes a plurality of pumps, a calculation unit, a smoothing unit, and a processing unit. The calculation unit calculates an integrated operating time for each of the plurality of pumps. The smoothing unit executes smoothing control of the operating time based on the integrated operating time. The switching unit switches the operating pump from the first pump to the second pump when a continuous operating time of a first pump that is in operation among the plurality of pumps is equal to or longer than a threshold value during execution of the smoothing control. Effect of the Invention
[0006] According to the present invention, smoothing control can be efficiently realized. [Brief description of the drawings]
[0007] [Figure 1] FIG. 1 is a diagram showing an example of a management system according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a block diagram showing the pump device according to the embodiment. [Diagram 3] 5 is a flowchart showing an example of an operation of smoothing control of the pump device according to the embodiment. [Figure 4] 4 is a table showing an example of operation data of each end pump unit according to the embodiment; [Diagram 5] 4 is a table showing an example of an operation table of the pump device according to the embodiment; [Figure 6] 11 is a table showing an example of a smoothing table according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0008] Hereinafter, a pump device according to an embodiment will be described with reference to the drawings. In addition, hereinafter, elements that are the same as or similar to elements already described will be given the same or similar reference numerals, and duplicated descriptions will basically be omitted. For example, when there are multiple identical or similar elements, a common reference numeral may be used to describe each element without distinguishing between them, and a subnumber may be used in addition to the common reference numeral to describe each element with distinction between them.
[0009] FIG. 1 is a block diagram illustrating a management system 100 according to the present embodiment. As shown in FIG. 1, the management system 100 includes a management server 1, a plurality of pump devices 5-n, and a plurality of terminals 3-n (n is an index). FIG. 1 shows a configuration in which n is 2, but this is not limited thereto, and n may be any number equal to or greater than 1. Hereinafter, when no particular distinction is made, the pump devices 5 and the terminals 3 will be simply referred to as the pump devices 5 and the terminals 3. The management system 100 is a computer system that uses the management server 1 to manage pump information measured on the pump devices 5. The pump information includes operation information of the pump unit. The operation information includes a plurality of parameters related to the operation of the pump. Examples of parameters included in the operation information include the voltage, current, and power supplied from a power source to a control panel of the pump device 5, the pressure value (head) measured by a pressure sensor, the flow rate measured by a flow rate sensor, the accumulated operation time, the number of operations, and liquid level (electrode) information. The liquid level information is, for example, information on the liquid level, such as full water, reduced water, drought, and no abnormality. The operation information may include control settings such as acceleration time, deceleration time, PI control setting value, operation frequency, maximum operation frequency, minimum operation frequency, etc. The operation information may also include failure information such as the date and time when a failure occurred, the location of the failure, and the cause.
[0010] 1, the management server 1, the pump device 5, and the terminal 3 are connected via a network NW by a mobile communication network such as 4G or 5G, or a relatively long-distance wireless communication means such as Wimax. It is also assumed that the pump device 5 and the terminal 3 are connected by a relatively short-distance wireless communication means such as Wi-Fi (registered trademark), Bluetooth (registered trademark), NFC (Near Field Communication), or infrared communication, in addition to the wireless communication lines described above. The pump device 5 and the terminal 3 may be connected via a wired communication line such as a LAN connection by USB or cable.
[0011] The management server 1 is an example of a management server, and is a computer having a processor such as a CPU, memories such as ROM and RAM, a display device, an input device, and a communication device. The management server 1 has a large-capacity storage device such as an HDD, SSD, or integrated circuit storage device for managing various data related to a plurality of pump devices 5. The large-capacity storage device is referred to as a database. For example, the management server 1 stores various data related to the pump devices 5 in the database and manages the operating status of each pump device 5. The management server 1 is not limited to being an on-premise server, and may be a cloud server.
[0012] The pump device 5 is, for example, a mechanical device (water supply device) that supplies water to a building. The pump device 5 is, for example, a constant pressure water supply type water supply device that assumes a constant pressure water supply from a water tank. Note that the pump device 5 may be a so-called direct pressure booster type water supply device that is directly connected to a water main pipe, directly boosts the pressure of the water flowing through the water main pipe, and supplies water to a supply destination such as a faucet or shower head installed in a building, or may be a direct pressure type.
[0013] The terminal 3 is a communication terminal that can be carried by a user such as an inspection worker, and specific examples include a notebook PC, a mobile terminal (smartphone, feature phone, tablet), and a wearable device such as a smart watch or goggles. The terminal 3 may be a communication device configured exclusively for managing the pump device 5. The pump device 5 may be controllable from the terminal 3; for example, an application for controlling the pump device 5 (hereinafter also referred to as a control application) may be installed, or the pump device 5 may be controllable from a web browser.
[0014] Next, the pump device 5 according to this embodiment will be described with reference to the block diagram of FIG. The pump device 5 includes a control panel 50 and a pump section 60. Of the pump section 60, three pumps 61a to 61c arranged in parallel with each other are referred to as pump No. 1, pump No. 2, and pump No. 3 from the left side for convenience of explanation. Note that the number of pumps 61 is not limited to three, and may be any number as long as there are more than one. The suction sections of these pumps 61a to 61c are connected to a water supply pipe extending from a water supply source, such as a water tank, via suction pipes 63a to 63c in which opening / closing valves 62a to 62c are interposed and a branch section 64.
[0015] The discharge parts of the pumps 61a to 61c are connected to a demand pipe 68 extending from a demand side, for example, a building or an apartment building, via discharge pipes 67a to 67c in which check valves 65a to 65c and on-off valves 66a to 66c are interposed. This constitutes a pump part 60 in which the three pumps 61a to 61c are connected in parallel. However, an accumulator 70, flow rate sensors 71a to 71c, and a pressure sensor 72 are provided on the discharge sides of the pumps 61a to 61c. An inverter 54 is provided to variably control the power supply frequency of the motors (not shown) of the pumps 61a to 61c. The inverter 54, the flow rate sensors 71a to 71c, and the pressure sensor 72 are connected to a control panel 50.
[0016] The control panel 50 controls the alternating operation or parallel operation of the pumps 61a to 61c according to a pump control algorithm such as constant target pressure control, depending on the demand detected by the flow rate signals of the flow rate sensors 71a to 71c and the pressure signal of the pressure sensor 72. The control panel 50 also drives the pumps 61a to 61c so as to smooth the total integrated operation time and the total integrated operation count of the pumps 61a to 61c.
[0017] As shown in FIG. 2, the control panel 50 includes a short-range communication device 51, a long-range communication device 52, an input device 53, an inverter 54, an interface 55, a display device 56, a memory device 57, and a processor 58, which are connected to each other via a bus.
[0018] The short-range communicator 51 performs short-range wireless communication using a wireless communication standard such as Bluetooth, Wi-Fi, or NFC. The short-range communicator 51 may perform short-range communication using a wired communication standard such as USB. The short-range communicator 51 sets the operation mode of the pump device 5 and transmits and receives various data between the terminal 3 and the short-range communicator 51 via a short-range communication line.
[0019] The long-distance communication device 52 performs long-distance communication using wireless communication standards such as a mobile communication network, Wimax, and Wi-Fi. The long-distance communication device 52 transmits and receives various data to and from the management server 1 or the terminal 3 via a long-distance communication line.
[0020] Regarding the establishment of a wireless connection by the short-range communication device 51 and the long-range communication device 52, for example, in the case of Bluetooth, a wireless connection may be established by a general pairing process, and in the case of Wi-Fi, a wireless connection may be established by inputting a preset SSID and password into a Wi-Fi access point. Note that once a wireless connection has been established between the pump device 5 and the terminal 3, a wireless connection is automatically established by turning on the wireless function of the terminal 3 and moving it close to the pump device 5.
[0021] The input device 53 converts a user's instruction into an electrical signal. For example, an operation panel, a touch panel, a keyboard, a mouse, various switches, etc. may be used as the input device 53. Note that a voice input device may also be used as the input device 53. The electrical signal from the input device 53 is supplied to the processor 58 via a bus.
[0022] The inverter 54 generates power to operate the pumps 61a to 61c. Specifically, the inverter 54 supplies AC power of a predetermined frequency to the motors (not shown) of the pumps 61a to 61c. The inverter 54 also receives an inverter control signal from the processor 58. The inverter 54 operates in response to the inverter control signal. For example, the inverter 54 stops or starts operation in response to the inverter control signal equivalent to an operation stop signal or an operation start signal. The inverter 54 also controls the rotation speed of the motor in response to the inverter control signal equivalent to a rotation speed control signal.
[0023] Specifically, the inverter 54 includes a converter circuit, a smoothing capacitor, and an inverter circuit (not shown). The converter circuit takes in AC power from an AC power source and converts it into DC power by rectifying it. The smoothing capacitor smoothes the voltage of the DC power output by the converter circuit to obtain DC power of a substantially constant voltage. The inverter circuit then converts the DC power obtained by the smoothing capacitor into AC power of a predetermined frequency according to an inverter control signal (corresponding to a rotation speed control signal) from the control panel 50, and supplies the AC power to the motor.
[0024] The interface 55 is, for example, an input / output interface such as a port, etc. The interface 55 connects, for example, the control panel 50 and the pump unit 60, and transmits and receives various signals.
[0025] The display device 56 displays various data. As the display device 56, any display may be used, such as a CRT (Cathode Ray Tube) display, a liquid crystal display, an organic EL display, an LED display, a plasma display, etc. Note that a projector may be used as the display device 56.
[0026] The storage device 57 is a memory device such as a ROM, RAM, HDD, SSD (solid state drive), or integrated circuit storage device that stores various data. The storage device 57 may be realized by a single physical memory device, or may be realized by a plurality of memory devices physically separated within the pump device 5. Here, the storage device 57 stores the operation time and the number of operations for each time. It is preferable that the operation time and the number of operations are stored for each pump unit, but if the memory capacity is small, it is not necessary to store them for each pump unit. The storage device 57 stores the average operation time, maximum operation time, and minimum operation time calculated by the processor 58 from the operation time and the number of operations stored for each time. Since the operation tendency may differ for each day of the week, it is better to store one week's worth of operation data. However, if the memory capacity is small, it is not necessary to store this data. It is possible that the operation may differ depending on the month or season, but if the memory capacity is small, it is not necessary to hold monthly or seasonal data if the subsequent processing is always reviewed based on the operation data of the previous day and last week. In addition, data on driving time, number of driving times, average, maximum and minimum driving time, and monthly and seasonal data may be transmitted to the management server 1 via the long-distance communication device 52 and stored in the management server 1.
[0027] The processor 58 is an arithmetic device such as a CPU or a microprocessor. The processor 58 may be configured with a dedicated circuit such as an ASIC or an FPGA. The processor 58 executes various programs stored in the storage device 57 to realize, for example, the functions of a communication control unit 581, a calculation unit 582, a determination unit 583, a smoothing unit 584, a switching unit 585, and an alarm unit 586.
[0028] The communication control unit 581 establishes a wireless connection between the control panel 50 of the pump device 5 and the terminal 3. For example, in the case of Bluetooth, the wireless connection may be established by a general pairing connection, and in the case of Wi-Fi, the wireless connection may be established by inputting a preset SSID and password in a Wi-Fi access point. Once the wireless connection between the pump device 5 and the terminal 3 has been established, the wireless connection is automatically established by turning on the wireless function of the terminal 3 and approaching the pump device 5. The communication control unit 581 also performs a process of releasing the wireless connection established between the control panel 50 and the terminal 3. The communication control unit 581 transmits and receives data between the terminal 3 with which the connection has been established, or between the terminal 3 and the management server 1.
[0029] The calculation unit 582 calculates the integrated operation time for each of the plurality of pumps 61. The determination unit 583 determines whether or not to execute smoothing control of the operation time, and also determines whether or not the continuous operation time of a pump (also referred to as a first pump) that is in operation among the multiple pumps 61 is equal to or longer than a threshold value. The smoothing unit 584 executes smoothing control of the driving time based on the integrated driving time. When the continuous operation time of the first pump is equal to or longer than a threshold value during execution of the smoothing control, the switching unit 585 switches the operating pump from the first pump to another pump (also referred to as the second pump). Note that the switching unit 585 is not limited to switching the operating pump from the first pump to the second pump. For example, when a plurality of pump units including the first pump are operating simultaneously, if the amount of water supply can be secured by stopping the first pump and increasing the operating frequency of the other pumps in operation, it is possible to simply stop the first pump without switching the operation. When the continuous operation time is equal to or longer than the threshold, the alarm unit 586 issues a signal to the outside.
[0030] The number of boards constituting the control panel 50 can be designed as desired, and it can also be designed as desired which of the short-range communicator 51, long-range communicator 52, input device 53, inverter 54, interface 55, display device 56, storage device 57, and processor 58 each board is physically equipped with. Although the communication control unit 581, calculation unit 582, determination unit 583, smoothing unit 584, switching unit 585, and alarm unit 586 are performed by one processor 58, they may be performed by multiple physically separated processors.
[0031] Next, an example of the operation of the pump device 5 according to this embodiment will be described with reference to the flowchart of Fig. 3. Here, processing at the time of starting up a pump or adding more pumps will be considered.
[0032] In step S301, for example, the calculation unit 582 creates or updates a smoothing table. Specifically, first, the calculation unit 582 calculates operation data of each pump unit. Next, the calculation unit 582 calculates and summarizes an integrated operation time and the like based on the operation data of each pump unit to calculate an operation table. Furthermore, the calculation unit 582 creates a smoothing table based on the operation table. If a smoothing table has already been created, the accumulated operation time and accumulated operation count of each pump unit may be calculated and updated based on the pump operation status for the most recent week, for example. If it is within a predetermined period of time since the smoothing table was created, the most recently created smoothing table may be used without performing the update process. For example, the determination unit 583 may calculate the difference between the time when the pump was started or added and the time when the most recent smoothing table was updated, and determine whether or not the difference is less than the predetermined period. If the difference is less than the predetermined period, the process of step S301 may not be performed, and the most recent smoothing table may be used.
[0033] In step S302, the determination unit 583 determines whether it is time to execute smoothing control. For example, if the current time is within the execution time period of smoothing control shown in the smoothing table, it is determined that smoothing control is to be executed, and the process proceeds to step S303. On the other hand, if the current time is not within the execution time period of smoothing control shown in the smoothing table, it is determined that smoothing control is not to be executed, and the determination process of step S302 is continued.
[0034] In step S303, the smoothing unit 584 executes smoothing control of the operation time of the pumps based on the accumulated operation time. For example, the smoothing control may be performed by rotating the pumps other than the pump with the longest accumulated operation time.
[0035] In step S304, the determination unit 583 determines whether or not the continuous operation time of an operating pump among the multiple pumps is equal to or longer than a threshold value during execution of smoothing control. If the continuous operation time of the operating pump is equal to or longer than the threshold value, the process proceeds to step S305. If the continuous operation time of the operating pump is less than the threshold value, the determination process of step S304 is continued while continuing operation of the operating pump.
[0036] In step S305, the switching unit 585 switches the operation from the first pump, which is the pump number in operation, to the second pump. In other words, the pump number in operation is stopped, and the other pump number that is stopped is started. Alternatively, the pump number in operation may be stopped, and the operating frequency of the pump number in operation may be increased, thereby increasing the amount of water supply.
[0037] In the smoothing control of step S304, time smoothing processing is assumed, but it may be performed together with count smoothing processing. Specifically, in a time period in which time smoothing is performed, the smoothing unit 584 performs smoothing control so that the pump unit with the least accumulated operating time is started preferentially. In a time period in which count smoothing is performed, the smoothing unit 584 performs smoothing control so that the pump unit with the least accumulated operating count is started preferentially.
[0038] Next, an example of the operation data of each pump unit will be described with reference to FIG. 4 is a table showing operation data Ta of pump No. 1, operation data Tb of pump No. 2, and operation data Tc of pump No. 3. The operation data of each pump is generated, for example, by the processor 58 of the pump device 5 storing in the storage device 57 the operation time per operation, the number of operations per operation, the accumulated operation time, and the accumulated number of operations at each predetermined time. The pump device 5 may periodically transmit the operation data Ta to Tc of each pump to the management server 1. The management server 1 stores the received operation data Ta to Tc in the database 14 for management.
[0039] Next, an example of an operation table of the pump device 5 will be described with reference to FIG. As shown in FIG. 5, for example, the processor 58 of the pump device 5 creates an operation table T1 that associates the average operation time, the total operation time, the total operation count, and the average time ranking based on the operation data (operation data Ta, operation data Tb, operation data Tc) of each pump from pump No. 1 to pump No. 3 for each predetermined time period of one day. Specifically, the processor 58 sums up the accumulated operation time for each pump for each of the operation data Ta to Tc for each predetermined time period of one day, and further obtains the total operation time of the entire pump device, that is, the total accumulated operation time of each of the summed operation data Ta to Tc, and the total operation count by summing the accumulated operation counts in the same manner as the total operation time. In addition, the processor 58 calculates the average operation time (=total operation time ÷ total operation count) of each pump for each predetermined time period based on the total operation time and the total operation count. In addition, the processor 58 ranks the average operation time in descending order of the average operation time for each predetermined time period. Specifically, in the example of FIG. 5, the average driving time for the 12 o'clock hour is "37 seconds", the total driving time is "1871 seconds", the total number of driving times is "50 times", and the average time ranking is "1". It can be seen that the average driving time for the 12 o'clock hour is the longest and the average time ranking is the first. Note that, although the specified time period is assumed to be every hour here, it is not limited to this and may be any time period such as every 30 minutes or every two hours. Using the driving table T1, it is possible to determine which time period has the longest driving time.
[0040] Next, an example of the smoothing table will be described with reference to FIG. The processor 58 creates the smoothing table T2 based on the operation table T1. For example, the processor 58 selects at least one first time slot in descending order of the average operation time from among the average operation times for each of the predetermined time slots described above. The first time slot is a time range for performing time smoothing control, and is indicated by the name of the time smoothing time and a range indicating the time slot. Specifically, in the example of FIG. 6, the calculation unit 582 of the processor 58 selects five first time slots in descending order of the average time ranking in the operation table T1. As a result, the processor 58 creates the first to fifth rows of the smoothing table T2 by associating each of the first to fourth average time rankings with the name of the time smoothing time and the range of the time value. However, the average time ranking "first place" is associated with a valid flag "1" (valid), and the average time rankings "second place", "third place", and "fourth place" are associated with a valid flag "0" (invalid). In other words, by operating the pump unit in a time slot with a high average time ranking, it is possible to extend the operation time for one operation. For the time periods during which smoothing control is to be performed in the smoothing table T2, the valid flags may be set to "1."
[0041] On the other hand, the processor 58 selects at least one second time slot in the order of shortest average driving time from among the average driving times for each predetermined time slot based on the operation table T1. The second time slot is a time range for performing the frequency smoothing control, and is indicated by the name of the frequency smoothing time and a range indicating the time slot. Specifically, in the example of FIG. 6, the calculation unit 582 of the processor 58 selects three second time slots in the order of lowest average time ranking in the operation table T1. As a result, the processor 58 creates the fourth to sixth rows of the smoothing table T2 by associating each of the 22nd to 24th average time rankings with the name of the frequency smoothing time and the range of time values. Similarly, the average time ranking "24th" is associated with a valid flag "1" (valid), and the average time ranking "22nd" is associated with a valid flag "0" (invalid). In this way, the processor 58 can create the smoothing table T2 in which the operation mode, valid flag, average time ranking, name, and range are associated. In other words, in a time period with a low average time ranking, the driving time per trip is short, so the number of trips can be increased. Note that for a time period for which time smoothing and number of trips smoothing control is executed in the smoothing table T2, the valid flag should be set to "1".
[0042] The number of first time periods (five) and the number of second time periods (three) shown in Figure 6 are each just examples and are not limited to these, and the number of first time periods and second time periods may be fewer or more than the example in Figure 6.
[0043] In the smoothing control of the pump device 5 according to the present embodiment shown in FIG. 3, if the smoothing control does not progress, that is, if the accumulated operating times of the pump units do not become approximately equal, the smoothing control may be set to be strengthened. For example, the smoothing unit 584 calculates a difference (first difference) between the maximum and minimum accumulated operating times for the multiple pumps 61 at the time when the smoothing control is started. The smoothing unit 584 similarly calculates a difference (second difference) between the maximum and minimum accumulated operating times after a predetermined period, such as one week after the smoothing control is started. The smoothing unit 584 compares the first difference with the second difference, and if the second difference is large, it can be determined that the smoothing control is not progressing.
[0044] In this case, for example, the valid flag associated with the time smoothed time of the average time rank "2" in the smoothing table T2 is updated to "1". This increases the range of time periods for which time smoothing control is performed by one hour, so that it is expected that the effect of time smoothing control will increase. Of course, it is not limited to setting the valid flags one by one in the order of the average time rank, but it is also possible to enable the average time ranks "2" and "3" at once and increase the time period for which time smoothing control is performed by two hours, or to enable all times for which time smoothing control can be performed. Similarly, when smoothing the integrated operation count, the number of times for which the valid flag is set may be increased for the count smoothing time. If smoothing has progressed as a result of strengthening the smoothing control as described above, the time period during which the smoothing control is performed may be maintained with the smoothing control in the strengthened state, or may be returned to the default setting value.
[0045] Furthermore, the switching unit 585 may switch the operating pump from the first pump to the second pump when the continuous operation time of the first pump, which is the operating pump, is equal to or exceeds a threshold value during a predetermined period or time period, such as late at night or on a store or factory holiday. In this way, when the pump is unlikely to operate continuously, it can be assumed that some kind of abnormality, such as water leakage from a mechanical seal, has occurred when the pump is operating continuously. Therefore, abnormalities can be detected by monitoring the continuous operation time.
[0046] In addition, since the switching of the unit of the operation pump during continuous operation for a long time assuming a pipe leakage needs to be performed while suppressing the secondary-side pressure fluctuation of the pump device as much as possible, the continuous operation time is measured only in the case of one-unit operation (single operation), not in the case of parallel operation of multiple units. That is, as an example, when the determination unit 583 determines that conditions regarding operation parameters are set to reduce pressure fluctuations during the switching of the operation pump unit, and the continuous operation time of the first pump, which is the operation pump, is equal to or greater than the threshold value, the switching unit 585 may execute the switching of the operation pump from the first pump unit to another second pump unit. Examples of the conditions regarding operation parameters include conditions such as "number of operating units = 1 unit and average operating frequency < A [Hz] or load factor (such as power consumption) < B [%]" (where A is an arbitrary real number of 1 or more, and B is a real number of 0 or more and less than 100).
[0047] Note that when the determination unit 583 determines that the continuous operation time is equal to or greater than the threshold value, the reporting unit 586 may report a signal notifying an abnormality to the outside. Further, the reporting unit 586 may transmit the signal to the terminal 3 via the short-range communicator 51 or the long-range communicator 52. Thereby, a maintenance worker or the like can notice the abnormality of the pump device 5.
[0048] According to the present embodiment described above, during the execution of the smoothing control, it is determined whether the continuous operation time of the first pump during operation is equal to or greater than the threshold value. When the continuous operation time of the first pump is equal to or greater than the threshold value, the operation pump is switched from the first pump to the second pump. Thereby, even in a field environment where one pump unit continues to operate continuously for a long time, the smoothing control can be efficiently realized.
[0049] At least a part of the processing of each of the above embodiments can be realized by using, for example, a processor mounted on a general-purpose computer as basic hardware. The program for realizing the above processing may be provided by being stored in a computer-readable recording medium. The program is stored in the recording medium as a file in an installable format or an executable format. The recording medium may be a magnetic disk, an optical disk (CD-ROM, CD-R, DVD, Blu-ray (registered trademark) Disc, etc.), a magneto-optical disk (MO, etc.), a semiconductor memory, etc. The recording medium may be any one that can store the program and is readable by a computer. In addition, the program for realizing the above processing may be stored on a computer (server) connected to a network such as the Internet, and downloaded to a computer (client) via the network.
[0050] The present invention is not limited to the above-mentioned embodiment, and can be modified in various ways without departing from the gist of the present invention. The embodiments may be combined as appropriate, and in that case, the combined effect can be obtained. Furthermore, the above-mentioned embodiment includes various inventions, and various inventions can be extracted by combinations selected from the multiple components disclosed. For example, if the problem can be solved and the effect can be obtained even if some components are deleted from all the components shown in the embodiment, the configuration from which the components are deleted can be extracted as an invention. [Explanation of symbols]
[0051] 1 Management server, 3, 3-1, 3-2 Terminal, 5, 5-1, 5-2 Pump device, 51 Short-distance communication device, 52 Long-distance communication device, 53 Input device, 54 Inverter, 55 Interface, 56 Display device, 57 Storage device, 58 Processor, 60 Pump unit, 61a to 61c Pump, 62a to 62c, 66 a~66c···on-off valve, 63a~63c···suction pipe, 64···branching section, 65a~65c···check valve, 67a~67c···discharge pipe, 70···accumulator, 71a~71c···flow rate sensor, 72···pressure sensor, 581···communication control section, 582···calculation section, 583···determination section, 584···smoothing section, 585···switching section, and 586···alarm section.
Claims
1. Several pumps, A calculation unit that calculates an integrated operation time for each of the plurality of pumps; A smoothing unit that executes smoothing control of the driving time based on the integrated driving time; a switching unit that switches the operating pump from the first pump to a second pump when a continuous operation time of a first pump that is in operation among the plurality of pumps is equal to or longer than a threshold value during execution of the smoothing control; A pump device comprising:
2. The calculation unit calculates an integrated operation count for each of the plurality of pumps, The pump device according to claim 1 , wherein the smoothing unit performs the smoothing control based on the integrated number of operations.
3. The pump device according to claim 1 , wherein the switching unit switches operation of the operating pump from the first pump to the second pump when a continuous operation time of the first pump during a predetermined period or a predetermined time period is equal to or longer than a threshold value.
4. Several pumps, A calculation unit that calculates an integrated operation time for each of the plurality of pumps; A smoothing unit that executes smoothing control of the driving time based on the integrated driving time; a determination unit that determines whether a continuous operation time of a first pump that is in operation among the plurality of pumps is equal to or longer than a threshold value during execution of the smoothing control; an alarm unit that issues a signal to an outside when the continuous operation time is equal to or longer than a threshold; A pump device comprising:
5. the calculation unit calculates the continuous operation time of the pump in operation when one pump is in operation; A pump device according to any one of claims 1 to 4.
Citation Information
Patent Citations
Control method and device for making pump operation time of variable speed water supply device uniform
JP2000045982A
