Crane
The crane design addresses the challenge of achieving long lifting heights and improved maintainability by using a front-rear oriented sheaves and support members to reduce the vertical thickness of the boom head, enhancing lifting capacity and preventing corrosion.
Patent Information
- Application Number
- JP2023081997
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-18
- Publication Date
- 2024-11-28
AI Technical Summary
Existing cranes face challenges in achieving a long lifting height for suspended loads while maintaining a low boom head height and improving maintainability, as the thickness of the boom head in the vertical direction often increases due to the placement of sheaves and guide frames, which impairs maintainability.
The crane design includes a first sheave oriented in the front-rear direction within the boom head, a second sheave on the hook block also oriented in the front-rear direction, and a wire rope configuration that wraps around these sheaves with a fixing member inside the boom head to support the wire rope, utilizing a support member to bend the rope rearward and reduce vertical thickness.
This configuration allows for a longer lifting height relative to the boom head height and enhances maintainability by reducing the vertical thickness of the boom head, while also preventing interference with sheaves and corrosion from sea breezes.
Smart Images

Figure 2024165637000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a crane. [Background technology]
[0002] Some cranes have a jib foot pin that is formed by extending the sheave pin in the boom head to the left and right of the boom head. In such cranes, when the end of the wire rope is fixed to the side wall of the boom head, the jib foot pin may interfere with the wire rope. Therefore, a crane has been developed that prevents the wire rope from interfering with the jib foot pin.
[0003] For example, Patent Document 1 discloses a crane in which a guide frame having an arc shape centered on the jib foot pin is provided on the jib foot pin of the side wall of the boom head. In this crane, the portion near the end of the wire rope is hung on the guide frame to prevent the wire rope from interfering with the jib foot pin. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Japanese Utility Model Application Publication No. 6-59381 Summary of the Invention [Problem to be solved by the invention]
[0005] On the other hand, in order to improve work efficiency, it is desirable to make the lifting height of a load as long as possible for the same boom head height. Also, in order to improve maintainability, it is desirable to make the height of the boom head as low as possible for the same lifting length. As a result, there is a demand for the development of a crane with a thin boom head in the vertical direction and a long lifting height for the boom head height.
[0006] However, in the crane described in Patent Document 1, a sheave is rotatably supported on the jib foot pin, and a guide frame is provided above the sheave. This makes the boom head thick in the vertical direction. As a result, the maintainability of the boom head is reduced.
[0007] The present invention has been made to solve the above-mentioned problems, and has an object to provide a crane which has a long load lifting range relative to the height of the boom head and has improved maintainability of the boom head. [Means for solving the problem]
[0008] In order to achieve the above object, the crane according to the present invention comprises: A first sheave is provided inside the boom head and has a radial direction directed in the front-rear direction; A second sheave is provided in the hook block and has a radial direction directed in the front-rear direction; a wire rope that is wound around the first sheave, hangs down from a front end of the first sheave, extends to a front end of the second sheave, and is further wound around the second sheave and extends upward from a rear end of the second sheave; a fixing member provided inside the boom head and behind the first sheave, for fixing an end of the wire rope on the side of a portion of the wire rope extending upward from the rear end of the second sheave; The present invention is characterized by comprising:
[0009] The boom head may further include a support member provided inside the boom head, around which a portion of the wire rope extending upward from the rear end of the second sheave is hung to support said portion and which bends said portion rearward to position the terminal behind the first sheave.
[0010] The support member may have an arc shape extending in the front-rear direction and having a center located on a lower side.
[0011] An end portion of the support member on the side of the second sheave may be located on a tangent to a rear end of the first sheave when viewed in the left-right direction.
[0012] The support member may be located rearward of a lower end of the first sheave.
[0013] The diameter of the second sheave may be greater than the diameter of the first sheave.
[0014] The second sheave may be formed of a plurality of small diameter sheaves arranged in a front-rear direction and having a total length of diameters greater than a diameter of the first sheave.
[0015] The wire rope further includes an over-winding detection weight that has a plate shape having a first opening through which a portion of the wire rope extending upward from the rear end of the second sheave is passed, the over-winding detection weight is suspended from the boom head, and is positioned between the boom head and the hook block, The boom head has a lower surface portion through which a portion of the wire rope extending upward from the first opening is passed and in which a second opening having a diameter smaller than that of the over-winding detection weight is formed, The over-winding detection weight may abut against the underside of the boom head and block the second opening when the wire rope is wound up and the hook block approaches the underside of the boom head. Effect of the Invention
[0016] According to the configuration of the present invention, the fixing member for fixing the end of the wire rope is provided inside the boom head and behind the first sheave. Therefore, compared to a configuration in which the end of the wire rope is provided below the boom head or above the first sheave, the lifting range of the load is longer relative to the height of the boom head. In addition, the vertical thickness of the boom head can be made thinner, making the boom head easier to maintain. [Brief description of the drawings]
[0017] [Figure 1] FIG. 1 is a side view of a davit crane according to a first embodiment of the present invention. [Diagram 2]FIG. 2 is a right side view of the boom head of the davit crane according to the first embodiment. [Diagram 3] FIG. 2 is a right side view of the boom head when the weight of the over-hoisting prevention device equipped in the davit crane according to the first embodiment is fixed. [Figure 4] FIG. 11 is a right side view of a boom head of the davit crane according to the second embodiment. [Diagram 5] FIG. 11 is a right side view of the boom head when the weight of the over-hoisting prevention device provided on the davit crane according to the second embodiment is fixed. [Figure 6] FIG. 11 is a right side view of a boom head of a davit crane according to embodiment 3. [Figure 7] FIG. 11 is a right side view of the boom head when the weight of the over-hoisting prevention device provided on the davit crane according to embodiment 3 is fixed. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0018] A crane according to an embodiment of the present invention will now be described in detail with reference to the drawings, in which the same or equivalent parts are designated by the same reference numerals.
[0019] (Embodiment 1) The crane according to the first embodiment is a crane equipped with an over-winding prevention device in which an over-winding detection weight is passed through two wire ropes hung between a sheave provided on the boom head and a sheave provided on the hook block. In this crane, in order to make the lifting height of the suspended load as long as possible, a rope socket to which the end of the wire rope is connected is fixed inside the boom head and behind the sheave of the boom head.
[0020] The following describes the configuration of the crane and the over-hoisting prevention device, taking as an example a case where the crane is a davit crane installed in an offshore wind power generation facility. First, the overall configuration of the crane will be described. In the following, the over-hoisting detection weight will be simply referred to as the weight.
[0021] Fig. 1 is a side view of a davit crane 1A according to embodiment 1. Note that in Fig. 1, the shape of a hook block 30 is simplified for ease of understanding.
[0022] As shown in FIG. 1, a davit crane 1A includes a rotating body 10, a boom 20, and a hook block 30.
[0023] The rotating body 10 is formed in a rectangular cylindrical shape and is installed on a platform 110 of the offshore wind power generation device 100 with its central axis A1 facing up and down. A boom 20 is provided on the rotating body 10. The boom 20 of the rotating body 10 is rotated about the central axis A1 by an actuator (not shown) or a manually driven rotating device.
[0024] The boom 20 extends in an inclined direction from the revolving body 10 and is then formed in the shape of a rectangular tube bent in the horizontal direction. Although not shown, a wire rope 40 extending from a winch drum provided inside the revolving body 10 is passed through the inside of the boom 20. Two openings not shown in FIG. 1 are formed on the lower surface of the tip of the boom 20 extending in the horizontal direction, i.e., the lower surface of the boom head 21. A sheave 22A is provided inside the boom head 21, and the above-mentioned wire rope 40 is wound around the sheave 22A. The wire rope 40 is drawn out from one of the two openings of the boom head 21 below the boom head 21 and further extends to the hook block 30.
[0025] The hook block 30 is formed in a shape of a substantially rectangular tube that tapers toward the bottom end. The upper end of the hook block 30 is provided with two openings (not shown in FIG. 1). The hook block 30 is provided with a sheave (not shown in FIG. 1) inside. A wire rope 40 extending downward from the boom head 21 is passed through one of the above-mentioned openings, and the wire rope 40 is further wound around the sheave in the hook block 30. After being wound around the sheave, the wire rope 40 passes through the other of the above-mentioned openings and returns to the boom head 21, and the end of the wire rope 40 is fixed to the boom head 21. As a result, the hook block 30 is suspended from the boom head 21 in a double-hanging manner.
[0026] Meanwhile, a hook 31 for suspending a load is provided at the lower end of the hook block 30. The hook 31 hoists the load by winding up the wire rope 40 with the load suspended therefrom.
[0027] In addition, a weight 51 of an over-winding prevention device 50 is suspended between the hook block 30 and the boom head 21 to detect over-winding of the wire rope 40 when lifting a load.
[0028] In detail, the weight 51 is formed in a disk shape. A through hole (not shown in FIG. 1) is formed in the center of the plate surface, and the wire rope 40 is passed through the through hole. The weight 51 is suspended by a chain extending from an over-winding switch 52 on the boom head 21 and chains extending from the left and right ends of a chain attachment rod (not shown in FIG. 1). As a result, the weight 51 is separated from the boom head 21 by a specific distance along the wire rope 40 during normal crane operation. When the hook block 30 collides with the weight 51 when the wire rope 40 is over-wound, the weight 51 slackens the chain between the weight 51 and the over-winding switch 52. As a result, the weight 51 turns on the over-winding switch 52 to detect the over-wound state of the wire rope 40.
[0029] Moreover, the weight 51 is plate-shaped as described above. This allows the weight 51 to be easily stored. In detail, in the davit crane 1A, when the crane operation is completed, the wire rope 40 is wound up and the hook block 30 is moved to directly below the boom head 21. As a result, the hook block 30 is stored directly below the boom head 21. At this time, the weight 51 is sandwiched between the hook block 30 and the boom head 21 and the position is fixed. As a result, the weight 51 is stored below the boom head 21. Since the weight 51 is plate-shaped, it is easy to be sandwiched between the hook block 30 and the boom head 21, which allows the weight 51 to be easily stored below the boom head 21.
[0030] In such a davit crane 1A, even if the height of the center of the sheave 22A is the same, if the thickness of the boom head 21 increases on the lower side, the lifting height will be shortened. Also, if the height of the center of the sheave 22A is greater than the thickness of the boom head 21 on the upper side, maintainability will be impaired. Furthermore, even if the height of the center of the sheave 22A is the same, if the thickness of the boom head 21 increases on the upper and lower sides, the lifting height will be shortened and maintainability will be impaired. In view of this background, it is desirable for the vertical thickness of the boom head 21 to be small in the davit crane 1A in order to improve maintainability and increase the lifting height.
[0031] Therefore, in the davit crane 1A, in order to reduce the thickness of the boom head 21 in the vertical direction, although not shown in FIG. 1, the end of the wire rope 40 is inserted into the boom head 21 from the other of the two openings in the underside of the boom head 21. Then, the end of the wire rope 40 is fixed inside the boom head 21.
[0032] Furthermore, the davit crane 1A may be installed in an environment where sea breezes blow, such as on a coast or offshore. In that case, when the weight 51 is sandwiched and fixed between the hook block 30 and the boom head 21, a gap may be formed between the weight 51 and the boom head 21. The sea breeze may then enter the boom head 21 through the gap. As a result, the salt in the sea breeze may corrode the components in the boom head 21, such as the wire rope 40, the sheave 22A, and the rope socket.
[0033] Therefore, in the davit crane 1A, in order to suppress corrosion of the parts inside the boom head 21 due to the salt in the sea air, the end of the wire rope 40 and the sheave of the hook block 30 are arranged in a position where the weight 51 is in close contact with the underside of the boom head 21 by the hook block 30 when the weight 51 is fixed.
[0034] 2 and 3, the fixing of the end of the wire rope 40 inside the boom head 21 will be described in detail. Also, the positional relationship between the end of the wire rope 40 and the sheave provided on the hook block 30 will be described in detail.
[0035] Fig. 2 is a right side view of the boom head 21 of the davit crane 1A according to the embodiment 1. Fig. 3 is a right side view of the boom head 21 when the weight 51 of the over-hoisting prevention device 50 provided in the davit crane 1A is fixed.
[0036] For ease of understanding, Fig. 2 and Fig. 3 also show the hook block 30. Although the top surface of the boom head 21 is covered with a cover, this cover is omitted. Furthermore, a portion of the wire rope 40 is shown by a dotted line. Fig. 2 and Fig. 3 also show the position of the sheave 32A in the hook block 30 to show the positional relationship.
[0037] As shown in Figs. 2 and 3, a disk-shaped sheave 22A with its disk axis oriented in the left-right direction is provided inside the boom head 21.
[0038] Although not shown, a groove is formed over the entire outer periphery of the sheave 22A for winding the wire rope 40. As shown in Figures 2 and 3, the wire rope 40 is wound around the outer periphery of the sheave 22A from above. The wire rope 40 extends downward from the end portion at the front F of the sheave 22A, i.e., the front end 221.
[0039] On the other hand, at the underside of the boom head 21, directly below the front end 221 of the sheave 22A and at the end of the rear B, i.e., directly below the rear end 222, there are provided circular openings 25, 27, respectively, for passing the wire rope 40 through, as shown in Figure 2.
[0040] Of these openings 25 and 27, the opening 27 is provided on its periphery with a flat annular seal member 28 made of resin such as nylon or rubber. This allows the opening 27 to be surrounded by the seal member 28. As a result, as shown in FIG. 3, when the wire rope 40 is wound up at the end of crane operation and the weight 51 is sandwiched between the hook block 30 and the boom head 21 to fix the weight 51, the seal member 28 comes into close contact with the weight 51 at the opening 27, preventing the sea breeze from entering. This also suppresses corrosion of the wire rope 40, rope socket 41, sheave 22A, and the like in the boom head 21.
[0041] 2, the wire rope 40 that is wound around the sheave 22A is passed through the opening 25. As a result, the wire rope 40 is pulled out below the boom head 21.
[0042] In contrast, the upper end of the hook block 30 is provided with openings 35, 37 on the front and rear ends, respectively, for passing the wire rope 40 therethrough.
[0043] The openings 35, 37 are formed in the same shape and size as the openings 25, 27 formed on the underside of the boom head 21 described above, and are arranged in the front-rear direction at the same pitch as the pitch of the openings 25 and 27, that is, at a pitch approximately the same as the diameter of the sheave 22A. In addition, the periphery of the openings 35, 37 is provided with sealing members 36, 38 of the same material, shape and size as the sealing member 28 of the boom head 21 described above. As a result, the openings 35, 37 are surrounded by the sealing members 36, 38. As a result, in the opening 35, when the weight 51 is fixed at the end of the crane operation shown in FIG. 3, the sealing member 36 comes into close contact with the underside of the boom head 21 to prevent the sea breeze from entering. In addition, in the opening 37, when the weight 51 is fixed at the end of the crane operation, the sealing member 38 comes into close contact with the weight 51 to prevent the sea breeze from entering.
[0044] On the other hand, as shown in FIG. 2, inside the hook block 30, between the openings 35 and 37 in the front-to-rear direction and directly below the openings 35 and 37, there is provided a disk-shaped sheave 32A having a groove formed on its outer periphery for winding the wire rope 40 therearound.
[0045] The sheave 32A has approximately the same diameter as the sheave 22A in the boom head 21. In addition, a groove for winding the wire rope 40 is formed over the entire outer periphery of the sheave 32A, similar to the sheave 22A. The wire rope 40 is drawn out from the opening 25 of the boom head 21 and drawn into the inside of the hook block 30 from the opening 35 and is wound around the outer periphery of the sheave 32A. The wire rope 40 is extended from the rear end 322 of the sheave 32A to the upper end of the hook block 30, passed through the opening 37 and the seal member 38, and drawn out above the hook block 30. Furthermore, the wire rope 40 is passed through the through hole of the weight 51 of the over-winding prevention device 50, and then extended toward the boom head 21.
[0046] In the boom head 21, the wire rope 40 passes through the through hole of the weight 51, passes through the opening 27 and the seal member 28, and is pulled into the inside of the boom head 21. Then, inside the boom head 21, the end of the wire rope 40 is fixed to the frame 211 of the boom head 21.
[0047] If the wire rope 40 pulled out from the hook block 30 becomes inclined due to the fixing of the end of the wire rope 40, when the weight 51 is sandwiched between the hook block 30 and the boom head 21 and fixed, the weight 51 may become inclined with respect to the underside of the boom head 21, causing a gap to be generated between the weight 51 and the underside of the boom head 21. As a result, sea wind may enter the boom head 21, causing corrosion of the parts inside the boom head 21.
[0048] On the other hand, if the wire rope 40 pulled out from the hook block 30 is extended straight up, there is a risk that the end of the wire rope 40 will interfere with the rear end 222 of the sheave 22A in the boom head 21. Also, if the rope socket 41 is accommodated under the sheave 22A to prevent the end of the wire rope 40 from interfering with the sheave 22A while the wire rope 40 is extended straight up inside the boom head 21, the boom head 21 will become larger in the vertical direction.
[0049] Therefore, in order to prevent interference of the end of the wire rope 40 with the sheave 22A and to make the boom head 21 smaller in the vertical direction, at the position where the wire rope 40 extends straight up from the hook block 30, the wire rope 40 is bent so that its extension point is directed backward, and a support member 60 is provided to support the wire rope 40.
[0050] In detail, as described above, the openings 35, 37 in the hook block 30 are formed with the same shape, size, and pitch as the openings 25, 27 in the underside of the boom head 21. The wire rope 40 is passed from the opening 25 in the boom head 21 to the opening 35 in the hook block 30, and further passed from the opening 37 in the hook block 30 to the opening 27 in the boom head 21. As a result, the opening 27 in the boom head 21 is located directly above the opening 37 in the hook block 30. The rear end 222 of the sheave 22A is located directly above the opening 27, and the front end of the support member 60 is located on the tangent line T of the rear end 222 of the sheave 22A.
[0051] The support member 60 has an upwardly convex arc shape in a side view. More specifically, the support member 60 has a quadrant arc shape centered at a point P located downward and rearward B in a side view. As a result, the support member 60 has a shape in which the outer periphery of the arc gradually becomes higher as it approaches the rearward B. A groove extending in the circumferential direction is formed on the outer periphery of the arc, although not shown. Furthermore, the wire rope 40 passed through the opening 27 is hung in the groove. As a result, the support member 60 supports the wire rope 40 as shown in FIG. 2, and bends the wire rope 40 to change the extending direction of the wire rope 40 from the upward direction to the diagonally upward direction rearward B.
[0052] The end of the wire rope 40 is positioned behind B of the sheave 22A by the support member 60. The end of the wire rope 40 is then connected to the rope socket 41 at that position. This causes the sheave 22A and the rope socket 41 to be aligned in the front-to-rear direction. Because the sheave 22A and the rope socket 41 are not aligned in the vertical direction, the boom head 21 does not become larger in the vertical direction. In other words, the boom head 21 is thin in the vertical direction. This lowers the height of the top surface of the davit crane 1A, improving maintainability.
[0053] Furthermore, the rope socket 41 is fixed to the frame 211 within the boom head 21. Because the rope socket 41 is housed in the boom head 21, the lifting range of a suspended load is longer than in a configuration in which the rope socket 41 itself is fixed below the boom head 21. Furthermore, by arranging the rope socket 41 in this manner, the upper surface of the boom head 21 is kept as low as possible, improving maintainability, while increasing the lifting range of a suspended load.
[0054] As shown in Figs. 2 and 3, the upper end of the hook block 30 is provided with a step 39 having the same size as the distance D1, which is the sum of the thickness of the weight 51 and the thickness of the seal member 36. As a result, the rear end side of the upper end of the hook block 30 is lower than the front end side by the same size as the distance D1. By providing the hook block 30 with this configuration, when the weight 51 is fixed, the weight 51 is sandwiched between the rear end side of the upper end and the boom head 21, and the seal member 38 on the rear end side is brought into close contact with the weight 51, and the seal member 36 is brought into close contact with the underside of the boom head 21. As a result, a gap is prevented from being generated between the boom head 21 and the weight 51.
[0055] As described above, in the davit crane 1A according to the first embodiment, the rope socket 41 is disposed inside the boom head 21 and behind the sheave 22A. Therefore, the lifting range of the suspended load is longer relative to the height of the boom head 21, compared to a configuration in which the rope socket 41 is disposed below the boom head 21 or above the sheave 22A.
[0056] In addition, since the rope socket 41 is provided inside the boom head 21 and behind the sheave 22A, the thickness of the boom head 21 in the vertical direction is thin. Therefore, the maintainability of the boom head 21 is high.
[0057] Since the support member 60 bends the terminal side portion of the wire rope 40 and changes the extending direction of the terminal side portion, it is easy to arrange the rope socket 41 inside the boom head 21. Also, since the support member 60 changes the extending direction of the terminal side portion of the wire rope 40 from the up-down direction to the front-rear direction, the thickness of the boom head 21 in the up-down direction can be made thinner.
[0058] Furthermore, since the support member 60 is formed in an arc shape when viewed from the side and supports the wire rope 40 in a state in which it is bent in an arc shape, the wire rope 40 is less likely to be damaged or broken.
[0059] The sheave 22A in the boom head 21 and the sheave 32A in the hook block 30 correspond to the first sheave and the second sheave in the claims. The through hole of the weight 51 corresponds to the first opening in the claims. The opening 27 in the underside of the boom head 21 corresponds to the second opening in the claims. The rope socket 41 corresponds to the fixing member for fixing the end of the wire rope 40 in the claims.
[0060] (Embodiment 2) In the first embodiment, the terminal side portion of the wire rope 40 is supported and bent by the support member 60. As a result, the extending direction of the terminal side portion of the wire rope 40 is changed. However, in the present invention, the support member 60 is an optional member. In the present invention, it is sufficient that a fixing member for fixing the terminal of the wire rope 40, for example, a rope socket 41, is disposed inside the boom head 21 and behind the first sheave, i.e., behind the sheave 22A.
[0061] In the davit crane 1B according to the second embodiment, the diameter of the sheave 22B is small, and as a result, a space is formed behind the sheave 22B at B. A rope socket 41 is disposed in the space. The configuration of the davit crane 1B will be described below with reference to Figs. 4 and 5. In the second embodiment, the configuration different from the first embodiment will be mainly described.
[0062] Fig. 4 is a right side view of the boom head 21 of the davit crane 1B according to the embodiment 2. Fig. 5 is a right side view of the boom head 21 when the weight 51 of the over-hoisting prevention device 50 provided in the davit crane 1B is fixed.
[0063] 4 and 5, like Fig. 2 and Fig. 3, the hook block 30 is also shown for ease of understanding. Also, the cover on the top surface of the boom head 21 is omitted. Furthermore, a part of the wire rope 40 is shown by a dotted line. The position of the sheave 32B in the hook block 30 is shown.
[0064] 4 and 5, diameter D2 of sheave 22B in boom head 21 is smaller than diameter D3 of sheave 32B in hook block 30. And, on the underside of boom head 21, as shown in Fig. 4, openings 25 and 27 for passing wire rope 40 are formed at a location directly below front end 221 of sheave 22B and at a location spaced rearward B from the location directly below by diameter D3 of sheave 32B.
[0065] On the other hand, at the upper end of the hook block 30, openings 35 and 37 for passing the wire rope 40 are formed directly above the front end 321 and rear end 322 of the sheave 32B, as in the first embodiment. As a result, the openings 35 and 37 are spaced apart by the diameter D3 of the sheave 32B. As described in the first embodiment, the wire rope 40 is passed from the opening 25 of the boom head 21 to the opening 35 of the hook block 30, and further from the opening 37 of the hook block 30 to the opening 27 of the boom head 21. Since the distance between the openings 25 and 27 in the front-rear direction and the distance between the openings 35 and 37 in the front-rear direction are the same as the diameter D3 as described above, the wire rope 40 extends straight between those openings in the vertical direction or in the reverse direction.
[0066] Furthermore, in the boom head 21, the diameter D2 of the sheave 22B is small, so that the opening 27 is spaced from directly below the sheave 22B to the rear B. This leaves a space directly above the opening 27. The rope socket 41 is disposed in the space. As a result, the wire rope 40 extends directly upward from the opening 37 of the hook block 30 to the rope socket 41. This prevents the weight 51 from inclining relative to the bottom surface of the boom head 21 when the weight 51 is sandwiched between the hook block 30 and the boom head 21 and fixed, as shown in FIG. 5, and thus prevents a gap from being generated between the weight 51 and the bottom surface of the boom head 21. As a result, the sea breeze is less likely to enter the boom head 21, and corrosion of the parts in the boom head 21 is prevented.
[0067] In addition, since the rope socket 41 is disposed at the rear B of the sheave 22B, the thickness of the boom head 21 in the vertical direction is thin, and the lifting range of the suspended load is long.
[0068] As described above, in the davit crane 1B according to the second embodiment, similarly to the davit crane 1A according to the first embodiment, the rope socket 41 is provided inside the boom head 21 and behind the sheave 22B, so that the lifting range of the suspended load is long relative to the height of the boom head 21. In addition, the thickness of the boom head 21 in the vertical direction is thin, so that the maintainability of the boom head 21 is high.
[0069] In addition, the support member 60 described in the first embodiment may also be used in the second embodiment. In that case, the support member 60 may guide the terminal side portion of the wire rope 40 rearward B from the opening 27 of the boom head 21. As a result, the rope socket 41 may be disposed rearward B of the sheave 22B.
[0070] (Embodiment 3) In the first and second embodiments, one sheave 32A, 32B is provided in the hook block 30. However, in the present invention, the number of sheaves 32A, 32B is arbitrary. For example, the sheaves 22A, 22B may be configured by a plurality of sheaves 22A, 22B arranged in the front-rear direction.
[0071] The davit crane 1C according to the third embodiment includes two sheaves 32C, 32D arranged in the front-rear direction within the hook block 30.
[0072] Fig. 6 is a right side view of the boom head 21 of the davit crane 1C according to the embodiment 3. Fig. 7 is a right side view of the boom head 21 when the weight 51 of the over-hoisting prevention device 50 provided in the davit crane 1C is fixed.
[0073] 2 to 5, in order to facilitate understanding, Fig. 6 and Fig. 7 also show the hook block 30. Also, the cover on the top surface of the boom head 21 is omitted. Furthermore, a part of the wire rope 40 is shown by a dotted line. The positions of the sheaves 32C and 32D in the hook block 30 are shown.
[0074] 6 and 7, the hook block 30 is provided with sheaves 32C and 32D adjacent to each other in the front-rear direction. As a result, a distance D4 from a front end 321 of the sheave 32C to a rear end 322 of the sheave 32D is greater than a diameter D2 of the sheave 22C in the boom head 21. In other words, a distance obtained by adding together the diameter of the sheave 32C, the diameter of the sheave 32D, and the size of the gap between the sheaves 32C and 32D is greater than the diameter D2 of the sheave 22C.
[0075] At the upper end of the hook block 30, openings 35 and 37 are formed directly above the front end 321 of the sheave 32C and directly above the rear end 322 of the sheave 32D. Meanwhile, at the underside of the boom head 21, openings 25 and 27 are formed directly below the front end 221 of the sheave 22C and at a location spaced rearward B from that location by the above-mentioned distance D4. And, as in the first and second embodiments, the wire rope 40 is passed through these openings.
[0076] As a result of forming the openings 25 and 27 of the boom head 21 in such positions, a space is also provided behind the sheave 22C inside the boom head 21. The rope socket 41 is disposed in that space directly above the opening 27. As in the second embodiment, the rope socket 41 is disposed behind the sheave 22C in the davit crane 1C, so that the vertical thickness of the boom head 21 is thin and the lifting range of the suspended load is long.
[0077] In addition, because the rope socket 41 is disposed in the position described above, the wire rope 40 extends straight up from the opening 37 of the hook block 30 to the rope socket 41. As a result, when the weight 51 shown in Fig. 7 is sandwiched between the hook block 30 and the boom head 21 and fixed, the weight 51 does not incline with respect to the underside of the boom head 21, and a gap is unlikely to occur between the weight 51 and the underside of the boom head 21. As a result, sea wind is unlikely to enter the boom head 21, and corrosion of parts inside the boom head 21 is prevented.
[0078] As described above, in the davit crane 1C according to embodiment 3, similarly to embodiments 1 and 2, the rope socket 41 is provided inside the boom head 21 and behind the sheave 22C, so that the lifting range of the suspended load is long relative to the height of the boom head 21. In addition, the boom head 21 is thin in the vertical direction, so that the maintainability of the boom head 21 is high.
[0079] In the third embodiment, the support member 60 may be used as described in the second embodiment. In that case, the support member 60 may guide the terminal side portion of the wire rope 40 rearward B from the opening 27 of the boom head 21. This allows the rope socket 41 to be disposed rearward B of the sheave 22C.
[0080] Further, the sheaves 32C and 32D provided on the hook block 30 correspond to the multiple small diameter sheaves referred to in the claims.
[0081] Although the embodiment of the present invention has been described above, the present invention is not limited to the embodiment. For example, in the first embodiment, the support member 60 has a quadrant arc shape in a side view. However, the shape of the support member 60 is not limited to this.
[0082] The support member 60 is provided inside the boom head 21, and a part of the wire rope 40 extending upward from the rear end 322 of the sheaves 32A-32D is hung on the support member 60 to support the part and bend the part backward to position the end of the wire rope 40 behind B of the sheaves 22A-C. Therefore, the shape of the support member 60 is arbitrary as long as it satisfies this condition. For example, the support member 60 may have a fan shape in a side view, and the wire rope 40 may be hung on the outer periphery of the fan. The support member 60 may also have a curved shape such as a parabolic shape in a side view.
[0083] In addition, in embodiment 1, the front end of support member 60, i.e., the end on the sheave 22A side, is located on the tangent T to the rear end 222 of sheave 22A of the boom head 21 in a side view, but if the only purpose is to make the boom head 21 thinner in the vertical direction, support member 60 may be located rearward B of the lower end of sheave 22A.
[0084] In addition, in the embodiments 1-3, the crane is a davit crane 1A-1C. However, the present invention is not limited to this. The present invention can be applied to all cranes, such as derrick cranes, rough terrain cranes, and truck cranes, which need to prevent wind, for example, sea breeze, from entering through the openings 25, 27 of the boom head 21. [Explanation of symbols]
[0085] 1A, 1B, 1C... davit crane, 10... rotating body, 20... boom, 21... boom head, 22A, 22B, 22C... sheave, 25, 27... opening, 28... sealing member, 30... hook block, 31... hook, 32A, 32B, 32C, 32D... sheave, 35, 37... opening, 36, 38... sealing member, 39... step, 40... wire rope, 41... rope socket, 50... overwinding prevention device, 51... weight, 52 ...Over-winding switch, 60...Support member, 100...Offshore wind power generation device, 110...Platform, 211...Frame, 221...Front end, 222...Rear end, 321...Front end, 322...Rear end, A1...Center axis, B...Rear, D1...Distance, D2, D3...Diameter, D4...Distance, F...Front, P...Location, T...Tangent
Claims
1. A first sheave is provided inside the boom head and has a radial direction directed in the front-rear direction; A second sheave is provided in the hook block and has a radial direction directed in the front-rear direction; a wire rope that is wound around the first sheave, hangs down from a front end of the first sheave, extends to a front end of the second sheave, and is further wound around the second sheave and extends upward from a rear end of the second sheave; a fixing member provided inside the boom head and behind the first sheave, for fixing an end of the wire rope on a side of a portion of the wire rope extending upward from the rear end of the second sheave; A crane equipped with
2. a support member provided inside the boom head, for supporting a portion of the wire rope extending upward from the rear end of the second sheave by hanging the portion, and for bending the portion backward to position the terminal end behind the first sheave; The crane of claim 1.
3. The support member has an arc shape extending in the front-rear direction and having a center located on the lower side. The crane of claim 2.
4. The end portion of the support member on the side of the second sheave is located on a tangent to the rear end of the first sheave when viewed in the left-right direction. A crane as claimed in claim 2 or 3.
5. The support member is located rearward of a lower end of the first sheave. A crane as claimed in claim 2 or 3.
6. The diameter of the second sheave is larger than the diameter of the first sheave. A crane as claimed in claim 1 or 2.
7. The second sheave is formed of a plurality of small diameter sheaves arranged in the front-rear direction and having a length obtained by adding up the diameters of the plurality of small diameter sheaves greater than the diameter of the first sheave. A crane as claimed in claim 1 or 2.
8. The wire rope is suspended from the boom head and further includes an over-winding detection weight having a plate shape with a first opening through which the portion of the wire rope extending upward from the rear end of the second sheave is passed, the over-winding detection weight being suspended from the boom head and positioned between the boom head and the hook block; The boom head has a lower surface portion through which a portion of the wire rope extending upward from the first opening is passed and in which a second opening having a diameter smaller than that of the over-winding detection weight is formed, When the wire rope is wound up and the hook block approaches the underside of the boom head, the over-winding detection weight abuts against the underside of the boom head and closes the second opening. A crane as claimed in claim 1 or 2.
Citation Information
Patent Citations
crane boom
JP1994059381U