Low-temperature ground type liquefied gas tank and construction method for low-temperature ground type liquefied gas tank
The low-temperature above-ground liquefied gas tank addresses load management and assembly complexity by fixing the metal roof to an inwardly projecting shoulder with stud bolts, enhancing structural integrity and simplifying assembly.
Patent Information
- Application Number
- JP2023083024
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-19
- Publication Date
- 2024-11-29
AI Technical Summary
Conventional low-temperature tanks face challenges in managing the load on the joint between the side wall and metal roof due to high internal gas pressure, and the assembly of underground tanks is complicated by interference with reinforcing bars, especially when using a metal spherical roof fixed to a concrete side wall.
A low-temperature above-ground liquefied gas tank design featuring a cylindrical concrete side wall with a metal roof fixed to an inwardly projecting shoulder, utilizing stud bolts and a support plate to distribute the load effectively, minimizing interference with reinforcing structures.
The design enables the tank to withstand large loads at the joint between the side wall and roof, simplifying assembly by reducing interference with reinforcing bars and ensuring structural integrity under high internal pressure.
Smart Images

Figure 2024166721000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a cryogenic above-ground liquefied gas tank and a method for constructing a cryogenic above-ground liquefied gas tank. [Background technology]
[0002] The following Patent Document 1 discloses an aboveground cryogenic tank for storing low-temperature liquefied gases such as LNG (liquefied natural gas), LPG (liquefied petroleum gas), and liquid nitrogen. This cryogenic tank has a double-shell structure consisting of an inner tank made entirely of metal and having a flat bottom and a cylindrical shape with a spherical roof, and an outer tank made of prestressed concrete side walls and a metallic spherical roof fixed to the side walls, and is configured by filling the space between the inner tank and the outer tank with a cold insulation material such as granular perlite and a material that reduces cold and heat resistance. Furthermore, Patent Document 2 listed below discloses an above-ground cryogenic tank in which a ring plate is attached around the entire inner periphery of the upper part of a cylindrical concrete body and the peripheral edge of the roof panel is fixed to the ring plate. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2002-267099 A [Patent Document 2] Japanese Patent Application Publication No. 8-338598 Summary of the Invention [Problem to be solved by the invention]
[0004] In conventional cryogenic tanks, as the tank size increases and the liquid head pressure increases, the thickness of the metal inner tank side plates becomes thicker to withstand the liquid pressure, but there is a limit to how thick the plates can be from the standpoint of strength and weldability.To solve this problem, a structure is sometimes adopted in which the side walls are made of prestressed concrete and a metal spherical roof is fixed to the side walls. Even in the outer vessel of a conventional cryogenic tank, the metallic spherical roof is fixed to a prestressed concrete side wall, but the acting internal pressure is about 0.5 kPa. In this structure, the joint between the side wall and the metallic spherical roof is subjected to high internal gas pressure (for example, about 20 kPa) due to the cryogenic liquefied gas. This creates the problem of a large load being placed on the joint between the side wall and the roof of the cryogenic tank. In addition, in a conventional underground cryogenic tank for storing low-temperature liquefied gas, a structure in which a metallic spherical roof is fixed to a concrete side wall buried underground may be adopted. In this case, the outer end of the spherical roof is made of a thick plate, and is embedded in the side wall by about 1 m, as in the ring plate shown in FIG. 1 of Patent Document 2. However, in this case, this embedded part causes a lot of interference with the reinforcing bars in the concrete side wall, making assembly very complicated and restricting the arrangement of the reinforcing bars. Furthermore, when a concrete side wall is adopted for an above-ground cryogenic tank, the side wall needs to withstand the liquid head pressure from the inside, so circumferential prestressing steel and vertical prestressing steel must be placed in the side wall, and it is expected that it will be even more difficult to solve this interference problem.
[0005] The present invention has been made in consideration of the above-mentioned circumstances, and provides a low-temperature above-ground liquefied gas tank and a method for constructing a low-temperature above-ground liquefied gas tank that can adequately withstand the load applied to the joint between the concrete side wall and the metal roof, and can significantly reduce interference between the outer edge of the metal roof and structures within the side wall. [Means for solving the problem]
[0006] The low-temperature above-ground liquefied gas tank of the first aspect of the present invention comprises a cylindrically formed concrete side wall, a metal membrane provided radially inward of the side wall and forming a storage space for low-temperature liquefied gas, and a metal roof covering the top of the storage space, wherein an upper end of the side wall is provided with a shoulder portion protruding radially inward, and the roof is fixed to the underside of the shoulder portion.
[0007] In addition, in a second aspect of the present invention, in the low-temperature above-ground liquefied gas tank of the first aspect, the roof may be fixed to the underside of the shoulder portion via a stud bolt.
[0008] In addition, in a third aspect of the present invention, in the low-temperature above-ground liquefied gas tank of the second aspect, the shoulder portion may comprise a support plate fixed to an inner wall of the side wall, a fixing plate fixed to the support plate and extending diagonally upward toward the radially inward direction of the side wall, the stud bolt provided on the upper surface side of the fixing plate, and a concrete body poured into the upper surface side of the fixing plate and embedding the stud bolt, and the roof may be fixed to the fixing plate.
[0009] A method of constructing a low-temperature above-ground liquefied gas tank according to a fourth aspect of the present invention comprises forming a concrete side wall into a cylindrical shape, forming a metal membrane on the radially inner side of the side wall to form a storage space for low-temperature liquefied gas, forming a shoulder protruding radially inward at the upper end of the side wall, and fixing a metal roof covering the top of the storage space to the underside of the shoulder. Effect of the Invention
[0010] According to the above-mentioned aspect of the present invention, it is possible to provide a cryogenic above-ground liquefied gas tank and a method for constructing a cryogenic above-ground liquefied gas tank that can adequately withstand large loads applied to the joints between the side walls and the roof. [Brief description of the drawings]
[0011] [Figure 1] FIG. 1 is a schematic diagram of a low-temperature ground-based liquefied gas tank according to one embodiment. [Diagram 2] FIG. 2 is a close-up view of a side wall and roof joint according to one embodiment. [Diagram 3] FIG. 2 is an explanatory diagram showing a process of connecting a roof to the upper end of a side wall in a method of constructing a low-temperature above-ground liquefied gas tank according to one embodiment. [Figure 4] FIG. 2 is an explanatory diagram showing a process of connecting a roof to the upper end of a side wall in a method of constructing a low-temperature above-ground liquefied gas tank according to one embodiment. [Diagram 5] FIG. 2 is an explanatory diagram showing a process of connecting a roof to the upper end of a side wall in a method of constructing a low-temperature above-ground liquefied gas tank according to one embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[0013] FIG. 1 is a configuration diagram of a low-temperature ground-based liquefied gas tank 1 according to one embodiment. As shown in Fig. 1, the low-temperature above-ground liquefied gas tank 1 generally includes a base slab 10, a side wall 20, a membrane 30, and a roof 40. In a storage space A inside the low-temperature above-ground liquefied gas tank 1, a low-temperature liquefied gas 2 is stored.
[0014] The base slab 10 is made of concrete and formed in a circular plate shape. A bottom liner and a cold insulation structure (cold insulation material, cold and heat resistance mitigation material, etc.) (not shown) are provided on the upper surface of the base slab 10.
[0015] The side wall 20 is formed in a cylindrical shape on the outer periphery of the base slab 10. The side wall 20 is made of concrete, for example, a PC (prestressed concrete) wall. A side liner (not shown) and a cold insulation structure 50 (see FIG. 2 described later) are provided on the inner wall of the side wall 20. An outer staircase 21 is provided on the outer wall of the side wall 20.
[0016] The membrane 30 is provided on the radially inner side of the side wall 20, and forms a storage space A for the low-temperature liquefied gas 2. The membrane 30 is formed in a bottomed cylindrical shape that covers the inner wall of the side wall 20 and the upper surface of the base slab 10. The membrane 30 is formed from a plurality of stainless steel thin metal plates, and the membrane 30 is provided with lattice-like corrugations (pleats).
[0017] The roof 40 is a metallic spherical roof formed into an upwardly convex dome shape, and covers the top of the storage space A. The roof 40 is provided with a cold insulation structure (not shown). The roof 40 is also provided with a roof staircase 41. The roof 40 is fixed to the upper end portion 20a of the side wall 20, as shown in FIG. 2.
[0018] FIG. 2 is an enlarged view of the joint between the side wall 20 and the roof 40 according to one embodiment. 2, a shoulder 22 that protrudes radially inward is provided at the upper end 20a of the side wall 20. The roof 40 is fixed to the lower surface side of the shoulder 22. The shoulder 22 is provided in an annular shape in the circumferential direction along the upper end 20a of the side wall 20.
[0019] The underside of shoulder 22 extends obliquely upward toward the radially inner side (center of tank) of side wall 20. A thick fixing plate 23 is provided on the underside of shoulder 22, and the outer periphery of roof 40 is fixed via fixing plate 23. Note that upper surface 22a of shoulder 22 is a flat surface (horizontal surface) so that rainwater and the like do not accumulate.
[0020] Next, a method for constructing the low-temperature above-ground liquefied gas tank 1 having the above-mentioned configuration will be described with reference to Figs. 3 to 5 are explanatory views showing a process of joining a roof 40 to an upper end 20a of a side wall 20 in a method of constructing a low-temperature above-ground liquefied gas tank 1 according to one embodiment. In Figs. 3 to 5, a circumferential PC steel member 61, a vertical PC steel member 62, and a large-diameter vertical reinforcing bar 63 are illustrated as structural members within the side wall 20. Note that the circumferential reinforcing bar that runs along the large-diameter vertical reinforcing bar 63 is not illustrated.
[0021] In this method, first, a base plate 10 is formed, and then a cylindrical side wall 20 is formed on the outer periphery of the base plate 10. A support plate 24 is fixed to the inner wall of the upper end portion 20a of the side wall 20, as shown in Fig. 3. The support plate 24 is a thick metal plate and is provided with a number of stud bolts 25.
[0022] Next, the fixing plate 23 is fixed by welding or the like to the upper end portion of the support plate 24. The fixing plate 23 is supported by the support plate 24 in a position in which it extends obliquely upward toward the radially inner side of the side wall 20.
[0023] The upper surface of the fixing plate 23 is provided with a plurality of stud bolts 26 and a frame fixing rib 27 for pouring a concrete body 29A (see FIG. 4) described later. The lower surface of the fixing plate 23 is provided with roof fixing ribs 28 for fixing steel members 42 (main rafters, sub rafters, etc.) extending radially from the center of the roof 40 in the radial direction.
[0024] The radially outer end of the fixing plate 23 is embedded in the inner wall of the side wall 20 together with the stud bolts 25 of the support plate 24. The embedded length of the radially outer end of the fixing plate 23 is shorter than the embedded length of the stud bolts 25 of the support plate 24. The radially outer end of the fixing plate 23 and the stud bolts 25 of the support plate 24 have lengths and circumferential arrangements that do not interfere with the circumferential PC steel 61, vertical PC steel 62, and large-diameter vertical reinforcing bars 63 that apply prestress to the side wall 20.
[0025] Next, in this method, as shown in Fig. 4, a concrete pouring frame (not shown) is attached to the frame fixing ribs 27 of the fixing plate 23, and a concrete body 29A in which the stud bolts 26 are embedded is poured on the upper surface side of the fixing plate 23. The concrete body 29A protrudes radially inward from the side wall 20 to form a shoulder portion 22. After the shoulder portion 22 is formed, the roof 40 constructed on the base slab 10 is raised by air raising or the like, and the outer periphery of the roof 40 is fixed to the fixing plate 23 by welding or the like.
[0026] Next, in this method, as shown in Fig. 5, concrete body 29B is poured into the recess between concrete body 29A and roof 40, and the upper surface 22a of shoulder 22 is made into a flat surface that continues with upper end 20a of side wall 20. A roof corridor board (not shown) may be laid on the flat surface. Then, an inclined water drain board 43 is fixed by welding or the like so as to straddle the joint between concrete body 29B and roof 40, to prevent rainwater from seeping in through the joint.
[0027] Inside the low-temperature above-ground liquefied gas tank 1, a corrugated membrane 30 is formed. When the membrane 30 is completed, an airtight test is performed. After that, through cold insulation work, painting work, piping work, etc., the low-temperature above-ground liquefied gas tank 1 shown in Figure 1 can be constructed.
[0028] As described above, the low-temperature ground-type liquefied gas tank 1 according to this embodiment includes a cylindrical concrete side wall 20, a metal membrane 30 provided on the radially inner side of the side wall 20 to form a storage space A for the low-temperature liquefied gas 2, and a metal roof 40 covering the upper part of the storage space A. The upper end 20a of the side wall 20 is provided with a shoulder 22 protruding radially inward, and the roof 40 is fixed to the lower surface side of the shoulder 22. With this configuration, the shoulder 22 can sufficiently bear the internal pressure acting when storing the low-temperature liquefied gas 2. Therefore, the low-temperature ground-type liquefied gas tank 1 can sufficiently withstand a large load applied to the joint between the side wall 20 and the roof 40.
[0029] In this embodiment, the roof 40 is fixed to the underside of the shoulder portion 22 via the stud bolts 26. With this configuration, the load of the roof 40 can be sufficiently supported by the shoulder portion 22 via the stud bolts 26.
[0030] In this embodiment, the shoulder portion 22 includes a support plate 24 fixed to the inner wall of the side wall 20, a fixing plate 23 fixed to the support plate 24 and extending obliquely upward toward the radially inner side of the side wall 20, a stud bolt 26 provided on the upper surface side of the fixing plate 23, and a concrete body 29A poured into the upper surface side of the fixing plate 23 and embedding the stud bolt 26, and the roof 40 is fixed to the fixing plate 23. With this configuration, even if the side wall 20 is a PC wall, the roof 40 can be fixed to the upper end portion 20a of the side wall 20 without interfering with the structures (the circumferential PC steel members 61, the vertical PC steel members 62, and the large-diameter vertical reinforcing bars 63) that apply prestress to the side wall 20.
[0031] Moreover, in the method for constructing the low-temperature above-ground liquefied gas tank 1 according to this embodiment, the side wall 20 made of concrete is formed into a cylindrical shape, a metal membrane 30 that forms the storage space A for the low-temperature liquefied gas 2 is formed on the radially inner side of the side wall 20, a shoulder 22 that protrudes radially inward is formed on the upper end 20a of the side wall 20, and a metal roof 40 that covers the upper part of the storage space A is fixed to the underside of the shoulder 22. With this configuration, a low-temperature above-ground liquefied gas tank 1 that can sufficiently withstand a large load applied to the joint between the side wall 20 and the roof 40 can be constructed.
[0032] Although preferred embodiments of the present invention have been described and illustrated above, it should be understood that these are illustrative of the present invention and should not be considered as limiting. Additions, omissions, substitutions, and other modifications can be made without departing from the scope of the present invention. Thus, the present invention should not be considered as limited by the foregoing description, but rather by the scope of the claims. [Explanation of symbols]
[0033] 1...Low temperature above-ground liquefied gas tank, 2...Low temperature liquefied gas, 10...Base plate, 20...Side wall, 20a...Upper end, 21...External staircase, 22...Shoulder, 22a...Upper surface, 23...Fixing plate, 24...Support plate, 25...Stud bolt, 26...Stud bolt, 27...Frame fixing rib, 28...Roof fixing rib, 29A...Concrete body, 29B...Concrete body, 30...Membrane, 40...Roof, 41...Roof staircase, 42...Steel member, 43...Drain board, 50...Cold insulation structure, 61...Circumferential PC steel, 62...Vertical PC steel, 63...Large diameter vertical reinforcing bar, A...Storage space
Claims
1. A cylindrical concrete side wall; A metallic membrane provided on the radially inner side of the side wall and forming a storage space for low-temperature liquefied gas; A metal roof covering the storage space from above; The side wall has an upper end provided with a shoulder protruding radially inward, The roof is fixed to the underside of the shoulder portion. Low temperature above-ground liquefied gas tank.
2. The roof is fixed to the underside of the shoulder portion via a stud bolt.
2. The low-temperature above-ground liquefied gas tank according to claim 1.
3. The shoulder portion is A support plate fixed to an inner wall of the side wall; a fixing plate fixed to the support plate and extending obliquely upward toward the radially inner side of the side wall; The stud bolt is provided on the upper surface side of the fixing plate; A concrete body is poured on the upper surface side of the fixing plate and embeds the stud bolt, The roof is fixed to the fixing plate.
3. The low-temperature above-ground liquefied gas tank according to claim 2.
4. The concrete side walls are formed into a cylindrical shape, A metallic membrane is formed on the radially inner side of the side wall to form a storage space for low-temperature liquefied gas; A shoulder portion is formed at an upper end of the side wall, the shoulder portion protruding radially inward; A metal roof is fixed to the underside of the shoulder portion to cover the storage space from above. How to construct a cryogenic above-ground liquefied gas tank.
Citation Information
Patent Citations
Low temperature liquefied gas storage tank
JP1996338598A
Low-temperature tank and storage method for low- temperature liquid
JP2002267099A
Construction method for double shell tank
JP2017128349A