Water supply system and operation control method
The water supply system efficiently produces pure water for hydrogen production using waste heat and nanocarbon membranes, addressing the challenge of sourcing pure water from low-quality sources with reduced energy consumption and extended membrane life.
Patent Information
- Application Number
- JP2023083653
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-22
- Publication Date
- 2024-12-04
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 2024167521000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a water supply system and an operation control method thereof. [Background technology]
[0002] Hydrogen produced by water electrolysis using renewable energy such as solar power and wind power has been attracting attention as a carbon-neutral energy source. An example of a hydrogen production device that produces such hydrogen is disclosed in Patent Document 1. The hydrogen production device disclosed in Patent Document 1 produces hydrogen from variable power generated by a renewable energy facility, and is characterized in that the oxygen evolution electrode is an alloy oxide of Ir and Mn. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2013-136801 A Summary of the Invention [Problem to be solved by the invention]
[0004] Meanwhile, hydrogen production devices require high-purity pure water as a raw material. If there is a freshwater source such as a river or a lake nearby, water can be secured from that freshwater source. However, freshwater sources are often used for drinking water or agricultural water, and it is difficult to secure a sufficient amount of water. Therefore, it is desirable to provide a water supply system that can efficiently produce pure water from a low-quality water source and supply it to a hydrogen production device.
[0005] In addition, generally, many of the locations suitable for installing power generating facilities such as solar and wind power, which are representative of renewable energy, are not rich in freshwater resources. Therefore, it is desirable for water supply systems to produce pure water from low-quality raw water such as industrial wastewater treatment water, brackish water, and produced water treatment water, and since the energy required to produce pure water from low-quality raw water tends to be large, it is desirable to suppress (reduce) the energy required to produce pure water. Furthermore, when producing pure water from low-quality raw water, concentrated water containing many residual impurities is generated, and since the concentrated water contains water components, it is desirable to obtain as much pure water as possible from the concentrated water.
[0006] The present invention has been made to solve the above-mentioned problems, and has as its main object to provide a water supply system that efficiently produces pure water from a low-quality water source and supplies it to a hydrogen production device, and a method for controlling the operation of the water supply system. [Means for solving the problem]
[0007] In order to achieve the above-mentioned object, the present invention provides a water supply system for supplying water for hydrogen production to a hydrogen production apparatus, comprising: a water treatment system for producing the water for hydrogen production from raw water; a concentrating device for further producing the water for hydrogen production from concentrated water discharged from the water treatment system; and a heating section located on a concentrated water discharge route connecting the inside of the water treatment system and the inside of the concentrating device for heating the concentrated water using waste heat generated by the hydrogen production apparatus. Other means will be described later. Effect of the Invention
[0008] According to the present invention, pure water can be efficiently produced from a low-quality water source and supplied to a hydrogen production device. [Brief description of the drawings]
[0009] [Figure 1] 1 is a block diagram showing a schematic configuration of a water supply system according to an embodiment of the present invention. [Diagram 2]FIG. 2 is a schematic diagram of a membrane distillation apparatus of a concentrating apparatus used in the water supply system according to the present embodiment. [Diagram 3] FIG. 13 is a schematic diagram of a modified membrane distillation apparatus of the concentrator used in the water supply system according to the embodiment. [Figure 4] 4 is a flowchart showing the operation of a first operation control method in the water supply system according to the present embodiment. [Diagram 5] 6 is a flowchart showing the operation of a second operation control method in the water supply system according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, an embodiment of the present invention (hereinafter referred to as "the present embodiment") will be described in detail with reference to the drawings. Note that each figure is merely a schematic illustration to allow a sufficient understanding of the present invention. Therefore, the present invention is not limited to only the illustrated examples. In addition, in each figure, common components or similar components are given the same reference numerals, and duplicated explanations thereof will be omitted. In addition, the present invention is not limited to the embodiment described below, and different configurations can be combined or modified as desired.
[0011] <Water supply system configuration> The configuration of a water supply system 10 according to the first embodiment will be described below with reference to Fig. 1 to Fig. 3. Fig. 1 is a block diagram showing a schematic configuration of the water supply system 10. Fig. 2 is a schematic diagram of a membrane distillation apparatus 31 of a concentrating apparatus 30 used in the water supply system 10. Fig. 3 is a schematic diagram of a modified example of a membrane distillation apparatus 31A of the concentrating apparatus 30 used in the water supply system 10.
[0012] 1, a water supply system 10 according to this embodiment is a system that performs a process to remove impurities from raw water 110 to produce purified water 120 for hydrogen production, and supplies the purified water to a hydrogen production device 100. The water supply system 10 includes a water treatment system 20 that produces pure water from the raw water 110, and a concentrating device 30 that produces pure water by further concentrating concentrated water 32 discharged from the water treatment system 20. The water supply system 10 also includes a heating unit 51 that heats the concentrated water 32 using waste heat from wastewater and exhaust gas generated in the hydrogen production device 100, on a delivery route 50 for the concentrated water 32 that connects the inside of the water treatment system 20 and the inside of the concentrating device 30.
[0013] In this embodiment, the heating unit 51 is described as having a heat pipe 52 (see FIGS. 2 and 3). The heat pipe 52 (see FIGS. 2 and 3) is a flow path for flowing wastewater and exhaust gas generated during hydrogen production in the hydrogen production device 100. The heat pipe 52 (see FIGS. 2 and 3) is arranged so as to be wound around the piping arranged in the delivery route 50 of the concentrated water 32 multiple times while being in contact with the piping. In the example shown in FIG. 1, the heating unit 51 is provided from the inside of the water treatment system 20 to the inside of the concentrating device 30. However, the heating unit 51 may be provided only inside the water treatment system 20, only inside the concentrating device 30, or between the water treatment system 20 and the concentrating device 30. The wastewater and exhaust gas that flow through the heat pipe 52 (see FIGS. 2 and 3) are discharged to the outside of the water supply system 10.
[0014] The water supply system 10 supplies produced water 120 for hydrogen production to the hydrogen production device 100, and receives waste heat 130 from wastewater and exhaust gas generated during hydrogen production in the hydrogen production device 100. The received waste heat 130 is used to heat the concentrated water 32.
[0015] The raw water 110 is not particularly limited, but may be taken from a water source available near the installation site of the hydrogen production device 100. The water supply system 10 according to this embodiment can obtain pure water from low-quality water containing a large amount of impurities using the water treatment system 20 and the concentrator 30. Therefore, the water supply system 10 can use low-quality water such as industrial wastewater treatment water, brackish water, and produced water treatment water as the raw water 110.
[0016] The water treatment system 20 includes a pump 20a that takes in raw water 110 into the water treatment system 20, a first water treatment membrane module 21 that separates the raw water 110 into a first concentrated water 24 and a first permeate 23, and a second water treatment membrane module 22 that separates the first permeate 23 into a second concentrated water 26 and a purified second permeate 25. The raw water 110 is supplied to the first water treatment membrane module 21 and separated into the first permeate 23 and the first concentrated water 24. The first permeate 23 is supplied to the second water treatment membrane module 22 and separated into the second permeate 25 and the second concentrated water 26. However, the water treatment system 20 may be configured to include three or more water treatment membrane modules.
[0017] The first water treatment membrane module 21 has a hydrophilic and porous first water treatment membrane 21a therein. The first water treatment membrane 21a is made of a nanocarbon structure. The first water treatment membrane module 21 removes organic matter that causes membrane fouling and divalent ions (e.g., Ca) that cause scale (scale) that adheres to the inside of piping from the raw water 110 through the first water treatment membrane 21a. 2+ , Mg 2+ The water treatment system 20 can thereby suppress deterioration in the treatment efficiency and the water quality of the second permeate 25 caused by membrane fouling and scale adhesion to the second water treatment membrane module 22. Furthermore, the water treatment system 20 can realize reduction in operating costs by reducing the frequency of cleaning and extending the life of the second water treatment membrane module 22.
[0018] The first water treatment membrane 21a is preferably a nanofiltration membrane (NF membrane). A nanofiltration membrane is a membrane used mainly for the purpose of removing divalent ions. The first water treatment membrane 21a may be made of a polymer material such as polyamide or cellulose acetate, an inorganic material such as alumina or titania, or a nanocarbon material such as graphene oxide. The first water treatment membrane 21a is more preferable because it has good fouling resistance, particularly when a nanocarbon material such as graphene oxide is used. By using such a first water treatment membrane 21a in the first water treatment membrane module 21, the water treatment system 20 can reduce the operating cost by reducing the frequency of cleaning the first water treatment membrane module 21 and reducing the replacement frequency due to the extended life.
[0019] The second water treatment membrane module 22 has a hydrophilic and porous second water treatment membrane 22a inside, which is finer than the first water treatment membrane 21a. The second water treatment membrane 22a is made of a nanocarbon structure. The second water treatment membrane module 22 produces a second permeate 25 from the first permeate 23 with the second water treatment membrane 22a. The first permeate 23 mainly contains monovalent ions as impurities. Therefore, the second water treatment membrane module 22 removes these impurities from the first permeate 23 with the second water treatment membrane 22a. The water treatment system 20 sends the second permeate 25 produced in the second water treatment membrane module 22 to the hydrogen production device 100 as water 120 for hydrogen production. At that time, the water treatment system 20 sends a part of the second permeate 25 to the concentrator 30 as pure water 35 for cooling.
[0020] The second water treatment membrane 22a is preferably a reverse osmosis membrane (RO membrane) or an electrodialysis membrane. The reverse osmosis membrane and the electrodialysis membrane are used for the purpose of removing all ionic impurities. The second water treatment membrane 22a may be configured as either a reverse osmosis membrane or an electrodialysis membrane, or may be configured as a combination of both. By using such a second water treatment membrane 22a in the second water treatment membrane module 22, the water treatment system 20 can separate the first permeate 23 generated in the first water treatment membrane module 21 into the second concentrated water 26 and the second permeate 25 that has been purified. The water treatment system 20 combines the first concentrated water 24 discharged from the first water treatment membrane module 21 and the second concentrated water 26 discharged from the second water treatment membrane module 22, and sends the combined concentrated water 32 to the concentrator 30.
[0021] The concentrating device 30 has a membrane distillation device 31 therein. The membrane distillation device 31 is a device that separates the concentrated water 32 into a further concentrated concentrated water (third concentrated water 34) and a purified permeated water (third permeated water 33). The membrane distillation device 31 has a hydrophobic porous membrane 36 therein. The hydrophobic porous membrane 36 is a membrane for separating the concentrated water 32 into the third concentrated water 34 and the third permeated water 33 (pure water). The hydrophobic porous membrane 36 is hydrophobic and has a porous structure. The hydrophobic porous membrane 36 has a property that it cannot pass water but can pass water vapor.
[0022] The concentrator 30 receives as feed water the concentrated water 32 separated from the raw water 110 in the water treatment system 20, and separates the concentrated water 32 into a third permeate 33 and a third concentrated water 34 using the hydrophobic porous membrane 36 of the membrane distillation device 31.
[0023] The concentrating device 30 can be configured, for example, as shown in Fig. 2. In the example shown in Fig. 2, the inside of the membrane distillation device 31 of the concentrating device 30 is divided (separated) by a hydrophobic porous membrane 36 into a compartment into which concentrated water 32 having a higher temperature than cooling pure water 35 flows and a compartment into which pure water (cooling pure water 35) having a lower temperature than the concentrated water 32 flows. In the example shown in Fig. 2, the compartment into which the high-temperature concentrated water 32 flows is the compartment on the left side of the hydrophobic porous membrane 36. Moreover, the compartment into which the low-temperature pure water (cooling pure water 35) flows is the compartment on the right side of the hydrophobic porous membrane 36.
[0024] Inside the membrane distillation apparatus 31, water vapor is generated from the high-temperature concentrated water 32. After permeating the hydrophobic porous membrane 36, the water vapor is combined with low-temperature cooling pure water 35 (pure water) and is cooled by the cooling pure water 35, causing it to condense and become liquefied. This produces the third permeate 33. In this way, the membrane distillation apparatus 31 produces pure water (third permeate 33) by concentration through membrane distillation. The produced third permeate 33 is combined with the second permeate 25 and supplied to the hydrogen production apparatus 100 as water for hydrogen production 120.
[0025] The concentrated water 32 and the cooling pure water 35 may be flowed in the same direction inside the membrane distillation apparatus 31. However, flowing them in opposite directions is more preferable because it ensures a temperature difference between the concentrated water 32 and the cooling pure water 35, and makes it easier to efficiently cool the water vapor generated from the concentrated water 32 and produce pure water (third permeate water 33).
[0026] In addition, examples of a method for heating the concentrated water 32 using the waste heat 130 of the hydrogen production device 100 include a method of directly exchanging heat with the concentrated water 32 and a method of exchanging heat via a dedicated heat conducting medium (such as a heat pipe 52). In this embodiment, the water supply system 10 will be described as using a method of exchanging heat via a heat pipe 52 as a dedicated heat conducting medium in the heating unit 51.
[0027] The low-temperature cooling pure water 35 may be the second permeate 25 produced by the water treatment system 20, or pure water produced by a system not shown. Examples of materials for the hydrophobic porous membrane 36 include polypropylene (PP), polytetrafluoroethylene (PTFE), polyvinylidene fluoride (PVDF) with a hydrophobic surface treatment, and nanocarbon materials such as graphene. Graphene in particular exhibits good fouling resistance, and is therefore expected to reduce operating costs by reducing the frequency of membrane cleaning and replacement.
[0028] The third concentrated water 34 discharged from the concentrating device 30 can be dried in the drying device 140 to become solid waste 150. Because the third concentrated water 34 is sufficiently concentrated in the concentrating device 30, it can be dried with little energy consumption, and the volume of the waste can be reduced (reduced).
[0029] The concentrating device 30 can be modified from the configuration shown in Fig. 2 to, for example, the configuration shown in Fig. 3. The configuration shown in Fig. 3 is configured so that cooling water 39 that may contain impurities can be used instead of the cooling pure water 35 used in the configuration shown in Fig. 2 when producing pure water (third permeate water 33) from concentrated water 32. Here, a description will be given assuming that raw water 110A that may contain impurities is used as the cooling water 39.
[0030] In the example shown in Fig. 3, the concentrating apparatus 30 is configured to have a membrane distillation apparatus 31A instead of the membrane distillation apparatus 31 (see Fig. 2). The membrane distillation apparatus 31A has a hydrophobic porous membrane 36 and a condensation plate 38 therein.
[0031] In the example shown in Fig. 3, the inside of the membrane distillation apparatus 31A is divided (separated) by a hydrophobic porous membrane 36 and a condenser plate 38 into a compartment into which concentrated water 32 having a higher temperature than cooling water 39 flows, a compartment into which cooling water 39 having a lower temperature than concentrated water 32 flows, and a compartment into which water vapor generated from the high-temperature concentrated water 32 flows. In the example shown in Fig. 3, the compartment into which the high-temperature concentrated water 32 flows is the compartment to the left of the hydrophobic porous membrane 36. The compartment into which the cooling water 39 flows is the compartment to the right of the condenser plate 38. The compartment into which water vapor generated from the high-temperature concentrated water 32 flows is the compartment between the hydrophobic porous membrane 36 and the condenser plate 38.
[0032] Inside the membrane distillation apparatus 31A, low-temperature cooling water 39 cools the condensation plate 38. In addition, water vapor is generated from the high-temperature concentrated water 32. The water vapor permeates the hydrophobic porous membrane 36 and flows into the air gap 37, and is then cooled by the low-temperature cooling water 39 via the condensation plate 38, causing it to condense and become liquefied. As a result, the third permeated water 33 is generated. In this way, the membrane distillation apparatus 31A produces pure water (third permeated water 33) by concentration through membrane distillation. The produced third permeated water 33 is supplied to the hydrogen production apparatus 100 together with the second permeated water 25 as water for hydrogen production 120.
[0033] The concentrated water 32 and the cooling water 39 may be flowed in the same direction inside the membrane distillation apparatus 31A. However, flowing them in opposite directions is more preferable because it ensures a temperature difference between the concentrated water 32 and the cooling water 39, and makes it easier to efficiently cool the water vapor generated from the concentrated water 32 and produce pure water (third permeate 33). The cooling water 39 may be raw water 110 that has not been treated to remove impurities.
[0034] <Water supply system operation control method> Hereinafter, the operation of the water supply system 10 will be described with reference to Fig. 4 and Fig. 5. Fig. 4 is a flowchart showing the operation of a first operation control method in the water supply system 10. Fig. 5 is a flowchart showing the operation of a second operation control method in the water supply system 10.
[0035] (Considerations regarding operation control methods) The hydrogen production device 100, which is a supply destination (demand destination) of pure water and a waste heat source, may change its operation rate depending on the amount of renewable energy and regulated power, which are the power sources. Since the amount of pure water required and the amount of waste heat generated change in such a hydrogen production device 100, it is preferable to control the operating conditions of the water supply system 10 accordingly.
[0036] The water supply system 10 uses a certain amount of energy (electricity) for the high-pressure pump for the reverse osmosis membrane module, the power source for electrodialysis, and the like in the water treatment system 20. On the other hand, the water supply system 10 uses the concentrated water 32 of the water treatment system 20 as supply water for producing pure water (third permeate 33) in the concentrator 30, so that it is possible to ensure an inflow flow rate of the concentrated water 32 at a certain level or higher without an additional pump or the like.
[0037] In addition, the concentrated water 32 is heated using the waste heat 130 from the hydrogen production device 100 as a heat source, so the water supply system 10 does not require a separate heat source. Such a water supply system 10 can suppress (reduce) the energy consumption during water production. Therefore, the water supply system 10 can suppress (reduce) the energy consumption more by increasing the amount of water produced by the concentrator 30. However, since the water supply system 10 uses the concentrated water 32 from the water treatment system 20 as feed water for producing pure water (third permeate 33), if the inflow rate of the concentrated water 32 is made too fast, it may exceed the processing amount for producing pure water from the concentrated water 32, and the amount of concentrated water (third concentrated water 34) discharged to the outside may increase.
[0038] Furthermore, when the operation rate of the hydrogen production device 100 is low, the amount of waste heat is small or the wastewater temperature is low. Therefore, the amount of water produced by the concentrator 30 is reduced. Such a water supply system 10 can optimize the energy (electricity) consumed for water production by controlling the ratio of the amount of water produced by the water treatment system 20 and the concentrator 30 according to the operation rate of the hydrogen production device 100 (demand amount of pure water, amount of waste heat / wastewater temperature). Specifically, since there is a sufficient amount of waste heat when the operation rate of the hydrogen production device 100 is high, the water supply system 10 may increase the amount of water produced by the concentrator 30 and reduce the amount of water produced by the water treatment system 20 (recovery rate). At that time, by lowering the pump pressure or raw water flow rate of the water treatment system 20, the water supply system 10 can reduce the amount of water produced by the water treatment system 20 (recovery rate) and can send the necessary amount of concentrated water to the concentrator 30. As a result, the water supply system 10 can suppress (reduce) the energy consumption consumed for water production.
[0039] Furthermore, when the operating rate of the hydrogen production device 100 is low, the amount of waste heat is small or the wastewater temperature is low. This may result in a decrease in the amount of concentrated water (the amount of concentrated water 32) that can be treated by the concentrator 30, or a decrease in the water production speed. Therefore, the water supply system 10 can ensure the necessary amount of water for hydrogen production 120 to be supplied to the hydrogen production device 100 and suppress (reduce) energy consumption by setting the amount of concentrated water produced (recovery rate) of the water treatment system 20 so that the amount of concentrated water that can be treated by the concentrator 30 is sent.
[0040] In addition, the water production speed (permeation speed) in the membrane distillation apparatus 31 is proportional to the temperature difference between the concentrated water 32 on the high-temperature side and the cooling pure water 35 (see FIG. 2) (or the cooling water 39 (see FIG. 3)) on the low-temperature side. Therefore, when the wastewater temperature of the hydrogen production apparatus 100 decreases, the temperature of the concentrated water 32 decreases, and the temperature difference between the concentrated water 32 on the high-temperature side and the cooling pure water 35 (see FIG. 2) (or the cooling water 39 (see FIG. 3)) on the low-temperature side becomes smaller. As a result, the water production speed (permeation speed) decreases. In order to ensure a sufficient amount of water production even under such conditions, it is preferable that the water supply system 10 controls the operating conditions of the membrane distillation apparatus 31 according to the wastewater temperature of the hydrogen production apparatus 100. Examples of controlling the operating conditions include a method of changing the inflow speed of the concentrated water 32 into the membrane distillation apparatus 31 using the wastewater temperature of the hydrogen production apparatus 100 as a control input, a method of causing the concentrated water 32 to flow into the membrane distillation apparatus 31 multiple times, and a method of changing the number of times the concentrated water 32 flows into the membrane distillation apparatus 31.
[0041] From these viewpoints, in this embodiment, as an example of control of the operating conditions of the water supply system 10, the following two methods, a first operation control method and a second operation control method, are provided. (First operation control method) A method of determining (adjusting) the water production volume ratio (operation rate) between the water treatment system 20 and the concentrator 30 so as to reduce the energy consumption in the water treatment system 20 (see FIG. 4). (Second operation control method) A method for determining the inflow flow rate of concentrated water 32 from the water treatment system 20 into the membrane distillation device 31 provided inside the concentrating device 30 (see FIG. 5).
[0042] (First operation control method) 4, in the first operation control method, first, the control unit CL of the water supply system 10 accesses an external server (not shown) communicatively connected to the water supply system 10, a database (not shown) provided inside or outside the water supply system 10, or the like. Then, the control unit CL refers to information such as the demand for water 120 for hydrogen production by the hydrogen production device 100, the amount of waste heat from wastewater and exhaust gas generated during hydrogen production by the hydrogen production device 100, the waste heat temperature of the wastewater and exhaust gas, the amount of available power of the water supply system 10, etc. (step S105).
[0043] Next, the control unit CL determines the water production volume ratio between the water treatment system 20 and the concentrator 30 based on the information referred to in step S105 (step S110). At this time, the control unit CL may determine the water production volume ratio between the water treatment system 20 and the concentrator 30 so that the energy consumption in the water supply system 10 is as small as possible (particularly preferably, minimized).
[0044] Next, the control unit CL operates the water treatment system 20 and the concentrator 30 in accordance with the freshwater production volume ratio determined in step S110 (step S115).
[0045] (Second operation control method) 5, in the second operation control method, first, the control unit CL of the water supply system 10 accesses an external server (not shown) communicatively connected to the water supply system 10, a database (not shown) provided inside or outside the water supply system 10, or the like. Then, the control unit CL refers to information such as the waste heat temperature of the wastewater or exhaust gas supplied from the hydrogen production device 100 to the water supply system 10, the cooling water temperature of the cooling pure water 35 (see FIG. 2) (or the cooling water 39 (see FIG. 3)) supplied to the concentrator 30, the amount of water produced in the concentrator 30, etc. (step S205).
[0046] Next, the control unit CL determines the inflow flow rate of the concentrated water 32 from the water treatment system 20 into the membrane distillation apparatus 31 based on the information referenced in step S205 (step S210). At this time, the control unit CL may determine the inflow flow rate of the concentrated water 32 from the water treatment system 20 into the membrane distillation apparatus 31 so that the necessary amount of water for hydrogen production 120 to be supplied to the hydrogen production apparatus 100 can be secured based on the amount of pure water (third permeate 33) produced in the membrane distillation apparatus 31.
[0047] Next, the control unit CL operates the water treatment system 20 and the concentrator 30 in accordance with the inflow flow rate of the concentrated water 32 determined in step S210 (step S215).
[0048] <Effects of the water supply system> Here, the effects of the water supply system 10 will be described by comparing the following Example 1, Example 2, and a comparative example.
[0049] Example 1 In Example 1, the water supply system 10 is configured to use a water treatment membrane module made of a graphene oxide membrane as the first water treatment membrane module 21 constituting the water treatment system 20, and a reverse osmosis membrane module as the second water treatment membrane module 22. The concentrator 30 includes a membrane distiller 31 (see FIG. 2), and a porous membrane made of a graphene membrane is used as the hydrophobic porous membrane 36. In Example 1, the water supply system 10 is configured to include a heating unit 51 that heats the concentrated water 32 using waste heat from wastewater and exhaust gas generated in the hydrogen production device 100 on a delivery route 50 of the concentrated water 32 connecting the inside of the water treatment system 20 and the inside of the concentrator 30. In Example 1, the water supply system 10 is configured to send the pure water (second permeated water 25) generated in the water treatment system 20 to the membrane distiller 31 as cooling pure water 35, and cool the water vapor generated from the concentrated water 32 and permeating the hydrophobic porous membrane 36 with the cooling pure water 35.
[0050] Example 2 In Example 2, the water supply system 10 is configured differently from Example 1 in that it includes a membrane distillation apparatus 31A (see FIG. 3) instead of the membrane distillation apparatus 31 (see FIG. 2). The other configurations are the same as those of Example 1.
[0051] (Comparative Example) In the comparative example, the water supply system was configured to include only the water treatment system 20 (see FIG. 1) without including the heating unit 51 (see FIG. 1) and the concentrating device 30 (see FIG. 1).
[0052] The water supply system of the comparative example does not include a heating section 51 (see FIG. 1) that utilizes waste heat from the wastewater and exhaust gas generated in the hydrogen production device 100, and a concentrator 30 (see FIG. 1). In such a water supply system of the comparative example, all of the pure water supplied to the hydrogen production device 100 is produced by a water treatment system 20. In such a water supply system of the comparative example, the pure water recovery rate (ratio of the amount of water produced to the amount of water taken) is about 70%. Furthermore, the water supply system of the comparative example consumes more energy (power consumption) than the water supply systems 10 of Examples 1 and 2, for example, by 20% or more.
[0053] In contrast, in the water supply system 10 of the first and second embodiments, when the operation rate of the hydrogen production device 100 is sufficiently high, wastewater and exhaust gas are discharged from the hydrogen production device 100 in sufficient amounts and at sufficient waste heat temperatures (e.g., 80°C). For example, when the ratio of the amount of water produced in the water treatment system 20 and the concentrator 30 is 15:85, the water supply system 10 can achieve a pure water recovery rate (ratio of the amount of water produced to the amount of water taken in) of about 15% in the water treatment system 20, and can suppress (reduce) energy consumption (power consumption). Furthermore, the water supply system 10 can achieve a pure water recovery rate (ratio of the amount of water produced to the amount of water taken in) of 90% or more in the entire water supply system 10, making it possible to efficiently use the raw water 110 and suppress (reduce) the amount of concentrated water to be subjected to drying and solidification treatment.
[0054] In the water supply system 10 of the first and second embodiments, when the operation rate of the hydrogen production device 100 is about 50%, the waste heat temperature is about 70° C. Therefore, the water production speed in the membrane distillation device 31 decreases by about 40%. Therefore, the water supply system 10 of the first and second embodiments ensures a predetermined amount of water production by setting the ratio of the water production amount in the water treatment system 20 and the concentrating device 30 to 65:35, and reducing the inflow rate of the concentrated water 32 into the membrane distillation device 31, or by causing the concentrated water 32 to flow into the membrane distillation device 31 multiple times, and the recovery rate of the entire water supply system 10 can be ensured to be 90% or more. As a result, the water supply system 10 of the first and second embodiments can efficiently use the raw water 110.
[0055] <Main features of the water supply system> (1) As shown in Fig. 1, a water supply system 10 according to this embodiment is a system for supplying water 120 for hydrogen production to a hydrogen production apparatus 100, and includes a water treatment system 20 and a concentrator 30. The water treatment system 20 is a system that produces water 120 for hydrogen production from raw water 110. The concentrator 30 is a device that further produces water 120 for hydrogen production from concentrated water 32 discharged from the water treatment system 20. The water supply system 10 includes a heating unit 51 on a delivery route 50 for the concentrated water 32 that connects the inside of the water treatment system 20 and the inside of the concentrator 30, which heats the concentrated water 32 using waste heat from wastewater and exhaust gas generated in the hydrogen production apparatus 100.
[0056] In the water supply system 10 according to this embodiment, the concentrated water 32 is heated by a heating section 51 provided on a delivery route 50 connecting the inside of the water treatment system 20 and the inside of the concentrating device 30, using waste heat from the wastewater and exhaust gas generated in the hydrogen production device 100. Therefore, the water supply system 10 can efficiently produce pure water while suppressing (reducing) the energy consumption in the water treatment system 20. As a result, the water supply system 10 can efficiently produce pure water from a low-quality water source and supply it to the hydrogen production device 100.
[0057] (2) As shown in Fig. 1, the water supply system 10 according to this embodiment includes a controller CL that controls the operations of the water treatment system 20 and the concentrator 30. The controller CL may control the ratio of the amount of water produced by the water treatment system 20 and the concentrator 30 depending on the operating rate of the hydrogen production device 100.
[0058] The water supply system 10 according to this embodiment controls the water production ratio between the water treatment system 20 and the concentrator 30 according to the operating rate of the hydrogen production device 100, and is therefore able to efficiently produce pure water and supply it to the hydrogen production device 100.
[0059] (3) In the water supply system 10 of this embodiment, the control unit CL controls the operation of the water treatment system 20 and the concentrator 30 so as to increase the water production rate of the concentrator 30 when the operating rate of the hydrogen production device 100 is equal to or higher than an arbitrary threshold value, and to increase the water production rate of the water treatment system 20 when the operating rate of the hydrogen production device 100 is below an arbitrary threshold value.
[0060] The water supply system 10 according to this embodiment can increase or decrease (adjust) the water production rate of the concentrator 30 or the water production rate of the water treatment system 20 in accordance with the relationship between the operation rate of the hydrogen production device 100 and a threshold value. This also enables the water supply system 10 to efficiently produce pure water and supply it to the hydrogen production device 100.
[0061] (4) As shown in Fig. 1, in the water supply system 10 according to this embodiment, the water treatment system 20 includes a first water treatment membrane module 21 that separates raw water 110 into a first concentrated water 24 and a first permeate 23, and a second water treatment membrane module 22 that separates the first permeate 23 into a second concentrated water 26 and a second permeate 25. The first water treatment membrane module 21 has a hydrophilic first water treatment membrane 21a, and the first water treatment membrane 21a may be made of a nanocarbon structure.
[0062] The water supply system 10 according to this embodiment can make it difficult for proteins and carbohydrates to adhere to the first water treatment membrane 21a. Therefore, the water supply system 10 can reduce the frequency of cleaning the first water treatment membrane 21a. Furthermore, the water supply system 10 can suppress deterioration of the first water treatment membrane 21a due to cleaning, so that the frequency of replacing the first water treatment membrane 21a can be reduced.
[0063] (5) In the water supply system 10 of this embodiment, the second water treatment membrane module 22 has a hydrophilic second water treatment membrane 22a that is finer than the first water treatment membrane 21a, and the second water treatment membrane 22a may be made of a nanocarbon structure.
[0064] The water supply system 10 according to this embodiment generates the second permeate 25 purified from the first permeate 23 generated in the first water treatment membrane module 21 in the second water treatment membrane module 22, and can make it difficult for proteins and carbohydrates to adhere to the second water treatment membrane 22a. Therefore, the water supply system 10 can reduce the frequency of cleaning the second water treatment membrane 22a while promoting the purification of the permeate. In addition, the water supply system 10 can suppress deterioration of the second water treatment membrane 22a due to cleaning, and therefore can reduce the frequency of replacing the second water treatment membrane 22a.
[0065] (6) As shown in FIG. 1, in the water supply system 10 according to this embodiment, the concentrating device 30 may include a membrane distillation device 31.
[0066] In the water supply system 10 according to this embodiment, the membrane distillation device 31 of the concentrating device 30 can separate the concentrated water 32 into a further concentrated water (third concentrated water 34) and a purified permeate water (third permeate water 33).
[0067] (7) As shown in Figures 2 and 3, in the water supply system 10 according to this embodiment, the membrane distillation apparatus 31 has a hydrophobic membrane (hydrophobic porous membrane 36). The hydrophobic membrane (hydrophobic porous membrane 36) may have a structure in which membranes made of graphene are stacked, or a structure in which a plurality of holes are formed in a membrane made of graphene.
[0068] The water supply system 10 according to this embodiment can efficiently separate the concentrated water 32 into a further concentrated water (third concentrated water 34) and a purified permeate water (third permeate water 33) using a hydrophobic membrane (hydrophobic porous membrane 36).
[0069] (8) As shown in FIG. 4, the operation control method for the water supply system 10 is such that the water production volume ratio between the water treatment system 20 and the concentrator 30 is determined based on the demand for water 120 for hydrogen production from the hydrogen production device 100, the amount of waste heat, the temperature of the waste heat, and the amount of available electricity, so that the energy consumption in the water supply system 10 is as small as possible (preferably, minimized).
[0070] The operation control method for the water supply system 10 according to this embodiment determines the water production volume ratio between the water treatment system 20 and the concentrator 30 from the demand for water 120 for hydrogen production in the hydrogen production device 100, the amount of waste heat, the temperature of the waste heat, and the amount of available power, so that the energy consumption in the water supply system 10 is as small as possible (particularly preferably, minimized). Therefore, the operation control method for the water supply system 10 can suppress (reduce) the energy consumption in the water supply system 10.
[0071] (9) As shown in FIG. 5 , the operation control method of the water supply system 10 may determine the inflow flow rate of concentrated water 32 from the water treatment system 20 into the membrane distillation device 31 provided inside the concentrator 30 based on the temperature of the waste heat supplied from the hydrogen production device 100 to the heating section 51, the temperature of the cooling water supplied to the concentrator 30, and the amount of water produced in the concentrator 30.
[0072] The operation control method for the water supply system 10 according to this embodiment determines the inflow flow rate of concentrated water 32 from the water treatment system 20 into the membrane distillation device 31 provided inside the concentrator 30 from the temperature of the waste heat supplied from the hydrogen production device 100 to the heating section 51, the temperature of the cooling water supplied to the concentrator 30, and the amount of water produced in the concentrator 30. Therefore, the operation control method for the water supply system 10 can efficiently produce pure water from the concentrated water 32.
[0073] As described above, according to the water supply system 10 of this embodiment, the concentrated water 32 is heated in the heating section 51 using waste heat generated in the hydrogen production device 100, so that pure water can be efficiently produced from a low-quality water source and supplied to the hydrogen production device 100.
[0074] The present invention is not limited to the above-described embodiment, and includes various modified examples. For example, the above-described embodiment has been described in detail to easily explain the present invention, and is not necessarily limited to the embodiment having all of the configurations described. In addition, it is possible to replace a part of the configuration of the embodiment with another configuration, and it is also possible to add another configuration to the configuration of the embodiment. In addition, it is possible to add, delete, or replace a part of each configuration with another configuration.
[0075] For example, in the above embodiment, the water treatment system 20 is described as having two water treatment membrane modules (the first water treatment membrane module 21 and the second water treatment membrane module 22), but the water treatment system 20 may be configured to have three or more water treatment membrane modules. In this case, the water supply system 10 combines the concentrated water discharged from each water treatment membrane module and sends the concentrated water 32 from the water treatment system 20 to the concentrator 30. At that time, the water supply system 10 heats the concentrated water 32 using waste heat from the wastewater and exhaust gas generated in the hydrogen production device 100 in a heating unit 51 provided on a sending route 50 connecting the inside of the water treatment system 20 and the inside of the concentrator 30. This allows the water supply system 10 to efficiently produce pure water while suppressing (reducing) energy consumption. In addition, the water supply system 10 mixes the permeated water generated in the water treatment membrane module at the final stage with the permeated water generated in the membrane distillation device 31 of the concentrator 30 and supplies the hydrogen production device 100 with the water for hydrogen production 120. This allows the water supply system 10 to obtain as much pure water as possible from the concentrated water 32. [Explanation of symbols]
[0076] 10 Water Supply System 20 Water Treatment System 20a pump 21 First water treatment membrane module 21a First water treatment membrane 22 Second water treatment membrane module 22a Second water treatment membrane 23 1st permeate water 24 1st concentrated water 25 2nd permeate water 26 Second concentrated water 30 Concentrator 31, 31A Membrane distillation apparatus 32 Concentrated water 33 Third permeate water 34 Third concentrated water 35 Pure water for cooling 36 Hydrophobic porous membrane (hydrophobic membrane) 37 Air Gap 38 Condenser plate 39 Cooling water 50 Sending Route 51 Heating section 52 Heat Pipe 100 Hydrogen production equipment 110 Raw water 110A raw water 120 Water for hydrogen production 130 Waste Heat 140 Drying equipment 150 Solid waste CL control section
Claims
1. A water supply system for supplying water for hydrogen production to a hydrogen production device, comprising: a water treatment system for producing the water for hydrogen production from raw water; a concentrator for further producing the water for hydrogen production from the concentrated water discharged from the water treatment system; A heating unit is provided on a concentrated water delivery route connecting the inside of the water treatment system and the inside of the concentrating device, the heating unit heating the concentrated water using waste heat generated in the hydrogen production device. A water supply system comprising:
2. A control unit is provided for controlling the operation of the water treatment system and the concentrating device, The control unit controls the water production rate ratio between the water treatment system and the concentrator in accordance with the operation rate of the hydrogen production device.
2. The water supply system according to claim 1 .
3. The control unit controls the operation of the water treatment system and the concentrator so as to increase the water production rate of the concentrator when the operation rate of the hydrogen production device is equal to or higher than a given threshold, and to increase the water production rate of the water treatment system when the operation rate of the hydrogen production device is less than the given threshold.
3. The water supply system according to claim 2.
4. The water treatment system includes a first water treatment membrane module that separates raw water into a concentrated water and a first permeate, and a second water treatment membrane module that separates the first permeate into a concentrated water and a second permeate, the first water treatment membrane module has a hydrophilic first water treatment membrane, The first water treatment membrane is made of a nanocarbon structure.
2. The water supply system according to claim 1 .
5. The second water treatment membrane module has a hydrophilic second water treatment membrane having a finer mesh than the first water treatment membrane, The second water treatment membrane is made of a nanocarbon structure.
5. The water supply system according to claim 4.
6. The concentrating device has a membrane distillation device.
2. The water supply system according to claim 1 .
7. The membrane distillation apparatus has a hydrophobic membrane, The hydrophobic film has a structure in which films made of graphene are laminated, or has a structure in which a plurality of holes are formed in a film made of graphene.
7. The water supply system according to claim 6.
8. An operation control method for a water supply system for supplying water for hydrogen production to the hydrogen production device, the water supply system comprising: a water treatment system for producing water for hydrogen production from raw water; a concentrating device for further producing the water for hydrogen production from concentrated water discharged from the water treatment system; and a heating unit for heating the concentrated water using waste heat generated in a hydrogen production device, the heating unit being located on a discharge route for the concentrated water connecting an inside of the water treatment system to an inside of the concentrating device, the method comprising: In order to minimize the energy consumption in the water supply system, the water production volume ratio between the water treatment system and the concentrator is determined based on the demand for water for hydrogen production in the hydrogen production device, the amount of waste heat, the temperature of the waste heat, and the available amount of electricity. A method for controlling the operation of a water supply system.
9. An operation control method for a water supply system for supplying water for hydrogen production to the hydrogen production device, the water supply system comprising: a water treatment system for producing water for hydrogen production from raw water; a concentrating device for further producing the water for hydrogen production from concentrated water discharged from the water treatment system; and a heating unit for heating the concentrated water using waste heat generated in a hydrogen production device, the heating unit being located on a discharge route for the concentrated water connecting an inside of the water treatment system to an inside of the concentrating device, the method comprising: The inflow flow rate of concentrated water from the water treatment system to a membrane distillation device provided inside the concentrator is determined based on the temperature of waste heat supplied from the hydrogen production device to the heating unit, the temperature of cooling water supplied to the concentrator, and the amount of water produced by the concentrator. A method for controlling the operation of a water supply system.