Full charge capacity estimation system

By implementing discharge, charge, and standby processes to stabilize voltage, the system accurately estimates the full charge capacity of power storage devices in vehicles, addressing the inaccuracy issue in existing systems.

JP2024167970AInactive Publication Date: 2024-12-05TOYOTA JIDOSHA KK
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023084315
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-23
Publication Date
2024-12-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing full charge capacity estimation systems for power storage devices in vehicles lack accuracy due to fluctuations in voltage after discharge and charge processes, as they do not consider optimal timing for acquiring voltage measurements.

Method used

The system includes discharge and charging processes followed by standby periods to stabilize the power storage device's voltage, allowing for accurate measurement of first and second voltages, and uses an SOC-OCV characteristic curve to estimate full charge capacity.

Benefits of technology

This approach stabilizes voltage fluctuations, enabling precise estimation of the full charge capacity by incorporating standby times after discharge and charge processes, thereby improving estimation accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024167970000001_ABST
    Figure 2024167970000001_ABST
Patent Text Reader

Abstract

To provide a technique which can improve estimation accuracy of a full charge capacity of a power storage device.SOLUTION: A full charge capacity estimation system estimating a full charge capacity of an on-vehicle power storage device executes discharge processing where the power storage device is discharged till voltage of the power storage device is a prescribed voltage or less, and executes first stand-by processing after completing the discharge processing. The full charge capacity estimation system acquires a first voltage after completing the first stand-by processing, and executes charging processing where the power storage device is charged. The full charge capacity estimation system acquires an integrated value of charging current during the charging processing and executes second stand-by processing after completing the charging processing. The full charge capacity estimation system acquires a second voltage after completing the second stand-by processing. The full charge capacity estimation system uses the first voltage, the second voltage, and the integrated value to estimate the full charge capacity of the power storage device.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present specification relates to a full charge capacity estimation system that estimates the full charge capacity of a power storage device mounted on a vehicle. [Background technology]

[0002] Patent Document 1 discloses a full charge capacity estimation system that estimates the full charge capacity of a power storage device mounted on a vehicle. This full charge capacity estimation system executes a discharge process to discharge the power storage device, and acquires a first voltage that is the voltage of the power storage device after the discharge process is completed. The full charge capacity estimation system executes a charge process to charge the power storage device, acquires an integrated value of the charging current during the charge process, and acquires a second voltage that is the voltage of the power storage device after the charge process is completed. The full charge capacity estimation system then estimates the full charge capacity of the power storage device using the first voltage, the second voltage, and the integrated value. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2020-94871 A Summary of the Invention [Problem to be solved by the invention]

[0004] In the above-described full charge capacity estimation system, no consideration is given to the timing of acquiring the first voltage and the second voltage. After the discharge process is completed, after the charge process is completed, etc., the voltage of the power storage device fluctuates. Therefore, the full charge capacity estimation system of Patent Document 1 cannot accurately detect the voltage of the power storage device, and therefore the accuracy of estimating the full charge capacity of the power storage device may be low.

[0005] This specification provides a technique that can improve the accuracy of estimating the full charge capacity of a power storage device. [Means for solving the problem]

[0006] In a first aspect of the present technology, a full charge capacity estimation system for estimating a full charge capacity of a power storage device mounted on a vehicle includes a discharge process execution control unit that executes a discharge process to discharge power of the power storage device until a voltage of the power storage device becomes equal to or lower than a predetermined voltage, a first standby process execution control unit that executes a first standby process to cause the power storage device to wait in an unloaded state for a first predetermined time after the discharge process is completed, a first acquisition unit that acquires a first voltage, which is the voltage of the power storage device after the first standby process is completed, and a second acquisition unit that acquires a first voltage, which is the voltage of the power storage device after the first standby process is completed, after the first standby process is completed. The power storage device includes a charging process execution control unit that executes a charging process to charge the power storage device, a second acquisition unit that acquires an integrated value of the charging current during the charging process, a second standby process execution control unit that executes a second standby process to cause the power storage device to wait in an unloaded state for a second predetermined time after the charging process is completed, a third acquisition unit that acquires a second voltage, which is the voltage of the power storage device after the second standby process is completed, after the second standby process is completed, and an estimation unit that estimates the full charge capacity of the power storage device by using the first voltage, the second voltage, and the integrated value.

[0007] According to the above configuration, in the full charge capacity estimation system, a waiting time is provided after the discharge process is completed and after the charge process is completed, before the first voltage or the second voltage of the power storage device is acquired. Therefore, it is possible to eliminate unintended fluctuations occurring in the voltage of the power storage device and acquire a voltage suitable for estimating the full charge capacity of the power storage device. Therefore, it is possible to improve the accuracy of estimating the full charge capacity of the power storage device. [Brief description of the drawings]

[0008] [Figure 1] Schematic diagram of a full charge capacity estimation system 2. [Diagram 2] 4 is a flowchart of a full-charge capacity estimation process executed by a CPU 30 of the electric vehicle 10. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] (Example) As shown in Fig. 1, the full charge capacity estimation system 2 includes an electric vehicle 10 and a charging device 100. The electric vehicle 10 includes battery electric vehicles, hybrid electric vehicles, plug-in hybrid electric vehicles, and fuel cell electric vehicles.

[0010] The electric vehicle 10 includes an electricity storage device 12, a power converter 14, a motor 16, accessories 18, a controller 20, a voltage sensor 22, a charger 24, and a charging inlet 26. The electricity storage device 12 is a rechargeable secondary battery, specifically a lithium-ion battery. The power converter 14 converts DC power from the electricity storage device 12 into drive power (AC power) for the motor 16. The power converter 14 supplies the drive power to the motor 16. The voltage sensor 22 measures the voltage of the electricity storage device 12. The accessories 18 are connected to the electricity storage device 12 via a DC-DC converter (not shown). The accessories 18 are, for example, an air conditioner, a seat heater, or a headlight.

[0011] The power storage device 12 is connected to an external charging device 100 via a charger 24 and a charging inlet 26. The charging inlet 26 is detachably connected to the charging device 100, and receives charging power for charging the power storage device 12 from the charging device 100.

[0012] The controller 20 includes a CPU 30 and a memory 32. The CPU 30 executes various processes according to a program 34 stored in the memory 32. The memory 32 is composed of a volatile memory, a non-volatile memory, and the like. The memory 32 further stores a SOC-OCV characteristic curve 36. The SOC-OCV characteristic curve 36 is a curve showing the relationship between the SOC (charging rate) and the OCV (open circuit voltage) of the battery. The SOC-OCV characteristic curve 36 is created at the vehicle design stage and is stored in advance in the memory 32.

[0013] (Full charge capacity estimation process; Figure 2) A full charge capacity estimation process executed by the CPU 30 of the electric vehicle 10 will be described with reference to Fig. 2. The CPU 30 starts the process of Fig. 2 when the electric vehicle 10 and the charging device 100 are connected via the charging inlet 26.

[0014] In S10, the CPU 30 displays a query screen on the multi-information display in the instrument panel. The query screen is a screen for querying the user as to whether or not to permit execution of a first full-charge capacity estimation process, which will be described later.

[0015] In S12, the CPU 30 determines whether or not the execution of the first full charge capacity estimation process has been permitted by the user. If the execution of the first full charge capacity estimation process has been permitted by the user (YES in S12), the CPU 30 proceeds to S20. On the other hand, if the execution of the first full charge capacity estimation process has not been permitted by the user (YES in S12), the CPU 30 proceeds to S50. If the execution of the first full charge capacity estimation process has not been permitted, the CPU 30 executes the second full charge capacity estimation process. The processes of S20 to S40 are the first full charge capacity estimation process, and S50 to S68 and S40 are the second full charge capacity estimation process.

[0016] In S20, the CPU 30 starts a discharge process. In the discharge process, the auxiliary machine 18 is driven, so that power is discharged from the power storage device 12.

[0017] In S22, CPU 30 monitors whether the voltage of power storage device 12 detected by voltage sensor 22 (hereinafter, sometimes referred to as "battery voltage") becomes equal to or lower than a first threshold. The first threshold is a threshold for determining whether the battery voltage has dropped to a voltage suitable for estimating the full charge capacity SOH of power storage device 12. When the battery voltage becomes equal to or lower than the first threshold, CPU 30 determines YES in S22 and proceeds to S24.

[0018] In S24, the CPU 30 ends the discharge process. Specifically, the CPU 30 stops the drive of the auxiliary machine 18. The CPU 30 further starts a first standby process. The first standby process is a process for causing the power storage device 12 to wait in an unloaded state for a first predetermined time. The unloaded state is a state in which the power storage device 12 is not charged and is not discharged. After the discharge process is completed, the voltage of the power storage device 12 fluctuates. The first predetermined time is a time required for the fluctuation in the voltage of the power storage device 12 to settle down.

[0019] In S26, CPU 30 monitors whether the time since power storage device 12 entered an unloaded state (hereinafter, referred to as "unloaded time") becomes equal to or longer than a first predetermined time (e.g., 2 hours). When the unloaded time becomes equal to or longer than the first predetermined time, CPU 30 determines YES in S26 and proceeds to S28.

[0020] In S28, CPU 30 stores the battery voltage as first voltage V1 in memory 32 and starts a charging process. In the charging process, charging power is supplied from charging device 100 to power storage device 12 via charger 24 and charging inlet 26. Charging device 100 continues to supply charging power until power storage device 12 is fully charged. Then, when power storage device 12 is fully charged, charging device 100 stops supplying charging power. This completes the charging process.

[0021] In S30, the CPU 30 monitors whether the charging process is completed. If the charging process is completed, the CPU 30 determines YES in S30 and proceeds to S32.

[0022] In S32, the CPU 30 stores the integrated value CI [Ah] of the charging current during the charging process in the memory 32, and starts a second standby process. The second standby process is a process for causing the power storage device 12 to wait in an unloaded state for a second predetermined time. That is, when the charging process is completed, the power storage device 12 enters an unloaded state. After the charging process is completed, the voltage of the power storage device 12 fluctuates. The second predetermined time is the time required for the fluctuation in the voltage of the power storage device 12 to settle. The second predetermined time may be the same as the first predetermined time, or may be different.

[0023] In S34, the CPU 30 monitors whether the no-load time is equal to or longer than the second predetermined time. If the no-load time is equal to or longer than the second predetermined time, the CPU 30 determines YES in S34 and proceeds to S36.

[0024] In S36, the CPU 30 stores the battery voltage in the memory 32 as the second voltage V2.

[0025] In S40, the CPU 30 executes an estimation process to estimate the full charge capacity SOH of the power storage device 12, using the first voltage V1 stored in the memory 32 in S28, the second voltage V2 stored in the memory 32 in S36, the integrated value CI stored in the memory 32 in S32, and the SOC-OCV characteristic curve 36 in the memory 32. The CPU 30 specifies a first SOC [%] at the first voltage V1 and a second SOC [%] at the second voltage V2, using the SOC-OCV characteristic curve 36. Next, the CPU 30 estimates the full charge capacity SOH by the following formula (1). SOH=CI*(2nd SOC-1st SOC)*100 Formula (1) When S40 ends, the CPU 30 ends the process of Fig. 2. The CPU 30 displays the full charge capacity SOH estimated in S40 on the multi-information display.

[0026] Moreover, if the determination in S12 is NO, the CPU 30 starts the charging process in S50.

[0027] In S52, the CPU 30 determines whether the no-load time is the first predetermined time. If the no-load time is equal to or longer than the first predetermined time (YES in S52), the CPU 30 proceeds to S54. On the other hand, if the no-load time is shorter than the first predetermined time (NO in S52), the CPU 30 proceeds to S58. Note that a YES determination in S52 occurs when the electric vehicle 10 is stopped for a long period of time without the accessories 18 being driven.

[0028] In S54, the CPU 30 determines whether the battery voltage is equal to or lower than the first threshold. If the battery voltage is equal to or lower than the first threshold (YES in S54), the CPU 30 proceeds to S56. On the other hand, if the battery voltage is higher than the first threshold (NO in S54), the CPU 30 proceeds to S58.

[0029] In S56, the CPU 30 stores the battery voltage as the first voltage V1 in the memory 32. The process contents of S58 and S60 are similar to the process contents of S30 and S32, respectively.

[0030] In S62, the CPU 30 determines whether or not the first voltage V1 is stored in the memory 32. If the first voltage V1 is stored in the memory 32 (YES in S62), the CPU 30 proceeds to S64. On the other hand, if the first voltage V1 is not stored in the memory 32 (NO in S62), the CPU 30 ends the processing in Fig. 2. That is, if NO is determined in S62, the CPU 30 does not estimate the full charge capacity SOH.

[0031] The process content of S64 is similar to the process content of S34.

[0032] In S66, the CPU 30 determines whether the battery voltage is equal to or greater than a second threshold. The second threshold is a threshold for determining whether the battery voltage has risen to a voltage suitable for estimating the full charge capacity SOH of the power storage device 12. The second threshold is greater than the first threshold. If the battery voltage is equal to or greater than the second threshold (YES in S66), the CPU 30 proceeds to S68. On the other hand, if the battery voltage is less than the second threshold (NO in S66), the CPU 30 ends the processing of FIG. 2.

[0033] The process of S68 is the same as the process of S36. When S68 ends, the CPU 30 proceeds to S40.

[0034] In S40 after S68, the CPU 30 executes an estimation process to estimate the full charge capacity SOH of the storage device 12, using the first voltage V1 stored in the memory 32 in S56, the second voltage V2 stored in the memory 32 in S68, the integrated value CI stored in the memory 32 in S60, and the SOC-OCV characteristic curve 36 in the memory 32.

[0035] As described above, the full charge capacity estimation system 2, which estimates the full charge capacity SOH of the power storage device 12 mounted on the electric vehicle 10 (an example of a "vehicle"), executes a discharge process (S20) to discharge the power of the power storage device 12 until the battery voltage becomes equal to or lower than a first threshold value (an example of a "predetermined voltage") when an instruction to estimate the full charge capacity SOH of the power storage device 12 is acquired (YES in S12), and executes a first standby process (S24) to cause the power storage device 12 to wait in an unloaded state for a first predetermined time after the discharge process is completed (YES in S22). After the first standby process is completed (YES in S26), the full charge capacity estimation system 2 acquires a first voltage V1 (S28) and executes a charging process (S28) to charge the power storage device 12. The full charge capacity estimation system 2 acquires an integrated value CI of the charging current during the charging process, and after the charging process is completed (YES in S30), executes a second standby process in which the power storage device 12 is placed in standby in an unloaded state for a second predetermined time (S32). After the second standby process is completed (YES in S34), the full charge capacity estimation system 2 acquires a second voltage V2 (S36). The full charge capacity estimation system 2 estimates a full charge capacity SOH of the power storage device 12 using the first voltage V1, the second voltage V2, and the integrated value CI (S40).

[0036] According to the above configuration, the full charge capacity estimation system 2 provides a waiting time after the discharge process is completed and after the charge process is completed, before acquiring the first voltage V1 or the second voltage V2 of the power storage device 12. This makes it possible to eliminate unintended fluctuations occurring in the voltage of the power storage device 12 and acquire a voltage suitable for estimating the full charge capacity SOH of the power storage device 12. This makes it possible to improve the accuracy of estimating the full charge capacity SOH of the power storage device 12. [Explanation of symbols]

[0037] 2: Full charge capacity estimation system, 10: Electric vehicle, 12: Power storage device, 14: Power converter, 16: Motor, 18: Auxiliary equipment, 20: Controller, 22: Voltage sensor, 24: Charger, 26: Charging inlet, 30: CPU, 32: Memory, 34: Program, 36: SOC-OCV characteristic curve, 100: Charging device

Claims

[Claim 1] A full charge capacity estimation system that estimates a full charge capacity of a power storage device mounted on a vehicle, comprising: a discharge process execution control unit that executes a discharge process to discharge the power of the power storage device until the voltage of the power storage device becomes equal to or lower than a predetermined voltage; a first standby process execution control unit that executes a first standby process to cause the power storage device to wait in a no-load state for a first predetermined time after the discharge process is completed; a first acquisition unit that acquires, after the first standby process is completed, a first voltage that is the voltage of the power storage device after the first standby process is completed; a charging process execution control unit that executes a charging process to charge the power storage device after the first standby process is completed; A second acquisition unit that acquires an integrated value of a charging current during the charging process; a second standby process execution control unit that executes a second standby process to cause the power storage device to wait in a no-load state for a second predetermined time after the charging process is completed; a third acquisition unit that acquires, after the second standby process is completed, a second voltage that is the voltage of the power storage device after the second standby process is completed; an estimation unit that estimates the full charge capacity of the power storage device by using the first voltage, the second voltage, and the integrated value; Equipped with a full charge capacity estimation system.

Citation Information

Patent Citations

  • Full charge capacity estimating device

    JP2020094871A