Grout re-injection method

The method addresses inefficiencies and risks in grout refilling by using vertical and horizontal drilling techniques with a blast shot device and vacuum grout injection, ensuring efficient and gap-free refilling of PC structures without damaging prestressed steel materials.

JP2024168107APending Publication Date: 2024-12-05ORIENTAL CONCRETE
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2023084533
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-23
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

Existing methods for grout refilling in PC structures face challenges such as labor inefficiency, traffic restrictions, and risk of damaging prestressed steel materials when attempting to fill unfilled portions of the sheath from the bottom of the slab, especially due to variations in grout filling status and the need for precise drilling techniques.

Method used

A method involving vertical hole drilling from the side of the sheath, followed by horizontal drilling using a right-angle injection jig, sheath excavation with a blast shot device, and grout injection using a vacuum pump and snake pump to fill the cavity without traffic restrictions and minimize damage to the prestressed steel material.

Benefits of technology

Enables efficient grout refilling in PC structures without traffic disruptions and reduces the risk of damaging prestressed steel materials, allowing for quicker completion and precise filling without gaps.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024168107000001_ABST
    Figure 2024168107000001_ABST
Patent Text Reader

Abstract

To provide a grout re-injection method capable of efficiently re-injecting grout into a sheath of an existing PC structure without traffic regulation.SOLUTION: In a grout re-injection method for re-injecting grout into the unfilled portion of the sheath of a PC structure, a longitudinal hole drilling step in which a vertical hole is drilled from the underside of the PC structure to the side directly below the sheath through which the PC steel is inserted and extending toward the vicinity of the sheath, a horizontal drilling step in which a right-angle jetting jig is inserted into the vertical hole and a water jet is injected from the right-angle jetting jig to remove concrete around the sheath, a sheath drilling step in which the exposed portion of the sheath exposed by the horizontal drilling step is drilled, and a grout injection step in which grout is injected from the open portion of the sheath drilled by the sheath drilling step are performed.SELECTED DRAWING: Figure 10
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a grout reinjection method for reinjecting grout into unfilled portions of the sheath of a PC structure. [Background technology]

[0002] In recent years, grout refilling work for PC structures has become more common, but most of this work involves refilling the main cables. In addition to main girders, PC structures are also used for other components, such as deck slabs. In the case of deck slabs, the prestressing steel PC1 is generally arranged horizontally, such as for the deck slab lateral fastening and main cables (see Figure 1). Assuming that the sheaths S1 of these prestressing steel PC1 are not filled with grout, when refilling the grout, it is necessary to make injection holes in the hollow areas Ca (see Figure 2).

[0003] Therefore, to put it simply, construction from the top surface of the deck is easy, but when construction is carried out from the top surface of the deck, it is necessary to restrict the passage of general vehicles, and there are problems such as time constraints and the need to repeat a small number of construction tasks in a short period of time, which increases the labor required due to the restrictions and makes it difficult to improve work efficiency.

[0004] If a method that does not involve traffic restrictions is devised, it is necessary to approach the cavity Ca from the underside of the deck, but the grout filling status of the sheath varies depending on the condition of the existing PC structure. For this reason, for example, if the entire cross section is unfilled, construction from the underside of the deck is easy, but if some grout G1 is filled, even if an injection hole is tried to be made from the underside of the deck, it will be difficult to make an injection hole into the cavity Ca because the grout will be encountered from directly below the sheath. Furthermore, drilling a hole from directly below the sheath S1 is likely to damage the PC steel PC1, which may hinder the performance of the PC structure.

[0005] In light of this, it is conceivable to start drilling from X2 directly below the sheath S1, rather than from X1 directly below the sheath S1, as shown in Figure 2. However, if the vertical hole Vh is drilled from X2 directly below the sheath S1, concrete C1 will remain in the diagonal part on the upper side of the sheath S1, and a separate method is required to remove this concrete C1. Furthermore, the injection hole cannot be completed unless the sheath S1 beyond the remaining concrete C1 is excavated.

[0006] For this reason, as shown in Figure 3, when drilling holes with a rotary drill D1 or the like with a curved tip, it is possible to drill holes in the concrete C1 in the shaded area and open the sheath S1, but there is a risk of damaging the prestressing steel PC1 inside the sheath S1. In addition, because it is curved, a large bending radius is required, and the diameter of the vertical hole Vh must be large, which causes problems such as damage to the PC structure and reduced durability.

[0007] Therefore, when trying to excavate concrete C1 and sheath S1 using a water jet as a method to avoid damaging prestressing steel PC1, it is difficult to ensure stable workability, even though sheath S1 may be excavated with a water jet. As mentioned above, there are many challenges in refilling grout from the underside of the deck. For this reason, there is a demand for the development of a grout reinjection method for PC structures that can be carried out efficiently from the underside of the deck without traffic restrictions, regardless of the grout G1 filling status in the sheath S1, and that does not risk damaging the prestressing steel PC1.

[0008] On the other hand, as a means for spraying a water jet at a right angle, Patent Document 1 discloses a construction method for an open caisson in which a high-pressure water pipe 3 is suspended in the internal space of the open caisson 1, a water jet injection pipe 5 is connected to the tip of the high-pressure water pipe 3 at a right angle to the high-pressure water pipe 3, and pressurized water is injected from the water jet injection pipe 5 toward the inner surface of the cutting edge of the open caisson (see claim 1 of Patent Document 1 and paragraphs

[0007] to

[0030] of the specification).

[0009] (See Figures 1 to 3 of the drawings, etc.)

[0009] Patent Document 2 discloses a method for removing the deck of a composite girder bridge, which includes the steps of using a water jet to remove a predetermined section of concrete from the side of the deck haunch while maintaining the top surface of the deck, installing reinforcing members in the section from which the concrete has been removed, and removing the deck after stopping traffic on the deck, removing the reinforcing members, and repeating the steps of removing the concrete from the predetermined section and installing the reinforcing members for different sections, thereby removing the concrete from the deck haunch in the section from which the deck is to be removed (see claim 1 in the claims of Patent Document 2, paragraphs

[0021] to

[0058] of the specification, Figures 1 to 7 of the drawings, etc.).

[0010] However, although the open caisson construction method described in Patent Document 1 and the composite girder bridge deck removal method described in Patent Document 2 describe spraying a water jet perpendicular to the spray pipe, they were not directly applicable to grout refilling work in PC structures.

[0011] Furthermore, Patent Document 3 and the like disclose an abrasive water jet processing machine that performs cutting by spraying a processing fluid mixed with an abrasive from a nozzle (see claim 1 in the claims of Patent Document 3, paragraphs

[0023] to

[0054] of the specification, and Figures 1 and 2 of the drawings, etc.).

[0012] However, in conventional abrasive water jet-related inventions, such as the invention described in Patent Document 3, in which an abrasive is mixed into a fluid and then sprayed, there is no idea of ​​using an abrasive water jet to refill grout in PC structures, and the invention is not directly applicable to refilling grout in PC structures. [Prior art documents] [Patent documents]

[0013] [Patent Document 1] Japanese Patent Application Publication No. 9-279598 [Patent Document 2] JP 2019-105031 A [Patent Document 3] Patent No. 5205481 Summary of the Invention [Problem to be solved by the invention]

[0014] Therefore, the present invention has been devised in consideration of the above-mentioned problems, and its object is to provide a grout reinjection method that can efficiently reinject grout into the unfilled parts of the sheath of an existing PC structure without traffic restrictions. [Means for solving the problem]

[0015] The grout reinjection method of claim 1 is a grout reinjection method for reinjecting grout into the unfilled portion of the sheath of an existing PC structure, and is characterized by comprising a vertical hole drilling step of drilling a vertical hole from the side directly below the sheath through which the PC steel is inserted from the underside of the existing PC structure upward, a horizontal drilling step of inserting a right-angle jet tool into the vertical hole and spraying a water jet from the right-angle jet tool to remove the concrete around the sheath, a sheath excavation step of excavating the exposed portion of the sheath exposed by the previous horizontal drilling step, and a grout injection step of injecting grout from the excavated portion of the sheath excavated in the sheath excavation step.

[0016] The grout reinjection method of claim 2 is the grout reinjection method of claim 1, characterized in that in the sheath excavation process, a blast shot device is used to inject abrasive material with high-pressure air into the sheath exposed portion exposed in the horizontal drilling process to excavate it.

[0017] The grout reinjection method of claim 3 is the grout reinjection method of claim 1, characterized in that in the sheath excavation step, a blast shot device is used to spray abrasive material with high-pressure air into the sheath exposed portion exposed in the horizontal drilling step to provide a depression or an excavation portion in the sheath exposed portion, and then the tip of an excavation jig having a sharp spiral tip is pushed into the depression or the excavation portion to excavate it.

[0018] The grout reinjection method of claim 4 is the grout reinjection method of claim 2 or 3, characterized in that in the sheath excavation step, abrasives are sprayed with high-pressure air using the blast shot device, and the abrasives sprayed by the blast shot device are collected by sucking the inside of the vertical hole with a dust collector.

[0019] The grout reinjection method according to claim 5 is the grout reinjection method according to claim 2 or 3, characterized in that the abrasive injected in the sheath excavation step is silica sand.

[0020] The grout reinjection method of claim 6 is the grout reinjection method of claim 1, characterized in that in the grout injection step, the pressure inside the sheath is reduced by a vacuum pump, the negative pressure is utilized to inject grout, additional injection is then performed by a snake pump, and finally pressurization is performed to fill the hollow portion inside the sheath with grout. Effect of the Invention

[0021] According to the inventions of claims 1 to 6, grout can be refilled into the ungrouted portions of the sheath through which the PC steel members of an existing PC structure such as a deck slab are inserted efficiently without traffic restrictions.

[0022] In particular, according to the invention of claim 2, in the sheath cutting process, a blast shot device is used to spray abrasives with high-pressure air onto the exposed sheath portion exposed in the horizontal drilling process to cut it open, so there is almost no risk of accidentally damaging the PC steel material inside the sheath.

[0023] In particular, according to the invention of claim 3, the tip of an excavation tool having a sharp spiral tip is pushed into the depression or the excavation portion to excavate it, so that the excavation portion required for grout injection can be excavated in a shorter time than when the entire excavation portion is excavated by blast shots.

[0024] In particular, according to the invention of claim 4, since the abrasives blasted by the blast shot device are collected, it is possible to prevent the situation in which the vertical hole becomes filled with abrasives and the sheath cannot be excavated. Therefore, the blast shot can be continued for the required time.

[0025] In particular, according to the invention as defined in claim 5, since the abrasive is silica sand, the sheath can be cut open efficiently by blast shots in a short time.

[0026] In particular, according to the invention as defined in claim 6, since grout is injected by the switching type grout injection method, it is possible to fill the grout-unfilled portions without leaving any gaps with grout. [Brief description of the drawings]

[0027] [Figure 1] Figure 1 is a cross-sectional view of a conventional PC girder. [Diagram 2] Figure 2 is a cross-sectional view of the deck slab lateral fastening. [Diagram 3] FIG. 3 is a diagram showing a case where a rotary drill is used to drill a hole in a remaining concrete portion. [Figure 4] FIG. 4 is a process explanatory diagram showing a vertical hole drilling process of the grout reinjection method according to the embodiment of the present invention. [Diagram 5] FIG. 5 is a process explanatory diagram showing the horizontal drilling process of the grout reinjection method. [Figure 6] Figure 6(a) is a photograph showing the situation in which a right-angle injection jig is attached to a hand gun during the horizontal drilling process of the grout reinjection method described above, and Figure 6(b) is a photograph showing the right-angle injection jig 1. [Figure 7]FIG. 7 is a cross-sectional view showing a conventional method of drilling holes by ejecting a water jet obliquely upward with a hand gun. [Figure 8] Figure 8 is a photograph taken by inserting an endoscope into the vertical hole, showing the state after a horizontal drilling process was performed with a water jet using a right-angle jet jig and the concrete around the sheath was removed in an experiment. [Figure 9] Figure 9 is a photograph taken after an endoscope was inserted into the vertical hole to show the state in which the sheath was partially opened by the water jet in an experiment. [Figure 10] FIG. 10 is a process explanatory diagram showing the sheath excavation process of the above-mentioned grout reinjection method. [Figure 11] FIG. 11(a) is a photograph showing an overview of a blast shot device used in the sheath cutting process, and FIG. 11(b) is an explanatory diagram explaining the mechanism of a blast nozzle. [Figure 12] FIG. 12 is a photograph showing an overview of the blast shot device. [Figure 13] FIG. 13 is a photograph mainly showing the abrasive recovery lid of the blast shot device. [Figure 14] Figure 14 is a photograph of an experiment showing the sheath being excavated using the grout reinjection method mentioned above. [Figure 15] FIG. 15 is a photograph showing the blast nozzle of the blast shot device. [Figure 16] FIG. 16 is a diagram illustrating the configuration of the blast nozzle of the above embodiment. [Figure 17] FIG. 17 is a configuration explanatory diagram showing the configuration of the abrasive recovery lid of the blast shot device, (a) being a side view, and (b) being a plan view. [Figure 18] FIG. 18 is a photograph showing the sheath after excavation by blast shots in the experiment. [Figure 19] FIG. 19 is a photograph showing an excavation jig according to an embodiment of the present invention. [Figure 20] FIG. 20 is a photograph showing the sheath being excavated using the excavation jig. [Figure 21]FIG. 21 is a photograph showing the state after the sheath is excavated using the excavation jig. [Figure 22] FIG. 22 is a photograph showing the results of an experiment on whether or not a PC steel bar (PC steel material) is damaged by blast shots. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0028] Hereinafter, one embodiment of the grout reinjection method according to the present invention will be described in detail with reference to the drawings.

[0029] A grout reinjection method according to an embodiment of the present invention will be described with reference to Figs. 4 to 22. In the grout reinjection method according to this embodiment, a case will be described in which grout G1 is reinjected into an unfilled portion (hollow portion) Ca of grout G1 in a sheath S1 through which PC steel material PC1 arranged horizontally such as PC lateral fastening and main cable is inserted into a deck Fb of an existing bridge as an existing PC structure (see Fig. 4, etc.). The grout reinjection method according to this embodiment is a grout reinjection method in which grout is reinjected into an unfilled portion of the sheath S1 of an existing PC structure.

[0030] (Vertical hole drilling process) Fig. 4 is a process explanatory diagram showing the vertical hole drilling process of the grout reinjection method according to this embodiment. As shown in Fig. 4, in the grout reinjection method according to this embodiment, a vertical hole drilling process is performed in which a vertical hole Vh is drilled upward from the side X2 directly below the sheath S1 through which the PC steel material PC1 is inserted from the underside of the deck Fb, which is a PC structure, to the vicinity of the sheath S1. In this embodiment, drilling is assumed to be performed using a small-diameter core drill, but it goes without saying that drilling using other drilling machines such as a hammer drill or drilling using a water jet may also be used.

[0031] The diameter of the vertical hole Vh drilled (perforated) in this process should be as small as possible to avoid damaging the PC structure, but since it is necessary to have a diameter that allows the insertion of right-angle injection jigs and the like used in the subsequent process, a hole with a diameter φD2 = 25mm to 40mm is appropriate. In addition, the vertical hole Vh is drilled (perforated) to a depth from the underside of the deck slab Fb to a height 1cm to 2cm beyond the top of the sheath S1.

[0032] In addition, in this process, the positional relationship between the vertical hole Vh to be drilled (perforated) and the sheath S1 is as shown in Figure 4, and the hole is drilled (perforated) upward from the underside Fba of the deck Fb so as to be as close to the sheath S1 as possible from the side X2 directly below X1 of the sheath S1 so as to just graze the side of the sheath S1 without damaging the sheath S1.

[0033] (Horizontal drilling process) Fig. 5 is a process explanatory diagram showing the horizontal drilling process of the grout reinjection method according to this embodiment, Fig. 6(a) is a photograph showing the situation in which the right-angle jet jig 1 is attached to a hand gun and work is performed in the horizontal drilling process of the grout reinjection method according to this embodiment, and Fig. 6(b) is a photograph showing the right-angle jet jig 1. Next, as shown in Figs. 5 and 6, in the grout reinjection method according to this embodiment, the right-angle jet jig 1 is inserted into the vertical hole Vh drilled in the previous process, and a water jet is sprayed from this right-angle jet jig 1 to drill in the horizontal direction (horizontal direction) to remove the concrete C1 in the shaded area around the sheath on the outside of the sheath S1.

[0034] However, as shown in Figure 7, even with a conventional handgun, it is possible to drill holes by injecting a water jet diagonally upwards at an angle of about 9°, but in this case, there is a problem that more concrete around the sheath S1 than necessary is removed, damaging the deck Fb, which is a PC structure. In particular, with the deck Fb, if the concrete is drilled through to the road surface (top surface Fbb of the deck) where traffic restrictions are not in place, this could lead to a serious accident, and so this process cannot be carried out using a conventional water jet handgun.

[0035] Therefore, in the grout re-injection method according to this embodiment, as shown in Figures 5 and 6, a newly developed right-angle injection jig 1 is used to inject a water jet in a lateral direction (horizontal direction) perpendicular to the axial direction (vertical direction) of the vertical hole Vh at 90° to drill a hole and remove concrete C1 in the diagonal line area around the sheath on the outside of the sheath S1. This right-angle injection jig 1 is a metal jig that is large enough to be inserted into a small circular hole with a diameter of about 28 mm including the injection nozzle 1a, and is attached to the handgun of a handgun-type water jet, and changes the water injection direction of the handgun to a right angle of 90° to inject water.

[0036] Figure 8 is a photograph taken by inserting an endoscope into the vertical hole Vh to show the state in which concrete C1 around the sheath S1 has been removed in the horizontal drilling process using a water jet with the right-angle jetting jig 1. As shown in Figure 8, it can be seen that the remaining concrete portion C1 (see Figure 5) that exists between the vertical hole and the top of the sheath from the side of the sheath to the top of the sheath has been completely removed by the water jet.

[0037] Furthermore, by carrying out this process, the metal sheath may be partially cut open by the water jet, as shown in Fig. 9. Fig. 9 is a photograph taken by inserting an endoscope into the vertical hole Vh to show the state in which the sheath S1 has been partially cut open by the water jet. If the sheath has been cut open in this manner by this process, there is no need to carry out the cutting process by blast shot, which will be described later.

[0038] (Sheath cutting process) FIG. 10 is a process explanatory diagram showing the sheath cutting process of the grout re-injection method according to this embodiment. Also, FIG. 11(a) is a photograph showing an outline of the blast shot device 10 used in the sheath cutting process, and FIG. 11(b) is an explanatory diagram explaining the mechanism of the blast nozzle 11. And, FIG. 12 is a photograph showing the overall outline of the blast shot device 10, and FIG. 13 is a photograph mainly showing the abrasive recovery lid 16 of the blast shot device 10. Furthermore, FIG. 14 is an experimental photograph showing the sheath cutting situation of the grout re-injection method according to this embodiment, and FIG. 15 is a photograph showing the blast nozzle 11. Also, FIG. 16 is a configuration explanatory diagram showing the configuration of the blast nozzle 11, and FIG. 17 is a configuration explanatory diagram showing the configuration of the abrasive recovery lid 16, where (a) is a side view and (b) is a plan view.

[0039] Next, as shown in Figure 10, in the grout reinjection method according to this embodiment, a sheath excavation process is carried out to cut open the metal (steel) tubular body of the sheath exposed portion S1a, which is exposed from the side to the top by the front lateral drilling process.

[0040] Specifically, in the grout reinjection method according to the present embodiment, a blast shot device 10 is used to inject abrasive Ab into the sheath exposed portion S1a with high-pressure air to perform excavation.

[0041] 11 to 13, the blast shot device 10 is composed of a blast nozzle 11, a high-pressure air supply hose 12, a compressor 13, an abrasive supply hose 14, an abrasive container 15, an abrasive recovery lid 16, a dust collection hose 17, a dust collector 18, etc. The high-pressure air supply hose 12 is connected to the compressor 13, and the abrasive supply hose 14 is connected to the abrasive container 15.

[0042] As shown in Figures 11, 12 and 16, the blast nozzle 11 is connected to a high-pressure air supply hose 12 and an abrasive supply hose 14. As shown in Figure 11(b), high-pressure air is sprayed through the high-pressure air supply hose 12 by the pressure of the compressor 13. By joining the abrasive supply hose 14 at the nozzle tip position, negative pressure is generated in the abrasive supply hose 14 as the high-pressure air is sprayed. The abrasive Ab is sucked in from the abrasive container 15 and sprayed at high speed together with the high-pressure air onto the sheath exposed portion S1a, thereby opening up the sheath S1.

[0043] The diameter of the air ejection tip of the blast nozzle 11 according to this embodiment is set to φ1.5 mm (see FIG. 15). If the diameter of the nozzle tip of the blast nozzle 11 is large, the pressure of the high-pressure air will decrease, and if the diameter is small, the pressure can be maintained high but the abrasive material Ab that can be ejected will be limited to small ones, which will be insufficient for cutting through the sheath S1.

[0044] In addition, since the abrasive Ab to be sprayed cuts through the sheath S1, it is preferable that the material has a hardness higher than that of the steel material of the sheath S1 but lower than the surface hardness of the PC steel bar (PC1) inserted through the sheath S1, because this allows the sheath S1 to be cut through without scratching the surface of the PC steel bar (PC1).

[0045] In the grout reinjection method according to the present embodiment, the abrasive Ab to be sprayed is silica sand No. 5. It was found through experiments described later that silica sand No. 5 is optimal, although it depends on the inner diameter of the blast nozzle 11 (see Tables 1 and 2). The reason why silica sand No. 5 is used as the abrasive Ab is that if the diameter of the abrasive Ab is too large, it will not pass through the blast nozzle 11 and will cause clogging, and if the diameter is too small, it will have a low abrasive ability and will take a long time to open the hole. In addition, silica sand is also used from the viewpoint of dissimilar metal corrosion, in that corrosion is not promoted due to differences in ionization tendency even if it remains in the sheath S1. However, the abrasive according to the present invention is not limited to silica sand, and other materials such as stainless steel and iron may be used as long as it has a predetermined hardness and a predetermined weight that can generate the impact force required for opening the hole.

[0046] As described above, it is possible to open the sheath S1 by the blast shot of the blast shot device 10 (see FIG. 18). FIG. 18 is a photograph showing the sheath after it has been opened by the blast shot. However, the opening of the sheath S1 is not instantaneous, but requires a certain amount of time. Therefore, abrasive Ab accumulates in the drilled vertical hole Vh, and if the vertical hole Vh becomes filled with abrasive Ab, it becomes impossible to open the sheath S1.

[0047] 12, 13 and 17, the blast shot device 10 is provided with an abrasive recovery cover 16 at the outlet of the vertical hole Vh facing the deck underside Fba, and a dust collector 18 is provided connected to the abrasive recovery cover 16 via a dust collection hose 17, and the dust collector 18 sucks the inside of the vertical hole Vh from the abrasive recovery cover 16 through the dust collection hose 17 to collect the abrasive Ab sprayed by the blast shot. In this way, not only is high-pressure air supplied from the high-pressure air supply hose 12, but the dust collector 18 also sucks the air from the outlet of the vertical hole Vh, so that the high-pressure air flows toward the dust collector 18 without being sealed, allowing the blast shot device 10 to continue the blast shot.

[0048] However, the disadvantage of excavation using blast shots is that if you try to make the excavation hole larger, the shot time becomes longer and the abrasives flow into the sheath through the small diameter hole. If we consider the mechanism of excavation using blast shots, when excavating sheath S1 using blast shots, the sheath S1 is gradually polished and reduced in thickness by the collision of the abrasives, and pressure from the shots continues to be generated there, causing a part of the sheath S1 to collapse just before excavation. If the blast shots are continued, stress will concentrate in the collapsed area and the impact load of the abrasives Ab will continue to act, eventually causing the steel of the sheath S1 to be excavated.

[0049] Considering this mechanism, when the sheath S1 collapses or when a small diameter (for example, 1 mm) is cut, a cutting tool (FIG. 19) may be used to push the sharp spiral tip of the cutting tool 2 into the center of the collapsed part or cut-out part, thereby performing cutting. FIG. 19 is a photograph showing the cutting tool 2.

[0050] Fig. 20 is a photograph showing the sheath S1 being excavated using the excavation jig 2, and Fig. 21 is a photograph showing the sheath S1 being excavated using the excavation jig 2 after excavation. As shown in Figs. 20 and 21, the extent of excavation depends on the drilling position of the vertical hole Vh and the distance to the sheath S1, but it is possible to peel off the steel tube of the sheath S1 near the depressed portion or excavated portion (see Fig. 18) using the excavation jig 2. In this way, by using the excavation jig 2 in addition to the blast shot by the blast shot device 10 to excavate, not only can the excavation time be shortened, but even if the excavation hole is enlarged, the abrasive Ab flowing into the sheath S1 due to the blast shot can be minimized or eliminated.

[0051] As shown in Fig. 18, the tip of the excavation jig 2 is spiral-shaped, and the sheath S1 can be turned up by rotating the excavation jig 2 inside the vertical hole Vh. However, if an attempt is made to excavate the sheath S1 with the excavation jig 2 when there is no depression in the sheath S1, the working point will not be able to be located and it will slip, making it difficult to determine the aim. However, by providing at least a depression with a blast shot, the point of action can be determined, making it easier to excavate the sheath with the excavation jig 2 or to expand the excavation opening.

[0052] Also, an experiment was conducted to verify whether the blast shots of the blast shot device 10 described above would damage the PC cable. Specifically, a PC steel bar (PC steel material) was prepared, and silica sand No. 5 was directly sprayed onto it as an abrasive by the blast shot device 10 described above continuously for 10 minutes, and the PC steel bar (PC steel material) was observed. As a result, as shown in Figure 22, the black skin on the surface of the PC steel bar (PC steel material) was merely scraped off, and no difference was confirmed by measuring the diameter with a vernier caliper. Therefore, it is clear that the PC steel bar (PC steel material) was not damaged. Figure 22 is a photograph showing the experimental result of whether the PC steel bar (PC steel material) would be damaged by the blast shots.

[0053] (Excavation confirmation) As described above, the blast shot by the blast shot device 10 is continued for a certain period of time, after which the abrasive recovery cover 16 installed at the exit of the vertical hole is temporarily removed, an endoscope is inserted through the vertical hole to grasp the extent of excavation, and the end of the blast shot is determined. Specifically, when it is confirmed that the excavation has progressed to an extent that allows filling with grout, as described below, the blast shot is terminated, and the silica sand and abrasive debris from the sheath are blown away with high-pressure air to clean the sheath and the inside of the vertical hole.

[0054] (Grout injection process) Next, in the grout injection method according to this embodiment, a grout injection process is performed in which grout G1 is injected and filled from the vertical hole Vh and the excavated portion of the sheath excavated in the sheath excavation process by a switching grout injection method. Specifically, the pressure inside the sheath S1 is reduced by a vacuum pump, and the grout G1 is injected using the negative pressure, after which a switching valve is operated to perform additional injection using a snake pump with less pulsation, and finally pressurization is performed to fill the cavity Ca (unfilled portion) in the sheath S1 with grout G1.

[0055] It is preferable to estimate the amount of the cavity in the sheath in advance based on the pressure change in the reduced pressure vessel that is in communication with the sheath, since this allows the amount of grout G1 required for filling to be calculated in advance with high accuracy. Upon completion of this process, the entire process of reinjecting grout into the unfilled portion of the sheath using the grout reinjection method according to this embodiment is completed.

[0056] <Experiment to examine abrasives> Next, an experiment to determine which abrasive is the most suitable will be described. The types of abrasives used were seven types: 0.5 mm long stainless steel cut wire (hardness Hv500), 0.425-0.6 mm long shellac beads (hardness Hv650-1030), 0.3-0.71 mm long stainless steel grid (hardness Hv400), 0.425-1.7 mm long silica sand No. 3 (hardness Hv6-7), 0.3-1.18 mm long silica sand No. 4 (hardness Hv6-7), 0.1-0.6 mm long silica sand No. 5 (hardness Hv6-7), and 0.075-0.425 mm long silica sand No. 6 (hardness Hv6-7). The diameter of the air ejection tip of the blast nozzle 11 was set to φ2.5 mm or φ1.5 mm. In addition, in this experiment, a vertical hole (drilled hole) was reproduced using an acrylic tube, a φ32 PC steel bar and a φ38 steel sheath were placed in it, and the abrasive and injection position were changed while blasting was continued for a specified time using the blast shot device 10 described above, and the injection time and the diameter of the drilled hole were measured to determine the extent of drilling. The injection positions were from the side to the top position of the steel sheath, the overlapping part of the steel sheath, the rib part, the standard part, etc. The results when the air injection tip diameter of the blast nozzle 11 was set to φ2.5 mm are shown in the following Table 1, and when it was set to φ1.5 mm are shown in the following Table 2.

[0057] [Table 1]

[0058] [Table 2]

[0059] As can be seen from the results of stainless steel cut wire in Tables 1 and 2, the polishing ability is improved when the diameter of the blast nozzle is reduced from 2.5 mm to 1.5 mm. Also, as can be seen from the results of stainless steel cut wire and ceramic beads in Table 1, the polishing ability does not increase even if ceramic beads with high hardness are used, and it is better to use materials with corners in the shape of the abrasive. However, since it was not possible to cut with silica sand No. 4 and silica sand No. 5 in Table 1, it is found that even if the sand has corners, it is necessary to have a certain degree of hardness or high jetting ability. Next, it can be seen that silica sand No. 5 in Table 2 can be cut to the same extent as stainless steel cut wire and stainless steel grid. This shows that even if the hardness is low, if it has corners and the length is roughly the same, it can be cut to the same extent. On the other hand, it can be seen that silica sand No. 6 in Table 2 cannot be cut with abrasives with a relatively short length of 0.075 to 0.425 mm. Although the abrasive depends on the inner diameter of the blast nozzle, silica sand No. 5 is optimal. If the diameter of the abrasive is too large, it will not pass through the nozzle and will cause clogging, whereas if the diameter is too small, the abrasive ability will be reduced.

[0060] According to the grout reinjection method of this embodiment described above, a vertical hole Vh is drilled from the underside of the PC structure from the side X2 directly below the sheath S1 upward to the vicinity of the sheath S1 and grout is reinjected, so that grout can be efficiently refilled into the unfilled parts of the sheath of an existing PC structure such as a deck slab without traffic restrictions.

[0061] Furthermore, according to the grout reinjection method of this embodiment, the right-angle injection tool 1 is used to inject a water jet in a lateral direction (horizontal direction) perpendicular to the axial direction (vertical direction) of the vertical hole Vh at 90° to drill holes and remove the concrete C1 in the diagonal line area around the sheath S1 on the outside of the sheath S1, so there is no risk of the water jet accidentally drilling holes down to the road surface, which can prevent serious accidents from occurring.

[0062] Furthermore, according to the grout reinjection method of this embodiment, a blast shot device 10 is used to spray abrasive Ab onto the exposed sheath portion S1a with high-pressure air to open the sheath S1, so there is almost no risk of accidentally damaging the PC steel material inside the sheath.

[0063] Furthermore, in the grout reinjection method according to this embodiment, the tip of an excavation jig having a sharp spiral tip is pushed into the depression or excavation area to excavate it, so that the excavation area required for grout injection can be excavated in a shorter time than when the entire excavation area is excavated by blast shots.

[0064] Moreover, in the grout reinjection method according to this embodiment, the abrasive Ab injected by the blast shot is collected by sucking the inside of the vertical hole Vh with the dust collector 18 through the dust collection hose 17 from the abrasive collection lid 16. This makes it possible to prevent the vertical hole Vh from filling up with abrasive, which would make it impossible to excavate the sheath, and allows the blast shot by the blast shot device 10 to continue for the time required for excavation.

[0065] In addition, in the grout reinjection method according to this embodiment, the abrasive sprayed in the sheath cutting process is silica sand No. 5, so that the sheath can be cut out efficiently in a short time by blast shots.

[0066] Furthermore, in the grout re-injection method according to this embodiment, the pressure inside the sheath S1 is reduced using a vacuum pump by using a switching grout injection method, and the negative pressure is used to inject grout G1. After that, the switching valve is operated to perform additional injection using a snake pump with less pulsation, and finally pressurization is applied to fill the hollow portion Ca (unfilled portion) in the sheath S1 with grout G1, so that grout can be filled without creating any voids in the unfilled portion.

[0067] The grout reinjection method according to the embodiment of the present invention has been described in detail above. However, the above-mentioned and illustrated embodiments are merely specific embodiments for carrying out the present invention. Therefore, the technical scope of the present invention should not be interpreted as being limited by these. [Explanation of symbols]

[0068] 1: Right angle injection jig 1a: Injection nozzle 2: Cutting jig 10: Blast shot device 11: Blast nozzle 12: High pressure air supply hose 13: Compressor Ab: Abrasive material 14: Abrasive supply hose 15: Abrasive container 16: Abrasive collection lid 17: Dust collection hose 18: Dust collector Fb: Floor slab (PC structure) Fba:Bottom side Fbb: Top surface (road surface) S1: Sheath S1a: Sheath exposed part PC1: PC steel bar (PC steel material) G1: Grout Ca: Cavity (unfilled part) C1: Remaining concrete area (concrete in the shaded area) Vh: Vertical hole X1: Directly below the sheath X2: Sheath side D1: Rotational drill

Claims

1. A grout reinjection method for reinjecting grout into a portion of an existing PC structure that has not been filled with grout, comprising: A vertical hole drilling process for drilling a vertical hole from the side directly below the sheath through which the PC steel is inserted from the underside of the existing PC structure to the upward direction; A horizontal drilling process of inserting a right-angle jetting tool into the vertical hole and jetting a water jet from the right-angle jetting tool to remove the concrete around the sheath; a sheath cutting step of cutting the exposed portion of the sheath exposed by the front lateral drilling step; and a grout injection step of injecting grout from the excavated portion of the sheath excavated in the sheath excavation step. A grout reinjection method characterized by the above.

2. In the sheath cutting step, abrasive material is sprayed with high-pressure air using a blast shot device to the sheath exposed portion exposed in the horizontal drilling step to cut it. The grout reinjection method according to claim 1,

3. In the sheath cutting process, abrasive material is sprayed with high-pressure air using a blast shot device to the sheath exposed portion exposed in the horizontal drilling process to form a recessed portion or a cutout portion in the sheath exposed portion, and then the tip of a cutting jig having a sharp spiral tip is pushed into the recessed portion or the cutout portion to cut it out. The grout reinjection method according to claim 1,

4. In the sheath cutting process, the abrasive is sprayed with high pressure air using the blast shot device, and the abrasive sprayed by the blast shot device is collected by sucking the inside of the vertical hole with a dust collector. The grout reinjection method according to claim 2 or 3, characterized in that

5. The abrasive material sprayed in the sheath cutting step is silica sand. The grout reinjection method according to claim 2 or 3, characterized in that

6. In the grout injection process, the pressure inside the sheath is reduced by a vacuum pump, the negative pressure is used to inject grout, additional injection is then performed by a snake pump, and finally pressurization is applied to fill the cavity inside the sheath with grout. The grout reinjection method according to claim 1,

Citation Information

Patent Citations

  • Power cable

    JP1977005481A

  • Execution work method of open caisson

    JP1997279598A

  • Method for removing floor slab of composite girder bridge and reinforcement member used for the same

    JP2019105031A