Lifting system
The elevating scaffolding system addresses instability and interference issues by integrating the drive device and battery on the working deck, ensuring stable and cable-free operation.
Patent Information
- Application Number
- JP2024084992
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-25
- Filing Date
- 2024-05-24
- Publication Date
- 2024-12-05
AI Technical Summary
Conventional lifting systems using hanging gondolas or scaffolding are unstable and can interfere with structures due to cables hanging down, especially in windy conditions.
An elevating scaffolding system where the drive device and battery are located on the working deck, eliminating the need for external cables by using electric power to vertically raise and lower the deck.
Prevents interference with structures by eliminating the need for hanging cables, reducing instability, and lowering the risk of cable-related issues, thereby enhancing safety and reducing operational costs.
Smart Images

Figure 2024169420000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a lifting system. [Background technology]
[0002] Conventionally, when carrying out exterior construction work on a structure such as a building, the work has been carried out by suspending a gondola as disclosed in, for example, Patent Document 1 below. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2002-138659 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, in conventional techniques including the technique of Patent Document 1, the use of gondolas as described above results in work being performed on unstable footing. Therefore, the inventors of the present application decided to proceed with the development of an elevating scaffolding, or an elevating system, which ensures stability by raising and lowering the scaffolding from the ground using a driving device that generates driving force using electricity, rather than the hanging type used in the prior art. However, in this type of lifting system, the cable supplying power to the drive unit hangs down to the ground, and if the wind blew relatively strongly, for example, the cable would be blown around and hit (interfere with) the outer wall of the structure.
[0005] The present invention has been made in consideration of the above circumstances, and has an object to provide a lifting system that does not interfere with structures. [Means for solving the problem]
[0006] In order to achieve the above object, a lifting system according to one aspect of the present invention comprises: A column member extending along the vertical direction of the structure; a work deck attached to the pillar member, extending in the left-right direction relative to the pillar member, on which an operator can work; Equipped with The working deck includes: A drive device that generates a driving force using electricity to raise and lower the working deck in the vertical direction; a battery for supplying the power to the drive device; are located, That is it. Effect of the Invention
[0007] According to the present invention, the battery that supplies power to the drive unit is arranged on the work deck together with the drive unit, so that no cables are needed and no dangling cables are required, thereby eliminating interference with structures, etc. [Brief description of the drawings]
[0008] [Figure 1] 1 is a schematic diagram illustrating an embodiment of a lifting system of the present invention. [Diagram 2] FIG. 2 is a perspective view showing an example of a configuration of a mast and a working deck in the lifting system of FIG. 1. [Diagram 3] FIG. 3 is an enlarged perspective view of a portion of the mast of FIG. 2. [Figure 4] FIG. 13 is an enlarged perspective view of a rack and pinion gear installed for lifting and lowering functions. [Diagram 5] FIG. 3 is an enlarged perspective view showing a portion of the working deck of FIG. 2. [Figure 6] FIG. 1 is a front view showing an example of a twin-mast lifting system. [Figure 7] FIG. 1 is a front view showing an example of a lifting system having a single mast. [Figure 8] FIG. 1 is a plan view showing an example of a twin-mast lifting system. [Figure 9]FIG. 1 is a plan view showing an example of a lifting system having a single mast. [Figure 10] FIG. 10 is a side view of the working deck of FIGS. 6 to 9. [Figure 11] FIG. 2 is a diagram showing an example of an electrical path (PLAN A) of a lifting system. [Figure 12] FIG. 13 is a diagram showing an example of an electrical path (PLAN B) of the lifting system. [Figure 13] FIG. 2 is a diagram showing an example of an electrical path (PLAN C) of a lifting system. [Figure 14] FIG. 2 is a diagram showing an example of an electrical path (PLAN D) of a lifting system. [Figure 15] FIG. 1 is a schematic diagram of a cable-type lifting system as a comparative example. [Figure 16] 16 is a diagram showing a comparison result between the lifting system of this embodiment and the comparative example of FIG. 15. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[0010] First, an outline of the lifting system of the present invention will be described with reference to FIG. FIG. 1 is a schematic diagram showing one embodiment of a lifting system of the present invention.
[0011] The lifting system 1 is a lifting scaffolding used for maintenance, inspection, repair, etc. of the exterior wall of a building (structure) such as an apartment building M. Examples of the above-mentioned structures include apartment building M, as well as buildings, chimneys, bridges, towers, tanks, and other structures of all shapes. In the case of apartment M, the lift system 1 can be used not only for maintenance, inspection and repair of the exterior walls, but also for new construction. The lift system 1 can also be used in buildings. In the case of chimneys, the lifting system 1 can be used for demolition and renovation works. In the case of bridges, the lifting system 1 can be used for repair work. In the case of towers and tanks, the lifting system 1 can be used for the construction work and for the internal works for these. The lifting system 1 can also be used when carrying out maintenance, inspection, repair work, etc. on the exterior walls of a commercial facility while the store is open for business.
[0012] The lifting system 1 is configured to include two masts 2 and a work deck 3. The lifting system 1 has a driving device 4 (see FIG. 2) and a battery 5 (see FIGS. 6 to 10) arranged on a working deck 3, which will be described later. Although FIG. 1 shows an example in which there are two masts 2 (twin), it is also possible to have one mast 2 (single).
[0013] The two masts 2 are column members (columnar structures) extending in the vertical direction of the apartment building M (the direction of the arrows indicated by V1 and V2 in Figure 1), and the two masts 2 are arranged at a predetermined distance in the left-right direction (the so-called horizontal direction perpendicular to the direction of the arrows indicated by V1 and V2 in Figure 1). The work deck 3 is attached so as to span the two masts 2. The work deck 3 is structured to extend in the left-right direction from the two masts 2, and is configured to enable workers S to carry out maintenance, inspection, and repair work on the exterior walls of the apartment building M. As described above, the work deck 3 is equipped with the drive unit 4 and battery 5, as well as an operation panel 6 (see Figure 2) that is operated to raise and lower the work deck 3 in the vertical direction.
[0014] The lifting system 1 is configured so that the working deck 3 is raised and lowered from the ground side by a drive device 4, which will be described later, etc. Therefore, compared to a case where a gondola is suspended, for example, the work is not unstable, and it is safe and convenient, so it can be said to be a useful system (lifting scaffolding). In addition, the lifting system 1 can be said to be a system that does not cause interference with the outer walls of the condominium M (described later with reference to FIG. 15). In other words, it is possible to provide a lifting system 1 that does not cause interference with structures.
[0015] Next, the configuration of the mast 2, the working deck 3, etc. will be described with reference to Figs. FIG. 2 is a perspective view showing an example of a configuration of a mast and a working deck in the lifting system of FIG. FIG. 3 is an enlarged perspective view showing a part of the mast of FIG. FIG. 4 is an enlarged perspective view of a rack and pinion gear provided for the lifting function. FIG. 5 is an enlarged perspective view showing a part of the working deck of FIG. It should be noted that FIG. 2 will be described taking as an example the lifting system 1 having one mast 2 (single).
[0016] In FIG. 2, the mast 2 has a columnar structure extending in the vertical direction (the direction of the arrows indicated by V1 and V2), and is composed of a leg 21, a mast body 22, and a top mast 23. The legs 21 are, for example, four-legged supports that are installed on the ground G. The legs 21 are installed on a base that is laid on the ground G, although not particularly shown. Although not shown in the figure, the legs 21 are provided with wheels for mobility.
[0017] 2 and 3, the mast body 22 is configured with three pillars 221 arranged at the three corners of an equilateral triangle, a plurality of horizontal connecting members 222 connecting the three pillars 221, and a plurality of diagonal braces 223. The horizontal connecting members 222 are arranged at predetermined intervals in the vertical direction. The diagonal braces 223 are respectively arranged between the horizontal connecting members 222 arranged in the vertical direction. The mast body 22 has a structure in which multiple masts as shown in Figure 3 can be connected in the vertical direction (the mast body 22 is long in the vertical direction to match the height of the structure, as shown in Figure 1). A rack gear 41 is fixed to the mast body 22 to provide a lifting function.
[0018] The top mast 23 is disposed directly above the mast body 22. Similar to the mast body 22, the top mast 23 is configured to include three posts, a plurality of horizontal connecting members, and a plurality of diagonal braces (reference numbers omitted). It is to be noted that the rack gear 41 is not fixed to the top mast 23 (the rack gear 41 is designed not to extend to the top mast 23, so that the work deck 3 will not pop out).
[0019] In FIG. 2, the work deck 3 is structured to be attached to the mast 2, and is configured to serve as a foothold extending in the left-right direction relative to the mast 2. The work deck 3 is configured to include a deck main body 31, a plurality of handrails 32, a mast enclosure 33, and a drive unit installation section 34.
[0020] 2 and 5, the deck main body 31 is configured to include a plurality of scaffolding boards 311 and a scaffolding strength ensuring portion (reference numeral omitted) for ensuring the strength of the deck main body 31. Each of the multiple scaffolding planks 311 is formed in a plate shape on which a worker S (see FIG. 1) can stand to perform work. The scaffolding strength ensuring section is composed of a plurality of short side receiving members 312 and long side receiving members 313 for respectively supporting a plurality of scaffolding boards 311, a long side support member 314 which is positioned, for example, at the lowest position of the deck main body 31 and extends in the longitudinal direction of the deck main body 31, and a plurality of connecting members 315 which connect these together to form a triangular shape to ensure strength.
[0021] The handrails 32 are arranged around the scaffolding planks 311 to ensure the safety of a worker S (see FIG. 1) standing on the scaffolding planks 311. A control panel 6 and a transformer 7, which will be described later, are attached to predetermined ones of the multiple handrails 32. The mast enclosure 33 is attached to surround the mast 2 at the working deck 3 position. The mast enclosure 33 is attached to a height that takes into account the height of the worker S, for example.
[0022] The drive unit installation section 34 is provided for installing the drive unit 4 . The drive unit installation section 34 is disposed at a central position in the longitudinal direction (the above-mentioned left-right direction) of the working deck 3. In addition, the drive unit installation section 34 is disposed at a position lower than the multiple scaffolding boards 311 on the working deck 3.
[0023] In FIG. 4, the rack gear 41 is a rod-shaped gear that extends straight in the vertical direction, and is adapted to mesh with a pinion gear 42 provided in the driving device 4 (see FIG. 2). The rack gear 41 of this embodiment is provided with limiters at appropriate positions on its upper and lower parts, so that it is possible to restrict, for example, the working deck 3 from jumping out relative to the mast 2.
[0024] Returning to FIG. 2, the drive device 4 is a device that generates, using electricity, a drive force for raising and lowering the working deck 3 in the vertical direction, and in this embodiment, is configured to include the pinion gear 42 described above. Although no particular reference numeral is given to the drive unit 4, the drive unit 4 is equipped with a centrifugal brake. The centrifugal brake is designed to apply the brakes to prevent the pinion gear 42 from rotating even in the unlikely event of a sudden descent or the like (allowing the vehicle to stop safely). In addition, although not specifically shown, there is a mechanism for lowering the working deck 3 using a method that does not use the driving force of the drive unit 4 (if there is a mechanism for manually lowering it, it would be possible to deal with, for example, a malfunction or dead battery).
[0025] The battery 5 is used to supply power to the drive device 4 and has a power capacity that is sufficient to generate a driving force for the drive device 4 to raise and lower the working deck 3 in the vertical direction. In this embodiment, three batteries 5 are provided for each drive device 4. Specifically, in an example of the lifting system 1 having one mast 2 (single), there is one drive device 4, and therefore, in this example, three batteries 5 are provided (see FIG. 7). In addition, in the example of the lifting system 1 having two masts 2 (twin), there are two drive devices 4, so in this example, six batteries 5 are provided (see FIG. 6). It should be noted that the number of batteries 5 as described above is merely an example.
[0026] The battery 5 is arranged (installed) on the work deck 3 so as to be in the vicinity of the drive unit 4. Specifically, the battery 5 is arranged on the scaffolding board 311 closest to the drive unit 4 (in other words, arranged on the scaffolding board 311 closest to the mast 2). The battery 5 is placed on the scaffolding board 311 closest to the drive unit 4 in order to shorten the length of the wiring. In addition, the battery 5 is placed on the scaffolding board 311 closest to the drive unit 4 in order to shorten the distance it needs to travel on the working deck 3 when it is removed for charging.
[0027] In this embodiment, the battery 5 is arranged so as to be placed on the scaffolding board 311. It should be noted that the above-mentioned arrangement of the battery 5 is merely one example, and it is also possible to provide a recess in the scaffolding board 311 closest to the driving unit 4 and store the battery in the recess, or to place the battery under the scaffolding board 311 as shown by the dotted line in Figure 10, or to place the battery together with the driving unit 4 at the driving unit installation section 34, for example.
[0028] In this embodiment, the battery 5 is arranged close to the handrail 32 closest to the drive device 4 (lined up along the handrail 32) (see FIGS. 8 and 9). The battery 5 is placed in a position that does not get in the way of the worker S working on the scaffolding board 311 (a position that ensures workability).
[0029] An operation panel 6, a transformer 7, an inverter 9, and a sine filter 10 are also arranged (installed) on the work deck 3. The operation panel 6 is disposed above a given handrail 32 in order to perform operations such as raising and lowering the working deck 3 (the location is not particularly limited as long as it is easy for the worker S to operate). The transformer 7 is disposed above the handrail 32, similar to the operation panel 6. The arrangement of the inverter 9 and the sine filter 10 will be described later.
[0030] 2, reference numeral 8 denotes an ascending staircase. This ascending staircase 8 is used when a worker S gets on and off the working deck 3, and has stairs and handrails (reference numerals omitted). The stairs 8 are adapted to be used when the working deck 3 has been lowered to a predetermined position.
[0031] Next, the lifting system 1 will be described with reference to a front view, a plan view, and a side view. FIG. 6 is a front view showing an example of a twin-mast lifting system. FIG. 7 is a front view showing an example of a lifting system having a single mast. FIG. 8 is a plan view showing an example of a lifting system having twin masts. FIG. 9 is a plan view showing an example of a lifting system having a single mast. FIG. 10 is a side view of the working deck of FIGS.
[0032] In addition, the lifting system 1 in the example of Figures 6 to 9 is shown in a state in which the left-right length of the work deck 3 is shortened for convenience (as shown in Figure 1, the left-right length can be lengthened).
[0033] 6 and 8, in an example lifting system 1 in which the masts 2 are twin (two), three batteries 5 are arranged side by side on the left side of each mast 2, for example. In the lifting system 1 in FIG. 6 and FIG. 8, for example, the inverter 9 and the sine filter 10 are arranged side by side on the right side of each mast 2 (the sine filter 10 is arranged closer to the mast 2). It should be noted that the lifting system 1 in Figs. 6 and 8 is provided with a level adjustment device (not shown) that automatically adjusts the horizontal state when the working deck 3 is raised or lowered.
[0034] 7 and 9, in an example of the lifting system 1 having a single mast 2, three batteries 5 are arranged side by side on the left side of the mast 2, for example. In the lifting system 1 in FIG. 7 and FIG. 9, for example, the inverter 9 and the sine filter 10 are arranged side by side on the right side of the mast 2 (the sine filter 10 is arranged closer to the mast 2). In the lifting system 1 of FIG. 7 and FIG. 9, a transformer 7 is disposed to the left of the mast 2, and an operation panel 6 is disposed to the right of the mast 2.
[0035] In the above-described lifting system 1, the battery 5 is disposed at the end of the working deck 3 as shown in FIG. 9, so that the battery 5 does not get in the way of the worker S (see FIG. 1) and sufficient work movement can be ensured.
[0036] Next, electrical paths that can be employed in the lifting system 1 will be described with reference to FIGS. FIG. 11 is a diagram showing an example of an electrical path (PLAN A) of the lifting system. FIG. 12 is a diagram showing an example of an electrical path (PLAN B) of the lifting system. FIG. 13 is a diagram showing an example of an electrical path (PLAN C) of the lifting system. FIG. 14 is a diagram showing an example of an electrical path (PLAN D) of the lifting system.
[0037] PLAN A shown in FIG. 11 adopts a route in which battery 5 is charged with single-phase 100V. Such a route PLAN A shown in FIG. 11 has the advantage that it can be operated in the commonly used so-called "outlet" shape. Another advantage of PLAN A is that it does not require construction work to lay 200V cables. In addition, under PLAN A, electrical equipment such as connectors will be general-purpose equipment, which has the advantage of being inexpensive.
[0038] PLAN B shown in FIG. 12 employs a route in which battery 5 is charged with single-phase 200V. In PLAN B of the route shown in Figure 12, it is expected that it will be possible to make a contract for less than 50kWh by making electricity contracts for both 100V and 200V. The advantage of making a low-voltage electricity contract is that the management costs, equipment costs, and electricity usage will be cheaper. In addition, PLAN B requires construction work for single-phase 200V wiring, but in recent years, the number of air conditioners and other devices that use single-phase 200V has been increasing, so this has the advantage that the construction work mentioned above is relatively easy. In addition, PLAN B has the advantage that the charging time is shorter compared to 100V (compared to PLAN A). In addition, PLAN B has the advantage of allowing charging at night, thereby reducing peak daytime power consumption by shortening charging time.
[0039] PLAN C shown in FIG. 13 employs a route in which the battery 5 is charged using three power sources. PLAN C having such a route as shown in FIG. 13 has the same advantages as PLAN A described above. In addition, PLAN C has the advantage of being able to shorten charging times compared to the above-mentioned PLAN A.
[0040] PLAN D shown in FIG. 14 employs a route in which two batteries 5 are prepared and the batteries 5 are charged with a single-phase 100V. PLAN D, which has a route as shown in FIG. 14, has the same advantages as PLAN A described above. In addition, PLAN D has the advantage that it can be used daily by switching between the two batteries 5.
[0041] Now, with reference to FIG. 15, a cable-type lifting system will be described as a comparative example. FIG. 15 is a schematic diagram of a cable-type lifting system as a comparative example.
[0042] In FIG. 15, a lifting system 101 as a comparative example is a lifting type scaffolding used for maintenance, inspection, repair work, etc. of the exterior walls of a building such as an apartment building M, as described above. The lifting system 101 is configured to include two masts 102 and a work deck 103. The lifting system 101 includes a drive unit (see the drive unit 4 in FIG. 2) disposed on the working deck 103. This drive unit is supplied with power from the ground via a cable CA. One end of the cable CA is connected to the drive device, and the other end is connected to a power source (three-phase 200V power source) (not shown) installed on the ground. When the working deck 103 is raised by the drive device, the cable CA is pulled out from a cable pot CAP installed on the ground G. As the working deck 103 rises, the cable CA is in a state of being suspended from the working deck 103 (it is not in a taut state, so it hangs in a manner that causes it to sway when the wind blows).
[0043] Comparing the lifting system 101 as such a comparative example with the above-described lifting system 1 of this embodiment, the lifting system 1 of this embodiment has advantages as shown in FIG. FIG. 16 is a diagram showing a comparison result between this embodiment and the comparative example of FIG. 15 with regard to the lifting system. Specifically, it shows the results of comparison compiled separately for users of the system and for companies that own the system.
[0044] In FIG. 16, the comparative example lift system 101 has problems such as (1) "requires construction to lay three-phase 200V electrical wiring," "requires nine or more drive devices to receive high voltage from a three-phase power source," and "has high running costs for cubicles, regular inspections, and other costs." In contrast, the lifting system 1 of this embodiment can solve the problem (1) and has the advantages of "only needing to draw single-phase 100V or single-phase 200V to the charger," "up to 16 drive units can receive low-voltage power," and "no cubicles or other equipment is required."
[0045] Furthermore, the lifting system 101 of the comparative example has the problem (2) that "the weight of the cable itself affects the lifting function capacity." In contrast, the lifting system 1 of the present embodiment can solve the problem (2) and has the advantage of being "only the weight of the battery device itself."
[0046] In addition, the comparative example lifting system 101 has the following problem: (3) "Since the cables move up and down, they may rub against each other and break. In addition, they need to be replaced frequently, and are greatly affected by rising material costs." In contrast, the lifting system 1 of the present embodiment can solve the problem (3) and has the advantage that "there is no need to replace the cable."
[0047] Moreover, the lifting system 101 of the comparative example has a problem (4) that "when a wire is broken, construction work is stopped, causing a delay in the process." In contrast, the lift system 1 of this embodiment can solve the problem (4), and has the advantage of eliminating the need to worry about construction delays due to wire breaks.
[0048] Furthermore, the lifting system 101 of the comparative example has a problem of (5) "constantly monitoring whether the cable becomes tangled during lifting." In contrast, the lifting system 1 of this embodiment can solve the problem of (5), and has the advantage that "there is no need to monitor the cables. There is no need to worry. The battery device can be placed on the floor, so it can be safely inspected in the unlikely event of a problem."
[0049] Furthermore, the lifting system 101 of the comparative example has a problem (6) that "the cable may flap and interfere with the repaired structure." In contrast, the lifting system 1 of the present embodiment can solve the problem (6) and has the advantage of being "worried-free."
[0050] Furthermore, the lifting system 101 of the comparative example has the problem (7) that "there is a possibility of electric leakage due to water ingress into the cable joint." In contrast, the lifting system 1 of this embodiment can solve the problem (7) and has the advantage of "improving IP performance since there is no need to insert or remove the cable joint."
[0051] Moreover, the lifting system 101 of the comparative example has the problem (8) that "strict care is required during transportation." In contrast, the lifting system 1 of this embodiment can solve the problem (8) and has the advantage that "there is no need to worry because it is an iron box."
[0052] In addition, the lifting system 101 of the comparative example has the following disadvantages: (9) it is not stackable and the transportation cost (volume) is high (approximately 1 m 3 / set)" In contrast, the lifting system 1 of the present embodiment can solve the problem (9) and has the advantage of being "stackable."
[0053] Furthermore, the lifting system 101 of the comparative example has a problem (10) that "the location where the cable pot (winding part) can be installed on-site is limited." In contrast, the lifting system 1 of the present embodiment can solve the problem (10) and has the advantage of being "worried-free."
[0054] Furthermore, the lifting system 101 of the comparative example has a problem such as (11) that "electricity consumption during the day is large." In contrast, the lifting system 1 of this embodiment can solve the problem (11), and has the advantages of "reducing the peak of daytime power consumption by charging at night, and contributing to the SDGs by using surplus power generated at night."
[0055] Furthermore, the lifting system 101 of the comparative example has the problem of (12) "inventory management is based on the length of use, and there are many types." In contrast, the lifting system 1 of this embodiment can solve the problem (12), and has the advantages of "simplification and reduced management costs. No need to purchase cables."
[0056] Furthermore, the lifting system 101 of the comparative example has a problem (13) that "the cable needs to be replaced every few years due to deterioration over time." In contrast, the lifting system 1 of this embodiment can solve the problem (13), and has the advantage of "no need to replace cables. No need to purchase cables contributes to the SDGs."
[0057] Therefore, compared to the conventional method, the lifting system 1 of this embodiment can greatly reduce running costs and management costs for both the user and the equipment-owning company. Furthermore, according to the lifting system 1 of this embodiment, since the drive unit 4 and the battery 5 are arranged on the work deck 3, no cables are needed and they do not hang down, thereby eliminating interference with structures, etc.
[0058] Although one embodiment of the present invention has been described above, the present invention is not limited to the above-described embodiment, and modifications, improvements, etc. within the scope that can achieve the object of the present invention are considered to be included in the present invention.
[0059] Although not specifically described in the above embodiment, information from cameras, anemometers, etc. is transmitted to a server to monitor the work environment. The remaining charge of the battery 5 is also monitored.
[0060] In summary, the lifting system to which the present invention is applied is sufficient as long as it has the following configuration, and can take on a variety of different embodiments. That is, the lifting system to which the present invention is applied (for example, the lifting system 1 shown in FIGS. 1 and 2 and FIGS. 6 to 10 ) has the following features: A column member (e.g., mast 2 in FIG. 2) extending in the vertical direction (the direction of the arrows V1 and V2 in FIG. 1) of a structure (e.g., apartment M in FIG. 1), A work deck (e.g., work deck 3 in FIG. 2) is attached to the column member, extends in the left-right direction (direction perpendicular to the arrows V1 and V2 in FIG. 1) with respect to the column member, and allows a worker (e.g., worker S in FIG. 1) to work thereon; Equipped with The working deck includes: A drive device (e.g., drive device 4 in FIG. 2) that generates a driving force by electricity to raise and lower the working deck in the vertical direction; a battery (e.g., battery 5 in FIGS. 6 to 10) that supplies the power to the driving device; are located, This will be enough.
[0061] Thus, according to the lifting system to which the present invention is applied, the battery that supplies power to the drive unit is located on the work deck together with the drive unit, so no cables are needed and they do not dangle, thereby eliminating interference with structures, etc. Moreover, the lifting system to which the present invention is applied can have various advantages as described with reference to FIG.
[0062] Moreover, according to the lifting system to which the present invention is applied, The battery is configured to be rechargeable (e.g., charged by the charger in FIG. 11) from a commercial AC power source (e.g., single-phase 100 V in FIG. 11). It is preferable. In this way, by employing a battery that is configured to be rechargeable from a commercial AC power source, it is possible to achieve, for example, cost reduction.
[0063] Moreover, according to the lifting system to which the present invention is applied, The working deck has a mechanism for lowering the working deck by a method that does not use the driving force of the driving device (the above-mentioned manual lowering mechanism, not shown in particular), It is preferable. In this way, since the device has a mechanism for lowering the working deck without using the driving force of the drive device, it is possible to deal with, for example, a malfunction or dead battery.
[0064] Moreover, according to the lifting system to which the present invention is applied, The battery is disposed near the driving device (for example, on the scaffold board 311 closest to the driving device 4 as shown in FIG. 6). It is preferred. In this way, by locating the battery close to the drive unit, it is possible to shorten the length of wiring and the distance that needs to be traveled on the work deck when the battery is removed for charging. [Explanation of symbols]
[0065] 1. Lifting system 2. Mast 3. Working deck 4. Drive unit 5. Battery 6...Operation panel 7. Transformer 8. Stairs 9. Inverter 10...sine filter 21...legs 22 Mast body 23. Top Mast 31. Deck body 32 Handrail 33 Mast enclosure 34 Drive unit installation section 41 Rack gear 42 Pinion gear 221...post 222 Horizontal connecting member 223... Bracing 311···Scaffolding board 312 Short side support member 313... Longitudinal support member 314...Longitudinal support member 315...Connecting member G...ground M···Mansion S... Worker CA···Cable
Claims
1. A column member extending along the vertical direction of the structure; a work deck attached to the pillar member, extending in the left-right direction relative to the pillar member, on which an operator can work; Equipped with The working deck includes: A drive device that generates a driving force using electricity to raise and lower the working deck in the vertical direction; a battery for supplying the power to the drive device; are located, Lifting system.
2. The battery has a configuration capable of being charged from a commercial AC power source. The lifting system of claim 1 .
3. The working deck has a mechanism for lowering the working deck by a method that does not use the driving force of the driving device. The lifting system of claim 1 .
4. The battery is disposed near the drive unit. The lifting system of claim 1 .
Citation Information
Patent Citations
Lift for construction
JP1999092059A
Manual braking device in elevating / lowering scaffolds
JP2012026093A
Elevation type scaffold device
JP2012184636A
Elevating scaffold device
JP2013234553A
Mast Climber
US20210362980A1