Operation management device, operation management system, operation adjustment method, and operation adjustment program

The traffic management system optimizes train schedules based on demand forecasts to enhance efficiency by adjusting train frequency and capacity, addressing the inefficiencies in existing technologies.

JP2024172525APending Publication Date: 2024-12-12MITSUBISHI ELECTRIC CORP

Patent Information

Application Number
JP2023090302
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-31
Publication Date
2024-12-12

AI Technical Summary

Technical Problem

Existing technologies struggle to improve train operation efficiency in railway networks by effectively utilizing trains with reduced frequency during low passenger demand periods.

Method used

A traffic management system that predicts passenger and freight demand using data acquisition, forecasting, and adjustment units to create an implementation timetable that adjusts train operations based on demand forecasts, allowing for increased or reduced train frequency and capacity.

Benefits of technology

Improves train operation efficiency by optimizing train schedules to match demand, reducing congestion and enhancing operational efficiency in railway networks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024172525000001_ABST
    Figure 2024172525000001_ABST
Patent Text Reader

Abstract

To provide an operation management device which enables improvement in operation efficiency of trains in a railway network.SOLUTION: An operation management device 1A comprises: a data acquisition unit 11 that acquires passenger data indicating a passenger boarding demand for a train 6 operated on a railroad and freight data indicating a freight transportation demand by the train 6; a demand prediction unit 12 that creates, on the basis of the passenger data and the freight data, passenger demand prediction data indicating a result of prediction of passenger future boarding demand for the train 6 and freight demand prediction data indicating a result of prediction of freight future transportation demand for the train 6; and an operation adjustment unit 13 that creates, on the basis of the passenger demand prediction data, the freight demand prediction data, and a basic schedule that is a basic for an operation plan of the train 6, an implementation schedule indicating an operation plan adjusted from the basic schedule.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a traffic management device, a traffic management system, a traffic adjustment method, and a traffic adjustment program for managing train operations. [Background technology]

[0002] There is a known technology for grasping the passenger demand for rail transport and adjusting train operation plans. Patent Document 1 discloses a vehicle control device that identifies the required transportation volume for each time period for each station based on information related to the past operation of trains, and determines the number of train configurations for each time period so that the train operation interval is always equal to or less than the minimum operation interval. According to the technology of Patent Document 1, by adjusting the number of train operations or the number of train configurations according to the passenger demand, it is possible to improve the operation efficiency of trains without impairing passenger convenience. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2015-182653 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, the technology disclosed in Patent Document 1 has the problem that it is difficult to improve the operating efficiency of trains on the railway network because it is not possible to effectively utilize reduced train services during times when there are fewer passengers.

[0005] The present disclosure has been made in consideration of the above, and aims to provide a traffic management device that enables improvement of train operation efficiency in a railway network. [Means for solving the problem]

[0006] In order to solve the above-mentioned problems and achieve the objectives, the operation management device disclosed herein comprises a data acquisition unit that acquires passenger data indicating passenger demand for trains operated by railways and cargo data indicating demand for transporting cargo by trains, a demand prediction unit that creates passenger demand forecast data, which is a result of predicting future passenger demand for trains, and cargo demand forecast data, which is a result of predicting future demand for transporting cargo by trains, based on the passenger data and the cargo data, and an operation adjustment unit that creates an implementation timetable, which is an operation plan adjusted from the basic timetable, based on the passenger demand forecast data, the cargo demand forecast data, and a basic timetable, which is the basis for train operation plans. Effect of the Invention

[0007] The traffic management device according to the present disclosure has an effect of improving the operation efficiency of trains on a railway network. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a diagram showing a configuration example of a traffic management device according to a first embodiment; [Diagram 2] FIG. 1 is a diagram for explaining a basic bus schedule created by a bus schedule creation unit of the traffic management device according to the first embodiment. [Diagram 3] FIG. 1 is a diagram showing an example of information included in a basic schedule created by a bus schedule creation unit of the traffic management device according to the first embodiment. [Figure 4] FIG. 1 is a diagram showing an example of passenger data stored in a passenger information database of the traffic management device according to the first embodiment; [Diagram 5] FIG. 1 is a diagram showing an example of cargo data stored in a cargo information database of the traffic management device according to the first embodiment; [Figure 6] FIG. 1 is a diagram showing an example of passenger demand forecast data created by a demand forecast unit of the traffic management device according to the first embodiment; [Figure 7] FIG. 1 is a diagram showing an example of freight demand forecast data generated by a demand forecast unit of the traffic management device according to the first embodiment; [Figure 8]FIG. 1 is a diagram for explaining an overview of adjustment of a basic schedule by a traffic control unit of a traffic management device according to a first embodiment; [Figure 9] FIG. 1 is a diagram for explaining a first example of adjustment of a basic schedule by a traffic control unit of the traffic management device according to the first embodiment; [Figure 10] FIG. 4 is a diagram for explaining a second example of adjustment of a basic schedule by the traffic adjustment unit of the traffic management device according to the first embodiment; [Figure 11] 1 is a flowchart showing a procedure of a process performed by the traffic management device according to the first embodiment. [Figure 12] 1 is a flowchart showing a procedure of a process performed by a traffic control unit of the traffic management device according to the first embodiment. [Figure 13] A flowchart showing a procedure of a process in a passenger adjustment mode of a traffic control unit included in the traffic control device according to the first embodiment. [Figure 14] A flowchart showing a procedure of processing in an increased service mode of a service adjustment unit included in the service management device according to the first embodiment. [Figure 15] A flowchart showing a procedure of processing in a reduced service mode of a service adjustment unit included in the service management device according to the first embodiment. [Figure 16] A flowchart showing a procedure of processing in a freight planning mode of a traffic control unit of the traffic control device according to the first embodiment. [Figure 17] FIG. 13 is a diagram showing a configuration example of a traffic control system according to a second embodiment; [Figure 18] FIG. 13 is a diagram showing a configuration example of a traffic control system according to a third embodiment; [Figure 19] FIG. 13 is a diagram showing a configuration example of a traffic control system according to a fourth embodiment; [Figure 20] FIG. 13 is a diagram for explaining allocation of passenger vehicles and freight vehicles by the traffic management device according to the fifth embodiment. [Figure 21] A flowchart showing a procedure of processing in a freight planning mode of a traffic control unit of a traffic management device according to a fifth embodiment. [Figure 22]FIG. 23 is a diagram for explaining the readjustment of a passenger schedule by the traffic management device according to the sixth embodiment. [Figure 23] A flowchart showing a procedure of a process performed by a traffic control unit of a traffic management device according to a sixth embodiment. [Figure 24] A flowchart showing a procedure of a process in a passenger adjustment mode of a traffic control unit of a traffic management device according to a sixth embodiment. [Diagram 25] FIG. 1 is a diagram showing a first example of a hardware configuration for implementing a traffic management device according to the first to sixth embodiments. [Figure 26] FIG. 2 is a diagram showing a second example of a hardware configuration for implementing the traffic management device according to the first to sixth embodiments. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, a traffic management device, a traffic management system, a traffic adjustment method, and a traffic adjustment program according to embodiments will be described in detail with reference to the drawings.

[0010] Embodiment 1 Fig. 1 is a diagram showing an example of the configuration of a traffic management device 1A according to a first embodiment. The traffic management device 1A manages the operation of a plurality of trains 6 on a railway. One of the plurality of trains 6 is shown in Fig. 1. The traffic management device 1A creates a timetable for realizing the transportation of passengers and cargo by the plurality of trains 6, and manages the operation of the plurality of trains 6 based on the timetable.

[0011] The fleet management device 1A is configured, for example, by one or more cloud servers. The cloud server is a server constructed in a cloud environment including computer resources provided by a cloud service platform. The fleet management device 1A may be a server other than a cloud server, for example, an on-premise server.

[0012] The information terminal 7 is installed at a station or the like where the train 6 departs and arrives. Information about cargo transportation is input to the information terminal 7 by station staff, a transport requester, or the like. It is assumed that there are a plurality of information terminals 7 into which information about cargo transportation is input. One of the plurality of information terminals 7 is shown in FIG. 1.

[0013] Each of the multiple trains 6 and each of the multiple information terminals 7 are communicatively connected to the traffic management device 1A via a network, and transmit and receive information to and from the traffic management device 1A. The network is, for example, a wide area network (WAN) such as the Internet, but may also be a local area network (LAN).

[0014] Each of the plurality of trains 6 transmits passenger data indicating passenger riding demand to the traffic management device 1A. Each of the plurality of information terminals 7 transmits cargo data indicating demand for cargo transportation by the trains 6 to the traffic management device 1A. In addition, reservation information, which is information regarding reservations for cargo transportation, is input to each of the plurality of information terminals 7. Each of the plurality of information terminals 7 transmits cargo data including the reservation information to the traffic management device 1A.

[0015] The traffic management device 1A includes a data acquisition unit 11, a demand prediction unit 12, a traffic adjustment unit 13, a traffic schedule creation unit 14, and a memory unit 15. The memory unit 15 stores four databases, namely, a passenger information database, a cargo information database, a demand prediction database, and a traffic schedule database. In FIG. 1, the databases are represented as DB (Data Base). The same applies to FIG. 2 and subsequent figures. In FIG. 1, four databases are stored in one memory unit 15, but the traffic management device 1A may include a memory unit for each database.

[0016] The data acquisition unit 11 acquires passenger data indicating passenger demand for trains 6 operated by railroads, and freight data indicating demand for freight transport by trains 6. Passenger data transmitted from each of the multiple trains 6 to the traffic management device 1A is input to the data acquisition unit 11. In addition, freight data transmitted from each of the multiple information terminals 7 to the traffic management device 1A is input to the data acquisition unit 11. The data acquisition unit 11 stores the acquired passenger data in a passenger information database. The data acquisition unit 11 stores the acquired freight data in a freight information database.

[0017] The demand forecasting unit 12 creates passenger demand forecast data, which is a result of predicting future passenger boarding demand for trains 6, and cargo demand forecast data, which is a result of predicting future cargo transport demand for trains 6, based on the passenger data and the cargo data. The demand forecasting unit 12 reads passenger data from the passenger information database. The demand forecasting unit 12 reads cargo data from the cargo information database. The demand forecasting unit 12 predicts boarding demand for each time period based on the passenger data, and creates passenger demand forecast data. The demand forecasting unit 12 predicts transport demand for each time period based on the cargo data, and creates cargo demand forecast data. The demand forecasting unit 12 saves the created passenger demand forecast data and the created cargo demand forecast data in the demand forecast database.

[0018] The operation coordination unit 13 creates an implementation timetable, which is an operation plan adjusted from the basic timetable, based on passenger demand forecast data, freight demand forecast data, and a basic timetable, which is the basis for the operation plan of trains 6. The operation coordination unit 13 reads out passenger demand forecast data and freight demand forecast data from the demand forecast database. The operation coordination unit 13 reads out the basic timetable from the operation timetable database. The operation coordination unit 13 creates a passenger timetable, which is an operation plan for the transportation of passengers by trains 6, based on the passenger demand forecast data and the basic timetable. In addition, the operation coordination unit 13 creates an implementation timetable, which is an operation plan including the transportation of passengers by trains 6 and the transportation of freight by trains 6, based on the passenger timetable and freight demand forecast data. The operation coordination unit 13 saves the created implementation timetable in the operation timetable database.

[0019] The bus schedule creation unit 14 creates a basic schedule. The bus schedule creation unit 14 creates a basic schedule for one or more routes that are the subject of operation by the traffic management device 1A. The basic schedule includes an inbound schedule and a outbound schedule for each route. The basic schedule also includes a weekday schedule and a holiday schedule. The bus schedule creation unit 14 may create the basic schedule automatically, or may create the basic schedule according to the operation of an operator who operates the traffic management device 1A. The bus schedule creation unit 14 saves the created bus schedule in a bus schedule database.

[0020] FIG. 2 is a diagram for explaining the basic timetable created by the bus schedule creation unit 14 of the traffic management device 1A according to the first embodiment. FIG. 2 shows a simplified example of the basic timetable. In the basic timetable shown in FIG. 2, the names of stations where the train 6 stops are arranged vertically. In the basic timetable shown in FIG. 2, the direction from left to right represents the progression of time. In the basic timetable shown in FIG. 2, the position of the train 6 at each time is represented by a line indicated by a broken line.

[0021] The basic timetable created by the operation timetable creation unit 14 includes a timetable for regular trains, a timetable for special trains, and a timetable for regular trains that can be suspended. A regular train refers to a train 6 that is operated regardless of whether the service is increased or decreased. In FIG. 2, the timetable for regular trains is shown by a solid line. A special train refers to a train 6 that is not operated during normal times when the service is not increased or decreased, and is operated additionally when the service is increased. In FIG. 2, the timetable for special trains is shown by a dashed line. A regular train that can be suspended is a train 6 that is operated during normal times, and can be suspended when the service is reduced. In FIG. 2, the timetable for regular trains that can be suspended is shown by a dashed line. In this way, the basic timetable includes an operation plan for a regular train that is an additional train 6 that is operated when the service is increased, and an operation plan for a regular train that can be suspended, which is a train 6 that can be canceled when the service is reduced. Information indicating whether the train 6 is a regular train, a special train, or a regular train that can be canceled is linked to the schedule of each train 6. In the following description, the information indicating whether the train 6 is a regular train, a special train, or a regular train that can be canceled is also referred to as train type information.

[0022] The trains 6 operated by the traffic management device 1A may include trains 6 used only for transporting passengers, i.e., passenger-only trains 6, and trains 6 used only for transporting cargo, i.e., freight-only trains 6. The trains 6 operated by the traffic management device 1A may include trains 6 that can be used for transporting passengers and cargo, i.e., trains 6 capable of mixed cargo and passenger transport. In FIG. 2, the lines of the passenger-only trains 6, which are trains 6 used only for transporting passengers, are marked with triangles. The lines of each train 6 are associated with information indicating whether the train 6 is a passenger-only train 6, a freight-only train 6, or a train 6 capable of mixed cargo and passenger transport. In the following description, the information indicating whether the train 6 is a passenger-only train 6, a freight-only train 6, or a train 6 capable of mixed cargo and passenger transport is also referred to as train use information.

[0023] Furthermore, in the basic schedule created by the bus schedule creation unit 14, whether or not the number of cars constituting the train 6 can be changed is set for each train 6. Information indicating whether or not the number of cars can be changed is linked to the route of each train 6. In the following description, the information indicating whether or not the number of cars can be changed is also referred to as car number change information.

[0024] As a property of the basic timetable, it is desirable that the number of trains 6 that can be suspended is small, from the viewpoint of passenger convenience or the inclusion of the timetable in the timetable. The traffic management device 1A reduces the number of trains 6 that can be suspended, and when reducing transportation capacity, adjusts by reducing the number of cars. Alternatively, the traffic management device 1A may reduce the number of regular trains and actively set special trains. When setting trains 6 that can be suspended, trains 6 that are determined to have a small impact on passengers are given priority as trains 6 that can be suspended.

[0025] For example, when there is a periodic demand for transporting freight, the bus schedule creation unit 14 may include the periodic operation of the freight train 6 in the basic bus schedule. The bus schedule creation unit 14 may adjust the operation of the freight train 6 in response to changes in the transport demand.

[0026] When the number of cars used in trains 6 is fixed, the traffic management device 1A creates a basic timetable with the fixed number of cars, and adjusts the transportation capacity by adjusting the number of trains 6 in operation. When the number of cars used in trains 6 is changeable, the traffic management device 1A can adjust the transportation capacity by adjusting the number of trains 6 in operation and the number of cars.

[0027] An example of information constituting the basic schedule will now be described. Fig. 3 is a diagram showing an example of information included in the basic schedule created by the bus schedule creation unit 14 of the traffic management device 1A according to the first embodiment.

[0028] The basic timetable includes information on the following items: operation date, train number, departure station, departure time, arrival station, arrival time, and vehicle used, as well as attribute information. The operation date item indicates the day on which train 6 is operated. The train number item indicates the train number, which is the identifier for train 6. The departure station item indicates the name of the station from which train 6 departs. The departure time item indicates the time at which train 6 departs from the departure station. The arrival station item indicates the name of the station at which train 6 arrives. The vehicle used item indicates the number of vehicles used for train 6. The attribute information includes train type information, vehicle number change information, and train purpose information.

[0029] The basic timetable includes, for each train 6, information on all inter-station routes that the train 6 runs between. Each row in the table shown in FIG. 3 represents information on an inter-station basis for each train 6. For example, the top row in the table shown in FIG. 3 shows information on the route between stations A and B for train 6 with train number "M0001". The row also shows that the train 6 runs all day, that the departure time from station A is 8:00, and the arrival time at station B is 8:05, and that the number of cars is four. The attribute information also shows that the train 6 is a regular train, that the number of cars can be changed, and that it cannot be used for freight transport.

[0030] As shown in FIG. 3, the basic timetable includes an operation plan for trains 6 that are to be operated additionally when the service is increased, and an operation plan for trains 6 that can be canceled when the service is reduced. The basic timetable is linked to train type information, which is information indicating whether a train is a regular train, a special train, or a regular train that can be canceled. The basic timetable is also linked to number of cars change information, which is information indicating whether the number of cars that make up the train 6 can be changed. The basic timetable is also linked to train use information, which is information indicating whether the train 6 can be used to transport cargo.

[0031] The number of cars change information may include information indicating the number of cars that can be set. For example, when 2 cars, 4 cars, and 6 cars are set as the number of cars that can be set, the number of cars of the train 6 can be changed between 2 cars, 4 cars, and 6 cars. The information constituting the basic timetable is not limited to the information of the items shown in FIG. 3. The information items constituting the basic timetable may include items other than the items shown in FIG. 3.

[0032] 4 is a diagram showing an example of passenger data stored in the passenger information database of the traffic management device 1A according to the first embodiment. The passenger data includes information on each of the items of date, train number, departure station, departure time, arrival station, arrival time, and number of passengers. The passenger data is data on trains 6 that have actually been operated.

[0033] The date field indicates the date that train 6 was operated. The train number field indicates the train number of train 6 that was operated. The departure station field indicates the name of the station from which train 6 that was operated departed. The departure time field indicates the time when train 6 departed from the departure station. The arrival station field indicates the name of the station at which train 6 that was operated arrived. The arrival time field indicates the time when train 6 arrived at the arrival station. The number of passengers field indicates the number of passengers who boarded train 6 between the departure station and the arrival station. The number of passengers field indicates the passenger boarding demand between stations.

[0034] The passenger data includes information about all the stations between which the train 6 traveled for each train 6 that was actually operated. Each row in the table shown in FIG. 4 represents information between stations for each train 6. For example, the first row from the top of the table shown in FIG. 4 shows information between stations A and B for train 6 with train number "M0001". The row also shows that the operation date of the train 6 was October 1, 2022, the departure time from station A was 8:00:00, and the arrival time at station B was 8:05:00, and the number of passengers on the train 6 was 134.

[0035] Information included in the passenger data is not limited to the items shown in FIG. 4. Items other than those shown in FIG. 4 may be included in the information items included in the passenger data. For example, if information on the number of passengers in each car of the train 6 can be acquired, the passenger data may include information on the number of passengers in each car. If even one of the cars in the train 6 is highly crowded, the train 6 is more likely to be delayed. Therefore, the traffic management device 1A may estimate the cause of the delay from information on the number of passengers in each car. Furthermore, if information indicating the number of people passing through the ticket gates of a station can be acquired, the passenger data may include information indicating the number of people passing through the ticket gates. The traffic management device 1A may estimate the flow of people between stations from the information.

[0036] FIG. 5 is a diagram showing an example of cargo data stored in the cargo information database of the traffic management device 1A according to the first embodiment. The cargo data includes information on each of the items of data classification, reception date and time, transportation deadline, departure station, departure date and time, arrival station, arrival date and time, classification, and content. The cargo data includes data on cargo that has actually been transported and reservation information data. The data classification item indicates whether the data is data on the actual transportation performance or data on the reservation for transportation. The reception date and time item indicates the date and time when the cargo was received for transportation, or the date and time when the cargo is scheduled to be received for transportation. The transportation deadline item indicates the date and time that is the transportation deadline of the cargo. The departure station item indicates the name of the station where the cargo is loaded onto the train 6. The departure date and time item indicates the time when the train 6 departs from the departure station. The arrival station item indicates the name of the station where the cargo is unloaded from the train 6. The arrival date and time item indicates the time when the train 6 arrives at the arrival station. The classification item indicates the classification of the cargo. The content item indicates the content of the cargo.

[0037] The freight data includes, for each train 6, information on all freight transported by the train 6. Each row of the table shown in FIG. 5 represents information on a freight unit. For example, the first row from the top of the table shown in FIG. 5 shows information on freight that has actually been transported and is classified as "ordinary" and has the content of "home delivery". The row also shows that the date and time when the freight was accepted for transportation was 8:30 on October 1, 2022, and the transportation deadline of the freight was October 3, 2022. The row also shows that the station where the freight was loaded onto the train 6 was Station A, the date and time when the train 6 departed from Station A was 15:00 on October 2, 2022, the station where the freight was unloaded from the train 6 was Station C, and the date and time when the train 6 arrived at Station C was 15:30 on October 2, 2022.

[0038] In addition, for the reservation information data, the information on the departure date and time and the information on the arrival date and time are both left blank. The information included in the cargo data is not limited to the items shown in Fig. 5. The information items included in the cargo data may include items other than the items shown in Fig. 5.

[0039] FIG. 6 is a diagram showing an example of passenger demand forecast data created by the demand forecast unit 12 of the traffic management device 1A according to the first embodiment. FIG. 6 shows an example of passenger demand forecast data between station A and station B. FIG. 6 shows a graph showing the relationship between the average number of passengers of each train 6 and time, and shows a graph of a reference value and a graph of a predicted value. The reference value is a value that is a reference for the average number of passengers and is used when estimating passenger demand. The reference value is calculated, for example, based on the actual number of passengers in the most recent year. The predicted value is the value of the average number of passengers predicted by the demand forecast unit 12. In FIG. 6, the vertical axis represents the average number of passengers of each train 6, and the horizontal axis represents time. In the example shown in FIG. 6, the predicted value is close to the reference value in the early morning time zone and the night time zone, and a deviation between the predicted value and the reference value is observed in other time zones.

[0040] The demand forecasting unit 12 forecasts passenger demand for the next day, for example, once a day. The demand forecasting unit 12 forecasts passenger demand for each station and creates passenger demand forecast data for each station. The demand forecasting unit 12 creates passenger demand forecast data for all stations between which trains 6 run. The passenger demand forecast data created by the demand forecasting unit 12 for all stations is accumulated in a demand forecast database.

[0041] As an example, the demand forecasting unit 12 creates passenger demand forecast data by predicting future passenger demand using artificial intelligence (AI). The demand forecasting unit 12 may predict future passenger demand using passenger data and a trained model that has learned the passenger data and the passenger demand forecasting data. For predicting passenger demand, data on the number of passengers boarding and alighting at each station of each train 6 may be used, or OD (Origin-Destination) data may be used. The OD data is data showing the passenger demand from the departure point to the destination for each unit time. The unit time of the OD data is arbitrary. The demand forecasting unit 12 may obtain the number of passengers boarding and alighting at each station from the passenger data. In the example shown in FIG. 6, the passenger demand forecasting data created by the demand forecasting unit 12 is data on the average number of passengers boarding. The passenger demand forecasting data created by the demand forecasting unit 12 may be data on the number of passengers boarding and alighting at each station.

[0042] The trained model for predicting future passenger demand may be generated by learning information about events that affect passenger flow, passenger data, and passenger demand forecast data. In this case, the demand forecasting unit 12 predicts future passenger demand using passenger data, information about future events that are expected to affect passenger flow, and the trained model. An example of an event that affects passenger flow is the holding of an event that attracts many people. By including information about events that affect passenger flow in the learning, the demand forecasting unit 12 can predict future passenger demand with even higher accuracy.

[0043] Fig. 7 is a diagram showing an example of freight demand forecast data created by the demand forecast unit 12 of the traffic management device 1A according to the first embodiment. Fig. 7 shows an example of freight demand forecast data between station A and station B. Fig. 7 shows a graph showing the relationship between the predicted value of the number of freights to be loaded onto a train 6 heading from station A to station B and the day. In Fig. 7, the vertical axis represents the number of freights, and the horizontal axis represents the day.

[0044] The demand forecasting unit 12 forecasts transportation demand for each station and creates freight demand forecast data for each station. The demand forecasting unit 12 creates freight demand forecast data for all stations between which trains 6 run. The freight demand forecast data for all stations created by the demand forecasting unit 12 is stored in a demand forecast database.

[0045] As an example, the demand forecasting unit 12 creates cargo demand forecast data by forecasting future transportation demand using AI. The demand forecasting unit 12 may forecast future transportation demand using cargo data and a trained model trained on the cargo data and the cargo demand forecast data.

[0046] In addition, since freight can be kept at a station or the like for transportation, it can be said that the freight transportation demand is less immediate than the passenger boarding demand. For this reason, in the example shown in FIG. 7, data on the number of freight transported per day is used as freight demand forecast data. The data on the number of freight is not limited to daily data. In other words, the unit period for which the data on the number of freight is obtained is not limited to one day. The unit period may be longer or shorter than one day. In addition, the unit period may be changed depending on the classification of the freight or the contents of the freight. For example, for freight with a short transportation deadline such as fresh goods, the unit period may be shorter than one day, and for other freight, the unit period may be one day or longer.

[0047] Next, a description will be given of the creation of a passenger schedule by the operation adjustment unit 13. The operation adjustment unit 13 creates a passenger schedule by adjusting a basic schedule based on passenger demand forecast data.

[0048] Fig. 8 is a diagram for explaining an overview of adjustment of a basic schedule by the operation adjustment unit 13 of the operation management device 1A according to the first embodiment. Fig. 8 shows a graph similar to Fig. 6. In Fig. 8, in the part of the graph surrounded by a dashed frame 21, the predicted value exceeds the reference value. In Fig. 8, in the part of the graph surrounded by a dashed frame 22, the predicted value falls short of the reference value.

[0049] The operation adjustment unit 13 attempts to adjust the basic timetable to increase transportation capacity during the time period when the predicted value is higher than the reference value, since it is expected that trains 6 will be more crowded than usual. On the other hand, the operation adjustment unit 13 attempts to adjust the basic timetable to decrease transportation capacity during the time period when the predicted value is lower than the reference value, since it is expected that trains 6 will be less crowded than usual.

[0050] Fig. 9 is a diagram for explaining a first example of adjustment of a basic timetable by the operation adjustment unit 13 of the operation management device 1A according to the first embodiment. Fig. 9 shows an example of adjustment of a timetable when the transportation capacity is increased from the basic timetable. The operation adjustment unit 13 performs adjustment to increase the transportation capacity by increasing the number of trains 6 that are the subject of operation in the basic timetable, or by increasing the frequency of trains from the basic timetable. Increasing the number of trains means increasing the number of cars of the train 6. Increasing the frequency means increasing the number of trains 6 in operation.

[0051] For example, the timetable 23 shown in Fig. 9 is a basic timetable created by the train schedule creation unit 14. The portion of the timetable 23 enclosed by an oval 26 is the time period during which the predicted value of passenger demand exceeds a reference value. The timetable 24 shown in Fig. 9 is an example of a timetable in which an additional train has been added to the timetable 23. Two train routes 27 and 28 in the timetable 24 are included in the portion enclosed by the oval 26 in the timetable 23, and both are regular train routes.

[0052] For example, the operation adjustment unit 13 adjusts the number of cars of each train 6 of the two routes 27 and 28 to increase the number of cars. If the number of cars of the train 6 of each route 27 and 28 is two cars in the timetable 23, the operation adjustment unit 13 increases the number of cars of the train 6 of each route 27 and 28 to four cars in the timetable 24. Such an adjustment can be made when the number of cars change information indicating that the number of cars can be changed is linked to each of the two routes 27 and 28 in the timetable 23. In addition, if there is a limit to the number of cars that can be changed, the number of cars after the change is determined from the number of cars that can be changed. The operation management device 1A can alleviate congestion on the train 6 in accordance with the boarding demand by adjusting the number of cars to increase the number of cars.

[0053] The timetable 25 shown in FIG. 9 is an example of a timetable in which the number of trains has been increased from the timetable 23. One route 29 in the timetable 25 is a route included in the part surrounded by the ellipse 26 in the timetable 23, and is a route for a special train. For example, the operation adjustment unit 13 sets the special train of route 29 as a train 6 to be operated additionally to increase the number of trains. The operation adjustment unit 13 can set the special train, whose route exists in a part of the timetable 23 where the predicted value of the passenger demand exceeds a reference value, as a target for increasing the number of trains. The operation management device 1A can reduce congestion on the trains 6 in accordance with the passenger demand by adjusting to increase the number of trains 6 to be operated.

[0054] Fig. 10 is a diagram for explaining a second example of adjustment of the basic timetable by the operation adjustment unit 13 of the operation management device 1A according to the first embodiment. Fig. 10 shows an example of adjustment of the timetable when the transportation capacity is reduced from the basic timetable. The operation adjustment unit 13 performs adjustment to reduce the transportation capacity by reducing the number of trains 6 that are subject to operation in the basic timetable or by reducing the number of trains from the basic timetable. Reducing the number of trains means reducing the number of cars of the train 6. Reducing the number of trains means reducing the number of trains 6 in operation.

[0055] For example, the timetable 31 shown in FIG. 10 is a basic timetable created by the train schedule creation unit 14. The portion of the timetable 31 surrounded by an oval 34 is the time period during which the predicted value of passenger demand falls below a reference value. The timetable 32 shown in FIG. 10 is an example of a timetable in which a reduction in trains has been made from the timetable 31. Two routes 35 and 36 in the timetable 32 are routes included in the portion surrounded by the oval 34 in the timetable 31. Of these, route 35 is a route for regular trains that can be canceled. Route 36 is a route for regular trains that cannot be canceled.

[0056] For example, the operation adjustment unit 13 adjusts the number of cars for each train 6 of the two routes 35 and 36 to be reduced. If the number of cars for the trains 6 of each route 35 and 36 is four cars in the timetable 31, the operation adjustment unit 13 reduces the number of cars for the trains 6 of each route 35 and 36 to two cars in the timetable 32. Such an adjustment can be made when the number of cars change information indicating that the number of cars can be changed is linked to each of the two routes 35 and 36 in the timetable 31. In addition, if there is a limit to the number of cars that can be changed, the number of cars after the change is determined from the number of cars that can be changed. By adjusting the number of cars to be reduced, the operation management device 1A can make the operation of the train 6 more efficient in accordance with the passenger demand.

[0057] The timetable 33 shown in FIG. 10 is an example of a timetable in which the number of trains has been reduced from the timetable 31. One route 37 in the timetable 33 is included in the part surrounded by an oval 34 in the timetable 31, and is a route for a regular train that can be suspended. For example, the operation adjustment unit 13 sets the regular train on route 37 as a train 6 that is to be canceled in order to reduce the number of trains. The operation adjustment unit 13 can reduce the number of regular trains that can be suspended and whose routes exist in a part of the timetable 31 where the predicted value of the passenger demand is below a reference value. The operation management device 1A can make the operation of the trains 6 more efficient in accordance with the passenger demand by making an adjustment to reduce the number of trains 6 in operation.

[0058] In addition, in the time period when the predicted value of passenger demand falls below the reference value, if there is neither a train line linked with information on the number of cars change indicating that the number of cars can be changed nor a regular train line that can be suspended, the operation adjustment unit 13 can adjust the train 6 on which the passenger is riding to be a mixed cargo and passenger load. Such an adjustment can be made when train use information indicating that the train 6 can be used for transporting cargo is linked to the train line.

[0059] In this way, the operation adjustment unit 13 creates a passenger timetable by adjusting the basic timetable to increase or decrease the transport capacity. This allows the operation adjustment unit 13 to reduce congestion on the train 6 or improve the efficiency of the operation of the train 6 in accordance with passenger demand.

[0060] When passenger demand forecast data exceeds a reference value of passenger demand and there are multiple candidates for trains 6 to be increased in number of cars or frequency, the operation adjustment unit 13 may select a train 6 to be increased in number of cars or frequency from the multiple candidates based on an evaluation function that evaluates the effect of increasing the number of cars or frequency. When there are multiple special trains that can be increased in number of cars during a time period when the predicted passenger demand value exceeds a reference value, each special train may be increased in number of cars. Also, when there are multiple regular trains that can be increased in number of cars during a time period when the predicted passenger demand value exceeds a reference value, each regular train may be increased in number of cars.

[0061] The evaluation function may be any function that can evaluate the effect of increasing the number of cars or services. The evaluation function may be a function that represents the maximum number of passengers boarding and alighting at each station for all trains 6 that operate during the time period when the predicted value of passenger demand exceeds a reference value. The operation adjustment unit 13 finds a combination of candidates that minimizes the evaluation function, and selects each of the found candidate combinations as a target for increasing the number of cars.

[0062] Alternatively, the evaluation function may be a function expressing the average occupancy rate of all trains 6 operating in the relevant time period. Alternatively, the evaluation function may be a function expressing the sum of the operation costs of all trains 6 operating in the relevant time period. Alternatively, the evaluation function may be a function expressing the difference between each of the above evaluation values ​​and the target value for all trains 6 operating in the relevant time period. Alternatively, the evaluation function may be a combination of at least two of the above evaluation functions. In the case of each of these evaluation functions, the operation adjustment unit 13 obtains a candidate combination that minimizes the evaluation function, and selects each of the obtained candidate combinations as a target for increasing the number of trains. The operation adjustment unit 13 can alleviate congestion on the trains 6 or improve the efficiency of the operation of the trains 6 by selecting trains 6 to be increased in number or frequency from multiple candidates based on the evaluation function.

[0063] When passenger demand forecast data falls below the reference value of passenger demand and there are multiple candidates for trains 6 to be reduced in number of trains or services, the operation adjustment unit 13 may select a train 6 to be reduced in number of trains or services from the multiple candidates based on an evaluation function that evaluates the effect of reducing the number of trains or services.

[0064] In the case of increasing the number of cars or the number of trains, the operation adjustment unit 13 adjusts the basic timetable on the premise that cars and crew members can be secured. The operation adjustment unit 13 may set a priority for increasing the number of cars or the number of trains for each candidate based on an evaluation function, and select a target for increasing the number of cars or the number of trains based on the priority within a range in which cars and crew members can be secured. When there are no special trains that can be increased in number, the operation adjustment unit 13 considers only increasing the number of cars on regular trains. In addition, in adjusting the basic timetable by the operation adjustment unit 13, the change in the number of cars is based on the premise that the change information on the number of cars linked to the route of each train 6 is satisfied.

[0065] Next, the creation of a freight schedule by the operation coordination unit 13 will be described. The operation coordination unit 13 determines the freight transport volume in a unit period based on reservation information for freight transport and freight demand forecast data. The operation coordination unit 13 creates a freight schedule based on the determined transport volume and a passenger schedule.

[0066] The creation of a freight schedule by the traffic adjustment unit 13 is divided into a step of determining a transportation volume, a step of calculating the number of trains 6 required for transporting the freight, and a step of determining a freight schedule.

[0067] In the step of determining the transportation volume, the operation coordination unit 13 determines the transportation volume of cargo between each station for each day based on the reservation information and cargo demand forecast data. The operation coordination unit 13 determines the transportation volume in consideration of constraints on the transportation of cargo. Constraints on the transportation of cargo include, for example, a transportation deadline, the transportation capacity of each train 6 or between each station, or the maximum storage volume of cargo at each station.

[0068] The operation coordination unit 13 may determine the transportation volume of cargo based on an evaluation function that evaluates the efficiency of cargo transportation. The evaluation function may be any function that can evaluate the efficiency of cargo transportation. The evaluation function may be a function that represents the cost of cargo transportation. The operation coordination unit 13 determines the transportation volume between each station for each day that minimizes the evaluation function.

[0069] Alternatively, the evaluation function may be a function that represents the cost required to store cargo before transportation. Alternatively, the evaluation function may be a function that represents the number of days remaining until the transportation deadline of each cargo. Alternatively, the evaluation function may be a combination of at least two of the above evaluation functions. In the case of each of these evaluation functions, the operation adjustment unit 13 determines the transportation volume between each station for each day so as to minimize the evaluation function. In the above explanation, the unit period for determining the transportation volume is one day, but the unit period may be a period other than one day.

[0070] In the step of calculating the number of trains 6 required for transporting cargo, the traffic adjustment unit 13 calculates the number of trains 6 to be used for transporting cargo between each station so as to satisfy the calculated transport volume.

[0071] In the step of determining the freight timetable, the operation coordination unit 13 determines the freight timetable for the trains 6 to be used for transporting freight on the next day. The operation coordination unit 13 selects, from among the passenger timetables, a train that can carry both freight and passengers, or a special train that is not subject to operation in the passenger timetable, as a candidate for a train to be used for transporting freight. Alternatively, if a train 6 dedicated to freight is set in the basic timetable, the operation coordination unit 13 selects that train as a candidate for a train to be used for transporting freight.

[0072] When there are multiple candidates for trains 6 that can be used to transport cargo, the operation coordination unit 13 may select a train 6 to be used for transporting cargo from the multiple candidates based on an evaluation function that evaluates the efficiency of cargo transportation. The evaluation function may be any function that can evaluate the efficiency of cargo transportation. The evaluation function may be a function that represents the cost of cargo transportation. The operation coordination unit 13 finds a combination of candidates that minimizes the evaluation function, and selects each candidate of the found combination as the train 6 to be used for cargo transportation. In this way, the operation coordination unit 13 creates a cargo timetable. The operation coordination unit 13 creates an implementation timetable by combining the created passenger timetable and the created cargo timetable.

[0073] If the operation adjustment unit 13 cannot secure the number of trains 6 required for transporting cargo, it notifies the manager of the operation management device 1A of an error. When notified of the error, the manager manually adjusts the actual timetable. When adjusting the actual timetable, measures can be taken, such as changing the cargo transportation deadline and recreating the cargo timetable, or reducing the number of trains 6 used for transporting passengers and increasing the number of trains 6 used for transporting cargo.

[0074] In this way, the traffic management device 1A creates an operational schedule including a passenger schedule and a cargo schedule based on passenger demand forecast data and cargo demand forecast data. When an adjustment is made to reduce passenger transport capacity, the traffic management device 1A can allocate the reduced passenger transport capacity to cargo transport. Therefore, the traffic management device 1A can effectively utilize the reduced passenger transport capacity, thereby improving the operation efficiency of trains 6 in the railway network.

[0075] Next, a procedure of the process performed by the traffic management device 1A will be described with reference to Fig. 11. The procedure of the process performed by the traffic management device 1A according to the first embodiment will be described with reference to Fig. 11.

[0076] In step S1, the traffic management device 1A acquires passenger data and cargo data. The traffic management device 1A stores the acquired passenger data in a passenger information database. The traffic management device 1A stores the acquired cargo data in a cargo information database.

[0077] In step S2, the traffic management device 1A creates passenger demand forecast data and cargo demand forecast data. The traffic management device 1A creates passenger demand forecast data based on passenger data. The traffic management device 1A creates cargo demand forecast data based on cargo data. The traffic management device 1A stores the created passenger demand forecast data and the created cargo demand forecast data in a demand forecast database.

[0078] In step S3, the operation management device 1A creates an implementation schedule. The operation management device 1A creates a passenger schedule based on passenger demand forecast data and the basic schedule. The operation management device 1A creates a passenger schedule by adjusting the basic schedule based on passenger demand forecast data by the operation adjustment unit 13. The operation management device 1A creates a freight schedule based on the created passenger schedule and freight demand forecast data. The operation management device 1A creates a freight schedule by planning trains 6 to be used for freight transportation based on the passenger schedule and freight demand forecast data by the operation adjustment unit 13. In the following description, adjusting the basic schedule based on passenger demand forecast data is also referred to as adjustment by passenger adjustment mode. Planning trains 6 to be used for freight transportation based on the passenger schedule and freight demand forecast data is also referred to as adjustment by freight planning mode.

[0079] The traffic management device 1A creates an actual timetable by combining the created passenger timetable and the created freight timetable. The traffic management device 1A stores the created actual timetable in the bus timetable database. With the above, the traffic management device 1A ends the processing according to the procedure shown in FIG.

[0080] Next, a detailed description will be given of the process performed by the traffic adjustment unit 13. Fig. 12 is a flowchart showing the procedure of the process performed by the traffic adjustment unit 13 of the traffic management device 1A according to the first embodiment.

[0081] In step S11, the operation adjustment unit 13 performs adjustment in the passenger adjustment mode. The operation adjustment unit 13 creates a passenger schedule by adjusting the basic schedule based on passenger demand forecast data.

[0082] In step S12, the operation adjustment unit 13 performs adjustment in the freight planning mode. The operation adjustment unit 13 creates a freight schedule by planning the trains 6 to be used for transporting freight based on the freight demand forecast data and the passenger schedule created in step S11.

[0083] In step S13, the operation coordination unit 13 finalizes the implementation schedule by combining the passenger schedule created in step S11 with the freight schedule created in step S12. With the above, the operation coordination unit 13 ends the processing according to the procedure shown in FIG.

[0084] 13 is a flowchart showing a procedure of processing in a passenger adjustment mode of the operation adjustment unit 13 of the operation management device 1A according to the first embodiment. The operation adjustment unit 13 performs the following processing from step S21 to step S24 for each time period. Here, an example will be described in which a first reference value as a criterion for determining whether to increase the number of services or the number of cars, and a second reference value as a criterion for determining whether to reduce the number of services or the number of cars are set as reference values ​​of passenger demand.

[0085] In step S21, the operation adjustment unit 13 judges whether the passenger demand forecast data exceeds a first reference value. The first reference value is a reference value of passenger demand for judging whether to implement an adjustment by increasing the number of trains or the number of trains. The first reference value can also be said to be a threshold for judging whether to implement an adjustment by increasing the number of trains or the number of trains. The first reference value is set in advance. If the passenger demand forecast data exceeds the first reference value (step S21, Yes), the operation adjustment unit 13 implements an adjustment in the increased train service mode in step S22. The adjustment in the increased train service mode refers to an adjustment to increase transportation capacity by increasing the number of trains 6 that are the subject of operation in the basic timetable, or by increasing the number of trains from the basic timetable. After that, the operation adjustment unit 13 repeats the procedure from step S21 for a time period other than the time period in which the adjustment in the increased train service mode was performed.

[0086] If the passenger demand forecast data does not exceed the first reference value (step S21, No), the operation adjustment unit 13 judges in step S23 whether the passenger demand forecast data is below the second reference value. The second reference value is a reference value of passenger demand for judging whether to implement adjustment by reducing the number of trains or the number of services. The second reference value can also be said to be a threshold for judging whether to implement adjustment by reducing the number of trains or the number of services. The second reference value is a value smaller than the first reference value. The second reference value is set in advance. If the passenger demand forecast data is below the second reference value (step S23, Yes), the operation adjustment unit 13 implements adjustment by reduced service mode in step S24. The adjustment by reduced service mode refers to adjustment to reduce transportation capacity by reducing the number of trains 6 that are subject to operation in the basic timetable or by reducing the number of services from the basic timetable. After that, the operation adjustment unit 13 repeats the procedure from step S21 for a time period other than the time period in which the adjustment by the reduced service mode was performed.

[0087] If the passenger demand forecast data is not below the second reference value (step S23, No), the operation adjustment unit 13 does not adjust in the increased service mode or the decreased service mode. The procedure from step S21 is repeated for a time period other than the time period determined in step S21 and step S23.

[0088] The operation adjustment unit 13 repeats the procedure from step S21 to step S24 for all time periods. When the operation adjustment unit 13 completes the procedure from step S21 to step S24 for all time periods, the operation adjustment unit 13 ends the processing in the passenger adjustment mode.

[0089] In the above description, the operation adjustment unit 13 performs adjustment in the increased service mode when the passenger demand forecast data exceeds a first reference value, and performs adjustment in the reduced service mode when the passenger demand forecast data falls below a second reference value. The operation adjustment unit 13 may determine whether to perform adjustment in the increased service mode and whether to perform adjustment in the reduced service mode based on a preset reference range. The reference range is a range that is a reference for passenger demand. Here, the reference range is, for example, from 100 to 120 passengers. The operation adjustment unit 13 performs adjustment in the increased service mode when the passenger demand forecast data exceeds 120 passengers, which is the upper limit of the reference range. The operation adjustment unit 13 performs adjustment in the reduced service mode when the passenger demand forecast data falls below 100 passengers, which is the lower limit of the reference range. The operation adjustment unit 13 does not perform adjustment in the increased service mode or adjustment in the reduced service mode when the passenger demand forecast data is 100 passengers or more and 120 passengers or less. At least one of the upper limit value of the reference range and the lower limit width of the reference range may be different for each time period. In other words, the operation adjustment unit 13 may determine whether to implement adjustment in the increased service mode and whether to implement adjustment in the reduced service mode based on the reference range that differs for each time period.

[0090] In the above description, the reference range is set by an upper limit value and a lower limit value. The reference range may be set by a numerical range centered on the reference value, such as a range of ±10 people around the reference value, or a range of ±10% of the reference value around the reference value. The numerical range of the reference range may be different for each time period. That is, the operation adjustment unit 13 may determine whether or not to implement adjustment using the increased service mode and whether or not to implement adjustment using the reduced service mode based on a reference range that differs for each time period.

[0091] Fig. 14 is a flowchart showing a procedure of processing in the increased service mode of the operation adjustment unit 13 of the operation management device 1A according to the first embodiment. Here, an example of processing when there are multiple candidates for trains 6 to be increased in number or frequency is described. In the following description of Fig. 14, a route of a train 6 that is a candidate for increasing in number or frequency is referred to as a candidate route. The operation adjustment unit 13 performs the following processing of steps S31 and S32 for each combination of two or more candidate routes.

[0092] In step S31, the operation adjustment unit 13 selects candidate routes to be combined with each other from the multiple candidate routes. In step S32, the operation adjustment unit 13 calculates an evaluation value for the case where the number of vehicles or the number of services is increased for the candidate route selected in step S31. The evaluation value calculated in step S31 is a value of an evaluation function that can evaluate the effect of increasing the number of vehicles or the number of services. The operation adjustment unit 13 repeats the procedures of steps S31 and S32 for all combinations of candidate routes included in the multiple candidate routes.

[0093] In step S33, the operation adjustment unit 13 selects a candidate route for which the number of vehicles or the number of services is to be increased based on the evaluation values ​​obtained for all combinations of the candidate routes. The operation adjustment unit 13 selects a candidate route for which the number of vehicles or the number of services is to be increased by identifying the combination with the smallest evaluation value from among all combinations of the candidate routes. The operation adjustment unit 13 ends the process in the increased service mode by completing the procedure in step S33.

[0094] Fig. 15 is a flowchart showing the procedure of processing in the reduction mode of the operation adjustment unit 13 of the operation management device 1A according to the first embodiment. Here, an example of processing when there are multiple candidates for trains 6 to be reduced in number or service is described. In the following description of Fig. 15, a route of a train 6 that is a candidate for reduction in number or service is referred to as a candidate route. The operation adjustment unit 13 performs the following processing of steps S41 and S42 for each combination of two or more candidate routes.

[0095] In step S41, the operation adjustment unit 13 selects candidate routes to be combined with each other from the multiple candidate routes. In step S42, the operation adjustment unit 13 calculates an evaluation value for the case where a reduction in the number of vehicles or services is implemented for the candidate route selected in step S41. The evaluation value calculated in step S41 is a value of an evaluation function that can evaluate the effect of a reduction in the number of vehicles or services. The operation adjustment unit 13 repeats the procedures of steps S41 and S42 for all combinations of candidate routes included in the multiple candidate routes.

[0096] In step S43, the operation adjustment unit 13 selects a candidate route for which the number of vehicles or the number of services is to be reduced based on the evaluation values ​​obtained for all combinations of the candidate routes. The operation adjustment unit 13 selects a candidate route for which the number of vehicles or the number of services is to be reduced by identifying the combination with the smallest evaluation value from among all combinations of the candidate routes. The operation adjustment unit 13 ends the process in the reduced service mode by completing the procedure in step S43.

[0097] 16 is a flowchart showing a procedure of processing in the freight planning mode of the operation adjustment unit 13 of the operation management device 1A according to the first embodiment. In step S51, the operation adjustment unit 13 determines the freight transport volume in a unit period. The operation adjustment unit 13 determines the freight transport volume between stations in a unit period based on reservation information and freight demand forecast data. The operation adjustment unit 13 determines the freight transport volume based on, for example, an evaluation function that evaluates the freight transport efficiency.

[0098] In step S52, the operation coordination unit 13 calculates the number of trains 6 that transport the cargo for the transportation amount determined in step S51. The operation coordination unit 13 calculates the number of trains 6 that can transport the cargo for the transportation amount determined in step S51 within the transportation deadline.

[0099] Next, the operation coordination unit 13 determines a freight schedule for the trains 6 used to transport freight. Here, an example of processing when there are multiple candidates for the trains 6 used to transport freight will be described. In the following description of FIG. 16, the routes of the trains 6 that are candidates for use in freight transportation will be referred to as candidate routes. The operation coordination unit 13 performs the following processing of steps S53 and S54 for each combination of two or more candidate routes.

[0100] In step S53, the operation coordination unit 13 selects candidate routes to be combined with each other from the multiple candidate routes. In step S54, an evaluation value for the cargo transport efficiency when cargo is transported using the candidate route selected in step S53 is calculated. The evaluation value calculated in step S54 is the value of an evaluation function that evaluates the cargo transport efficiency. The operation coordination unit 13 repeats the procedures of steps S53 and S54 for all combinations of candidate routes included in the multiple candidate routes.

[0101] In step S55, the operation coordination unit 13 selects a candidate route to be used for transporting cargo based on the evaluation values ​​obtained for all combinations of the candidate routes. The operation coordination unit 13 selects a candidate route to be used for transporting cargo by identifying the combination with the smallest evaluation value from among all combinations of the candidate routes. The operation coordination unit 13 ends the process in the cargo planning mode by completing the procedure in step S55.

[0102] According to the first embodiment, the operation adjustment unit 13 creates an implementation timetable based on passenger demand forecast data, freight demand forecast data, and a basic timetable. The operation adjustment unit 13 creates a passenger timetable based on the passenger demand forecast data and the basic timetable, and creates an implementation timetable including passenger transportation by the train 6 and freight transportation by the train 6 based on the passenger timetable and freight demand forecast data. The operation management device 1A can alleviate congestion on the train 6 or improve the efficiency of the operation of the train 6 according to the boarding demand. When the transportation capacity for passengers is reduced based on the passenger demand forecast data, the operation management device 1A can allocate the transportation capacity to the transportation of freight. The operation management device 1A can effectively utilize the reduced transportation capacity for passengers, and therefore can improve the operation efficiency of the train 6 in the railway network. As described above, the operation management device 1A has an effect of improving the operation efficiency of trains in the railway network.

[0103] Embodiment 2 In the second embodiment, a first example of a traffic management system having a traffic management device will be described. In the second embodiment, the same components as those in the first embodiment are given the same reference numerals, and the configuration different from the first embodiment will be mainly described.

[0104] 17 is a diagram showing a configuration example of a traffic management system 3B according to the second embodiment. The traffic management system 3B includes a traffic management device 1B and a traffic coordination device 2B. In the second embodiment, the traffic coordination device 2B is an external device of the traffic management device 1B.

[0105] The traffic management device 1B manages the operation of a plurality of trains 6 on a railway. The traffic management device 1B manages the operation of the plurality of trains 6 based on a timetable. FIG. 17 shows one of the plurality of trains 6. FIG. 17 also shows one of the plurality of information terminals 7.

[0106] Each of the traffic management device 1B and the traffic coordination device 2B is configured by, for example, one or more cloud servers. Each of the traffic management device 1B and the traffic coordination device 2B may be a server other than a cloud server, for example, may be an on-premise server.

[0107] The traffic management device 1B and the traffic control device 2B are communicatively connected to each other via a network. Each of the trains 6 is communicatively connected to the traffic management device 1B via the network. Each of the information terminals 7 is communicatively connected to the traffic control device 2B via the network. The network is, for example, a WAN such as the Internet, but may also be a LAN.

[0108] The traffic coordination device 2B creates an actual timetable that realizes the transportation of passengers and freight by multiple trains 6. The traffic coordination device 2B transmits the created actual timetable to the traffic management device 1B. The traffic management device 1B manages the operations of the multiple trains 6 based on the actual timetable created by the traffic coordination device 2B.

[0109] The traffic adjustment device 2B includes a data acquisition unit 11, a demand prediction unit 12, a traffic adjustment unit 13, a bus schedule creation unit 14, and a storage unit 15. That is, the traffic adjustment device 2B includes the same configuration as the traffic management device 1A shown in FIG.

[0110] Each of the multiple trains 6 transmits passenger data to the operation management device 1B. The operation management device 1B receives the passenger data and transmits the passenger data to the operation coordination device 2B. The data acquisition unit 11 acquires the passenger data transmitted from the operation management device 1B. Each of the multiple information terminals 7 transmits freight data to the operation coordination device 2B. The data acquisition unit 11 acquires the freight data transmitted from each of the multiple information terminals 7.

[0111] The traffic adjustment unit 13 creates an actual schedule, similarly to the first embodiment. The traffic adjustment device 2B transmits the created actual schedule to the traffic management device 1B.

[0112] According to the second embodiment, the traffic control system 3B can improve the operation efficiency of the trains 6 in the railway network, similar to the traffic control device 1A according to the first embodiment. The traffic control system 3B includes a traffic control device 2B that is an external device of the traffic control device 1B, so that an existing traffic control device can be used as the traffic control device 1B. By combining the traffic control device 2B with the traffic control device 1B, the traffic control system 3B having a function of creating an actual timetable by adjusting the basic timetable can be easily realized. Furthermore, the traffic control system 3B can distribute the processing load between the traffic control device 1B and the traffic control device 2B by creating an actual timetable using the traffic control device 2B external to the traffic control device 1B.

[0113] Embodiment 3 In the third embodiment, a second example of a traffic management system having a traffic management device will be described. In the third embodiment, the same components as those in the first or second embodiment are denoted by the same reference numerals, and the configuration different from the first or second embodiment will be mainly described.

[0114] 18 is a diagram illustrating a configuration example of a traffic management system 3C according to the third embodiment. The traffic management system 3C includes a traffic management device 1C and a data collection device 4. In the third embodiment, the data collection device 4 is an external device of the traffic management device 1C.

[0115] The traffic management device 1C manages the traffic of a plurality of trains 6 on a railway based on a timetable. Two of the plurality of trains 6 are shown in FIG. 18. One of the plurality of information terminals 7 is also shown in FIG. 18. The data collection device 4 collects passenger data acquired in each of the plurality of trains 6.

[0116] Each of the fleet management device 1C and the data collection device 4 is configured, for example, by one or more cloud servers. Each of the fleet management device 1C and the data collection device 4 may be a server other than a cloud server, for example, may be an on-premise server.

[0117] The traffic management device 1C and the data collection device 4 are communicatively connected to each other via a network. Each of the multiple trains 6 is communicatively connected to the data collection device 4 via the network. Each of the multiple information terminals 7 is communicatively connected to the traffic management device 1C via the network. The network is, for example, a WAN such as the Internet, but may also be a LAN.

[0118] The traffic management device 1C includes a data acquisition unit 11, a demand prediction unit 12, a traffic adjustment unit 13, a traffic diagram creation unit 14, and a storage unit 15. That is, the traffic management device 1C includes the same configuration as the traffic management device 1A shown in FIG.

[0119] Each of the multiple trains 6 transmits passenger data to the data collection device 4. The data collection device 4 collects passenger data transmitted from each of the multiple trains 6, and transmits the collected passenger data to the traffic management device 1C. The data acquisition unit 11 acquires the passenger data transmitted from the data collection device 4. Each of the multiple information terminals 7 transmits freight data to the traffic management device 1C. The data acquisition unit 11 acquires the freight data transmitted from each of the multiple information terminals 7.

[0120] The operation coordinating unit 13 creates an actual operation schedule, similar to the first embodiment. The operation management device 1C manages the operation of each train 6 based on the created actual operation schedule.

[0121] According to the third embodiment, the traffic control system 3C can improve the operation efficiency of trains 6 in a railway network, similar to the traffic control device 1A according to the first embodiment. The traffic control system 3C can create an actual timetable by utilizing passenger data collected by the data collection device 4.

[0122] Embodiment 4 In the fourth embodiment, a third example of a traffic management system having a traffic management device will be described. In the fourth embodiment, the same components as those in the first to third embodiments are given the same reference numerals, and the configurations different from those in the first to third embodiments will be mainly described.

[0123] 19 is a diagram showing a configuration example of a traffic control system 3D according to the fourth embodiment. The traffic control system 3D includes a traffic control device 1D and a freight information management device 5. In the fourth embodiment, the freight information management device 5 is an external device of the traffic control device 1D.

[0124] The traffic management device 1D manages the traffic of a plurality of trains 6 on a railway based on a timetable. One of the plurality of trains 6 is shown in Fig. 19. Also, one of the plurality of information terminals 7 is shown in Fig. 19.

[0125] The cargo information management device 5 manages information related to the transportation of cargo by rail. The cargo information management device 5 stores a cargo information database. The cargo information management device 5 holds cargo data and outputs the cargo data to the data acquisition unit 11. The cargo information database stored in the cargo information management device 5 is similar to the cargo information database stored in the memory unit 15 of the traffic management device 1A shown in FIG. 1.

[0126] Each of the traffic management device 1D and the cargo information management device 5 is configured, for example, by one or more cloud servers. Each of the traffic management device 1D and the cargo information management device 5 may be a server other than a cloud server, for example, may be an on-premise server.

[0127] The traffic management device 1D and the freight information management device 5 are communicatively connected to each other via a network. Each of the multiple trains 6 is communicatively connected to the traffic management device 1D via the network. Each of the multiple information terminals 7 is communicatively connected to the freight information management device 5 via the network. The network is, for example, a WAN such as the Internet, but may also be a LAN.

[0128] The traffic management device 1D includes a data acquisition unit 11, a demand prediction unit 12, an operation adjustment unit 13, a traffic diagram creation unit 14, and a storage unit 15. That is, the traffic management device 1D has a similar configuration to the traffic management device 1A shown in Fig. 1. However, the traffic management device 1D differs from the traffic management device 1A in that a freight information database is not stored in the storage unit 15.

[0129] Each of the multiple trains 6 transmits passenger data to the operation management device 1D. The data acquisition unit 11 acquires the passenger data transmitted from each of the multiple trains 6. Each of the multiple information terminals 7 transmits freight data to the freight information management device 5. The freight information management device 5 accumulates the freight data in a freight information database. The freight information management device 5 transmits the freight data to the operation management device 1D. The data acquisition unit 11 acquires the freight data transmitted from the freight information management device 5. The data acquisition unit 11 outputs the acquired freight data to the demand prediction unit 12.

[0130] The demand prediction unit 12 creates passenger demand prediction data and freight demand prediction data based on the acquired freight data and passenger data read from the passenger information database. The operation coordination unit 13 creates an actual operation schedule, similar to the first embodiment. The operation management device 1D manages the operation of each train 6 based on the created actual operation schedule.

[0131] According to the fourth embodiment, the traffic control system 3D can improve the operation efficiency of the trains 6 on the railway network, similarly to the traffic control device 1A according to the first embodiment. The traffic control system 3D can create an actual timetable by utilizing the freight data accumulated in the freight information management device 5.

[0132] Embodiment 5. In the fifth embodiment, an example of allocating passenger cars and freight cars in a train 6 that is a target for mixed cargo and passenger transport will be described. The functions described in the fifth embodiment can be provided in any of the traffic management devices 1A, 1C, 1D and the traffic adjustment device 2B. Here, it is assumed that the functions described in the fifth embodiment are provided in the traffic management device 1A. In the fifth embodiment, the same components as those in the first to fourth embodiments are given the same reference numerals, and the configurations different from those in the first to fourth embodiments will be mainly described.

[0133] 20 is a diagram for explaining allocation of passenger vehicles and freight vehicles by the traffic management device 1A according to the fifth embodiment. When a train 6 carrying passengers is also used for transporting freight, the traffic adjustment unit 13 of the traffic management device 1A allocates the multiple vehicles into passenger vehicles and vehicles used for transporting freight based on a result of predicting the occupancy rate of each of the multiple vehicles constituting the train 6 when passengers board the multiple vehicles.

[0134] FIG. 20 shows one station where train 6 arrives and departs, and train 6 traveling toward the station. The arrow in FIG. 20 indicates the direction in which train 6 is traveling. Train 6 shown in FIG. 20 is composed of four carriages. The station shown in FIG. 20 has a structure in which passengers waiting to board tend to concentrate in one area. In the example shown in FIG. 20, a staircase for passengers to use is installed ahead of train 6 arriving at the station in the direction of travel. For this reason, passengers waiting to board tend to concentrate at the position on the station platform where the front part of train 6 arrives.

[0135] The operation management device 1A acquires information on the number of passengers in each vehicle of the train 6 as passenger data. The operation coordination unit 13 predicts the occupancy rate of each of the multiple vehicles between stations based on the passenger data. The operation coordination unit 13 predicts from the passenger data that the occupancy rate will be higher in the vehicles closer to the front of the train 6 for the stations shown in Fig. 20. Based on this prediction, the operation coordination unit 13 allocates the multiple vehicles into vehicles for passengers and vehicles used for transporting cargo so that the vehicles closer to the front of the train 6 are used for transporting passengers.

[0136] For example, assume that the operation coordination unit 13 has determined that two cars of the train 6 shown in Fig. 20 will be used to transport cargo, and the other two cars will be used to transport passengers. In this case, the operation coordination unit 13 determines that the two cars 42 at the front in the traveling direction will be used to transport passengers, and the remaining two cars 41 will be used to transport cargo.

[0137] Next, a description will be given of the procedure of the processing performed by the traffic adjustment unit 13 in the embodiment 5. Here, of the processing performed by the traffic adjustment unit 13, processing in the freight planning mode will be described.

[0138] 21 is a flowchart showing a procedure of processing in the freight planning mode of the operation adjustment unit 13 of the operation management device 1A according to the fifth embodiment. In step S61, the operation adjustment unit 13 determines the freight transport volume in a unit period. In step S62, the operation adjustment unit 13 calculates the number of trains 6 transporting the freight for the freight transport volume determined in step S61. Steps S61 and S62 are similar to steps S51 and S52 shown in FIG. 16.

[0139] In step S63, the operation coordination unit 13 determines a route to be used for transporting cargo. In step S63, the operation coordination unit 13 determines a route to be used for transporting cargo by selecting a candidate route to be used for transporting cargo, similar to steps S53 to S55 shown in Fig. 16. In the following description of Fig. 21, a route to be used for transporting cargo is referred to as a cargo route.

[0140] Next, the operation coordination unit 13 allocates passenger cars and cars used for transporting cargo for trains 6 carrying passengers and cargo. The operation coordination unit 13 performs the following processes of steps S64 and S65 for each cargo route.

[0141] In step S64, the operation coordination unit 13 judges whether or not mixed cargo and passenger loading is performed for the freight line. That is, the operation coordination unit 13 judges whether or not the freight line corresponds to the line of the train 6 on which mixed cargo and passenger loading is performed. When mixed cargo and passenger loading is performed (step S64, Yes), the operation coordination unit 13 determines in step S65 the allocation of passenger-carrying vehicles and vehicles used for transporting cargo for the train 6 of the freight line. The operation coordination unit 13 allocates multiple vehicles to passenger-carrying vehicles and vehicles used for transporting cargo based on the result of predicting the occupancy rate of each of the multiple vehicles when passengers board the multiple vehicles constituting the train 6. On the other hand, when mixed cargo and passenger loading is not performed (step S64, No), the operation coordination unit 13 skips step S65.

[0142] The traffic adjustment unit 13 repeats the procedures of steps S64 and S65 for all freight routes. When the traffic adjustment unit 13 has completed the procedures of steps S64 and S65 for all freight routes, the traffic adjustment unit 13 ends the processing in the freight planning mode.

[0143] According to the fifth embodiment, the operation adjustment unit 13 allocates a plurality of cars of a train 6 carrying both passengers and freight to passenger cars and cars used for transporting cargo, based on the result of predicting the occupancy rate of each of the cars constituting the train 6 when passengers board the cars. By allocating cars of the train 6 that are expected to have a high occupancy rate to passenger cars, smooth boarding and disembarking is made possible. In this way, the operation management device 1A can create an implementation timetable that allows smooth boarding and disembarking.

[0144] Embodiment 6 In the first embodiment, a case where the number of trains 6 required for transporting cargo cannot be secured in the adjustment in the freight planning mode is treated as an error. In the sixth embodiment, an example of readjusting the passenger timetable when the number of trains 6 required for transporting cargo cannot be secured will be described.

[0145] The functions described in the sixth embodiment can be provided in any of the traffic management devices 1A, 1C, and 1D and the traffic adjustment device 2B. Here, it is assumed that the functions described in the sixth embodiment are provided in the traffic management device 1A. In the sixth embodiment, the same components as those in the first to fifth embodiments are given the same reference numerals, and the configurations different from those in the first to fifth embodiments are mainly described.

[0146] In embodiment 6, when the number of trains 6 available for transporting cargo is insufficient for the determined transportation volume, the operation coordination unit 13 changes some of the multiple trains 6 used for transporting passengers to trains 6 used for transporting cargo.

[0147] Fig. 22 is a diagram for explaining the readjustment of a passenger schedule by the traffic management device 1A according to the sixth embodiment. Fig. 22 shows a graph similar to that of Fig. 6. The traffic adjustment unit 13 sets time periods with relatively low passenger demand as candidate time periods for reducing the number of trains or services of trains 6 used for transporting passengers. In Fig. 22, the parts of the graph surrounded by dashed frames 51 and 52 have relatively low predicted passenger demand, so the traffic adjustment unit 13 sets the time periods corresponding to each of the frames 51 and 52 as candidate time periods for reducing the number of trains or services.

[0148] The operation adjustment unit 13 determines a route for changing from passenger transportation to cargo transportation from routes in the candidate time period for reducing the number of trains or the number of trains. In this way, the operation adjustment unit 13 secures the line capacity for transporting cargo during the transportation deadline by reducing the number of trains or the number of trains 6 used for passenger transportation.

[0149] Next, a description will be given of a procedure of processing performed by the traffic adjustment unit 13 in the sixth embodiment. Fig. 23 is a flowchart showing a procedure of processing performed by the traffic adjustment unit 13 of the traffic management device 1A according to the sixth embodiment.

[0150] In step S71, the operation coordinator 13 performs adjustment in the passenger adjustment mode. In step S72, the operation coordinator 13 performs adjustment in the freight planning mode. Steps S71 and S72 are similar to steps S11 and S12 shown in FIG.

[0151] In step S73, the operation coordination unit 13 judges whether or not the cargo can be transported within the transportation deadline. If the cargo can be transported within the transportation deadline (step S73, Yes), the operation coordination unit 13 finalizes the implementation schedule in step S74. Step S74 is the same as step S13 shown in Fig. 12. By completing step S74, the operation coordination unit 13 ends the processing according to the procedure shown in Fig. 23.

[0152] On the other hand, if the cargo cannot be transported within the transportation deadline (step S73, No), the operation coordination unit 13 returns the procedure to step S71 and performs the adjustment again in the passenger adjustment mode. The operation coordination unit 13 repeats the procedure from step S71 to step S73 until the cargo can be transported within the transportation deadline.

[0153] Fig. 24 is a flowchart showing a procedure of processing in a passenger adjustment mode of the operation adjustment unit 13 of the operation management device 1A according to the sixth embodiment. The operation adjustment unit 13 performs the following processing from step S81 to step S85 for each time period. Here, as in Fig. 13, an example will be described in which a first reference value as a criterion for determining whether to increase the number of services or the number of cars, and a second reference value as a criterion for determining whether to reduce the number of services or the number of cars are set as reference values ​​of passenger demand.

[0154] In step S81, the operation adjustment unit 13 judges whether the passenger demand forecast data exceeds the first reference value. If the passenger demand forecast data exceeds the first reference value (step S81, Yes), the operation adjustment unit 13 performs adjustment in the increased service mode in step S82. After that, the operation adjustment unit 13 repeats the procedure from step S81 for a time period other than the time period in which the adjustment in the increased service mode was performed.

[0155] If the passenger demand forecast data does not exceed the first reference value (step S81, No), the operation adjustment unit 13 determines in step S83 whether the passenger demand forecast data falls below the second reference value. If the passenger demand forecast data falls below the second reference value (step S83, Yes), the operation adjustment unit 13 performs adjustment in the reduced service mode in step S84. Thereafter, the operation adjustment unit 13 repeats the procedure from step S81 for a time period other than the time period during which adjustment in the reduced service mode was performed.

[0156] If the passenger demand forecast data is not below the second reference value (step S83, No), the operation coordination unit 13 determines in step S85 whether or not a route to be used for transporting cargo has been secured. The operation coordination unit 13 determines whether or not a number of trains 6 capable of transporting the amount of cargo determined in the cargo planning mode within the transportation deadline have been secured as trains 6 for transporting cargo.

[0157] If a route for transporting cargo is secured (Yes at step S85), the operation adjustment unit 13 repeats the procedure from step S81 for a time period other than the time period determined at step S81, step S83, and step S85.

[0158] On the other hand, if the route for transporting the cargo is not secured (step S85, No), the operation adjustment unit 13 performs adjustment in the reduced service mode in step S84. As a result, the operation adjustment unit 13 secures the route capacity capable of transporting the cargo within the transportation deadline by reducing the number or frequency of trains 6 used for transporting passengers.

[0159] The operation adjustment unit 13 repeats the procedure from step S81 to step S85 for all time periods. The operation adjustment unit 13 ends the processing in the passenger adjustment mode by completing the procedure from step S81 to step S85 for all time periods. Note that the operation adjustment unit 13 may determine whether to implement adjustment in the increased service mode and whether to implement adjustment in the reduced service mode based on the reference range, similarly to the case of FIG. 13.

[0160] According to the sixth embodiment, when the number of trains 6 available for transporting cargo is insufficient for the determined transport volume, the traffic adjustment unit 13 changes some of the trains 6 used for transporting passengers to trains 6 used for transporting cargo. By adjusting to change some of the trains 6 used for transporting passengers to trains 6 used for transporting cargo, the traffic adjustment unit 13 makes it possible to transport cargo within the transportation deadline. This allows the traffic management device 1A to improve convenience.

[0161] Next, a hardware configuration for realizing the traffic management devices 1A, 1B, 1C, and 1D according to the first to sixth embodiments will be described. The processing functions of the traffic management devices 1A, 1C, and 1D are realized by a processing circuit. The processing circuit may be a circuit in which a processor executes software, or may be a dedicated circuit.

[0162] 25 is a diagram showing a first example of a hardware configuration for realizing the traffic management devices 1A, 1B, 1C, and 1D according to the first to sixth embodiments. In the first example, the traffic management devices 1A, 1B, 1C, and 1D include a processing circuit 70 having a processor 72 and a memory 73, an input unit 71, and an output unit 74.

[0163] The input unit 71 is an interface circuit that receives data transmitted from outside the traffic management devices 1A, 1B, 1C, 1D to the traffic management devices 1A, 1B, 1C, 1D and provides the data to the processor 72. The output unit 74 is an interface circuit that outputs data of the processor 72 or the memory 73 to outside the traffic management devices 1A, 1B, 1C, 1D.

[0164] The processing units of each of the traffic management devices 1A, 1B, 1C, and 1D are realized by software, firmware, or a combination of software and firmware. The software or firmware is written as a program and stored in the memory 73. In the processing circuit 70, the processor 72 reads and executes the program stored in the memory 73, thereby realizing each function of the processing unit. That is, the processing circuit 70 includes a memory 73 for storing a program that results in the processing of each function of the processing unit. This program can be said to be a program that causes a computer to execute the procedure and method of the traffic management devices 1A, 1B, 1C, and 1D. The data acquisition unit 11, the demand forecast unit 12, the traffic adjustment unit 13, and the traffic diagram creation unit 14, which are the processing units of each of the traffic management devices 1A, 1C, and 1D, are realized by the processor 72 reading and executing the program stored in the memory 73. The memory 73 is also used as a temporary memory when the processor 72 executes various processes. The storage unit 15 included in the traffic management devices 1A, 1C, and 1D is realized by the memory 73.

[0165] The processor 72 includes, for example, one or more of a central processing unit (CPU), a digital signal processor (DSP), and a system large scale integration (LSI). The memory 73 includes one or more of a random access memory (RAM), a read only memory (ROM), a flash memory, an erasable programmable read only memory (EPROM), and an electrically erasable programmable read only memory (EEPROM (registered trademark)). The memory 73 also includes a recording medium on which a computer-readable program is recorded. Such a recording medium includes one or more of a non-volatile or volatile semiconductor memory, a magnetic disk, a flexible memory, an optical disk, a compact disk, and a digital versatile disk (DVD).

[0166] Fig. 25 is an example of hardware that realizes the processing unit using a general-purpose processor 72 and memory 73, but the processing unit may be realized by a dedicated hardware circuit. Fig. 26 is a diagram showing a second example of a hardware configuration that realizes the traffic management devices 1A, 1B, 1C, and 1D according to the first to sixth embodiments. In the second example, the traffic management devices 1A, 1B, 1C, and 1D include a processing circuit 75, which is a dedicated hardware circuit, an input unit 71, and an output unit 74.

[0167] The processing circuit 75 is a single circuit, a composite circuit, a programmed processor, a parallel programmed processor, an integrated circuit such as an ASIC (Application Specific Integrated Circuit) or an FPGA (Field Programmable Gate Array), or a circuit that combines these. Each function of the processing unit may be realized by the processing circuit 75 separately for each function, or may be realized collectively by the processing circuit 75. Each function of the processing unit may be realized by a combination of the processing circuit 70 and the processing circuit 75.

[0168] The traffic control device 2B according to the second embodiment is realized by a hardware configuration similar to that illustrated in Fig. 25 or a hardware configuration similar to that illustrated in Fig. 26. The data acquisition unit 11, the demand forecasting unit 12, the traffic control unit 13, and the traffic diagram creation unit 14, which are processing units included in the traffic control device 2B, are realized by a processing circuit 70 or a processing circuit 75. The data collection device 4 according to the third embodiment and the freight information management device 5 according to the fourth embodiment are each realized by a hardware configuration similar to that illustrated in Fig. 25 or a hardware configuration similar to that illustrated in Fig. 26.

[0169] The configurations shown in the above embodiments are examples of the contents of the present disclosure. The configurations of each embodiment can be combined with other known technologies. The configurations of each embodiment can be appropriately combined. A part of the configuration of each embodiment can be omitted or modified without departing from the gist of the present disclosure.

[0170] Various aspects of the present disclosure are summarized below as appendices.

[0171] (Appendix 1) A data acquisition unit that acquires passenger data indicating passenger demand for trains operated by railroads and freight data indicating demand for freight transport by the trains; a demand forecasting unit that creates passenger demand forecast data, which is a result of predicting the future passenger riding demand for the train, and cargo demand forecast data, which is a result of predicting the future transportation demand of cargo for the train, based on the passenger data and the cargo data; and an operation adjustment unit that creates an operation schedule, which is an operation plan adjusted from a basic schedule, based on the passenger demand forecast data, the freight demand forecast data, and a basic schedule that is a basis for the train operation plan. An operation management device characterized by: (Appendix 2) The operation coordination unit creates a passenger timetable, which is an operation plan for transporting passengers by the train, based on the passenger demand forecast data and the basic timetable, and creates the implementation timetable, which is an operation plan including the transportation of passengers by the train and the transportation of cargo by the train, based on the passenger timetable and the cargo demand forecast data. 2. The traffic management device according to claim 1 . (Appendix 3) The basic timetable includes an operation plan for the trains that are to be additionally operated when the number of trains is increased, and an operation plan for the trains that can be canceled when the number of trains is reduced. 3. The traffic management device according to claim 1 or 2. (Appendix 4) The basic timetable is associated with information indicating whether the number of cars constituting the train can be changed. 4. The traffic management device according to claim 1, (Appendix 5) The basic timetable is linked to information indicating whether the train can be used for transporting cargo. 5. The traffic management device according to claim 1, (Appendix 6) The demand forecasting unit forecasts the future passenger demand using the passenger data and a trained model trained on the passenger data and the passenger demand forecast data. 6. The traffic management device according to claim 1, (Appendix 7) The trained model is generated by learning information about events affecting passenger flow, the passenger data, and the passenger demand forecast data; The demand forecasting unit forecasts the future passenger demand using the passenger data, information about future events expected to affect passenger flow, and the trained model. 7. The traffic management device according to claim 6, (Appendix 8) The demand forecasting unit forecasts the future transportation demand using the cargo data and a trained model trained on the cargo data and the cargo demand forecast data. 8. The traffic management device according to claim 1, (Appendix 9) The operation adjustment unit, when the passenger demand forecast data exceeds the reference value of the passenger demand and there are a plurality of candidates for the trains to be increased in number of cars or number of services, selects the train to be increased in number of cars or number of services from the plurality of candidates based on an evaluation function that evaluates the effect of increasing the number of cars or number of services. 9. The traffic management device according to claim 1, (Appendix 10) The operation coordination unit determines a freight transportation volume in a unit period based on reservation information for freight transportation and the freight demand forecast data, and creates a freight schedule, which is an operation plan for freight transportation, from the implementation schedule based on the determined transportation volume. 10. The traffic management device according to claim 1, (Appendix 11) The traffic adjustment unit determines the transportation volume of the cargo based on an evaluation function for evaluating the efficiency of cargo transportation. 11. The traffic management device according to claim 10, (Appendix 12) The operation coordination unit, when there are a plurality of candidates for the train that can be used for transporting cargo, selects the train to be used for transporting cargo from the plurality of candidates based on an evaluation function that evaluates the efficiency of cargo transportation. 12. The traffic management device according to claim 10 or 11. (Appendix 13) When the train on which passengers ride is also used for transporting cargo, the operation coordination unit allocates the multiple vehicles to the vehicles on which passengers ride and the vehicles used for transporting cargo based on a result of predicting the occupancy rate of each of the multiple vehicles in the case where passengers ride in the multiple vehicles constituting the train. 13. The traffic management device according to any one of claims 10 to 12. (Appendix 14) When the number of trains available for transporting cargo is insufficient for the determined transportation volume, the operation adjustment unit changes some of the trains used for transporting passengers to the trains used for transporting cargo. 14. The traffic management device according to any one of claims 10 to 13. (Appendix 15) A data acquisition unit that acquires passenger data indicating passenger demand for trains operated by railroads and freight data indicating demand for freight transport by the trains; a demand forecasting unit that creates passenger demand forecast data, which is a result of predicting the future passenger riding demand for the train, and cargo demand forecast data, which is a result of predicting the future transportation demand of cargo for the train, based on the passenger data and the cargo data; an operation adjustment device including: an operation adjustment unit that creates an implementation timetable, which is an operation plan adjusted from a basic timetable, which is a basis for the train operation plan, based on the passenger demand forecast data, the freight demand forecast data, and a basic timetable, which is a basis for the train operation plan; a traffic control device that controls the operation of the train based on the actual timetable created by the traffic adjustment device; A traffic management system characterized by the above. (Appendix 16) A data acquisition unit that acquires passenger data indicating passenger demand for trains operated by railroads and freight data indicating demand for freight transport by the trains; a demand forecasting unit that creates passenger demand forecast data, which is a result of predicting the future passenger riding demand for the train, and cargo demand forecast data, which is a result of predicting the future transportation demand of cargo for the train, based on the passenger data and the cargo data; an operation control device including: an operation adjustment unit that creates an implementation timetable, which is an operation plan adjusted from a basic timetable, based on the passenger demand forecast data, the freight demand forecast data, and a basic timetable, which is a basis for the train operation plan; a cargo information management device that stores the cargo data and outputs the cargo data to the data acquisition unit. A traffic management system characterized by the above. (Appendix 17) A method for adjusting a train operation plan for a railway by a computer, comprising the steps of: acquiring passenger data indicating passenger demand for the train and freight data indicating demand for freight transport by the train; creating passenger demand forecast data, which is a result of predicting the future passenger riding demand for the train, and freight demand forecast data, which is a result of predicting the future transportation demand of freight for the train, based on the passenger data and the freight data; and creating an implementation timetable, which is an operation plan adjusted from a basic timetable, based on the passenger demand forecast data, the freight demand forecast data, and a basic timetable, which is the basis of the train operation plan. A method for adjusting operations. (Appendix 18) Acquiring passenger data indicating passenger demand for trains operated by railroads and freight data indicating demand for freight transport by the trains; creating passenger demand forecast data, which is a result of predicting the future passenger riding demand for the train, and freight demand forecast data, which is a result of predicting the future transportation demand of freight for the train, based on the passenger data and the freight data; and creating an actual timetable, which is an operation plan adjusted from a basic timetable, based on the passenger demand forecast data, the freight demand forecast data, and a basic timetable, which is the basis of the train operation plan. An operation adjustment program characterized by: [Explanation of symbols]

[0172] 1A, 1B, 1C, 1D Traffic management device, 2B Traffic adjustment device, 3B, 3C, 3D Traffic management system, 4 Data collection device, 5 Freight information management device, 6 Train, 7 Information terminal, 11 Data acquisition unit, 12 Demand forecasting unit, 13 Traffic adjustment unit, 14 Traffic diagram creation unit, 15 Memory unit, 21, 22, 51, 52 Frame, 23, 24, 25, 31, 32, 33 Diagram, 26, 34 Ellipse, 27, 28, 29, 35, 36, 37 Line, 41, 42 Two vehicles, 70, 75 Processing circuit, 71 Input unit, 72 Processor, 73 Memory, 74 Output unit.

Claims

1. A data acquisition unit that acquires passenger data indicating passenger demand for trains operated by railroads and freight data indicating demand for freight transported by the trains; a demand forecasting unit that creates passenger demand forecast data, which is a result of predicting the future passenger riding demand for the train, and cargo demand forecast data, which is a result of predicting the future transportation demand of cargo for the train, based on the passenger data and the cargo data; and an operation adjustment unit that creates an operation schedule, which is an operation plan adjusted from a basic schedule, based on the passenger demand forecast data, the freight demand forecast data, and a basic schedule that is a basis for the train operation plan. An operation management device characterized by:

2. The operation coordination unit creates a passenger timetable, which is an operation plan for transporting passengers by the train, based on the passenger demand forecast data and the basic timetable, and creates the implementation timetable, which is an operation plan including the transportation of passengers by the train and the transportation of cargo by the train, based on the passenger timetable and the cargo demand forecast data.

2. The operation management device according to claim 1 .

3. The basic timetable includes an operation plan for the trains that are to be additionally operated when the number of trains is increased, and an operation plan for the trains that can be canceled when the number of trains is reduced.

3. The operation management device according to claim 1 or 2.

4. The basic timetable is associated with information indicating whether the number of cars constituting the train can be changed.

3. The operation management device according to claim 1 or 2.

5. The basic timetable is linked to information indicating whether the train can be used for transporting cargo.

3. The operation management device according to claim 1 or 2.

6. The demand forecasting unit forecasts the future passenger demand using the passenger data and a trained model trained on the passenger data and the passenger demand forecast data.

3. The operation management device according to claim 1 or 2.

7. The trained model is generated by learning information about events affecting passenger flow, the passenger data, and the passenger demand forecast data; The demand forecasting unit forecasts the future passenger demand using the passenger data, information about future events expected to affect passenger flow, and the trained model. The operation management device according to claim 6.

8. The demand forecasting unit forecasts the future transportation demand using the cargo data and a trained model trained on the cargo data and the cargo demand forecast data.

3. The operation management device according to claim 1 or 2.

9. The operation adjustment unit, when the passenger demand forecast data exceeds the reference value of the passenger demand and there are a plurality of candidates for the trains to be increased in number of cars or number of services, selects the train to be increased in number of cars or number of services from the plurality of candidates based on an evaluation function that evaluates the effect of increasing the number of cars or number of services.

3. The operation management device according to claim 1 or 2.

10. The operation coordination unit determines a freight transportation volume in a unit period based on reservation information for freight transportation and the freight demand forecast data, and creates a freight schedule, which is an operation plan for freight transportation, from the implementation schedule based on the determined transportation volume.

3. The operation management device according to claim 1 or 2.

11. The traffic adjustment unit determines the transportation volume of the cargo based on an evaluation function for evaluating the efficiency of cargo transportation. The operation management device according to claim 10.

12. The operation coordination unit, when there are a plurality of candidates for the train that can be used for transporting cargo, selects the train to be used for transporting cargo from the plurality of candidates based on an evaluation function that evaluates the efficiency of cargo transportation. The operation management device according to claim 10.

13. When the train on which passengers ride is also used for transporting cargo, the operation coordination unit allocates the multiple vehicles to the vehicles on which passengers ride and the vehicles used for transporting cargo based on a result of predicting the occupancy rate of each of the multiple vehicles in the case where passengers ride in the multiple vehicles constituting the train. The operation management device according to claim 10.

14. When the number of trains available for transporting cargo is insufficient for the determined transportation volume, the operation adjustment unit changes some of the trains used for transporting passengers to the trains used for transporting cargo. The operation management device according to claim 10.

15. A data acquisition unit that acquires passenger data indicating passenger demand for trains operated by railroads and freight data indicating demand for freight transported by the trains; a demand forecasting unit that creates passenger demand forecast data, which is a result of predicting the future passenger riding demand for the train, and cargo demand forecast data, which is a result of predicting the future transportation demand of cargo for the train, based on the passenger data and the cargo data; an operation adjustment device including: an operation adjustment unit that creates an implementation timetable, which is an operation plan adjusted from a basic timetable, which is a basis for the train operation plan, based on the passenger demand forecast data, the freight demand forecast data, and a basic timetable, which is a basis for the train operation plan; a traffic control device that controls the operation of the train based on the actual timetable created by the traffic adjustment device; A traffic management system characterized by the above.

16. A data acquisition unit that acquires passenger data indicating passenger demand for trains operated by railroads and freight data indicating demand for freight transported by the trains; a demand forecasting unit that creates passenger demand forecast data, which is a result of predicting the future passenger riding demand for the train, and cargo demand forecast data, which is a result of predicting the future transportation demand of cargo for the train, based on the passenger data and the cargo data; an operation control device including: an operation adjustment unit that creates an implementation timetable, which is an operation plan adjusted from a basic timetable, based on the passenger demand forecast data, the freight demand forecast data, and a basic timetable, which is a basis for the train operation plan; a cargo information management device that stores the cargo data and outputs the cargo data to the data acquisition unit. A traffic management system characterized by the above.

17. A method for adjusting a train operation plan for a railway by a computer, comprising the steps of: acquiring passenger data indicating passenger demand for the train and freight data indicating demand for freight transport by the train; creating passenger demand forecast data, which is a result of predicting the future passenger riding demand for the train, and freight demand forecast data, which is a result of predicting the future transportation demand of freight for the train, based on the passenger data and the freight data; and creating an implementation timetable, which is an operation plan adjusted from a basic timetable, based on the passenger demand forecast data, the freight demand forecast data, and a basic timetable, which is the basis of the train operation plan. A method for adjusting operations.

18. Acquiring passenger data indicating passenger demand for trains operated by railroads and freight data indicating demand for freight transport by the trains; creating passenger demand forecast data, which is a result of predicting the future passenger riding demand for the train, and freight demand forecast data, which is a result of predicting the future transportation demand of freight for the train, based on the passenger data and the freight data; and creating an actual timetable, which is an operation plan adjusted from a basic timetable, based on the passenger demand forecast data, the freight demand forecast data, and a basic timetable, which is the basis of the train operation plan. An operation adjustment program characterized by:

Citation Information

Patent Citations

  • Operation management device, train control method, and program

    JP2015182653A

Cited By

  • Motor train unit and truck interval forbidding recognition and card control method based on CTC running diagram