Simultaneous removal and installation of underground power cables
The method addresses inefficiencies in underground cable removal and installation by using a connection fitting and drive roller section to simultaneously remove and install cables, enhancing safety and reducing work time and costs.
Patent Information
- Application Number
- JP2024545735
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2021-10-08
- Filing Date
- 2022-09-30
- Publication Date
- 2024-10-10
- Estimated Expiration
- 2042-09-30
AI Technical Summary
Existing methods for removing and installing underground power cables are inefficient, unsafe, and costly, involving repetitive processes like cutting, tying, and loading cables, which disrupt traffic and increase worker fatigue and safety risks.
A method that simultaneously removes and installs underground power cables using a connection fitting to link the rear end of the removed cable with the tip of the newly installed cable, incorporating a drive roller section for cable separation and cutting, and a brushing process to prevent damage and twisting, allowing for simultaneous cable removal and installation.
This method reduces work time, minimizes worker fatigue, prevents safety accidents, and enhances construction quality by enabling simultaneous cable removal and installation, reducing the need for additional work steps and equipment.
Smart Images

Figure 2024537547000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for simultaneously removing and installing an underground power cable, and more particularly to a method for simultaneously removing and installing an underground power cable, in which the rear end of the cable to be removed and the front end of the cable to be newly installed are connected to each other with a connector, thereby removing the cable to be removed, and at the same time, the new cable is pulled into an underground pipe, thereby shortening the process compared to the existing process. [Background technology]
[0002] Generally, the underground line method used in power pipeline construction involves burying power pipelines in the ground and then using the buried power pipelines to bury cables in the ground.
[0003] Such underground cables consist of a pipeline buried underground, manholes buried on both sides of the pipeline, and a newly installed cable in the pipeline between the manholes, with transformers and switches located at the branching points and power supply points. In order to replace such a cable buried in the ground, the buried cable must first be removed.
[0004] In particular, the conventional cable removal method involves first connecting one side of a wire to the end of the cable to be replaced, connecting the end of the cable and the wire with one side connected to it to a crane, and then using the crane to lift the cable and remove it from the manhole.The crane then moves along the road to pull out the buried cable. The conventional cable removal method has a problem in that road control work must be carried out for the distance the crane travels.
[0005] That is, when the crane is moving, a guide must perform a guide operation to prevent other vehicles from approaching, which exposes the guide to a risk of accidents.
[0006] In addition, workers must use a cutter to cut the cables that are removed from the manholes by the crane, then tie them up. Then, they must use a crane to lift up the tied-up cable bundles, load them, and then move them away, which is an additional step, and creates the inconvenience of having to control the roads until the work is completed.
[0007] Of course, it is possible to lift the cable by the crane without moving the crane, and then cut the lifted cable and tie down the cut cable for loading.
[0008] In addition, after the cable cutting operation, in order to separate the cut cable from the crane, the wire connected to the cable must be untied from the cable and then tied back to the end of the cable remaining inside the manhole, which must be repeated.
[0009] This not only significantly reduces the efficiency of workers working in the narrow space of a manhole, but also exposes workers to safety accidents in which they may be injured during work.
[0010] Looking closely at the cable removal device in Patent Document 1 (registered on August 1, 2008) of the Republic of Korea, as a prior art, the cable removal device includes a main rotary jig that is connected to a hydraulic motor and can pull out the cable by rotating in contact with the cable, and a winch that is connected to the main rotary jig and rotates to pull the pulled-out cable. The cable removal device is equipped with a sub rotary jig that is installed so as to be able to move back and forth adjacent to or separated from the main rotary jig and is rotatably installed between the main rotary jig and the main rotary jig so as to be able to pull out the cable, and a bed on which the main rotary jig, winch and rotary jig are mounted and which is installed horizontally on the ground.
[0011] Although such conventional techniques allow cable removal to be performed in a fixed state without moving equipment such as a crane, they do not completely solve the problems associated with cutting and loading the cable after removal, or with separating the conductor and insulator.
[0012] Furthermore, when installing a new underground line, the cable is usually delivered to the site wound on a drum, and the length of cable installed at one time is approximately 250 to 300 meters. Due to the nature of electricity, three cables are placed in one conduit, and the three cables are configured as one circuit (for three-phase AC). The cable wound on the drum is moved inside the underground conduit or above ground, and then it is installed while being unwound.
[0013] Considering that the lifespan of installed cables is usually 30 years, they will need to be replaced with new cables in the future. However, the current general construction methods for new installation and removal have the following problems: First, there is inefficiency in the repetitive process of installing one circuit at a time in the same location where multiple circuits are installed. Second: The repeated installation and removal of cable drums is uneconomical. Third: Insufficient information management of installed cables and lack of reliability in installation quality. Fourth: During the removal work, there were problems such as the need to pull out long cables to the side of the road, cut them, tie them together, and load them onto work vehicles, which reduced work efficiency due to discontinuity.
[0014] For example, devices proposed for construction companies to retrieve cables include Patent Document 2: Korean Registered Patent No. 10-0921984 "Winding device for retrieving electric wires," Patent Document 3: Korean Registered Patent No. 10-0978003 "Vehicle-mounted automatic distribution cable pulling device," and Patent Document 4: Korean Registered Patent No. 10-1027732 "Multi-line cable pulling device for drum cable," and Patent Document 5: Korean Registered Patent No. 10-1261458 "Multi-line pulling device for underground cable," all of which were filed and registered by the applicant. These devices rotate a winding drum using hydraulic pressure supplied from the vehicle on which the cable is mounted, to wind up and retrieve the cable.
[0015] The collected cables wound on the winding drums are usually transported to a materials warehouse and stored for a certain period of time before being sold to a recycling company for reprocessing. After being transported and stored several times, the discarded cables are stripped of their outer sheaths (insulation) at the reprocessing company, and only the copper is recycled.
[0016] Currently, the cable removal (recovery) process involves pulling out the cable with a cable puller that utilizes an electric motor. This method involves repeatedly tying and pulling out the cable inside the narrow manhole, and when the cable comes out of the manhole at about 3m at a time, it is cut and removed. Considering that one manhole span is 250~300m, this process is complex and extremely tough work, requiring more than 80~100 tying and untying processes to complete the removal of one section.
[0017] Therefore, while removal work takes more time than installing a new cable, the cost is simply calculated to be 50% of the cost of installing a new cable, and in actual practice, rather than using a cable puller, heavy equipment such as a crane or backhoe is used to pull the cable to the side of the road and spread it out before removing it.
[0018] The removal method of using vehicles or heavy equipment to pull out the cables is effective in shortening the work time, but since the cables are pulled out at a fast speed, it is difficult to control the speed and there is a risk of damaging other live cables in the manhole.
[0019] In addition, after pulling out about 250 to 300 meters of cable to the side of the road on the ground, to collect the cable that has been removed to the side of the road, two people work together to cut the removed cable, moving about 2 to 3 meters at a time with a large manual cutter. The cut cables are then tied together in groups of several dozen for transport back to the vehicle, and are then loaded onto a cargo crane before being removed.
[0020] During the cable removal process, the cables are pulled out, cut, tied together, and loaded, causing traffic congestion by restricting traffic lanes of approximately 250 to 300 meters, so the cable removal process needs to be improved. Therefore, there was a need for a new device that could process the cable to be removed immediately on-site, without having to go through a series of manual processes as in the past.
[0021] In order to solve the above problems, Patent Document 6: Republic of Korea Patent No. 10-1031795 (registered on April 21, 2011) "Vehicle-Mounted Three-Phase Distribution Cable Automated Removal Device" and Patent Document 7: Republic of Korea Patent No. 10-1147597 (registered on May 14, 2012) "Underground Cable Composite Power Pooling Device" were proposed.
[0022] The former removal device uses a winch to pull out the cable from inside a power trench or conduit, and then places the cable between upper and lower rollers and pulls out the cable through pressure and rotation with the help of a hydraulic cylinder.
[0023] The latter pulling device is a device that pulls out a cable using a winch rotated by a hydraulic motor, and is equipped with a cable cutter for the convenience of recovering worn-out cables. However, since these cable cutters are fixed type, they are configured to cut the recovered cable in a stopped state after pulling out a predetermined length. Therefore, it is not possible to continuously pull out the recovered cable and cut it at the same time, which causes an uneconomical problem of increasing the equipment operating time and work time.
[0024] In addition, Patent Document 8 (Korean Patent Registration No. 10-1471017) filed and registered by the applicant, entitled "Cable Multi-pulling Device", is configured to cut the recovery cable with a fixed cutting section at the return point of a pulling section consisting of a first clamping device and a second clamping device, which pull out the recovery cable in a linear reciprocating motion and temporarily suspend it.
[0025] This is designed to make it easier to cut the recovered cable while pulling it out more stably than the conventional recovery cable winding method, but it has the uneconomical problem of increasing equipment operating time and labor time because the recovered cable cannot be continuously pulled out and cut at the same time.
[0026] In addition, the conventional devices for removing the recovered cable and installing the new cable are both independently mounted on vehicles so that they can perform their work while moving.
[0027] As a result, two vehicles and two drivers were required to retrieve and install a new cable, which required manpower, and the equipment installed in the two vehicles had to be replaced at the same time, making the work complicated and uneconomical due to the additional costs. [Prior art documents] [Patent documents]
[0028] [Patent Document 1] Republic of Korea Patent No. 10-0851196 (registered on August 1, 2008) [Patent Document 2] Republic of Korea Patent No. 10-0921984 "Winding device for recovering electric wires" [Patent Document 3] Korean Patent No. 10-0978003 "On-board automatic distribution cable pooling device" [Patent Document 4] Korean Patent No. 10-1027732 "Multi-line cable pulling device for drum cables" [Patent Document 5] Korean Patent No. 10-1261458 "Underground cable multi-line pooling device" [Patent Document 6] Republic of Korea Patent No. 10-1031795 (registered on April 21, 2011) "Vehicle-mounted 3-phase power distribution cable automated removal device" [Patent Document 7] Republic of Korea Patent No. 10-1147597 (registered on May 14, 2012) "Underground cable composite power pooling device" [Patent Document 8] Korean Patent No. 10-1471017 "Cable Multi-Pooling Device" Summary of the Invention [Problem to be solved by the invention]
[0029] In order to solve the problems of the conventional technology as described above, the present invention provides a method for simultaneously removing and installing underground power cables with a new structure, in which the rear end of a cable to be removed and the front end of a cable to be newly installed are connected to each other with a connector, the cable to be removed is removed, and the new cable is pulled into an underground pipe, thereby shortening the time compared to the conventional process.
[0030] In addition, a method for simultaneously removing and installing an underground power cable is provided, which enables a stripping unit to be placed on one side of a drive roller unit to separate the coating and copper wire of the cable to be removed, and a cutting unit to be placed on one side of the stripping unit to cut the cable to be removed to a fixed length, thereby simultaneously separating and cutting the cable to be removed.
[0031] In addition, the present invention provides a method for simultaneously removing and installing an underground power cable, which further includes a brushing process for connecting a brush portion to the outer peripheral surface of the connection port, and in which, when the newly installed cable is moved into the underground pipe, the brush removes impurities on the inner surface of the underground pipe, thereby preventing damage to the outer sheath of the newly installed cable.
[0032] In addition, the present invention provides a method for simultaneously removing and installing underground power cables, which prevents the cables from twisting by rotating the connection connectors, to which the rear end of the removed cable and the front end of the newly installed cable are respectively connected, around an axis in the longitudinal direction. [Means for solving the problem]
[0033] In order to solve the above problems, the present invention provides a removal preparation process in which the removal rope is pulled out by a removal winch on which the removal rope is wound, and the removal rope is pulled into a manhole and connected to a removal cable; A connecting step of connecting the tip end of the new cable wound on the rotating drum to the rear end of the removed cable laid in the underground pipe through a lead-in manhole; and The cable replacement step includes inserting the cable to be removed into a drive roller section, removing the cable to be removed by driving the drive roller section, and pulling the new cable into an underground pipe. To provide a method for simultaneously removing an underground power cable and installing a new one.
[0034] In a method for simultaneously removing and installing an underground power cable according to an embodiment of the present invention, the removal preparation process may further include a first preparation process of applying power to the removal winch to drive it and pull out the cable to be removed from the underground pipeline; and a second preparation process of placing the cable to be removed pulled out from the underground pipeline in the drive roller section.
[0035] In the method for simultaneously removing and installing an underground power cable according to an embodiment of the present invention, the connecting step may further include a first installation step of installing the rotating drum on a first-advance device, and installing a plurality of rotating drums corresponding to the number of twists of at least one line of the newly installed cable; a second installation step of pulling the newly installed cable, which is advanced by the first-advance device, into the underground pipeline through the entrance manhole; a first connecting step of connecting a new installation connector port to the front end of the newly installed cable and connecting a removal connector port to the rear end of the removed cable; and a second connecting step of connecting the new installation connector port and the removal connector port with a connecting connector port.
[0036] In the method for simultaneously removing and installing an underground power cable according to an embodiment of the present invention, the second connecting step further includes a brushing step of connecting a main pipe having an inner diameter formed to correspond to an outer surface of the connector port and a brush part consisting of a brush formed on an outer peripheral surface of the main pipe, and the brushing step can be characterized in that when the connector port moves into the underground pipe, impurities on the inner surface of the underground pipe are removed to prevent damage to the outer sheath of the newly installed cable.
[0037] In the method for simultaneously removing and installing an underground power cable according to an embodiment of the present invention, the cable replacement process may further include a cutting process of disposing a cutting unit on one side of the driving roller unit and cutting the removed cable transmitted through the driving roller unit to a certain length through the cutting unit.
[0038] In the method for simultaneously removing and installing an underground power cable according to an embodiment of the present invention, the cutting step may further include a separation section connecting step of connecting the tip end of the cable to be removed to a stripping section in order to separate the coating, which is an insulator, and the copper wire, which is a conductor, of the cable to be removed before connecting the tip end of the cable to the cutting section. Effect of the Invention
[0039] The method of simultaneously removing and installing an underground power cable according to the present invention involves connecting the rear end of the cable to be removed and the front end of the cable to be newly installed with a connector, removing the cable to be removed, and pulling the new cable into an underground pipe to install it. This has the advantage of reducing the number of work steps compared to a process of removing an existing cable and then installing a new cable, allowing for quick installation of the cable and minimizing fatigue of workers.
[0040] In addition, by cutting the cable to be removed to a certain length while transporting it to the cutting section, the pulling and cutting operations for the cable to be removed are carried out simultaneously, minimizing the work time and fatigue of the worker and preventing safety accidents for the worker.
[0041] In addition, the additional work of recycling removed cables can be eliminated by separating the conductor coating from the copper insulation of the removed cables.
[0042] In addition, the method further includes a brush process of attaching a brush part to the outer circumferential surface of the connector, and when the new cable is moved into the underground pipeline, the brush removes impurities from the inner surface of the underground pipeline to prevent damage to the outer sheath of the new cable. This has the advantage that the new cable located inside the underground pipeline can be used for a long period of time and construction quality is improved.
[0043] In addition, the connection ports to which the rear end of the cable to be removed and the front end of the new cable are connected are designed to rotate around the longitudinal axis, thereby preventing the cables from twisting, which has the advantage of enabling the cables to be removed and installed quickly. [Brief description of the drawings]
[0044] [Figure 1] 1 is a process diagram showing a method for simultaneously removing and installing an underground power cable according to an embodiment of the present invention. FIG. [Diagram 2] FIG. 2 is a conceptual diagram showing the concept of FIG. 1 using an underground power cable replacement device. [Diagram 3] 1 is an illustrative diagram showing a drive roller part of a method for simultaneously removing and installing an underground power cable according to an embodiment of the present invention. FIG. [Figure 4] FIG. 2 is an illustrative diagram showing a stripping section in a simultaneous removal and new installation method for an underground power cable according to an embodiment of the present invention. [Diagram 5] FIG. 2 is a process diagram specifically illustrating a method for simultaneously removing and installing an underground power cable according to an embodiment of the present invention. [Figure 6] 1 is a conceptual diagram showing a new installation process among the connecting processes of a simultaneous removal and new installation method of an underground power cable according to an embodiment of the present invention. FIG. [Figure 7] 1 is an illustrative diagram showing a connecting connector and a splice connector for a connection process of a simultaneous removal and new installation method of an underground power cable according to an embodiment of the present invention. FIG. [Figure 8]FIG. 7 is an illustrative view showing a state in which the brush part is coupled to the connector of FIG. 6. [Figure 9] 1 is a conceptual diagram showing the removal process of a simultaneous removal and new installation method for an underground power cable according to an embodiment of the present invention. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0045] Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings, which will enable those skilled in the art to easily carry out the present invention. However, in describing the operation principle of the preferred embodiments of the present invention in detail, detailed descriptions of related known functions or configurations will be omitted if it is determined that such detailed descriptions may unnecessarily obscure the gist of the present invention. In addition, the same reference numerals are used throughout the drawings for parts having similar functions and actions. In addition, when a certain part is referred to as being "connected" to another part throughout the specification, this includes not only direct connection but also indirect connection through another component in between. Furthermore, "including" a certain component does not mean excluding other components, but may further include other components, unless otherwise specified. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a method for simultaneously removing and installing an underground power cable according to a preferred embodiment of the present invention will be described in detail with reference to the accompanying drawings.
[0046] FIG. 1 is a process diagram showing a method for simultaneously removing and installing an underground power cable according to an embodiment of the present invention; FIG. 2 is a conceptual diagram showing the concept of FIG. 1 using an underground power cable replacement device; FIG. 3 is an illustrative diagram showing a drive roller part of a method for simultaneously removing and installing an underground power cable according to an embodiment of the present invention; FIG. 4 is an illustrative diagram showing a stripping part of a method for simultaneously removing and installing an underground power cable according to an embodiment of the present invention; FIG. 5 is a process diagram specifically showing a method for simultaneously removing and installing an underground power cable according to an embodiment of the present invention; FIG. 6 is a conceptual diagram showing a new installation process among the connection processes of a method for simultaneously removing and installing an underground power cable according to an embodiment of the present invention; FIG. 7 is an illustrative diagram showing a connecting connector and a splicing connector for the connection process of a method for simultaneously removing and installing an underground power cable according to an embodiment of the present invention; FIG. 8 is an illustrative diagram showing a state in which a brush part is connected to the splicing connector of FIG. 6; and FIG. 9 is a conceptual diagram showing a removal process of a method for simultaneously removing and installing an underground power cable according to an embodiment of the present invention.
[0047] As shown in FIG. 1, the method for simultaneously removing and installing an underground power cable (S10) according to an embodiment of the present invention includes a removal preparation step (S100), a connection step (S200) and a cable replacement step (S300).
[0048] More specifically, as shown in Figures 1 and 2, the method (S10) for simultaneously removing and installing an underground power cable according to an embodiment of the present invention includes a removal preparation process (S100) in which a removal rope 110 is pulled out by a removal winch 100 on which the removal rope is wound, and the removal rope is pulled into a manhole 11 to connect to the cable DC to be removed, a connection process (S200) in which a front end of a new cable NC wound around a rotating drum RD is connected to a rear end of the cable to be removed laid in an underground pipeline through an inlet manhole 12, and a cable replacement process (S300) in which the cable to be removed is inserted into a drive roller unit 200, and the cable to be removed is removed by driving the drive roller unit, and the new cable is pulled into the underground pipeline.
[0049] Here, as shown in FIG. 2, the method for simultaneously removing and installing an underground power cable (S10) according to an embodiment of the present invention includes an underground power cable replacement device 10, which is positioned on one side of an exit manhole 11 and one side of an entrance manhole 12, respectively. Such an underground power cable replacement device 10 includes a removal winch 100, a drive roller unit 200, a stripping unit 300, a cutting unit 400 and a leading device 500.
[0050] The removal winch 100 is mounted on a loading box of a moving means such as a vehicle and is driven by an applied power source to wind and unwind the removal rope 110. It is preferable that the removal rope 110 is fixed to one side or one end of the removal cable DC via a wire, band, or the like.
[0051] Referring to FIG. 3, the driving roller unit 200 is provided on a vehicle equipped with the removal winch 100 and serves to wind and unwind the removal rope 110.
[0052] In addition, the driving roller unit 200 includes a plurality of support walls 210, at least one upper roller 220 rotatably mounted on the support walls 210, a lower roller 230 spaced a predetermined distance from the upper roller 220, a cylinder 240 for providing a pressure force while raising and lowering the upper roller 220, and a motor 250 for transmitting power to the lower roller 230. Additionally, the drive roller portion 200 further includes a gear 260 .
[0053] The gear 260 is disposed between the lower rollers 230 arranged in a plurality of pieces, and is rotatably mounted on the support wall 210 so as to receive a driving force from the lower rollers 230 driven by the motor 250 .
[0054] Referring to FIG. 3, the stripping unit 300 is disposed on one side of the driving roller unit 200 and separates the coating and the copper wire of the cable DC that has passed through the driving roller unit 200.
[0055] For this purpose, the peeling unit 300 includes a plurality of lower blades 310, an upper blade 320 disposed at a predetermined distance from the lower blade 310, a plurality of transfer tubes 330 that guide the cable DC to be removed so that the lower blade 310 and the upper blade 320 can come into contact with the outer skin of the cable DC, and openings 340 through which the outer periphery of the transfer tube 330 where the lower blade 310 and the upper blade 320 are located is opened and cut to expose the cable DC to the upper and lower parts of the transfer tube 330.
[0056] Referring to FIG. 2, the cutting unit 400 is disposed on one side of the driving roller unit 200 and serves to cut the removed cable DC that has passed through the removing unit 300 .
[0057] For example, if the cable to be removed is pulled out from the manhole and then pulled out to the side of the road above ground, the traffic control area will be long, posing a safety problem for passing vehicles and workers. To remedy this, it is preferable to disconnect the withdrawal cable DC.
[0058] 2 and 6, the advance device 500 is mounted on a loading box of a moving means such as a vehicle and disposed on one side of the pull-out manhole 12, and serves to lay a new cable NC in an underground pipe.
[0059] Such a first-out device 500 forms a partitioned frame so that a plurality of rotating drums RD can be installed. And the advance device 500 further includes a pull-in roller 510 and a tension roller 520 . At least one pull-in roller 510 is provided on one side of the frame in order to increase the discharge speed of the new cable NC being unwound from the rotating drum RD.
[0060] The tension roller 520 is disposed in the underground pipe where the pull-out manhole 11 is located, and serves to maintain the tension of the removal cable DC pulled by the driving of the driving roller unit 200.
[0061] In this manner, the underground power cable replacement device 10 is provided to pull out the removed cable DC and to pull the new cable NC into the underground pipeline, and the removal preparation process (S100) is first carried out as shown in Figures 2 and 5. For this purpose, the removal preparation step (S100) further includes a first preparation step (S110) and a second preparation step (S120). The first preparation step (S110) is a step of applying power to the removal winch 100 to drive it and pull out the removal cable DC from the underground conduit.
[0062] That is, a vehicle equipped with a removal winch 100 is positioned on one side of the drawout manhole 11, and the removal rope 110 wound around the removal winch 100 is pulled into the inside of the drawout manhole 11 to connect the removal cable DC laid up to the drawout manhole 11. Then, the removal winch 100 is driven to pull the removal rope 110 to pull the removal cable DC out of the underground pipeline.
[0063] The second preparation step (S120) is a step of placing the removal cable DC, which has been pulled out from the underground conduit, on the drive roller unit 200.
[0064] For this purpose, the removal rope 110 connected to the tip of the removal cable DC is removed, and the tip of the removal cable DC is inserted into the driving roller unit 200 as in a cable replacement step (S300) described below.
[0065] 2 and 5, the connecting step (S200) is a step of connecting the leading end of the new cable NC wound around the rotating drum RD to the trailing end of the cable to be removed DC laid in the underground pipeline through the entrance manhole 12. For this purpose, the method further includes a first installing step (S210), a second installing step (S220), a first bonding step (S230), and a second bonding step (S240).
[0066] The first new installation process S210 is a process of installing a rotating drum RD in the advance device 500, and installing a plurality of rotating drums RD corresponding to the number of twists of at least one or more lines of the newly installed cable NC. Here, the rotating drum RD is installed for two lines, and since one line consists of three cables, a total of six rotating drums are installed in this embodiment of the present invention. Moreover, the embodiment of the present invention can also lay only one line instead of two lines.
[0067] Referring to FIG. 6, the second new installation step (S220) is a step of leading the new cable NC, which is led by the lead-in device 500, into the underground pipeline through the lead-in manhole 12.
[0068] That is, in the second new installation step (S220), the new cable NC wound around the rotating drum RD is connected to a pull-in roller 510 to prevent the new cable NC from bending when the new cable NC is pulled into the underground conduit.
[0069] At this time, when the new cable NC is pulled into the inlet manhole 12 from the direction in which it is wound around the rotating drum RD, it forms a "C" shape to suppress the occurrence of artificial bending, thereby preventing bending of the neutral wire.
[0070] For example, in the conventional cable pulling method shown in Fig. 6(a), the rotating drum is positioned in a straight line with the direction of the cable being laid when pulling in the cable, minimizing the pulling tension generated during pulling, but there is a problem that the cable is partially bent due to the difference in height from the rotating drum to the underground pipe, which causes a problem of damaging the neutral wire inside the cable.
[0071] In contrast, in the present invention shown in Fig. 6(b), when the cable is pulled in, the rotating drum is positioned in the same direction as the cable being laid, so the cable is pulled into the underground pipe forming a "C" shape. This has the advantage that the pulling tension is higher than in the conventional method, but damage to the neutral wire can be prevented. At this time, the problem of high pull-in tension can be solved by using the pull-in roller 510 described above.
[0072] 5 and 7, the first coupling step (S230) is a step of connecting the new connector 600 to the leading end of the new cable NC and connecting the removal connector 600 to the trailing end of the removal cable DC.
[0073] Here, the connector 600 has connecting wires connected to one end of a pulling eye that is connected to each of the three power cables, and one side of the connecting wires is gathered to form a loop.
[0074] Therefore, in the first connecting process (S230), the removal connector port 600 is first connected to the rear end of the three cables DC to be removed, and then the new installation connector port 600 is connected to the front end of the new cable NC that has been pulled into the entrance manhole 12, and the loops are arranged so that they face each other. The second connecting step (S240) is a step of connecting the new connection connector 600 and the removal connection connector 600 with the connecting connector 700.
[0075] Here, the connection connector 700 has a shaft portion extending in the length direction, and is formed with fastening rings on both sides of the shaft portion to fasten the rings of the connection connector 600, thereby connecting the rear end of the removed cable DC and the front end of the new cable NC to each other.
[0076] In particular, the connector 700 is manufactured to match the length of the continuity test rod, so that a continuity test can be performed simultaneously when replacing a cable, thereby preventing problems caused by a lack of continuity in the conduit.
[0077] In this manner, the second connection process (S240) uses the connection socket 700 to connect the rear end of the cable DC to the front end of the new cable NC, thereby shortening the process of removing the previous cable to be removed and the process of installing the new cable, thereby reducing work time and manpower costs.
[0078] Meanwhile, as shown in FIG. 8, the second connecting step (S240) of the method for simultaneously removing and installing an underground power cable (S10) according to an embodiment of the present invention further includes a brushing step (S241).
[0079] The brush step (S241) is a step of combining a main pipe having an inner diameter corresponding to the outer surface of the connector port 700 with a brush part 800 formed on the outer circumferential surface of the main pipe.
[0080] In particular, the brush process (S241) is a process for removing impurities on the inner surface of the underground conduit when the connector 700 moves into the underground conduit, thereby preventing damage to the outer cover of the newly installed cable NC.
[0081] In other words, the brush process (S241) removes impurities by pulling the removed cable DC in the cable replacement process (S300) and moving the new cable NC into the underground pipeline so that the connection socket 700 enters the underground pipeline and comes into contact with the inner surface of the underground pipeline.
[0082] This allows the new cable NC to be laid in the underground conduit while cleaning the inner surface of the underground conduit, and prevents damage to the outer sheath of the new cable NC that comes into contact with the inner surface of the cleaned underground conduit, making it possible to use the new cable NC for a long period of time without replacement.
[0083] 5 and 9, the cable replacement process (S300) is a process in which the removed cable DC is inserted into the drive roller unit 200, and the removed cable DC is removed by driving the drive roller unit 200, and a new cable NC is pulled into the underground pipeline.
[0084] In this cable replacement process (S300), before removing the removed cable DC, a removal preparation process (S100) is performed to place the removed cable DC on the driving roller unit 200. Then, a second new installation process (S220) is performed to introduce the above-mentioned new cable NC into the inlet manhole 12.
[0085] Thereafter, in the connecting step (S200), the leading end of the new cable NC is connected to the trailing end of the removed cable DC using the connecting connector 600 and the connecting connector 700.
[0086] Next, the tip of the removal cable DC is inserted into the drive roller unit 200, and the drive roller unit 200 is driven.
[0087] At this time, while the removed cable DC is being pulled, the new cable NC moves in the direction in which the removed cable DC is being pulled and is pulled into the underground conduit, making it possible to lay the new cable at the same time as removing the cable.
[0088] 5 and 9, the cable replacement step (S300) further includes a cutting step (S310).
[0089] The cutting step (S310) is a step of disposing a cutting unit 400 on one side of the driving roller unit 200 and cutting the removal cable DC transmitted through the driving roller unit 200 to a predetermined length through the cutting unit 400.
[0090] This solves the problem of the conventional method in which a worker must cut a long cable DC to be removed with a cutter after it has been completely pulled out of a manhole and placed on the road. In particular, it is preferable that the cable DC to be removed can be pulled out from the manhole and cut to a fixed length at the same time as it is transported, and that the cut cable can be loaded onto another means of transportation.
[0091] For example, the cut length of the cable to be removed is preferably 2 to 3 meters. If the cut length is less than 2 meters, the time required for pulling out and cutting the long cable to be removed will be delayed. If the cut length is more than 3 meters, it will be difficult to tie up the cut cable, and it will be difficult to transport the tied cable when loading it.
[0092] Meanwhile, as shown in FIG. 2 and FIG. 4, the cutting step (S310) of the method for simultaneously removing and installing an underground power cable (S10) according to an embodiment of the present invention further includes a separation part connecting step (S311).
[0093] The separation section connection process (S311) is a process of connecting the tip of the cable DC to the stripping section 300 in order to separate the coating, which is the insulator of the cable to be removed, from the copper wire, which is the conductor, before connecting the tip of the cable DC to the cutting section 400.
[0094] More specifically, in the separation unit connecting process (S311), the removal cable DC that has passed through the driving roller unit 200 is inserted into the transfer tube 330, and the outer sheath of the removal cable DC is exposed through an opening 340 cut on one side of the transfer tube 330.
[0095] At this time, the lower blade 310 and the upper blade 320 arranged in the opening 340 cut the outer sheath of the cable DC to be removed in the length direction of the upper and lower sides. Then, the cable DC to be removed whose upper and lower parts have been cut is transferred to the cutting unit 400 and cut to a certain length, and then delivered to a transport vehicle.
[0096] As described above, the detailed description of the present invention has been given with respect to the preferred embodiment of the present invention, but this is merely an illustrative description of the best embodiment of the present invention and is not intended to limit the present invention. In addition, it goes without saying that anyone with ordinary knowledge in the technical field to which the present invention pertains can make various modifications and imitation of the present invention within the scope of the technical concept of the present invention. Therefore, the scope of the present invention is not limited to the above-described embodiment, but may be embodied in various forms within the scope of the appended claims. Furthermore, the scope of the present invention includes various modifications that can be made by anyone having ordinary skill in the art to which the invention pertains without departing from the gist of the present invention as claimed in the claims.
Claims
1. a removal preparation step in which the removal rope is pulled out by a removal winch on which the removal rope is wound, and the removal rope is pulled into a manhole and connected to a removal cable; a connecting step of connecting a leading end of the new cable wound around a rotating drum to a trailing end of the removed cable laid in an underground pipeline through an entrance manhole; and a cable replacement process in which the cable to be removed is inserted into a drive roller section, the drive roller section is driven to remove the cable to be removed, and the new cable is pulled into an underground pipe; The linking step comprises: a first installation step of installing the rotating drum on the advance device, the first installation step being to install a plurality of rotating drums corresponding to the number of twists of at least one new cable line; a second new installation step of introducing the new cable, which is advanced by the advance-advancement device, into the inside of the underground pipeline through the entrance manhole; a first connecting step of connecting a new cable connector to a front end of the new cable and connecting a removal cable connector to a rear end of the removal cable; and The method further includes a second connecting step, which connects the new cable connector and the removal cable connector with a connector, and which includes a brush step of connecting a main pipe having an inner diameter corresponding to the outer surface of the connector and a brush part formed on the outer circumferential surface of the main pipe to remove impurities on the inner surface of the underground pipe when the connector moves into the underground pipe, thereby preventing damage to the outer sheath of the new cable, The connecting wire port includes a rod-shaped pulling eye and a ring formed on one side of the pulling eye, The connector has a shaft portion extending in the length direction, and fastening rings are formed on both sides of the shaft portion to fasten the rings of the connector, thereby connecting the rear end of the removed cable and the front end of the new cable to each other, thereby enabling the cable replacement process to be performed. A method for simultaneously removing and installing an underground power cable, comprising:
2. The removal preparation step includes: A first preparation step of applying power to the removal winch to drive the removal winch and pull out the removal cable from the underground pipe; and The method further includes a second preparation step of arranging the removal cable pulled out from the underground pipe in the drive roller unit. The method for simultaneously removing and installing an underground power cable according to claim 1.
3. The cable replacement step includes: The method further includes the step of: disposing a cutting unit on one side of the driving roller unit and cutting the removal cable transmitted through the driving roller unit to a predetermined length through the cutting unit. The method for simultaneously removing and installing an underground power cable according to claim 1.
4. The cutting step includes: The method further includes a separation part connection step of connecting the tip of the removed cable to a peeling part to separate the coating, which is an insulator, and the copper wire, which is a conductor, of the removed cable before connecting the tip of the removed cable to the cutting part. The method for simultaneously removing and installing an underground power cable according to claim 3.
Citation Information
Patent Citations
Cable remover
JP1996033142A
Method of drawing cable
JP2005086838A
Separation connector of tester of conduit conduction test
JP2020106108A
Tube pulling and lubricating system
US4411409A
JPS4222505B1