Data transmission method, device and base station device
The data transmission method in TDD systems using SBFD time-frequency resources addresses the limitations of half-duplex operation by enabling simultaneous uplink and downlink data processing, enhancing resource utilization and reducing transmission delay.
Patent Information
- Application Number
- JP2024535340
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2022-09-28
- Publication Date
- 2024-11-21
- Estimated Expiration
- 2042-09-28
AI Technical Summary
TDD systems face limitations in downlink transmission rate and increased transmission delay due to the half-duplex operation, where the same time domain resources can only be used for either uplink or downlink, limiting flexible resource utilization.
Implementing a data transmission method that allows downlink data transmission on Sub-Band Full Duplex (SBFD) time-frequency resources, determining overlap situations with uplink resources and selecting available resources based on user equipment FD capability to transmit downlink data effectively.
This approach enhances resource utilization, reduces transmission delay, and improves network coverage and capacity by allowing simultaneous uplink and downlink data processing on SBFD time-frequency resources.
Smart Images

Figure 2024543684000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to the field of communications, and in particular to a data transmission method, device, and base station device. [Background technology]
[0002] Time Division Duplex (TDD) systems are widely used in mobile communication systems such as 5G systems. In a TDD system, a frame structure is divided into a DL (Down Link) slot, a UL (Up Link) slot, and an S (Special) slot. The DL slot includes a number of DL symbols, and downlink data is processed in the time domain resources corresponding to these DL symbols. The UL slot includes a number of UL symbols, and uplink data is processed in the time domain resources corresponding to these UL symbols. The S slot includes at least one F (Flexible) symbol. The F symbol may be used for DL, i.e., downlink data is processed in the time domain resources corresponding to the F symbol, the F symbol may be used for UL, i.e., uplink data is processed in the time domain resources corresponding to the F symbol, and the F symbol may be used for GP (Guard Period), i.e., guarding of uplink and downlink switching is performed in the time domain resources corresponding to the F symbol. A TDD system may be operated in HD (Half Duplex) mode, ie at the same time the same time domain resource can only be used for UL or DL. Summary of the Invention [Means for solving the problem]
[0003] The present invention provides a data transmission method applicable to a base station device, the method including the steps of: determining an overlapping situation between SBFD time-frequency resources and uplink time-frequency resources; selecting an available time-frequency resource from the SBFD time-frequency resources based on the overlapping situation and an FD capability of a user equipment; and transmitting downlink data corresponding to a PDSCH on the available time-frequency resource.
[0004] The present invention provides a data transmission device applicable to a base station device, the device including: a determination module configured to determine an overlapping situation between SBFD time-frequency resources and uplink time-frequency resources; an acquisition module configured to select an available time-frequency resource from the SBFD time-frequency resources based on the overlapping situation and an FD capability of a user equipment; and a transmission module configured to transmit downlink data corresponding to a PDSCH on the available time-frequency resource.
[0005] The present invention provides a base station device including a processor and a machine-readable storage medium, the machine-readable storage medium storing machine-executable instructions executable by the processor, the processor being configured to execute the machine-executable instructions to realize the data transmission method disclosed above. Effect of the Invention
[0006] As can be seen from the above technical proposal, downlink data corresponding to PDSCH (Physical Downlink Shared Channel) can be transmitted on SBFD (Sub-Band Full Duplex) time-frequency resources, so as to more effectively utilize SBFD time-frequency resources, improve resource utilization rate, improve network coverage and network capacity, reduce downlink transmission delay, and so on, thereby reducing transmission delay. [Brief description of the drawings]
[0007] [Figure 1] 2 is a flowchart of a data transmission method according to an embodiment of the present invention. [Diagram 2] FIG. 1 is a schematic diagram of scheduling PDSCH on SBFD time-frequency resources. [Diagram 3] FIG. 2 is a schematic diagram of PRACH uplink time-frequency resources and SBFD time-frequency resources. [Figure 4] FIG. 2 is a schematic diagram of non-overlapping time-frequency resources of the same symbol; [Diagram 5] FIG. 1 is a schematic diagram of overlapping SBFD time-frequency resources and SRS uplink time-frequency resources. [Figure 6] 1 is a schematic diagram of overlapping PDSCH repetitive transmission and SRS uplink time-frequency resources; [Figure 7] FIG. 2 is a schematic diagram of overlapping SBFD time-frequency resources and PUCCH uplink time-frequency resources; [Figure 8] 1 is a schematic diagram of overlapping PDSCH repetitive transmission and PUCCH uplink time-frequency resources; [Figure 9] 2 is a schematic structural diagram of a base station device in an embodiment of the present invention; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0008] The terms used in the embodiments of the present invention are not intended to limit the present invention, but merely to describe specific embodiments. The singular forms "a," "the," and "the" used in the embodiments and claims of the present invention are also intended to include the plural, unless the context clearly indicates otherwise. The term "and / or" as used herein should be understood to mean any or all possible combinations including one or more of the associated listed items.
[0009] In the examples herein, terms such as first, second, third, etc. may be used to describe various pieces of information, but it should be understood that these pieces of information should not be limited to these terms. These terms are used only to distinguish between the same types of information. For example, a first piece of information may be referred to as a second piece of information, and similarly, a second piece of information may be referred to as a first piece of information, without departing from the scope of the present invention. Depending on the context, furthermore, the word "if" used may be interpreted as "when," or "when," or "in response to determining."
[0010] In a TDD (Time Division Duplex) system, the frame structure is divided into a DL (Down Link) slot, an UL (Up Link) slot, and an S (Special) slot. A DL slot includes a number of DL symbols, and downlink data is processed in time domain resources corresponding to these DL symbols. A UL slot includes a number of UL symbols, and uplink data is processed in time domain resources corresponding to these UL symbols. An S slot includes at least one F (Flexible) symbol. The F symbol may be used for DL, UL, or GP (Guard Period). Currently, a TDD system may be operated in HD (Half Duplex) mode, i.e., at the same time, the same time domain resource can only be used for UL or DL. In order to use the time domain resource more flexibly and improve resource utilization, a TDD system may be operated in FD (Full-Duplex) mode, i.e., at the same time, the same time domain resource can be used for UL and DL at the same time, i.e., uplink data and downlink data are processed at the same time in the same time domain resource.
[0011] In a TDD system, once the frame structure is determined, the user equipment can transmit and receive data according to the frame structure. The frame structure is divided into DL slots, UL slots, and S slots. For user equipment using HD mode, the base station device schedules the transmission and reception of the user equipment based on the frame structure. For user equipment using a mode supporting FD, the base station device schedules the transmission, reception, or simultaneous transmission and reception of the user equipment based on the frame structure.
[0012] As described above, the base station device sets the frame structure and notifies the user equipment of the frame structure, so that the user equipment can know the frame structure and can transmit and receive data accurately. From another perspective, after knowing the frame structure, the user equipment can know the possible interference between user equipments, so that some interference cancellation techniques can be adopted to reduce the interference caused by other user equipments and improve the reliability of communication.
[0013] For example, in a TDD system, for a frame structure mainly for uplink transmission, many UL slots are usually set, which results in fewer DL slots, restricting the downlink transmission rate, increasing the transmission delay of downlink data, and increasing the delay of downlink transmission, which is detrimental to downlink services.
[0014] In one embodiment of the present invention, a data transmission method is provided that can transmit downlink data corresponding to a Physical Downlink Shared Channel (PDSCH) on a Sub-Band Full Duplex (SBFD) time-frequency resource, that is, the method can transmit downlink data corresponding to a PDSCH using an uplink slot or an F slot, thereby improving the downlink transmission rate and reducing the transmission delay of the downlink data.
[0015] In one embodiment of the present invention, a data transmission method applied to a base station device is provided. Figure 1 is a flowchart of the data transmission method. The method may include steps 101 to 103.
[0016] In step 101, an overlap situation between the SBFD time-frequency resource and the uplink time-frequency resource is determined.
[0017] In step 102, an available time-frequency resource is selected from the SBFD time-frequency resources based on the overlapping situation and the FD capability of the user equipment. The FD capability includes a mode supporting FD (FD mode) or a mode not supporting FD (non-FD mode). The user equipment supporting the mode supporting FD is a full-duplex user equipment, and the user equipment not supporting the mode supporting FD is a half-duplex user equipment.
[0018] In step 103, transmit downlink data corresponding to the PDSCH on the available time-frequency resources.
[0019] In one example, if the overlap situation is that a first slot in the SBFD time-frequency resource and a second slot in the uplink time-frequency resource do not overlap, when the FD capability is in a mode supporting FD or a mode not supporting FD, the first slot in the SBFD time-frequency resource is selected as an available time-frequency resource.
[0020] In one example, when the overlapping situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB (Physical Resource Block) in the first slot overlaps with a PRB in the second slot, an available time-frequency resource is selected from the SBFD time-frequency resource based on the FD capability of the user equipment and the signal type or channel type carried in the uplink time-frequency resource.
[0021] In one example, when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is in a mode supporting FD, the PRB in the first slot is selected as an available time-frequency resource, and when the FD capability is in a mode not supporting FD, an available time-frequency resource is selected from the SBFD time-frequency resource based on a signal type or channel type carried in the uplink time-frequency resource.
[0022] In one example, the signal or channel types carried in the uplink time-frequency resources may include, but are not limited to, at least one of the following: Sounding Reference Signal (SRS), Physical Random Access Channel (PRACH), Physical Uplink Control Channel (PUCCH), Physical Uplink Shared Channel (PUSCH).
[0023] In one example, when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time-frequency resource is PRACH and the FD capability is a mode that does not support FD, it is determined that the SBFD time-frequency resource is an unavailable time-frequency resource.
[0024] In one example, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time-frequency resource is PRACH and the FD capability is a mode supporting FD, it is determined that the SBFD time-frequency resource is an unavailable time-frequency resource.
[0025] In one example, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode that does not support FD and a channel type carried in the uplink time-frequency resource is PRACH, it is determined that the SBFD time-frequency resource is an unavailable time-frequency resource.
[0026] In one example, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode supporting FD and the channel type carried in the uplink time-frequency resource is PRACH, select all PRBs in the first slot of the SBFD time-frequency resource as available time-frequency resources.
[0027] In one example, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode supporting FD and a channel type carried in the uplink time-frequency resource is PRACH, determine that the SBFD time-frequency resource is an unavailable time-frequency resource.
[0028] In one example, when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a signal type carried in the uplink time-frequency resource is SRS and the FD capability is a mode that does not support FD, it is determined that the SBFD time-frequency resource is an unavailable time-frequency resource.
[0029] In one example, if the overlapping situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a signal type carried in the uplink time-frequency resource is SRS and the FD capability is in a mode supporting FD, select a first target PRB in the first slot of the SBFD time-frequency resource as an available time-frequency resource, where the first target PRB may be a PRB in a symbol not occupied by the uplink time-frequency resource.
[0030] In one example, when the overlapping situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when the signal type carried in the uplink time-frequency resource is SRS and the FD capability is in a mode supporting FD, for downlink data of each repeated transmission corresponding to a PDSCH, select a second target PRB in the first slot of the SBFD time-frequency resource as an available time-frequency resource, and transmit the downlink data of the repeated transmission by the available time-frequency resource, where the second target PRB is a PRB in a symbol not occupied by the uplink time-frequency resource.
[0031] In one example, when the overlapping situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when the signal type carried in the uplink time-frequency resource is SRS and the FD capability is in a mode supporting FD, for downlink data of each repeated transmission corresponding to a PDSCH, select a third target PRB in the first slot of the SBFD time-frequency resource as an available time-frequency resource, and transmit the downlink data of the repeated transmission by the available time-frequency resource, where the third target PRB is not occupied by the uplink time-frequency resource. In the symbol It is PRB.
[0032] In one example, when the overlapping situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a signal type carried in the uplink time-frequency resource is SRS and the FD capability is in a mode supporting FD, select a fourth target PRB from the first slot of the SBFD time-frequency resource, and select a first RE resource of the fourth target PRB as an available time-frequency resource. The fourth target PRB is not occupied by the uplink time-frequency resource. In the symbol The first RE (Resource Element) resource is occupied by the uplink time-frequency resource. In the symbol and a second RE resource.
[0033] In one example, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode that does not support FD and a signal type carried in the uplink time-frequency resource is SRS, it is determined that the SBFD time-frequency resource is an unavailable time-frequency resource.
[0034] In one example, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode supporting FD and a signal type carried in the uplink time-frequency resource is SRS, select all PRBs in the first slot of the SBFD time-frequency resource as available time-frequency resources.
[0035] In one example, when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time-frequency resource is PUCCH and the FD capability is a mode that does not support FD, it is determined that the SBFD time-frequency resource is an unavailable time-frequency resource.
[0036] In one example, if the overlapping situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time-frequency resource is PUCCH and the FD capability is in a mode supporting FD, select a first target PRB in the first slot of the SBFD time-frequency resource as an available time-frequency resource, where the first target PRB may be a PRB in a symbol not occupied by the uplink time-frequency resource.
[0037] In one example, when the overlapping situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when the channel type carried in the uplink time-frequency resource is PUCCH and the FD capability is in a mode supporting FD, for downlink data of each repeated transmission corresponding to PDSCH, select a second target PRB in the first slot of the SBFD time-frequency resource as an available time-frequency resource, and transmit the downlink data of the repeated transmission by the available time-frequency resource, where the second target PRB may be a PRB in a symbol not occupied by the uplink time-frequency resource.
[0038] In one example, when the overlapping situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when the channel type carried in the uplink time-frequency resource is PUCCH and the FD capability is in a mode supporting FD, for downlink data of each repeated transmission corresponding to PDSCH, select a third target PRB in the first slot of the SBFD time-frequency resource as an available time-frequency resource, and transmit the downlink data of the repeated transmission by the available time-frequency resource, where the third target PRB is not occupied by the uplink time-frequency resource. In the symbol It may also be a PRB.
[0039] In one example, when the overlapping situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time-frequency resource is PUCCH and the FD capability is in a mode supporting FD, select a fourth target PRB from the first slot of the SBFD time-frequency resource, and select the fourth target PRB as an available time-frequency resource. The fourth target PRB is not occupied by the uplink time-frequency resource. In the symbol It is PRB.
[0040] In one example, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode that does not support FD and the channel type carried in the uplink time-frequency resource is PUCCH, it is determined that the SBFD time-frequency resource is an unavailable time-frequency resource.
[0041] In one example, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode supporting FD and the channel type carried in the uplink time-frequency resource is PUCCH, select all PRBs in the first slot of the SBFD time-frequency resource as available time-frequency resources.
[0042] In one example, when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot or a PRB in the first slot does not overlap with a PRB in the second slot, when a channel type carried in the uplink time-frequency resource is a PUSCH and the FD capability is a mode that does not support FD, determine data corresponding to the PUSCH carried in the uplink time-frequency resource, and when the data is data for random access, determine that the SBFD time-frequency resource is an unavailable time-frequency resource.
[0043] If the data is not data for random access, determine a first scheduling type corresponding to a PUSCH carried in the uplink time-frequency resource, determine a second scheduling type corresponding to a PDSCH carried in the SBFD time-frequency resource, and if the first scheduling type is dynamic scheduling and the second scheduling type is semi-static scheduling, determine that the SBFD time-frequency resource is an unavailable time-frequency resource, and if the first scheduling type is semi-static scheduling and the second scheduling type is dynamic scheduling, select all PRBs in the SBFD time-frequency resource as available time-frequency resources.
[0044] If the first scheduling type and the second scheduling type are both dynamic scheduling, or if the first scheduling type and the second scheduling type are both semi-static scheduling, determine a first priority corresponding to a PUSCH carried in the uplink time-frequency resource, determine a second priority corresponding to a PDSCH carried in the SBFD time-frequency resource, and if the first priority is greater than the second priority, determine that the SBFD time-frequency resource is an unavailable time-frequency resource; and if the first priority is less than the second priority, select all PRBs in the SBFD time-frequency resource as available time-frequency resources.
[0045] If the first priority is equal to the second priority, when the PUSCH carried in the uplink time-frequency resource corresponds to the initial transmission data and the PDSCH carried in the SBFD time-frequency resource corresponds to the retransmission data, determine that the SBFD time-frequency resource is an unavailable time-frequency resource; when the PUSCH carried in the uplink time-frequency resource corresponds to the retransmission data and the PDSCH carried in the SBFD time-frequency resource corresponds to the initial transmission data, select all PRBs in the SBFD time-frequency resource as available time-frequency resources; when the PUSCH carried in the uplink time-frequency resource corresponds to the initial transmission data and the PDSCH carried in the SBFD time-frequency resource corresponds to the initial transmission data, select all PRBs in the SBFD time-frequency resource as available time-frequency resources; when the PUSCH carried in the uplink time-frequency resource corresponds to the initial transmission data and the PDSCH carried in the SBFD time-frequency resource corresponds to the initial transmission data, select all PRBs in the SBFD time-frequency resource as available time-frequency resources;
[0046] In one example, when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when the channel type carried in the uplink time-frequency resource is PUSCH and the FD capability is in a mode supporting FD, all PRBs in the first slot of the SBFD time-frequency resource are selected as available time-frequency resources.
[0047] In one example, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode supporting FD and the channel type carried in the uplink time-frequency resource is PUSCH, select all PRBs in the first slot of the SBFD time-frequency resource as available time-frequency resources.
[0048] According to the above technical solution, downlink data corresponding to PDSCH can be transmitted on SBFD time-frequency resources, so as to more effectively utilize SBFD time-frequency resources, improve resource utilization rate, improve network coverage and network capacity, reduce downlink transmission delay, and so on, thereby reducing transmission delay.
[0049] The above technical solution of the present invention will be described below with reference to examples.
[0050] In the TDD system, the frame structure is divided into UL slots, DL slots and S slots according to slots. The symbols in the S slots may be set as UL symbols, DL symbols and flexible (F) symbols. The F symbol can be used for UL, DL or GP. Here, the downlink data corresponding to the PDSCH may be transmitted in the DL slot, or in the DL symbol or F symbol of the S slot. The downlink data corresponding to the PDSCH cannot be transmitted in the UL slot, nor in the UL symbol of the S slot.
[0051] In a TDD system, the SBFD time-frequency resource may be set to a time-frequency resource (e.g., a UL slot, a DL slot, and an S slot). On the SBFD time-frequency resource, data in a different direction from other time-frequency resources can be transmitted. For example, the SBFD time-frequency resource is set to the UL slot, and downlink data corresponding to the PDSCH is transmitted through the SBFD time-frequency resource, so that the downlink data corresponding to the PDSCH is transmitted in the UL slot. Also, for example, the SBFD time-frequency resource is set to the UL symbol in the S slot, and downlink data corresponding to the PDSCH is transmitted through the SBFD time-frequency resource, so that the downlink data corresponding to the PDSCH is transmitted in the UL symbol in the S slot.
[0052] In one example, the SBFD symbol is defined as a symbol for which the base station device and the user equipment can configure SBFD sub-bands. On the SBFD sub-bands (called SBFD time-frequency resources) of these SBFD symbols, the base station device and the user equipment can perform full-duplex communication. That is, uplink transmission, downlink transmission, or uplink and downlink transmission can be performed on the SBFD time-frequency resources. The SBFD time-frequency resources may be explicitly indicated as uplink, downlink, or Flexible. If the SBFD time-frequency resources are indicated as Flexible, uplink transmission or downlink transmission can be flexibly scheduled on the SBFD time-frequency resources.
[0053] The SBFD time-frequency resource may be configured in the DL symbol, the F symbol, and the UL symbol. A slot in which the SBFD time-frequency resource is configured is also referred to as an SBFD slot. For example, if the SBFD time-frequency resource is configured in the DL symbol of a DL slot, the DL slot is also referred to as an SBFD slot. If the SBFD time-frequency resource is configured in the UL symbol of a UL slot, the UL slot is also referred to as an SBFD slot. If the SBFD time-frequency resource is configured in the DL symbol, the UL symbol, or the F symbol of an S slot, the S slot is also referred to as an SBFD slot.
[0054] For user equipment that does not have SBFD capability, all SBFD configurations will be ignored. For user equipment that has SBFD capability, it can perform uplink transmission, downlink transmission, or uplink transmission and downlink transmission on SBFD time-frequency resources. In the following, we take user equipment that has SBFD capability as an example.
[0055] For user equipment with SBFD capability, one is half-duplex user equipment supporting SBFD capability, i.e., user equipment that can transmit or receive on SBFD time-frequency resources, but can only transmit or receive at the same time, is called half-duplex user equipment; the other is full-duplex user equipment supporting SBFD capability, i.e., user equipment that can transmit and receive on SBFD time-frequency resources, i.e., user equipment that can simultaneously transmit and receive on SBFD time-frequency resources at the same time, is called full-duplex user equipment.
[0056] In one example, the SBFD time-frequency resource may be a semi-statically configured SBFD time-frequency resource. For example, the SBFD time-frequency resource is semi-statically configured by RRC (Radio Resource Control) signaling. The SBFD time-frequency resource may be a dynamically configured SBFD time-frequency resource. For example, the SBFD time-frequency resource is dynamically configured by DCI (Downlink Control Information) signaling.
[0057] In one example, downlink data corresponding to PDSCH can be transmitted on SBFD time-frequency resources. For example, SBFD time-frequency resources are set in UL slots, and downlink data corresponding to PDSCH are transmitted through the SBFD time-frequency resources, thereby scheduling PDSCH on the SBFD time-frequency resources of the UL slots. By clarifying the scheduling policy of PDSCH on the SBFD time-frequency resources of the base station device and the user equipment, downlink transmission based on SBFD time-frequency resources can be realized in the TDD system, and the overall performance of the TDD system can be improved.
[0058] In order to transmit downlink data corresponding to a PDSCH in the SBFD time-frequency resource, a scheduling policy of the PDSCH in the SBFD time-frequency resource may be determined based on an overlapping situation between the SBFD time-frequency resource (i.e., the time-frequency resource used by the PDSCH) and the uplink time-frequency resource (i.e., the time-frequency resource occupied by the uplink data) and the FD capability of the user equipment (e.g., a mode supporting FD or a mode not supporting FD). In this way, the base station apparatus and the user equipment can have a clear transmission mechanism, and full-duplex communication based on the SBFD time-frequency resource between the base station apparatus and the user equipment can be realized.
[0059] In one example, the downlink data carried in the PDSCH may include, but is not limited to, application data and downlink common control information. The downlink common control information may include, but is not limited to, SIB (System Information Block), paging information, message B (MSG-B) in a two-step random access procedure, message 2 (MSG 2) in a four-step random access procedure, and message 4 (MSG 4) in a four-step random access procedure. Here, based on the above data carried in the PDSCH, the PDSCH may transmit initial transmission data, retransmission data fed back based on HARQ (Hybrid Automatic Repeat reQuest), or semi-statically set repeated transmission data, but is not limited thereto.
[0060] Figure 2 is a schematic diagram of scheduling PDSCH in SBFD time-frequency resources. When the SBFD time-frequency resources are in DL symbols or F symbols, downlink data corresponding to PDSCH can be transmitted over the SBFD time-frequency resources. That is, some downlink data may be transmitted within the SBFD time-frequency resources, and another part of downlink data may be transmitted outside the SBFD time-frequency resources. In Figure 2, for slot 0 and slot 1, downlink data corresponding to PDSCH may be transmitted within the SBFD time-frequency resources, or may be transmitted outside the SBFD time-frequency resources.
[0061] When the SBFD time-frequency resource is in the UL symbol, the downlink data corresponding to the PDSCH can only be transmitted in the SBFD time-frequency resource, and UL resources other than the SBFD time-frequency resource cannot be used. For a dynamically scheduled PDSCH, the PDSCH can be scheduled in the SBFD time-frequency resource by the DCI. For a PDSCH with SPS (Semi-Persistent Scheduling), when the PDSCH scheduled by the SPS exceeds the range of the SBFD time-frequency resource, the PDSCH is only transmitted in the SBFD time-frequency resource. In FIG. 2, for slot 2 and slot 3, the downlink data corresponding to the PDSCH can only be transmitted in the SBFD time-frequency resource.
[0062] In one example, since the SBFD time-frequency resource overlaps with the uplink time-frequency resource, the transmission policy of the PDSCH may be comprehensively considered based on information such as the overlapping situation between the SBFD time-frequency resource and the uplink time-frequency resource, the FD capability of the user equipment, the signal type or channel type carried in the uplink time-frequency resource, etc.
[0063] For example, an available time-frequency resource may be selected from the SBFD time-frequency resource, and downlink data corresponding to the PDSCH may be transmitted on the available time-frequency resource, or the SBFD time-frequency resource may be determined to be an unavailable time-frequency resource, and downlink data corresponding to the PDSCH may be transmitted on the SBFD time-frequency resource.
[0064] Case 1: A collision situation between the SBFD time-frequency resource and the PRACH uplink time-frequency resource, that is, the PDSCH carried by the SBFD time-frequency resource and the PRACH carried by the uplink time-frequency resource collide.
[0065] A collision situation between PRACH and dynamically configured SBFD time-frequency resources will be described.
[0066] Since the base station apparatus clearly knows the location of the PRACH uplink time-frequency resource, in order to ensure that the user equipment can successfully use the PRACH to transmit the access preamble and complete the initial access of the user equipment, the base station apparatus needs to avoid dynamically configuring the SBFD time-frequency resource in the uplink time-frequency resource occupied by the PRACH. From the user equipment's perspective, the user equipment does not expect the SBFD time-frequency resource to be dynamically configured on the uplink time-frequency resource overlapping with the PRACH. The uplink data corresponding to the PRACH uplink time-frequency resource (symbol) may include a RACH Occasion (RO) and a GP symbol that may exist before the RO.
[0067] A collision situation between the PRACH and the semi-statically configured SBFD time-frequency resources will be described.
[0068] For half-duplex user equipment, when the user equipment is not accessing the network, the user equipment needs to be ready to be in the network at any time, so the PRACH uplink time-frequency resource cannot be occupied, and the downlink data corresponding to the PDSCH, such as SIB1, cannot be transmitted on the SBFD time-frequency resource that conflicts with the PRACH uplink time-frequency resource. For dynamic scheduling PDSCH, dynamic scheduling can avoid transmitting downlink data corresponding to the PDSCH on the conflicting SBFD time-frequency resource. For semi-persistent scheduling PDSCH, the base station device does not transmit downlink data corresponding to the PDSCH on the SBFD time-frequency resource that conflicts with the PRACH uplink time-frequency resource, and the user equipment does not receive downlink data on the SBFD time-frequency resource that conflicts with the PRACH uplink time-frequency resource.
[0069] For half-duplex user equipment, in the process of the user equipment accessing the network, the PRACH uplink time-frequency resource (i.e., RO resource) is used in MSG 1 (4-step RACH) or MSG A (2-step RACH), and the PDSCH is used in MSG 2, MSG 4 (4-step RACH) or MSG B (2-step RACH). That is, the PRACH and the PDSCH are not used simultaneously. However, considering that the PRACH uplink time-frequency resource is shared by multiple users, if downlink data corresponding to the PDSCH is transmitted to one user equipment in the SBFD time-frequency resource that conflicts with the PRACH uplink time-frequency resource, the downlink data corresponding to the PDSCH is not transmitted in the SBFD time-frequency resource that conflicts with the PRACH uplink time-frequency resource, since it will affect the reception of the PRACH by other user equipments.
[0070] For half-duplex user equipment, after the user equipment accesses the network, it does not need PRACH uplink time-frequency resource. However, other user equipments that do not access the network may initiate random access in PRACH uplink time-frequency resource. If the downlink data corresponding to PDSCH is sent to one user equipment in SBFD time-frequency resource that collide with PRACH uplink time-frequency resource, it will affect other user equipments receiving PRACH, so the downlink data corresponding to PDSCH is not sent in SBFD time-frequency resource that collide with PRACH uplink time-frequency resource.
[0071] As described above, considering the importance of PRACH to half-duplex user equipment, when SBFD time-frequency resource and PRACH uplink time-frequency resource overlap, in any SBFD symbol overlapping with PRACH symbol, base station device does not transmit downlink data corresponding to PDSCH. That is, base station device does not transmit downlink data corresponding to dynamic scheduling PDSCH, and does not transmit downlink data corresponding to semi-static scheduling PDSCH. Accordingly, user equipment does not receive downlink data corresponding to PDSCH in SBFD time-frequency resource.
[0072] For a half-duplex user equipment, i.e., if the user equipment does not support a mode supporting FD, when the channel type carried in the uplink time-frequency resource is PRACH, if the first slot in the SBFD time-frequency resource overlaps with the second slot in the PRACH uplink time-frequency resource, determine that the SBFD time-frequency resource is an unavailable time-frequency resource, regardless of whether the PRB in the first slot overlaps with the PRB in the second slot. That is, do not transmit downlink data corresponding to PDSCH in the SBFD time-frequency resource. If the first slot in the SBFD time-frequency resource does not overlap with the second slot in the PRACH uplink time-frequency resource, determine that the SBFD time-frequency resource is an available time-frequency resource. That is, transmit downlink data corresponding to PDSCH in the SBFD time-frequency resource.
[0073] A slot in the SBFD time-frequency resource is referred to as a first slot, and a slot in the PRACH uplink time-frequency resource is referred to as a second slot. If the first slot and the second slot are the same, the first slot in the SBFD time-frequency resource and the second slot in the PRACH uplink time-frequency resource overlap. If the first slot and the second slot are different, the first slot in the SBFD time-frequency resource and the second slot in the PRACH uplink time-frequency resource do not overlap.
[0074] A collision situation between the PRACH and the semi-statically configured SBFD time-frequency resources will be described.
[0075] For a full-duplex user equipment, when the PRACH uplink time-frequency resource and the SBFD time-frequency resource overlap, for example, when the PRB in the PRACH uplink time-frequency resource and the PRB in the SBFD time-frequency resource overlap (partially or completely), as shown in Figure 3, a schematic diagram of partial overlap is shown. F stands for flexible slot, which can be used for uplink or downlink. DL stands for downlink slot. UL stands for uplink slot. In Figure 3, the PRACH uplink time-frequency resource in slot 4 partially overlaps with the SBFD time-frequency resource, and the shaded part represents the SBFD time-frequency resource that overlaps with the PRACH uplink time-frequency resource. That is, the shaded part represents the overlapping part of the PRB.
[0076] Before performing random access, the user equipment needs to receive SIB1 via PDSCH, obtain PRACH configuration information, and perform random access based on the PRACH configuration information. If the base station device transmits SIB1 on SBFD time-frequency resources overlapping with PRACH uplink time-frequency resources, SIB1 will affect the detection performance of the PRACH preamble, and the user equipment will affect the reception of SIB1 when transmitting the PRACH preamble.
[0077] Since both the PRACH preamble and SIB1 are important information, it is necessary to avoid scheduling SIB1 in the PRACH uplink time-frequency resource in order to avoid interference between the PRACH and SIB1. Of course, when the base station device transmits other downlink data through the PDSCH, it is necessary to avoid affecting the transmission of the PRACH preamble.
[0078] As described above, when the PRB in the PRACH uplink time-frequency resource and the PRB in the SBFD time-frequency resource overlap, the user equipment does not expect to schedule the PDSCH in the overlapping SBFD time-frequency resource. For the PDSCH of semi-persistent scheduling, the base station device does not transmit the PDSCH in the overlapping SBFD time-frequency resource. Correspondingly, the user equipment does not expect to receive the PDSCH in the overlapping SBFD time-frequency resource.
[0079] As can be seen from the above, for a full-duplex user equipment, i.e., when the user equipment supports a mode supporting FD, when the channel type carried in the uplink time-frequency resource is PRACH, if the first slot in the SBFD time-frequency resource overlaps with the second slot in the PRACH uplink time-frequency resource, and the PRB in the first slot overlaps with the PRB in the second slot, it can be determined that the SBFD time-frequency resource is an unavailable time-frequency resource. That is, do not transmit downlink data corresponding to PDSCH in the SBFD time-frequency resource. When the first slot in the SBFD time-frequency resource does not overlap with the second slot in the PRACH uplink time-frequency resource, it can be determined that the SBFD time-frequency resource is an available time-frequency resource.
[0080] For full-duplex user equipment, when the PRACH uplink time-frequency resource and the SBFD time-frequency resource do not overlap, for example, when the PRB in the PRACH uplink time-frequency resource and the PRB in the SBFD time-frequency resource do not overlap, as shown in Figure 4, which is a schematic diagram of the time-frequency resource of the same symbol not overlapping, unlike the overlapping case, when the PRBs do not overlap, only inter-subband interference exists. Compared with the intra-subband interference, the inter-subband interference is small.
[0081] Based on this, the following schemes can be adopted for processing: In scheme 1, do not transmit downlink data corresponding to PDSCH in any time-frequency resource of SBFD symbol overlapping with PRACH symbol; In scheme 2, transmit downlink data corresponding to PDSCH in all SBFD time-frequency resources; Dynamic Scheduling For repeated transmission of PDSCH and PDSCH, the base station device can determine whether to schedule PDSCH in SBFD time-frequency resource and transmit the scheduling information to the user equipment by DCI; The user equipment receives PDSCH according to the scheduling information; For semi-persistent scheduling, if there is no time-frequency resource overlap between SBFD time-frequency resource and PRACH uplink time-frequency resource, the base station device transmits downlink data corresponding to PDSCH on SBFD time-frequency resource, and the user equipment receives downlink data corresponding to PDSCH on SBFD time-frequency resource.
[0082] As can be seen from the above, for a full-duplex user equipment, that is, when the user equipment supports a mode that supports FD, when the channel type carried in the uplink time-frequency resource is PRACH, if the first slot in the SBFD time-frequency resource overlaps with the second slot in the PRACH uplink time-frequency resource, and the PRB in the first slot does not overlap with the PRB in the second slot, select all PRBs in the first slot of the SBFD time-frequency resource as available time-frequency resources, and transmit downlink data corresponding to PDSCH in the SBFD time-frequency resource, that is, transmit downlink data corresponding to PDSCH in all SBFD time-frequency resources (scheme 2); or determine that the SBFD time-frequency resource is an unavailable time-frequency resource, that is, do not transmit downlink data corresponding to PDSCH in the SBFD time-frequency resource (scheme 1).
[0083] Case 2: A collision situation between the SBFD time-frequency resource and the SRS uplink time-frequency resource, that is, the PDSCH carried by the SBFD time-frequency resource and the SRS carried by the uplink time-frequency resource collide.
[0084] In one example, the SRS is used for functions such as uplink beam management, precoding, antenna switching, etc. The SRS is configured semi-statically by RRC signaling. The SRS may be configured periodically, semi-persistent, and aperiodic. For periodic SRS, activation occurs upon configuration completion. For semi-persistent SRS, activation must be performed by the MAC media access control-control element (CE). For aperiodic SRS, activation must be performed by the DCI.
[0085] When the activated SRS and the SBFD time-frequency resource overlap, the transmission policy of the PDSCH on the SBFD time-frequency resource can be determined based on the FD capability of the user equipment.
[0086] For half-duplex user equipment, it is necessary to clarify how the user equipment processes the PDSCH in the SBFD time-frequency resource overlapping with the SRS. If the PDSCH is dynamic scheduling, the base station device does not schedule the PDSCH and PDSCH repeated transmission in the SRS uplink time-frequency resource (e.g., the symbol occupied by the SRS and at least one symbol (for GP) before the SRS symbol, etc.). The user equipment does not expect to receive the PDSCH and PDSCH repeated transmission in the SRS uplink time-frequency resource. Also, if the PDSCH and PDSCH repeated transmission is SPS and the PDSCH time-frequency resource is transmitted to the user equipment by DCI in the SPS activation process, the base station device does not allocate the time-frequency resource for the PDSCH and PDSCH repeated transmission in the SRS uplink time-frequency resource when allocating the time-frequency resource for the PDSCH and PDSCH repeated transmission. The user equipment does not receive the PDSCH and PDSCH repeated data in the SRS uplink time-frequency resource.
[0087] It can be seen from the above that, for a half-duplex user equipment, when the signal type carried in the uplink time-frequency resource is SRS, if the first slot in the SBFD time-frequency resource overlaps with the second slot in the SRS uplink time-frequency resource, no matter whether the PRB in the first slot overlaps with the PRB in the second slot, the half-duplex user equipment determines that the SBFD time-frequency resource is an unavailable time-frequency resource, i.e. does not transmit downlink data corresponding to PDSCH in the SBFD time-frequency resource; if the first slot in the SBFD time-frequency resource does not overlap with the second slot in the SRS uplink time-frequency resource, the half-duplex user equipment determines that the SBFD time-frequency resource is an available time-frequency resource, i.e. transmit downlink data corresponding to PDSCH in the SBFD time-frequency resource.
[0088] For a full-duplex user equipment, when the SRS uplink time-frequency resource and the SBFD time-frequency resource do not overlap, for example, when the PRB in the SRS uplink time-frequency resource and the PRB in the SBFD time-frequency resource do not overlap, for example, when different PRB resources are occupied in the same symbol or the same PRB resource is occupied in different symbols, the base station device can transmit downlink data corresponding to the PDSCH in the SBFD time-frequency resource, and the user equipment can receive downlink data corresponding to the PDSCH in the corresponding SBFD time-frequency resource.
[0089] It can be seen from the above that, for a full-duplex user equipment, when the signal type carried in the uplink time-frequency resource is SRS, if the first slot in the SBFD time-frequency resource overlaps with the second slot in the SRS uplink time-frequency resource, and the PRB in the first slot does not overlap with the PRB in the second slot, select all PRBs in the first slot of the SBFD time-frequency resource as available time-frequency resources, and transmit downlink data corresponding to PDSCH in the SBFD time-frequency resource, i.e. transmit downlink data corresponding to PDSCH in all SBFD time-frequency resources; if the first slot in the SBFD time-frequency resource does not overlap with the second slot in the SRS uplink time-frequency resource, determine that the SBFD time-frequency resource is available time-frequency resource, and transmit downlink data corresponding to PDSCH in the SBFD time-frequency resource.
[0090] For a full-duplex user equipment, when the SRS uplink time-frequency resource and the SBFD time-frequency resource overlap, for example, when the PRB in the SRS uplink time-frequency resource and the PRB in the SBFD time-frequency resource overlap, as shown in FIG. 5, which is a schematic diagram of the PRB in the SBFD time-frequency resource and the PRB in the SRS uplink time-frequency resource overlap, the SBFD time-frequency resource occupies PRBs #190 to #193, etc., the SRS uplink time-frequency resource occupies 272 PRBs from symbol #12 to symbol #13, and the SRS uplink time-frequency resource occupies RE#0, #4、#8 Occupy.
[0091] For a dynamically scheduled PDSCH, the time-frequency resource occupied by the PDSCH is transmitted from the base station device to the user equipment by the DCI. When the PDSCH is transmitted on the SBFD time-frequency resource overlapping with the SRS, the following schemes can be adopted: Scheme 1: The base station device does not schedule the PDSCH on the SBFD time-frequency resource overlapping with the SRS, and the user equipment does not receive downlink data corresponding to the PDSCH on the SBFD time-frequency resource overlapping with the SRS.
[0092] In scheme 1, the base station device can determine the SBFD time-frequency resources that overlap with the SRS, schedule the PDSCH on the remaining non-overlapping time-frequency resources, and transmit the time-frequency resources used in the PDSCH to the user equipment via the DCI. The user equipment receives downlink data corresponding to the PDSCH based on the scheduling information.
[0093] As can be seen from the above, for a full-duplex user equipment, when the signal type carried in the uplink time-frequency resource is SRS, if the first slot in the SBFD time-frequency resource overlaps with the second slot in the SRS uplink time-frequency resource, and the PRB in the first slot overlaps with the PRB in the second slot, select the target PRB in the first slot of the SBFD time-frequency resource as the available time-frequency resource, and transmit the downlink data corresponding to the PDSCH in the available time-frequency resource. That is, instead of transmitting the downlink data corresponding to the PDSCH in all the time-frequency resources of the SBFD time-frequency resource, transmit the downlink data corresponding to the PDSCH in some time-frequency resources of the SBFD time-frequency resource. The target PRB is a PRB in a symbol that is not occupied by the SRS uplink time-frequency resource. That is, exclude the symbol occupied by the SRS uplink time-frequency resource from the SBFD time-frequency resource, and instead of transmitting the downlink data corresponding to the PDSCH in the symbol that is not occupied by the SRS uplink time-frequency resource, transmit the downlink data corresponding to the PDSCH in the PRB of the remaining symbol.
[0094] In one example, for repeated PDSCH transmissions, the time-frequency resource corresponding to a certain PDSCH transmission does not overlap with the SRS uplink time-frequency resource, but the time-frequency resource corresponding to another PDSCH transmission may overlap with the SRS uplink time-frequency resource. In this case, the following scheme may be adopted:
[0095] Scheme A: Based on the SBFD time-frequency resource overlapping with the SRS uplink time-frequency resource, the base station device ensures that all PDSCHs (e.g., multiple PDSCHs repeated transmissions) transmitted on the SBFD time-frequency resource do not collide with the SRS uplink time-frequency resource. That is, all PDSCHs repeated transmissions use PRBs in symbols not occupied by the SRS uplink time-frequency resource. The user equipment receives the PDSCHs repeated transmissions based on the scheduling information of the base station device.
[0096] In the manner A, for the first transmission of the PDSCH and each repeated transmission of the PDSCH (i.e., downlink data of each repeated transmission corresponding to the PDSCH), a target PRB may be selected from the first slot of the SBFD time-frequency resource. The target PRB may be a PRB in a symbol not occupied by the SRS uplink time-frequency resource. That is, a PRB in a symbol not occupied by the SRS uplink time-frequency resource may participate in the repeated transmission of the PDSCH as the target PRB. Then, the target PRB may be selected as an available time-frequency resource, and the repeated transmission corresponding to the PDSCH may be transmitted on the available time-frequency resource, or the downlink data corresponding to the first transmission of the PDSCH may be transmitted on the available time-frequency resource.
[0097] Method B: The base station device sets time-frequency resources for PDSCH transmission based on the actual data size. For the PDSCH on the SBFD time-frequency resource overlapping with the SRS uplink time-frequency resource, the base station device transmits downlink data corresponding to the PDSCH on the SBFD time-frequency resource not overlapping with the SRS uplink time-frequency resource. For example, for the initial transmission of the PDSCH and the repeated transmission of multiple PDSCHs, a PRB not occupied by the SRS uplink time-frequency resource can be used. The PRB not occupied by the SRS uplink time-frequency resource may be a PRB in a symbol not occupied by the SRS uplink time-frequency resource, or may be a PRB in a symbol occupied by the SRS uplink time-frequency resource.
[0098] FIG. 6 is a schematic diagram of PDSCH repeated transmission overlapping with SRS uplink time-frequency resources. The first transmission of PDSCH is in slot 3, and the PDSCH repeated transmission overlaps with SRS uplink time-frequency resources in slot 4. In this case, all downlink data corresponding to PDSCH in slot 3 is normally transmitted. However, in the PDSCH repeated transmission in slot 4, only a part of downlink data is transmitted in non-overlapping SBFD time-frequency resources. Similarly, when the time-frequency resources of the first transmission of PDSCH and the SRS uplink time-frequency resources overlap, the downlink data corresponding to the first transmission of PDSCH is only transmitted in non-overlapping SBFD time-frequency resources.
[0099] In the manner B, for the initial transmission of the PDSCH and the repeated transmission of each PDSCH, a target PRB may be selected from the first slot of the SBFD time-frequency resource. The target PRB may be a PRB that is not occupied by the SRS uplink time-frequency resource. That is, the PRB that is not occupied by the SRS uplink time-frequency resource may be used as the target PRB to participate in the initial transmission of the PDSCH or the repeated transmission of the PDSCH. Then, the target PRB may be selected as an available time-frequency resource, and downlink data corresponding to the PDSCH may be transmitted on the available time-frequency resource.
[0100] In one example, DCI is required for scheduling for retransmission of PDSCH based on HARQ feedback. If the SBFD time-frequency resource that does not overlap with the SRS uplink time-frequency resource is sufficient for retransmission of PDSCH, the base station device schedules retransmission of PDSCH in the SBFD time-frequency resource. The user equipment receives downlink data corresponding to retransmission of PDSCH according to the scheduling information. If the SBFD time-frequency resource that does not overlap with the SRS uplink time-frequency resource is insufficient for transmitting downlink data corresponding to retransmission of PDSCH, the base station device may not schedule retransmission of PDSCH in the SBFD time-frequency resource. The user equipment does not receive downlink data corresponding to retransmission of PDSCH in the SBFD time-frequency resource. Alternatively, the base station device schedules retransmission of PDSCH in the SBFD time-frequency resource, but transmits only some retransmission data of PDSCH based on the available resource size. The user equipment receives retransmission data of PDSCH in the non-overlapping SBFD time-frequency resource based on the scheduling information.
[0101] Scheme 2: Downlink data corresponding to PDSCH is rate-matched with SRS as the center in SBFD time-frequency resources. In scheme 2, the base station device schedules PDSCH in SBFD time-frequency resources that overlap with SRS uplink time-frequency resources. However, downlink data corresponding to PDSCH is transmitted in all REs that are not occupied by SRS uplink time-frequency resources. As shown in FIG. 5, in symbols #12 to #13, RE#0, #4 and #8 All REs except RE 1 may be used to transmit downlink data corresponding to the PDSCH, and rate matching may be performed on these REs.
[0102] As can be seen from the above, for a full-duplex user equipment, when the signal type carried in the uplink time-frequency resource is SRS, if the first slot in the SBFD time-frequency resource overlaps with the second slot in the SRS uplink time-frequency resource, and the PRB in the first slot overlaps with the PRB in the second slot, the target PRB can be selected from the first slot of the SBFD time-frequency resource. The target PRB includes a first RE resource that is not occupied by the SRS uplink time-frequency resource and a second RE resource that is occupied by the SRS uplink time-frequency resource. Select the first RE resource of the target PRB as an available time-frequency resource, and transmit downlink data corresponding to the PDSCH in the available time-frequency resource. That is, transmit downlink data corresponding to the PDSCH in some time-frequency resources of the target PRB in the SBFD time-frequency resource.
[0103] Here, the target PRB may be a PRB occupied by the SRS uplink time-frequency resource, i.e., a part of the RE of the target PRB is occupied by the SRS uplink time-frequency resource, and the RE occupied by the SRS uplink time-frequency resource may be excluded from the target PRB, and downlink data corresponding to the PDSCH may be transmitted in the remaining RE resource.
[0104] In one example, the base station device configures the user equipment via RRC signaling with respect to the location of the uplink time-frequency resource occupied by the SRS. For semi-persistent SRS, the base station device activates the SRS by a MAC CE command. For aperiodic SRS, the base station device activates the SRS by a DCI command. Thus, the base station device performs rate matching on the PDSCH based on the valid SRS resource location, and the user equipment performs de-rate matching on the PDSCH centered on the SRS based on the SRS resource configuration.
[0105] For example, within one bandwidth part (BWP), the user equipment may be configured with one or more periodic, semi-persistent or aperiodic SRS resource sets, and each resource set may include up to 16 SRS resources. Here, for periodic SRS, all the RE resources of the SRS configured in srs-ResourceSetToAddModList and srs-ResourceToAddModList cannot be used for PDSCH. For semi-persistent SRS, all the RE resources of the SRS configured in srs-ResourceSetToAddModList and srs-ResourceToAddModList and activated by MAC CE cannot be used for PDSCH. For aperiodic SRS resources, all the RE resources of the SRS configured in srs-ResourceSetToAddModList and srs-ResourceToAddModList and activated by DCI cannot be used for PDSCH.
[0106] Similarly, for the repeated transmission of the PDSCH transmitted in the SBFD time-frequency resource overlapping with the SRS uplink time-frequency resource and the retransmission of the PDSCH based on the HARQ feedback, rate matching must be performed centered on the SRS according to the above method in both the SBFD time-frequency resource overlapping with the SRS, and will not be repeated here.
[0107] From the user equipment's perspective, which scheme (scheme 1 or scheme 2) to adopt for the one-time PDSCH transmission and the PDSCH transmission based on the HARQ feedback can be determined in the dynamic scheduling process. If the user equipment determines that the SBFD time-frequency resource occupied by the dynamic scheduling PDSCH does not overlap with the SRS uplink time-frequency resource, it can determine that it is scheme 1; otherwise, it can determine that it is scheme 2, and the user equipment can perform de-rate matching on the PDSCH with the SRS as the center. For the repeated transmission of the PDSCH, the user equipment may have a special indication parameter because it cannot determine which scheme to adopt based on the parameters of the repeated transmission of the PDSCH.
[0108] Here, the number of repeated transmissions of the PDSCH is set by the RRC parameter pdsch-AggregationFactor or RepetitionSchemeConfig-r16. Therefore, when repeated transmission of the PDSCH is performed in the SBFD time-frequency resource that overlaps with the SRS uplink time-frequency resource, the RRC parameter indicates which scheme to adopt.
[0109] For example, when the pdsch-AggregationFactor setting indicates whether to adopt scheme 1 or scheme 2, a new parameter pdsch-AggregationMultiplexingWithSRSInSbfd: pdsch-AggregationMultiplexingWithSRSInSbfd ENUMERATED{noTx, rm}option may be introduced. This parameter may be called an indication parameter of PDSCH repetitive transmission and srs multiplexing method. When pdsch-AggregationFactor is not set, pdsch-AggregationMultiplexingWithSRSInSbfd is not set either. When pdsch-AggregationFactor is set, pdsch-AggregationMultiplexingWithSRSInSbfd is used to indicate whether to adopt scheme 1 or scheme 2. For example, one of the two options (noTx, rm) is selected, where noTx indicates no transmission, and the option corresponds to scheme 1, that is, the processing of scheme 1 is adopted. rm indicates that rate matching is performed, and this option corresponds to scheme 2, that is, the processing of scheme 2 is adopted.
[0110] For example, when the RepetitionSchemeConfig-r16 setting indicates whether to adopt scheme 1 or scheme 2, a new parameter RepetitionMultiplexingWithSRS:RepetitionMultiplexingWithSRS ENUMERATED{noTx, rm}option may be introduced. This parameter may be called an indication parameter of PDSCH repetitive transmission and srs multiplexing method. If RepetitionSchemeConfig-r16 is not set, RepetitionMultiplexingWithSRS is not set either. If RepetitionSchemeConfig-r16 is set, RepetitionMultiplexingWithSRS is used to indicate whether to adopt scheme 1 or scheme 2. For example, one of two options (noTx, rm) is selected, where noTx indicates that no transmission is performed and the option corresponds to scheme 1. rm indicates that rate matching is performed and the option corresponds to scheme 2.
[0111] For each of the above parameters, if RepetitionSchemeConfig-r16 is set, pdsch-AggregationFactor is not set. If RepetitionMultiplexingWithSRS is set, pdsch-AggregationMultiplexingWithSRSInSbfd is not set.
[0112] In one example, for a PDSCH in semi-persistent scheduling (SPS), the time-frequency resources occupied by the PDSCH are transmitted to the user equipment by DCI when the semi-static configuration is activated. Thus, the above scheme may be used for SPS PDSCH, repeated transmission of SPS PDSCH, and retransmission based on HARQ feedback.
[0113] Case 3: A collision situation between the SBFD time-frequency resource and the PUCCH uplink time-frequency resource, that is, the PDSCH carried by the SBFD time-frequency resource and the PUCCH carried by the uplink time-frequency resource collide.
[0114] In one example, the PUCCH is used to transmit SR (Scheduling Request), HARQ feedback, and CSI (Channel State Information). The PUCCH is divided into multiple formats, which are PUCCH formats 0 / 1 / 2 / 3 / 4. The PUCCH formats 0 / 2 are short PUCCHs with a length of 1 or 2 symbols. The PUCCH formats 1 / 3 / 4 are long PUCCHs with a length of 4 to 14 symbols. When the PUCCH uplink time-frequency resource and the SBFD time-frequency resource overlap, a transmission policy of the PDSCH in the SBFD time-frequency resource can be determined according to the FD capability of the user equipment.
[0115] For half-duplex user equipment, it is necessary to clarify how the user equipment handles PDSCH in SBFD time-frequency resources that overlap with PUCCH. If PDSCH is dynamically scheduled, the base station device does not schedule PDSCH and PDSCH repeated transmission in PUCCH uplink time-frequency resources (e.g., symbols occupied by PUCCH and at least one symbol (for GP) before PUCCH, etc.). The user equipment does not expect to receive PDSCH and PDSCH repeated transmission in PUCCH uplink time-frequency resources. If PDSCH is semi-persistently scheduled, the base station device does not schedule PDSCH and PDSCH repeated transmission in PUCCH uplink time-frequency resources.
[0116] It can be seen from the above that, for a half-duplex user equipment, when the channel type carried in the uplink time-frequency resource is PUCCH, if the first slot in the SBFD time-frequency resource overlaps with the second slot in the PUCCH uplink time-frequency resource, regardless of whether the PRB in the first slot overlaps with the PRB in the second slot, the half-duplex user equipment determines that the SBFD time-frequency resource is an unavailable time-frequency resource, i.e. does not transmit downlink data corresponding to PDSCH in the SBFD time-frequency resource; if the first slot in the SBFD time-frequency resource does not overlap with the second slot in the PUCCH uplink time-frequency resource, the half-duplex user equipment determines that the SBFD time-frequency resource is an available time-frequency resource, i.e. transmit downlink data corresponding to PDSCH in the SBFD time-frequency resource.
[0117] For full-duplex user equipment, when PUCCH uplink time-frequency resource and SBFD time-frequency resource do not overlap, for example, PRB in PUCCH uplink time-frequency resource and PRB in SBFD time-frequency resource do not overlap, for example, different PRB resource are occupied in the same symbol, or the same PRB resource is occupied in different symbols, the base station device can transmit downlink data corresponding to PDSCH in SBFD time-frequency resource. The user equipment can receive downlink data corresponding to PDSCH in corresponding SBFD time-frequency resource. That is, the user equipment can transmit PUCCH and receive downlink data corresponding to PDSCH at the same time.
[0118] It can be seen from the above that, for a full-duplex user equipment, when the channel type carried in the uplink time-frequency resource is PUCCH, if the first slot in the SBFD time-frequency resource and the second slot in the PUCCH uplink time-frequency resource overlap, and the PRB in the first slot and the PRB in the second slot do not overlap, select all PRBs in the first slot of the SBFD time-frequency resource as available time-frequency resources, and transmit downlink data corresponding to PDSCH in the SBFD time-frequency resource, i.e. transmit downlink data in all SBFD time-frequency resources; if the first slot in the SBFD time-frequency resource and the second slot in the PUCCH uplink time-frequency resource do not overlap, determine that the SBFD time-frequency resource is available time-frequency resource, and transmit downlink data corresponding to PDSCH in the SBFD time-frequency resource.
[0119] For a full-duplex user equipment, when the PUCCH uplink time-frequency resource and the SBFD time-frequency resource overlap, for example, when the PRB in the PUCCH uplink time-frequency resource and the PRB in the SBFD time-frequency resource overlap, as shown in FIG. 7, which is a schematic diagram of the PRB in the SBFD time-frequency resource and the PRB in the PUCCH uplink time-frequency resource overlap, and when the SBFD time-frequency resource is # 0~#31 and so on, and a PUCCH uplink time-frequency resource (eg, PUCCH format 3) occupies 16 PRBs in symbol #10 to symbol #13.
[0120] For a dynamically scheduled PDSCH, the time-frequency resource occupied by the PDSCH is transmitted from the base station device to the user equipment by DCI. When the PDSCH is transmitted on the SBFD time-frequency resource overlapping with the PUCCH, the following schemes can be adopted. Scheme 1: The base station device does not schedule the PDSCH on the SBFD time-frequency resource overlapping with the PUCCH, and the user equipment does not receive the downlink data corresponding to the PDSCH on the SBFD time-frequency resource overlapping with the PUCCH. In scheme 1, the base station device can determine the SBFD time-frequency resource overlapping with the PUCCH, schedule the PDSCH on the remaining non-overlapping time-frequency resource, and transmit the time-frequency resource used in the PDSCH to the user equipment by DCI. The user equipment receives the downlink data corresponding to the PDSCH based on the scheduling information.
[0121] It can be seen from the above that for a full-duplex user equipment, when the channel type carried in the uplink time-frequency resource is PUCCH, if the first slot in the SBFD time-frequency resource overlaps with the second slot in the PUCCH uplink time-frequency resource, and the PRB in the first slot overlaps with the PRB in the second slot, select the target PRB in the first slot of the SBFD time-frequency resource as the available time-frequency resource, and transmit the downlink data corresponding to the PDSCH in the available time-frequency resource. That is, transmit the downlink data corresponding to the PDSCH in some time-frequency resources of the SBFD time-frequency resource. The target PRB is a PRB in a symbol that is not occupied by the PUCCH uplink time-frequency resource. That is, exclude the symbol occupied by the PUCCH uplink time-frequency resource from the SBFD time-frequency resource, and transmit the downlink data corresponding to the PDSCH in the PRB of the remaining symbol, rather than transmitting the downlink data corresponding to the PDSCH in the symbol that is not occupied by the PUCCH uplink time-frequency resource.
[0122] In one example, for PDSCH repetition transmission, the time-frequency resource corresponding to a certain PDSCH repetition transmission does not overlap with the PUCCH uplink time-frequency resource, but the time-frequency resource corresponding to another PDSCH repetition transmission may overlap with the PUCCH uplink time-frequency resource. In this case, the following method can be adopted:
[0123] Scheme A: Based on the SBFD time-frequency resource overlapping with the PUCCH uplink time-frequency resource, the base station device ensures that all PDSCHs transmitted on the SBFD time-frequency resource (e.g., repeated transmissions of multiple PDSCHs) do not collide with the PUCCH uplink time-frequency resource. That is, all PDSCH repeated transmissions use PRBs in symbols not occupied by the PUCCH uplink time-frequency resource. The user equipment receives the PDSCH repeated transmission based on the scheduling information of the base station device. In scheme A, for the initial transmission of the PDSCH and the repeated transmission of each PDSCH (i.e., downlink data of each repeated transmission corresponding to the PDSCH), a target PRB may be selected from the first slot of the SBFD time-frequency resource. The target PRB may be a PRB in symbols not occupied by the PUCCH uplink time-frequency resource. That is, a PRB in a symbol not occupied by the PUCCH uplink time-frequency resource may participate in the repeated transmission of the PDSCH as a target PRB. Then, the target PRB can be selected as an available time-frequency resource, and a repeated transmission corresponding to the PDSCH can be transmitted on the available time-frequency resource, or downlink data corresponding to the initial transmission of the PDSCH can be transmitted on the available time-frequency resource.
[0124] Method B: The base station device sets the time-frequency resource for PDSCH transmission based on the actual data size. For the PDSCH on the SBFD time-frequency resource overlapping with the PUCCH uplink time-frequency resource, the base station device transmits downlink data corresponding to the PDSCH on the SBFD time-frequency resource not overlapping with the PUCCH uplink time-frequency resource. For example, for the initial transmission of the PDSCH and the repeated transmission of multiple PDSCHs, a PRB not occupied by the PUCCH uplink time-frequency resource can be used. The PRB not occupied by the PUCCH uplink time-frequency resource may be a PRB in a symbol not occupied by the PUCCH uplink time-frequency resource, or may be a PRB in a symbol occupied by the PUCCH uplink time-frequency resource.
[0125] FIG. 8 is a schematic diagram of PDSCH repeated transmission overlapping with PUCCH uplink time-frequency resources. The first transmission of PDSCH is in slot 3, and the PDSCH repeated transmission overlaps with PUCCH uplink time-frequency resources in slot 4. In this case, all downlink data corresponding to PDSCH in slot 3 is normally transmitted. However, in the PDSCH repeated transmission in slot 4, only a part of downlink data is transmitted in non-overlapping SBFD time-frequency resources. Similarly, when the time-frequency resources of the first transmission of PDSCH overlap with the PUCCH uplink time-frequency resources, the downlink data corresponding to the first transmission of PDSCH is only transmitted in non-overlapping SBFD time-frequency resources.
[0126] In the manner B, for the initial transmission of the PDSCH and the repeated transmission of each PDSCH, a target PRB may be selected from the first slot of the SBFD time-frequency resource. The target PRB may be a PRB that is not occupied by the PUCCH uplink time-frequency resource. That is, the PRB that is not occupied by the PUCCH uplink time-frequency resource may be used as the target PRB to participate in the initial transmission of the PDSCH or the repeated transmission of the PDSCH. Then, the target PRB is selected as an available time-frequency resource, and downlink data corresponding to the PDSCH can be transmitted on the available frequency resource.
[0127] In one example, DCI is required for scheduling for retransmission of PDSCH based on HARQ feedback. If the SBFD time-frequency resource that does not overlap with the PUCCH uplink time-frequency resource is sufficient for retransmission of PDSCH, the base station device schedules retransmission of PDSCH in the SBFD time-frequency resource. The user equipment receives downlink data corresponding to retransmission of PDSCH according to the scheduling information. If the SBFD time-frequency resource that does not overlap with the PUCCH uplink time-frequency resource is insufficient for transmitting downlink data corresponding to retransmission of PDSCH, the base station device may not schedule retransmission of PDSCH in the SBFD time-frequency resource. The user equipment does not receive downlink data corresponding to retransmission of PDSCH in the SBFD time-frequency resource. Alternatively, the base station device schedules retransmission of PDSCH in the SBFD time-frequency resource, but transmits only some retransmission data of PDSCH based on the available resource size. The user equipment receives retransmission data of PDSCH in the non-overlapping SBFD time-frequency resource based on the scheduling information.
[0128] Scheme 2: Downlink data corresponding to PDSCH is rate-matched in SBFD time-frequency resources with PUCCH as the center. In scheme 2, the base station device schedules PDSCH in SBFD time-frequency resources that overlap with PUCCH uplink time-frequency resources. However, downlink data corresponding to PDSCH is transmitted in all PRBs that are not occupied by PUCCH uplink time-frequency resources. The difference from SRS is that PDSCH performs RE-level rate matching with SRS as the center, and PDSCH performs PRB-level rate matching with PUCCH as the center. As shown in FIG. 7, in symbols #10 to #13, all PRBs except PRBs #0 to #15 may be used for PDSCH transmission. It can be seen from the above that, for a full-duplex user equipment, when the channel type carried in the uplink time-frequency resource is PUCCH, if the first slot in the SBFD time-frequency resource overlaps with the second slot in the PUCCH uplink time-frequency resource, and the PRB in the first slot overlaps with the PRB in the second slot, a target PRB can be selected from the first slot of the SBFD time-frequency resource. The target PRB is a PRB that is not occupied by the PUCCH uplink time-frequency resource. Select the target PRB as an available time-frequency resource, and transmit downlink data corresponding to the PDSCH in the available time-frequency resource.
[0129] In one example, the base station device configures the user equipment via RRC signaling the position of the time-frequency resource occupied by the PUCCH. The base station device can perform rate matching on the PDSCH based on the valid PUCCH resource position. The user equipment performs de-rate matching on the PDSCH centered on the PUCCH time-frequency resource based on the PUCCH configuration. Similarly, for the repeated transmission of the PDSCH transmitted in the SBFD time-frequency resource overlapping with the PUCCH uplink time-frequency resource and the retransmission of the PDSCH based on the HARQ feedback, it is necessary to perform rate matching centered on the PUCCH according to the above method in the SBFD time-frequency resource overlapping with the PUCCH, and the description is omitted here.
[0130] From the user equipment's perspective, which scheme (scheme 1 or scheme 2) to adopt for the one-time PDSCH transmission and the PDSCH transmission based on the HARQ feedback can be determined in the dynamic scheduling process. If the user equipment determines that the SBFD time-frequency resource occupied by the dynamic scheduling PDSCH does not overlap with the PUCCH uplink time-frequency resource, it can determine that it is scheme 1; otherwise, it can determine that it is scheme 2, and the user equipment can perform de-rate matching on the PDSCH with the PUCCH as the center. For the repeated transmission of the PDSCH, the user equipment may have a special indication parameter because it cannot determine which scheme to adopt based on the parameters of the repeated transmission of the PDSCH.
[0131] Here, the number of repeated transmissions of the PDSCH is set by the RRC parameter pdsch-AggregationFactor or RepetitionSchemeConfig-r16. Therefore, when repeated transmission of the PDSCH is performed in the SBFD time-frequency resource that overlaps with the PUCCH uplink time-frequency resource, the RRC parameter indicates which scheme to adopt.
[0132] For example, when the pdsch-AggregationFactor setting indicates whether to adopt scheme 1 or scheme 2, a new parameter pdsch-AggregationMultiplexingWithPUCCHInSbfd:pdsch-AggregationMultiplexingWithPUCCHInSbfd ENUMERATED{noTx, rm}option may be introduced. This parameter may be called an indication parameter of PDSCH repetitive transmission and pucch multiplexing method. If pdsch-AggregationFactor is not set, pdsch-AggregationMultiplexingWithPUCCHInSbfd is not set either. If pdsch-AggregationFactor is set, pdsch-AggregationMultiplexingWithPUCCHInSbfd is used to indicate whether to adopt scheme 1 or scheme 2. For example, one of the two options (noTx, rm) is selected, where noTx indicates no transmission, and the option corresponds to scheme 1, that is, the processing of scheme 1 is adopted. rm indicates that rate matching is performed, and this option corresponds to scheme 2, that is, the processing of scheme 2 is adopted.
[0133] For example, when the RepetitionSchemeConfig-r16 setting indicates whether to adopt scheme 1 or scheme 2, a new parameter RepetitionMultiplexingWithPUCCH:RepetitionMultiplexingWithPUCCH ENUMERATED{noTx, rm}option may be introduced. This parameter may be called an indication parameter of PDSCH repetitive transmission and pucch multiplexing method. If RepetitionSchemeConfig-r16 is not set, RepetitionMultiplexingWithPUCCH is not set either. If RepetitionSchemeConfig-r16 is set, RepetitionMultiplexingWithPUCCH is used to indicate whether to adopt scheme 1 or scheme 2. For example, one of two options (noTx, rm) is selected, where noTx indicates that no transmission is performed and the option corresponds to scheme 1. rm indicates that rate matching is performed and the option corresponds to scheme 2.
[0134] Regarding the above parameters, when RepetitionSchemeConfig-r16 is set, pdsch-AggregationFactor is not set, and when RepetitionMultiplexingWithPUCCH is set, pdsch-AggregationMultiplexingWithPUCCHInSbfd is not set.
[0135] In one example, for a PDSCH in semi-persistent scheduling (SPS), the time-frequency resources occupied by the PDSCH are transmitted to the user equipment by DCI when the semi-static configuration is activated. Thus, the above scheme may be used for SPS PDSCH, repeated transmission of SPS PDSCH, and retransmission based on HARQ feedback.
[0136] Case 4: A collision situation between the SBFD time-frequency resource and the PUSCH uplink time-frequency resource, that is, the PDSCH carried by the SBFD time-frequency resource and the PUSCH carried by the uplink time-frequency resource collide.
[0137] In one example, the PUSCH is used to transmit uplink data. There are two types of PUSCH: Dynamic Grant (DG) PUSCH and Configured Grant (CG) PUSCH. When the PUSCH uplink time-frequency resource and the SBFD time-frequency resource overlap, the transmission policy of the PDSCH in the SBFD time-frequency resource can be determined based on the FD capability of the user equipment.
[0138] For a full-duplex user equipment, the full-duplex user equipment can process uplink data and downlink data simultaneously, so there is no need to consider the collision between the PDSCH and the PUSCH. The user equipment can transmit uplink data corresponding to the PUSCH and receive downlink data corresponding to the PDSCH at the same time.
[0139] As can be seen from the above, for a full-duplex user equipment, when the channel type carried in the uplink time-frequency resource is PUSCH, if the first slot in the SBFD time-frequency resource and the second slot in the PUSCH uplink time-frequency resource overlap, no matter whether the PRB in the first slot and the PRB in the second slot overlap, determine that the SBFD time-frequency resource is an available time-frequency resource, and send downlink data corresponding to PDSCH in the SBFD time-frequency resource.If the first slot in the SBFD time-frequency resource and the second slot in the PUSCH uplink time-frequency resource do not overlap, determine that the SBFD time-frequency resource is an available time-frequency resource, and send downlink data corresponding to PDSCH in the SBFD time-frequency resource.
[0140] For half-duplex user equipment, the half-duplex user equipment can only transmit or receive on the time-frequency resource, i.e., can only transmit or receive at the same time, so it is necessary to clarify how to handle the PDSCH in the SBFD time-frequency resource overlapping with the different type of PUSCH, considering the collision between the PDSCH and the PUSCH. If the first slot in the SBFD time-frequency resource and the second slot in the PUSCH uplink time-frequency resource do not overlap, it is determined that the SBFD time-frequency resource is the available time-frequency resource, and the downlink data corresponding to the PDSCH can be transmitted in the SBFD time-frequency resource. If the first slot in the SBFD time-frequency resource and the second slot in the PUSCH uplink time-frequency resource overlap, the following processing is performed regardless of whether the PRB in the first slot and the PRB in the second slot overlap:
[0141] First, the priority of the PUSCH for random access is higher than the priority of the PDSCH. Secondly, the priority of the dynamic scheduling is higher than the priority of the semi-static scheduling. For example, the priority of the dynamic scheduling PDSCH is higher than the priority of the configured grant scheduling PUSCH, and the priority of the dynamic scheduling PUSCH is higher than the priority of the semi-persistent scheduling PDSCH. Then, if the scheduling types are the same, that is, if both the PUSCH and the PDSCH are dynamic scheduling or semi-static scheduling, processing is performed according to the priority of the PHY channel or the priority of the MAC channel. Then, if the priority of the PHY channel or the priority of the MAC channel is the same, the priority of the PUSCH and the priority of the PDSCH are determined based on whether the data carried on the PUSCH and the PDSCH are initial transmission data or retransmission data.
[0142] As can be seen from the above, for a half-duplex user equipment, when the channel type carried in the PUSCH uplink time-frequency resource is PUSCH, it can be processed as follows:
[0143] First, determine data corresponding to PUSCH carried in PUSCH uplink time-frequency resource, and if the data is data for random access, determine that SBFD time-frequency resource is unavailable time-frequency resource. In this case, use PUSCH uplink time-frequency resource to transmit uplink data corresponding to PUSCH, and do not use SBFD time-frequency resource to transmit downlink data corresponding to PDSCH. Here, if the data corresponding to PUSCH is PUSCH (MSG3) scheduled by RAR (random access response) or PUSCH opportunity after MAG A, the data is data for random access. PUSCH scheduled by RAR represents message 3 (MSG3) in type 1 random access procedure. PUSCH opportunity after MSG A (PRACH) represents PUSCH immediately after PRACH in type 2 random access procedure.
[0144] Then, if the data corresponding to the PUSCH is not data for random access, a first scheduling type corresponding to the PUSCH carried in the PUSCH uplink time-frequency resource may be determined, and a second scheduling type corresponding to the PDSCH carried in the SBFD time-frequency resource may be determined. If the first scheduling type is dynamic scheduling and the second scheduling type is semi-static scheduling, it may be determined that the SBFD time-frequency resource is an unavailable time-frequency resource. In this case, the PUSCH uplink time-frequency resource is used to transmit uplink data corresponding to the PUSCH, and the SBFD time-frequency resource is not used to transmit downlink data corresponding to the PDSCH. Alternatively, if the first scheduling type is semi-static scheduling and the second scheduling type is dynamic scheduling, all PRBs in the SBFD time-frequency resource may be selected as available time-frequency resources. In this case, the SBFD time-frequency resource is used to transmit downlink data corresponding to the PDSCH, and the PUSCH uplink time-frequency resource is not used to transmit uplink data corresponding to the PUSCH.
[0145] Then, when the first scheduling type and the second scheduling type are both dynamic scheduling, or when the first scheduling type and the second scheduling type are both semi-static scheduling, a first priority corresponding to the PUSCH carried in the PUSCH uplink time-frequency resource may be determined, and a second priority corresponding to the PDSCH carried in the SBFD time-frequency resource may be determined. The first priority may be a priority of the PHY channel, and the second priority may be a priority of the PHY channel. Or, the first priority may be a priority of the MAC channel, and the second priority may be a priority of the MAC channel. If the first priority is greater than the second priority, it may be determined that the SBFD time-frequency resource is an unavailable time-frequency resource. In this case, the PUSCH uplink time-frequency resource is used to transmit uplink data corresponding to the PUSCH, and the SBFD time-frequency resource is not used to transmit downlink data corresponding to the PDSCH. Or, if the first priority is less than the second priority, all PRBs in the SBFD time-frequency resource may be selected as available time-frequency resources. In this case, the SBFD time-frequency resource is used to transmit downlink data corresponding to the PDSCH, and the PUSCH uplink time-frequency resource is not used to transmit uplink data corresponding to the PUSCH.
[0146] Then, when the first priority is equal to the second priority, if the PUSCH carried in the PUSCH uplink time-frequency resource corresponds to the first transmission data and the PDSCH carried in the SBFD time-frequency resource corresponds to the retransmission data, it can be determined that the SBFD time-frequency resource is an unavailable time-frequency resource. In this case, the PUSCH uplink time-frequency resource is used to transmit uplink data corresponding to the PUSCH, and the SBFD time-frequency resource is not used to transmit downlink data corresponding to the PDSCH. If the PUSCH carried in the PUSCH uplink time-frequency resource corresponds to the retransmission data and the PDSCH carried in the SBFD time-frequency resource corresponds to the first transmission data, all the PRBs in the SBFD time-frequency resource can be selected as available time-frequency resources. In this case, the SBFD time-frequency resource is used to transmit downlink data corresponding to the PDSCH, and the PUSCH uplink time-frequency resource is not used to transmit uplink data corresponding to the PUSCH. When the PUSCH carried in the PUSCH uplink time-frequency resource corresponds to the initial transmission data, and the PDSCH carried in the SBFD time-frequency resource corresponds to the initial transmission data, all PRBs in the SBFD time-frequency resource can be selected as available time-frequency resources. In this case, the SBFD time-frequency resource is used to transmit downlink data corresponding to the PDSCH, and the PUSCH uplink time-frequency resource is not used to transmit uplink data corresponding to the PUSCH. When the PUSCH carried in the PUSCH uplink time-frequency resource corresponds to retransmission data, and the PDSCH carried in the SBFD time-frequency resource corresponds to retransmission data, all PRBs in the SBFD time-frequency resource can be selected as available time-frequency resources. In this case, the SBFD time-frequency resource is used to transmit downlink data corresponding to the PDSCH, and the PUSCH uplink time-frequency resource is not used to transmit uplink data corresponding to the PUSCH.
[0147] In one example, the above scheduling policy is shown in Table 1. Table 1 shows the scheduling policy when PDSCH and different types of PUSCH collide in the SBFD time-frequency resource.
[0148] [Table 1]
[0149] According to the above technical solution, downlink data corresponding to PDSCH can be transmitted on SBFD time-frequency resources, so as to more effectively utilize SBFD time-frequency resources, improve resource utilization, improve network coverage and network capacity, and reduce transmission delay, such as reducing downlink transmission delay. In the above technical solution, a scheduling mechanism on SBFD time-frequency resources when PDSCH collides with PRACH, SRS, PUCCH, PUSCH, etc. is determined. For user equipment with different capabilities, the mechanisms for scheduling PDSCH on SBFD time-frequency resources are different. By clarifying the scheduling mechanism of PDSCH of the base station device and the user equipment when SBFD time-frequency resources collide with other resources, the base station device and the user equipment can avoid the generation of behavior ambiguity in this case, and ensure that the base station device and the user equipment can normally transmit PDSCH in full duplex mode.
[0150] Based on the same inventive idea, a data transmission device and a base station device corresponding to the above data transmission method are further provided. Since the principle of the base station device solving the problem is similar to that of the data transmission method in the above embodiment, the implementation of the base station device can refer to the implementation of the method, and will not be repeated in this specification.
[0151] Based on a similar idea to the above method, one embodiment of the present invention provides a data transmission device applied to a base station device, the device including: a determination module configured to determine an overlapping situation between SBFD time-frequency resources and uplink time-frequency resources; an acquisition module configured to select an available time-frequency resource from the SBFD time-frequency resources based on the overlapping situation and an FD capability of a user equipment; and a transmission module configured to transmit downlink data corresponding to a PDSCH on the available time-frequency resource.
[0152] In one example, the acquisition module is configured, when selecting an available time-frequency resource from the SBFD time-frequency resources based on the overlap situation and the FD capability of the user equipment, specifically, when the overlap situation is that a first slot in the SBFD time-frequency resource and a second slot in the uplink time-frequency resource do not overlap, to select a first slot in the SBFD time-frequency resource as the available time-frequency resource when the FD capability is a mode supporting FD or a mode not supporting FD.
[0153] In one example, when the acquisition module selects an available time-frequency resource from the SBFD time-frequency resources according to the overlapping situation and the FD capability of the user equipment, specifically: and when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a physical resource block (PRB) in the first slot overlaps with a PRB in the second slot, the user equipment is configured to select an available time-frequency resource from the SBFD time-frequency resource based on an FD capability of the user equipment and a signal type or channel type carried in the uplink time-frequency resource.
[0154] In one example, when the acquisition module selects an available time-frequency resource from the SBFD time-frequency resources according to the overlapping situation and the FD capability of the user equipment, specifically: When the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is in a mode supporting FD, the mobile station is configured to select a PRB in the first slot as the available time-frequency resource, and when the FD capability is in a mode not supporting FD, to select an available time-frequency resource from the SBFD time-frequency resource based on a signal type or a channel type carried in the uplink time-frequency resource.
[0155] In one example, the signal or channel types carried in the uplink time-frequency resources include a Sounding Reference Signal (SRS), a Physical Random Access Channel (PRACH), a Physical Uplink Control Channel (PUCCH), and a Physical Uplink Shared Channel (PUSCH).
[0156] In one example, the acquisition module is further configured to: determine that the SBFD time-frequency resource is an unavailable time-frequency resource when a channel type carried in the uplink time-frequency resource is a PRACH and the FD capability is a mode that does not support FD when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource and a PRB in the first slot overlaps with a PRB in the second slot.
[0157] In one example, the acquisition module is further configured to: determine that the SBFD time-frequency resource is an unavailable time-frequency resource when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time-frequency resource is a PRACH and the FD capability is a mode supporting FD.
[0158] In one example, the acquisition module is further configured to determine that the SBFD time-frequency resource is an unavailable time-frequency resource when the FD capability is a mode that does not support FD and a channel type carried in the uplink time-frequency resource is a PRACH, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource and a PRB in the first slot does not overlap with a PRB in the second slot.
[0159] In one example, when a PRB in the first slot and a PRB in the second slot do not overlap, the acquisition module is configured to select all PRBs in the first slot of the SBFD time-frequency resource as the available time-frequency resource when the FD capability is a mode supporting FD and the channel type carried in the uplink time-frequency resource is PRACH, specifically, when the PRB in the first slot and the PRB in the second slot do not overlap, the acquisition module is configured to select all PRBs in the first slot of the SBFD time-frequency resource as the available time-frequency resource.
[0160] In one example, the acquisition module is further configured to: determine that the SBFD time-frequency resource is an unavailable time-frequency resource when the FD capability is a mode supporting FD and a channel type carried in the uplink time-frequency resource is PRACH, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource and a PRB in the first slot does not overlap with a PRB in the second slot.
[0161] In one example, the acquisition module is further configured to determine that the SBFD time-frequency resource is an unavailable time-frequency resource when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a signal type carried in the uplink time-frequency resource is SRS and the FD capability is a mode that does not support FD.
[0162] In one example, when a PRB in the first slot and a PRB in the second slot overlap, the acquisition module is configured to select an available time-frequency resource from the SBFD time-frequency resource based on the FD capability of the user equipment and a signal type or channel type carried in the uplink time-frequency resource, specifically, when the signal type carried in the uplink time-frequency resource is SRS and the FD capability is a mode supporting FD, select a first target PRB in the first slot of the SBFD time-frequency resource as the available time-frequency resource. The first target PRB is a PRB in a symbol not occupied by the uplink time-frequency resource.
[0163] In one example, when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a signal type carried in the uplink time-frequency resource is SRS and the FD capability is in a mode supporting FD, the acquisition module is further configured to: select, for downlink data of each repeated transmission corresponding to the PDSCH, a second target PRB in the first slot of the SBFD time-frequency resource as the available time-frequency resource, and transmit the downlink data of the repeated transmission by the available time-frequency resource. The second target PRB is a PRB in a symbol not occupied by the uplink time-frequency resource.
[0164] In one example, when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a signal type carried in the uplink time-frequency resource is SRS and the FD capability is in a mode supporting FD, the acquisition module is further configured to: select a third target PRB in the first slot of the SBFD time-frequency resource as the available time-frequency resource for downlink data of each repeated transmission corresponding to the PDSCH, and transmit the downlink data of the repeated transmission by the available time-frequency resource. The third target PRB is not occupied by the uplink time-frequency resource. In the symbol It is PRB.
[0165] In one example, when the PRB in the first slot and the PRB in the second slot overlap, the acquisition module is configured to select an available time-frequency resource from the SBFD time-frequency resource based on the FD capability of the user equipment and the signal type or channel type carried in the uplink time-frequency resource, specifically, when the signal type carried in the uplink time-frequency resource is SRS and the FD capability is a mode supporting FD, select a fourth target PRB from a first slot of the SBFD time-frequency resource and select a first resource element (RE) resource of the fourth target PRB as the available time-frequency resource. The fourth target PRB is not occupied by the uplink time-frequency resource. In the symbol a first RE resource and an uplink time-frequency resource occupied by the uplink time-frequency resource; In the symbol and a second RE resource.
[0166] In one example, the acquisition module is further configured to determine that the SBFD time-frequency resource is an unavailable time-frequency resource when the FD capability is a mode that does not support FD and a signal type carried in the uplink time-frequency resource is SRS, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource and a PRB in the first slot does not overlap with a PRB in the second slot.
[0167] In one example, when a PRB in the first slot and a PRB in the second slot do not overlap, the acquisition module is configured to select all PRBs in the first slot of the SBFD time-frequency resource as the available time-frequency resource when the FD capability is a mode supporting FD and a signal type carried in the uplink time-frequency resource is SRS, specifically, when the FD capability is a mode supporting FD and a signal type carried in the uplink time-frequency resource is SRS.
[0168] In one example, the acquisition module is further configured to: determine that the SBFD time-frequency resource is an unavailable time-frequency resource when a channel type carried in the uplink time-frequency resource is a PUCCH and the FD capability is a mode that does not support FD when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource and a PRB in the first slot overlaps with a PRB in the second slot.
[0169] In one example, when a PRB in the first slot and a PRB in the second slot overlap, the acquisition module is configured to select an available time-frequency resource from the SBFD time-frequency resource based on the FD capability of the user equipment and a signal type or channel type carried in the uplink time-frequency resource, specifically, when the channel type carried in the uplink time-frequency resource is PUCCH and the FD capability is a mode supporting FD, select a first target PRB in the first slot of the SBFD time-frequency resource as the available time-frequency resource. The first target PRB is a PRB in a symbol not occupied by the uplink time-frequency resource.
[0170] In one example, when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time-frequency resource is a PUCCH and the FD capability is a mode supporting FD, the acquisition module is further configured to: select, for downlink data of each repeated transmission corresponding to the PDSCH, a second target PRB in the first slot of the SBFD time-frequency resource as the available time-frequency resource, and transmit the downlink data of the repeated transmission by the available time-frequency resource. The second target PRB is a PRB in a symbol not occupied by the uplink time-frequency resource.
[0171] In one example, when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time-frequency resource is a PUCCH and the FD capability is a mode supporting FD, the acquisition module is further configured to: select a third target PRB in the first slot of the SBFD time-frequency resource as the available time-frequency resource for downlink data of each repeated transmission corresponding to the PDSCH, and transmit the downlink data of the repeated transmission by the available time-frequency resource. The third target PRB is not occupied by the uplink time-frequency resource. In the symbol It is PRB.
[0172] In one example, when a PRB in the first slot and a PRB in the second slot overlap, the acquisition module is configured to select an available time-frequency resource from the SBFD time-frequency resource based on the FD capability of the user equipment and a signal type or channel type carried in the uplink time-frequency resource, specifically, when the channel type carried in the uplink time-frequency resource is PUCCH and the FD capability is a mode supporting FD, select a fourth target PRB from the first slot of the SBFD time-frequency resource and select the fourth target PRB as the available time-frequency resource. The fourth target PRB is not occupied by the uplink time-frequency resource. In the symbol It is PRB.
[0173] In one example, the acquisition module is further configured to: determine that the SBFD time-frequency resource is an unavailable time-frequency resource when the FD capability is a mode that does not support FD and a channel type carried in the uplink time-frequency resource is a PUCCH, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource and a PRB in the first slot does not overlap with a PRB in the second slot.
[0174] In one example, when a PRB in the first slot and a PRB in the second slot do not overlap, the acquisition module is configured to select all PRBs in the first slot of the SBFD time-frequency resource as the available time-frequency resource when the FD capability is a mode supporting FD and the channel type carried in the uplink time-frequency resource is PUCCH, specifically, when the PRB in the first slot and the PRB in the second slot do not overlap, the acquisition module is configured to select all PRBs in the first slot of the SBFD time-frequency resource as the available time-frequency resource.
[0175] In one example, when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot or a PRB in the first slot does not overlap with a PRB in the second slot, the acquisition module is further configured to: determine data corresponding to a PUSCH carried in the uplink time-frequency resource when a channel type carried in the uplink time-frequency resource is a PUSCH and the FD capability is a mode that does not support FD; and determine that the SBFD time-frequency resource is an unavailable time-frequency resource when the data is data for random access.
[0176] In one example, if the data is not for random access, the acquisition module: determining a first scheduling type corresponding to a PUSCH carried in the uplink time frequency resource; determining a second scheduling type corresponding to a PDSCH carried in the SBFD time-frequency resource; The scheduling unit is further configured to determine that the SBFD time-frequency resource is an unavailable time-frequency resource if the first scheduling type is dynamic scheduling and the second scheduling type is semi-static scheduling, and to select all PRBs in the SBFD time-frequency resource as the available time-frequency resource if the first scheduling type is semi-static scheduling and the second scheduling type is dynamic scheduling.
[0177] In one example, when the first scheduling type and the second scheduling type are both dynamic scheduling, or when the first scheduling type and the second scheduling type are both semi-static scheduling, the acquisition module: determining a first priority corresponding to a PUSCH carried in the uplink time frequency resource; determining a second priority corresponding to a PDSCH carried in the SBFD time-frequency resource; The method is further configured to determine that the SBFD time-frequency resource is an unavailable time-frequency resource if the first priority is greater than the second priority, and to select all PRBs in the SBFD time-frequency resource as the available time-frequency resource if the first priority is less than the second priority.
[0178] In one example, if the first priority is equal to the second priority, the acquisition module: If a PUSCH carried in the uplink time-frequency resource corresponds to initial transmission data and a PDSCH carried in the SBFD time-frequency resource corresponds to retransmission data, determining that the SBFD time-frequency resource is an unavailable time-frequency resource; If a PUSCH carried in the uplink time-frequency resource corresponds to retransmission data and a PDSCH carried in the SBFD time-frequency resource corresponds to initial transmission data, selecting all PRBs in the SBFD time-frequency resource as the available time-frequency resource; If a PUSCH carried in the uplink time-frequency resource corresponds to initial transmission data and a PDSCH carried in the SBFD time-frequency resource corresponds to initial transmission data, selecting all PRBs in the SBFD time-frequency resource as the available time-frequency resource; It is further configured to select all PRBs in the SBFD time-frequency resource as the available time-frequency resource if a PUSCH carried in the uplink time-frequency resource corresponds to retransmission data and a PDSCH carried in the SBFD time-frequency resource corresponds to retransmission data.
[0179] In one example, when a PRB in the first slot and a PRB in the second slot overlap, the acquisition module is configured to select available time-frequency resources from the SBFD time-frequency resources based on the FD capability of the user equipment and a signal type or channel type carried in the uplink time-frequency resource, specifically, when the channel type carried in the uplink time-frequency resource is a PUSCH and the FD capability is a mode supporting FD, select all PRBs in the first slot of the SBFD time-frequency resource as the available time-frequency resources.
[0180] In one example, when a PRB in the first slot and a PRB in the second slot do not overlap, the acquisition module is configured to select all PRBs in the first slot of the SBFD time-frequency resource as the available time-frequency resource when the FD capability is a mode supporting FD and a channel type carried in the uplink time-frequency resource is PUSCH.
[0181] Based on the same idea as the above method, a base station device is provided in one embodiment of the present invention. As shown in Fig. 9, the base station device includes a processor 911 and a machine-readable storage medium 912. The machine-readable storage medium 912 stores machine-executable instructions executable by the processor 911, and the processor 911 is configured to execute the machine-executable instructions to realize the data transmission method disclosed in the above embodiment of the present invention.
[0182] In one example, when executed by the processor 911, the machine-executable instructions perform the steps of determining an overlapping status between SBFD time-frequency resources and uplink time-frequency resources, selecting an available time-frequency resource from the SBFD time-frequency resources based on the overlapping status and an FD capability of a user equipment, and transmitting downlink data corresponding to a PDSCH on the available time-frequency resource.
[0183] In one example, in the process performed by the processor 911, the step of selecting an available time-frequency resource from the SBFD time-frequency resources based on the overlap situation and the FD capability of the user equipment includes the step of selecting a first slot in the SBFD time-frequency resources as the available time-frequency resource when the overlap situation is that a first slot in the SBFD time-frequency resources and a second slot in the uplink time-frequency resources do not overlap, when the FD capability is a mode supporting FD or a mode not supporting FD.
[0184] In one example, in the process performed by the processor 911, the step of selecting an available time-frequency resource from the SBFD time-frequency resource based on the overlap situation and the FD capability of the user equipment includes, when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, selecting an available time-frequency resource from the SBFD time-frequency resource based on the FD capability of the user equipment and a signal type or channel type carried in the uplink time-frequency resource.
[0185] In one example, in a process performed by the processor 911, the step of selecting an available time-frequency resource from the SBFD time-frequency resource based on the overlap situation and the FD capability of the user equipment includes, when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource and a PRB in the first slot does not overlap with a PRB in the second slot, selecting a PRB in the first slot as the available time-frequency resource when the FD capability is in a mode supporting FD, and selecting an available time-frequency resource from the SBFD time-frequency resource based on a signal type or channel type carried in the uplink time-frequency resource when the FD capability is in a mode not supporting FD.
[0186] In one example, in the processing performed by the processor 911, the signal types or channel types carried in the uplink time frequency resource include SRS, PRACH, PUCCH, and PUSCH.
[0187] In one example, when the machine-readable instructions are executed by the processor 911, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time-frequency resource is PRACH and the FD capability is a mode that does not support FD, the step of determining that the SBFD time-frequency resource is an unavailable time-frequency resource is further executed.
[0188] In one example, when the machine-readable instructions are executed by the processor 911, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time-frequency resource is PRACH and the FD capability is a mode supporting FD, the step of determining that the SBFD time-frequency resource is an unavailable time-frequency resource is further executed.
[0189] In one example, when the machine-readable instructions are executed by the processor 911, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode that does not support FD and a channel type carried in the uplink time-frequency resource is PRACH, the step of determining that the SBFD time-frequency resource is an unavailable time-frequency resource is further executed.
[0190] In one example, in the process performed by the processor 911, when a PRB in the first slot and a PRB in the second slot do not overlap, selecting a PRB in the first slot as the available time-frequency resource includes selecting all PRBs in the first slot of the SBFD time-frequency resource as the available time-frequency resource when the FD capability is a mode supporting FD and a channel type carried in the uplink time-frequency resource is PRACH.
[0191] In one example, when the machine-readable instructions are executed by the processor 911, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode supporting FD and a channel type carried in the uplink time-frequency resource is PRACH, the step of determining that the SBFD time-frequency resource is an unavailable time-frequency resource is further executed.
[0192] In one example, when the machine-readable instructions are executed by the processor 911, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a signal type carried in the uplink time-frequency resource is SRS and the FD capability is a mode that does not support FD, the step of determining that the SBFD time-frequency resource is an unavailable time-frequency resource is further executed.
[0193] In one example, in the process performed by the processor 911, when a PRB in the first slot and a PRB in the second slot overlap, selecting an available time-frequency resource from the SBFD time-frequency resource based on the FD capability of the user equipment and a signal type or channel type carried in the uplink time-frequency resource includes selecting a first target PRB in the first slot of the SBFD time-frequency resource as the available time-frequency resource when the signal type carried in the uplink time-frequency resource is SRS and the FD capability is a mode supporting FD. The first target PRB is a PRB in a symbol not occupied by the uplink time-frequency resource.
[0194] In one example, when the machine-readable instructions are executed by the processor 911, when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a signal type carried in the uplink time-frequency resource is SRS and the FD capability is in a mode supporting FD, for downlink data of each repeated transmission corresponding to the PDSCH, select a second target PRB in the first slot of the SBFD time-frequency resource as the available time-frequency resource, and transmit the downlink data of the repeated transmission by the available time-frequency resource. The second target PRB is a PRB in a symbol not occupied by the uplink time-frequency resource.
[0195] In one example, when the machine-readable instructions are executed by the processor 911, when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a signal type carried in the uplink time-frequency resource is SRS and the FD capability is in a mode supporting FD, the step of selecting a third target PRB in the first slot of the SBFD time-frequency resource as the available time-frequency resource for downlink data of each repeated transmission corresponding to the PDSCH, and transmitting the downlink data of the repeated transmission by the available time-frequency resource is further performed. The third target PRB is not occupied by the uplink time-frequency resource. In the symbol It is PRB.
[0196] In one example, in the process performed by the processor 911, when a PRB in the first slot and a PRB in the second slot overlap, selecting an available time-frequency resource from the SBFD time-frequency resource based on the FD capability of the user equipment and a signal type or channel type carried in the uplink time-frequency resource includes: selecting a fourth target PRB from a first slot of the SBFD time-frequency resource and selecting a first RE resource of the fourth target PRB as the available time-frequency resource when the signal type carried in the uplink time-frequency resource is SRS and the FD capability is a mode supporting FD. The fourth target PRB is not occupied by the uplink time-frequency resource. In the symbol a first RE resource and an uplink time-frequency resource occupied by the uplink time-frequency resource; In the symbol and a second RE resource.
[0197] In one example, when the machine-readable instructions are executed by the processor 911, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode that does not support FD and a signal type carried in the uplink time-frequency resource is SRS, the step of determining that the SBFD time-frequency resource is an unavailable time-frequency resource is further executed.
[0198] In one example, in the processing performed by the processor 911, when a PRB in the first slot and a PRB in the second slot do not overlap, selecting a PRB in the first slot as the available time-frequency resource includes selecting all PRBs in the first slot of the SBFD time-frequency resource as the available time-frequency resource when the FD capability is in a mode supporting FD and a signal type carried in the uplink time-frequency resource is SRS.
[0199] In one example, when the machine-readable instructions are executed by the processor 911, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time-frequency resource is PUCCH and the FD capability is a mode that does not support FD, the step of determining that the SBFD time-frequency resource is an unavailable time-frequency resource is further executed.
[0200] In one example, in the process performed by the processor 911, when a PRB in the first slot and a PRB in the second slot overlap, selecting an available time-frequency resource from the SBFD time-frequency resource based on the FD capability of the user equipment and a signal type or channel type carried in the uplink time-frequency resource includes selecting a first target PRB in the first slot of the SBFD time-frequency resource as the available time-frequency resource when the channel type carried in the uplink time-frequency resource is PUCCH and the FD capability is a mode supporting FD. The first target PRB is a PRB in a symbol not occupied by the uplink time-frequency resource.
[0201] In one example, when the machine-readable instructions are executed by the processor 911, when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time-frequency resource is a PUCCH and the FD capability is a mode supporting FD, for downlink data of each repeated transmission corresponding to the PDSCH, select a second target PRB in the first slot of the SBFD time-frequency resource as the available time-frequency resource, and transmit the downlink data of the repeated transmission by the available time-frequency resource. The second target PRB is a PRB in a symbol not occupied by the uplink time-frequency resource.
[0202] In one example, when the machine-readable instructions are executed by the processor 911, when the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time-frequency resource is a PUCCH and the FD capability is a mode supporting FD, the following steps are further performed: for downlink data of each repeated transmission corresponding to the PDSCH, select a third target PRB in the first slot of the SBFD time-frequency resource as the available time-frequency resource, and transmit the downlink data of the repeated transmission by the available time-frequency resource. The third target PRB is not occupied by the uplink time-frequency resource. In the symbol It is PRB.
[0203] In one example, in the process performed by the processor 911, when a PRB in the first slot and a PRB in the second slot overlap, selecting an available time-frequency resource from the SBFD time-frequency resource based on the FD capability of the user equipment and a signal type or channel type carried in the uplink time-frequency resource includes: selecting a fourth target PRB from the first slot of the SBFD time-frequency resource and selecting the fourth target PRB as the available time-frequency resource when the channel type carried in the uplink time-frequency resource is PUCCH and the FD capability is a mode supporting FD. The fourth target PRB is not occupied by the uplink time-frequency resource. In the symbol It is PRB.
[0204] In one example, when the machine-readable instructions are executed by the processor 911, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode that does not support FD and a channel type carried in the uplink time-frequency resource is PUCCH, the step of determining that the SBFD time-frequency resource is an unavailable time-frequency resource is further executed.
[0205] In one example, in the processing performed by the processor 911, when a PRB in the first slot and a PRB in the second slot do not overlap, selecting a PRB in the first slot as the available time-frequency resource includes selecting all PRBs in the first slot of the SBFD time-frequency resource as the available time-frequency resource when the FD capability is a mode supporting FD and a channel type carried in the uplink time-frequency resource is PUCCH.
[0206] In one example, when the machine-readable instructions are executed by the processor 911, if the overlap situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot or a PRB in the first slot does not overlap with a PRB in the second slot, when a channel type carried in the uplink time-frequency resource is a PUSCH and the FD capability is a mode that does not support FD, the step of determining data corresponding to a PUSCH carried in the uplink time-frequency resource and the step of determining that the SBFD time-frequency resource is an unavailable time-frequency resource when the data is data for random access.
[0207] In one example, the machine-readable instructions, when executed by the processor 911, may include: if the data is not data for random access: determining a first scheduling type corresponding to a PUSCH carried in the uplink time frequency resource; determining a second scheduling type corresponding to a PDSCH carried in the SBFD time-frequency resource; determining that the SBFD time-frequency resource is an unavailable time-frequency resource if the first scheduling type is dynamic scheduling and the second scheduling type is semi-static scheduling, and selecting all PRBs in the SBFD time-frequency resource as the available time-frequency resource if the first scheduling type is semi-static scheduling and the second scheduling type is dynamic scheduling.
[0208] In one example, the machine-readable instructions, when executed by the processor 911, may include: if the first scheduling type and the second scheduling type are both dynamic scheduling, or if the first scheduling type and the second scheduling type are both semi-static scheduling, determining a first priority corresponding to a PUSCH carried in the uplink time frequency resource; determining a second priority corresponding to a PDSCH carried in the SBFD time-frequency resource; and determining that the SBFD time-frequency resource is an unavailable time-frequency resource if the first priority is greater than the second priority, and selecting all PRBs in the SBFD time-frequency resource as the available time-frequency resource if the first priority is less than the second priority.
[0209] In one example, the machine-readable instructions, when executed by the processor 911, may include: if the first priority is equal to the second priority, determining that the SBFD time-frequency resource is an unavailable time-frequency resource when a PUSCH carried in the uplink time-frequency resource corresponds to initial transmission data and a PDSCH carried in the SBFD time-frequency resource corresponds to retransmission data; selecting all PRBs in the SBFD time-frequency resource as the available time-frequency resource when a PUSCH carried in the uplink time-frequency resource corresponds to retransmission data and a PDSCH carried in the SBFD time-frequency resource corresponds to initial transmission data; selecting all PRBs in the SBFD time-frequency resource as the available time-frequency resource when a PUSCH carried in the uplink time-frequency resource corresponds to initial transmission data and a PDSCH carried in the SBFD time-frequency resource corresponds to initial transmission data; and if a PUSCH carried in the uplink time-frequency resource corresponds to retransmission data and a PDSCH carried in the SBFD time-frequency resource corresponds to retransmission data, selecting all PRBs in the SBFD time-frequency resource as the available time-frequency resources.
[0210] In one example, in the process performed by the processor 911, when a PRB in the first slot and a PRB in the second slot overlap, selecting available time-frequency resources from the SBFD time-frequency resources based on the FD capability of the user equipment and a signal type or channel type carried in the uplink time-frequency resource includes selecting all PRBs in the first slot of the SBFD time-frequency resource as the available time-frequency resources when the channel type carried in the uplink time-frequency resource is PUSCH and the FD capability is a mode supporting FD.
[0211] In one example, in the process performed by the processor 911, when a PRB in the first slot and a PRB in the second slot do not overlap, selecting a PRB in the first slot as the available time-frequency resource includes selecting all PRBs in the first slot of the SBFD time-frequency resource as the available time-frequency resource when the FD capability is a mode supporting FD and a channel type carried in the uplink time-frequency resource is PUSCH.
[0212] Based on a similar idea to the above method, an embodiment of the present invention further provides a machine-readable storage medium, which stores some computer instructions, and when the computer instructions are executed by a processor, the data transmission method disclosed in the above embodiment of the present invention is implemented.
[0213] The machine-readable storage medium may be any electronic, magnetic, optical, or other physical storage device that can contain or store information such as executable instructions, data, etc. For example, the machine-readable storage medium may be a RAM (random access memory), a volatile memory, a non-volatile memory, a flash memory, a storage drive (e.g., a hard disk drive), a solid-state drive, any type of storage disk (e.g., an optical disk, a DVD, etc.), or a similar storage medium, or a combination thereof.
[0214] The system, device, module or unit described in the above embodiments may be specifically realized by a computer chip or entity, or may be realized by a product having some function. A typical implementation device is a computer, and the specific form of the computer may be a personal computer, a laptop computer, a mobile phone, a camera phone, a smartphone, a personal digital assistant, a media player, a navigation device, an e-mail sending and receiving device, a game machine, a tablet PC, a wearable device, or any combination of these devices.
[0215] For convenience of description, the above-mentioned device will be described as being divided into units according to their functions. Of course, when implementing the present invention, the functions of each unit can be realized by the same or multiple pieces of software and / or hardware.
[0216] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as a method, a system, or a computer program product. Thus, the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, embodiments of the present invention may take the form of a computer program product embodied in one or more computer usable storage mediums (including, but not limited to, magnetic disk storage devices, CD-ROMs, optical storage devices, etc.) having computer usable program code therein.
[0217] The present invention will be described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each flow and / or block in the flowcharts and / or block diagrams, and combinations of flows and / or blocks in the flowcharts and / or block diagrams, can be realized by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, a special purpose computer, an embedded processor, or other programmable data processing device to generate a machine, and the instructions executed by the processor of the general purpose computer or other programmable data processing device generate an apparatus for implementing the function specified in one or more flows of the flowcharts and / or one or more blocks of the block diagrams.
[0218] Furthermore, these computer program instructions may be stored in a computer-readable memory that can direct a computer or other programmable data processing device to operate in a specified manner, where the instructions stored in the computer-readable memory generate an article of manufacture that includes an instruction apparatus that implements the functions specified in one or more flows of the flowcharts and / or one or more blocks of the block diagrams.
[0219] These computer program instructions may be loaded into a computer or other programmable data processing device and a series of operational steps executed on the computer or other programmable device to generate a computer-implemented process, whereby the instructions executed on the computer or other programmable device provide steps for implementing the functions specified in one or more flows of the flowcharts and / or one or more blocks of the block diagrams.
[0220] The above description is merely an embodiment of the present invention, and is not intended to limit the present invention. Various modifications and variations of the present invention are possible for those skilled in the art. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the scope of the claims of the present invention.
Claims
1. A data transmission method applied to a base station device, comprising: determining an overlap situation between a sub-band full duplex (SBFD) time-frequency resource and an uplink time-frequency resource; selecting an available time-frequency resource from the SBFD time-frequency resources based on the overlapping situation and a full duplex (FD) capability of a user equipment (UE); transmitting downlink data corresponding to a Physical Downlink Shared Channel (PDSCH) on the available time-frequency resources.
2. A data transmission method comprising:
2. selecting an available time-frequency resource from the SBFD time-frequency resources based on the overlapping situation and FD capability of the user equipment, If the overlapping situation is that a first slot in the SBFD time frequency resource and a second slot in the uplink time frequency resource do not overlap, when the FD capability is in a mode supporting FD or a mode not supporting FD, selecting a first slot in the SBFD time frequency resource as the available time frequency resource.
2. The method of claim 1 .
3. selecting an available time-frequency resource from the SBFD time-frequency resources based on the overlapping situation and FD capability of the user equipment, and if the overlapping situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a physical resource block (PRB) in the first slot overlaps with a PRB in the second slot, selecting an available time frequency resource from the SBFD time frequency resource based on an FD capability of the user equipment and a signal type or channel type carried in the uplink time frequency resource.
2. The method of claim 1 .
4. selecting an available time-frequency resource from the SBFD time-frequency resources based on the overlapping situation and FD capability of the user equipment, When the overlap situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource and a PRB in the first slot does not overlap with a PRB in the second slot, the method includes the steps of: selecting a PRB in the first slot as the available time frequency resource when the FD capability is in a mode supporting FD; and selecting an available time frequency resource from the SBFD time frequency resource based on a signal type or a channel type carried in the uplink time frequency resource when the FD capability is in a mode not supporting FD.
2. The method of claim 1 .
5. The signal type or channel type carried in the uplink time-frequency resource is Sounding Reference Signal (SRS), Physical Random Access Channel (PRACH), Physical Uplink Control Channel (PUCCH), and Physical Uplink Shared Channel (PUSCH), 5. The method according to claim 3 or 4.
6. When the overlapping situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time frequency resource is a PRACH and the FD capability is a mode that does not support FD, the method further includes the step of determining that the SBFD time frequency resource is an unavailable time frequency resource.
2. The method of claim 1 .
7. When the overlapping situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time frequency resource is PRACH and the FD capability is a mode supporting FD, the method further includes the step of determining that the SBFD time frequency resource is an unavailable time frequency resource.
4. The method according to claim 3 .
8. If the overlap situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode that does not support FD and a channel type carried in the uplink time frequency resource is a PRACH, further comprising: determining that the SBFD time frequency resource is an unavailable time frequency resource.
2. The method of claim 1 .
9. When the PRBs in the first slot and the PRBs in the second slot do not overlap, selecting the PRBs in the first slot as the available time-frequency resources includes selecting all PRBs in the first slot of the SBFD time-frequency resources as the available time-frequency resources when the FD capability is a mode supporting FD and a channel type carried in the uplink time-frequency resources is PRACH.
5. The method of claim 4.
10. If the overlap situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode supporting FD and a channel type carried in the uplink time frequency resource is PRACH, further comprising: determining that the SBFD time frequency resource is an unavailable time frequency resource.
2. The method of claim 1 .
11. If the overlapping situation is that a first slot in the SBFD time-frequency resource overlaps with a second slot in the uplink time-frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a signal type carried in the uplink time-frequency resource is an SRS and the FD capability is a mode that does not support FD, determine that the SBFD time-frequency resource is an unavailable time-frequency resource. The further step includes:
2. The method of claim 1 .
12. selecting an available time-frequency resource from the SBFD time-frequency resources based on an FD capability of the user equipment and a signal type or channel type carried in the uplink time-frequency resources when a PRB in the first slot and a PRB in the second slot overlap, comprising: When a signal type carried in the uplink time-frequency resource is an SRS and the FD capability is a mode supporting FD, selecting a first target PRB in a first slot of the SBFD time-frequency resource as the available time-frequency resource; the first target PRB is a PRB in a symbol not occupied by the uplink time-frequency resource; 4. The method according to claim 3 .
13. When the overlapping situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a signal type carried in the uplink time frequency resource is an SRS and the FD capability is a mode supporting FD, for downlink data of each repeated transmission corresponding to the PDSCH: selecting a second target PRB in a first slot of the SBFD time-frequency resource as the available time-frequency resource, and transmitting the downlink data of the repeated transmission via the available time-frequency resource; the second target PRB is a PRB in a symbol not occupied by the uplink time-frequency resource.
2. The method of claim 1 .
14. When the overlapping situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a signal type carried in the uplink time frequency resource is an SRS and the FD capability is a mode supporting FD, for downlink data of each repeated transmission corresponding to the PDSCH: selecting a third target PRB in a first slot of the SBFD time-frequency resource as the available time-frequency resource, and transmitting the downlink data of the repeated transmission via the available time-frequency resource; the third target PRB is a PRB not occupied by the uplink time-frequency resource; 2. The method of claim 1 .
15. selecting an available time-frequency resource from the SBFD time-frequency resources based on an FD capability of the user equipment and a signal type or channel type carried in the uplink time-frequency resources when a PRB in the first slot and a PRB in the second slot overlap, comprising: When a signal type carried in the uplink time frequency resource is an SRS and the FD capability is a mode supporting FD, selecting a fourth target PRB from a first slot of the SBFD time frequency resource and selecting a first resource element (RE) resource of the fourth target PRB as the available time frequency resource; the fourth target PRB includes a first RE resource that is not occupied by the uplink time frequency resource and a second RE resource that is occupied by the uplink time frequency resource; 4. The method according to claim 3 .
16. When the overlap situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode that does not support FD and a signal type carried in the uplink time frequency resource is an SRS, the method further includes the step of determining that the SBFD time frequency resource is an unavailable time frequency resource.
2. The method of claim 1 .
17. When a PRB in the first slot and a PRB in the second slot do not overlap, selecting a PRB in the first slot as the available time-frequency resource includes selecting all PRBs in the first slot of the SBFD time-frequency resource as the available time-frequency resource when the FD capability is a mode supporting FD and a signal type carried in the uplink time-frequency resource is SRS.
5. The method of claim 4.
18. and when the overlapping situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time frequency resource is a PUCCH and the FD capability is a mode that does not support FD, determining that the SBFD time frequency resource is an unavailable time frequency resource.
2. The method of claim 1 .
19. selecting an available time-frequency resource from the SBFD time-frequency resources based on an FD capability of the user equipment and a signal type or channel type carried in the uplink time-frequency resources when a PRB in the first slot and a PRB in the second slot overlap, comprising: When a channel type carried in the uplink time-frequency resource is a PUCCH and the FD capability is a mode supporting FD, selecting a first target PRB in a first slot of the SBFD time-frequency resource as the available time-frequency resource; the first target PRB is a PRB in a symbol not occupied by the uplink time-frequency resource; 4. The method according to claim 3 .
20. When the overlapping situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time frequency resource is a PUCCH and the FD capability is a mode supporting FD, for downlink data of each repeated transmission corresponding to the PDSCH: selecting a second target PRB in a first slot of the SBFD time-frequency resource as the available time-frequency resource, and transmitting the downlink data of the repeated transmission via the available time-frequency resource; the second target PRB is a PRB in a symbol not occupied by the uplink time-frequency resource.
2. The method of claim 1 .
21. When the overlapping situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time frequency resource is a PUCCH and the FD capability is a mode supporting FD, for downlink data of each repeated transmission corresponding to the PDSCH: selecting a third target PRB in a first slot of the SBFD time-frequency resource as the available time-frequency resource, and transmitting the downlink data of the repeated transmission via the available time-frequency resource; the third target PRB is a PRB not occupied by the uplink time-frequency resource; 2. The method of claim 1 .
22. selecting an available time-frequency resource from the SBFD time-frequency resources based on an FD capability of the user equipment and a signal type or channel type carried in the uplink time-frequency resources when a PRB in the first slot and a PRB in the second slot overlap, comprising: When a channel type carried in the uplink time-frequency resource is a PUCCH and the FD capability is a mode supporting FD, selecting a fourth target PRB from a first slot of the SBFD time-frequency resource, and selecting the fourth target PRB as the available time-frequency resource; the fourth target PRB is a PRB not occupied by the uplink time-frequency resource; 4. The method according to claim 3 .
23. When the overlap situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode that does not support FD and a channel type carried in the uplink time frequency resource is a PUCCH, further comprising: determining that the SBFD time frequency resource is an unavailable time frequency resource.
2. The method of claim 1 .
24. When a PRB in the first slot and a PRB in the second slot do not overlap, selecting a PRB in the first slot as the available time-frequency resource includes selecting all PRBs in the first slot of the SBFD time-frequency resource as the available time-frequency resource when the FD capability is a mode supporting FD and a channel type carried in the uplink time-frequency resource is a PUCCH.
5. The method of claim 4.
25. if the overlapping situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot or a PRB in the first slot does not overlap with a PRB in the second slot; determining data corresponding to the PUSCH carried in the uplink time frequency resource when the channel type carried in the uplink time frequency resource is a PUSCH and the FD capability is a mode that does not support FD; and determining, when the data is data for random access, that the SBFD time-frequency resource is an unavailable time-frequency resource.
2. The method of claim 1 .
26. If the data is not data for random access, determining a first scheduling type corresponding to a PUSCH carried in the uplink time frequency resource; determining a second scheduling type corresponding to a PDSCH carried in the SBFD time frequency resource; determining that the SBFD time-frequency resource is an unavailable time-frequency resource if the first scheduling type is dynamic scheduling and the second scheduling type is semi-static scheduling, and selecting all PRBs in the SBFD time-frequency resource as the available time-frequency resource if the first scheduling type is semi-static scheduling and the second scheduling type is dynamic scheduling.
26. The method of claim 25.
27. When the first scheduling type and the second scheduling type are both dynamic scheduling, or when the first scheduling type and the second scheduling type are both semi-static scheduling, determining a first priority corresponding to a PUSCH carried in the uplink time frequency resource; determining a second priority corresponding to a PDSCH carried in the SBFD time frequency resource; determining that the SBFD time-frequency resource is an unavailable time-frequency resource if the first priority is greater than the second priority, and selecting all PRBs in the SBFD time-frequency resource as the available time-frequency resource if the first priority is less than the second priority.
27. The method of claim 26.
28. If the first priority is equal to the second priority, determining that the SBFD time-frequency resource is an unavailable time-frequency resource when a PUSCH carried in the uplink time-frequency resource corresponds to initial transmission data and a PDSCH carried in the SBFD time-frequency resource corresponds to retransmission data; selecting all PRBs in the SBFD time frequency resource as the available time frequency resource when a PUSCH carried in the uplink time frequency resource corresponds to retransmission data and a PDSCH carried in the SBFD time frequency resource corresponds to initial transmission data; selecting all PRBs in the SBFD time frequency resource as the available time frequency resource when a PUSCH carried in the uplink time frequency resource corresponds to initial transmission data and a PDSCH carried in the SBFD time frequency resource corresponds to initial transmission data; and if a PUSCH carried in the uplink time frequency resource corresponds to retransmission data and a PDSCH carried in the SBFD time frequency resource corresponds to retransmission data, selecting all PRBs in the SBFD time frequency resource as the available time frequency resource.
28. The method of claim 27.
29. selecting an available time-frequency resource from the SBFD time-frequency resources based on an FD capability of the user equipment and a signal type or channel type carried in the uplink time-frequency resources when a PRB in the first slot and a PRB in the second slot overlap, comprising: When a channel type carried in the uplink time frequency resource is a PUSCH and the FD capability is a mode supporting FD, selecting all PRBs in a first slot of the SBFD time frequency resource as the available time frequency resource.
4. The method according to claim 3 .
30. When a PRB in the first slot and a PRB in the second slot do not overlap, selecting a PRB in the first slot as the available time-frequency resource includes selecting all PRBs in the first slot of the SBFD time-frequency resource as the available time-frequency resource when the FD capability is a mode supporting FD and a channel type carried in the uplink time-frequency resource is a PUSCH.
5. The method of claim 4.
31. A data transmission device applied to a base station device, A determination module configured to determine an overlap situation between a sub-band full duplex (SBFD) time-frequency resource and an uplink time-frequency resource; an acquisition module configured to select an available time-frequency resource from the SBFD time-frequency resources based on the overlap situation and a full duplex (FD) capability of a user equipment (UE); a transmission module configured to transmit downlink data corresponding to a Physical Downlink Shared Channel (PDSCH) on the available time-frequency resources. A data transmission device comprising:
32. When the acquisition module selects an available time-frequency resource from the SBFD time-frequency resources according to the overlapping situation and the FD capability of the user equipment, it specifically: and configured to select a first slot in the SBFD time frequency resource as the available time frequency resource when the FD capability is in a mode supporting FD or a mode not supporting FD, if the overlapping situation is that a first slot in the SBFD time frequency resource and a second slot in the uplink time frequency resource do not overlap.
32. The apparatus of claim 31 .
33. When the acquisition module selects an available time-frequency resource from the SBFD time-frequency resources according to the overlapping situation and the FD capability of the user equipment, it specifically: and if the overlapping situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a physical resource block (PRB) in the first slot overlaps with a PRB in the second slot, the user equipment is configured to select an available time frequency resource from the SBFD time frequency resource based on an FD capability of the user equipment and a signal type or channel type carried in the uplink time frequency resource.
32. The apparatus of claim 31 .
34. When the acquisition module selects an available time-frequency resource from the SBFD time-frequency resources according to the overlapping situation and the FD capability of the user equipment, it specifically: and when the overlap situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource and a PRB in the first slot does not overlap with a PRB in the second slot, the FD capability is configured to select a PRB in the first slot as the available time frequency resource when the FD capability is in a mode supporting FD, and to select an available time frequency resource from the SBFD time frequency resource based on a signal type or a channel type carried in the uplink time frequency resource when the FD capability is in a mode not supporting FD.
32. The apparatus of claim 31 .
35. The signal type or channel type carried in the uplink time-frequency resource is Sounding Reference Signal (SRS), Physical Random Access Channel (PRACH), Physical Uplink Control Channel (PUCCH), and Physical Uplink Shared Channel (PUSCH), 35. Apparatus according to claim 33 or 34.
36. The acquisition module is further configured to: determine, when the overlap situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time frequency resource is a PRACH and the FD capability is a mode that does not support FD, that the SBFD time frequency resource is an unavailable time frequency resource.
32. The apparatus of claim 31 .
37. The obtaining module is further configured to: determine, when the overlap situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time frequency resource is a PRACH and the FD capability is a mode supporting FD, that the SBFD time frequency resource is an unavailable time frequency resource.
34. The apparatus of claim 33.
38. The acquisition module is further configured to: determine, when the overlap situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode that does not support FD and a channel type carried in the uplink time frequency resource is a PRACH, the SBFD time frequency resource is an unavailable time frequency resource.
32. The apparatus of claim 31 .
39. When the PRB in the first slot and the PRB in the second slot do not overlap, when the acquisition module selects the PRB in the first slot as the available time-frequency resource, it specifically: configured to select all PRBs in a first slot of the SBFD time frequency resource as the available time frequency resource when the FD capability is a mode supporting FD and a channel type carried in the uplink time frequency resource is a PRACH; 35. The apparatus of claim 34.
40. The acquisition module is further configured to: determine, when the overlap situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode supporting FD and a channel type carried in the uplink time frequency resource is a PRACH, the SBFD time frequency resource is an unavailable time frequency resource.
32. The apparatus of claim 31 .
41. The acquisition module is further configured to: determine, when the overlap situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a signal type carried in the uplink time frequency resource is an SRS and the FD capability is a mode that does not support FD, that the SBFD time frequency resource is an unavailable time frequency resource.
32. The apparatus of claim 31 .
42. When the PRB in the first slot and the PRB in the second slot overlap, when the acquisition module selects an available time-frequency resource from the SBFD time-frequency resources according to the FD capability of the user equipment and the signal type or channel type carried in the uplink time-frequency resource, specifically: configured to select a first target PRB in a first slot of the SBFD time frequency resource as the available time frequency resource when a signal type carried in the uplink time frequency resource is an SRS and the FD capability is a mode supporting FD; the first target PRB is a PRB in a symbol not occupied by the uplink time-frequency resource; 34. Apparatus according to claim 33,
43. When the overlapping situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a signal type carried in the uplink time frequency resource is an SRS and the FD capability is a mode supporting FD, for downlink data of each repeated transmission corresponding to the PDSCH: The method is further configured to: select a second target PRB in a first slot of the SBFD time-frequency resource as the available time-frequency resource; and transmit the downlink data of the repeated transmission via the available time-frequency resource; the second target PRB is a PRB in a symbol not occupied by the uplink time-frequency resource.
32. The apparatus of claim 31 .
44. When the overlapping situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a signal type carried in the uplink time frequency resource is an SRS and the FD capability is a mode supporting FD, for downlink data of each repeated transmission corresponding to the PDSCH: and further configured to select a third target PRB in a first slot of the SBFD time-frequency resource as the available time-frequency resource, and transmit the downlink data of the repeated transmission via the available time-frequency resource; the third target PRB is a PRB not occupied by the uplink time-frequency resource; 32. The apparatus of claim 31 .
45. When the PRB in the first slot and the PRB in the second slot overlap, when the acquisition module selects an available time-frequency resource from the SBFD time-frequency resources according to the FD capability of the user equipment and the signal type or channel type carried in the uplink time-frequency resource, specifically: When a signal type carried in the uplink time frequency resource is an SRS and the FD capability is a mode supporting FD, the SBFD time frequency resource is configured to select a fourth target PRB from a first slot, and select a first resource element (RE) resource of the fourth target PRB as the available time frequency resource; the fourth target PRB includes a first RE resource that is not occupied by the uplink time frequency resource and a second RE resource that is occupied by the uplink time frequency resource; 34. The apparatus of claim 33.
46. The acquisition module is further configured to: determine, when the overlap situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode that does not support FD and a signal type carried in the uplink time frequency resource is an SRS, that the SBFD time frequency resource is an unavailable time frequency resource.
32. The apparatus of claim 31 .
47. When the PRB in the first slot and the PRB in the second slot do not overlap, when the acquisition module selects the PRB in the first slot as the available time-frequency resource, it specifically: configured to select all PRBs in a first slot of the SBFD time-frequency resource as the available time-frequency resource when the FD capability is a mode supporting FD and a signal type carried in the uplink time-frequency resource is an SRS; 35. The apparatus of claim 34.
48. The obtaining module is further configured to: determine, when the overlap situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time frequency resource is a PUCCH and the FD capability is a mode that does not support FD, that the SBFD time frequency resource is an unavailable time frequency resource.
32. The apparatus of claim 31 .
49. When the PRB in the first slot and the PRB in the second slot overlap, when the acquisition module selects an available time-frequency resource from the SBFD time-frequency resources according to the FD capability of the user equipment and the signal type or channel type carried in the uplink time-frequency resource, specifically: configured to select a first target PRB in a first slot of the SBFD time frequency resource as the available time frequency resource when a channel type carried in the uplink time frequency resource is a PUCCH and the FD capability is a mode supporting FD; the first target PRB is a PRB in a symbol not occupied by the uplink time-frequency resource; 34. The apparatus of claim 33.
50. When the overlapping situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time frequency resource is a PUCCH and the FD capability is a mode supporting FD, for downlink data of each repeated transmission corresponding to the PDSCH: The method is further configured to: select a second target PRB in a first slot of the SBFD time-frequency resource as the available time-frequency resource; and transmit the downlink data of the repeated transmission via the available time-frequency resource; the second target PRB is a PRB in a symbol not occupied by the uplink time-frequency resource.
32. The apparatus of claim 31 .
51. When the overlapping situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, when a channel type carried in the uplink time frequency resource is a PUCCH and the FD capability is a mode supporting FD, for downlink data of each repeated transmission corresponding to the PDSCH: and further configured to select a third target PRB in a first slot of the SBFD time-frequency resource as the available time-frequency resource, and transmit the downlink data of the repeated transmission via the available time-frequency resource; the third target PRB is a PRB not occupied by the uplink time-frequency resource; 32. The apparatus of claim 31 .
52. When the PRB in the first slot and the PRB in the second slot overlap, when the acquisition module selects an available time-frequency resource from the SBFD time-frequency resources according to the FD capability of the user equipment and the signal type or channel type carried in the uplink time-frequency resource, specifically: configured to select a fourth target PRB from a first slot of the SBFD time-frequency resource and select the fourth target PRB as the available time-frequency resource when a channel type carried in the uplink time-frequency resource is a PUCCH and the FD capability is a mode supporting FD; the fourth target PRB is a PRB not occupied by the uplink time-frequency resource; 34. The apparatus of claim 33.
53. the acquiring module is further configured to: determine, when the overlap situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot does not overlap with a PRB in the second slot, when the FD capability is a mode that does not support FD and a channel type carried in the uplink time frequency resource is a PUCCH, the SBFD time frequency resource is an unavailable time frequency resource.
32. The apparatus of claim 31 .
54. When the PRB in the first slot and the PRB in the second slot do not overlap, when the acquisition module selects the PRB in the first slot as the available time-frequency resource, it specifically: configured to select all PRBs in a first slot of the SBFD time frequency resource as the available time frequency resource when the FD capability is a mode supporting FD and a channel type carried in the uplink time frequency resource is a PUCCH; 35. The apparatus of claim 34.
55. When the overlap situation is that a first slot in the SBFD time frequency resource overlaps with a second slot in the uplink time frequency resource, and a PRB in the first slot overlaps with a PRB in the second slot, or a PRB in the first slot does not overlap with a PRB in the second slot, the acquisition module: When a channel type carried in the uplink time frequency resource is a PUSCH and the FD capability is a mode that does not support FD, determining data corresponding to the PUSCH carried in the uplink time frequency resource; and determining, when the data is data for random access, that the SBFD time-frequency resource is an unavailable time-frequency resource.
32. The apparatus of claim 31 .
56. If the data is not for random access, the acquisition module: determining a first scheduling type corresponding to a PUSCH carried in the uplink time frequency resource; determining a second scheduling type corresponding to a PDSCH carried in the SBFD time frequency resource; and determining that the SBFD time-frequency resource is an unavailable time-frequency resource if the first scheduling type is dynamic scheduling and the second scheduling type is semi-static scheduling, and selecting all PRBs in the SBFD time-frequency resource as the available time-frequency resource if the first scheduling type is semi-static scheduling and the second scheduling type is dynamic scheduling.
56. The apparatus of claim 55.
57. When the first scheduling type and the second scheduling type are both dynamic scheduling, or when the first scheduling type and the second scheduling type are both semi-static scheduling, the acquisition module: determining a first priority corresponding to a PUSCH carried in the uplink time frequency resource; determining a second priority corresponding to a PDSCH carried in the SBFD time-frequency resource; and determining that the SBFD time-frequency resource is an unavailable time-frequency resource if the first priority is greater than the second priority, and selecting all PRBs in the SBFD time-frequency resource as the available time-frequency resource if the first priority is less than the second priority.
57. The apparatus of claim 56.
58. If the first priority is equal to the second priority, the acquisition module: If a PUSCH carried in the uplink time-frequency resource corresponds to initial transmission data and a PDSCH carried in the SBFD time-frequency resource corresponds to retransmission data, determining that the SBFD time-frequency resource is an unavailable time-frequency resource; If a PUSCH carried in the uplink time frequency resource corresponds to retransmission data and a PDSCH carried in the SBFD time frequency resource corresponds to initial transmission data, selecting all PRBs in the SBFD time frequency resource as the available time frequency resource; If the PUSCH carried in the uplink time frequency resource corresponds to initial transmission data and the PDSCH carried in the SBFD time frequency resource corresponds to initial transmission data, selecting all PRBs in the SBFD time frequency resource as the available time frequency resource; and further configured to select all PRBs in the SBFD time frequency resource as the available time frequency resource if the PUSCH carried in the uplink time frequency resource corresponds to retransmission data and the PDSCH carried in the SBFD time frequency resource corresponds to retransmission data.
58. The apparatus of claim 57.
59. When the PRB in the first slot and the PRB in the second slot overlap, when the acquisition module selects an available time-frequency resource from the SBFD time-frequency resources according to the FD capability of the user equipment and the signal type or channel type carried in the uplink time-frequency resource, specifically: configured to select all PRBs in a first slot of the SBFD time frequency resource as the available time frequency resource when a channel type carried in the uplink time frequency resource is a PUSCH and the FD capability is a mode supporting FD; 34. The apparatus of claim 33.
60. When the PRB in the first slot and the PRB in the second slot do not overlap, when the acquisition module selects the PRB in the first slot as the available time-frequency resource, it specifically: configured to select all PRBs in a first slot of the SBFD time frequency resource as the available time frequency resource when the FD capability is a mode supporting FD and a channel type carried in the uplink time frequency resource is a PUSCH; 35. The apparatus of claim 34.
61. A base station apparatus including a processor and a machine-readable storage medium, the machine-readable storage medium storing machine-executable instructions executable by the processor, the processor being configured to execute the machine-executable instructions to implement a method according to any one of claims 1 to 30. A base station device comprising:
Citation Information
Patent Citations
Configurations for full-duplex communication systems
US20210152418A1
Frequency domain allocation techniques
US20210377938A1
Sub-band full duplex resource configuration
WO2024010632A1
