Submarine cable system and method for laying a submarine cable system - Patents.com

The submarine cable system addresses heat loss and mechanical stability issues by dividing the cable into sections with and without reinforcement, enhancing cooling efficiency and power transmission capacity through a seamless transition piece.

JP2024543969AActive Publication Date: 2024-11-26RWE OFFSHORE WIND GMBH
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2024532476
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2021-11-30
Filing Date
2022-11-14
Publication Date
2024-11-26
Estimated Expiration
2042-11-14

AI Technical Summary

Technical Problem

Submarine cables face challenges in balancing high power transmission capacity with mechanical stability and environmental protection, leading to increased heat loss due to eddy currents and limited cooling efficiency, which restricts maximum power transmission and increases costs.

Method used

The submarine cable system is divided into two sections: one with metal reinforcement and insulation for underwater use, and another without reinforcement and outer insulation for land-based installation, using a transition piece to connect them seamlessly, reducing eddy current-induced heat loss and enhancing cooling efficiency.

Benefits of technology

This design allows for increased power transmission capacity without significant cost increases, by minimizing heat loss and maintaining continuous operation from underwater to land-based installations, while ensuring mechanical stability and environmental protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024543969000001_ABST
    Figure 2024543969000001_ABST
Patent Text Reader

Abstract

A submarine cable system comprising: a submarine cable having at least two energy lines guided between two distal ends of the submarine cable, each energy line comprising a strand wire and at least one insulating layer surrounding the strand wire, the two energy lines being connected at a common metal stiffener, a transition piece, the metal stiffener, and an outer insulating layer surrounding the metal stiffener, a first section of the submarine cable being formed from a first one of the distal ends of the submarine cable to a transition area, in the first section, the energy lines being connected to the metal stiffener and the outer insulating layer surrounding the metal stiffener. a second section of the submarine cable formed from the transition region to a second one of the distal ends of the submarine cable, in which the energy lines are guided in the metal reinforcement and the outer insulating layer surrounding the metal reinforcement, the energy lines being guided in the transition region to a second one of the distal ends of the submarine cable, in which the power conductors are free of the metal reinforcement and the outer insulating layer surrounding the metal reinforcement, in which the power conductors are free of the metal reinforcement and the outer insulating layer surrounding the metal reinforcement, and the submarine cable system further comprises a sleeve-shaped transition piece having a through opening, the transition region being disposed within the through opening.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present subject matter relates to submarine cable systems and methods for installing such submarine cable systems. [Background technology]

[0002] As the expansion of open sea (offshore) electricity generation accelerates, subsea electric cables are also increasingly laid between offshore and onshore plants. Typically, several power generation plants, e.g. wind turbines, are connected offshore to transformer stations, also called substations. Electrical energy generated in the power generation plants is transmitted from such substations to onshore plants via subsea electric cables. Electrical energy is supplied to the electricity grid via onshore plants.

[0003] On the one hand, submarine cables must be able to transport high power. They must therefore have a large transmission capacity. This leads to a large cross section of the conductors of the electric energy lines. Furthermore, submarine cables are subjected to high mechanical loads and therefore must be provided with appropriate mechanical protection. This can be mechanical protection against tensile, shear, bending, torsion or other forces. Such protection is usually provided by metallic reinforcements. For that purpose, submarine cables may be provided with one or more reinforcement layers. Furthermore, submarine cables are usually exposed to highly corrosive salt water. The strands of the energy lines must also be protected against salt water and are therefore provided with various insulation layers to prevent the ingress or diffusion of sea water as completely as possible.

[0004] These two requirements, both regarding mechanical stability and stability against environmental influences, are in conflict with the need to transmit high powers in submarine cables. On the one hand, high powers lead to an increase in the temperature of the strands due to ohmic losses. Such ohmic losses are minimized as much as possible by choosing the largest possible cable cross-section and by using metals with high conductivity values, such as aluminum, copper or copper alloys. But on the other hand, if the submarine cable is used as an AC line, induced currents arise in the reinforcement, since it is metallic. Such induced eddy currents also generate ohmic losses in the reinforcement. Both cause heat losses and, as a result, the cable heats up.

[0005] Heat losses along submarine cables are usually well dissipated by the surrounding water and / or the seabed, thus providing sufficient heat dissipation of the submarine cable even when very high powers are transmitted.

[0006] As mentioned above, submarine cables are pulled to onshore facilities (stations). For this purpose, they are currently switched to underground cable ducts near the coast at the transition point. Such cable ducts are often designed as HDD (arc-thrust) ducts and run from the transition point of the submarine cable through the ground to the onshore facility or to the Terraced Junction Box (TJB), where the transition to the onshore cable takes place. The cable ducts are often empty (cables surrounded by air), but can be filled with grout or another filler, preferably a mineral, to improve the thermal conductivity of the cable. Plastic tubes increase the insulation of the submarine cable.

[0007] Due to the lack of water and the harsher conditions (the cables are installed at great depths and sometimes surrounded by air in plastic pipes), submarine cables are not cooled as well as they would be if they were installed underwater or on the seabed. Overall, this type of installation on land limits the maximum power that can be transmitted by a submarine cable compared to an exclusively underwater / seabed installation. To counteract these drawbacks, currently the power transmitted through the submarine cable must be reduced or the cable cross-section must be significantly increased, both of which significantly increase costs.

[0008] The subject matter was based on the objective of increasing the maximum power transmission capacity of the submarine cables to be laid. Summary of the Invention [Means for solving the problem]

[0009] This object is achieved by a submarine cable system according to claim 1 and a method according to claim 15.

[0010] The submarine cable according to the present subject matter has two distal ends. At least two energy lines extend between the two distal ends. However, preferably, more than two, in particular three, four or five energy lines may be routed inside the submarine cable according to the present subject matter. The energy lines serve to transport electrical energy. Preferably, the energy lines are operated as AC lines. In that case, the present solution is particularly advantageous due to the low eddy current losses. Nevertheless, the present solution can also be used for DC lines. For the transmission of electrical energy, the energy lines each have a stranded wire. The strands can be multifilament strands or strands of solid material. Preferably, the multifilament strands are formed from a number of filaments (wires / strands), preferably twisted or twisted. The strands of each energy line are each surrounded by an insulating layer.

[0011] Thus, the insulating layer can be formed from one material or a laminate of different materials and / or layers. In particular, the insulating layer can be extruded onto the strands. The insulating layer can also be wrapped around the strands.

[0012] The strands of each energy line are insulated from one another via an insulating layer, the dielectric strength of which is at least 1000V, preferably greater than 1000V.

[0013] At least two energy lines can be guided individually, but objectively at least together with a metal reinforcement. The metal reinforcement can be single-layered or multi-layered, and is preferably formed by metal wires. The metal wires of each reinforcement layer can be guided in a forward or reverse twist with respect to each other. First, the insulation layers of the individual energy lines can be guided in a common insulation layer. This can then be surrounded by a metal reinforcement. Finally, the metal reinforcement is surrounded by at least one further outer insulation layer. Both the inner and outer insulation layers can be multi-layered, laminated, multi-layered, and / or similar. The materials of the insulation layers can be the same or different from each other.

[0014] Submarine cables are typically laid from an offshore station to a shore station or a TJB, where a first distal end of the submarine cable is mechanically, and in particular also electrically, connected at the offshore station and a second distal end of the submarine cable is mechanically, and in particular also electrically, connected at the shore station or TJB.

[0015] The submarine cable according to the present subject matter is characterized by two sections. The energy line extends in both sections, specifically, there is no interruption of the energy line between the distal ends. That is, the submarine cable, specifically, the energy line of the submarine cable, is pulled between an offshore station and a land station or a shore junction box (TJB) without interruption. The first section of the submarine cable is formed from a first one of the distal ends of the submarine cable to a transition region. The second section of the submarine cable is formed from the transition region to a second one of the distal ends of the submarine cable. Thus, the transition region forms a transition between the two sections of the submarine cable.

[0016] In the first section of the submarine cable, the energy lines are guided in a metallic reinforcement and an outer insulating layer surrounding the metallic reinforcement, in particular, the submarine cable is formed in the first section in the same manner as a conventional submarine cable, i.e. with all insulating and reinforcement layers as conventionally implemented.

[0017] The energy lines extend from the first section, preferably without interruption, across the transition region to the second section.

[0018] In the second section, the energy line does not have a metal reinforcement and an outer insulation layer surrounding the metal reinforcement. As a result, there is no heat loss due to eddy currents in the reinforcement of the second section. Furthermore, because the outer insulation has been removed, the heat convection in the energy line is increased compared to the heat convection in the first section.

[0019] Here, the second section is a section of the submarine cable that is laid on land and the first section of the cable is a section of the submarine cable that is laid above sea level, underwater / undersea. In the transition section, the submarine cable comprises a sleeve-shaped transition piece. The transition piece has a through opening. Preferably, the transition region is located within the through opening.

[0020] According to one embodiment, it is possible that the submarine cable is manufactured on land and preferably also the transition piece is already joined to the submarine cable on land, so that the first section, in particular the transition area, is located in the through opening, however, according to further embodiments it is also possible that the submarine cable is manufactured on land without the transition piece and is simply joined with the transition piece offshore.

[0021] According to one embodiment, the transition piece is preferably divided at least into two parts, the first part being preferably formed as a one-piece sleeve with a passage, into which a first section of the submarine cable with its outer insulation can be guided. This first sleeve can be terminated in the second part of the transition piece. The second part can be formed as a multi-part sleeve with a number of passages corresponding to the number of energy lines of the submarine cable. The energy lines can be guided in respective passages of the multi-part sleeve with respective insulating layers.

[0022] The two sleeve passages preferably have an inner surface, in particular made of plastic. In particular, the passages are formed such that their diameter fits snugly with the outer diameter of the outer insulating layer on the one hand and the insulating layer surrounding the strands on the other hand. Preferably, the inner surface of the passages is formed from the same or similar plastic as the respective insulating layers that abut the inner surfaces of the sleeve passages.

[0023] The transition piece is used for mechanically connecting the offshore laying point of the submarine cable to the laying point of the underground cable duct, in this context the transition piece is preferably inserted into the cable duct together with the submarine cable or is connected to the cable duct, in particular by screwing.

[0024] According to one embodiment, it is proposed that the submarine cable system comprises a cable duct. The cable duct has an opening for receiving the transition piece. Thereby, the transition piece is preferably inserted or pressed into the opening of the cable duct such that the outer side of the transition piece sits against the inner side of the cable duct in the area of ​​the opening. The transition piece is preferably inserted into the opening of the cable duct in the form of a plug. The transition piece can also be arranged like a flange at the opening of the cable duct. In this respect, the sleeve of the transition piece receiving the first section of the cable may preferably be at least partially outside the cable duct and / or the sleeve of the transition piece receiving the second section of the cable may preferably be at least partially inside the cable duct.

[0025] The submarine cable can be inserted into the transition piece such that the first section enters a first sleeve. This first sleeve can have a flange-like protrusion at its end face. The stiffener can rest on the end face of the flange-like protrusion. In that case, the wires of the stiffener are preferably bent radially outwardly to fan out so that they can seat on the end face of the flange.

[0026] The end face of the flange or the end face of the sleeve on which the reinforcement is laid can be mechanically connected to a flange-like radial protrusion at the opening of the cable duct, with the reinforcement being clamped between the two flanges.

[0027] It is also possible that the sleeve of the second section of the transition piece is screwed onto the flange surface of the first section on which the stiffener sits, so that the stiffener is then clamped between the flange-like surfaces of the two parts. It is therefore preferred that the stiffener is clamped between two flange-like radial projections in the transition piece. The stiffener may be grounded.

[0028] According to one embodiment, it is proposed that the first section of the submarine cable is inserted watertight into the through-opening. For that purpose, the outer insulation of the submarine cable can abut against the inner side of the first sleeve of the transition piece. The first sleeve forms a through-opening in the region of the first section of the submarine cable. The submarine cable is joined, in particular pushed, into the through-opening, preferably up to the transition region.

[0029] According to one embodiment, it is proposed that the second section of the submarine cable is led out watertight from the through opening. For that purpose, a second sleeve may be provided in the second part of the transition piece. This may have a number of passages, each of which encloses one of the energy lines. Here too, the outer surface of the insulating layer surrounding each strand may be in contact with the inner surface of each passage of the second sleeve.

[0030] The transition piece can abut with its flange-like radial projections against the flange-like radial projections of the cable duct. A radially projecting flange can be formed at the end face of the cable duct, which flange is formed as a stop for the transition piece. A sealing means, in particular a plastic seal, can be arranged between the two flange-like projections.

[0031] The transition piece can be formed from two parts as already mentioned. The two parts can be formed like sleeves. The two parts can each have a flange-like projection on one end face. These flange-like projections can match one another geometrically and can be attached to one another when connected. The reinforcement can be clamped between the two flanges of the two parts of the transition piece. For this purpose, the reinforcement can be radially fanned out and placed between the two projections. The two parts can then be joined to one another, in particular screwed to one another, so that the reinforcement is fixed between the flange faces that meet one another. Also, a gasket, in particular a plastic gasket, can be arranged between the two flanges of the two parts that are in contact with one another.

[0032] The two parts may be sleeve-like as mentioned above. The first part may be a first sleeve having passages, into which the outer insulation of the submarine cable is received. The second part may be a second sleeve having a number of passages corresponding to the number of energy lines of the submarine cable. In particular, the second sleeve may be formed from two separate parts joined together along an axially extending joint surface. Then, it is not necessary to pass each energy line through a bushing of the sleeve. The energy lines may be accommodated in the passages of the second sleeve.

[0033] The passage of the first part may extend towards the first section of the submarine cable. The passage of the second part may extend towards the second section of the submarine cable. In the assembled state, the first section of the submarine cable is guided in the first part. In the assembled state, the second section of the submarine cable is preferably guided in the second part. In the assembled state, the submarine cable with its second section protrudes from the second part.

[0034] The two parts of the transition piece, specifically the sleeve, have passages through which the energy line and the submarine cable are inserted. The sleeve can be a one-piece or a multi-piece joint.

[0035] The transition piece should be sealed against the cable duct. It is therefore proposed that the outer side of the transition piece is securely attached to the inner side of the cable duct. In particular, radial projections, which can be separated from one another along the axis, can be arranged on the outer side of the transition piece. They can project radially outward in a lip-shaped manner. They can abut against the inner side of the cable duct. It is particularly preferred that radial recesses corresponding to the radial projections on the outer side of the transition piece are arranged on the inner side of the cable duct. In this way, the transition piece is securely fixed to the inner side of the cable duct. The radial projections can optimize the sealing effect against the ingress of water through the interface between the transition piece and the cable duct.

[0036] As already explained, the reinforcement is fanned out in the transition area by bending the individual wires of the reinforcement radially outward. The fanned reinforcement can preferably be located circumferentially around the energy line. The reinforcement can be bent radially outward in a star shape. The transition piece can clamp the reinforcement. To that end, the reinforcement can be clamped between the portions of the transition piece or it is also possible that the reinforcement is clamped between a flange-like projection of the transition piece and a flange of the cable duct.

[0037] In addition to the frictional connection by clamping, a positive connection can also be achieved. For this purpose, the end faces along which the reinforcement fan outwards can be provided with corresponding profiling. The end faces of the flanges can be provided with grooves which extend radially outwards and into which the wires of the reinforcement can be inserted. Preferably, the grooves can be formed in such a way that they are joined to one another on the surfaces of the flanges.

[0038] According to one embodiment, it is proposed that a first section of the submarine cable is guided from an offshore station to a transition piece, which is guided into a cable duct. The submarine cable is then pulled in a second section of the cable duct underground to a land station or a shore joint box (TJB). The submarine cable is thus pulled on land as well as offshore without interrupting the energy line. At sea, the submarine cable is cooled with water surrounding the cable. Since the reinforcement and the outer insulation are removed in the second section, the heat losses in the cable duct are reduced, since eddy currents are no longer generated in the reinforcement removed there, while the energy line can be cooled more efficiently, since the outer insulation layer does not interfere with the assembly.

[0039] The cable duct is an at least partially horizontal drilled duct, in particular a HDD duct. To stabilize the submarine cable in the cable duct, spacers can be provided on the inner wall of the cable duct to keep the energy lines at a certain distance from the inner wall of the cable duct. This ensures that the energy lines in the cable duct do not sit against the wall of the cable duct.

[0040] Specifically, it is preferable that the energy lines are arranged in a triangular shape within the cable duct.

[0041] In another aspect, a method for laying a corresponding submarine cable system is provided, where a submarine cable is assembled on land in two sections. During the fabrication of the submarine cable, a first section can be fabricated with both the stiffener and the outer insulation, and a second section is fabricated without the stiffener and the outer insulation. The energy line runs uninterrupted between the two sections.

[0042] The cable thus made is connected offshore to an offshore station, which connection comprises both an electrical and a mechanical connection, in particular in the form of a so-called cable hang-off, in which the cable reinforcement is fastened to the offshore station by means of a force-fit and / or form-fit.

[0043] A transition area is formed between two sections of submarine cable. The submarine cable is joined to the transition area in a through hole in the transition piece. The process can be done during the harnessing process onshore or during the laying process at sea. A laying vessel can lay the first section of the submarine cable up to the transition point. The transition piece can then be attached to the submarine cable before it is pulled into the cable duct.

[0044] For installation on land, a second section of the submarine cable is pulled from the transition piece through an at least partially buried cable duct to a land station or a shore joint box (TJB). At the land station / TJB, the submarine cable is in particular electrically connected to the energy line, so that an electrical contact is made between the land station / TJB and the offshore station through the energy line.

[0045] The transition piece can be fabricated on land and attached to the submarine cable. To this end, the submarine cable can be joined at its transition area to the through hole of the transition piece. The reinforcement of the submarine cable can be fanned outwards as described and mechanically fixed to the transition piece. Fixation can be achieved by flanges on the two parts of the transition piece.

[0046] The subject matter will be explained in more detail below with reference to the drawings showing embodiments. [Brief description of the drawings]

[0047] [Figure 1] 1 is an installed undersea cable system according to one embodiment. [Diagram 2]FIG. 1 is a diagram of a submarine cable having two energy lines. [Figure 3A] 1 is a transition piece according to a first embodiment. [Figure 3B] 1 is a transition piece according to a first embodiment. [Figure 3C] 1 is a transition piece according to a first embodiment. [Figure 4A] 4 is a transition piece according to a second embodiment. [Figure 4B] 4 is a transition piece according to a second embodiment. [Figure 4C] 4 is a transition piece according to a second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0048] FIG. 1 shows the laying of a submarine cable system. In FIG. 1 an offshore station 4, for example a substation 4, is shown. The substation 4 is floating or anchored on the seabed. In the area of ​​the electrical connection bracket 8 the electrical as well as mechanical contacting of the submarine cable 2 is carried out conventionally. The submarine cable 2 is guided with a first section 2a below the water surface 10 or on the seabed 6 up to a switching point 12. The switching point 12 represents the transition from the undersea / underground laying of the submarine cable 2 to the underground HDD laying of the submarine cable 2.

[0049] A cable duct 14, e.g. a HDD duct, is guided from the switching point 12. This cable duct 14 is guided, for example, under a sand dune 16. The cable duct 14 leads to a land station or beach junction box (TJB) 18. The land station / TJB 18 is, for example, a switching point for the power supply to the electrical energy grid. Here too, the electrical connection of the energy lines of the submarine cable 2 is made in a connection bracket 20. The laying of the submarine cable 2, and in particular the connection of the connection brackets 8, 20, is well known.

[0050] According to the present subject matter, it is now proposed to divide the submarine cable 2 into a first section 2a that is run under the sea / underground and a second section 2b that is run underground, the first section 2a having a reinforcement and an outer insulation, the second section having no reinforcement and in particular no outer insulation.

[0051] A transition section of a submarine cable 2 is illustrated in FIG. 2. The submarine cable 2 is formed from at least two energy lines 22a, 22b. The strands 24a, 24b of the energy lines 22a, 22b are formed from multifilaments, in particular twisted or twisted. A single or laminated insulating layer 26a, 26b can be formed around the strands 24a, 24b. The structure of the insulating layers 26a, 26b or the insulating layers 26a, 26b are well known and will not be described in detail.

[0052] Within the submarine cable 2 the energy lines 22a, 22b are preferably spaced apart by a spacer 28.

[0053] The energy lines 22a, 22b are surrounded by at least a single layer, but preferably also multiple layers, of reinforcement material 30. The reinforcement material 30 is formed from a metal wire. In doing so, the metal wire is preferably coiled or wrapped around the energy lines 22a, 22b. If the reinforcement material 30 is multiple layers, the wire may be wound in the opposite direction. When multiple layers of reinforcement material 30 are provided, they may be insulated from each other. Finally, the submarine cable 2 comprises an outer insulation 32.

[0054] In Fig. 2, the transition section is shown. On the right side, the first section 2a is shown, and on the left side, the second section 2b is shown. The cable 2 has been stripped of the insulation 32 and the stiffener 30 in the transition area. The spacer 28 may also be removed. In the second section 2b, the cable 2 extends only with its energy lines 22a, 22b formed by the strands 24a, 24b and the single or multiple insulation layers 26a, 26b.

[0055] Transition piece 34 is shown as an example in Figures 3A-3C and 4A-4C.

[0056] FIG. 3A shows a sleeve-shaped transition piece 34, which can be formed from a first part 34a and a second part 34b. The parts 34a, 34b can be in one piece or in several pieces. The transition piece 34 can be formed in one piece from the parts 34a, 34b or in several pieces from at least the parts 34a, 34b. The first part 34a is formed to receive the first section 2a of the submarine cable 2. To that end, the first part 34a is formed like a sleeve and has a through opening 36a, into which the cable 2 can be assembled with its insulating layer 32, in particular by pushing or fitting it in. The insulating body 32 is in contact with the inner surface of the through opening 36a.

[0057] In the transition region, the second portion 34b adjoins the first portion 34a. The second portion 34b has a number of through openings 36b corresponding to the number of energy lines 22a, 22b. The second portion 34b may also be sleeve-shaped. Each energy line 24a, 24b rests with its respective insulating layer 26a, 26b against the inner side of the through opening 36b. The second portion 34b is flange-shaped at its end face 38. At its end face 38, the stiffener 30 is bent radially outward like a fan. The stiffener 30 rests against the end face 38.

[0058] 3B shows a schematic representation of the cable duct 14, which has a flange 40 at its end face, which is configured to receive the end face 38. In particular, a screw connection can be provided.

[0059] 3C shows how the transition piece 34 can be connected to the cable duct 14. The transition piece 34 is screwed or in some other way fixed with its end face 38 to a flange 40. The stiffener 30 is clamped between the end face 38 and the flange 40. Furthermore, a gasket 42 can be provided. The cable 2 is inserted with its first section 2a into the transition piece 34. The transition piece 34 is screwed into the cable channel 14 at the flange 40. Inside the cable duct 14, the cable runs with its second section 2b, in particular the individual energy lines 22.

[0060] The inner wall of the cable duct 14 may be provided with one or more spacers so that the individual energy lines 22 are spaced from the inner wall of the cable duct 14 .

[0061] 4A-4C show another way by which the transition piece 34 can be formed. FIG. 4A shows a view of a first part 34a. The first part 34a has a flange 46. The first part 34a is formed in a sleeve shape and receives the first section 2a of the cable 2. At the end face 48, the reinforcement 30 can be laid outwardly in a fan-like shape. On the first part 34a thus formed, the second part 34b can be placed, as shown in FIG. 4B. The second part 34b is then in two pieces and can be placed like a sleeve around the energy line 22 in the region 2b.

[0062] The second part 34b is screwed to an end face 48 of the first part 34a by means of a flange 46. The stiffener 30 is now clamped between the two parts 34a, 34b. A seal 42 can also be provided at the end face 48.

[0063] The energy line 22 is received in the second part 34b in the form of a sleeve and is led out therefrom, preferably in a sealed state. The transition piece 34 thus assembled can be inserted into the cable duct 14, as shown in FIG. 4C. For that purpose, the energy line 22 is drawn in the second section 2b into the cable duct 14. In the process, the second part 34b is also inserted into the cable duct 14. The flange 46 of the first part 34a comes into contact with the flange 40 and can provide a seal 42. The flange 40 is screwed to the flange 46. Now, in the joined state, the cable 2 runs with its first section 2a substantially outside the cable duct 14 and its second section 2b inside the cable duct 14.

[0064] With this submarine cable system, it is possible to increase the power transmission capacity of the submarine cable when it is laid underground with HDD. At the same time, the submarine cable can be laid continuously underwater / underground as well as underground with HDD without temperature problems. Heat loss due to eddy currents in the reinforcement is reduced. [Explanation of symbols]

[0065] 2. Submarine Cable System 4. Substation 6 Undersea 8, 20 Connection bracket 10 water surface 12 Switching Points 14 Cable Duct 16 Nozzles 18 Land Station or Terrain Junction Box (TJB) 22a, 22b Energy Line 24a, 24b stranded wire 26a, 26b Insulating layer 28, 44 Spacer 30 Reinforcement 32 Insulators 34 Transition piece 34a, 34b part 36a, 36b through hole 38, 48 sides 40, 46 flange 42 Gasket

Claims

1. 1. A submarine cable system comprising: - comprising a submarine cable having at least two energy lines guided between two distal ends of the submarine cable, each energy line comprises a stranded wire and at least one insulating layer surrounding said stranded wire; the two energy lines are guided in a common metal reinforcement and in an outer insulating layer surrounding said metal reinforcement; a first section of the submarine cable is formed from a first of the distal ends of the submarine cable to a transition region, in which the energy line is guided in the metal reinforcement and in the outer insulating layer surrounding the metal reinforcement; a second section of the submarine cable is formed from the transition region to a second one of the distal ends of the submarine cable, in which the energy line is free of the metal reinforcement and the outer insulating layer surrounding the metal reinforcement; The submarine cable system further comprises: - a sleeve-shaped transition piece with a through opening, - the transition area is disposed within the through opening; Submarine cable system.

2. 2. The submarine cable system of claim 1, further comprising a cable duct, the opening of the cable duct being shaped to receive the transition piece such that an outer shell surface of the transition piece abuts an inner shell surface of the cable duct in the region of the opening.

3. 3. The submarine cable system according to claim 1, wherein at least two energy lines are guided within the submarine cable surrounded by the reinforcement material.

4. A submarine cable system according to any one of claims 1 to 3, characterised in that the transition piece has a flange-like radial projection.

5. 5. A submarine cable system according to claim 1, wherein the flange-like projection abuts an end face of the cable duct.

6. A submarine cable system according to any one of claims 1 to 5, characterised in that the transition piece is formed from two parts, the two parts being attached to each other by respective protrusions.

7. 7. The submarine cable system according to claim 1, wherein the first portion of the transition piece extends towards the first section of the submarine cable and the second portion of the transition piece extends towards the second section of the submarine cable.

8. 8. A submarine cable system according to claim 1, characterized in that an outer surface of one of the transition pieces is fixed to the inner surface of the cable duct by force-fitting and / or form-fitting, in particular a radial protrusion on the outer surface of the transition piece engaging in a radial recess on the inner surface of the cable duct.

9. A submarine cable system according to any one of claims 1 to 8, characterised in that the reinforcement is fastened to the transition piece by force-fitting and / or form-fitting, in particular by clamping.

10. The submarine cable system according to any one of claims 1 to 9, characterized in that a first section of the submarine cable is guided from an offshore station to the transition piece, through the transition piece into the cable duct, and a second section of the submarine cable is guided in an underground cable duct to a land station / shore junction box (TJB).

11. A submarine cable system according to any one of claims 1 to 10, characterised in that the cable duct is an at least partially horizontal bore duct.

12. A method for laying a submarine cable system according to any one of claims 1 to 11, comprising the steps of: - said submarine cable being assembled in said two sections on land; - said first section is mechanically and electrically connected to an offshore station; - said submarine cable is inserted in said through opening of said transition piece by said transition section, the reinforcement of the submarine cable is mechanically fixed to the transition piece; - the second section of the submarine cable is guided from the transition piece at least partially through the buried cable duct towards a land station / TJB.

13. 13. The method according to claim 12, characterized in that the submarine cable is inserted into the through opening of the transition piece on land at the transition section, and the reinforcement of the submarine cable is mechanically fixed to the transition piece on land.

Citation Information

Patent Citations

  • Dynamic and static submarine cable with continuous wire cores and production method thereof

    CN111899927A

  • Cable installation

    US20030026662A1