Integrated LNG production facility on a gravity-based structure (GBS)
The modular LNG production complex on a gravity-based structure addresses limitations of existing designs by providing efficient operation in icy conditions, reducing corrosion, and simplifying installation and integration with onshore facilities.
Patent Information
- Application Number
- JP2024525843
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2021-11-24
- Filing Date
- 2022-09-22
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2042-09-22
AI Technical Summary
Existing LNG production facilities on floating and gravity-bound structures face limitations in icy conditions, corrosion susceptibility, increased metal consumption, difficulty in ballasting/deballasting, and transportation challenges due to rectangular prismatic shape.
A gravity-based LNG production complex with a modular design featuring a GBS top slab, aligned equipment modules, and integrated interconnect modules, allowing for efficient installation and operation in icy conditions, reduced corrosion, and simplified transportation.
Enables efficient LNG production and storage in coastal waters with thick ice, minimizing corrosion, reducing metal consumption, and facilitating easier installation and integration with onshore facilities.
Smart Images

Figure 2024544488000001_ABST
Abstract
Description
[Technical field]
[0001] The invention relates to production facilities and can be used for the development of integrated onshore and offshore liquefied natural gas (LNG) production complexes on gravity-based structures. [Background technology]
[0002] Currently, there are several types of onshore and offshore hydrocarbon processing facilities, such as natural gas liquefaction plants (LNG plants) on floating and gravity-based structures.
[0003] A common design is the LNG production complex, which is a floating natural gas extraction, processing, liquefaction, LNG storage and offshore facility. Floating facilities for the extraction, storage and offshore of LNG (FLNG) are used for offshore gas field development and are installed directly on the offshore gas field using anchorage and / or mooring. Such floating facilities are not operated in offshore locations with thick ice conditions because their reliable positioning required for connecting to the underwater pipeline framework is not possible due to the drifting ice. Floating LNG plant applications are limited to offshore gas field development projects in ice-free waters. Furthermore, the production capacity of a floating facility is limited by its size.
[0004] An example of an LNG plant on a gravity-based structure (GBS) is the Coastal LNG Production, Storage and Offloading Plant (Korean Patent Publication No. 20180051852, published May 17, 2018), in which a production facility is installed on the top deck of the gravity-based structure, comprising two rectangular prism-shaped steel caissons, one smaller inside the larger one. The space between the caissons is filled with solid ballast. An LNG tank is installed inside the inner caisson. This design is characterized by the following disadvantages: 1. The top side support needs to be strengthened because it is on the opposite side of the internal caisson, i.e. on the installation deck, onto which the top side will be attached. 2.GBS steel body is more susceptible to corrosion and has reduced durability. 3. The GBS steel body needs to be significantly thicker to withstand ice impacts, meaning greater metal consumption. 4. Solid ballast makes ballasting / de-ballasting the GBS more difficult. 5. The rectangular prism shaped GBS has a large draft when transported to the installation site, which makes transportation through shallow water areas impossible.
[0005] There is also a floating LNG plant with LNG production equipment located on the top deck of the ship (Korean Patent Publication No. 20130009064, published on January 23, 2013). Along the centerline of the top deck, a grade separation with pipelines stands upright, along which equipment modules are arranged, namely a power generation module, a gas processing module and a gas liquefaction module on one side, an electrical equipment module, a dehydration module, an LNG landing module, a boil-off gas module and a main cargo mechanism module on the other side. The bow features accommodation and a turret, and the stern features a flare installation.
[0006] The design features an asymmetrical modular layout, so ballasting and other design solutions are essential for vessel balancing purposes. Furthermore, the floating installation cannot operate in water with icy conditions.
[0007] The complex design is closest to that proposed and features an Offshore Natural Gas Processing Facility on a Gravity Grounded Structure (GBS) (WO 2021 / 106151, published June 3, 2021) with a rectangular prism-shaped GBS having base and top slabs, inner vertical walls and an intermediate slab, on which one or more LNG tanks are installed in a compartment, and a ballast compartment extends along the entire GBS, with a top-side module installed on supports on the top slab. One of the design options features a piping module along the top slab centerline with a processing equipment module on its side.
[0008] The disadvantage of this installation is that the piping module is much longer than the other top side modules, resulting in its installation being complicated and the distance between modules for LNG pump installation purposes is increased, which requires a larger installation with longer piping and cabling. [Prior art documents] [Patent documents]
[0009] [Patent Document 1] Korean Patent Publication No. 20180051852 [Patent Document 2] Korean Patent Publication No. 20130009064 [Patent Document 3] International Patent Publication No. 2021 / 106151 Summary of the Invention [Problem to be solved by the invention]
[0010] The proposed invention proposes a solution to the problem of increasing accumulation of facilities for LNG production in coastal waters with thick ice conditions.
[0011] The technical result is the achievement of the intended use of the invention, namely the achievement of LNG production utilizing a complex on a gravity-based structure (GBS).
[0012] The technical result is achieved by a Liquefied Natural Gas (LNG) production complex, comprising a gravity based structure (GBS), having a GBS top slab, a top module disposed on the GBS top slab, including at least one interconnection module along the top slab centerline, and equipment modules, at least a portion of which are aligned on each side of the at least one interconnection module, and a liquid storage tank is disposed inside the GBS, together with which, according to the invention, the complex comprises interconnection modules aligned along the top slab centerline, and the equipment modules include: - a first row on one side of the interconnection module, i.e. At least one module of a receiving device, a condensate stabilization device, and an acid gas removal device; a first row of at least one module of a mixed refrigerant compressor; - a second row on the other side of the interconnection module, i.e. Gas dehydration, mercury removal, wide distillation light hydrocarbon extraction, fractionation and liquefaction equipment modules and a second train of at least one module of a boil-off gas, a fuel gas system, and a heating medium compressor; The equipment modules are also located along the short ends of the GBS. at least one power plant module; At least one module with a main technical room and an emergency diesel generator; and at least one auxiliary system module.
[0013] Additionally, each top module has a frame with braces on which the equipment is installed.
[0014] In this case, in each interconnection module, the lower main layer houses the local substations and control and measurement devices, the middle layer houses the cable crossings, the upper layer houses the pipeline crossings, and the open layer houses the air-cooled heat exchangers located above all the top-side module equipment.
[0015] It is advisable that the main technical room and emergency diesel generator modules are installed in the same row as the interconnection modules and that the open layer houses the air-cooled heat exchangers.
[0016] The preferred design has a center portion and protrusions, the center portion being a rectangular prism with a top slab, the protrusions extending along the center portion side around its entire periphery and having an outer vertical wall, the protrusions and center portion sharing a base slab, and the protrusions featuring a GBS with a shorter height than the center portion.
[0017] The GBS core has inner longitudinal and lateral walls forming a compartment, part of which the tanks are placed, part of which is the ballast compartment, and the GBS projection has inner walls perpendicular to its outer walls and forming a compartment, part of which is the ballast compartment.
[0018] Additionally, a portion of the compartment formed by the longitudinal and lateral walls of the GBS core houses auxiliary equipment.
[0019] Additionally, the top modules are mounted on supports that are located on the top slab above the intersection of the longitudinal and lateral walls of the GBS core. [Brief description of the drawings]
[0020] [Figure 1] FIG. 1 shows the top-down layout of the proposed complex on the GBS. [Diagram 2] 3 is a cross-sectional view taken along line AA in FIG. 2. [Diagram 3] FIG. 3 is a vertical cross-sectional view of FIG. 2 . [Figure 4] FIG. 3 is a longitudinal sectional view taken along CC in FIG. [Diagram 5] FIG. 2 shows the layout of the GBS main section. [Figure 6] FIG. 13 shows the layout of the top module supports on the GBS top slab. [Figure 7] FIG. 13 shows the layout of the top modular load-bearing structure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0021] The Liquefied Natural Gas (LNG) Production Complex on a Gravity-Based Structure (GBS) is a pre-fabricated technology product that includes a set of processing, utility and auxiliary facilities for the production, storage and offloading of LNG and gas condensate.
[0022] The GBS LNG production complex is assembled at a dedicated industrial site and then float-towed to its installation site. The GBS is installed on a specific underbase foundation on the seabed. Gabions or other similar devices may be placed at the bottom around the GBS to prevent scouring of the seabed and the seabed of the water body below the GBS. The GBS is installed near a dedicated pier and connected to the shore by flyovers and bridges to allow the installation of the respective piping and cable installations without the aid of underwater piping and / or long overwater flyovers, as well as easy access to the production complex and rapid evacuation of personnel. The short distance to the shore allows simpler and cheaper integration with onshore facilities, including the hydrocarbon fields that are the source of raw hydrocarbons for the production complex.
[0023] The main components of the complex are the gravity-based structure (GBS) and the modular processing equipment on the top side.
[0024] The top side of the LNG production complex comprises modules onto which the processing and technological treatment facilities are mounted. Each module is an individual complete three-dimensional structure with processing and / or engineering equipment, piping, systems and networks intended to accomplish or support one or more LNG processing steps.
[0025] The modules are sent to their installation site on the GBS as a product with the required level of pre-assembly. Module installation on the GBS is followed by module integration in terms of connections to other modules and to the GBS equipment modules installed across the top side.
[0026] Structurally, each top module 28-41 is a three-dimensional steel framework with multiple layers of braces inside which the equipment is installed. The modular framework with braces (FIG. 7) generally consists of vertical columns 21, vertical braces 22, and floor beams 23 with horizontal braces.
[0027] To facilitate equipment maintenance and personnel access, each module has multiple levels (decks). Each module is designed with at least one stairwell for personnel movement between levels and personnel evacuation. The main levels 24 of all modules are at the same height to combine evacuation and load transport routes across the top side, thus reducing the load on the GBS top slab 2. The other levels 42-44 of the top side modules vary in height depending on their functions and equipment. Transition bridges can be installed between adjacent module levels.
[0028] Each module has its individual purpose as part of the LNG processing and has its individual set of equipment. Depending on the equipment contained in the module, the module may be an equipment module or an interconnecting module.
[0029] The equipment module is Among them, there are processing modules (7 in this case) where the main LNG processing is completed, - Engineering modules (in this case three) in which the power sources and engineering systems are installed.
[0030] The interconnection modules (four in this case) contain pipe racks and cable trays, local substations and control and measurement devices, and air-cooled heat exchangers.
[0031] The processing modules 28-34 are arranged in two rows on each side along the GBS top slab 2, the interconnection modules 35-38 are positioned between the two rows along the GBS top slab 2, and the engineering modules 39-41 are concentrated at one of the short ends of the GBS (FIG. 1).
[0032] This arrangement allows for a rational facility layout consistent with the LNG process sequence. The engineering modules are also separated from the rest of the top side by fire and explosion-proof walls, and there are also fire and explosion-proof walls between the processing modules, which allows for shortest distances between modules and smaller dimensions of the production complex while maintaining a high level of fire and explosion safety.
[0033] Processing module (Fig. 1 to 3) 1. The receiver, condensate stabilization and acid gas removal module 28, in which raw gas reception, pressure control, liquid condensate (hydrocarbons and water) separation, removal of carbon dioxide, hydrogen sulfide and methanol from the raw gas, and gas condensate stabilization take place. Module 28 is located on the shore side of the GBS. 2. A gas dehydration and mercury removal module 29 in which the removal of mercury, moisture and residual methanol from the raw gas takes place. 3. Wide fraction light hydrocarbon (WFLH) extraction, fractionator module 30, in which heavy hydrocarbon removal from the gas takes place before feeding it to a liquefied state. The resulting liquid hydrocarbons are stabilized and partially fractionated to obtain ethane, propane and butane fractions. 4. Liquefaction module 31, in which the gas is cooled and depressurized to produce Liquefied Natural Gas (LNG). Modules 29, 30 and 31 are located along the offshore side of the GBS. 5. Mixed refrigerant compressor module 32 (line A), in which three different mixed refrigerants are processed and compressed using a centrifugal compressor driven by a gas turbine. Waste heat from the gas turbine flue can be recovered to heat the heating medium. 6. Mixed refrigerant compressor module 33 (line B), in which three different mixed refrigerants are processed and compressed using a centrifugal compressor driven by a gas turbine. Waste heat of the gas turbine flue can be recovered to heat the heating medium. Modules 32 and 33 are located on the shore side of the GBS. 7. A boil-off gas, fuel gas system and heating medium compressor module 34 in which boil-off gas compression and distribution, fuel gas treatment, heating medium treatment and heating take place. Module 34 is installed on the offshore side of the GBS.
[0034] Engineering System Modules 1. A power generation module 39, in which electricity is generated by a gas turbine generator. The waste heat of the gas flue can be recovered to heat a heating medium. 2. The main technical room and emergency diesel generator module 40, in which the uninterruptible power supply and control and measuring devices, as well as the air-cooled heat exchanger are located. 3. Auxiliary system module 41, which houses the air supply system and the nitrogen supply system, i.e., the auxiliary system, the air compressor, the air separation unit, the air dryer and other equipment.
[0035] Modules 39, 40 and 41 are installed along the short ends of the GBS.
[0036] The distribution of installations among modules may vary. This describes one option for filling the modules with equipment.
[0037] The interconnection modules 35, 36, 37, 38 aligned along the GBS top slab have a similar layout and set of fixtures (Figure 4). The main layer 24 houses the local substations and the control and measurement devices 48; The intermediate layer 42 accommodates the cable crossing 47; The upper layer 43 houses the pipeline crossing 46; The open layer 44 houses the air-cooled heat exchanger 45.
[0038] However, each interconnection module 35, 36, 37, 38 has an individual equipment configuration depending on the production process taking place in the adjacent process modules. For example, local substations and control and measurement devices in module 48 support the operation of equipment in the process modules on either side of each interconnection module 35, 36, 37, 38, thus enabling optimized switchgear layouts and better equipment reaction times.
[0039] Having a significant portion of the cable and pipeline crossings 46, 47 within the interconnection modules 35, 36, 37, 38 allows for optimized piping and cable laying interconnections between modules, shorter cable and pipe runs, and extra space for equipment within the processing modules.
[0040] The air-cooled heat exchanger 45 on the open layer 44 of the interconnect modules 35, 36, 37, 38 is a piece of process equipment located within the processing modules. The interconnect modules 35, 36, 37, 38 are located in the top center along the GBS centerline and are higher than any of the adjacent processing modules, and the air-cooled heat exchanger 45 is located on the open layer 44, which is the highest layer of the interconnect modules 35, 36, 37, 38. Locating the air-cooled heat exchanger 45 at the highest elevation on the top side allows for the most efficient heat dissipation.
[0041] The technical room and emergency diesel generator module 40 is also located along the GBS centreline and is quite tall, which is why it also houses an air-cooled heat exchanger 45 .
[0042] The GBS is a three-dimensional structure made from reinforced concrete that serves as a storage area for produced and processed feedstock, as well as for auxiliary substances and materials. The GBS serves as the top-side foundation of the production complex and is designed to rest under its own weight on the seabed 50 of the body of water. The core 1 of the GBS is shaped as a rectangular prism and has a top slab 2 (Figure 1).
[0043] On the sides of the core 1 along its entire perimeter are placed GBS protrusions 3 with vertical outer walls. The GBS core 1 and the GBS protrusions 3 share the same base slab 4, the protrusions 3 being lower than the core 1 (Figures 2 and 3).
[0044] The core 1 is divided into compartments by vertical longitudinal and transverse walls 5. Some of the compartments, e.g. compartments 6 and 15, are used for product (LNG and condensate) storage, while other compartments, e.g. compartments 7 and 20, are used for ballast water. The GBS projection 3 is divided into compartments by vertical walls 5 perpendicular to its outer walls. Compartments 8 along the GBS periphery are also included within the ballast system.
[0045] The top slab 2 has a reinforced concrete support 9 on which the top modules 28 to 41 are mounted.
[0046] The GBS is able to remain floating during transportation on water to the site of the integrated production complex and is able to withstand ice strikes in icy conditions. The change of state of the GBS from floating to stationary at the site of installation on the foundation 11 is ensured by flooding the ballast compartments 7, 8 and 20.
[0047] The reinforced concrete wall 5 also acts as a load-bearing structure, transferring the load from the top side to the supporting slab 13 and the underbase foundation 11, and the top support 9 is located above the intersection of the vertical longitudinal and transverse walls 5 of the GBS.
[0048] The LNG storage tank, the gas condensate storage tank and the consumables storage tank are placed inside the GBS compartment. The GBS core 1 has several tanks that may have different designs depending on the properties of the material to be stored. Membrane tanks are used for LNG storage. In this case, a tank 12 is installed inside the concrete compartment 6 (Figures 2, 4) with a metal membrane made of stainless steel or Invar (Fe-Ni alloy) separated from the concrete structure by an insulating layer. The insulating layer is placed directly against the top slab 2, the middle slab 13 and the GBS walls 5 and transfers the load from the tank 12 and its LNG contents to the above mentioned boundary structures. The GBS slabs and walls thus act as support structures for the membrane tank, with which they are integrated into a single structural unit. To prevent any leakage, the bottom and sides of the membrane tank 12 have a secondary barrier, which is an additional membrane installed inside the insulating layer.
[0049] The LNG will be stored in two 115,000 cbm tanks 12 situated in individual compartments 6 each measuring 135 x 40 x 24 m.
[0050] Condensate may be stored in GBS concrete compartments 15 and 17, with their boundary structures acting as barriers. The 135x30x30 m stable condensate storage compartment 15 has a capacity of 75,000 cbm. The 30x8x30 m compartment 17 is used for storing non-standard condensate and has a capacity of 5,000 cbm.
[0051] "Wet" storage with an underlying layer of water is used for condensate storage. In this case the bottom layer of stored product around 1m thick is considered as a mixing zone ensuring the guarantee of separation of water and stored product during loading operations. Compartments 15 and 17 are also slightly pressurized (from atmospheric pressure level) using a nitrogen cushion in the top of the compartments to make compartments 15 and 17 gas tight, preventing the formation of any flammable and explosive gas mixtures with the hydrocarbon vapours.
[0052] Self-contained tanks located within the GBS compartment are used for wastewater, demineralized water, wash water, absorbents, butane and propane.
[0053] Tanks for the various media (liquefied gas, diesel fuel, propane, butane, ethane, water) are located within the GBS as close as possible to the relevant modules in which such media are used, making it possible to optimize pipeline lengths and mass, electrical heat tracing and insulation.
[0054] A jetty 25 for the landing of LNG and condensate is structurally integrated with the GBS and the top side. A landing platform with fenders and loading arms and other marine and processing equipment allowing the landing of LNG and condensate is installed on the outboard side of the GBS at the overhang 3. Moorings for the berthing of tankers are installed on the outboard side of the GBS. The water area near the jetty 25 may have a seabed reinforcement 10 that protects the bottom soil from scouring by the ship's propellers.
[0055] The integrated production complex on gravity-based structure is connected to the shore by two flyovers 26, on which the pipelines and cableways are laid (Figures 1 and 2). The pipelines connecting the production complex to the gas fields and other facilities are equipped with cut-off valves at the land contacts of the flyovers. There are also three evacuation bridges 27 (Figure 1) used for the transfer and evacuation of personnel, if necessary. The flyovers and bridges are made of steel and mounted on supports. The supports stand on the GBS top slab 2 at one end and on the quay 49 at the other end. The seabed 50 and water level 52 in the water body are shown in Figures 2 to 4.
[0056] The processing technology of the LNG production complex on the GBS is not fundamentally different from the mixed refrigerant-based processing technology used in onshore plants. Raw gas and condensate from the gas field are piped via a grade crossing 26 to the receiving module 28, where raw gas reception, pressure control, separation of liquid condensate (hydrocarbons and water), removal of carbon dioxide, hydrogen sulfide, methanol and other impurities from the raw gas and stabilization of the condensate take place. The processing utilizes air-cooled heat exchangers installed on the open layer of the interconnection module 35. The stabilized gas condensate is sent to the storage tanks 15 and 17 housed inside the GBS, and the treated raw gas is sent to the gas dehydration and mercury removal module 29, where mercury, water and remaining methanol are removed from the raw gas before it is sent to the wide fraction light hydrocarbons (WFLH) extraction and fractionation module 30. The processing utilizes air-cooled heat exchangers installed on the open layer of the interconnection module 35. Extraction of wide fraction light hydrocarbons (WFLH), fractionator module 30 is used to extract heavy hydrocarbons before the treated gas is transferred to liquefied state. The resulting liquid hydrocarbons are stabilized and a part is fractionated to obtain ethane, propane and butane fractions for the purpose of making up the mixed refrigerant components. The GBS has dedicated tanks to store these components. The stabilized heavy hydrocarbons are sent to a gas condensate storage tank. Once processed in modules 28-30, the gas is sent to liquefier module 31, which has three coil-wound heat exchangers installed side by side. The heat exchangers are used to cool the gas with subsequent depressurization and generation of liquefied fraction (LNG) and boil-off gas. The liquefied gas is sent to LNG storage tank 12 housed inside the GBS. Three mixed refrigerants (MR1, MR2, MR3) with different compositions are mixtures of nitrogen, methane, ethane, propane and butane and are used to cool the gas in the heat exchangers. The process utilizes air-cooled heat exchangers 45 installed on the open layers of the interconnect modules 36,37,38.
[0057] Mixed refrigerant processing and compression occurs in mixed refrigerant compressor modules 32 and 33. The refrigerant is air cooled downstream of the compressor in air-cooled heat exchanger 45 in interconnection modules 36, 37 and 38 through which the refrigerant circulates between liquefaction plant module 31 and mixed refrigerant compressor modules 32 and 33.
[0058] Each of the three mixed refrigerant loops has two parallel lines A and B installed in different modules, with line A installed in mixed refrigerant compressor module 32 and line B installed in mixed refrigerant compressor module 33.
[0059] Both mixed refrigerant compressor modules 32 and 33 feature the same compressor arrangement and compressor capacity is based on 2x50% operating mode, i.e., 100% compressor backup. The MR1 and MR2 compressors in each of modules 32 and 33 are on the same shaft and base frame and are driven by the same gas turbine driver, thus reducing the number of gas turbine drivers.
[0060] Refrigerants are produced from ethane, propane and butane extracted in the WFLH extraction and fractionation unit module 30 and stored in GBS tanks for refrigerant production. Nitrogen for refrigerant production is generated in the auxiliary system module 41. Methane refrigeration is done using raw gas and boil-off gas after processing.
[0061] During offshore operation, the boil-off gas also produced in the liquefaction unit module 31, the LNG storage tanks and the gas transport cargo tanks is sent to the boil-off gas, fuel gas system and heating medium compressor module 34 for boil-off gas compression and dispersion. The boil-off gas is partly used for the processing of fuel gas, which is mainly consumed by the gas turbines in the power generation station module 39 and the mixed refrigerant compressor modules 32 and 33.
[0062] The gas turbine is equipped with a waste heat recovery system to recover waste heat for use in heating the heating medium. Excess heat is rejected from the heating medium system via an air-cooled heat exchanger 45 mounted on the open level of the main technical room and emergency diesel generator module 40. The module housing the gas turbine, the waste heat recovery system, the fuel gas system and the heating medium system are grouped together, so less piping is required and efficient heat recovery is achieved.
[0063] The mixed refrigerant compressor turbine driver and turbogenerator use a unified gas turbine, simplifying and reducing the cost of equipment operation and maintenance. [Explanation of symbols]
[0064] 1 GBS Center 2 GBS top slab 3 GBS protrusion 4 GBS base slab 5 GBS Vertical Wall 6 Main compartment for LNG storage tanks 7. Internal ballast compartment 8 External ballast compartment 9 Top support 10 Seabed reinforcement near the wharf 11 GBS Underbase Foundation 12 LNG storage tank 13 Support slab for LNG storage tank 12 14 Vertical wall below supporting slab 13 15 Gas condensate storage tank (compartment) 16 Auxiliary and Engineering Section 17 Substandard gas condensate storage tanks (compartments) 18 Gasket 19 Space between top slab 2 and top module 10 20 Inner ballast section below support slab 13 21 Module Support 22 module vertical brace 23 Modular floor beam (girder) 24 Top Main Deck 25 Jetty for tankers 26 Interconnecting Pipe Rack to Shore 27 Evacuation Bridge 28 Receiving Unit, Condensate Stabilizer and Acid Gas Removal Unit Module 29 Dehydration and Mercury Removal Module 30 Wide fraction light hydrocarbon (WFLH) extraction, fractionation and liquefaction unit module 31 Liquefaction Module 32 Mixed refrigerant compressor module (Line A) 33 Mixed refrigerant compressor module (Line B) 34 Boil-off gas, fuel gas systems and heating medium compressor modules 35 First Interconnection Module 36 Second Interconnection Module 37 Third Interconnection Module 38 Fourth Interconnection Module 39 Power Station Module 40 Main technical room and emergency diesel generator module 41 Auxiliary System Module 42 Top side middle layer 43 Top side upper layer 44 Top side open layer 45 Air-cooled heat exchanger 46 Pipe rack on interconnection module 47 Cable tray on interconnection module 48 Local Substations and Control and Measuring Devices on Interconnection Modules 49 Quay 50 Seabed of Waters 51 Water levels in water bodies
Claims
1. A liquefied natural gas (LNG) production complex comprising a gravity based structure (GBS) having a GBS top slab, a top module disposed on the GBS top slab, at least one interconnection module along a centerline of the top slab, and equipment modules at least a portion of which are aligned on each side of the at least one interconnection module, and a liquid storage tank is disposed inside the GBS, the complex comprising interconnection modules aligned along a centerline of the top slab, the equipment modules comprising: A first row on one side of the interconnection module, i.e. At least one module of a receiving device, a condensate stabilization device, and an acid gas removal device; a first row of at least one module of a mixed refrigerant compressor; A second row on the other side of the interconnection module, i.e. Gas dehydration, mercury removal, wide distillation light hydrocarbon extraction, fractionation and liquefaction equipment and a second train of at least one module of a boil-off gas, a fuel gas system, and a heating medium compressor; The equipment module also includes a plurality of modules disposed along a short end of the GBS. at least one power plant module; At least one module comprising a main technical room and an emergency diesel generator; and at least one auxiliary system module.
2. 2. The complex of claim 1, wherein each top module has a frame with braces and equipment is installed on that layer.
3. 3. The complex according to claim 2, characterized in that in each interconnection module, the lower main layer houses local substations and control and measurement devices, the middle layer houses cable crossings, the upper layer houses pipeline crossings, and the open layer houses air-cooled heat exchangers located above all top-side module equipment.
4. The complex according to claim 3, characterized in that the main technical room and emergency diesel generator modules are installed in the same row as the interconnection modules and that the open layer houses an air-cooled heat exchanger.
5. 2. The complex of claim 1, wherein the GBS has a center and protrusions, the center being a rectangular prism having the top slab, the protrusions extending along the center side around its entire periphery and having an outer vertical wall, the protrusions and the center sharing the base slab, and the protrusions being shorter in height than the center.
6. 6. The complex according to claim 5, characterized in that the GBS core has inner longitudinal and lateral walls forming a compartment, part of which the tank is located, part of which is a ballast compartment, and the GBS projection has an inner wall perpendicular to its outer wall and forming a compartment, part of which is a ballast compartment.
7. 6. The complex according to claim 5, characterized in that part of the compartment formed by the longitudinal and lateral walls of the GBS core houses auxiliary equipment.
8. 2. The complex according to claim 1, characterized in that the top modules are mounted on supports placed on the top slab above the intersection of the longitudinal and transverse walls of the GBS core.
Citation Information
Patent Citations
Offshore liquefied natural or petroleum gas terminal comprises storage tanks and auxiliary chambers of a size such that they can be installed by flotation on a base
FR2894646A1
Gas liquefying plant
JP2005147568A
Floating type offshore facility and power supply method of floating type offshore facility
JP2017047718A
Floating body structure with production equipment
JP2017154702A
Modularization of hydrocarbon processing plants
JP2018531356A
