Power supply distribution device
Patent Information
- Application Number
- JP2023138579
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-08-29
- Publication Date
- 2025-03-13
- Estimated Expiration
- 2043-08-29
AI Technical Summary
【0007】 本発明によれば、車載装置の変更又は追加の際に、電線保護機能の再設計を要することなく、上流側から下流側まで電線保護を成立させることができる。
Smart Images

Figure 2025033088000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a power distribution device. [Background technology]
[0002] There are known in-vehicle power distribution devices having a function of distributing power supply power to a plurality of in-vehicle devices, which have the problem of dealing with additional connection of new in-vehicle devices (see, for example, Patent Documents 1 and 2). In the power distribution device described in Patent Document 1, conditions are set for the smoke generation characteristics of the upstream electric wire, the melting characteristics of the upstream fuse, and the power control characteristics of the downstream switch, and when the sum of the currents flowing through the plurality of in-vehicle devices approaches the power control characteristics of the downstream switch, the power distribution of the in-vehicle devices is adjusted according to the priority. In addition, in the power distribution device described in Patent Document 2, an extension section including a fuse is provided in a relay device to which a main power line is connected, and further relay devices are connected via this extension section. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2023-14748 A [Patent Document 2] Patent Publication No. 2022-363 Summary of the Invention [Problem to be solved by the invention]
[0004] In the power distribution device described in Patent Document 1, the operation of an on-board device with a low priority is simulated. In addition, in the power distribution device described in Patent Document 2, it is necessary to change the expansion section in the relay device every time an on-board device is added or changed, which increases the load on the design of the power protection function. Furthermore, in the power distribution device described in Patent Document 2, when a plurality of relay devices are connected in series and parallel, if an on-board device is added or changed downstream, the wire protection conditions are not satisfied not only in the downstream relay device but also in the upstream relay device. In this case, problems such as simultaneous tripping or erroneous tripping of the upstream switch or fuse and the downstream switch or fuse occur.
[0005] In view of the above circumstances, an object of the present invention is to provide a power distribution device that can achieve wire protection from the upstream side to the downstream side without requiring redesign of the wire protection function when changing or adding an in-vehicle device. [Means for solving the problem]
[0006] A power supply distribution device of the present invention includes a first power supply distribution device that distributes power supplied from a power supply device, and a second power supply distribution device that distributes the power distributed by the first power supply distribution device to an in-vehicle device, the first power supply distribution device includes a first cutoff unit that connects or cuts off a first electric wire that supplies power from the power supply device to the second power supply distribution device, and a first control unit that controls the first cutoff unit based on a first cutoff characteristic that indicates a relationship between a heat amount of the first electric wire and a first cutoff time that is a time from when current starts to flow through the first electric wire to when the first cutoff unit cuts off the first electric wire, and the second power supply distribution device connects or cuts off a second electric wire that supplies power from the first power supply distribution device to the in-vehicle device. and a second control unit that controls the second cutting unit based on a second cutting characteristic indicating a relationship between a heat quantity of the second electric wire and a second cutting time which is a time from when current starts to flow through the second electric wire until the second cutting unit cuts off the current, wherein the first cutting characteristic and the second cutting characteristic are initially set so that the first cutting time is longer than the second cutting time, and when the in-vehicle device is changed or added to change the second cutting characteristic and the first cutting time becomes shorter than the second cutting time, the first control unit executes a first cutting characteristic change process to change the first cutting characteristic so that the first cutting time becomes longer than the second cutting time. Effect of the Invention
[0007] According to the present invention, when an in-vehicle device is changed or added, it is possible to achieve wire protection from the upstream side to the downstream side without the need to redesign the wire protection function. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a block diagram showing a power distribution device according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a graph showing the relationship between the time when the electric current is passed through the electric wire and the change in the amount of heat. [Diagram 3] FIG. 3 is a logarithmic graph showing the relationship between the current flowing through the wire and the interruption time of the interrupter. [Figure 4]FIG. 4 is a flowchart for explaining a process for changing the interrupting characteristics of the upstream interrupter after a downstream in-vehicle load is changed or added. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] The present invention will be described below along with preferred embodiments. Note that the present invention is not limited to the embodiments shown below, and the embodiments shown below can be modified as appropriate within the scope of the present invention. In addition, in the embodiments shown below, some configurations are omitted from illustration and description, but for the details of the omitted technologies, publicly known or well-known technologies are applied as appropriate within the scope of no contradiction with the contents described below.
[0010] Fig. 1 is a block diagram showing a power distribution device 10 according to one embodiment of the present invention. As shown in this figure, the power distribution device 10 includes a first power distribution device 11, a second power distribution device 12, and a third power distribution device 13. The power distribution device 10 distributes power supplied from an in-vehicle power supply device 1 to a plurality of in-vehicle devices (in-vehicle loads 2A, 2B, 2B', 2C, sensors 3A, 3C, an ECU (Electronic Control Unit) 4, etc.).
[0011] The power supply device 1 is a storage battery such as a lithium ion battery, a power converter such as a DC / DC converter, and a generator such as an alternator. The vehicle loads 2A, 2B, 2B', and 2C are a motor, an air conditioner, a lighting device, and the like. The sensors 3A and 3C are various vehicle sensors such as a camera, a LiDAR (Light detection and ranging), a millimeter wave radar, an ultrasonic sensor, a GPS (Global Positioning System) sensor, an acceleration / gyro sensor, a wheel speed sensor, and an air pressure sensor. The ECU 4 is an electronic control device equipped with a microcomputer, a CAN (Control Area Network) transceiver, an AD converter, and the like.
[0012] The first power distribution device 11 is connected to the power supply device 1 by an electric wire 14. Moreover, the second power distribution device 12 is connected to the first power distribution device 11 by an electric wire 15. Furthermore, the third power distribution device 13 is connected to the first power distribution device 11 by an electric wire 16. That is, the second power distribution device 12 and the third power distribution device 13 are connected to the power supply device 1 via the first power distribution device 11.
[0013] An on-vehicle load 2A is connected to the first power distribution device 11 by an electric wire 17A. A sensor 3A is also connected to the first power distribution device 11. A on-vehicle load 2B is also connected to the second power distribution device 12 by an electric wire 17B. An ECU 4 is also connected to the second power distribution device 12. A on-vehicle load 2C is also connected to the third power distribution device 13 by an electric wire 17C. A sensor 3C is also connected to the third power distribution device 13.
[0014] Here, after the shipment of the vehicle, the on-vehicle devices connected to the first to third power distribution devices 11 to 13 may be changed or added, such as changing the on-vehicle load 2B connected to the second power distribution device 12 to an on-vehicle load 2B' after the shipment of the vehicle. In this case, the characteristics of the wire protection function provided in the first to third power distribution devices 11 to 13 are automatically changed. This point will be described in detail later.
[0015] The first power distribution device 11 includes a cutoff unit 111, a detection unit 112, and a control unit 113. The second power distribution device 12 includes a cutoff unit 121, a detection unit 122, and a control unit 123. The third power distribution device 13 includes a cutoff unit 131, a detection unit 132, and a control unit 133.
[0016] The interrupting units 111, 121, and 131 are relays such as semiconductor relays and mechanical relays. The interrupting unit 111 connects or disconnects the electric wire 14 and the electric wire 15, and also connects or disconnects the electric wire 14 and the electric wire 16. The interrupting unit 121 connects or disconnects the electric wire 15 and the electric wire 17B. The interrupting unit 131 connects or disconnects the electric wire 16 and the electric wire 17C.
[0017] The sensor 3A is connected to a contact on the upstream side of the cutoff unit 111. Therefore, when the cutoff unit 111 is in the cutoff state, power is supplied from the power supply device 1 to the sensor 3A. Furthermore, the ECU 4 is connected to a contact on the upstream side of the cutoff unit 121. Therefore, when the cutoff unit 121 is in the cutoff state and the cutoff unit 111 is in the connected state, power is supplied from the power supply device 1 to the ECU 4. Furthermore, the sensor 3C is connected to a contact on the upstream side of the cutoff unit 131. Therefore, when the cutoff unit 131 is in the cutoff state and the cutoff unit 111 is in the connected state, power is supplied from the power supply device 1 to the sensor 3C.
[0018] On the other hand, the vehicle-mounted load 2A is connected to a contact downstream of the circuit breaker 111 by an electric wire 17A. Therefore, when the circuit breaker 111 is in the circuit breaker state, power is not supplied from the power supply device 1 to the vehicle-mounted load 2A. Furthermore, the vehicle-mounted load 2B is connected to a contact downstream of the circuit breaker 121 by an electric wire 17B. Therefore, when the circuit breaker 121 is in the circuit breaker state, power is not supplied from the power supply device 1 to the vehicle-mounted load 2B, regardless of the state of the circuit breaker 111. Furthermore, the vehicle-mounted load 2C is connected to a contact downstream of the circuit breaker 131 by an electric wire 17C. Therefore, when the circuit breaker 131 is in the circuit breaker state, power is not supplied from the power supply device 1 to the vehicle-mounted load 2C, regardless of the state of the circuit breaker 111.
[0019] The detection unit 112 detects the voltage and current of the interrupter 111 and transmits the detection value to the control unit 113. Furthermore, the detection unit 122 detects the voltage and current of the interrupter 121 and transmits the detection value to the control unit 123. Furthermore, the detection unit 132 detects the voltage and current of the interrupter 131 and transmits the detection value to the control unit 133.
[0020] The control unit 113 incorporates a timer that measures the time that the electric wires 15, 16 are energized, and a memory that stores information such as the interruption characteristics of the interruption unit 111. The control unit 113 determines whether to connect or disconnect the interruption unit 111 based on the time that the electric wires 15, 16 are energized and the detection value of the detection unit 112 and the interruption characteristics of the interruption unit 111 stored in the memory, and transmits a control signal to the interruption unit 111. The control unit 113 can calculate the temperature (amount of heat) of the connected electric wires 15, 16 based on the information obtained by the detection unit 112.
[0021] The control unit 123 incorporates a timer that measures the time that electric current is applied to the electric wire 17B, and a memory that stores information such as the interruption characteristics of the interruption unit 121. The control unit 123 determines whether to connect or disconnect the interruption unit 121 based on the time that electric current is applied measured by the timer, the detection value of the detection unit 122, and the interruption characteristics of the interruption unit 121 stored in the memory, and transmits a control signal to the interruption unit 121. The control unit 123 can calculate the temperature (amount of heat) of the connected electric wire 17B based on the information obtained by the detection unit 122.
[0022] The control unit 133 incorporates a timer that measures the time that electric current is applied to the electric wire 17C, and a memory that stores information such as the interruption characteristics of the interruption unit 131. The control unit 133 determines whether to connect or disconnect the interruption unit 131 based on the time that electric current is applied measured by the timer, the detection value of the detection unit 132, and the interruption characteristics of the interruption unit 131 stored in the memory, and transmits a control signal to the interruption unit 131. The control unit 133 can calculate the temperature (amount of heat) of the connected electric wire 17C based on the information obtained by the detection unit 132.
[0023] Fig. 2 is a graph showing the relationship between the current flow time of the electric wire 15 etc. and the change in heat quantity. Fig. 3 is a logarithmic graph showing the relationship between the current flowing through the electric wires 15, 17B and the interruption time (the time from the start of current flow to the interruption) of the interrupting parts 111, 121. The vertical axis of this graph is a logarithmic scale.
[0024] As shown by the dashed line and the two-dotted line in the graph of Fig. 2, the interruption characteristics of interrupter unit 111 are defined by a curve showing the relationship between the amount of heat of electric wire 15 and the interruption time of interrupter unit 111. As shown by the solid line and the dashed line in the graph of Fig. 2, the interruption characteristics of interrupter unit 121 are defined by a curve showing the relationship between the amount of heat of electric wires 17B, 17B' and the interruption time of interrupter unit 121. Furthermore, although not shown in the graph of Fig. 2, the interruption characteristics of interrupter unit 131 are defined by a curve showing the relationship between the amount of heat of electric wire 17C and the interruption time of interrupter unit 131.
[0025] The control unit 113 of the first power distribution device 11 reads out the interruption time (threshold) corresponding to the temperature (amount of heat) of the electric wires 15, 16 calculated from the detection value of the current flowing by the detection unit 112 from the interruption characteristics of the interruption unit 111, and when the current flowing time measured by the timer exceeds the threshold, determines to interrupt the interruption unit 111 and transmits a interruption signal to the interruption unit 111. Also, the control unit 123 of the second power distribution device 12 reads out the interruption time (threshold) corresponding to the temperature (amount of heat) of the electric wire 17B calculated from the detection value of the current flowing by the detection unit 122 from the interruption characteristics of the interruption unit 121, and when the current flowing time measured by the timer exceeds the threshold, determines to interrupt the interruption unit 121 and transmits a interruption signal to the interruption unit 121. Furthermore, the control unit 133 of the third power distribution device 13 reads out the interruption time (threshold value) corresponding to the temperature (heat quantity) of the electric wire 17C calculated from the detection value of the current flowing by the detection unit 132 from the interruption characteristics of the interruption unit 131, and when the current flow time measured by the timer exceeds the threshold value, it determines that the interruption unit 131 is to be interrupted and transmits a interruption signal to the interruption unit 131.
[0026] 1, the control unit 113 of the first power distribution device 11, the control unit 123 of the second power distribution device 12, and the control unit 133 of the third power distribution device 13 are connected to be able to communicate with each other. The control unit 123 of the second power distribution device 12 transmits the detection value of the open circuit voltage of the circuit breaker 121 detected by the detection unit 122 to the control unit 113 of the first power distribution device 11. In addition, the control unit 133 of the third power distribution device 13 transmits the detection value of the open circuit voltage of the circuit breaker 131 detected by the detection unit 132 to the control unit 113 of the first power distribution device 11.
[0027] The control unit 113 of the first power distribution device 11 compares the detection value of the open-circuit voltage of the breaker 121 received from the control unit 123 of the second power distribution device 12 with the detection value of the open-circuit voltage of the breaker 111 received from the detection unit 112. Then, the control unit 113 of the first power distribution device 11 determines that the open-circuit voltage of the breaker 111 is located upstream of the breaker 121 based on the fact that the open-circuit voltage of the breaker 111 is higher than the open-circuit voltage of the breaker 121.
[0028] Furthermore, control unit 113 of first power distribution device 11 compares the detection value of the open circuit voltage of breaker unit 131 received from control unit 133 of third power distribution device 13 with the detection value of the open circuit voltage of breaker unit 111 received from detection unit 112. Then, control unit 113 of first power distribution device 11 determines that breaker unit 111 is located upstream of breaker unit 131 because the open circuit voltage of breaker unit 111 is higher than the open circuit voltage of breaker unit 131. Note that the method of determining the upstream-downstream relationship between breaker unit 111 and breaker units 121 and 131 is not limited to the method based on the open circuit voltage, and may be replaced with another method such as storing information indicating the upstream-downstream relationship in advance.
[0029] The control units 113, 123, and 133 are communicatively connected to the communication device 18 mounted on the vehicle shown in FIG. 1, and the communication device 18 is communicatively connected to the data center DC via a wireless communication network such as a mobile phone network. The control units 113, 123, and 133 can transmit to the communication device 18 an acquisition request for information on changes to the vehicle loads 2A, 2B, and 2C (hereinafter, load change information). The communication device 18 can also transmit to the data center DC an acquisition request for the load change information received from the control units 113, 123, and 133. The data center DC also stores load change information related to the interruption characteristics of the interruption units 111, 121, and 131, and can transmit the load change information to the communication device 18 in response to the received acquisition request. The communication device 18 can also transmit to the control units 113, 123, and 133 the load change information received from the data center DC.
[0030] The control units 113, 123, and 133 can be connected to the service terminal ST via wired or wireless communication. The control units 113, 123, and 133 can transmit a request to acquire load change information to the service terminal ST. The service terminal ST also stores load change information related to the interruption characteristics of the interruption units 111, 121, and 131, and can transmit the load change information to the control units 113, 123, and 133 in response to the received request.
[0031] Here, a case will be described where the vehicle-mounted load 2B connected to the breaker unit 121 of the second power distribution device 12 is changed to the vehicle-mounted load 2B'. An example will be assumed in which a state where the vehicle-mounted load 2B, which is a small lighting device that lights up with a relatively small current, is connected to the breaker unit 121 with an electric wire 17B rated for the small current is changed to a state where the vehicle-mounted load 2B', which is a large lighting device that lights up with a relatively large current, is connected to the breaker unit 121 with an electric wire 17B' rated for the large current.
[0032] In this assumed example, as shown by the solid line in the graph of Fig. 3, the relationship between the energizing current and the breaking time of the breaker 121 corresponding to the in-vehicle load 2B before the change is initially set to match the energizing current that is a relatively small current (I2). Also, as shown by the dashed line in the graph of Fig. 3, the relationship between the energizing current and the breaking time of the breaker 121 corresponding to the in-vehicle load 2B' after the change is set to match the energizing current that is a relatively large current (I2').
[0033] 2 is initially set. A curve showing the relationship between the current passing through the interrupter 111 and the interruption time before the change, shown by a dashed line in the graph of FIG. 3, is initially set so as to fall between the curve showing the relationship between the current passing through the interrupter 121 and the interruption time before the change, and the curve showing the relationship between the current passing through the wire 15 and the time until the start of the smoke generation. Although not shown in the graph of FIG. 3, a curve showing the relationship between the current passing through the interrupter 111 and the interruption time before the change, is initially set so as to fall between the curve showing the relationship between the current passing through the interrupter 131 and the interruption time, and the curve showing the relationship between the current passing through the wire 15 and the time until the start of the smoke generation. That is, the relationship between the energizing current and the interruption time of the interrupter 111 is initially set so that the interruption time of the interrupter 111 is shorter than the smoke generation time of the electric wire 15 and longer than the interruption times of the interrupter 121 and 131.
[0034] 3, the curve showing the relationship between the current passing through the breaker unit 111 and the interruption time before the change, which is indicated by a dashed line in the graph of FIG. 3, intersects with the curve showing the relationship between the current passing through the breaker unit 121 and the interruption time after the change when the current passing is I3 (>I2'>I2), and does not fall between the curve showing the relationship between the current passing through the breaker unit 121 and the interruption time after the change and the curve showing the relationship between the current passing through the electric wire 15 and the time until smoke is generated. That is, when the current passing through is I3 or more, the interruption time of the breaker unit 111 becomes shorter than the interruption time of the breaker unit 121. Therefore, when the current passing through is I3, the breaker unit 111 and the breaker unit 121 are interrupted at the same time, and when an abnormality occurs in the in-vehicle load 2B', not only the in-vehicle load 2B' but also the ECU 4 cannot be operated at the same time.
[0035] Therefore, in the power distribution device 10 of the present embodiment, when the downstream on-board loads 2B, 2C are changed, not only the interruption characteristics of the interrupting units 121, 131 corresponding to the changed on-board loads 2B, 2C are changed, but also the interruption characteristics of the upstream on-board interrupting unit 111 are changed. Specifically, first, each control unit 113, 123, 133 acquires the detection values of the voltage and current of each of the interrupting units 111, 121, 131 from each detection unit 112, 122, 132 every time the power supply device 1 is reset. Each control unit 113, 123, 133 judges whether or not the change process of the interruption characteristics of each of the interrupting units 111, 121, 131 is required depending on the amount of change in the detection values of the voltage and current of each of the interrupting units 111, 121, 131. In the above assumed example, when the vehicle load 2B connected to the interrupter 121 is changed to the vehicle load 2B', the detected voltage and current values of the interrupter 121 change, and the control unit 123 determines that it is necessary to change the interruption characteristics of the interrupter 121.
[0036] When each of the control units 113, 123, and 133 determines that it is necessary to change the cutoff characteristics of each of the cutoff units 111, 121, and 131, it transmits a request to acquire load change information to the data center DC or the service terminal ST, and receives the load change information from the data center DC or the service terminal ST. Each of the control units 113, 123, and 133 changes the cutoff characteristics of each of the cutoff units 111, 121, and 131 according to the received load change information.
[0037] Next, the control unit 113 of the first power distribution device 11 changes the interrupting characteristics of the interrupting unit 111 so that a curve showing the relationship between the current flowing through the interrupting unit 111 and the interrupting time falls between a curve showing the relationship between the current flowing through the interrupting units 121, 131 and the interrupting time after the change and a curve showing the relationship between the current flowing through the electric wire 15 and the time until smoke is generated. Hereinafter, a process of changing the interrupting characteristics of the upstream interrupting unit 111 after changing or adding the downstream in-vehicle loads 2B, 3B will be described.
[0038] 4 is a flowchart for explaining a process for changing the interrupting characteristics of the upstream interrupter 111 after changing or adding the downstream in-vehicle loads 2B, 3B. The process shown in this flowchart is started when the power supply device 1 is reset.
[0039] First, each of the control units 113, 123, and 133 acquires the detection values of the voltage and current of each of the interrupting units 111, 121, and 131 from each of the detection units 112, 122, and 132, and judges whether or not the amount of change in the detection value since the previous reset of the power supply device 1 exceeds a threshold value (step S1). If a positive judgment is made in step S1, the process proceeds to step S2, and if a negative judgment is made in step S1, the process proceeds to normal processing.
[0040] Next, each of the control units 113, 123, and 133 transmits a request to acquire load change information to the data center DC or the service terminal ST, and acquires load change information such as interruption characteristics for the changed in-vehicle load (step S2). Next, each of the control units 113, 123, and 133 changes the interruption characteristics of the corresponding interruption units 111, 121, and 131 based on the acquired load change information (step S3).
[0041] Next, the control unit 113 obtains the detection values of the open circuit voltages of the interrupting units 111, 121, 131 detected by the detection units 112, 122, 132, and determines the upstream-downstream relationship of the interrupting units 111, 121, 131 based on the obtained detection values (step S4).
[0042] Next, the control unit 123 transmits the interrupting characteristics of the interrupting unit 121 to the control unit 113, and the control unit 133 transmits the interrupting characteristics of the interrupting unit 131 to the control unit 113 (step S5). Next, the control unit 113 calculates the heat quantity of each of the electric wires 15, 17B, 17B', 17C (hereinafter, electric wire 15, etc.) when a virtual steady-state current flows through each of the electric wires 15, 17B, 17B', 17C by using the following formulas (1) to (6) (step S6).
[0043] When the electric current supply to the electric wires 15 and the like is started, the control unit 113 calculates the heat generation amount X1 per unit length of the electric wires 15 and the like using the following formula (1).
number
[0044] Moreover, the control unit 113 calculates the amount of heat dissipation Y1 of the electric wires 15 and the like using the following formula (2).
number
[0045] Then, the control unit 113 calculates the wire temperature T n Calculate.
number
[0046] That is, every time the sampling time Δt elapses, the control unit 113 calculates the temperature T p The heat generation amount X1 is added to the wire 15 at the time of measurement, or the heat dissipation amount Y1 is subtracted from the wire 15 at the time of measurement. n Calculate.
[0047] Hereafter, pseudo heat capacity C th * As shown by the dashed-dotted curve in the graph of Fig. 2, when a given current is continuously passed through the electric wire 15, the heat quantity of the electric wire 15 rises. It is known that the temperature T2 of the electric wire 15 at this time is expressed by the following formula (4).
number
[0048] The control unit 113 determines the continuous current I of a fuse of a standard that is normally used for the electric wire 15, etc. max Based on this, the temperature threshold ΔT max The continuous current I of this fuse can be calculated. max can be obtained by actually passing a current through the fuse and measuring the current and time until the fuse melts.
number
[0049] In the above equation (4), if T2-T1=ΔT, it is expressed by the following equation (4').
number
[0050] The current I in the above formula (4') is appropriately changed, and the elapsed time t is increased for each current I, so that the increase in temperature ΔT is equal to or greater than the temperature threshold ΔT max By plotting the time when the temperature threshold ΔT max By multiplying this by the mass and specific heat of the electric wire 15 etc., the heat quantity thresholds (shutoff threshold A, shutoff threshold A', shutoff threshold B, shutoff threshold B') shown in the graph of FIG. 2 are obtained.
[0051] The temperature threshold ΔT calculated using the above formula (5) maxSubstitute the value of ΔT in the above equation (4'), and the left side is the heat capacity C th Then, the heat capacity C th The pseudo heat capacity C th * Substituting this into equation (6), we obtain the following equation (6).
number
[0052] As shown in the flowchart of FIG. 4, the control unit 113 calculates the interruption time of each of the interrupting units 111, 121, 131 when the virtual steady-state current flows through the electric wire 15, etc., based on the heat quantity and interruption threshold of each of the interrupting units 111, 121, 131 (step S7).
[0053] Next, the control unit 113 judges whether or not the interruption time of the interruption units 121, 131 is longer than the interruption time of the interruption unit 111 (step S8). As shown in the graph of Fig. 2, in the initial setting, the interruption time T1 of the interruption unit 111 is longer than the interruption time T2 of the interruption unit 121, but after the in-vehicle load 2B is changed, it is assumed that the interruption time T1 of the interruption unit 111 will be shorter than the interruption time T2' of the interruption unit 121. As shown in the flowchart of Fig. 4, if a positive determination is made in step S8, the process proceeds to step S9, and if a negative determination is made in step S8, the process proceeds to normal processing.
[0054] The control unit 113 changes the time constant τ shown in the following formula (7) to change the interruption characteristics of the interruption unit 111 so that the interruption characteristics of the interruption unit 111 are between the changed interruption characteristics of the interruption units 121 and 131 and the smoke generation characteristics of the electric wire 15 (step S9). As a result, as shown in the graph of FIG. 2, the interruption time T1' of the interruption unit 111 becomes longer than the interruption time T2' of the interruption unit 121.
number
[0055] The above formula (7) is obtained by converting the above formula (6) with ΔT max as the left side into the following formula (8), and after converting the following formula (8) into a formula with the time constant τ as the left side, ΔT max is converted so that it becomes a value between the temperature threshold of the changed cutoff part 121 for the in-vehicle load 2B' and the temperature threshold for the smoke generation characteristic of the electric wire 15.
Equation
[0056] As shown in the flowchart of FIG. 4, the control unit 113 determines whether the cutoff time of the cutoff part 111 is longer than the cutoff times of the cutoff parts 121 and 131 (step S10). If an affirmative determination is made in step S10, the process proceeds to normal processing. If a negative determination is made in step S10, alarm processing is executed (step S11), and the process proceeds to normal processing.
[0057] As described above, in the power distribution device 10 of the present embodiment, when the vehicle-mounted loads 2B, 2C connected to the downstream second power distribution device 12 or the third power distribution device 13 are changed or added, the interruption characteristics of the interrupting units 121, 131 of the second power distribution device 12 or the third power distribution device 13 are changed. In this situation, when the interruption time of the interrupting unit 111 of the upstream first power distribution device 11 becomes shorter than the interruption times of the interrupting units 121, 131, the control unit 113 of the upstream first power distribution device 11 changes the interruption characteristics of the interrupting unit 111 so that the interruption time of the interrupting unit 111 becomes longer than the interruption times of the interrupting units 121, 131. This makes it possible to achieve protection of the electric wire 15 from the upstream side to the downstream side without the need to redesign the interrupting units 111, 121, 131 when the vehicle-mounted loads 2B, 2C connected to the downstream second power distribution device 12 or the third power distribution device 13 are added or changed. Also, simultaneous interruption of the upstream interrupter 111 and the downstream interrupters 121 and 131 can be prevented.
[0058] In the power distribution device 10 according to the present embodiment, the interruption characteristics between the upstream interrupter 111 and the downstream interrupters 121 and 131 are initially set so that the interruption time between the interrupter 111 and the interrupter 121 and 131 is shorter than the smoke generation time, which is the time from the start of current flow through the electric wire 15 to the generation of smoke. In addition, the interruption characteristics between the interrupter 111 and the interrupter 121 and 131 are initially set so that the interruption time of the interrupter 111 is longer than the interruption times of the interrupter 121 and 131. On the other hand, in a situation where the in-vehicle loads 2B, 2C connected to the downstream second power distribution device 12 and the third power distribution device 13 are changed or added to change the interrupting characteristics of the interrupting units 121, 131, if the interrupting time of the interrupting unit 111 becomes shorter than the interrupting times of the interrupting units 121, 131, the control unit 113 changes the interrupting characteristics of the interrupting unit 111 so that the interrupting time of the interrupting unit 111 becomes longer than the interrupting times of the interrupting units 121, 131 and shorter than the smoking time of the electric wire 15. This makes it possible to prevent simultaneous interruption of the upstream interrupting unit 111 and the downstream interrupting units 121, 131, and to reliably prevent smoking of the electric wire 15.
[0059] In the power distribution device 10 according to the present embodiment, the upstream control unit 113 and the downstream control units 123 and 133 are connected to be able to communicate with each other. The upstream control unit 113 receives the interruption characteristics of the downstream interruption units 121 and 131 from the downstream control units 123 and 133. The upstream control unit 113 calculates the interruption time of the interruption units 121 and 131 when a predetermined current flows through the electric wires 17B, 17B', and 17C based on the interruption characteristics of the interruption units 121 and 131 that it has received. In addition, the upstream control unit 113 calculates the interruption time of the interruption unit 111 when a predetermined current flows through the electric wires 15 and 16 based on the interruption characteristics of the interruption unit 111. Then, when the calculated interruption time of the interruption unit 111 is shorter than the calculated interruption times of the interruption units 121 and 131, the upstream control unit 113 changes the interruption characteristics of the interruption unit 111 so that the interruption time of the interruption unit 111 becomes longer than the interruption times of the interruption units 121 and 131. This makes it possible to compare the interruption times of the interruption units 111, 121 and 131 after changing or adding the in-vehicle loads 2B and 2C, and change the interruption characteristics of the interruption unit 111 based on the comparison result.
[0060] Moreover, in the power distribution device 10 according to this embodiment, the first power distribution device 11 on the upstream side includes a detection unit 112 that detects the voltage and current of the interrupter 111, and the second power distribution device 12 and the third power distribution device 13 on the downstream side include detection units 122 and 132 that detect the voltage and current of the interrupter units 121 and 131. The control unit 113 of the first power distribution device 11 receives the detection values of the voltage and current of the interrupter units 121 and 131 detected by the detection units 122 and 132 from the control units 123 and 133 of the second power distribution device 12 and the third power distribution device 13. This allows the control unit 113 of the first power distribution device 11 to determine the upstream-downstream relationship of the interrupter units 111, 121, and 131 by comparing the voltage of the interrupter unit 111 on the upstream side with the voltage of the interrupter units 121 and 131 on the downstream side. Furthermore, the control unit 113 of the first power distribution device 11 can calculate the amount of heat of the electric wires 15 and the like based on the currents of the breakers 111, 121, and 131.
[0061] The present invention has been described above based on the above embodiment, but the present invention is not limited to the above embodiment, and modifications may be made to the above embodiment without departing from the spirit of the present invention, and publicly known or well-known technologies may be combined as appropriate. [Explanation of symbols]
[0062] 1: Power supply 2B: Vehicle load (vehicle device) 2B': Vehicle load (vehicle device) 2C: Vehicle load (vehicle device) 10:Power distribution device 11:1st power distribution device 12:Second power distribution device 13:Third power distribution device (second power distribution device) 15: Electric wire (first electric wire) 16: Electric wire (first electric wire) 17B: Electric wire (second electric wire) 17B': Electric wire (second electric wire) 17C: Electric wire (second electric wire) 111: Interrupter (first interrupter) 112: Detection unit (first detection unit) 113: Control unit (first control unit) 121: Interrupter (second interrupter) 122: Detection unit (second detection unit) 123: Control unit (second control unit) 131: Interrupter (second interrupter) 132: detection unit (second detection unit) 133: Control unit (second control unit) T1: Interruption time (first interruption time) T1': Breaking time (first breaking time) T2: Breaking time (second breaking time) T2': Cutoff time (second cutoff time)
Claims
1. a first power distribution device that distributes power supplied from a power supply device; a second power distribution device that distributes the power distributed by the first power distribution device to an in-vehicle device, The first power distribution device is a first cutoff unit that connects or cuts off a first electric wire that supplies power from the power supply device to the second power distribution device; a first control unit that controls the first interrupting unit based on a first interrupting characteristic that indicates a relationship between a heat amount of the first electric wire and a first interrupting time that is a time from when current starts to flow through the first electric wire until the first interrupting unit interrupts the current; Equipped with The second power distribution device is a second cutoff unit that connects or cuts off a second electric wire that supplies power from the first power distribution device to the in-vehicle device; a second control unit that controls the second cutoff unit based on a second cutoff characteristic that indicates a relationship between a heat amount of the second electric wire and a second cutoff time that is a time from when current starts to flow through the second electric wire until the second cutoff unit cuts off the current; Equipped with the first cut-off characteristic and the second cut-off characteristic are initially set so that the first cut-off time is longer than the second cut-off time, The first control unit of the power supply distribution device executes a first cut-off characteristic change process to change the first cut-off characteristic so that the first cut-off time becomes longer than the second cut-off time when the in-vehicle device is changed or added to change the second cut-off characteristic and the first cut-off time becomes shorter than the second cut-off time.
2. the first interruption characteristic and the second interruption characteristic are initially set so that the first interruption time and the second interruption time are shorter than a smoke generation time, which is a time from when current starts to flow in the first electric wire until smoke is generated, 2 . The power distribution device according to claim 1 , wherein the first control unit changes the first cut-off characteristic in the first cut-off characteristic change process so that the first cut-off time is longer than the second cut-off time and shorter than the smoking time.
3. The first control unit and the second control unit are communicatively connected to each other, The first control unit is receiving the second interruption characteristic from the second control unit; calculating the first breaking time when a predetermined current flows through the first electric wire based on the first breaking characteristic; calculating the second breaking time when the predetermined energizing current flows through the second electric wire based on the second breaking characteristic; 3 . The power distribution device according to claim 1 , wherein the first cut-off characteristic change process is executed when the calculated first cut-off time is shorter than the calculated second cut-off time.
4. the first power distribution device includes a first detection unit that detects a voltage and a current of the first cutoff unit, the second power distribution device includes a second detection unit that detects a voltage and a current of the second cutoff unit, The power distribution device according to claim 3 , wherein the first control unit receives detection values of the voltage and current of the second cutoff unit detected by the second detection unit from the second control unit.
Citation Information
Patent Citations
Multifunction preventive relay and multifunction protective relay operation method by multifunction protective relay system
JP1997219922A
Vehicular current interruptor
JP2013014203A
Power supply line protection method, master device, and power supply system
JP2020202604A
Repeating device
JP2022000363A
On-vehicle power distribution device
JP2023014748A
Cited By
Controlling data routing in premises management systems
US12301379B2
Virtual device systems and methods
US12341865B2
Mobile premises automation platform
US12476840B2
Defining and implementing sensor triggered response rules
US12494938B2
IP device discovery systems and methods
US12513110B2