Shield segment collaborated transportation system and construction method

By adopting the coordinated operation of the first crane, the second crane and the transmission structure in the shield construction, efficient transmission of the shield section is achieved, the problems of low transmission efficiency and high ground occupation are solved, and the risk of falling objects at high places is reduced.

JP2025054151AActive Publication Date: 2025-04-07CHINA RAILWAY NO 8 ENG GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
JP2023179847
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-09-25
Filing Date
2023-10-18
Publication Date
2025-04-07
Estimated Expiration
2043-10-18

AI Technical Summary

Technical Problem

During the existing shield construction, the transmission efficiency of the shield section is low, occupying many construction sites, and there is a risk of falling objects at high places during the transmission process.

Method used

A joint shield segment transmission system consisting of a first crane, a second crane, a transmission structure and a shield segment is adopted to achieve efficient transmission of shield segments by accurately defining the transmission path and time, and using the coordinated operation of the transmission structure and the crane.

Benefits of technology

It improves the transmission efficiency of the shield section, reduces the construction occupation of the ground, reduces the risk of falling objects at high places, and optimizes the resource allocation at the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2025054151000001_ABST
    Figure 2025054151000001_ABST
Patent Text Reader

Abstract

To provide a shield segment collaborated transportation system and a construction method capable of improving transportation efficiency of a segment.SOLUTION: The present invention provides a shield segment collaborated transportation system and a construction method, relating to a shied technique field, being capable of calculating optimum traveling point positions of a first crane (1), a second crane (2) and a transmission structure (3), having a merit to prevent risk of falling from a high place due to movement of the segment with the transmission structure (3) without occupying a large space at the construction site, being capable of improving transportation efficiency of the segment by combining fast travel speed of the transmission structure (3), and a traveling path provided with the shield segment collaborated transportation system.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to the technical field of shields, and in particular to a shield segment joint transportation system and construction method. [Background technology]

[0002] Shield tunnels require the use of prefabricated tunnel lining construction, and require the construction of segments in a bricolage (assembly) for the tunnel. The efficiency of the bricolage of segments directly affects the construction speed of the shield. Shield construction generally employs transporting segments from a vertical shaft, and since the construction site is limited, cranes are often used to transport the segments. However, transporting segments by crane requires moving above the construction site, which poses the risk of falling from a high place. The efficiency of transporting segments by a single person is poor, and it occupies a large amount of construction site, so a shield segment joint transportation system and construction method are required. Summary of the Invention [Problem to be solved by the invention]

[0003] An object of the present invention is to provide a shield segment joint transportation system and construction method for solving the problems of conventional segment transportation. [Means for solving the problem]

[0004] An embodiment of the present invention is implemented as follows.

[0005] One embodiment of the present invention provides a shield segment joint transportation system, the system including a first crane, a second crane, a transmission structure, and a segment, the first crane and the second crane are installed on both sides of the transmission structure, the first crane, the second crane and the transmission structure are all used to transport the segment, the segment includes a group A, a group B and a group C, where L is defined as the segment transport distance, V0 is defined as the transport speed of the first crane and the second crane, V1 is the transmission speed of the transmission structure, E is the start point of the transportation process, F is the end point of the transportation process, M1, M2, M3 are three points defined during the transportation, t1, t2 and t3 are three times divided when all the segments are transported from point E to point F, where the distance formula from point M to point E is: JPEG2025054151000002.jpg37170

[0006] Optionally, obtain the transportation itinerary of segments A, B and C; Segment travel of group A: V1t1+V0(t2+t3)=L; Segment travel of group B: V0(t1+t2)+V1t3=L; Segment travel for group C: V1(t1+t2+t2)=L+2((V1-V0)t1-V0t2).

[0007] Optionally, calculate t1, t2 and t3 from the transportation routes of segments A, B and C; JPEG2025054151000003.jpg12170

[0008] Optionally, the transmission structure includes a guide rail and a rope hoisting device, a transport frame is slidably connected to a surface of the guide rail, a wire rope is wound and connected to a surface of the rope hoisting device, a fixed wheel is fixedly connected to a surface of the guide rail, and a movable wheel is fixedly connected to a surface of the transport frame.

[0009] Optionally, the rope winding device is driven by a motor, there are two sets of the rope winding device, and the rope winding devices are diagonally distributed on both sides of the guide rail, and the two sets of the rope winding device are indirectly actuated.

[0010] Optionally, the wire rope is installed on both sides of the guide rail, and the rope winding device continuously winds the wire rope on both sides of the wire rope on the surface of the rope winding device after starting.

[0011] Optionally, the wire rope slides on the surface of a fixed wheel, and the wire rope is guided by the fixed wheel during the winding process, and the movable wheel pulls the transportation frame via the wire rope and slides on the surface of the guide rail.

[0012] Another aspect of the present invention provides a shield segment joint transportation construction method, comprising: S1: The transmission structure transports group A and group C, and the first crane transports group B's segments and departs. After time t1 has passed, the segments of groups A and C arrive at point M3, and the segment of group B arrives at point M1. S2: The A group segments are lifted from the transmission mechanism to the second crane, the second crane continues to transport the A group segments forward, the first crane continues to transport the B group segments forward to the end point F, and the transmission structure carries the C group segments back along the original path to point E, and after a time t2, it intersects with the B group segments at point M2; S3: The first crane lowers the segments of group B onto the transmission mechanism, which then carries the segments of groups B and C and arrives at point F at the same time as the segments of group A carried by the second crane, after a time t3 has elapsed. Effect of the Invention

[0013] The beneficial effects of the embodiment of the present invention include the following: the shield segment joint transportation system and construction method according to the embodiment of the present invention includes a first crane, a second crane, a transmission structure, and a segment, the first crane and the second crane are installed on both sides of the transmission structure, the first crane, the second crane and the transmission structure are all used to transport the segment, and the segment includes a set A, a set B and a set C, where L is defined as the segment transportation distance, V0 is defined as the transportation speed of the first crane and the second crane, and V1 is the transmission speed of the transmission structure. where E is the start point of the transportation journey, F is the end point of the transportation journey, M1, M2, and M3 are three points defined during the transmission, and t1, t2, and t3 are three times divided when all segments are transported from point E to point F, where the distance formula from point M to point E is calculated based on the journey formula L=Vt, where the segment journey of group A is V1t1+V0(t2+t3)=L, the segment journey of group B is V0(t1+t2)+V1t3=L, and the segment journey of group C is V1(t1+t2+t2)=L+2((V1-V0)t1-V0t2).The shield segment joint transportation system and construction method using the embodiment of the present invention first calculates the movement path of the three sets of segments, and then calculates the operation time for each time to derive the intersections M1, M2 and M3 at the start and end points of the segments. At this time, according to the real-time method of the present invention, the first crane leaves the A and C sets of segments on the transmission structure at point E, and the first crane 1 can carry the B set of segments and depart together with the transmission structure. At this time, after the time t1 has passed, the A and C sets of segments arrive at point M3, the B set of segments arrive at M1, and the A set of segments are lifted from the transmission structure 3 to the second crane, and the second crane continues to carry the A set of segments. The first crane transports the segments of group B forward, the first crane continues to transport the segments of group B forward to the end point F, while the transmission mechanism carries the segments of group C back to point E along the original route, and after a time t2, intersects with the segments of group B at point M2, the first crane lowers the segments of group B to the transmission mechanism, and the transmission mechanism carries the segments of groups B and C, and arrives at point F simultaneously with the segments of group A carried by the second crane after a time t3, at this time completing the task of transporting the segments of groups A, B, and C from point E to point F, which has the advantages of not occupying a large amount of construction site and avoiding the risk of falling from high places, and effectively improving the transportation efficiency of the segments. [Brief description of the drawings]

[0014] [Figure 1] FIG. 2 is a process diagram of a shield segment joint transportation system S1 according to an embodiment of the present invention. [Diagram 2] FIG. 1 is a process diagram of a shield segment joint transportation system S2 according to an embodiment of the present invention. [Diagram 3] FIG. 13 is a process diagram of a shield segment joint transportation system S3 according to an embodiment of the present invention. [Figure 4] FIG. 2 is a top schematic view of a transmission structure according to an embodiment of the present invention; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] The shield segment joint transportation system replaces the segment transportation by the first crane 1 and the second crane 2 with the transmission structure 3 during the segment transportation process, thereby avoiding the occurrence of the phenomenon of segments falling during the transportation process of the first crane 1 and the second crane 2, and the moving speed of the transmission structure 3 is higher than that of the first crane 1 and the second crane 2, enabling rapid transportation of segments at the construction site. The segment joint transportation system makes it possible to calculate the most effective method of mutual cooperation between the first crane 1, the second crane 2 and the transmission structure 3, thereby improving the transportation efficiency of the segments at the site of use.

[0016] Here, the transmission structure 3 can transport two sets of segments at the same time, and during the operation of the transmission structure 3, the shield segment joint transportation system completes the transportation trajectory planning of the transmission structure 3 in advance, and the transmission structure 3 cooperates with the first crane 1 and the second crane 2 to plan the transportation of the segments. Since the first crane 1 and the second crane 2 can only transport one set of segments, during the transportation process of the segments, the shield segment joint transportation system calculates the optimal running positions of the first crane 1, the second crane 2 and the transmission structure 3, so that the transportation efficiency of the segments can be accelerated.

[0017] An embodiment of the present invention provides a shield segment joint transportation system, which calculates the distance from point M1 to point E, the distance from point M2 to point E, and the distance from point M3 to point E, as shown in FIGS.

[0018] S11, obtain the segment conveying distance as L, define the conveying speed of the first crane 1 and the second crane 2 as V0, the transmission speed of the transmission structure 3 as V1, the starting point of the transportation process as E, and the end point of the transportation process as F.

[0019] S12, calculate L based on equation (1); Segment travel of group A: V1t1+V0(t2+t3)=L; Segment travel of group B: V0(t1+t2)+V1t3=L; Segment travel for group C: V1(t1+t2+t2)=L+2((V1-V0)t1-V0t2) (1) S12, calculate t based on equation (2); JPEG2025054151000004.jpg29170t1, t2 and t3 are the three times for transmitting the segments A, B and C, respectively, and the cumulative time is the total time length for transporting the three segments.

[0020] Then, the specific positions of M1, M2 and M3 at the construction site are calculated based on the above formulas (1) and (2), S13, calculate M1, M2 and M3 based on equation (3); JPEG2025054151000005.jpg37170It should be explained that the shield segment joint transportation system derives equation (2) from equation (1) based on the input of measured data parameters, and further calculates from equation (1) and equation (2), which is a very important step of measurement, including: the segment transporting distance is L, the transporting speed of the first crane 1 and the second crane 2 is V0, and the transmission structure 3 transmission speed is V1, where it further includes the time of loading the segment from the first crane 1 to the transmission structure 3, the time of loading the segment from the second crane 2 to the transmission structure 3, the time of unloading the segment from the first crane 1, and the time of unloading the segment from the second crane 2, thereby ensuring that the connection points between the first crane 1, the second crane 2 and the transmission structure 3 are more accurate.

[0021] The shield segment joint transportation system according to an embodiment of the present invention includes a first crane 1, a second crane 2, a transmission structure 3, and a segment, the first crane 1 and the second crane 2 are installed on both sides of the transmission structure 3, the first crane 1, the second crane 2 and the transmission structure 3 are all used to transport the segment, the segment includes a group A, a group B and a group C, where L is defined as the segment transport distance, V0 is defined as the transport speed of the first crane and the second crane, V1 is the transmission speed of the transmission structure, E is the start point of the transportation process, F is the end point of the transportation process, M1, M2, M3 are three points defined during the transmission, t1, t2 and t3 are three times divided when all the segments are transported from point E to point F, where the distance formula from point M to point E is calculated based on the process formula L=Vt, where the distance formula from point M to point E is calculated based on the process formula L=Vt, where the distance formula from point M to point E is calculated based on the process formula L=Vt, where the distance formula from point A to point E is calculated based on the process formula L=Vt, where the distance formula from point A to point E is calculated based on the process formula L=Vt, Segment travel: V1t1+V0(t2+t3)=L, segment travel of group B: V0(t1+t2)+V1t3=L, segment travel of group C: V1(t1+t2+t2)=L+2((V1-V0)t1-V0t2), and calculate the transportation travel of the segment based on the travel formula L=Vt, where segment travel of group A: V1t1+V0(t2+t3)=L, segment travel of group B: V0(t1+t2)+V1t3=L, segment travel of group C: V1(t 1+t2+t2)=L+2((V1-V0)t1-V0t2), and further includes a transmission structure 3, which includes a guide rail 31 and a rope hoisting device 33, a transport frame 32 is slidably connected to the surface of the guide rail 31, a wire rope 34 is wound around and connected to the surface of the rope hoisting device 33, a fixed wheel 35 is fixedly connected to the surface of the guide rail 31, and a movable wheel 36 is fixedly connected to the surface of the transport frame 32.

[0022] Optionally, the rope winding device 33 is driven by a motor, there are two sets of the rope winding device 33, and the rope winding device 33 is diagonally distributed on both sides of the guide rail 31, and the two sets of the rope winding device 33 are indirectly actuated.

[0023] Here, after the rope hoisting device 33 is started, it can pull the transport frame 32 to slide on the guide rail 31. During the sliding process, the transport frame 32 slides to the side that starts the rope hoisting device 33, so that the transport frame 32 pulls the two sets of segments to move around the construction site, where the first crane 1, the second crane 2 and the transmission structure 3 cross-operate to avoid mutual interference between the first crane 1, the second crane 2 and the transmission structure 3.

[0024] Alternatively, the wire rope 34 is installed on both sides of the guide rail 31, and the rope winding device 33 continuously winds the wire rope 34 on both sides of the wire rope 34 on the surface of the rope winding device 33 after starting.

[0025] Here, the wire rope 34 slides on the fixed wheel 35 and the movable wheel 36, and when the rope winding device 33 is operating on one side of the wire rope 34, the fixed wheel 35 and the movable wheel 36 move closer to each other, and when the rope winding device 33 is not operating on one side of the wire rope 34, the fixed wheel 35 and the movable wheel 36 move away from each other.

[0026] Alternatively, the wire rope 34 slides on the surface of the fixed wheel 35, and the wire rope 34 is guided by the fixed wheel 35 during the winding process, and the movable wheel 36 pulls the transport frame 32 via the wire rope 34 and slides on the surface of the guide rail 31.

[0027] Here, the transport frame 32 always moves on the guide rail 31 carrying two sets of segments, and the moving direction of the transport frame 32 continues to indirectly activate the rope winding device 33 according to the transporting direction of the segments, and the activation of different rope winding devices 33 realizes the reciprocating operation of the transport frame 32 on the guide rail 31, so that the transmission structure 3 quickly delivers the segments between the first crane 1 and the second crane 2, thereby achieving the effect of improving efficiency.

[0028] A shield segment joint transportation implementation method, comprising the steps of: S1: The transmission structure 3 transports the A and C groups, and the first crane 1 transports the B group segments and departs. After the time t1 has elapsed, the A and C group segments arrive at the M3 point, and the B group segment arrives at the M1 point. S2: The A group segments are lifted from the transmission mechanism to the second crane 2, the second crane 2 continues to transport the A group segments forward, the first crane 1 continues to transport the B group segments forward to the end point F, and the transmission structure 3 carries the C group segments back along the original path to point E, and after a time t2, it intersects with the B group segments at point M2; S3: The first crane 1 lowers the segments of group B into the transmission mechanism, and the transmission structure 3 carries the segments of groups B and C, and arrives at point F at the same time as the segments of group A carried by the second crane 2, after a time t3 has elapsed.

[0029] To summarize the above, after adding the variable of transmission structure 3, the shield segment joint transportation system transports three sets of segments each time, namely set A of segments, set B of segments and set C of segments, and by calculating the speed of the first crane 1, the second crane 2 and the transmission structure 3, and calculating the segment transportation distance, the optimal turning points M1, M2 and M3 between points E and F of the first crane 1, the second crane 2 and the transmission structure 3 are calculated. As shown in Figures 1, 2 and 3, the shield segment joint transportation construction method is simultaneously adjusted to the optimal driving route calculated by the shield segment joint transportation system, thereby improving the segment transportation efficiency at the transportation site.

[0030] Working principle: First, measure the conveying speed V0 of the first crane 1 and the second crane 2, the transmission speed V1 of the transmission structure 3, and the starting point positions E and F. At this time, derive the segment travel formula (2) from formula (1). Then, calculate the specific positions from M1, M2, and M3 to point E from formula (1) and formula (2). Thus, the travel distance of the first crane 1, the second crane 2, and the transmission structure 3 can be accurately controlled. After sending the control data to the first crane 1, the second crane 2, and the transmission structure 3, the transportation of the segments is started. The first crane 1 leaves the segments of group A and group C on the transmission structure 3 at point E. The first crane 1 carries the segments of group B and departs together with the transmission structure 3. At this time, after the time t1 has elapsed, the segments of group A and group C are transported. When the first crane 1 arrives at point M3, the group B segments arrive at M1, and the group A segments are lifted from the transmission structure 3 to the second crane 2, the second crane 2 continues to transport the group A segments forward, and the first crane 1 continues to transport the group B segments forward to the end point F, while the transmission mechanism carries the group C segments back to point E along the original path, and after a time t2, intersects with the group B segments at point M2, the first crane unloads the group B segments onto the transmission mechanism, and the transmission mechanism carries the groups B and C segments and arrives at point F simultaneously with the group A segments carried by the second crane after a time t3, and at this time the task of transporting the groups A, B, and C segments from point E to point F can be completed. [Explanation of symbols]

[0031] 1. First Crane 2. Second Crane 3 Transmission structure 31 Guide rail 32 Transport Frame 33 Rope Winding Equipment 34 Wire Rope 35 Fixed wheel 36 Movable Wheel

Claims

1. A shield segment joint transportation system, comprising: a first crane, a second crane, a transmission structure, and a segment; the first crane and the second crane are installed on both sides of the transmission structure; the first crane, the second crane and the transmission structure are all used to transport the segment; the segment includes a set A, a set B, and a set C; where L is defined as the segment transport distance; V is the distance between the segments; 0 is defined as the conveying speed of the first crane and the second crane, and V 1 is the transmission speed of the transmission structure, E is the start point of the transportation process, F is the end point of the transportation process, M1, M2, and M3 are three points defined during the transmission, and t 1 , t 2 and 3 are the three times required to transport all the segments from point E to point F, where the distance equation from point M to point E is: Segment intermodal transport system.

2. Obtain the transportation itinerary for segments A, B and C, Segment travel of group A: V 1 t 1 +V 0 (t 2 +t 3 )=L, Segment travel of group B: V 0 (t 1 +t 2 ) + V 1 t 3 = L, Segment Path of Group C: V 1 (t 1 +t 2 +t 2 ) = L + 2 ((V 1 -V 0 ) t 1 -V 0 t 2 2. The shield segment joint transportation system according to claim 1, wherein the shield segment joint transportation system is a multi-segment ...vehicle system.

3. From the transportation route of segments A, B and C, 1 , t 2 and 3 Calculate the t 2 = Shield segment intermodal transport system as described.

4. The shield segment joint transportation system of claim 1, characterized in that the transmission structure includes a guide rail and a rope winding device, a transport frame is slidably connected to the surface of the guide rail, a wire rope is wound and connected to the surface of the rope winding device, a fixed wheel is fixedly connected to the surface of the guide rail, and a movable wheel is fixedly connected to the surface of the transport frame.

5. The shield segment joint transportation system according to claim 4, characterized in that the rope winding device is driven by a motor, there are two sets of the rope winding device, and the rope winding devices are diagonally distributed on both sides of the guide rail, and the two sets of the rope winding devices are indirectly activated.

6. The shield segment joint transportation system according to claim 5, characterized in that the wire rope is installed on both sides of the guide rail, and the rope winding device continuously winds the wire rope on both sides of the wire rope around the surface of the rope winding device after starting.

7. The shield segment joint transport system according to claim 6, characterized in that the wire rope slides on the surface of the fixed wheel, the wire rope is guided by the fixed wheel during the winding process, and the movable wheel pulls the transport frame via the wire rope and slides on the surface of the guide rail.

8. A shield segment joint transportation construction method, comprising the steps of: S1: The transmission structure transports the A and C groups, and the first crane transports the B group of segments and departs. At time t 1 After passing through, the segments of groups A and C arrive at point M3, and the segment of group B arrives at point M1, S2: The A group of segments is lifted from the transmission mechanism to the second crane, the second crane continues to transport the A group of segments forward, the first crane continues to transport the B group of segments forward to the end point F, and the transmission structure carries the C group of segments back to the E point along the original path, and t 2 After some time has passed, it intersects with the segment of group B at point M2, S3: The first crane lowers the B group of segments to the transmission mechanism, and the transmission mechanism carries the B group and C group of segments to connect them with the A group of segments carried by the second crane. 3 A shield segment joint transportation construction method, characterized in that the segments arrive at point F at the same time after a period of time has elapsed.