Supply and demand monitoring device, supply and demand adjustment device and method
The supply and demand monitoring device addresses the challenge of balancing economic efficiency and stability in power systems by evaluating and adjusting output distribution patterns to meet stability constraints, ensuring stable and cost-effective power system operation.
Patent Information
- Application Number
- JP2020112427
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-06-30
- Publication Date
- 2024-09-17
- Estimated Expiration
- 2040-06-30
AI Technical Summary
Existing methods for adjusting supply and demand in electric power systems face challenges in ensuring both economic efficiency and stability constraints, as they often prioritize economic load distribution over stability considerations, leading to potential violations of power system constraints such as overload, voltage excursion, voltage stability, synchronization stability, and insufficient adjustment power.
A supply and demand monitoring device and method that evaluates output distribution patterns across multiple regulated power sources, determining the most economical allocation while satisfying stability constraints by using a system analysis unit and stability determination unit to assess and adjust output commands to regulated power sources.
Enables the evaluation of the most economical output allocation that satisfies stability constraints, ensuring stable and cost-effective power system operation by identifying and implementing cheaper output distribution patterns.
Smart Images

Figure 0007551360000002 
Figure 0007551360000007 
Figure 0007551360000015
Abstract
Description
[Technical field]
[0001] The present invention relates to a power system supply and demand monitoring device, and a supply and demand adjustment device and method. [Background technology]
[0002] When a supply-demand imbalance occurs in a power system due to load fluctuations (including output fluctuations of renewable energy), frequency fluctuations occur. Currently, system operators adjust the supply-demand balance in a power supply area by combining economic load dispatch (ELD) and load frequency control (LFC) at the central load dispatch center to allocate output to regulated power sources. In this specification, the destination of output allocation in supply-demand adjustment is called an regulated power source. The regulated power source can be selected from at least one of a generator, a storage battery, and a demand response.
[0003] Economic load dispatch (ELD) is a function that determines the output distribution of each regulated power source to follow the load, taking into account fuel costs, etc., for load fluctuations of about 10 minutes or more. Load frequency control (LFC) is a function that calculates the amount of fluctuation for a load of about several minutes to 10 minutes, and controls the system frequency within an allowable range by commanding each regulated power source to generate power in accordance with this amount of fluctuation.
[0004] Furthermore, if a supply-demand balancing market where balancing capacity can be traded is established, grid operators will be able to procure balancing capacity from this supply-demand balancing market. In such operations, a mechanism for activating balancing capacity based on merit order may be established. In output allocation based on merit order, output is allocated to balancing power sources based on priority order based on cost. In the direction of increasing balancing capacity, output is allocated in order of lowest cost, and in the direction of decreasing balancing capacity, output is allocated in order of highest cost.
[0005] FIG. 1 shows an example of the output distribution for each regulated power supply based on the output distribution according to the merit order. At this time, it is assumed that the regulation costs MA to ME of each regulated power supply G (from GA to GE) satisfy MA < MB < MC < MD < ME. This example is an image of distributing a total value of 80 of the upward regulation power to each regulated power supply G (from GA to GE) with an output distribution possible upper limit value of 30. In this example of distributing the upward regulation power, first, 30, which is the output distribution possible upper limit value, is assigned to the regulated power supply GA with the lowest regulation cost. Next, 30, which is the output distribution possible upper limit value, is assigned to the regulated power supply GB with the second lowest regulation cost. Finally, 20 is assigned to the regulated power supply GC with the second lowest regulation cost.
[0006] At this time, it is assumed that the output is distributed considering not only the supply-demand balance but also the stability of the power system. In order to operate the power system stably, it is necessary to eliminate various constraints such as overload, voltage deviation, voltage stability, synchronous stability, and ensuring regulation power. In order not to violate such constraints, although the economy is sacrificed, it is normal to operate so that no constraint violation occurs by transferring the output from the distribution according to the merit order.
[0007] That is, as a result of considering the stability constraints of the power system, the output distribution according to the merit order as shown in FIG. 1 may not be achieved. FIG. 2 shows an example in which 30 is distributed to the regulated power supply GA, 5 is distributed to the regulated power supply GB, 25 is distributed to the regulated power supply GC, and 20 is distributed to the regulated power supply GD as an example of the distribution of regulated power supplies that are not in the order of merit.
[0008] As the first stability constraint, overload will be explained. Overload means that the power flow exceeds the capacity of the transmission line. FIG. 3 shows an example of a transmission line that is overloaded. In this power transmission system, regulated power supplies G (from GA to GD) are connected as shown in the figure, and the upper figure shows an example where the power flow in the direction from the regulated power supply GB to load 1 is small. The lower figure is an example where the power flow in the direction to load 1 increases due to an increase in the output of the regulated power supply GD. Note that the operation is carried out so that no overload occurs by changing the output of the regulated power supply.
[0009] As the second constraint on stability, we will explain voltage deviation. Voltage deviation occurs when the voltage at each node deviates from its upper or lower limit. Figure 3 shows an example where a node connected to load 3 has experienced a voltage deviation (deviating from the lower voltage limit). Note that operations are carried out to prevent voltage deviations from occurring by appropriately adjusting the balance of reactive power, etc.
[0010] The third constraint on stability is voltage stability. Voltage stability is the ability to maintain a stable voltage during disturbances such as an increase in load or the shutdown of regulating power sources or substation equipment. Voltage stability becomes an issue due to the need to transmit large amounts of power over long distances due to remote and uneven distribution of power sources, increased reactive power losses, and changes in load characteristics (increase in constant power loads). Voltage stability is maintained by installing synchronous phase modifiers and static reactive power compensators that control voltage and reactive power.
[0011] As a fourth constraint on stability, we will explain synchronous stability. Synchronous stability is the ability to stably maintain synchronization between regulated power sources during disturbances such as the shutdown of a regulated power source. When a fault occurs in the power system due to a lightning strike or other cause, the rotation of some rotating machine-type regulated power sources accelerates relative to the other regulated power sources. The internal phase difference angle of the accelerated regulated power source with respect to the reference regulated power source becomes larger compared to the other regulated power sources, making it impossible to maintain synchronization between the regulated power sources. Synchronous stability is maintained by disconnecting the accelerated regulated power source from the system to prevent the number of accelerating regulated power sources from increasing.
[0012] The fifth constraint on stability is ensuring the ability to adjust. Adjustment is the ability to change supply or demand in an upward or downward direction. This adjustment ability must be secured so that it can respond to demand forecast errors, time fluctuations, and power source failures.
[0013] A technology for adjusting supply and demand in a power system is disclosed in Patent Document 1. Patent Document 1 describes that it provides an electric power supply and demand control system, program, and method that enables supply and demand adjustment by merit order based on not only economic load distribution (LFC) but also load frequency control (ELD), ensures fairness and transparency when procuring adjustment capacity, and exhibits excellent supply and demand control performance.
[0014] Furthermore, as a method for adjusting supply and demand in a power system, there is a technology disclosed in Patent Document 2. Patent Document 2 describes that by appropriately formulating one or both of the constraints of the transformer tap ratios of the parallel banks and the input amount of phase modifying equipment and incorporating them into an optimal power flow calculation, it is possible to shorten the calculation time and obtain a suitable solution that conforms to actual operation as the result of the optimal power flow calculation regardless of the objective function. [Prior art documents] [Patent documents]
[0015] [Patent Document 1] JP 2019-187099 A [Patent Document 2] Patent No. 5077316 Summary of the Invention [Problem to be solved by the invention]
[0016] However, in Patent Document 1, when only output allocation based on the merit order is performed, there is a possibility that various constraints on the stability of the power system cannot be satisfied.
[0017] Furthermore, although Patent Document 2 does not refer to output allocation by the merit order method, it uses optimal power flow calculations to calculate so as not to violate constraints on the stability of the power system. It is possible to satisfy power stability such as overload, but it may not be possible to explain whether this is the most economical output allocation while satisfying the stability constraints.
[0018] In view of the above, the present invention aims to provide a power system supply and demand monitoring device, supply and demand adjustment device, and method that can evaluate the appropriateness of whether output allocation is the most economical output allocation while satisfying stability constraints, and that can apply a cheaper output allocation pattern. [Means for solving the problem]
[0019] In view of the above, the present invention is described as "a supply and demand monitoring device that determines output allocation patterns of a plurality of regulating power sources in a power system, comprising an output allocation pattern determination unit that determines a plurality of less expensive output allocation patterns in response to an output allocation command value, a system analysis unit that performs a system analysis of the power system based on each of the plurality of output allocation patterns from the output allocation pattern determination unit, and a stability determination unit that determines the stability of the power system for the plurality of output allocation patterns as a result of the system analysis in the system analysis unit, and is characterized in that the supply and demand monitoring device enables an evaluation of the validity of whether the output allocation patterns of the plurality of regulating power sources in the power system are the most economical output allocation while satisfying the stability constraints of the power system."
[0020] In addition, the present invention is defined as "a supply and demand adjustment device having an output means in a supply and demand monitoring device and configured to give output commands via a communication means to a plurality of regulating power sources in a power system, wherein the output means selects one output allocation pattern which is the most economical output allocation while satisfying the stability constraints of the power system, and gives output commands to the plurality of regulating power sources via the communication means."
[0021] Furthermore, the present invention is described as "a supply and demand monitoring method for determining output allocation patterns of a plurality of regulating power sources in a power system, which determines a plurality of output allocation patterns that are cheaper than an output allocation command value, performs a system analysis of the power system based on each of the plurality of output allocation patterns, judges the stability of the power system for the plurality of output allocation patterns as a result of the system analysis, and enables an evaluation of the validity of whether the output allocation pattern of the plurality of regulating power sources in the power system is the most economical output allocation while satisfying the stability constraints of the power system."
[0022] In addition, the present invention is defined as "a supply and demand adjustment method in which an output allocation pattern obtained by the supply and demand monitoring method is given as an output command to a plurality of regulating power sources in a power system, characterized in that one output allocation pattern which is the most economical output allocation while satisfying the stability constraints of the power system is selected, and this is given as an output command to the plurality of regulating power sources." Effect of the Invention
[0023] According to the present invention, it is possible to evaluate the validity of the power distribution as to whether it is the most economical power distribution while satisfying the stability constraint, and to apply a cheaper power distribution pattern. [Brief description of the drawings]
[0024] [Figure 1] FIG. 13 is a diagram showing an example of output distribution according to a merit order. [Diagram 2] FIG. 1 is a diagram showing an example of a power system in which output allocation is not based on merit order as a result of taking into account stability constraints. [Diagram 3] FIG. 1 shows an example of a power system experiencing overload and voltage excursions. [Figure 4] 1 is a block diagram showing a hardware configuration of a power system demand and supply monitoring device according to a first embodiment. [Diagram 5] FIG. 2 is a block diagram showing the functional configuration of the supply and demand monitoring device according to the first embodiment. [Figure 6] 6 is a flowchart showing the process of the supply and demand monitoring device of FIG. 5 . [Figure 7] 6 is a flowchart showing a first example of automatic determination of an output distribution pattern. [Figure 8] FIG. 4 is a diagram showing a processing image of a first example of automatic output distribution pattern determination. [Figure 9] 10 is a flowchart showing a second example of automatic determination of an output distribution pattern. [Figure 10] FIG. 11 is a diagram showing a processing image of a second example of automatic output distribution pattern determination. [Figure 11]FIG. 13 is a diagram showing an example of an output image regarding the output distribution pattern of regulating power sources and the results of stability analysis. [Figure 12] FIG. 11 is a block diagram showing a hardware configuration of a power system demand and supply monitoring device according to a second embodiment. [Figure 13] 13 is a flowchart showing the process of the supply and demand monitoring device of FIG. 12. [Figure 14] An example of an output image regarding the output distribution pattern of regulated power sources and the results of stability analysis is shown below. [Figure 15] FIG. 11 is a block diagram showing a functional configuration of a supply and demand monitoring device according to a third embodiment. [Figure 16] 16 is a flowchart showing the processing of the supply and demand adjusting device of FIG. 15 . [Figure 17] FIG. 13 is a diagram showing an example of an output image regarding the output distribution pattern of regulating power sources and the results of stability analysis. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0025] The embodiments of the present invention will be described with reference to the drawings. Note that the embodiments described below do not limit the invention according to the claims, and all of the elements and combinations thereof described in the embodiments are not necessarily essential to the solution of the invention. EXAMPLES
[0026] Fig. 4 is a block diagram showing a hardware configuration of a power system demand and supply monitoring device according to Example 1. Fig. 4 illustrates a power system 20 and a power system demand and supply monitoring device 10 connected to each point of the power system 20 via a communication network 300.
[0027] 4, the supply and demand monitoring device 10 is configured, for example, by a computer system. The supply and demand monitoring device 10 evaluates the validity of a certain output allocation as to whether it is an optimal economic output allocation while satisfying a stability constraint.
[0028] The supply and demand monitoring device 10 can access measurement information of the power system 20 via the communication network 300. The power system 20 here is illustrated as having the same configuration as that of Fig. 3, and is a system in which a plurality of regulated power sources G (GA to GD) and loads Ld (Ld1 to Ld6) are interconnected via nodes N (N1 to N6), transformers Tr (Tr1 to Tr4), and transmission lines L (L1 to L5). Various measuring instruments for protecting, controlling, and monitoring the power system 20 are installed at the nodes N (N1 to N6).
[0029] The supply and demand monitoring device 10 includes an output unit 21, an input unit 22, a communication unit 23, a processor 24, a memory 25, and a storage device 26, which are interconnected via a bus 27.
[0030] The display unit 21 displays parameters handled by the supply and demand monitoring device 10 and processing results in the supply and demand monitoring device 10. The display unit 21 may be a display device, or a printer device or an audio output device may be used together with the display device.
[0031] The input unit 22 inputs various conditions for operating the supply and demand monitoring device 10. The input unit 22 can use a keyboard and a mouse, and may also include at least one of a touch panel or a voice instruction device.
[0032] The communication unit 23 includes a circuit and a communication protocol for connecting to the communication network 300. The communication network 300 may be a WAN (Wide Area Network) such as the Internet, a LAN (Local Area Network) such as WiFi or Ethernet (registered trademark), or a combination of a WAN and a LAN.
[0033] The processor 24 executes a computer program, searches for data in various databases stored in the storage device 26, issues instructions to display processing results, and performs processing related to supply and demand monitoring of the power system 20. The processor 24 may be a central processing unit (CPU) or a graphics processing unit (GPU). The processor 24 may be a single-core processor or a multi-core processor. The processor 24 may include a hardware circuit (e.g., a field-programmable gate array (FPGA) or an application specific integrated circuit (ASIC)) that performs part or all of the processing. The processor 24 may include a neural network. The processor 24 may be configured as one or more semiconductor chips, or may be configured as a computer device such as a calculation server. The execution of the program may be shared among multiple processors or computers. Alternatively, the processor 24 may instruct a cloud computer or the like to execute all or part of the supply and demand monitoring program via the communication network 300, and receive the execution result.
[0034] The memory 25 is configured as, for example, a RAM (Random Access Memory), and stores computer programs and calculation result data, and provides the processor 24 with a work area necessary for each process.
[0035] The storage device 26 is a storage device having a large storage capacity, such as a hard disk drive or a solid state drive (SSD). The storage device 26 can hold executable files of various programs and data used to execute the programs. The storage device 26 can hold an output distribution command value model database DB1, a system information database DB2, and a stability result database DB3. The storage device 26 can also hold a supply and demand monitoring program. The supply and demand monitoring program may be software that can be installed in the supply and demand monitoring device 10, or may be incorporated in the supply and demand monitoring device 10 as firmware.
[0036] The power distribution command value database DB1 stores power distribution command values D1 distributed by a merit order method or the like. The system information database DB2 stores system information D2 for analyzing the stability of the power system. The stability result database DB3 stores stability results D3 related to various constraints such as overload, voltage deviation, voltage stability, and synchronous stability.
[0037] FIG. 4 shows an example in which the supply and demand monitoring device 10 holds an output distribution command value database DB1, a system information database DB2, and a stability result database DB3, but at least one of these databases may be held in a cloud server.
[0038] Fig. 5 is a block diagram showing an example of a functional configuration of the supply and demand monitoring device according to the embodiment 1. In the following description, when an operating subject is described as "XX unit", it is assumed that the processor 24 in Fig. 4 reads the XX unit, which is a program, loads it into a DRAM (Dynamic Random Access Memory), and then realizes the function of the XX unit.
[0039] In FIG. 5, the supply and demand monitoring device 10 includes an output distribution command value database DB1, a system information database DB2, a stability result database DB3, an output distribution pattern determination unit 11, a system analysis unit 12, and a stability determination unit 13.
[0040] The output distribution pattern determination unit 11 inputs an output distribution command value D1 from an output distribution command value database DB1, and determines a plurality of less expensive output distribution patterns.
[0041] The system analysis unit 12 inputs an arbitrary time and an arbitrary output distribution command value D1, and also inputs system information D2 from a system information database DB2, and performs calculations such as power flow calculation, synchronous stability calculation, voltage stability calculation, and adjustment capability reserve calculation, and outputs the results to the stability determination unit 13.
[0042] The stability determination unit 13 inputs the results calculated by the system analysis unit 12 and determines the stability of overload, voltage deviation, synchronous instability, voltage instability, insufficient adjustment power, etc., and outputs the results to a stability result database DB3.
[0043] Fig. 6 is a flowchart showing the processing of the supply and demand monitoring device of Fig. 5. In Fig. 6, first, in the output allocation pattern determination of processing step S1, a plurality of less expensive output allocation patterns are determined based on the output allocation command value D1. The output allocation pattern may be determined manually or automatically, and is not limited to a specific determination means. Two examples of automatically determining the output allocation pattern are described below.
[0044] A first example of the automatic determination of the output distribution pattern in processing step S1 will be described using the flow in Fig. 7 and the processing image in Fig. 8. Also, a second example of the automatic determination of the output distribution pattern in processing step S1 will be described using the flow in Fig. 9 and the processing image in Fig. 10.
[0045] As a first example of automatic output allocation pattern determination, an example will be shown in which an output allocation pattern is determined while taking costs into consideration when the output allocation deviates from the ideal merit order in Fig. 1. Fig. 7 shows a flowchart showing an example of processing by the output allocation pattern determination unit 11. Each processing step of the flowchart will be explained using an image of an example of processing by the output allocation pattern determination unit 11 in Fig. 8.
[0046] In determining the output allocation replacement target in processing step S11 in Fig. 7, an adjustable power source that deviates from the output allocation according to the ideal merit order is selected. In this case, since the output allocation according to the ideal merit order is 30, 30, 20 output from the three units (GA, GB, GC) in Fig. 1 from the viewpoint of cost, GB, GC, and GD are selected from among the adjustable power sources GA to GE as replacement targets for the adjustable power sources that deviate from this relationship in the upper part of Fig. 8.
[0047] In the process step S12, the upward adjustment range is calculated. In the example in the upper part of Fig. 8, when compared with the relationship in Fig. 1, which is the output distribution according to the ideal merit order, the regulating power source GB has an output deviation on the downward side, and the upward adjustment range is +25.
[0048] Similarly, in the calculation of the downward adjustment range in processing step S13, the downward adjustment range is calculated. In the example in the upper part of Fig. 8, compared with the relationship in Fig. 1, the regulated power sources GC and GD have output that deviates upward from the output distribution according to the ideal merit order, and the upward adjustment ranges are -5 and -20, respectively.
[0049] In the output replacement in process step S14, a candidate for a cheaper output distribution pattern is obtained by replacing the output within the range of the up-adjustment range and the down-adjustment range in increments of 5. In the example in the middle part of Fig. 8, as the first candidate for the output distribution pattern, the output is replaced while considering the cost in increments of the up-adjustment range and the down-adjustment range in increments of 5, and as a result, the output of the regulating power source GB is changed from 5 to 10, and the output of the regulating power source GD is changed from 20 to 15. Therefore, the first output distribution pattern has the outputs of the regulating power sources GA to GE as 30, 10, 25, 15, and 0, respectively. In the output replacement process in process step S14, the process of replacing the output is continuously executed while considering the cost in increments of the up-adjustment range and the down-adjustment range in increments of 5, and a new output distribution pattern is generated each time.
[0050] In process step S15, it is determined whether the output changeover is complete for the entire adjustment range. If it is complete, this flow ends. If it is not complete, the process returns to process step S14 and the output distribution pattern for the next step is determined. The output distribution pattern after completion is described in the lower part of FIG. 8, and is the output distribution according to the ideal merit order exemplified in FIG. 1.
[0051] As a second example of automatic output allocation pattern determination, we will explain an example of determining an output allocation pattern while taking cost into consideration when the output of an inexpensive regulating power source is smaller than the output of an expensive regulating power source, using the flow in Figure 9 and the processing image in Figure 10.
[0052] In the flowchart showing an example of the processing of the output allocation pattern determination unit in FIG. 9, first, in the output allocation switching target determination processing in processing step S21, when the output of the inexpensive regulating power source is smaller than the output of the expensive regulating power source, each regulating power source is selected. In the example in the upper part of FIG. 10, the output of the inexpensive regulating power source GB is 5, which is even smaller than the output of the expensive regulating power source GD, which is 20, and regulating power sources GB and GD are selected as the initial output allocation switching targets. Note that, as will be apparent from the following processing, in the example of FIG. 10, GB, GC, and GD are ultimately selected as switching targets from among the regulating power sources GA to GE.
[0053] In the process step S22 of selecting an inexpensive regulating power source, the least expensive regulating power source is selected from among the replacement targets. In the example in the upper part of Fig. 10, the regulating power source GB is selected. In the process step S23 of selecting an expensive regulating power source, in the example in the upper part of Fig. 10, the most expensive regulating power source GD is selected from among the replacement targets.
[0054] In the output switching in process step S24, the outputs of both regulated power sources GB and GD are switched until the outputs become the same, thereby finding candidates for a cheaper output distribution pattern. In the example in the upper part of Fig. 10, the first candidate output distribution pattern shows that the output of regulated power source GB is changed from 5 to 12.5, and the output of regulated power source GD is changed from 20 to 12.5 as a result of switching the outputs of both regulated power sources GB and GD while taking into account the cost. At this time, the outputs may be switched while taking into account a certain increment.
[0055] In process step S25, it is determined whether output switching is complete for all regulated power sources. If it is complete, this flow ends. If it is not complete, the process returns to process step S22, and the output allocation pattern for the next interval is determined.
[0056] The middle part of Figure 10 shows that after the first switching process for both regulated power sources GB and GD, the output of the inexpensive regulated power source is again considered to be smaller than the output of the expensive regulated power source, and the second switching process uses an adjustment width of 6.25 between the regulated power sources GB and GC. In this case, too, a new output distribution pattern is generated each time a switching process is performed.
[0057] As a result, as shown in the lower part of Figure 10, the outputs of both regulated power supplies GB and GD become equal, and the condition for the next execution, which is "the output of the inexpensive regulated power supply is smaller than the output of the expensive regulated power supply," no longer exists, indicating that the processing has ended.
[0058] 6, the system analysis unit 12 in processing step S2 performs system analysis such as power flow calculation, synchronous stability calculation, voltage stability calculation, and adjustment capability reserve calculation. For the system analysis, multiple stability calculations may be performed, or only one stability calculation may be performed.
[0059] In the process step S3, the stability determination unit 13 outputs data on the output allocation pattern and the stability result for the system analysis results such as the power flow calculation, the synchronous stability calculation, the voltage stability calculation, the adjustment capability reserve calculation, etc. The stability includes the overload, the voltage deviation, the synchronous stability, the voltage stability, the adjustment capability shortage, etc., which are described in the background art.
[0060] Processing steps S2 and S3 are performed for each power distribution pattern in the intermediate stages (middle stage of FIG. 8, middle stage of FIG. 10) from the initial stage (top stage of FIG. 8, top stage of FIG. 10) in processing step S1 to the final stage (bottom stage of FIG. 8, bottom stage of FIG. 10), and various stability evaluations are performed for multiple power distribution patterns.
[0061] Figure 11 shows an example of an output image of the output allocation patterns of adjustable power sources and the results of stability analysis. Here, the output of each adjustable power source from the initial stage 1 through the intermediate stage to the final stage X as an output allocation pattern, the cost for the output allocation pattern at each stage, and the results of various stability judgments are organized in a list. This list makes it clear at what timing and in what situation in the power system will become unstable if the operation of the adjustable power sources in the power system is changed chronologically from the initial stage 1 through the intermediate stage to the final stage X. From this, when past output allocations at any time are all stable at each stability and any output allocation command value is unstable at one or more stability levels, it can be said that the output allocation command value is the most economical output allocation while satisfying the stability constraints.
[0062] As described above, according to the above-mentioned first embodiment, it is possible to evaluate the validity of whether the output allocation is the most economical output allocation while satisfying the stability constraint. EXAMPLES
[0063] FIG. 12 is a block diagram of a functional configuration of the supply and demand monitoring device according to the second embodiment. As illustrated in FIG.
[0064] The supply and demand monitoring device 10 in FIG. 12 is configured to include an arbitrary output distribution command value database DB4 in addition to the supply and demand monitoring device 10 in FIG. 5 of the first embodiment, which is equipped with an output distribution command value database DB1, a system information database DB2, a stability result database DB3, an arbitrary output distribution command value database DB4, an output distribution pattern determination unit 11, a system analysis unit 12, a stability judgment unit 13, an output distribution determination unit 14, and an output reallocation determination unit 15.
[0065] The arbitrary power distribution command value database DB4 stores one or more patterns of arbitrary power distribution command values.
[0066] The output distribution pattern determination unit 11 receives the output distribution command value and the arbitrary output distribution command value, and determines a plurality of less expensive output distribution patterns, and outputs the results to the system analysis unit 12.
[0067] The system analysis unit 12 inputs the output allocation pattern calculated by the output allocation pattern determination unit 11 and the system information stored in the system information DB2, and performs calculations such as power flow calculation, synchronous stability calculation, voltage stability calculation, and adjustment power reserve calculation, and outputs the results to the stability judgment unit 13.
[0068] The stability determination unit 13 inputs the results calculated by the system analysis unit 12 and determines the stability of overload, voltage deviation, synchronous instability, voltage instability, insufficient adjustment power, etc., and outputs the results to a stability result database DB3.
[0069] FIG. 13 is a flowchart showing the processing of the supply and demand monitoring device of FIG.
[0070] In the process step S1, the output distribution pattern is determined based on one or both of the output distribution command values distributed by the merit order method or the arbitrary output distribution command values. Two examples of the output distribution patterns input to the system analysis unit 12 are explained below.
[0071] In the first example, the output distribution command value is an arbitrary output distribution command value from the arbitrary output distribution command value database DB4. By using an arbitrary output distribution command value desired by a system operator or a power generation company (such as an output distribution command value that is cheaper than the output distribution command value distributed by the merit order method or the like) as an input value, the stability of the desired output distribution command value can be determined.
[0072] In the second example, the output allocation command value allocated using the merit order method or the like and the arbitrary output allocation command value from the arbitrary output allocation command value database DB4 are set as output allocation patterns. By using the output allocation command value allocated using the merit order method or the like as an input value in addition to the arbitrary output allocation command value desired by the system operator or power generation company (such as an output allocation command value that is cheaper than the output allocation command value allocated using the merit order method or the like), it is possible to determine not only the stability of the desired output allocation command value, but also the stability of the output allocation command value allocated using the merit order method or the like. This makes it possible to confirm the difference in the stability results between the two.
[0073] In processing step S2, the system analysis unit 12 performs system analysis such as power flow calculation, synchronous stability calculation, voltage stability calculation, and adjustment capability reserve calculation. For the system analysis, multiple stability calculations may be performed, or only one stability calculation may be performed.
[0074] In the process step S3, the stability determination unit 13 outputs data on the output allocation pattern and the stability result for the system analysis results such as the power flow calculation, the synchronous stability calculation, the voltage stability calculation, the adjustment capability reserve calculation, etc. The stability includes the overload, the voltage deviation, the synchronous stability, the voltage stability, the adjustment capability shortage, etc., which are described in the background art.
[0075] An example of the output image of the output allocation pattern of the regulating power source and the result of stability analysis is shown in Figure 14. When past output allocations at any time are all stable at each stability and any output allocation command value is unstable at one or more stability, the output allocation command value can be said to be the most economical output allocation while satisfying the stability constraints.
[0076] As described above, according to the second embodiment, it is possible to evaluate the validity of the output allocation as to whether it is the most economical output allocation while satisfying the stability constraint. EXAMPLES
[0077] FIG. 15 is a block diagram of a functional configuration of the supply and demand monitoring device according to the third embodiment. As shown in FIG.
[0078] 15, the supply and demand adjustment device 10 includes an output allocation command value database DB1, a system information database DB2, a stability result database DB3, an output reallocation command value database DB5, an output allocation pattern determination unit 11, a system analysis unit 12, a stability judgment unit 13, an output allocation determination unit 14, and an output reallocation determination unit 15 in addition to the components of the supply and demand monitoring device 10 in Example 1 and FIG. 5.
[0079] The power reallocation command value database DB5 stores power reallocation command values that reduce costs while still satisfying stability, based on power allocation command values allocated by the merit order method or the like.
[0080] The output distribution determination unit 14 inputs the supply and demand imbalance, determines the output distribution to each regulating power source, and outputs the result to the output distribution command value database DB1.
[0081] The output distribution pattern determination unit 11 receives the output distribution command value calculated by the output distribution determination unit 14 , and determines a plurality of less expensive output distribution patterns, and outputs the results to the system analysis unit 12 .
[0082] The system analysis unit 12 inputs the output allocation pattern calculated by the output allocation pattern determination unit 11 and the system information stored in the system information DB2, and performs calculations such as power flow calculation, synchronous stability calculation, voltage stability calculation, and adjustment power reserve calculation, and outputs the results to the stability judgment unit 13.
[0083] The stability judgment unit 13 inputs the results calculated by the system analysis unit 12 and judges the stability of overload, voltage deviation, synchronous instability, voltage instability, insufficient adjustment power, etc., and outputs the results to a stability result database DB3 and an output reallocation decision unit 15.
[0084] The output reallocation determination unit 15 receives a plurality of output allocation patterns and their stability results as input, selects the most economical output reallocation command value while satisfying the stability constraints, and outputs the result to the output reallocation command value database DB5.
[0085] FIG. 16 is a flowchart showing the processing of the supply and demand adjusting device of FIG.
[0086] In the first process step S34, output allocation determination, output allocation to each regulating power source is determined based on the amount of supply and demand imbalance. For example, output allocation according to merit order is determined. When determining output allocation of each regulating power source according to merit order, in the direction of increasing regulating power, regulating power can be allocated in order from the lowest cost regulating power source within the range of constraints that can be allocated to each regulating power source. In the direction of decreasing regulating power, regulating power can be allocated in order from the highest cost regulating power source within the range of constraints that can be allocated to each regulating power source. The cost referred to here may include procurement costs in addition to fuel costs for regulating power sources.
[0087] In order to operate the power system stably, it is necessary to determine output allocation so as to satisfy not only the balance between supply and demand, but also the stability of the power system, including overload, voltage deviation, voltage stability, and synchronous stability. For this purpose, a method is generally used to determine output allocation through optimization calculations after setting various constraints.
[0088] In the output distribution pattern determination in process step S31, a plurality of less expensive output distribution patterns are determined based on the output distribution determined in process step S34. Two examples of determining the output distribution pattern will be described below.
[0089] In processing step S32, the system analysis unit 12 performs system analysis such as power flow calculation, synchronous stability calculation, voltage stability calculation, and adjustment capability reserve calculation. For the system analysis, multiple stability calculations may be performed, or only one stability calculation may be performed.
[0090] The stability determination unit 13 in processing step S33 outputs data on the output distribution pattern and stability results for the system analysis results such as power flow calculation, synchronous stability calculation, voltage stability calculation, and adjustment capability reserve calculation. Stability includes overload, voltage deviation, synchronous stability, voltage stability, and adjustment capability shortage, as explained in the background art. Fig. 17 shows an example of an output image of the output distribution pattern of regulating power sources and the results of stability analysis.
[0091] In the output allocation re-determination in processing step S35, the presence or absence of constraint violation is determined by stability analysis in multiple output allocation patterns. If one or more of all output allocation patterns are unstable in each stability, the output allocation command value determined by the output allocation determination unit 14 can be said to be the most economical output allocation in which the output allocation satisfies the stability constraint. Also, if there are output allocation patterns in which all stability is stable, the output allocation pattern with the lowest cost among the relevant output allocation patterns is selected as the output reallocation command value. In the example of FIG. 17, assuming that only pattern 1 and pattern 2 are stable in all stability among patterns 1 to X, pattern 2, which is the cheaper pattern, is selected.
[0092] Note that the above explanation has mainly been about configuring a supply and demand monitoring device for a power system, but it goes without saying that a supply and demand adjustment device can be configured by further providing a function for allocating the output allocation pattern defined here to an adjustment power source.
[0093] As described above, according to the third embodiment, it is possible to search for a better power distribution and perform power distribution based on the search, thereby reducing costs while still satisfying stability.
[0094] The present invention is not limited to the above-described embodiment, and various modifications are included. For example, the above-described embodiment has been described in detail to clearly explain the present invention, and is not necessarily limited to those having all the configurations described. In addition, it is possible to replace a part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. In addition, it is possible to add, delete, or replace other configurations with respect to a part of the configuration of each embodiment. In addition, each of the above-described configurations, functions, processing units, etc. may be realized in part or in whole by hardware, for example, by designing them as an integrated circuit. [Explanation of symbols]
[0095] DB1: Power distribution command value database DB2: Genealogical database DB3: Stability results database DB4: Optional power distribution command value database DB5: Power redistribution command database 20: Power system 10: Supply and demand monitoring device 11: Output distribution pattern determination unit 12: Systematic analysis department 13: Stability judgment part 14: Output allocation decision unit 15: Output reallocation decision unit 21: Display section 22: Input section 23: Communications Department 24: Processor 25: Memory 26: Storage device 27: Bus 300: Communication Network
Claims
1. A supply and demand monitoring device that determines an output allocation pattern of a plurality of regulating power sources in a power system, 1. A supply and demand monitoring device comprising: an output allocation pattern determination unit that determines a plurality of output allocation patterns including the output and cost of each regulated power source at each stage in an output transfer process from an initial stage through an intermediate stage to a final stage that is cheaper than an output allocation command value; a system analysis unit that performs a system analysis of the power system based on each of the output allocation patterns at each stage from the output allocation pattern determination unit; and a stability determination unit that determines the stability of the power system at the time of the output allocation pattern at each stage as a result of the system analysis by the system analysis unit, wherein the most economical output allocation is obtained as the output allocation pattern at each stage of the plurality of regulated power sources in the power system while satisfying the stability constraints of the power system.
2. 2. The supply and demand monitoring device according to claim 1, A supply and demand monitoring device characterized in that at least one of a power flow calculation, a synchronous stability calculation, a voltage stability calculation, and a guaranteed adjustment capability calculation is calculated by the system analysis in the system analysis unit.
3. The supply and demand monitoring device according to claim 1 or 2, The supply and demand monitoring device is characterized in that the stability determination unit determines stability with respect to at least one of overload, voltage deviation, synchronization instability, voltage instability, and insufficient regulation capability.
4. The supply and demand monitoring device according to any one of claims 1 to 3, The output allocation pattern determination unit determines the output allocation by an adjustable power source selected from among a plurality of adjustable power sources from the viewpoint of cost as an output allocation according to an ideal merit order, and in the event of a deviation from the output allocation according to the ideal merit order, determines an output allocation pattern while taking costs into consideration, including adjustable power sources that are not included in the ideal merit order.
5. The supply and demand monitoring device according to any one of claims 1 to 4, A supply and demand monitoring device characterized in that the output distribution pattern determination unit determines the output distribution pattern while taking cost into consideration when the output of an inexpensive regulating power source is smaller than the output of an expensive regulating power source.
6. The supply and demand monitoring device according to any one of claims 1 to 5, The supply and demand monitoring device is characterized in that the output allocation pattern determination unit determines an output allocation pattern based on either one or both of an output allocation command value allocated by a merit order method and an arbitrary output allocation command value.
7. The supply and demand monitoring device according to any one of claims 1 to 6, A supply and demand monitoring device characterized in that it is further provided with an output reallocation determination unit that determines an output reallocation command value based on multiple output allocation patterns and their stability results, thereby being able to apply a cheaper output allocation pattern while satisfying the stability constraints.
8. The supply and demand monitoring device according to claim 7, A supply and demand monitoring device comprising an output allocation determination unit that inputs a supply and demand imbalance and determines an output allocation to each regulating power source, the result of the output allocation determination unit being output to the output allocation pattern determination unit, and the output allocation pattern determination unit determining a plurality of less expensive output allocation patterns.
9. The supply and demand monitoring device according to claim 7, The output reallocation determination unit receives a plurality of output allocation patterns and their stability results as input, selects the most economical output reallocation command value while satisfying the stability constraints, and outputs the result to the output reallocation command value database. This supply and demand monitoring device is characterized by this.
10. A supply and demand adjustment device comprising the supply and demand monitoring device according to any one of claims 1 to 9, and configured to give output commands to a plurality of regulated power sources in a power system via communication means, The supply and demand adjustment device is characterized in that the output means selects one output allocation pattern which is the most economical output allocation while satisfying the stability constraints of the power system, and issues output commands to a plurality of regulating power sources via a communication means.
11. A supply and demand monitoring method for determining an output allocation pattern of a plurality of regulating power sources in a power system using a computer, comprising: A supply and demand monitoring method characterized in that a computer determines a plurality of output allocation patterns including the output and cost of each regulating power source at each stage in the output transfer process from the initial stage through the intermediate stage to the final stage that is cheaper than an output allocation command value, performs a system analysis of the power system based on each of the output allocation patterns at each stage, determines the stability of the power system for the output allocation pattern at each stage as a result of the system analysis, and obtains the most economical output allocation while satisfying the constraints of the stability of the power system as the output allocation pattern at each stage of the plurality of regulating power sources in the power system.
12. A supply and demand adjustment method in which an output allocation pattern obtained by the supply and demand monitoring method according to claim 11 is given as an output command to a plurality of regulating power sources in a power system, A supply and demand adjustment method comprising the steps of: selecting one output allocation pattern which is the most economical output allocation while satisfying the stability constraints of the power system; and providing this as an output command to a plurality of adjustment power sources.
Citation Information
Patent Citations
The simian [huaidokioyuusuruporikarubonsannoseizouhou[huaidokioyuusuruporikarubonsannoseizouhou]
JP1975077316A
Power supply and demand control system, power supply and demand control program and power supply and demand control method
JP2019187099A
Power supply-demand control device, power supply-demand control system, and power supply-demand control method
JP2020039222A
Frequency controller and frequency controlling method
JP2020089175A
Management device, management method, and management system
WO2019187359A1