Information processing system, information processing device, information processing method, and information processing program
The information processing system optimizes charging facility use for both registered and unregistered EVs on expressways by managing reservations and predicting energy supply, addressing inefficiencies in existing systems.
Patent Information
- Application Number
- JP2023142216
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2023-09-01
- Publication Date
- 2024-09-17
- Estimated Expiration
- 2039-04-01
AI Technical Summary
Existing information processing systems for electric vehicles (EVs) on expressways fail to efficiently manage charging facilities for both registered and unregistered EVs, leading to inefficiencies in the use of service/parking areas with charging equipment.
An information processing system that manages charging equipment reservations for registered EVs while also accommodating unregistered EVs by creating a travel plan that includes energy supply points, using a predictive model to optimize energy supply and manage waiting orders for both types of EVs.
Ensures efficient use of charging facilities for all EVs, reducing waiting times and optimizing energy supply by integrating registered and unregistered EVs into a unified charging plan.
Smart Images

Figure 0007551874000025 
Figure 0007551874000020 
Figure 0007551874000008
Abstract
Description
[Technical field]
[0001] An embodiment of the present invention relates to an information processing system, an information processing device, an information processing method, and an information processing program. [Background technology]
[0002] An information providing navigation system for electric vehicles (EVs) is a system that refers to map information, accurately predicts the reachable range of an EV when the EV is using a highway (toll road), and recommends service / parking areas (step SA / PA) with charging facilities that should be used by the user. It is necessary to create a plan that allows the user to use SA / PA with charging facilities efficiently so that the EV does not run out of power. A prediction model of the EV's power consumption is used to estimate the reachable range of the EV.
[0003] However, not all EVs that use expressways are necessarily managed by the information processing system, and there may be EVs that are not registered in the information processing system, or EVs that are registered but do not use the services of the information processing system (hereinafter referred to as external EVs). [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2003-262525 A [Patent Document 2] JP 2014-038048 A [Patent Document 3] JP 2010-267110 A Summary of the Invention [Problem to be solved by the invention]
[0005] However, if a plan to use charging facilities at SA / PAs is made without taking into account the existence of external EVs that are not managed by the EV information system, it is not necessarily possible to recommend efficient use of charging facilities at SA / PAs for EVs using this service. Similarly, it would be desirable for external EVs to be able to use the charging facilities at SA / PA efficiently with simple procedures.
[0006] The present invention has been made in consideration of the above, and aims to provide an information processing system, information processing device, information processing method, and information processing program that, when an EV pre-registered in an EV information system uses charging equipment at an SA / PA, improves the accuracy of management of the use of the charging equipment by the pre-registered EV, while also managing information on external EVs that use the charging equipment that is not pre-registered in the EV information system, thereby enabling efficient use of the charging equipment at the SA / PA. [Means for solving the problem]
[0007] According to an embodiment, an information processing system includes a plurality of energy supply points, and when an energy supply request is received from a mobile object, the information processing system makes a reservation for an energy supply point recommended from the plurality of energy supply points. of Said use person a mobile information terminal that transmits information including destination information set by a registered user; an information processing device that receives a reservation request for energy supply for the first moving body, creates a driving plan including the energy supply point to which energy supply is recommended for the first moving body based on the destination information included in the received reservation request, and acquires a waiting position for energy supply for the recommended energy supply point; and Accepted The first movement Body Based on reservation request Replying to @sarah_mcdonald Present the energy supply queue information of the energy supply point. After, unmanaged, which has not been registered in the system beforehand The first 2. About moving objects NoE Energy supply request received Attachment hand, Regarding the second moving body and an information communication terminal that acquires the energy supply order. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a block diagram showing a schematic configuration of an information processing system according to an embodiment. [Diagram 2] FIG. 2 is a block diagram of the information processing device according to the embodiment. [Diagram 3] FIG. 3 is an explanatory diagram of a processing procedure in the information processing system according to the embodiment. [Figure 4] FIG. 4 is an explanatory diagram showing an example of an initial display screen of a local information device. [Diagram 5] FIG. 5 is an explanatory diagram of an example of a charging order status display screen. [Figure 6] FIG. 6 is an explanatory diagram of an example of the charge acceptance screen. [Figure 7] FIG. 7 is an explanatory diagram of an example of a PIN input screen. [Figure 8] FIG. 8 is an explanatory diagram of an example of a screen for changing or canceling acceptance of charging. [Figure 9] FIG. 9 is an explanatory diagram of an example of the charge start screen. [Figure 10] FIG. 10 is a diagram illustrating an example of route information between supply points. [Figure 11] FIG. 11 is an explanatory diagram of an example of route information between supply points, expressed in the form of a network structure. [Figure 12] FIG. 12 is an explanatory diagram of traffic counter management information managed by the traffic counter. [Figure 13] FIG. 13 is a diagram illustrating an example of the traffic counter information. [Figure 14] FIG. 14 is a diagram illustrating an example of the charger information. [Figure 15] FIG. 15 is a diagram illustrating an example of weather information. [Figure 16] FIG. 16 is a diagram illustrating an example of the vehicle information. [Figure 17] FIG. 17 is an explanatory diagram for a case where the amount of power consumption in a certain section is calculated as the consumption history information. [Figure 18] FIG. 18 is a diagram illustrating another example of calculating the power consumption amount. [Figure 19] FIG. 19 is a diagram illustrating an example of the learning data (travel data). [Figure 20] FIG. 20 is a diagram illustrating an example of the classification rule. [Figure 21] FIG. 21 is a flowchart of an example of the operation of the model management unit. [Figure 22] FIG. 22 is a flowchart showing an example of the operation of the model management unit 31. [Figure 23] FIG. 23 is an explanatory diagram of an example of a model management table. [Figure 24] FIG. 24 is an explanatory diagram of an example of a driving management database for an expressway. [Diagram 25] FIG. 25 is a flowchart of an operation example of the virtual EV management unit. [Figure 26] FIG. 26 is a diagram illustrating an example of a driving plan for one virtual EV. [Figure 27] FIG. 27 is an explanatory diagram of an example of the arrangement of virtual EVs. [Figure 28] FIG. 28 is an explanatory diagram of a specific example of creating a driving schedule in the first example. [Figure 29] FIG. 29 is an explanatory diagram of a specific example of creating a driving schedule in the second example. [Diagram 30] FIG. 30 is a flowchart of an example of a process for generating probability information for each interchange. [Diagram 31] FIG. 31 is an explanatory diagram of a process for identifying points that an EV can reach in order to create a charging plan for the EV. [Diagram 32] FIG. 32 is a diagram illustrating an example of the overall charging plan data including a charging plan for only a virtual EV. [Diagram 33]FIG. 33 is a diagram for explaining an example of data after the addition of a system-registered EV. [Diagram 34] FIG. 34 is a diagram illustrating an example of the recommendation data to be transmitted to an EV registered in the system. [Diagram 35] FIG. 35 is a flowchart showing an example of the operation of the information processing device according to the present embodiment. [Diagram 36] FIG. 36 is a diagram showing a hardware configuration of an information processing device 101 according to this embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] Next, a preferred embodiment will be described in detail with reference to the drawings. In the following explanation, an EV will be used as an example of a moving body, but the present invention can be applied to moving bodies other than EVs as well, such as trains, hybrid cars, fuel cell cars, airplanes, drones, electric motorcycles, cars with diesel engines, ships, etc.
[0010] In this embodiment, since the moving body is assumed to be an EV, the energy supply is referred to as charging, the supply point is referred to as a charging station, and the energy supply device is referred to as a charger. However, if the moving body is a gasoline-powered vehicle, the energy supply can be read as refueling, and the supply point as a gas station and a refueling device. If the moving body is an airplane or a drone, the road can be read as an air route, and if it is a ship, the road can be read as a sea route. In this way, the same processing as in this embodiment is possible for moving bodies other than EVs.
[0011] Now, an EV uses the charging power (charging energy) stored in its battery to travel on roads, which are traffic routes, and travel to various locations. The EV point is not limited to an energy supply point but may be any point on the map, such as a home, a restaurant, a store, or a point arbitrarily designated by the EV user. However, the EV point in this embodiment refers to an energy supply point, which is a point where the EV is charged.
[0012] An EV is supplied with power at an energy supply point (hereinafter referred to as a supply point or charging point), and the supplied power is stored in a battery. The EV then travels using the power stored in the battery. In order for the EV to continue traveling, it must move to the next supply point and receive a supply of power at that supply point before the battery runs out of power. In this way, the EV moves to its destination while charging at each supply point. One or more chargers (energy suppliers) are installed at the supply point, and the EV receives a supply of power by connecting to any charger via wire or wirelessly. The communication unit 11 communicates with various information devices, various servers, etc. via a communication network.
[0013] FIG. 1 is a block diagram showing a schematic configuration of an information processing system according to an embodiment. The information processing system 100 is roughly divided into an information processing device 101, information devices 201A to 201N and 211A to 211N, and a communication network 220.
[0014] As shown in FIG. 1, the information processing device 101 is connected via a communication network 220 to information devices 201A to 201N and servers 211A to 211N.
[0015] Next, the configuration of the information processing device will be described. FIG. 2 is a block diagram of the information processing device according to the embodiment. As shown in FIG. 2, the information processing device 101 includes a communication unit 11, a user ID registration unit 12, an EV navigation usage registration unit 13, a user database (DB) 14, a map information management unit 15, a road control information management unit 16, a charger information management unit 17, a weather information management unit 18, a vehicle information management unit 19, a system database (DB) 20, and a control unit 21.
[0016] The information processing device 101 also includes a model management unit 31, a model database (DB) 32, a prediction unit 41, a driving state management unit (first management unit) 51, a driving management database 52, a virtual EV management unit (second management unit) 61, a virtual EV database (DB) 62, a charging planning unit (planning unit) 71, and a charging plan database 72. Additionally, the information processing device may include an input device for an operator to input instructions or data to the device, and a display device for displaying data to the operator.
[0017] Examples of the input device include a keyboard, a mouse, a touch panel, and a microphone for voice input. Examples of the display device include an LCD (liquid crystal display), a CRT (cathode ray tube), and a PDP (plasma display).
[0018] The information processing device 101 is an information providing system for EVs that recommends energy supply points to EVs using expressways (toll roads). Moreover, the information processing device 101 is installed, for example, in a facility management company or a traffic control station. However, the information processing device 101 can also be incorporated into a car navigation system of an EV (hereinafter, car navigation) or installed on the roadside. When installed on the roadside, the information processing device can also be configured so that an operator can remotely operate the information processing device.
[0019] The user ID registration unit 12 of the information processing device 101 receives a user registration request from the information device 201 and performs user registration for the service (EV navigation service) of the information provision system for EVs according to this embodiment. For example, the user operates the information device 201 to open an application or web page for user registration for the EV navigation service, and accesses the user ID registration unit 12.
[0020] The user ID registration unit 12 also acquires personal information of the user and information of the EV used by the user (vehicle type, battery capacity, battery deterioration level, cumulative mileage, tire type, etc.), which are treated as user information. The user ID registration unit 12 issues a user ID (EV_ID) to the user, associates the user ID with the user information, and registers it in the user database 14.
[0021] The EV navigation usage registration unit 13 of the information processing device 101 receives a usage registration request from the information device 201 and performs usage registration to start the EV navigation service. For example, when the user goes out, the user operates the information device 201 at home or in the EV to open an application or web page for receiving the EV navigation service, and transmits a usage registration request including information necessary to receive this service from the information device 201 to the EV navigation usage registration unit 13.
[0022] For example, information transmitted may include the date and time of the trip, the scheduled departure date and time from the departure IC (interchange) (current date and time, scheduled departure date and time from home, etc.), the departure point (the departure IC on the expressway, etc.), the destination (the destination IC, etc.), the EV's battery capacity (may be omitted if already notified at the time of user registration), the degree of battery deterioration (may be omitted if already notified at the time of user registration), the remaining battery charge of the EV, the air conditioning usage status (on / off, set mode, temperature setting, etc.), the accumulated mileage (may be omitted if already notified at the time of user registration), the type of tires (may be omitted if already notified at the time of user registration), and the number of passengers.
[0023] If the information device 201 is a car navigation system, the information transmitted may be information set in the car navigation system, or if the information device 201 is a smartphone or the like, the information transmitted may be information entered by the user. The acquired information is referred to as usage registration information. The EV navigation usage registration unit 13 issues an ID (driving ID) for this service usage, associates the driving ID with the usage registration information, stores it in the user database 14, and also notifies the driving state management unit or the model management unit, or both, which will be described later.
[0024] In addition, the information processing device 101 communicates with the user's information device 201 after user registration to obtain information such as GPS location information, current time, remaining battery power (battery charge), and air conditioner usage status, and notifies the driving status management unit 51 or the model management unit 31, or both, which will be described later.
[0025] The timing of communication can be real time, at regular intervals, when a specific IC such as a departure IC registered by the user is passed, when this device issues a request and receives a response, when entering or leaving a service area / parking area (step SA / PA), when passing near an SA / PA, etc.
[0026] The user database 14 holds information registered by the user ID registration unit 12 and the EV navigation usage registration unit 13. The user database 14 is a hardware storage device, such as a memory device, a hard disk device, or an SSD device.
[0027] The control unit 21 controls each unit of the information processing device 101, thereby controlling the entire information processing device 101 and realizing the operation of the information provision system for EVs.
[0028] The map information management unit 15 acquires map information from the server 211 , and stores and manages the acquired map information in the system database 20 . In this case, map information is information that represents the position (latitude, longitude), size, range, etc. of map elements. For example, it includes altitude information associated with each position on the map, distance information for each route (each route on an expressway, each route on a general road, etc.), gradient, angle of curve, route, direction, KP (kilometre post), shape of JCT (junction), tunnels, lights (places other than tunnels), and road surface conditions (pavement conditions, etc.).
[0029] The map information also includes the number of lanes on expressways, the locations of interchanges (ICs), and service areas / parking areas (step SA / PA). The map information also includes information on supply points, SA / PA points, ICs and JCTs as the above map elements.
[0030] The map information may also include route information between supply points, SA / PA points, ICs and JCT points, such as route distance information and information on the required driving time for the route.
[0031] The information devices 201A to 201N are, for example, communication terminals held by users (smartphones, tablet devices, mobile phones, notebook PCs, etc.), in-vehicle devices such as car navigation systems installed in EVs, shared communication terminals installed at supply points where EVs are charged, chargers, communication devices provided at ITS spots, etc.
[0032] In the following description, for ease of understanding, an example will be described in which the information device 201N functions as a shared communication terminal installed at a supply point where EVs are charged.
[0033] The information devices 201A to 201N are capable of communicating with the information processing device 101 in real time.
[0034] The communication terminal as an example of the information devices 201A to 201N may be operated by another passenger (e.g., a person sitting in the passenger seat) of the EV driven by the user. Alternatively, the user may operate the communication terminal and another person may drive the EV. Input to the communication terminal may be manual input or voice input.
[0035] In addition, a device (hereinafter, referred to as an ETC2.0 device) that is installed on the roadside and conforms to the ETC2.0 standard as another example of the information devices 201A to 201N is a communication device that can communicate with at least one of a communication terminal and a car navigation system. The ETC2.0 device is placed, for example, at a plurality of predetermined spots. The predetermined spots may be ITS spots, points along a route, service areas on a highway, toll booths, buildings, etc.
[0036] The ETC 2.0 device may be installed at the entrance and exit of the supply point, in which case it may detect the entry time, exit time, and number of EVs entering and exiting.
[0037] In the following description, when there is no need to distinguish between the information devices 201A to 201N, they will be collectively referred to as the information device 201.
[0038] The servers 211A to 211N are a map information management server that manages map information, a weather information management server that manages weather information, a vehicle information management server that manages vehicle information, a charger information server that manages charger information, a road control information server that manages road control information, etc. Servers other than those listed here may also be arranged. In the following description, when there is no need to distinguish between these servers 211A to 211N, they will be collectively referred to as server 211.
[0039] The communication network 220 may be a wired or wireless network or a hybrid network of these. The communication network 220 may include a relay device such as a wireless LAN access point.
[0040] FIG. 3 is an explanatory diagram of a processing procedure in the information processing system according to the embodiment. The information processing system 100 of this embodiment functions as an information providing navigation system for EVs. For this reason, the information processing system is represented as an EV charging navigation system in FIG.
[0041] First, the flow of the processing in the information processing system 100 differs depending on whether or not the user is registered in the information processing system 100 (a user of a system-registered EV [=first mobile object]).
[0042] First, a processing procedure will be described for the case where the user is a user registered in the information processing system 100 (a user of a system-registered EV).
[0043] First, if the user is registered in the information processing system 100 (step S11; Yes), the user inputs the departure point, destination, and remaining battery level via a mobile information terminal such as a smartphone, and departs (step S12).
[0044] As a result, the information processing device 101 searches for SA / PA that the user (the user's EV) can reach and that has available charging facilities, by a processing procedure described later (step S13).
[0045] At this stage, since the queue management database may already contain charging waiting orders (=energy supply waiting order information) corresponding to other users (users of registered EVs (=first moving bodies) registered in the information processing device 101, virtual users of virtual EVs (=third moving bodies), and users who have obtained their orders and are users of external EVs (second moving bodies) not registered in the information processing device 101), the information processing device 101 checks the orders (=energy supply waiting order information) (step S14).
[0046] Next, the information processing device 101 determines whether or not there is a waiting list for charging (step S15). If it is determined in step S15 that there is a waiting list for charging (step S15; Yes), the information processing device 101 recommends and presents a location with a shorter waiting list (SA / PA that is reachable and has charging facilities available), obtains the waiting list (step S16), and updates the waiting list management database (step S18).
[0047] On the other hand, if it is determined in step S15 that there is no one waiting in line for charging (step S15; No), the system recommends and presents the farthest SA / PA that the user (or his / her EV) can reach and that has charging facilities available, obtains the order (step S17), and updates the order management database (step S18).
[0048] Next, based on the current location of the user (or his / her EV) obtained, the information processing device 101 determines whether the user has arrived at the location (charging location) where the charging facility of the SA / PA for which the user has taken his / her turn is located (step S19).
[0049] When the user arrives at the location (charging location) where the charging equipment of the SA / PA that was selected in step S19 is installed, the charger is connected to the user by priority or wirelessly and charging begins (step S20).
[0050] Then, when charging is completed, the user starts traveling again (step S21).
[0051] On the other hand, if the information processing device 101 determines in step S19 that the user has not yet arrived at the location (charging location) where the charging equipment of the SA / PA for which the user has taken his / her turn is located, the information processing device 101 determines whether the user has passed the charging location (whether the user is traveling beyond the entrance to the corresponding SA / PA) (step S22).
[0052] In the judgment of step S22, if the user has not yet passed the charging location where the charging equipment of the SA / PA for which the user has taken his / her turn is installed (step S22; No), the information processing device 101 judges whether there are other users who have already arrived at the charging location and are waiting for their turn (step S23).
[0053] If it is determined in step S23 that there are no other users who have already arrived at the charging location and are waiting for their turn (step S23; No), the user is allowed to continue driving (step S24), and the process transitions back to step S19 to repeat the same process as described above.
[0054] In the determination in step S23, if there is another user who has already arrived at the charging location and is waiting for his / her turn (step S23; Yes), the information processing device 101 determines whether or not the user can arrive at the charging location within a predetermined time (10 minutes in the example of FIG. 3) (step S25).
[0055] If it is determined in step S25 that the user can arrive at the charging location within a predetermined time (10 minutes in the example of FIG. 3), the user is allowed to continue driving (step S24), and the process returns to step S19 to repeat the same process as described above.
[0056] If it is determined in step S25 that the user is not expected to arrive at the charging location within a predetermined time (10 minutes in the example of FIG. 3) (step S25; No), the information processing device 101 recommends and presents a location with a shorter waiting line (a SA / PA that is reachable and has charging equipment available), obtains the line (step S16), and updates the line management database (step S18).
[0057] Then, the information processing device 101 shifts the process to step S13, and repeats the same process as described above.
[0058] On the other hand, if it is determined in step S22 that the user has passed a charging location where charging equipment for the SA / PA for which the user has already taken his / her turn is installed (step S22; Yes), the information processing device 101 updates the turn management database, cancels the user's turn at that charging location, transitions to step SS13, and repeats the same process as described above.
[0059] Next, a processing procedure in the case where the user is an EV (=second moving object) that is not registered in the information processing device 101 will be described.
[0060] If the user is not registered with the information processing device 101 (step S11; No) and the user arrives at a location where a charging device is located in an SA / PA where any charging equipment can be used (step S31), the user checks the waiting position for charging using a local information communication terminal installed at the charging location (a charging device with communication functions, an operation panel with communication functions installed adjacent to the charging device, a mobile information terminal in a stationary state, etc.) (step S32).
[0061] The processing of the information processing device 101 will be described below with reference to the display on the local information device and the user's operation. FIG. 4 is an explanatory diagram showing an example of an initial display screen of a local information device. Here, it is assumed that the local information device 201N is provided with a touch panel display that functions as an operation unit and a display unit.
[0062] On the initial display screen of the local information device 201N, a menu screen G11 of the charging order management system is displayed as a screen of the information processing system 100.
[0063] As shown in FIG. 4, the menu screen G11 of the charging order management system displays a button B11 for checking the charging order status, a button B12 for starting charging, a button B13 for changing or canceling the acceptance of charging, and a button B14 for starting charging, which is operated when starting charging.
[0064] The user is not registered in the information processing device 101 and has not yet acquired his / her turn for charging, so the user touches, for example, a button B11 for viewing the charging turn status.
[0065] FIG. 5 is an explanatory diagram of an example of a charging order status display screen. As a result, the display screen of the local information device 201N transitions from the menu screen G11 of the charging order management system to a charging order status confirmation screen G12. The charging order status confirmation screen G12 displays the number of groups waiting for their turn at the current time (two in the example of FIG. 5), the confirmation time, and waiting information for multiple groups (eight groups in the example of FIG. 5), and also displays a back button B21 for returning the display to the menu screen G11.
[0066] In the example of Figure 5, the waiting information displayed indicates that two groups, reception number "123" (first in the reception order) and reception number "254" (second in the reception order), are waiting their turn to charge. In this case, the user determines whether or not there is a waiting line for charging at the charging device (step S33).
[0067] Specifically, when there is a waiting line for charging on the charging order status screen G12, as in the example of Figure 5 (step S33; Yes), the user who is about to perform the charging acceptance process checks the charging order status, presses the back button 21 on the charging order status confirmation screen G12, and touches the charging acceptance start button B12 to obtain the charging order (step S34).
[0068] FIG. 6 is an explanatory diagram of an example of the charge acceptance screen. As a result, the display screen of the local information device 201N transitions from the menu screen G11 of the charging order management system to a charging acceptance screen G13. The charging reception screen G13 displays the reception order at the charging device (in the example of Figure 13, "No. 3" = energy supply waiting order information), and displays a message prompting the user to enter a PIN number (in the example of Figure 13, any four-digit number) to complete the reception.
[0069] FIG. 7 is an explanatory diagram of an example of a PIN input screen. In this state, when the user touches the display screen, the display transitions from the charging acceptance screen G13 to a PIN input screen G14, and a numeric input panel P31 for inputting a PIN, a display area D31 for the input PIN, and an acceptance button B31 for confirming the PIN are displayed.
[0070] The user then operates the numeric input panel P31 to input a desired PIN number, and when the desired PIN number is displayed in the PIN number display area D31, touches the Accept button B31 to complete the acceptance process.
[0071] It should be noted that, in order to change or cancel the acceptance of charging after the acceptance process, the button B13 for changing or cancelling the acceptance of charging is touched on the menu screen G11.
[0072] FIG. 8 is an explanatory diagram of an example of a screen for changing or canceling acceptance of charging. As a result, the display screen of the local information device 201N transitions from the menu screen G11 of the charging order management system to a charging acceptance, change, or cancellation screen G15, and displays a number input panel P41 for inputting a PIN, a display area D41 for the input PIN, and an acceptance button B41 for confirming the PIN.
[0073] The user then operates the numeric input panel P31 to input the PIN number that was set when accepting charging, and when the desired PIN number is displayed in the PIN number display area D31, the user touches the acceptance button B41 to move to the charging acceptance change / cancellation process and carry out the process.
[0074] When the input on the PIN input screen G14 is completed, the information processing device 101 updates the queue management database to record information on the user's waiting status (step S35).
[0075] Then, the information processing device 101 determines whether or not there is a waiting list for charging (step S36).
[0076] In the determination of step S36, if there is still someone waiting their turn to charge (step S36; Yes), the charging turn status screen G12 is displayed on the local information device 201N, so that the user waiting their turn to charge can check his or her turn.
[0077] On the other hand, if it is the user's turn to charge (step S36; No), the user touches the button B14 for starting charging on the menu screen G11 of the local information device 201N to display a charging start screen.
[0078] FIG. 9 is an explanatory diagram of an example of the charge start screen. The charging start screen G16 displays a reception number ("125" in the example of FIG. 15), a numeric input panel P41 for inputting a PIN, a display area D41 for the input PIN, and a charging start button B41 for instructing the start of charging.
[0079] The user then connects the charging connector (in the case of a wired connection) or faces the power receiving unit to the power transmitting unit (in the case of a wireless connection), and operates the numeric input panel P41 to input the PIN number that the user has entered. When the desired PIN number is displayed in the PIN display area D41, the user touches the start charging button B41 to instruct the start of charging (step S20). Then, when charging is completed, the user starts traveling again (step S21).
[0080] On the other hand, when it is determined in step S33 that there is no waiting for charging on the charging order status screen G12 (step S33; No), the user who is about to perform the charging acceptance process checks the charging order status, presses the back button 21 on the charging order status confirmation screen G12, and touches the charging acceptance start button B12 to obtain the charging order (first in the acceptance order: charging possible immediately) (step S38).
[0081] As a result, the information processing device 101 updates the queue management database to record information about the user's waiting status (step S39). Then, the user connects the connector for charging (in the case of a wired connection) or faces the power receiving unit to the power transmitting unit (in the case of a wireless connection) and performs the same operations as described above to display the above-mentioned charging start screen G16.
[0082] Then, the user operates the numeric input panel P51 of the local information device 201N to input the PIN that he or she has set, and when the desired PIN is displayed in the PIN display area D51, the user touches the charging start instruction button B51 to instruct the start of charging (step S20).
[0083] Then, when charging is completed, the user starts traveling again (step S21).
[0084] As described above, according to this embodiment, even an EV that is not registered for use in the EV information provision system (information processing system), a so-called external EV, cannot make a reservation for charging using any device other than the local information device 201N installed at the charging equipment, but by using the local information device 201N, it is possible to use the charging equipment at the SA / PA using a simple procedure similar to that of a registered user of the information processing system 100.
[0085] In this case, as described below, the information processing system 100 assumes the existence of an external EV (second moving body) and uses a virtual EV (third moving body) to generate a driving plan for a registered user of the information processing system 100, who is the user of the registered EV (first moving body), and provides information to the user of the external EV and the user of the registered EV based on the generated driving plan, so that no user will be made to wait longer than necessary for charging.
[0086] Next, a process in which the information processing device 101 determines an SA / PA that the user (the user's EV) can reach and for which charging facilities can be used in step S13 described above will be described.
[0087] FIG. 10 is a diagram illustrating an example of route information between supply points. As shown in FIG. 3, examples of route information between supply points include information identifying adjacent supply points for a given supply point, distance information to the adjacent supply point, gradient difference information to the adjacent supply point, altitude difference information to the adjacent supply point, required time (required driving time) information to the adjacent supply point, required energy information to reach the adjacent supply point, electricity cost information to the adjacent supply point, etc.
[0088] In this case, the time required to reach the adjacent supply point may be the average value of past measurements, or the time required to travel a distance at a predetermined speed.
[0089] Furthermore, the energy required or electricity cost required for traveling the route may be a statistical value of actual results (average value, median value, etc.), or may be a value calculated by a formula or a simulation.
[0090] In this case, the route information may be expressed in a general network structure. FIG. 11 is an explanatory diagram of an example of route information between supply points, expressed in the form of a network structure. In this case, the nodes corresponding to the supply points Q1 to Qn are connected by links corresponding to routes as shown by dashed lines.
[0091] In FIG. 11, links connect adjacent supply points. Therefore, for example, it can be seen that the supply point Q1 is adjacent to the supply points Q3 and Q2, and that there is one route from the supply point Q1 to the supply point Q3, and one route from the supply point Q1 to the supply point Q2.
[0092] Furthermore, the link is represented by both nodes connected by the link, and is assigned the characteristics of the route between the supply points, although the notation of the route characteristics is omitted in FIG.
[0093] In the example of FIG. 11, a network structure including only supply points is shown, but SA / PA points, ICs and JCTs may also be included as nodes in addition to supply points.
[0094] The map information may also include traffic counter (TC) management information that identifies traffic counters (TCs) that exist in sections between the supply points. A traffic counter is a device that acquires information about traffic in sections between the supply points. A traffic counter is an example of the above map element.
[0095] FIG. 12 is an explanatory diagram of traffic counter management information managed by the traffic counter. Traffic counter management information (hereinafter referred to as TC management information) is traffic counter data that represents supply point data, adjacent supply point data, and information on traffic counters that exist between the supply points.
[0096] 12, supply point data=Qj, phosphorus cell supply point data=Qj', traffic counter data=TC1, TC2, ... are stored. The multiple traffic counters (TC1, TC2, ...) in the traffic counter data do not need to be arranged in the order in which they are stored.
[0097] The map information management unit 15 may obtain all or part of the map information from the server 211 at regular intervals or in real time, and update the map information.
[0098] The road control information management unit 16 acquires road control information for each route (section) from the server 211, and stores and manages the acquired information in the system database 20. Examples of road control information include traffic counter (TC) information and ETC information (number of entering vehicles, number of exiting vehicles, EV models, remaining battery power of EVs, etc.). Other information on occurring events includes road closures, congestion, accidents, broken-down vehicles, construction, fallen objects, fires, disasters, speed restrictions, etc. Examples of forecast information include traffic congestion forecast, accident occurrence forecast, sudden heavy rain forecast, landslide forecast, etc. The installation positions of the traffic counters are known in advance from the above map information (see FIG. 5).
[0099] FIG. 13 is a diagram illustrating an example of the traffic counter information. The traffic counter information includes, for example, speed information [km / h], occupancy information [%], traffic volume information [vehicles / h], and vehicle density information [vehicles / km], and is stored in chronological order of acquisition. In the above configuration, the speed information is expressed as, for example, an average speed, a maximum speed, a minimum speed, etc. for each fixed period of time.
[0100] Furthermore, the road control information management unit 16 may acquire road control information from the server 211 at regular time intervals or in real time. Also, the road control information may be acquired from the server 211 every time the road control information is updated. The road control information management unit 16 may acquire traffic counter information directly from a traffic counter, not from the server 211. Time is assigned to the row name, and the traffic counter (TC) ID is assigned to the column name. A speed (average speed) value is stored in each element of the table. In the following, the case of traffic counter information is mainly assumed as the road control information.
[0101] The charger information management unit 17 acquires charger information about one or more chargers (energy supply devices) installed at each supply point from the server 211. The charger information management unit 17 stores and manages the acquired charger information in the system database 20. The charger information management unit 17 keeps track of the number of chargers at each supply point.
[0102] FIG. 14 is a diagram illustrating an example of the charger information. The charger information includes, for example, the user ID (EV_ID) of the user (EV navigation user) who performed charging at the charger, the supply point ID, the start charge amount, the end charge amount, the charge start time, and the charge end time as shown in Fig. 14. Other information such as charging efficiency and the number of charges may also be stored.
[0103] In the above configuration, the starting charge amount is the amount of power stored in the EV's battery at the time charging starts at the charger. The final charge amount is the amount of energy stored in the EV battery at the time charging at the charger ends. The difference between the final charge amount and the start charge amount is the amount of energy charged in the EV.
[0104] Instead of the start charge amount and the end charge amount, the charger information may include information on either the start charge amount or the end charge amount and the amount of charged power. In the case of an external EV (an EV that is not registered as a user in the EV information system, or an EV that is registered as a user but does not use the services of the EV information system (not registered for use), any numerical value may be entered in the user ID column. The charger information indicates the energy supply history at the corresponding supply point. The charger information management unit 17 may acquire the charger information from the server 211 at regular intervals or in real time.
[0105] The charger information management unit 17 may obtain the charger information by direct communication from the charger, not from the server 211. Alternatively, the user may input the charger information (such as GPS location information and the amount of charged power) to the information device 201, and the charger information management unit 17 may obtain the charger information from the information device 201. Alternatively, the information device 201 (an in-vehicle device such as a car navigation system) may read information on the amount of charged power from the EV, and transmit the charger information to the information processing device 101.
[0106] The weather information management unit 18 acquires weather information from the server 211 , and stores and manages the acquired weather information in the system database 20 .
[0107] FIG. 15 is a diagram illustrating an example of weather information. The weather information includes, for example, temperature, rainfall, amount of precipitation, wind speed, wind direction, total solar radiation, amount of snowfall, road surface temperature, luminosity, visibility (fog), radiation, and sudden heavy rain for each predetermined region and date and time. In addition to past and current weather information, the weather information may also include predicted weather information if future predicted weather information is available. The weather information management unit 18 may obtain weather information from the server 211 at regular intervals or in real time.
[0108] The vehicle information management unit 19 obtains information (vehicle information) such as the vehicle model ID, EV manufacturer, battery capacity, battery type (lithium ion battery, etc.), total weight (weight of the EV when fully loaded or weight of the EV itself), electricity consumption, battery deterioration rate, and release year from the server 211, and stores and manages the obtained information in the system database 20.
[0109] FIG. 16 is a diagram illustrating an example of the vehicle information. The vehicle model ID has a different value for each vehicle model. The server 211 that manages the vehicle information may be a server of the EV manufacturer, or may be a server that collectively manages vehicle model information of multiple EV manufacturers. The vehicle information management unit 19 may obtain the vehicle model information from the server 211 at regular intervals. Alternatively, the vehicle model information may be obtained from the information device 201, not from the server 211.
[0110] By using charger information for the same user in a chronological order, consumption history information can be obtained that indicates the amount of power consumed by the user for each section between supply points, driving time, driving speed, etc. As an example, driving time can be obtained by subtracting the charging end time at the previous supply point from the charging start time at a certain supply point. Driving speed (average driving speed) can be obtained by dividing the driving time by the distance of the section. It is also possible to configure the system to communicate with the EV to obtain information on driving speed and driving time in real time, and to ascertain the driving speed and driving time from the information obtained from the EV.
[0111] FIG. 17 is an explanatory diagram for a case where the amount of power consumption in a certain section is calculated as the consumption history information. Here is an example of calculating the power consumption for a certain section of travel from the charger information for the same EV. Another supply point (the supply point of the second entry) that has the closest charging start time to the charging end time at a certain supply point (the supply point of the first entry) is identified as the next supply point.
[0112] That is, the ID of the supply point Qj (previous supply point) indicated by three black circles, and the ID of the next supply point Qj' (next supply point) indicated by three triangles are specified. Also, the time when charging ended at the supply point Qj (last use end time), the time when charging started at the supply point Qj' (next use start time), the charge amount when charging started at the supply point Qj' (next start charge amount), and the charge amount when charging ended at the supply point Qj (previous end charge amount) are specified.
[0113] Then, the power consumption consumed in moving from the supply point Qj to the supply point Qj' is calculated by subtracting the next start charge amount from the previous end charge amount.
[0114] FIG. 18 is a diagram illustrating another example of calculating the power consumption amount. 18, information acquired from an information device (smartphone) is used. This information indicates an ID (EV_ID) for identifying a user, a GPS information location, and a charged amount. In this case, the amount of power consumption is calculated by subtracting the amount of charge at a certain point from the amount of charge at the next point. The GPS information point may be the coordinates obtained by GPS, or the name of a place, facility, etc. associated with the coordinates in map information.
[0115] The system database 20 holds information (sometimes called external information) acquired by each of the above management units. The external information acquired by each management unit may be held in a buffer in each management unit. The buffer is, for example, a memory device, a hard disk device, an SSD device, or a hardware storage device. The system database 20 also stores an operating system, an information processing program, and various data used in information processing. The operating system is a computer program for controlling the overall operation of the information processing device 101. The information processing program is a computer program for the information processing device 101 to realize each of the information processing functions described below. The system database 20 is, for example, a memory device, a hard disk device, an SSD device, or a hardware storage device.
[0116] The model management unit 31 uses a plurality of learning data to generate a model (prediction model) for calculating the predicted power consumption of the EV. Here, the learning data is generated using all or part of, for example, consumption history information (charger information), meteorological information, geographical information, vehicle information, road control information, and information acquired from information devices (smartphones, car navigation systems, etc.). These pieces of information are acquired from the geographical information management unit 15, the road control information management unit 16, the charger information management unit 17, the meteorological information management unit 18, the vehicle information management unit 19, and the information device 201.
[0117] The model management unit 31 generates learning data by associating all or part of the acquired information. For example, the power consumption in a certain travel section (a section between supply points), meteorological information (temperature, etc.) for the travel date and time of the route, and geographic information (distance, gradient, etc.) of the route in the certain travel section are associated with each other to generate travel data, which is used as learning data. Travel data acquired and managed by the travel state management unit 51, which will be described later, may be used as learning data. The traveling data generated for learning here and the traveling data managed by the traveling state management unit 51 may be the same as or different from each other.
[0118] FIG. 19 is a diagram illustrating an example of the learning data (travel data). As shown in FIG. 19, the learning data includes, for example, a history ID, power consumption, distance, speed, driving time, battery capacity, whether or not the air conditioner is operating, temperature, and vehicle model. The history ID is an identifier for identifying the learning data.
[0119] The power consumption is the amount of electricity used to travel the travel section. For example, it can be obtained from the charger information (history information) mentioned above. The distance is the distance of the traveled section. Speed is the average speed of the trip. The travel time is the time required to travel the travel section.
[0120] Battery capacity is the capacity of the battery installed in the EV (also called the total battery capacity). The air conditioner operation status indicates whether the air conditioner was on while the EV was running. The temperature indicates the temperature at the time of driving. The vehicle type indicates the type of EV registered by the user.
[0121] The items shown here are merely examples, and other items may be present, or some of the items shown may not be present. For example, the learning data may include information specifying the travel section, the gradient of the route, humidity, remaining battery power, and the like.
[0122] Each item in the training data corresponds to an EV feature. In the above example, the speed (average speed), distance, driving time, power consumption, whether the air conditioner is on, etc. indicate the operating status of the EV, the remaining battery charge, the degree of battery deterioration, etc. indicate the characteristics of the EV, and the temperature, gradient, etc. indicate the driving environment of the EV.
[0123] The route used by the EV to move from the delivery point Qj to the next delivery point Qj' may be identified from information (GPS information, etc.) acquired by directly communicating with the information device 201.
[0124] As another method, the route used by the EV can be estimated from the consumption history information and geographic information. When estimating the route used for travel between a supply point Qj (e.g., supply point Q1 in FIG. 11) where energy is supplied to an EV and a supply point Qj' (e.g., supply point Q6 in FIG. 11) where energy is next supplied to the EV, the shortest travel route (shortest route) from the supply point Qj to the next supply point Qj' may be estimated as the route used for travel.
[0125] Methods for solving the shortest path problem include the general Dijkstra algorithm, the Bellman-Ford algorithm, the Gabow algorithm, the Warshall-Floyd algorithm, etc. The route obtained can be expressed as a list of supply points, for example (Qj, Q4, ..., Qj').
[0126] The above generation of learning data is merely an example, and the combination of types of information used to create the learning data can be determined arbitrarily. At least one of vehicle information of the EV and road control information for the date and time when the EV is traveling may be further used to generate the learning data. The learning data is generated, for example, using information from a certain period of time in the past.
[0127] The model management unit 31 classifies a plurality of pieces of learning data into a plurality of groups (which may be called clusters) in accordance with classification rules. The classification rules include criteria based on at least one of the following: distance traveled, travel time, travel speed, remaining battery power, gradient information, temperature, vehicle type, and the like.
[0128] One or more classification rules are stored in the model database 32. The classification rules are created in advance by an operator's operation and stored in the model database 32. The classification rules may be updated by an operation of an operator. The classification rules may be created or updated by a process described later. The structure of the classification rules may be appropriately selected from a decision tree, a cluster model, and the like.
[0129] FIG. 20 is a diagram illustrating an example of the classification rule. The classification rules shown in FIG. 20 are an example of a decision tree. It includes nodes (non-terminal nodes) 301 and 302 to which features are assigned, and terminal nodes 303, 304, and 305 to which groups A, B, and C are assigned. Feature conditions (branching conditions) are set in the nodes 301 and 302, and they branch to lower nodes depending on which branching condition is satisfied. With this structure, the learning data is finally classified into one of groups A, B, and C corresponding to the terminal nodes 303 to 305.
[0130] For example, if the value of the driving speed (feature) included in the learning data is less than 40km / h and the temperature (feature) is less than 20 degrees, the learning data is classified into group A. In this example, the features of the nodes of the decision tree are only the driving speed and the temperature, but other items (e.g., gradient) may be selected as features. Also, the depth of the decision tree is 2 in the example shown in the figure, but the depth may be 1 or 3 or more.
[0131] As described below, each group is associated with a prediction model. Therefore, a decision tree is a classification rule that associates multiple conditions of feature quantities with multiple prediction models.
[0132] The model management unit 31 generates a prediction model (model parameters) for each group based on the learning data belonging to each group classified according to the classification rule. Moreover, the model management unit 31 stores the generated prediction model in the model database 32. The model database 32 stores a prediction model for each group.
[0133] There are many methods for building predictive models, including artificial intelligence, machine learning, black-box modeling, and white-box modeling that defines a physical model.
[0134] More specifically, black-box modeling is a method of modeling using regression, neural networks, support vector machines (SVMs), statistics, etc. when the characteristics of the target are unknown.
[0135] Moreover, white-box modeling is modeling that is performed by defining a physical model or the like when the characteristics of the target are known. In this embodiment, as an example, a prediction model that is a sum of multiple models is shown. In this case, each model that constitutes the prediction model may be called a submodel. The type of prediction model can generally be expressed by the following formula (1).
[0136]
number
[0137] Here, ^yi is the predicted value (output value) of the i-th model, and βi is the weighting coefficient of the i-th model. LP is the number of models. ^y is the output value of the prediction model, which is the weighted sum of the power consumption calculated by each sub-model ^yi. The number of sub-models may be one. The predicted value ^y of the power consumption indicated by the sub-model is a value including the power consumption for a section when the EV is traveling, and the sub-model may also include the power consumption of the air conditioner, the power consumption of the wipers, the power consumption of the car navigation system, and the charging capacity of the smartphone that the EV user charges in the car.
[0138] Examples of sub-models include regression models, specification models, and discrete value models. The regression model and the spec model are examples of continuous value models that treat continuous values as feature quantities. The discrete value model is an example of a discrete value model that handles discrete values as feature quantities. As an example, submodel ^y1 is a regression model, submodel ^y2 is a specification model, and submodel ^y3 is a discrete value model.
[0139] When the sub-model is a multiple regression model, the basic function ^y1=f(x) is expressed, for example, as follows:
[0140]
number
[0141] Here, w0, w1, w2, w3, ..., wn are the model parameters to be estimated. x1, x2, x3 ..., xn are input variables (features). ^y1 is the output variable. Note that, to absorb the difference in measurement units of each input variable, the output variable and all input variables may be normalized to a mean of 0 and a variance of 1 (scaling). Examples of input variables are distance, time required, outside temperature, etc. These are items included in the training data. For example, x1 is the distance, x2 is the time required, and x3 is the outside temperature. The input variables may be other values calculated from multiple items included in the training data. For example, the speed obtained by dividing the distance by the time required may be the input variable.
[0142] In the case of the spec model, the basic function ^y2=f(x) is expressed as the following equation (3).
[0143]
number
[0144] In equation (3), w is a coefficient or constant to be estimated. x is a feature. ^y2 is an output variable. w may be a fixed value (e.g., 1). x may be the value of an item included in the learning data, or may be the output value ^y1 of the regression model in (2). The power consumption calculated by the spec model depends on, for example, the vehicle model and battery capacity.
[0145] (Example where model ^y2 represents the power consumption during driving) The feature quantity x may be distance (km) / electricity consumption (km / kWh). In this case, the electricity consumption may be, for example, a catalog specification value or a coefficient to be estimated. The coefficient w may be the power consumption ratio (power consumption of vehicle type A / power consumption of vehicle type B), and the feature value x may be the power consumption of vehicle type B (a value obtained by a regression model). The power consumption ratio may be a coefficient to be estimated. In this case, it is considered that the model corresponds to a group to which vehicle types A and B belong.
[0146] The coefficient w may represent the degree of deterioration of the battery, and the feature value x may represent the amount of power consumption calculated using a regression model. The degree of deterioration of the battery may be, for example, the SoH of the EV battery / average SoH, or the accumulated mileage of the EV / average accumulated mileage. SoH (State of Health) is an index that indicates the degree of deterioration of the battery.
[0147] The coefficient w may be the total weight of the EV and the luggage / the total weight of the EV (or the average total weight), and the feature x may be the power consumption amount based on a regression model. The total weight of the EV and luggage / total weight of the vehicle (or average total weight) may be determined based on a catalog value or may be a coefficient estimated by learning. The total weight of the EV and luggage is, for example, the weight when the maximum number of people and luggage permitted in the EV are loaded.
[0148] (Example where model ^y2 represents the power consumption by an air conditioner) The feature quantity x is the air conditioner usage time (h), and the coefficient w is the coefficient to be estimated, and its unit is kWh / h. The feature quantity x is the temperature difference (Δ°C), and the coefficient w is the coefficient to be estimated, and the unit may be kWh / Δ°C.
[0149] (Example where ^y2 represents the power consumption by the wiper) The feature quantity x is the wiper usage time (h), and the coefficient w is the coefficient to be estimated, and its unit is kWh / h.
[0150] In the case of a discrete value model, the basic function ^y3=f(x) is expressed as the following equation (4).
[0151]
number
[0152] For example, a certain constant may be the power consumption of an EV's air conditioner = 3 (kWh) or the amount of smartphone charging = 1 (kWh). In the case of a discrete value model, C is the coefficient or constant to be estimated (such as the value of the catalog specifications).
[0153] The C item is included in the learning data. The power consumption by the discrete value model is, for example, the power consumption other than driving. The constant C item can be used to generate a model corresponding to a specific vehicle model, season, or road surface condition. When a feature is a discrete value with multiple values (for example, the feature represents the season, such as spring, summer, fall, winter, etc.), it can be treated in the same way as a binary discrete value by converting it into a dummy variable, which is a commonly known method.
[0154] The model parameter w in equation (2), the coefficient w in equation (3), and the constant C in equation (4) can be obtained by applying a known optimization algorithm such as the maximum likelihood method or the least squares method to equation (1).
[0155] The model management unit 31 generates a prediction model using at least one of the modeling means. A prediction model ^y is generated for each group. The generated prediction model ^y is stored in the model database 32.
[0156] In this case, the types of sub-models constituting the prediction model may differ for each group. For example, a discretized model included in the prediction model of group A may be the power consumption of an air conditioner, and a discretized model included in the prediction model of group B may be the charge amount of a smartphone. For groups with only a small amount of training data, transfer learning may also be used for the regression model.
[0157] FIG. 21 is a flowchart of an example of the operation of the model management unit. The operation for each group is carried out according to the flow chart shown in FIG. One or more candidate methods for constructing a prediction model are determined for a target group (step S101). Examples of construction methods include a model that represents the sum of a regression model, a spec model, and a discrete value model, a model that represents the sum of a regression model and a spec model, a model that represents the sum of a neural network, a spec model, and a discrete value model, etc. By further changing the type of each submodel, many more construction methods are possible.
[0158] A new prediction model is constructed using learning data belonging to a target group (step S102). The prediction models constructed by each construction method are registered as provisional models in the model database 32 (step S103).
[0159] Each provisional model is evaluated using the learning data of the target group (step S104). As an example, an evaluation value (model evaluation value) is calculated by the sum of errors (prediction errors) between the output value of the provisional model and the actual value. The provisional model with the highest evaluation (smallest model evaluation value) is selected as the prediction model (step S105). Note that the provisional models not selected may be deleted from the model database 32.
[0160] Here, each provisional model may be generated and evaluated using a cross-validation method. In this case, in step S102, the learning data belonging to the target group is divided into K pieces (cross number). K is an integer equal to or greater than 2. One of the pieces is used as test data, and the remaining K-1 pieces are used as training data. A model is constructed using the training data. In step S105, the constructed model is evaluated using the test data. Model generation and model evaluation are performed K times using each of the K pieces of divided data as test data, and an evaluation value (model evaluation value) is calculated for each. In step S105, statistics of the model evaluation value (e.g., mean, median, variance, quartile, maximum, minimum, etc.) are calculated. Based on the statistics, the provisional model with the highest evaluation is selected as the prediction model.
[0161] In this case, depending on the evaluation method, the higher the evaluation, the larger the statistical value may be, or the higher the evaluation, the smaller the statistical value may be.
[0162] Here, in the above example, the model evaluation value of the provisional model is the sum of errors between the output values of the provisional model and the actual values, but the model evaluation value is not limited to this. For example, the evaluation may be performed using the following formula (5). Here, an example of a regression formula is shown, but when using the sum of the regression model and the spec model, the difference between the actual value and the estimated value of the spec model, normalized according to the number of samples of the learning data, is added to the formula below.
number
[0163] Other examples of model evaluation values include Mean Squared Error (MSE), Mean Absolute Error (MAE), R2 value (the square of the correlation coefficient R, also known as the coefficient of determination), Root Mean Square Error (RMSE), and Root Mean Square Percentage Error (RMSPE).
[0164] A model evaluation value may be defined that takes into consideration factors other than the error between the actual power consumption value and the predicted value. For example, the model data size may be multiplied by a certain coefficient, and the model evaluation value may be obtained by adding the multiplied value to the value of the sum of the errors described above. The larger the data size of the model, the longer it takes to calculate a prediction using the model, so by making it easier to select a model with a small size, it is expected that the calculation time and amount of calculation will be reduced.
[0165] The model management unit 31 can use the classification rules given in advance as described above, and can also automatically generate the classification rules. When the classification rules are automatically generated, the classification rules are generated by the method described below, and then a process of constructing a prediction model using the classification rules is performed by the method described above.
[0166] Here, the classification rules are shown as decision trees, but are not limited to this. When the classification rules are automatically generated, the classification rules are generated and the prediction model is constructed at the same time. The decision tree is repeatedly divided in a direction that reduces the variance of the prediction error of the prediction model.
[0167] In this case, splitting a node means generating multiple child nodes for that node. For example, setting the number of divisions for a certain node (parent node) to 2 means generating two child nodes for that node. In other words, it represents splitting the data group belonging to the parent node into data groups corresponding to each child node.
[0168] In this case, it is necessary to determine the feature to be assigned to the parent node and the condition for branching based on the value of the feature. The feature to be assigned to the parent node may be an item present in the training data, or an item calculated from multiple items in the training data. The number of divisions of the parent node may be 3 or more.
[0169] Here we consider an example of developing a classification rule (decision tree) by repeatedly splitting a node into two. In other words, the classification rule is grown (the depth of the decision tree is deepened) by dividing the parent group into two groups (left group and right group). SDR (Standard Deviation Reduction) is used to determine which feature is assigned to the parent node and the value of the feature that is the condition for branching.
[0170] FIG. 22 is a flowchart showing an example of the operation of the model management unit 31. First, the number of divisions is determined (step S201). Here, the number of divisions is set to 2. The number of divisions may be a predetermined value, or may be a value determined according to the number of learning data belonging to the node to be divided or the number of items included in the learning data.
[0171] The feature to be assigned to the parent node and the feature value that serves as the branching condition (feature condition) are determined so as to maximize the SDR (step S202). Based on the determined feature condition, the learning data is divided into two child nodes (left child node (left group) and right child node (right group)). As an example, the SDR is expressed by the following formula (6). In this example, the power consumption is used as the feature. Alternatively, a prediction model can be constructed for the parent node and child node first, and the error between the predicted value and the actual measured value can be used as the feature of the SDR.
[0172]
number
[0173] A number of feature values are set as candidate conditions, and the above SDR is calculated for the multiple candidates. In this case, the candidates may be sorted by the power consumption amount belonging to the parent node, and all the values may be used as candidates. Then, the pair of feature with the highest SDR and feature condition is selected. In this way, two child nodes are provisionally generated for the parent node. Note that the SDR can be calculated in the same way when dividing into three or more. Note that in the case of dividing into three, there are, for example, two feature values that are candidates for the condition.
[0174] Using the generated decision tree, the training data is divided into multiple groups, a prediction model is generated by the above-mentioned method (step S203), and an evaluation value of the prediction model (model evaluation value) is calculated. Based on the model evaluation value of the prediction model of the parent node and the model evaluation values of the prediction models of each child node, it is determined whether the decision tree satisfies the division condition (step S204).
[0175] For example, if the model evaluation value of the predictive model of the parent node is greater than the average of the model evaluation values of the predictive models of the two child nodes (the smaller the model evaluation value, the higher the evaluation), the decision tree is determined to satisfy the splitting condition; otherwise, it is determined that the splitting condition is not satisfied. Then, in the determination at step S204, if the division condition is satisfied (step S204; Yes), the division of the parent node is confirmed, and the two provisionally generated child nodes are adopted (step S205).
[0176] Next, the process returns to step S202, and the same process as above is repeated with each child node as a parent node. When performing the process of step S202 again, feature amounts already assigned to higher-level nodes (including the parent node) may be excluded when determining candidate feature amounts to be assigned to each child node.
[0177] If it is determined in step S204 that the splitting condition is not satisfied (step S204; No), the provisionally generated child node is deleted (splitting is stopped), the child node is returned to the decision tree before it was provisionally generated (step S206), and the process ends. As a result of performing this process recursively for each child node, multiple decision trees may be identified. In this case, for example, a decision tree is finally selected from among these multiple decision trees. For example, an evaluation value (rule evaluation value) that represents the prediction error of the child node is calculated. For example, statistical values such as the average, median, and maximum value of the prediction error are calculated.
[0178] Then, the decision tree with the smallest rule evaluation value is selected. When calculating the average, the prediction error may be weighted according to the number of data items belonging to the child node (group). Also, the weight may be smaller for a group with a larger value obtained by dividing the total battery capacity (total battery capacity for the number of EVs) of the EVs belonging to the child node (group) by the power consumption (the larger the divided value, the less likely the battery will run out). Also, the number of child nodes with prediction errors larger than a threshold may be counted, and the decision tree with the smallest number may be selected. Also, the number of child nodes multiplied by a certain coefficient may be added to the value of the statistical value calculated as above to obtain the rule evaluation value. This makes it easier to select a decision tree with a small number of child nodes, thereby reducing the amount of calculation and the calculation time.
[0179] The end condition of the process may be a condition other than the above-mentioned splitting condition. For example, the process may be ended when the decision tree reaches a predetermined depth. The process may also be ended when the maximum value of the SDR becomes less than a threshold value.
[0180] The model management unit 31 manages each generated prediction model and classification rule in a model database 32. The model management unit 31 may manage the model ID of each prediction model and the coefficient of the feature amount used in each prediction model in a model management table.
[0181] FIG. 23 is an explanatory diagram of an example of a model management table. The coefficient values to be used are shown for each feature (input variable) such as power consumption and battery capacity. A feature value of 0 means that it is not used. The classification rules may be stored in the model database 32 in a format that implements a general tree structure (see FIG. 20), or may be stored in the form of a program. The model management unit 31 may also store program codes for each prediction model (program codes for functions that configure the prediction model) in the model database 32.
[0182] The prediction unit 41 predicts the power consumption of the EV in the travel section to be predicted, using the prediction model and prediction data of the EV. The prediction data is data including items used in each sub-model of the prediction model. However, the items used in the sub-model may be output values of other sub-models. The travel section to be predicted is, for example, a section to a supply point that is a next candidate for charging.
[0183] The driving status management unit 51 manages the driving status of each driving section of the EV during driving. It also manages the performance of the EV after completing the driving (EV that has left the destination IC). The driving status management unit 51 acquires driving data of the driving section between the supply points where charging was performed for the EV during driving, and manages it in the driving management database 52. The driving data is generated based on data acquired by each of the management units 15 to 19 and the EV navigation usage registration unit 13.
[0184] FIG. 24 is an explanatory diagram of an example of a driving management database for an expressway. The travel management database 52 manages, for example, the first charging point, the second charging point, and various variables for each EV. If charging has been performed three or more times, the value of the second charging point is entered in the column for the first charging point, and the value of the third charging point is entered in the column for the second charging point. If charging has been performed four or more times, the values are updated and entered in the same manner.
[0185] Time is the time required to travel the traveled section, power consumption is the power consumption (actual value) used in traveling the traveled section, and distance is the distance of the traveled section. Uphill is the length of the route where the traveled section has a gradient of a certain value or more. Downhill is the length of the route where the traveled section has a gradient of less than a certain value (expressed as a negative value).
[0186] The variables shown here are merely examples, and various types of variables are possible. For example, the total charge amount of the two charging locations may be added as the total charge amount. The traveling state management unit 51 may add the power consumption predicted for each traveling section of the EV after the traveling is completed to the traveling data of the EV. In addition, the first charging location and the second charging location may be any two locations for which the power consumption is to be calculated. There may be multiple combinations of any two locations, such as between traffic counters (TCs), between interchanges, or between an interchange and a power supply location. The traveling data may be used to update the classification rules or the prediction model, or both.
[0187] The virtual EV management unit 61 generates a virtual EV (= third moving body) that virtually sets up EVs (external EVs) that use the expressway and do not use this EV information provision system, and creates a driving plan for the virtual EV. Therefore, even if an external EV that is not actually using the services of the information processing system 100 charges at a charging device, a driving plan can be created that reduces the impact on the driving plan of the EV that is using the services of the information processing system 100.
[0188] In addition, the virtual EV management unit 61 may update the created driving plan. Specific examples of external EVs include EVs that are not registered in the EV information provision system, EVs that are registered in the EV information provision system but do not use the services of the EV information provision system, and EVs that are expected to use the EV information provision system in the future.
[0189] FIG. 25 is a flowchart of an operation example of the virtual EV management unit. This operation may be performed for a fixed period of time, for example. The virtual EV management unit 61 determines whether or not to generate virtual EVs, and if it does, determines the number of virtual EVs to be generated (step S301). If the conditions for creating a virtual EV are met, the virtual EV management unit 61 determines that a virtual EV should be created, and otherwise determines not to create a virtual EV.
[0190] For example, the conditions for generating a virtual EV may be determined to be that the virtual EV is generated at regular intervals, or that the virtual EV is generated at a time designated from the outside (eg, an operator). Alternatively, it may be decided to generate a virtual EV at a randomly determined time.
[0191] In this case, the number of virtual EVs to be generated may be a predetermined number (e.g., one per charging device), a number specified from outside (such as an operator), a number determined randomly, or a number set in advance taking into account holidays, days of the week, and time periods.
[0192] Furthermore, when the charging plan unit 71, which will be described later, creates a charging plan (energy supply plan) for a specific time period, the time at which a virtual EV is generated may be limited to within that time period.
[0193] In addition, whether or not to generate virtual EVs, or the number of virtual EVs to generate, may be determined according to the traffic conditions on the expressway, for example, based on the number of EVs currently traveling using the EV information provision system and the number of EVs currently traveling identified from road control information.
[0194] For example, if the ratio between the number of EVs using the EV information system and the number of EVs currently in motion as determined from road control information (an estimate of the number of EVs actually in motion) is less than a threshold, it is decided to generate virtual EVs. The number of EVs to be created is determined according to the difference between these numbers. The larger the difference, the larger the number of EVs to be created. As an example, the system generates the same number of virtual EVs as the difference.
[0195] Conversely, if the ratio is equal to or greater than another threshold, a predetermined number of virtual EVs (for example, one) or a number corresponding to the difference may be deleted.
[0196] In addition, the decision as to whether or not to generate virtual EVs, or the number of virtual EVs to generate, may be based on the utilization rate of chargers at each supply point (if there are multiple chargers at a supply point, the average utilization rate of multiple chargers), the utilization rate of each inlet / outlet point such as an IC, or the average utilization rate of chargers between supply points.
[0197] The utilization rate of the charger is, for example, the ratio of the time during which the charger is used to the time from a reference time to the current time. In this case, the utilization rate may be calculated in fixed time units (for example, hourly units). The higher the utilization rate, the more congested the expressway or supply point is. As an example, when the utilization rate or average is equal to or exceeds a threshold, it is decided to create virtual EVs. The higher the utilization rate or its average, the larger the number of virtual EVs to be created may be.
[0198] Furthermore, whether or not to generate virtual EVs or the number of virtual EVs to generate may be determined depending on whether the probability that the recommendation by the charging planning unit 71 is successful (recommendation success rate) is below a threshold. For example, when the recommendation success rate falls below a threshold, it is determined that virtual EVs are to be generated. The smaller the recommendation success rate, the greater the number of virtual EVs to be created. The recommendation success rate may be calculated for each time period. A successful recommendation here means that the user actually charges at the supply point recommended to the user. If a charging time is specified, a requirement for success may be that charging is performed within the specified time or within a time including a margin.
[0199] If it is determined in step S301 that a virtual EV is not to be generated (step S301; No), the process ends. In the judgment in step S301, when it is decided to generate virtual EVs (step S301; Yes), IDs (virtual EV_IDs) for the number of virtual EVs to be generated are issued (step S302). As a result, a virtual EV is generated. The virtual EV_ID can be any value as long as it does not overlap with the ID of an EV already registered by the user or with another virtual EV.
[0200] Next, the virtual EV management unit 61 determines the departure time (departure date and time), departure point (departure IC), destination (destination IC), remaining battery level at the time of departure, etc. for each virtual EV that has been created (step S303). Here, the departure time is, for example, the time of arrival at the departure IC (i.e., the time of entering the expressway from the departure IC). The items listed here are only examples, and various other items are possible, such as the vehicle type, driving speed (average driving speed), air conditioner usage status (on / off, heating / cooling, set temperature, air volume, etc.), cumulative mileage, tire type, total weight, route used by the virtual EV to travel to the destination, charging location, charging start time, charging amount, charging end time, rest location, rest start time, rest time, etc.
[0201] Then, the virtual EV management unit 61 generates a driving plan for the virtual EV by associating the value determined in step S303 with the virtual EV_ID issued in step S302 (step S304).
[0202] FIG. 26 is a diagram illustrating an example of a driving plan for one virtual EV. Although FIG. 26 shows only basic items, various other items can be included in the travel plan.
[0203] The virtual EV management unit 61 stores the created virtual EV driving plan in the virtual EV database 62 . Every time a virtual EV is generated, the virtual EV database 62 stores a driving plan for the virtual EV. The virtual EV for which a driving plan has been created is then treated as traveling to the destination at the above driving speed according to that driving plan.
[0204] The departure time of the virtual EV may be the current time, a past time, or a future time. In the case of the current time, the virtual EV may be located at the departure point, and the movement of the virtual EV thereafter may be simulated. If the departure time of the virtual EV is a time in the past, the movement from the departure time to the current time may be simulated, and the virtual EV may be assumed to be at that position, and its subsequent operations may be simulated. In addition, when a charging plan for the virtual EV is created as described below, the operation is simulated assuming that the charging plan is followed. Also, the location of the virtual EV may be determined first, and then the departure time may be determined. Furthermore, if the departure time of the virtual EV is a future time, the virtual EV may be treated as being present at the departure position when the future time arrives.
[0205] A section where virtual EVs are generated may be determined, and virtual EVs may be placed at equal intervals in that section. Here, the section may be the entire expressway, a section between the departure point and destination of an EV registered for use in the EV information provision system, or a section between supply points (for example, charging device installation points). Furthermore, the decision as to whether or not to generate a virtual EV may be made for each section. For example, the traffic conditions are checked for each section, and a decision is made as to whether or not to generate a virtual EV for each section. A virtual EV is placed in the section where it has been decided to generate a virtual EV. In other words, the departure time, departure point, destination, etc. are determined so that a virtual EV is placed in the section (or the departure time may be omitted). It is also possible to randomly determine the section in which the virtual EV is generated.
[0206] It is also possible to arrange for the virtual EV to be deployed at the delivery point. For example, for each supply point, a decision may be made as to whether or not to generate a virtual EV based on the utilization rate or average of the supply point (charger), and if the utilization rate or average is equal to or greater than a threshold, a virtual EV may be placed at the supply point. Furthermore, the departure time may be determined so as to match the position and time of the placed virtual EV (or the departure time may be omitted).
[0207] FIG. 27 is an explanatory diagram of an example of the arrangement of virtual EVs. FIG. 27(A) shows a road on which an EV registered in the EV information provision system (system-registered EV) is traveling. In this case, supply points K, L, M, and N are located on a highway, and these points K to N are SA / PAs where chargers are located.
[0208] In the following description, the section between two supply points X and Y will be referred to as section XY. One EV 402 and one EV 403 are traveling in section KL and section LM, respectively. One EV 401 is staying at supply point K, two EVs 404 and 405 are staying at supply point M, and one EV 406 is staying at supply point N (these EVs may be staying for any purpose, such as charging, resting, or shopping).
[0209] An interchange IC01 exists in the section LM, and an interchange IC02 is located after the supply point N. FIG. 27(B) shows an example of virtual EVs arranged on the road in FIG. 27(A). 27(B), a virtual EV 411 is located at interchange IC01 as the starting point. A virtual EV 412 is located in section MN. A virtual EV 413 is located at supply point N.
[0210] In the examples of Figures 27(A) and 27(B), there may actually be external EVs traveling that are not system-registered EVs; however, these external EVs are not subject to the management of this system and are therefore not shown in the figures. The virtual EV corresponds to a simulation of this external EV.
[0211] The process of creating a driving plan for the virtual EV in step S303 will be described in detail below.
[0212] [First example] For example, a period related to the day (current day) on which the driving plan is to be created is identified, and a driving plan for a virtual EV is created using the driving history of multiple EVs (EVs registered in an EV information system (system-registered EVs)) during the identified period.
[0213] As an example of a simple method, if the current day is a Sunday, for example, each Sunday of a certain month in the past (it could be the previous month, the same month a year ago, or any other month) is specified as the period, and the driving history of one EV registered in the system during that period is selected using a random number or the like. Then, the items necessary for the driving plan are extracted from the selected driving history, and a driving plan for the virtual EV is created using the values of the extracted items.
[0214] FIG. 28 is an explanatory diagram of a specific example of creating a driving schedule in the first example. The upper part of FIG. 28 shows the past driving history of the EV selected from the driving history, and the lower part of FIG. 28 shows a driving plan for the virtual EV created based on the past driving history of the EV. In the example of Figure 28, the items in the created virtual EV driving plan, except for the departure date at the departure time, are set to the same values as the EV's past driving history (the year, month, hour, minute, and second of departure are also the same). That is, the departure date in the past driving history of the EV is "DD1", but the departure date in the driving plan of the virtual EV is "DD2", which is a date later than "DD1".
[0215] Here, the past driving history of one EV is used, but the driving history of multiple EVs may be integrated. For example, for the hour, minute, and second of the departure time, a statistical value such as the average value of multiple EVs in the past is used. Furthermore, the departure point and destination may be statistical values such as the mode of multiple EVs. In this case, the departure point and destination may be determined separately, or the departure point and destination may be treated as a set and statistical values such as the mode may be obtained. Furthermore, a statistical value such as the mode of multiple EVs may be used as the vehicle type.
[0216] Regarding the number of virtual EVs determined in step S301, as described above, the number of virtual EVs to be created may be determined based on a statistical value such as the average number of EVs per day in the specified period. For example, the number of virtual EVs to be created may be the difference between the average number and the average number of EVs per day traveling in the above period obtained from road control information, or a number corresponding to the difference.
[0217] [Second example] For each item included in the driving plan (departure time, departure point, destination, remaining battery power at the departure point, etc.), the probability of multiple attributes that each item can take is stored. Based on the probability, the value of each item to be included in the driving plan to be created is determined.
[0218] FIG. 29 is an explanatory diagram of a specific example of creating a driving schedule in the second example. An example of determining the departure point (starting IC) in this example will be shown. FIG. 29(A) shows an example of a table (probability table) that holds probabilities for a number of ICs (attributes) provided on an expressway. This probability table is stored in virtual EV_DV62. The interchange IC may be either a normal IC or a smart IC. In the example shown in the figure, the probability of interchange IC01 is 0.42, and the probability of interchange IC02 is 0.55. The departure interchange IC is determined using random numbers or the like so that each interchange IC is selected with these probabilities. Here, the case of the departure point is shown, but similar probability tables may be prepared for other items as well.
[0219] The probabilities stored in the probability table are just an example, and the table may store, for example, the frequency with which each attribute was actually selected in the past. In this case, each attribute may be selected with a probability according to the magnitude of each frequency value. Note that, although an example of a departure point is shown here, probabilities may be stored in the probability table for pairs of departure point and destination in a similar manner.
[0220] In FIG. 29(A), the values that the items can take (IC01, IC02, etc.) are discrete values, but if the values that the items can take are continuous values, a probability distribution may be used. For example, a normal distribution may be used as a probability distribution. For example, consider driving speed (average driving speed) as an item.
[0221] Figure 29(B) shows an example of a normal distribution with the horizontal axis representing the driving speed and the vertical axis representing the probability. The parameters of such a normal distribution (mean value and standard deviation) are stored in advance in the virtual EV database. The driving speed is determined so that it is selected with a probability according to the normal distribution.
[0222] More specifically, the range of the normal distribution of the travel speed is divided into regular intervals, and a representative speed is calculated for each interval. The interval to which the travel speed selected from the normal distribution belongs is identified, and the representative speed of the identified interval is determined as the travel speed of the virtual EV.
[0223] The probability information such as the probability tables and probability distributions described above may be generated for all driving history over the past period, or may be generated for any time type, such as by date and time, day of the week, month, hour, minute, second, or holiday / weekday.
[0224] In this case, the values of the items (e.g., departure point, driving speed, etc.) can be determined using a probability table or probability distribution for the corresponding time type. Also, instead of determining the number of virtual EVs in advance in step S301, virtual EV IDs can be issued according to the occurrence probability of inflow and outflow in road control information or ETC2.0.
[0225] FIG. 30 is a flowchart of an example of a process for generating probability information for each interchange. Here, an example is shown in which probability information is generated that indicates the frequency, probability, or probability distribution of each interchange IC being used as a starting interchange IC, but probability information can also be generated for other items in a similar manner.
[0226] For example, indexes j (the maximum value of j corresponds to the number of the target interchange ICs) starting from 1 are temporarily assigned to the multiple interchange ICs (step S401).
[0227] First, the interchange IC with parameter j=1 is identified, and data required for processing (target data) is obtained from the past driving history corresponding to the interchange IC corresponding to the parameter j=1 (step S402).
[0228] Here, at least information regarding the departure interchange IC and date and time is obtained. Next, an index i starting from 1 is assigned to each attribute of the target time type (step S403).
[0229] For example, if the time type is day of the week, the attributes are Sunday to Saturday, with 1 being assigned to Sunday, 2 to Monday, and 3 to Tuesday. First, data relating to parameter i=1 is extracted from the target data (step S404), and based on the extracted data, the frequency, probability, or probability distribution that the interchange IC with parameter j=1 is used as the departure interchange IC is calculated (step S405).
[0230] Similarly, the frequency or probability is calculated for each day of the week from parameter i=2 onwards (steps S404, S405). As a result, for example, if the time type is day of the week, probability information indicating the frequency, probability, or probability distribution for each day of the week from Sunday to Saturday is obtained. The obtained probability information is stored in the virtual EV database 62 (step S406). Similar processing is repeated for interchanges after parameter j=2 (steps S402 to S406), whereby probability information for each day of the week is obtained for each interchange.
[0231] In the above explanation, probability information for each interchange IC was generated for each day of the week, but probability information for each IC may also be calculated for each vehicle type and for each day of the week, or other items may be added to calculate probability information.
[0232] Also, although the time type is the day of the week, it can be each day (1st to 31st), each month (January to December), each time (0:00 to 23:00), or even a time period such as morning, afternoon, evening, or late night.
[0233] Also, the probability that each interchange IC will be selected as the departure interchange IC has been shown, but as mentioned above, the probabilities of other items can also be calculated in a similar manner.
[0234] The charging plan unit 71 uses the EV information provision system to create a charging plan (energy supply plan) for the EV (system-registered EV) currently in motion and the virtual EV based on the driving state of the system-registered EV, the driving plan of the system-registered EV, and the driving plan of the virtual EV. When creating the charging plan, the usage registration data notified by the system-registered EV and the driving plan of the virtual EV are used.
[0235] In addition, the power consumption history (charging history) of an EV registered in the system since entering the departure IC, or the current driving state (current location, remaining battery level, etc.) of an EV registered in the system may be used.
[0236] In addition, external information obtained in real time (e.g., road control information, charger information, etc.) may be used. The charging plan is, for example, information about a supply point that can be reached with the current remaining battery power of an EV, and information indicating the congestion status (whether the waiting time is long or short) of the reachable supply point. The route used by an EV registered in the system may be notified by the information device 201, or may be estimated by the device from the departure point and destination. Examples of the estimation include the above-mentioned method of estimating the shortest route.
[0237] Since it is not possible to recommend a charging plan for a virtual EV, a charging plan for the virtual EV is first created, and then a charging plan for EVs registered in the system is created, assuming that the virtual EV will charge at the supply point according to the charging plan. In this case, in consideration of the case where the system-registered EV does not charge as recommended, the charging plan may be created by treating the virtual EV and the system-registered EV in the same manner.
[0238] For system-registered EVs, charging plans may be created in the order of earliest departure time for system-registered EVs. When a new system-registered EV or a new virtual EV is added, a charging plan is created for the added system-registered EV or virtual EV, and charging plans for system-registered EVs and virtual EVs created previously may be updated or maintained as is, or all charging plans may be recreated (updated) every time a new system-registered EV or virtual EV is added.
[0239] FIG. 31 is an explanatory diagram of a process for identifying points that an EV can reach in order to create a charging plan for the EV. In this case, the EV in question is a system-registered EV or a virtual EV.
[0240] In FIG. 31, supply points A, B, C, D, E, F, and G (hereinafter, points A to G) are assumed to be located on an expressway. These points A to G are SA / PAs where charging is possible, which are located along a route to the EV's destination (destination IC).
[0241] The target EV is assumed to have been charged at point A and is currently traveling between points B and C.
[0242] In the following description, the section between two supply points X and Y will be referred to as section XY. The charging plan unit 71 calculates the power consumption amounts in the sections CD, DE, EF, and FG, and calculates the remaining battery levels (here, SoC (State of Charge)) of the EVs at the supply points C, D, E, F, and G.
[0243] The charging plan unit 71 keeps track of the current location and remaining battery charge of the EV. In this case, the current position may be determined from information (such as GPS information) acquired through real-time communication with the information device.
[0244] The current remaining battery level may be calculated by using variables such as the distance from the supply point where the previous charge was performed to the current location and a prediction model to calculate the amount of power consumed up to the current location, and subtracting this amount of power consumed from the remaining battery level after the previous charge. Alternatively, the amount of power consumed may be calculated using information on the electricity consumption, which is the specification data of the EV, and subtracting this amount of power consumed from the remaining battery level after the previous charge.
[0245] The remaining battery charge at point C may be calculated by subtracting the amount of power consumed during the journey from the current location to point C from the current remaining battery charge. The amount of power consumed may be calculated based on variables such as the distance from the current location to point C, and a prediction model (the amount of power consumed may be calculated using information on the power consumption, which is the EV's specification data, and this amount of power consumed may be subtracted from the remaining battery charge after the previous charge; the same applies below). When the prediction model includes a travel speed or the like as a variable, information obtained from outside, such as the speed in the section CD indicated by the traffic counter information, may be used.
[0246] The remaining battery level at point D may be calculated by subtracting the power consumption ^ycd during travel in section CD from the remaining battery level calculated at point C. The power consumption ^ycd during travel in section CD may be calculated based on variables such as the distance from point C to point D and a prediction model.
[0247] Similarly, the power consumption ^yde for driving in section DE is calculated, and the power consumption ^yde is subtracted from the remaining battery level at point D to calculate the remaining battery level at point E. Also, the power consumption ^yef for driving in section EF is calculated, and the power consumption ^yef is subtracted from the remaining battery level at point E to calculate the remaining battery level at point F.
[0248] In addition, the power consumption ^yfg during travel in section FG is calculated, and the battery remaining capacity at point G is calculated by subtracting the power consumption ^yfg from the battery remaining capacity at point F. The battery remaining capacity at points after point G is calculated in the same manner.
[0249] If the calculated remaining battery level falls below a certain value, it is determined that the location cannot be reached with the current remaining battery level. Locations prior to that location are identified as locations within a reachable range. For example, after location G, the remaining battery level is calculated for location H, and the calculated remaining battery level for location H (not shown) falls below a certain value. In this case, locations C to G are identified (this case is assumed in the following description).
[0250] Based on the above method, the charging plan unit 71 first creates a charging plan for each virtual EV among the virtual EVs and the EVs registered in the system. First, it identifies multiple points that the virtual EV can reach, and determines the charging points for the EV based on the distribution of the remaining battery power at the identified points. As an example, it determines the first point among the identified points that is located after the remaining battery power falls below a threshold as the charging point.
[0251] For example, if the threshold is SOC=30, then the first point after which the SOC falls below 30 is point E. Therefore, in this case, point E is determined as the charging point. The charging plan unit 71 determines that the virtual EV will be charged at this point, and calculates the time when the virtual EV will arrive at the charging point (for example, from the traveling speed of the virtual EV and the distance to the charging point).
[0252] Assuming that the virtual EV will use the charger at this location for a certain period of time from the earliest available time (the earliest available time after the arrival time), charging of the virtual EV is planned, and the charging schedule is added to the driving plan of the virtual EV. In this case, if there is a charger to which a virtual EV is not assigned at the time corresponding to the arrival time (which may be the arrival time or 5 minutes after the arrival time), it may be determined that the arrival time coincides with the earliest available time.
[0253] Also, if all charging devices (chargers) have been assigned at the time of arrival, the earliest available time may be the time when a charger becomes available after that (the time may be the time when the charger becomes available, or 5 minutes after the time when the charger becomes available). Charging time is a predetermined time regardless of the remaining battery level, but the charging time may be determined so that it is longer as the remaining battery level decreases. The SOC after charging can be calculated by adding the amount of power corresponding to the charging time to the remaining battery level at the start of charging.
[0254] As another method for determining a charging point for a virtual EV, the charging plan unit 71 may determine points after the remaining battery charge falls below a threshold as candidate points, and select a charging point from among the candidate points. For example, if the threshold is SOC=30, the candidate points are points E, F, and G.
[0255] In this case, a requirement that the remaining battery charge be equal to or greater than a lower limit may be added as a requirement for a candidate location. For example, if the lower limit value is SOC=18, the candidate points are points E and F. Then, a charging point is selected from the multiple candidate points. The selection method may be random. Alternatively, the selection may be based on the congestion state of the candidate point or the surrounding traffic conditions (presence or absence of traffic jams, etc.).
[0256] For example, the congestion status may be the utilization rate of the chargers at each candidate point. When there are multiple chargers at a candidate point, the average utilization rate of the multiple chargers on the day may be used. As an example, the utilization rate may be calculated from the charger information in FIG. 16 using the method described above. The candidate point with the lowest utilization rate among the multiple candidate points or the candidate point with a utilization rate below a threshold value is determined as the charging point.
[0257] As an example of using surrounding traffic conditions, the traffic volume in the section leading to each candidate point may be compared, and the candidate point with the least traffic volume may be determined as the charging point.
[0258] Then, the charging plan unit 71 determines a charging schedule for all the virtual EVs, and thereby creates data (overall charging plan data) including a charging plan for the virtual EV for each charger at each supply point.
[0259] This overall charging plan data can be used as a prediction of how many external EVs will arrive at each supply point in the future and at what times to charge. In addition, charging plans for EVs registered in the system are also added to the overall charging plan data, as described below. The charging plan unit 71 stores the overall charging plan data in the charging plan database 72.
[0260] The charging plan database 72 holds the overall charging plan data. The charging plan database 72 is realized by a hardware storage device such as a memory device, a hard disk device, or an SSD device.
[0261] FIG. 32 is a diagram illustrating an example of the overall charging plan data including a charging plan for only a virtual EV. The overall charging plan data in FIG. 32 has the form of graphical data, but may be configured in other formats such as a table format or a list format.
[0262] Furthermore, this overall charging plan data may be displayed to the operator via a display device. Supply points E to H are shown on the horizontal axis (other supply points are not shown), and the vertical axis represents time. For each supply point, a rectangle (hatched rectangle) representing the virtual EV is arranged along the time axis. The vertical length of the rectangular symbol representing the virtual EV represents the time (start time and end time) during which the virtual EV is charged.
[0263] In addition, the position of the bottom side of the rectangular symbol represents the start time of charging, and the position of the top side represents the end time of charging. For example, at supply point F, it is shown that charging will be performed in the order of virtual EV2, virtual EV3, virtual EV4, and virtual EV5.
[0264] That is, in the example of FIG. 32, it is predicted that an external EV will actually arrive at supply point F and begin charging at the respective charging start times of virtual EV2 to virtual EV5.
[0265] In the example of Fig. 32, two supply points are determined for each of the virtual EVs 1 to 5. In the example of Fig. 32, there is one charger at each supply point, but if there are multiple chargers, a virtual EV rectangle can be placed along the time axis for each charger.
[0266] Then, the charging plan unit 71 determines a supply point that minimizes the waiting time for the EVs registered in the system by using the overall charging plan data in the charging plan database 72. That is, the charging schedule for the EVs registered in the system is created using the charging schedule for the virtual EV shown in the overall charging plan data as a constraint (i.e., without changing the charging schedule for the virtual EV).
[0267] The charging plan unit 71 also identifies candidate charging points for the system-registered EV from points within the reachable range in the same manner as described above. The method of identifying candidate charging points may be the same as that for the virtual EV. For example, the charging plan unit 71 determines the points after the battery remaining amount falls below a threshold as the candidate points.
[0268] Specifically, if the threshold value is SOC=30, the candidate points are points E, F, and G. A requirement for a candidate point may be that the remaining battery level is equal to or greater than a lower limit. For example, if the lower limit value is SOC=18, the candidate points are points E and F. Then, a recommended charging point (recommended point) is selected from the multiple candidate points.
[0269] As an example, the charging planning unit 71 determines, from among the multiple candidate points, a supply point with the shortest waiting time or a waiting time less than a threshold value as the charging point. Then, the charging planning unit 71 calculates a predicted arrival time at each candidate point. It is assumed that EVs registered in the system can be charged if a charger is available from the predicted arrival time or a time corresponding to that time.
[0270] Under these conditions, the system determines the supply point with the shortest waiting time or below the threshold. Suppose the candidate points for EVs registered in the system are E and F, and it is determined that candidate point E has the shortest waiting time based on the predicted arrival times of EVs registered in the system at candidate points E and F and the overall charging plan data.
[0271] In this case, the recommended point is determined to be the candidate point E. The charging time length may be a predetermined length of time, or may be determined so that the charging time increases as the remaining battery level decreases, or, if the user specifies a charging amount, may be determined to be the time required to charge the specified amount of charging. The SOC after charging can be calculated by adding the amount of power corresponding to the charging time to the remaining battery level at the start of charging, or the charging time length can be determined by the user. The charging plan unit 71 adds the determined predicted charging time data for the EVs registered in the system to the overall charging plan data as a charging plan for the EVs registered in the system.
[0272] FIG. 33 is a diagram for explaining an example of data after the addition of a system-registered EV. As shown in Fig. 33, a charging plan for a system-registered EV (EV11 in the figure) is added to a supply point E. The time determined for the system-registered EV is indicated by a white rectangle representing the system-registered EV. Furthermore, by repeating the same process as above, the next supply point G is determined as a recommended point for the system-registered EV 11, and a charging plan is also added for supply point G.
[0273] The charging planning unit 71 transmits recommended data indicating the recommended points (two supply points in the example of FIG. 33) determined for the EV registered in the system and the charging time (start time and end time) at the recommended points to the user's information device 201 via the communication unit 11.
[0274] FIG. 34 is a diagram illustrating an example of the recommendation data to be transmitted to an EV registered in the system. The recommendation data may include information regarding the predicted arrival time at the recommended point and the waiting time until charging can begin at the recommended point (e.g., waiting for x minutes, no waiting time, etc.). Here, two sets of recommended points (the next supply point and the supply point after that) are shown, but only one set (only the next supply point) may be shown.
[0275] The charging planning unit 71 determines recommended points for other EVs registered in the system in a similar manner. In this case, too, it is assumed that charging will be performed at the recommended supply points not only for the virtual EV but also for system-registered EVs based on the latest overall charging plan data, and recommended points for the other system-registered EVs are determined using these as constraints. By planning charging for the virtual EV and other system-registered EVs in this way, it is possible to recommend supply points with no or short waiting times for system-registered EVs.
[0276] In the explanation using Figures 32 and 33 above, the charging plan for the virtual EV is made first, but as mentioned above, the order of the charging plans may be determined without distinguishing between virtual EVs and EVs registered in the system. In this case, for example, the charging plan may be made in order of earliest departure time, or the order may be determined randomly.Also, as in the method described in Patent No. 5364768, a plan may be formulated to achieve overall optimization by combining EVs registered in the system and virtual EVs using the avalanche method or other mathematical optimization methods to minimize peak waiting times and loads.
[0277] Furthermore, when the user agrees to a recommended location recommended to the user, the recommended location may be reserved for the user. For example, reservation information including user information is transmitted to a reservation system (not shown) for a charging facility (charger) at the recommended location. The reservation system makes a reservation for the user based on the reservation information. This ensures that the reservation time is reserved for the user at the recommended location. Thus, the user can charge the EV at the scheduled time. Note that the user's consent can be obtained by inputting data of consent into the information device 201 and transmitting the input data to the charging planning unit 71. The charging planning unit 71 generates reservation information based on the data and transmits it to the reservation system. The information processing device may be equipped with the function of the reservation system.
[0278] (Update of virtual EV driving plan) The charging planning unit 71 may update the virtual EV data in the virtual EV database 62 based on information on EVs registered in the system and information obtained in real time from the server 211 (traffic control information, charger information, etc.).
[0279] [First example] Based on charger information obtained in real time, we identify virtual EVs that are scheduled to be charged at a certain supply point during a certain time period (e.g., 13:00-15:00, which is sufficiently longer than the time required for one charging session). We then calculate the number of EVs that were actually charged during that time period.
[0280] Next, the ratio between the calculated number of vehicles and the number of virtual EVs is calculated. If this ratio is less than a threshold, the accuracy (reliability) of these virtual EVs is deemed low, and these virtual EVs are deleted. The process described here may be performed for other supply points and other time periods. After deleting the virtual EVs, the charging planning unit may perform re-planning for the remaining virtual EVs and EVs registered in the system.
[0281] For example, a charging plan for the remaining virtual EVs is recreated, and using this as a constraint, a charging plan for EVs registered in the system is created. Here, all applicable virtual EVs are deleted, but it is also possible to delete a number of EVs according to the ratio. For example, the smaller the ratio, the more virtual EVs are deleted. Also, the difference between the number calculated above and the number of virtual EVs is calculated, and virtual EVs equal to the difference are deleted. In these cases, the virtual EVs to be deleted may be selected at random, for example, or deleted in the order in which they were created, or in some other order.
[0282] [Second example] Using ETC information (number of entering vehicles, number of exiting vehicles, EV models, remaining battery power of EVs, etc.), the actual number of entering vehicles at a certain location (e.g., IC, supply point) during a certain time period is calculated.
[0283] Next, the number of system-registered EVs that entered the same location during the same time period is subtracted from the actual number of entering vehicles. The number of virtual EVs entering the same location during the same time period is calculated. The ratio between the number after subtraction and the number of virtual EVs entering is calculated. If this ratio is less than a threshold, the accuracy of these virtual EVs is deemed low, and these virtual EVs are deleted. The process described here may be performed for other time periods and other locations.
[0284] In the above explanation, all applicable virtual EVs are deleted, but it is also possible to delete only a number of EVs according to the ratio. For example, the smaller the ratio, the more virtual EVs are deleted. Alternatively, the difference between the number of EVs after the above subtraction and the number of virtual EVs may be calculated, and the number of virtual EVs equal to the difference may be deleted. In these cases, the virtual EVs to be deleted may be selected, for example, randomly.
[0285] [Third example] Calculate statistics on the frequency (number of vehicles entering, number of vehicles charging) of a certain event (entry into an interchange, charging, etc.) at a certain location during a certain time period for a specified period (e.g., one year). Examples of statistical values include the average, median, and maximum value, but here we use the average. If the average value is equal to or greater than the threshold, it is determined that the accuracy of the virtual EV is high for that time period and location. In this case, the virtual EV related to the above event for that time period and location is determined to be valid, and may be excluded from the deletion targets in the first and second examples above.
[0286] (First Modification) In the above-mentioned embodiment, the above-mentioned information on various probabilities or frequencies (probability information) is calculated based on past data obtained at that time, but the probability information may be recalculated based on new data collected thereafter and the past data. Alternatively, the probability information calculated based on the past data may be updated by Bayesian updating using new data.
[0287] (Second Modification) In the above-described embodiment, among the EVs registered in the system, EVs that do not follow the recommendations of the information processing system 100 (EVs that do not charge at the recommended supply points) or EVs that are likely to not follow the recommendations will disrupt the schedule of EVs that follow the recommendations of the EV-oriented information provision system or EVs that are likely to follow the recommendations. Therefore, a virtual EV that imitates such an EV (disturbance EV) may be generated.
[0288] First, the probability that an EV registered in the system will follow the recommendation is calculated from its past driving history (such as the driving data history managed by driving state management unit 51). If the probability is below a threshold, the EV registered in the system is regarded as a disturbance EV, and the positional relationship between the previously recommended supply points and the supply point where the EV was actually charged is calculated.
[0289] In this case, examples of the positional relationship include a statistical value (average value, etc.) or a distribution (probability distribution, etc.) of the difference in distance. If the supply point where charging actually took place is ahead of the recommended supply point along the direction of travel, the difference is a negative value, and if it is ahead, the difference is a positive value (or the positive / negative relationship may be reversed). Note that examples of the positional relationship are not limited to this, and may also be how many supply points there are along the route between the recommended point and the supply point where charging actually took place.
[0290] A charging plan is created for the disturbance EV in question the next time it is registered for use, using the method described above. Then, in the charging plan for the virtual EV, a charging point for the virtual EV is determined based on the recommended point in the charging plan for the disturbance EV in question and the statistical value or distribution of the difference.
[0291] The charging point for the virtual EV may be generated, for example, on the condition that the disturbance EV has been registered for use. As an example of determining the charging point for the virtual EV, a position is obtained by adding the statistical value of the difference to the recommended point for the disturbance EV, and the point closest to this position is set as the final recommended point.
[0292] Alternatively, the charging point is determined based on the distance between the position to which the statistical value of the difference is added and each reachable supply point, so that the closer the distance is, the higher the probability of selection is. Also, instead of the statistical value of the difference, the difference value may be selected from the distribution by random numbers or the like, and the charging point may be determined using the selected difference.
[0293] (Third Modification) Based on the past driving history of this EV information provision system, the driving pattern from each departure point to each destination and its probability are calculated. The driving pattern includes, as an example, the departure point, the destination, the supply point used for charging, and the route (driving section) used for the trip. Other items such as the vehicle type, tire type, temperature, and incline may also be included. A driving pattern is selected from these driving patterns according to the probability, and a virtual EV is generated using the selected driving pattern.
[0294] For example, the same values as those of the selected driving pattern are used, except for the departure time of the virtual EV, etc. This makes it possible to generate a virtual EV that will be registered for use in the EV information provision system and will be driven in the future.
[0295] FIG. 35 is a flowchart showing an example of the operation of the information processing device according to the present embodiment.
[0296] The traveling state management unit 51 identifies EVs that have been registered for use (system-registered EVs) by referring to the user database 14 or the like (step S501). For each identified EV, the traveling state management unit 51 determines whether or not the EV is currently traveling (step S502).
[0297] In the determination at step S502, if the EV is traveling (including the case where the EV is staying at a SA / PA along the way) (step S502; Yes), the prediction unit 41 is used to predict the amount of power consumption for each section (e.g., sections between supply points) on the way to the destination (step S503).
[0298] In this case, the power consumption may be predicted for a certain number of sections ahead, or for all sections up to the destination. Note that this step may be performed each time this flowchart is repeated to successively update the predicted power consumption. Note that the route to the destination may be estimated and determined by, for example, searching for the shortest route, or information on the route to the destination may be obtained from an information device of the EV user, and the route to the destination may be determined based on this information.
[0299] Furthermore, if it is determined in step S502 that the EV is not traveling (step S502; No), that is, if the EV has passed the destination, the traveling record of the EV is stored as a traveling history in the traveling management database 52 (step S504).
[0300] The virtual EV management unit 61 generates one or more virtual EVs based on the virtual EV generation conditions (step S505). Next, items such as the departure time, departure point, destination, remaining energy, and route to be used to travel to the destination of the generated virtual EV are determined. In addition, the prediction unit 41 predicts the power consumption of the virtual EV for each section (e.g., section between supply points) up to the destination (step S506). In this case, the power consumption may be predicted for a certain number of sections ahead, or for all sections up to the destination. Note that the process of step S506 may be performed each time this flowchart is repeated, and the predicted power consumption may be updated successively.
[0301] The charging plan unit 71 determines a charging point based on the power consumption amount predicted for each virtual EV (step S507), and determines the charging time (start time and end time). That is, a charging plan is created for each virtual EV. The charging time is determined based on, for example, the predicted time when the virtual EV will arrive at the charging point and the remaining battery level. At this time, the charging time is determined so as not to overlap with the charging times determined for other virtual EVs (and, in cases where there are EVs registered in the system for which a charging plan has already been created, the charging time for that charging plan as well). As a result, the charging plan unit 71 generates overall charging schedule data including the charging plans for each virtual EV.
[0302] Then, the charging plan unit 71 determines recommended locations for the EVs registered in the system based on the overall charging plan data (step S508).
[0303] The charging plan unit 71 also determines the charging time (start time and end time) for the determined recommended point. For example, the recommended point and charging time are determined so as not to overlap with the charging time of the virtual EV registered in the overall charging plan data (and also the charging time of the virtual EV registered in the system if a charging plan for another system-registered EV has already been registered). At this time, a supply point with the shortest waiting time or a waiting time less than a threshold value is selected.
[0304] In other words, assuming that an external EV actually charges in accordance with the charging plan of the virtual EV, and that other system-registered EVs actually charge using the charging plan that has already been recommended to other system-registered EVs, the supply point that minimizes waiting time is determined as the recommended point for the system-registered EV.
[0305] Then, the charging plan unit 71 adds the determined charging plan for the EV registered in the system to the overall charging schedule data. Furthermore, the charging planning unit 71 transmits the recommendation data including the determined recommended point to the information device of the user (step S509).
[0306] Next, the control unit 21 determines whether or not a condition for ending this process is met (step S510). For example, when an operator inputs an end instruction, it is determined that the end condition is met.
[0307] In the determination at step S510, when the end condition is not satisfied (step S510; No), the process proceeds to step S501. If a new registered EV occurs, the same process as above is repeated for the newly registered EV. In addition, in the processing of step S505, if the conditions for generating a virtual EV are met, a virtual EV is generated, and the previously generated virtual EV is carried over as is unless it is deleted using the method described above or the running is completed.
[0308] If it is determined in step S510 that the end condition is met (step S510; Yes), this process ends.
[0309] As described above, according to this embodiment, an external EV that is not using this system is treated as a virtual EV, and a charging schedule for the virtual EV is generated. Then, assuming that the external EV will actually charge according to this charging schedule, a charging schedule for EVs registered in the system is generated.
[0310] This allows the system to recommend uncrowded delivery points (steps SA / PA) to users of EVs registered in the system with high accuracy. Since delivery points can be recommended to users with high accuracy, the probability that users will follow the recommendations of this EV information provision system can be improved. In other words, the success rate of guidance can be increased.
[0311] FIG. 36 is a diagram showing a hardware configuration of an information processing device 101 according to this embodiment. The information processing device 101 according to this embodiment is configured by a computer device 100. The computer device 100 includes a CPU 151, an input interface 152, a display device 153, a communication device 154, a main storage device 155, and an external storage device 156, which are interconnected by a bus 157.
[0312] A CPU (Central Processing Unit) 151 executes a computer program that realizes each of the above-mentioned functional components of the information processing device 101 on a main storage device 155. Each functional component is realized by the CPU 151 executing the program.
[0313] The input interface 152 is a circuit for inputting operation signals from input devices such as a keyboard, a mouse, and a touch panel to the information processing device 101.
[0314] The display device 153 displays data or information output from the information processing device 101 . Here, examples of the display device 153 include, but are not limited to, an LCD (liquid crystal display) and an organic EL display. Furthermore, data or information output from the computer device 100 can be displayed on the display device 153 .
[0315] The communication device 154 is a device for enabling the information processing device 101 to communicate with an external device wirelessly or via wires. Information can be input from an external device via the communication device 154. The information input from the external device can be stored in various databases (DB). The communication unit 11 can be constructed on the communication device 154.
[0316] The main memory device 155 stores a program for implementing the processing of this embodiment, data required for executing the program, data generated by executing the program, and the like. The program is deployed and executed on the main memory device 155. The main memory device 155 is, for example, a RAM, a DRAM, or an SRAM, but is not limited to these. The storage unit in each embodiment may be constructed on the main memory device 155.
[0317] The external storage device 156 stores the above programs, data required for executing the programs, and data generated by executing the programs. These programs and data are read into the main storage device 155 during processing of this embodiment. Examples of the external storage device 156 include a hard disk, an optical disk, a flash memory, and a magnetic tape. However, the external storage device 156 is not limited to these. Furthermore, the storage unit in each embodiment may be constructed on the external storage device 156.
[0318] The above-mentioned program may be pre-installed in the computer device 100, or may be stored in a storage medium such as a CD-ROM. Also, the program may be uploaded onto the Internet.
[0319] The computer device 100 may include one or more of each of a processor 151, an input interface 152, a display device 153, a communication device 154, and a main memory device 155, and may be connected to peripheral devices such as a printer or a scanner.
[0320] The information processing device 101 may be configured as a single computer device 100. Alternatively, the information processing device 101 may be configured as a system made up of a plurality of computer devices 100 interconnected via a communication network.
[0321] Although some embodiments of the present invention have been described, these embodiments are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. These embodiments and their modifications are included in the scope and spirit of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]
[0322] 11: Communications Department 12: User ID registration section 13: EV Navigation User Registration Section 14: User database (DB) 15: Map information management section 16: Road control information management department 17: Charger information management department 18: Weather Information Management Department 19: Vehicle Information Management Department 20: System database (DB) 21: Control unit 31: Model Management Department 32: Model database (DB) 41: Prediction Department 51: Driving status management unit 52: Driving management database (DB) 61: Virtual EV Management Department 62: Virtual EV_Database (DB) 71: Charging Planning Department 72: Charging plan DB 100: Information processing systems 101: Information processing device 201A~201N: Information equipment 211A~211N: Server 220: Communication network
Claims
1. 1. An information processing system comprising a plurality of energy supply points, the information processing system being configured to reserve a recommended energy supply point from among the plurality of energy supply points upon receiving an energy supply request from a moving object, a mobile information terminal that transmits a reservation request for energy supply for a first moving object of a user who has been registered in advance, the request including destination information set by the user; an information processing device that receives a reservation request for the energy supply for the first moving body, creates a travel plan including the energy supply points to which energy supply is recommended for the first moving body based on the destination information included in the received reservation request, and acquires a waiting position for energy supply for the recommended energy supply points; an information communication terminal that is provided at the energy supply point, presenting energy supply waiting information for the energy supply point based on the reservation request for the first moving body accepted by the information processing device, and then accepting an energy supply request for a second moving body that is not registered in the system in advance and is an unmanaged object, and acquiring the energy supply order for the second moving body; An information processing system comprising:
2. the information processing device includes a queue management database that stores the energy supply queue information to be provided to the first moving body and the second moving body for each of the energy supply points; 2. The information processing system according to claim 1.
3. When creating the travel plan, the information processing device creates a travel plan including an energy supply plan that recommends energy supply points that are reachable by the first moving body and have charging facilities available, based on route information between the energy supply points and an amount of energy required for the first moving body to reach the supply point.
2. The information processing system according to claim 1.
4. When creating the travel plan, the information processing device creates an energy supply plan for the first moving body by assuming that a third moving body, which is a virtual moving body assumed to travel along a route corresponding to the route information without using the information processing system, travels on the route and is charged at any of the energy supply points.
4. The information processing system according to claim 3.
5. accepting a reservation request for energy supply for a first moving object of a user who has been registered in advance, the reservation request including destination information set by the user who has been registered in advance; creating a travel plan including an energy supply point to which energy supply is recommended to the first moving object based on the destination information included in the reservation request; Obtaining a waiting list for energy supply at the recommended energy supply point; After displaying the acquired energy supply queue information on an information terminal installed at the energy supply point, receiving an energy supply request for a second moving object that is not registered in advance in the system and is an unmanaged object from an information terminal installed at the energy supply point, and acquiring a waiting position for the energy supply for the second moving object; Information processing device.
6. the information processing device includes a queue management database that stores information on a queue for energy supply to be provided to the first moving body and the second moving body for each of the energy supply points, 6. The information processing device according to claim 5.
7. When creating the travel plan, the information processing device assumes that a third moving body, which is a virtual moving body assumed to travel along a route corresponding to the route information without using an information processing system constituted by the information processing device, travels on the route and is charged at any of the energy supply points, and creates the travel plan including an energy supply plan for the first moving body.
7. The information processing device according to claim 5.
8. the information processing device creates an energy supply plan for the first moving body using the energy supply plan for the third moving body as a constraint condition; 8. The information processing device according to claim 7.
9. A reservation processing method for reserving a recommended energy supply point from among a plurality of energy supply points when an energy supply request is received from a moving object, the method comprising: A step in which an information processing device receives a reservation request for the energy supply point for a first moving object from a user who has been registered in advance, the reservation request including destination information set by the user who has been registered in advance; creating a travel plan including the energy supply point to which energy supply is recommended to the first moving object based on the destination information included in the received reservation request; obtaining a waiting list for energy supply of the recommended energy supply point; a step of displaying energy supply waiting information for the energy supply point, which is generated based on a reservation request from the first moving object, on an information terminal provided at the energy supply point; receiving, from an information communication terminal provided at an energy supply point, an energy supply request for a second mobile object that is a non-managed mobile object that has not been registered in the system in advance; acquiring an energy supply order corresponding to an energy supply request at the energy supply point for the second moving body; providing an energy supply order corresponding to the energy supply request at the energy supply point for the second moving object to an information communication terminal provided at the energy supply point; An information processing method comprising:
10. An information processing program executed by an information processing device that is connected to a plurality of mobile information terminals and an information communication terminal provided for each of a plurality of energy supply points via a communication network, and that, upon receiving an energy supply request from a mobile object, reserves a recommended energy supply point from the plurality of energy supply points, A step of receiving a reservation request for the energy supply point for a first moving object from a user who has been registered in advance, the reservation request including destination information set by the user who has been registered in advance; creating a travel plan including the energy supply point to which energy supply is recommended to the first moving object based on the destination information included in the received reservation request; obtaining a waiting list for energy supply of the recommended energy supply point; a step of displaying energy supply waiting information for the energy supply point, which is generated based on a reservation request from the first moving object, on an information terminal provided at the energy supply point; receiving, from an information communication terminal installed at an energy supply point, an energy supply request for a second mobile object that is a non-managed mobile object that has not been registered in the system in advance; acquiring an energy supply order corresponding to an energy supply request at the energy supply point for the second moving body; providing an energy supply order corresponding to the energy supply request at the energy supply point for the second moving object to an information communication terminal provided at the energy supply point; An information processing program for causing an information processing device to execute the above.
Citation Information
Patent Citations
Charging stand information-supplying apparatus
JP2003262525A
Electric vehicle charging system and method of providing charging support service
JP2010267110A
Charging station management system for electric vehicle
JP2012019658A
Charging reservation method and charging reservation apparatus for electric vehicle
JP2012128633A
Reservation system, navigation device, battery charger and server
JP2013149030A
