Management computer, management system, and management program

The management computer optimizes parallel processes in a hybrid cloud data analysis platform by calculating resource and load information, addressing bottlenecks and reducing costs in data processing.

JP7553173B2Active Publication Date: 2024-09-18HITACHI VANTARA LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2021006670
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-01-19
Publication Date
2024-09-18
Estimated Expiration
2041-01-19

AI Technical Summary

Technical Problem

In data analysis platforms with hybrid cloud configurations, determining the optimal number of parallel processes is challenging due to varying data transfer speeds and rates, which are influenced by shared components and network locations, leading to potential bottlenecks and increased costs in public clouds.

Method used

A management computer that includes a job execution server and storage device, which manages a data processing infrastructure by calculating the number of parallel processes based on maximum resource amounts, path information, and load information to optimize job execution on the job execution server.

Benefits of technology

Enables appropriate determination of parallel processes, reducing processing time and costs by avoiding bottlenecks in the data processing infrastructure, thereby optimizing resource utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007553173000004
    Figure 0007553173000004
  • Figure 0007553173000017
    Figure 0007553173000017
  • Figure 0007553173000010
    Figure 0007553173000010
Patent Text Reader

Abstract

To allow for appropriately determining the number of processes in parallel processing, which is suitable for job execution in a job execution server, in a data processing framework.SOLUTION: A management computer 200 manages a data processing framework 100 comprising a server 150d for job execution and a storage device 130 which is connected to the server 150d via a network 140 and stores therein data for use in processing of jobs. The management computer 200 comprises a disk 213 and a CPU 211, and maximum resource amount information, path information, and load information are stored in the disk 213, and the CPU 211 calculates an amount of free resources of components constituting a path to data relating to the execution of a prescribed job on the basis of the maximum resource amount information, the path information, and the load information, and determines the allowable number of processes in parallel processing for processing units which can be executed in parallel during the execution of the prescribed job in the server 150d, on the basis of the amount of free resources.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a technique for managing a data processing infrastructure including a job execution server that executes jobs and a storage device that is connected to the job execution server via a network and stores data used in job processing. [Background technology]

[0002] In recent years, in the field of IT (Information Technology), public clouds are often used rather than building IT systems in a data center (on-premises) owned by a single company. A typical public cloud is a service in which a data center operator pools computing resources such as servers, disks (also called storage), and networks, and divides them up for individual users using virtualization technology. In public clouds, pay-per-use fees are generally based on the performance of the computing resources used (the amount of computing resources, such as the number of CPU cores on the server, and the quality, such as the type of disk) and the duration of use. Due to these characteristics, when building a data analysis system that processes large amounts of data in a relatively short period of time, it is more cost-effective to use a public cloud than to build one on-premises.

[0003] Additionally, in recent years, there have been an increasing number of cases where data analysis platforms (an example of a data processing platform) are being built on public clouds to aggregate in-house data and publicly available data and to appropriately extract, process, and transfer data in order to utilize the data across the entire organization, rather than systems for a specific analytical purpose.

[0004] On the other hand, from the perspective of data governance, etc., there is a need to manage data processed by IT systems in-house, rather than storing it on a public cloud. To meet such needs, a hybrid cloud configuration may be adopted as a data analysis platform, in which the computers that process the data are placed on the public cloud, while the storage devices that store the data are placed on-premise, and these are connected via a network.

[0005] Before starting data analysis, a data analyst using the data analysis platform selects data to be used according to the purpose of analysis from a data catalog of aggregated data groups (hereinafter referred to as a data lake), executes a process to extract, process, and transfer the necessary data (hereinafter referred to as ETL processing), and stores the data group for a specific analysis purpose in a separate storage area. Since this ETL processing performs the same processing on multiple similar data, these processing can often be executed in parallel. For example, when processing can be executed in parallel, the data analyst may execute the processing by setting the performance and number of computers (e.g., servers) that process the data and the number of parallel processes to a large value in order to complete the data processing as quickly as possible.

[0006] However, because data analysts do not understand the system configuration of the data analysis platform, they cannot estimate the amount of data transfer that will cause the server, network, or storage device for transferring data to the computer for data processing to become a bottleneck.As a result, the system for data transfer becomes a bottleneck in processing performance, and the processing time does not decrease even if the performance and quantity of the computer and the number of parallel processes that can be executed are increased, and if the computer that executes the processing is placed on a public cloud, the billing amount becomes large due to the pay-as-you-go system of the public cloud.

[0007] For example, Patent Document 1 discloses a technology in which the response time for each condition is measured under different conditions in which the number of processing requests simultaneously sent to a server device (the number of parallel processes in the server device) is changed, the processing efficiency is estimated, and the optimal maximum number of parallel processes in the server device is determined based on the estimated results. [Prior art documents] [Patent documents]

[0008] [Patent Document 1] JP 2006-221516 A Summary of the Invention [Problem to be solved by the invention]

[0009] However, in a data analysis platform, the components of the server, network, and storage device constructed for transferring data are shared with multiple data processes, so the maximum data transfer speed varies depending on the usage situation. In addition, in a data analysis platform with a hybrid cloud configuration, the computer that processes the data and the data are located in a remote location on the network, and the network is shared by multiple companies, so the time it takes to send and receive one piece of data varies, and the data transfer speed required by the data processing also varies. Therefore, even for the same data processing content, the optimal number of parallel processes is not fixed, and the technology of Patent Document 1 cannot determine the optimal number of parallel processes.

[0010] The present invention has been made in consideration of the above-mentioned circumstances, and its object is to provide a technology that can appropriately determine the number of parallel processes suitable for executing a job on a job execution server in a data processing infrastructure that includes a job execution server that executes jobs and a storage device that is connected to the job execution server via a network and stores data used for processing by the job. [Means for solving the problem]

[0011] In order to achieve the above-mentioned object, a management computer according to one aspect is a management computer that manages a data processing infrastructure comprising a job execution server that executes jobs, and a storage device connected to the job execution server via a network and storing data used for processing by the job, wherein the management computer comprises a storage device and a processor connected to the storage device, and the storage device stores maximum resource amount information which is information on the maximum resource amount of components involved in communication between the job execution server and the storage device of the data processing infrastructure, path information which is information on a path to data in the storage device of the data processing infrastructure, and load information which is information on the load of the components of the data processing infrastructure, and the processor calculates the free resource amount of components that constitute a path from the job execution server to the data in the storage device, which is involved in the execution of a specified job, based on the maximum resource amount information, the path information, and the load information, and determines a parallel number which is the number of parallel executable processing units used in the job when the specified job is executed in the job execution server, based on the free resource amount. Effect of the Invention

[0012] According to the present invention, in a data processing infrastructure, it is possible to appropriately determine the number of parallel processes suitable for executing a job in a job execution server. [Brief description of the drawings]

[0013] [Figure 1] FIG. 1 is a logical overall configuration diagram of a data analysis platform management system according to the first embodiment. [Diagram 2] FIG. 2 is a diagram showing the overall configuration including the physical configuration of the data analysis platform management system according to the first embodiment. [Diagram 3] FIG. 3 is a diagram showing the configuration of a table in the configuration information storage unit according to the first embodiment. [Figure 4] FIG. 4 is a configuration diagram of a load information table in the load information storage unit according to the first embodiment. [Diagram 5] FIG. 5 is a configuration diagram of a response time information table according to the first embodiment. [Figure 6] FIG. 6 is a configuration diagram of a data attribute information table according to the first embodiment. [Figure 7] FIG. 7 is a configuration diagram of a process type information table according to the first embodiment. [Figure 8] FIG. 8 is a diagram showing an example of an input screen according to the first embodiment. [Figure 9] FIG. 9 is a configuration diagram of a registered job information table according to the first embodiment. [Figure 10] FIG. 10 is a flowchart of the free resource amount calculation process according to the first embodiment. [Figure 11] FIG. 11 is a flowchart of the required resource amount calculation process according to the first embodiment. [Figure 12] FIG. 12 is a flowchart of the maximum parallel number calculation process according to the first embodiment. [Figure 13] FIG. 13 is a diagram showing an example of an output screen according to the first embodiment. [Figure 14] FIG. 14 is a diagram showing changes in the amount of resources required by a job. [Figure 15] FIG. 15 is a configuration diagram of a registered job information table according to the second embodiment. [Figure 16] FIG. 16 is a flowchart of the maximum parallel number calculation process according to the second embodiment. [Figure 17] FIG. 17 is a diagram for explaining the essence of the maximum parallel number calculation process according to the second embodiment. [Figure 18] FIG. 18 is a flowchart of the estimated completion time calculation process according to the second embodiment. [Figure 19] FIG. 19 is a diagram showing an example of an output screen according to the second embodiment. [Figure 20] FIG. 20 is a diagram showing an example of an input screen according to the third embodiment. [Figure 21] FIG. 21 is a configuration diagram of a registered job information table according to the third embodiment. [Figure 22] FIG. 22 is a flowchart of the maximum parallel number calculation process according to the third embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] In the following description of the present invention, reference is made to the accompanying drawings, which form a part of the disclosure, and which show exemplary embodiments in which the present invention may be practiced, but which are not intended to limit the present invention. In these drawings, the same reference numerals throughout the various views represent the same components. Furthermore, while the detailed description provides various exemplary embodiments, as described and illustrated below, it should be noted that the present invention is not limited to the embodiments described and illustrated herein, but may extend to other embodiments known or which may become known in the future to those skilled in the art.

[0015] Also, in the following description, numerous specific details are disclosed to provide a thorough understanding of the present invention. However, it will be apparent to one of ordinary skill in the art that not all of these specific details are required to practice the present invention. In other circumstances, well-known structures, materials, circuits, processes and interfaces may not be described in detail and / or may be shown in block diagram form so as not to unnecessarily obscure the present invention.

[0016] In addition, in the following description, the processing may be described with a "program" as the operating subject, but since the program is executed by a processor (e.g., a CPU (Central Processing Unit)) to perform a defined process using a storage device (e.g., a memory) and / or an interface device, etc. as appropriate, the processing subject may be the processor (or a device or system having the processor). The processor may also include a hardware circuit that performs part or all of the processing. The program may be installed in a device such as a computer from a program source. The program source may be, for example, a program distribution server or a storage medium readable by a computer. In the following description, two or more programs may be realized as one program, and one program may be realized as two or more programs.

[0017] In addition, in the following description, when the terms calculator, server, or computer are used, they may refer to a physical computer, or they may refer to a virtual machine or container that is a virtual division of a physical computer using virtualization technology or the like.

[0018] In the following description, when elements of the same type are described with distinction, the reference numerals of the elements are used, and when elements of the same type are described without distinction, the common parent numerals of the reference numerals of the elements are used. For example, when describing a server without distinction, it may be described as server 150, and when describing individual servers with distinction, it may be described as servers 150a, 150b, etc.

[0019] In the following, one or a combination of the processes of extraction, processing, and transfer may be referred to as ETL process.

[0020] In addition, the physical or virtual computers, networks, storage, OS (Operating System), middleware, etc. that make up an IT system are sometimes collectively referred to as IT infrastructure.

[0021] In the following description, information may be expressed as an "AAA table", but the information may be expressed in any data structure. In other words, to indicate that the information does not depend on the data structure, the "AAA table" may be called "AAA information".

[0022] First Embodiment FIG. 1 is a logical overall configuration diagram of a data analysis platform management system according to the first embodiment.

[0023] The data analysis platform management system 1 is an example of a management system, and includes a data analysis platform 100 that processes data specified by a data analyst, and a management computer 200 that manages the data analysis platform.

[0024] The data analysis platform 100 is an example of a data processing platform, and includes a storage device 130 that stores data used in data analysis, one or more RDBMS (relational database management system) servers 120 (120a, 120b, 120c) for transferring a specified range of data, and one or more job execution servers 110 (110d, 110e) that executes predetermined processing (e.g., ETL processing) on ​​the data. The storage device 130, the RDBMS server 120, and the job execution server 110 are connected via a network 140 (see FIG. 2). The job execution server 110 and the RDBMS server 120 may be physical computers (computers), or may be virtual machines or containers that are obtained by virtually dividing a physical computer using virtualization technology or the like.

[0025] In the data analysis platform 100, the job execution server 110 and the RDBMS server 120 are placed in a public cloud environment 101, and the storage device 130 is placed in an on-premise environment 102. The placement of the job execution server 110, the RDBMS server 120, and the storage device 130 is not limited to this, and any of the IT infrastructures may be placed in an on-premise environment or a public cloud environment.

[0026] The storage device 130 has one or more I / O ports 131 (131a, 131b) and one or more volumes 132 (132a, 132b, 132c) obtained by virtually dividing a disk. The I / O port 131 is an interface for transferring data to the servers (job execution server 110, RDBMS server 120) via a network. The volume 132 is a storage device for storing data used for data analysis processing in the job execution server 110. For example, the volume 132a stores a table DB1_Table1 (DB1_Table 133a) managed by the RDBMS server DB1 (RDBMS server 120a).

[0027] The RDBMS server 120 includes a network interface device (network I / F) 153. The network I / F 153 is an interface for receiving data from the volume 132 or transmitting data to the volume 132 based on a request from the job execution server 110.

[0028] For example, in the data analysis platform 100, when a data analyst selects data to be subjected to ETL processing from data in the storage device 130 using a computer or the like (not shown) and determines the processing content, the job execution server 110a obtains the specified data from the volume 132a via the RDBMS server 120a, processes the data, and then stores the processed data in the volume 132c via the RDBMS server 120c. Here, the ETL processing executed on the specified data is sometimes called a job. Also, each data extraction and processing process that constitutes the ETL processing is sometimes called a process.

[0029] The management computer 200 comprises a configuration information storage unit 300, a load information storage unit 400, a response time information storage unit 500, a data attribute information storage unit 600, a process type information storage unit 700, and a registered job information storage unit 800.

[0030] The configuration information storage unit 300 stores configuration information of the IT infrastructure that constitutes the data analysis platform 100 to be managed. The load information storage unit 400 stores time series data of the load of each of the components of the IT infrastructure that constitutes the data analysis platform 100. The response time information storage unit 500 stores the time (response time) required to read or write data of a predetermined size from the RDBMS server 120 to the volume 132 for data transfer. The data attribute information storage unit 600 stores attribute information of data stored in the storage device 130 to be used for data analysis processing.

[0031] The information stored in the configuration information storage unit 300, the load information storage unit 400, the response time information storage unit 500, and the data attribute information storage unit 600 is collected from the data analysis infrastructure 100 by the processor of the management computer 200 executing the managed object information collection program 52000, and is updated at any time.

[0032] The process type information storage unit 700 stores information on the processing calculation time required to execute one processing of a predetermined processing unit and the data unit handled in the processing unit in processes classified according to the contents of the processing executed by the job execution server 110. The registered job information storage unit 800 stores information on jobs registered from the input unit 51100 by a data analyst.

[0033] Next, an overview of the processing of the management computer 200 of this embodiment will be explained.

[0034] When the management computer 200 detects that a new job has been registered, when it detects a delay in job execution, when it detects that the load on the data transfer path of the job being executed has changed significantly, or at any timing, it starts and executes the free resource amount calculation program 900. The free resource amount calculation program 900 (strictly speaking, the CPU 211 (see FIG. 2) of the management computer 200 that executes the free resource amount calculation program 900) acquires information on a specific job (e.g., a newly registered job) stored in the registered job information storage unit 800, acquires information on a path for transferring data when the job is executed (path information), the maximum performance (maximum resource amount) of the components on the path, and the load of each of the components on the path from the configuration information storage unit 300 and the load information storage unit 400, and calculates the free resource amount of the components on the path.

[0035] Next, the requested resource amount calculation program 1000 (more precisely, the CPU 211 executing the requested resource amount calculation program 1000) calculates the load on the components on the path in the data transfer when processing one processing unit of data in the process once, based on the response time in the path related to the predetermined job information, the data attribute information of the data processed by the job, and the information of the process type to which the process constituting the job belongs. Next, the maximum parallel number calculation program 1100 calculates the maximum number (maximum parallel number) of processing units that can be executed in parallel in the process from the free resource amount of each component on the path derived by the free resource amount calculation program 900 and the load of each component on the path derived by the requested resource amount calculation program 1000 per processing unit, and outputs it to the display unit 51200. The information displayed by the display unit 51200 may be displayed on a device of an external computer connected via a network.

[0036] According to the management computer 200, for example, when a new job is registered, the maximum parallel number of processes that will not cause the IT infrastructure to become a bottleneck when the new job is executed is derived from the load on the IT infrastructure for data transfer. This allows the data analyst to set the performance and quantity of the job execution servers 110 so that the job is completed as quickly as possible and the IT infrastructure does not become a bottleneck in the processing of the job execution servers 110. This makes it possible to reduce the amount of charges for using the job execution servers 110 in the public cloud environment 101. Note that the performance and quantity of the job execution servers 110 may be automatically set by the management computer 200 without the data analyst having to set them.

[0037] More specifically, when job execution server 2 (110e) sequentially reads and processes data in DB table DB2_Table1 via I / O port 131a, when job execution server 1 (110d) is started to sequentially read each of tables DB1_Table1 to DB1_Table999, the parallel number of processes (number of parallel processes) of job execution server 1 (110d) can be determined taking into account the load on I / O port 131a by job execution server 2 (110b) so that I / O port 131a does not become a bottleneck.

[0038] A more specific configuration of the data analysis platform management system 1 will be described.

[0039] FIG. 2 is a diagram showing the overall configuration including the physical configuration of the data analysis platform management system according to the first embodiment.

[0040] The data analysis platform 100 includes one or more servers 150 (150a to 150e) and a storage device 130. The servers 150 and the storage device 130 are communicatively connected via a network 140. The network 140 may be a network for a network service that enables communication between an on-premise environment and a public cloud environment via a dedicated line, such as Amazon's AWS Direct Connect (registered trademark), and that virtually divides the network bandwidth for each user. In this network service, the maximum bandwidth of the network that can be used may be defined for each user.

[0041] The management computer 200 is configured, for example, by a general-purpose computer, and includes a CPU 211 as an example of a processor, a memory 212, a disk 213, an input device 214, a network interface device (network I / F) 215, and an output device 217. These devices are connected via a system bus 216. The management computer 200 may be configured by a plurality of computers, and distribution and integration may be arbitrary depending on processing efficiency and the like.

[0042] The CPU 211 executes various processes in accordance with programs stored in the memory 212 and / or the disk 213 .

[0043] The disk 213 is an example of a storage device, and is, for example, a non-volatile storage device such as a hard disk drive (HDD) or a solid state drive (SSD). The disk 213 has a configuration information storage unit 300, a load information storage unit 400, a response time information storage unit 500, a data attribute information storage unit 600, a process type information storage unit 700, and a registered job information storage unit 800. At least one of these storage units may be included in another appropriate storage area that can be referenced by the CPU 211.

[0044] The memory 212 is an example of a storage device, for example a RAM (RANDOM ACCESS MEMORY), and stores programs executed by the CPU 211 and necessary information. The memory 212 stores a management target information collection program 52000, an available resource amount calculation program 900, a required resource amount calculation program 1000, and a maximum parallel number calculation program 1100. At least one of these programs may be stored in another appropriate storage area that can be referenced by the CPU 211. Furthermore, each program may be stored in a computer-readable non-volatile recording medium, and read out by a reading device or obtained from an external device via the network I / F 215.

[0045] The network I / F 215 communicates with other devices (the server 150, the storage device 130) via the network 140. The network I / F 215 acquires various information such as configuration information, load information, etc. from devices that are managed by the management computer 200, such as the server 150 and the storage device 130.

[0046] The output device 217 is, for example, a device such as a display or a printer, and outputs (typically displays) various information derived by each program or stored in the disk 213. The input device 214 is, for example, a device such as a keyboard or a pointer device, and accepts instruction inputs from the user.

[0047] The server 150 is, for example, a general-purpose computer, and includes a memory 152, a network I / F 153, and a CPU 151. The server 150 may further include a disk configured from a non-volatile storage device such as an HDD. The CPU 151 executes various processes according to programs stored in the memory 152 and / or a disk (not shown). The memory 152 is, for example, a RAM, and stores the programs executed by the CPU 151 and necessary information. The network I / F 153 communicates with other devices (the storage device 130, the server 150, the management computer 200, etc.) via the network 140.

[0048] The servers 150 include servers (150d, 150e) that constitute the job execution servers 110 (110d, 110e) and servers (150a, 150b, 150c) that constitute the RDBMS server 120.

[0049] The memory 152 of the servers (150d, 150e) constituting the job execution servers 110 (110d, 110e) stores a job execution program 111 that executes jobs registered by a data analyst, and a parallel processing management program 112 that controls parallel execution of job processing. The servers (150d, 150e) constituting the job execution servers 110 (110d, 110e) have a function of transmitting configuration information, load information, response time information, and the like of the server 150 via the network 140 when requested by the management computer 200, for example.

[0050] The memory 152 of the servers (150a, 150b, 150c) constituting the RDBMS server 120 stores RDBMS software 121 for acquiring and transferring specified data. The servers (150a, 150b, 150c) constituting the RDBMS server 120 have a function for transmitting configuration information, load information, response time information, etc. of the server 150 via the network 140, and a function for transmitting data attribute information of the data they manage, when requested by the management computer 200, for example.

[0051] The storage device 130 is a device that provides a storage area (logical volume) for a program that runs on the server 150. The storage device 130 includes one or more I / O ports 131, one or more volumes 132 (132a, 132b, 132c in the figure), and a storage processor 134 such as a CPU.

[0052] The I / O port 131 is an interface for communicating with devices (for example, the server 150, the management computer 200, etc.) connected via the network 140.

[0053] Volume 132 is a storage device that stores data used for data analysis. Volume 132 is a storage device obtained by virtually dividing a disk. The disks constituting volume 132 may be non-volatile storage devices such as one or more HDDs, SSDs, etc. Volume 132 may be a RAID (Redundant Array of Independent (or Inexpensive) Disks) group composed of multiple HDDs. For example, volume 132a stores table DB1_Table1 managed by RDBMS server DB1. Data on volume 132 is transferred via one or more I / O ports 131 assigned to volume 132.

[0054] The storage device 130 may provide a volume as a storage area to the server 150. In this case, the storage device 130 may transmit configuration information, load information, and the like of the storage device 130 to the management computer 200.

[0055] <Configuration information storage unit 300> FIG. 3 is a diagram showing the configuration of a table in the configuration information storage unit according to the first embodiment.

[0056] The configuration information storage unit 300 stores a configuration element information table 310 and a path information table 320 .

[0057] The component information table 310 is a table that stores the maximum resource amount (performance value) of the components of the IT infrastructure that constitutes the data analysis infrastructure 100, and stores an entry for each component.

[0058] An entry in the component information table 310 has fields for a component ID 311, a monitoring metric type 312, and a maximum performance value 313. The component ID 311 stores a value (component ID) that uniquely identifies a component of the IT infrastructure that constitutes the data analysis platform 100 to be managed. The monitoring metric type 312 stores a value (metric type, monitoring metric type) that identifies an item to be monitored for the performance of the component. The maximum performance value 313 stores a maximum value (maximum performance value: maximum resource amount) for the performance of the item of the metric type corresponding to the entry, for the component of the component ID corresponding to the entry. The maximum performance value 313 may include unit information indicating the magnitude of the maximum performance value. The maximum performance value stored in the maximum performance value 313 may be a physical limit value of the component, or may be a value with a margin for the physical limit value so that a performance failure does not occur.

[0059] For example, entry 3101 indicates the following: That is, the maximum performance value of the transfer speed (receiving transfer speed) when receiving data of the component having the component ID "I / O port 131a" (here, I / O port 131a) is 10 Gbps.

[0060] The path information table 320 is a table that stores a list of components (path information) in a path through which data is input and output in order to transfer specific data to or from the job execution server 110, and stores an entry for each data group that stores data. The entry of the path information table 320 has fields for a data ID 321, a network I / F ID 322, a network ID 323, an I / O port ID 324, and a volume ID 325.

[0061] Data ID 321 stores a value (data ID) that uniquely identifies a data group classified and divided so that it can be used by a data analyst in managed data analysis platform 100, and a data storage destination. For example, one database table for stock price analysis created for each listed company, in which a date and the opening and closing prices for that day are stored for each row (entry), may be one data group.

[0062] The network I / F ID 322 stores a value (network I / F ID) that uniquely identifies the network I / F of a server (e.g., the RDBMS server 120) that transfers the data of the data group indicated by the data ID corresponding to the entry to the job execution server 110. The network ID 323 stores a value (network ID) that uniquely identifies the network that transfers the data of the data group indicated by the data ID corresponding to the entry to the job execution server 110. The I / O port ID 324 stores a value (I / O port ID) that uniquely identifies the I / O port 131 of the storage device 130 that transfers the data of the data group indicated by the data ID 321 corresponding to the entry to the job execution server 110. The volume ID 325 stores a value (volume ID) that uniquely identifies the volume 132 in which the data of the data group indicated by the data ID 321 corresponding to the entry is stored.

[0063] For example, entry 3201 of the path information table 320 indicates that the path for transferring data of a data group with a data ID of "DB1_Table1" to the job execution server 110 is a path for transferring data from "volume 132a" via "network I / F 121a", the network of "network 140", and "I / O port 131a". Note that there may be multiple paths for a data group of one data ID. For example, if multiple I / O ports 131 are assigned to one volume 132 and data is transferred via any of the I / O ports 131, there will be multiple paths. In addition, the path information table 320 stores not only a path for reading data used in ETL processing as in entry 3201, but also a path for storing data after ETL processing as in entry 3204. In addition, in this embodiment, the path information is composed of data, a network I / F, a network, an I / O port, and a volume, but other components that may become a bottleneck may be included. For example, it may include a storage processor or a CPU of an RDBMS server that generates a load when transferring data.

[0064] In this embodiment, the component ID stored in the component information table 310 and the path information table 320 may be a value for identifying a physical component, or a value for identifying a component obtained by virtually integrating or dividing a physical component. For example, when a plurality of I / O ports are virtually integrated, it may be a single identifier of the integrated virtual I / O port. Conversely, when one I / O port is divided into a plurality of virtual I / O ports and a resource upper limit value is set for each of them, it may be a single identifier of each virtual I / O port. Also, when the RDBMS server 120 or the volume 132 is virtualized by RDBMS software or the like, it may be an identifier that identifies a plurality of physical components as a single component.

[0065] <Load information storage section 400> The load information storage unit 400 stores a load information table that stores time-series transitions of the load monitored for each monitoring metric type in each component of the data analysis infrastructure 100 collected by the management target information collection program 52000 .

[0066] FIG. 4 is a configuration diagram of a load information table in the load information storage unit according to the first embodiment.

[0067] The load information storage unit 400 stores a load information table (410, 420, 430, etc.) for each combination of a component and a monitoring metric type. In this embodiment, the load information storage unit 400 stores, for example, the same number of load information tables as the number of entries in the component information table 310 (the number of combinations of a component and a monitoring metric type). The load information table 410 is an example of a load information table corresponding to the receiving transfer rate of the I / O port 131a, the load information table 420 is an example of a load information table corresponding to the sending transfer rate of the I / O port 131a, and the load information table 430 is an example of a load information table corresponding to the transfer rate of the volume 132a.

[0068] The entries of the load information tables (410, 420, 430) include fields for time 401 (401a, 401c, 401e) and observed value 402 (402b, 402d, 402f). The time 401 stores the time when the load in the monitoring metric type of the component was observed. The observed load value 402 stores the observed load value. For example, entry 4101 of the load information table 410 indicates the following content. That is, it indicates that the load of the receiving transfer rate of I / O port 131a was 2.0 Gbps at 00:00 on Jan. 1, 2020.

[0069] <Response time information storage unit 500> The response time information storage unit 500 stores a response time information table 510 that stores information on the time (sometimes called response time) required to read or write a predetermined size of data stored in the volume 132 from the RDBMS server 120 for data transfer. For example, the RDBMS server 120 may execute a response time measurement program that reads and writes the predetermined data and measures the response time in the read and write, and the management target information collection program 52000 may store the response time information measured by the response time measurement program in the response time information table 510. The response time measurement program may be executed by the job execution server 110 or another computer in the same environment as the job execution server 110. The response time measurement by the response time measurement program may be performed periodically, or may be performed immediately before executing a requested resource amount calculation process (see FIG. 11) described later.

[0070] FIG. 5 is a configuration diagram of a response time information table according to the first embodiment.

[0071] The response time information table 510 includes fields for time 511, data ID 512, processing type 513, and response time 514. The time when the response time was measured is stored in the time 511. The data ID 512 stores a value (storage destination ID) that uniquely identifies the storage destination of the data read or written to measure the response time. The storage destination ID may be, for example, the data ID of a data group when a data group of the read data corresponds to the data storage destination. The processing type 513 stores a value that identifies the type of processing (processing type) executed when the response time was measured, for example, whether it was a data read process or a data write process. The response time 514 stores the measured response time. The response time may be the response time in one measurement, or may be the average or maximum value of each time obtained by performing the measurement multiple times.

[0072] For example, entry 5003 shows the following content. It indicates that the time it took for data of a data group with a data ID of "DB3_Table1" to write a specified size of data to a storage destination at 00:00 on January 1, 2020 was 10 ms (milliseconds). Note that in this embodiment, the response time is measured for each data of the data group with the data ID and for each data storage destination, but it may also be measured for each volume or each RDBMS server. Also, for data with the same path, the response time may be measured all at once.

[0073] <Data Attribute Information Storage Unit 600> The data attribute information storage unit 600 stores a data attribute information table 610 that stores information (data attribute information) regarding the attributes (e.g., data volume) of data groups classified and divided so that they can be used by data analysts in the managed data analysis platform 100.

[0074] FIG. 6 is a configuration diagram of a data attribute information table according to the first embodiment.

[0075] The data attribute information table 610 stores an entry for each data group. An entry in the data attribute information table 610 has fields for a data ID 611 and a data capacity 612. The data ID 611 stores a value (data ID) that uniquely identifies a data group that has been classified and divided so that it can be used by a data analyst. The data capacity 612 stores the capacity (data capacity) of the data group of the data ID corresponding to the entry.

[0076] For example, entry 6001 indicates the following content: That is, it indicates that the data capacity of the data group with the data ID "DB1_Table1" is 50 MB.

[0077] In the present embodiment, in order to give an example of performing ETL processing with one RDB table as one unit of parallelizable processing units, the data attribute information table 610 stores the data capacity with one RDB table as a unit. If the unit of data for which ETL processing is performed may be a row unit of an RDB table, the data attribute information table 610 may also store the data capacity for each row or the average value of the data for each row. In addition, since the present embodiment is targeted at RDB data, the data capacity of the RDB table is stored. However, for example, if the data to be subjected to ETL processing is a file, the data capacity for each file may be stored. In addition, if the data is stored in object storage, the data capacity of the object may be stored. In addition, in order to improve the efficiency of parallel processing of ETL processing, if the RDB table, file, and object are divided into logical partitions and managed by the ETL processing software, the data capacity for each partition or the average value may also be stored.

[0078] <Process Type Information Storage Unit 700> The process type information storage unit 700 classifies the contents of the process of a job that can be executed by the job execution server 110 in the managed data analysis infrastructure 100, and stores a process type information table 710 that stores information regarding the computational processing time for one execution of a parallelizable processing unit in the process and the data of the processing unit in the process.

[0079] FIG. 7 is a configuration diagram of a process type information table according to the first embodiment.

[0080] The process type information table 710 stores an entry for each process type. The entry of the process type information table 710 stores fields of a process type ID 711, a single processing calculation time 712, a read unit 713, a write unit 714, a read count 715, and a write count 716.

[0081] The process type ID 711 stores a value (process type ID) that classifies and uniquely identifies the contents of the processes that constitute a job that can be executed by the job execution server 110. The single processing calculation time 712 stores the calculation time (processing calculation time) required for one execution of a processing unit that can be executed in parallel during the execution of a process. In this embodiment, this processing calculation time does not include the time required for transferring data required for processing. The single processing calculation time may be a value derived by executing a process on a trial basis in advance and measuring the processing calculation time, such as when building the data analysis platform 100, or a value measured for a similar process in another data analysis platform. The processing calculation time may be measured when a process of a job corresponding to an entry is executed, and updated each time.

[0082] The read unit 713 stores the unit of data read from the volume 132 per processing unit executed in parallel. The write unit 714 stores the unit of data written to the volume 132 per processing unit executed in parallel. The read count 715 stores the number of times data is read from the volume 132 per processing unit executed in parallel. The write count 716 stores the number of times data is written to the volume 132 per processing unit executed in parallel.

[0083] For example, entry 7001 indicates the following: That is, a process with a process type ID of "Table_to_Table_Extract_Column" has a processing calculation time of 30 milliseconds per processing unit executed in parallel, and reads one table from volume 132 and writes one table to volume 132 per processing unit executed in parallel.

[0084] In this embodiment, the processing calculation time per processing unit of a given process is used as a unique value, but may not be uniquely determined depending on the processing contents. For example, it may vary greatly depending on the data volume handled in processing of one processing unit and the performance of the job execution server 110. In this case, a model of data volume and processing calculation time per processing unit (for example, a calculation formula expressing the correlation between data volume and processing calculation time per processing unit) for each process type, or a model of the job execution server and processing calculation time per processing unit may be prepared, and the processing calculation time per processing unit may be calculated based on the information in the data attribute information table 610 at the timing of executing a requested resource amount calculation process (see FIG. 11) described later or at the timing of registering a job. In this embodiment, information about data to be processed in processing units is stored in a table, but the present invention is not limited to this. For example, when executing a process such as an available resource amount calculation process (see FIG. 10) described later, the source code of the processing program to be executed may be analyzed to extract and use equivalent information.

[0085] <Input screen> Fig. 8 is a diagram showing an example of an input screen according to the first embodiment. The input screen shown in Fig. 8 shows an example when implemented using a GUI (Graphical User Interface).

[0086] The input screen 51110 is an input screen for a data analyst to input, using an input unit 51100, input data for executing ETL processing, details of the ETL processing to be executed, a storage destination of the processed data, and the relationship between them. The input screen 51110 has an input area 51111. The input area 51111 has a data node 51112, a process node 51113, and an output node 51114. The data node 51112 is an area for defining a data source for executing ETL processing for a job. The process node 51113 is an area for defining a process to be executed in a process. The output node 51114 is an area for defining a storage destination of the processed data.

[0087] Input screen 51110 shows that job A takes 999 tables with IDs DB1_Table1 to 999 managed by RDBMS server 120a (DB1) as input, extracts "Date," "Opening Price," and "Closing Price" from the columns of the tables, and stores them in table DB3_Table1 managed by RDBMS server 120c (DB3).

[0088] <Registered Job Information Storage Unit 800> The registered job information storage unit 800 stores a registered job information table 810 that stores information on processes, data sources, and outputs to be executed by jobs scheduled for execution or currently being executed based on information inputted by the input unit 51100.

[0089] FIG. 9 is a configuration diagram of a registered job information table according to the first embodiment.

[0090] The registered job information table 810 stores an entry for each job. The entry of the registered job information table 810 stores fields of a job ID 811, a process ID 812, a process type ID 813, a parameter 814, a data source 815, and an output 816.

[0091] The job ID 811 stores a value (job ID) that uniquely identifies a job (registered job) registered by a data analyst. The process ID 812 stores a value (process ID) that uniquely identifies a process (processing) executed by the job. The process type ID 813 stores a value (process type ID) that uniquely identifies a type of process. The parameter 814 stores a setting value (parameter) in the process. The parameter 814 stores, for example, a setting value set in the process node 51113 of the input screen 51110. The data source 815 stores a value that identifies data input to the process. The data source 815 stores, for example, a value set in the data node 51112 of the input screen 51110. The output 816 stores a value that uniquely identifies a destination for saving data output by the process. The output 816 stores, for example, a value set in the output node 51114 of the input screen 51110.

[0092] For example, entry 8001 shows the following: In other words, in a job with a job ID of "Job A", "Process a" with a process type of "Table_to_Table_Extract_Column" is executed with the setting values ​​"Date, Opening Price, Closing Price", the input data to Process a is 999 tables "DB1_Table1 to DB1_Table999", and the destination for saving the processed data is the table "DB3_Table1".

[0093] In this embodiment, one input data, one process, and one output are defined for one job, but multiple definitions may be made for one job. For example, in a job, if process b is defined using the processing result as input after process a is executed, and the result of process b is saved in volume 132 in storage device 130, multiple processes and the input data and output of each process may be stored in an entry.

[0094] Next, the processing operations in the data analysis platform management system 1 will be described in detail.

[0095] <Free resource amount calculation process> The free resource amount calculation process is performed by the CPU 211 executing the free resource amount calculation program 900 of the management computer 200, and is a process for calculating the free resource amount of each of the components that make up the data transfer path of the data processed by the job.

[0096] FIG. 10 is a flowchart of the free resource amount calculation process according to the first embodiment.

[0097] The free resource amount calculation process is started, for example, when it is detected that a new job has been registered, when it is detected that a delay in job execution has been detected, when it is detected that a large change has occurred in the load on the data transfer path of a job being executed, or at any timing. The free resource amount calculation process may be executed in a different order from the required resource amount calculation process described later, or may be executed simultaneously.

[0098] In step S901, the free resource amount calculation program 900 (more precisely, the CPU 211 executing the free resource amount calculation program 900) acquires an entry related to a specific job from the registered job information table 810. For example, the "specific job" may be a newly registered job (registered job) that triggered the start of the free resource amount calculation process, a job for which a processing delay has been detected, one of the jobs for which the load on the data transfer path has changed significantly, or any other job.

[0099] In step S902, the free resource amount calculation program 900 obtains path information related to the identifier stored in the data source 815 and output 816 of the entry obtained in step S901, i.e., path information for accessing the data of the identifier (e.g., a table), from the path information table 320 of the configuration information storage unit 300.

[0100] After step S902, the free resource amount calculation program 900 repeats the processing of loop 1 (steps S903 to S906) for each piece of path information acquired in step S902 as a processing target. Here, the path information as a processing target is referred to as target path information.

[0101] In step S903, the free resource amount calculation program 900 acquires all entries related to each component from the component information table 310 in the configuration information storage unit 300 based on the IDs (network I / F ID, network ID, I / O port ID, volume ID) of the components indicated by the entries of the target path information. Note that the entries related to the components include information on the maximum performance value of the components.

[0102] In step S904, the free resource amount calculation program 900 refers to a load information table related to the components in the load information storage unit 400 based on the IDs (network I / F ID, network ID, I / O port ID, volume ID) of the components indicated by the entries of the target path information, acquires an entry of load information from the load information table, and derives the load of each monitoring metric type of each component. At this time, the acquired entry may be the entry with the latest time 401 and may be used as the load value. Alternatively, for example, all entries whose time 401 falls within a predetermined period may be acquired, and the average or maximum value of those load values, or the average plus the standard deviation, may be used as the load value. Furthermore, a known load prediction algorithm may be used to predict future loads from the loads of a predetermined period, and the predicted load values ​​may be used as the load values ​​of each component.

[0103] In step S905, the free resource amount calculation program 900 calculates the free resource amount for each monitoring metric type of each component by subtracting the corresponding load value derived in step S904 from the maximum performance value in the maximum performance value 313 for all entries of the component information table 310 acquired in step S903.

[0104] In step S906, the available resource amount calculation program 900 stores the available resource amounts for all pairs of the configuration item and the monitoring metric type calculated in step S905. For example, the available resource amounts may be stored in the memory 212.

[0105] A specific example of the free resource amount calculation process is as follows. For example, when a new job A is registered as shown in the input screen 51110 of Fig. 8, in step S901, the free resource amount calculation program 900 acquires entry 8001 of the registered job information table 810. Next, the free resource amount calculation program 900 acquires 999 entries 3201 to 3202 and one entry 3204 of the path information table 320 based on the value "DB1_Table1 to DB1_Table999" of the data source 815 of the entry 8001 and the value "DB3_Table1" of the output 816 (step S902).

[0106] Next, the free resource amount calculation program 900 executes the processing of loop 1 (steps S903 to S906) for each of the acquired 1000 entries as a processing target. For example, when entry 3201 is selected as the processing target, in step S903, the free resource amount calculation program 900 acquires entries from the component information table 310 using the component IDs "network I / F 121a," "network 140," "I / O port 131a," and "volume 132a" stored in entry 3201 as keys. For example, when "I / O port 131a" is used as a key, the free resource amount calculation program 900 acquires entries 3101 and 3102.

[0107] In step S904, the free resource amount calculation program 900 acquires an entry from the corresponding load information table of the load information storage unit 400 using the component ID stored in the entry 3201 as a key. For example, when the "I / O port 131a" is used as a key and the latest load is used as the load value for the component, the free resource amount calculation program 900 acquires the entry 4104 of the load information table 410 and the entry 4204 of the load information table 420. Then, in step S905, when calculating the free resource amount of the reception transfer speed of the I / O port 131a, for example, the free resource amount calculation program 900 subtracts "2.0 Gbps" of the entry 4104 from "10 Gbps" which is the maximum performance value of the entry 3101 to obtain 8.0 Gbps as the free resource amount, and in step S906, stores a pair of the reception transfer speed of the I / O port 131a and the free resource amount.

[0108] In this embodiment, in each process, unnecessary data may be acquired or calculated for the purpose of explanation. For example, when the job execution server 110 calculates the amount of free resources for the process of reading data from a volume, it is sufficient to calculate only the amount of free resources for the sending transfer rate of the I / O port 131, but in this embodiment, the amount of free resources for the receiving transfer rate is also included in the calculation. Such unnecessary data acquisition or calculation may be reduced as necessary.

[0109] <Required resource amount calculation process> The required resource amount calculation process is a process performed by CPU 211 executing required resource amount calculation program 1000 of management computer 200, and calculates the amount of resources (required resource amount) requested from each component per processing unit (parallel processing unit) in which the process executed by the registered job can be executed in parallel.

[0110] FIG. 11 is a flowchart of the required resource amount calculation process according to the first embodiment.

[0111] The required resource amount calculation process may be started by detecting the completion of the free resource amount calculation process. The required resource amount calculation process may be executed in a reverse order to the free resource amount calculation process, or may be executed simultaneously. In this case, for example, the required resource amount calculation process may be started when it is detected that a new job has been registered, when it is detected that a job execution delay has been detected, when it is detected that the load on the data transfer path of the job being executed has changed significantly, or at any timing.

[0112] In step S1001, the requested resource amount calculation program 1000 (more precisely, the CPU 211 executing the requested resource amount calculation program 1000) acquires an entry (job information) related to a predetermined job from the registered job information table 810. For example, the predetermined job may be a job that is a trigger for starting the free resource amount calculation process.

[0113] After step S1001, the requested resource amount calculation program 1000 repeats the processing of loop 2 (steps S1002 to S1006) for all process information (process information) included in the job information acquired in step S1001. Here, the process information to be processed is referred to as target process information.

[0114] In step S1002, the required resource amount calculation program 1000 obtains path information related to the identifier stored in the data source 815 and output 816 of the target process information, i.e., path information for accessing the identifier data, from the path information table 320 of the configuration information storage unit 300.

[0115] In step S1003, the requested resource amount calculation program 1000 acquires a response time for the data for the data source 815 or the output 816 of the target process information from the response time information table 510. The acquired response time may be, for example, the latest response time for the data associated with the identifier of the data source 815 or the output 816 in the response time information table 510. Note that the response time may be acquired by measuring the response time for the data associated with the identifier of the data source 815 or the output 816 after the requested resource amount calculation process is started.

[0116] In step S1004, the required resource amount calculation program 1000 obtains related entries (one processing calculation time, read unit, write unit, number of reads, number of writes, etc.) from the process type information table 710 based on the process type ID of the process type ID 813 of the target process information.

[0117] In step S1005, the requested resource amount calculation program 1000 acquires from the data attribute information table 610 the data attribute of the data related to the value of the data source 815 of the target process information, that is, the data capacity.

[0118] In step S1006, the requested resource amount calculation program 1000 calculates the load per parallel processing unit of the process for each component of the path information acquired in step S1002, taking into consideration the direction of data transfer, based on the response time acquired in step S1003, the entry information acquired in step S1004 (single processing calculation time, read unit, write unit, read count, and write count), and the data capacity acquired in step S1005. For example, the load (bandwidth) of the I / O port 131a may be calculated using the following formulas (1) and (2).

[0119] Load of I / O port 131a's transmission transfer rate per parallel processing unit (Gbps) = (Average amount of data read x number of reads) / (Response time of read data × Number of reads + Processing calculation time for one time + Response time of write data × Number of writes) (1) Load of I / O port 131a receiving transfer speed per parallel processing unit (Gbps) = (Average amount of written data x number of writes) / (Response time of read data × Number of reads + Processing calculation time for one time + Response time of write data × Number of writes) (2)

[0120] Here, the average value of the read data capacity may be the average value of read data per parallel processing unit calculated based on the data source 815 and the read unit 713. Also, the average value of the write data capacity may be calculated, for example, from the average value of the read data capacity, for example, using the following formula (3). Average write data capacity = Average read data capacity × number of reads / number of writes (3)

[0121] In addition, when converting from a table to a file, the data volume of the table may be multiplied by the compression rate used when converting from a general table to a file. When extracting and writing a portion of the read data, the reduction rate (including a predicted value) may be multiplied.

[0122] Note that the above formulas (1) and (2) are based on the premise that the data transfer paths for reading and writing data are the same, but for example, if data is read from two data transfer paths and the ratio of the amount of data passing through two I / O ports is 3:2, the "load on the upstream transfer rate of network 140 per parallel processing unit" calculated by the above formula (1) may be multiplied by 3 / 5 and 2 / 5, respectively. Also, if the data transfer paths for reading and writing are different, the average read data capacity and the average write data capacity may be calculated and used for each path.

[0123] In step S1007, the required resource amount calculation program 1000 calculates the required resource amount for each component per parallel processing unit of the job acquired in step S1001, and stores the amount in the memory 212 or the like. For example, if the job has one process, the load for each component per parallel processing unit of the process calculated in step S1006 may be set as the required resource amount. On the other hand, for example, if the job includes multiple processes executed in parallel, the loads due to the multiple processes calculated in step S1006 may be added together to set the required resource amount. Also, for example, if the job includes multiple processes executed in sequence, the maximum value of the loads due to the multiple processes calculated in step S1006 may be set as the required resource amount. If the job includes multiple processes executed in parallel and multiple processes executed in sequence, the required resource amount may be calculated by combining them.

[0124] A specific example of the requested resource amount calculation process is as follows: For example, when a new job A is registered as shown in the input screen 51110 of Fig. 8, the requested resource amount calculation program 1000 acquires an entry 8001 of the registered job information table 810 in step S1001. Next, the requested resource amount calculation program 1000 repeats the process of loop 2 (steps S1002 to S1006) the number of times corresponding to the number of acquired entries.

[0125] In step S1003, the requested resource amount calculation program 1000 acquires 999 entries 3201 to 3202 and one entry 3204 of the path information table 320 based on the value “DB1_Table1 to DB1_Table999” of the data source 815 of the entry 8001 and the value “DB3_Table1” of the output 816 (step S1003).

[0126] Next, the required resource amount calculation program 1000 refers to entries 5001 and 5003 in the response time information table 510 based on the value of data source 815 "DB1_Table1 to DB1_Table999" of entry 8001 in the registered job information table 810 and the value of output 816 "DB3_Table1," and obtains a read response time of 3 ms (3 milliseconds) for DB1 and a write response time of 10 ms for DB3_Table1 (step S1003).

[0127] In step S1004, the requested resource amount calculation program 1000 acquires the entry 7001 from the process type table 710 based on the process type "Table_to_Table_Extract_Column" of the entry 8001. In step S1005, the requested resource amount calculation program 1000 acquires the data capacity of the data corresponding to the value "DB1_Table1 to DB1_Table999" of the data source 815 of the entry 8001 from the data attribute information table 610, and calculates the average value (for example, 70 MB in this example).

[0128] In step S1006, the requested resource amount calculation program 1000 calculates the load of each component stored in the path information (entries 3201 to 3202) acquired in step S1002.

[0129] For example, the load of the receiving transfer rate (Gbps) in one parallel processing unit of the I / O port 1131a, which is one of the components of the data transfer path when reading DB1_Tables 1-999, can be calculated from formula (1) as (70MB x 1) / (3 ms x 1 + 30 ms + 10 ms x 1) ≈ 1.6 Gbps. Then, the required resource amount calculation program 1000 stores, for example, the required resource amount of the receiving transfer rate of the I / O port 131a as "1.6 Gbps" (step S1007).

[0130] <Maximum parallel processing> The maximum parallel number calculation process is a process performed by CPU 211 executing maximum parallel number calculation program 1100, and calculates the maximum parallel number of a job that does not cause each component to become a bottleneck, based on the free resource amount of each component calculated in the free resource amount calculation process and the required resource amount of the job for each component calculated in the required resource amount calculation process.

[0131] FIG. 12 is a flowchart of the maximum parallel number calculation process according to the first embodiment.

[0132] The maximum parallel number calculation process is started, for example, when the completion of the free resource amount calculation process and the required resource amount calculation process is detected.

[0133] In step S1101, the maximum parallel number calculation program 1100 (more precisely, the CPU 211 executing the maximum parallel number calculation program 1100) obtains the free resource amount of each component on the path of the registered job calculated and stored in the free resource amount calculation process, and the required resource amount for each component per parallel processing unit calculated and stored in the required resource amount calculation process.

[0134] In step S1102, the maximum parallel number calculation program 1100 identifies a component that will run out of free resources at the smallest parallel number when the parallel number of the job is gradually increased based on the free resource amount of each component and the required resource amount for each component per parallel processing unit, calculates the maximum parallel number when the component does not run out of free resources, and sets this parallel number as the maximum parallel number of the job. For example, the maximum parallel number may be determined by calculating (free resource amount / required resource amount) for each component on the path, and setting the maximum integer value not exceeding the minimum value of these calculated values.

[0135] In step S1103, the maximum parallel number calculation program 1100 outputs the maximum parallel number calculated in step S1102 to the display unit 5100.

[0136] A specific example of the maximum parallel number calculation process is as follows. For example, in step S1101, the maximum parallel number calculation program 1100 receives the free resource amount of each component of the path calculated in the free resource amount calculation process and the requested resource amount for each component of the path of the registered job calculated in the requested resource amount calculation process. In step S1102, the maximum parallel number calculation program 1100 calculates the maximum parallel number allowed by the I / O port 131a as 8.0 / 1.6=5 when the free resource amount of the I / O port 131a is 8.0 Gbps and the requested resource amount is 1.6 Gbps. The parallel number of 5 means that the parallel number of the registered job is allowed up to 5. Furthermore, the maximum parallel number calculation program 1100 performs similar calculations for other components of the path. Here, the component that allows the smallest parallel number becomes a bottleneck, and the parallel number allowed by that component becomes the maximum parallel number in the data analysis platform. Therefore, the maximum parallel number calculation program 1100 calculates the maximum parallel number from the parallel number allowed by such a bottleneck component. In step S1103, the maximum parallel number calculation program 1100 displays, on the display unit 51200, for example, an output screen including the maximum parallel number (see, for example, FIG. 13).

[0137] <Output screen 51210> Fig. 13 is a diagram showing an example of an output screen according to the first embodiment. The output screen shown in Fig. 13 shows an example when implemented by a GUI.

[0138] The output screen 51210 has a display area 51211 for displaying the job name of the registered job, and a display area 51212 for displaying the recommended number of parallel processes for the job. The maximum number of parallel processes calculated by the maximum number of parallel processes calculation process is displayed in the display area 51212.

[0139] For example, the output screen 51210 in FIG. 13 indicates that it is recommended that the processing of "Job A" be executed with a parallel number of "20."

[0140] In the above embodiment, the maximum parallel number is displayed on the output screen 51210. However, for example, the management computer 200 may have a function for setting the job execution server 110 to execute the job with the maximum parallel number calculated by the maximum parallel number calculation process.

[0141] As described above, according to the first embodiment, for example, when executing a job, the maximum parallel number of the job can be calculated based on the load of the components on the path that transfers data of the job and the maximum performance value so that each component does not become a bottleneck. This makes it possible to appropriately determine the number of parallel processes that minimizes the time required to complete the job and reduces the amount of money charged to the computer in the public cloud environment 101.

[0142] In the first embodiment, an example is shown on the assumption that the parallel number of processes executed by a job maintains the set parallel number at any time during job execution. However, in actual ETL processing, especially immediately after starting a job, the job may not be executed with the set parallel number due to the processing load for starting the job.

[0143] Here, a change in the amount of resources required for a job will be described.

[0144] Fig. 14 is a diagram showing changes in the amount of resources required for a job, in which Fig. 14(a) shows changes in the amount of resources required for an ideal job in the first embodiment, and Fig. 14(b) shows changes in the amount of resources required for a typical job.

[0145] For example, in the first embodiment, it is assumed that the amount of requested resources ideally increases by the number of parallel jobs when a job is started, and decreases when the job is finished, as shown in graph 51301. However, in reality, as shown in graph 51302, the amount of requested resources gradually increases when a job is started, and gradually decreases as the job approaches completion. In response to this, a model that can learn the fluctuation of the amount of requested resources as shown in graph 51302 by machine learning or the like for each process type and derive the number of parallel jobs and the peak value of the amount of requested resources may be created in advance, and the maximum number of parallel jobs may be calculated by obtaining the number of parallel jobs at the peak value of the amount of requested resources. For example, a model that has at least the response time of data transfer based on the process type, the processing calculation time of one parallel processing unit of the process, the number of reads, the number of writes, the data capacity of the data to be read and the read unit, the data capacity of the data to be written and the write unit, and the number of parallel jobs as feature quantities, and that calculates the amount of requested resources (or the peak value of the amount of requested resources), may be created, and the maximum number of parallel jobs may be calculated using this model.

[0146] In the first embodiment, only the maximum parallel number of the registered job is displayed on the output screen 51210, but the scheduled completion time of the job when executed with the maximum parallel number may also be displayed. The method of calculating the scheduled completion time of the job may be the same as that used in the scheduled completion time calculation process (FIG. 18) of the second embodiment described later.

[0147] In the first embodiment, the recommended parallel number for a job is calculated and displayed, but the specifications of the job execution server that executes the job may be determined based on the calculated recommended parallel number. For example, the load on the job execution server 110 per parallel processing unit may be measured for each process type and stored, the load on the job execution server 110 for the recommended parallel number may be calculated, and the specifications (performance) of the job execution server 110 may be determined to satisfy this load.

[0148] In the first embodiment, an example is given in which one RDBMS server 120 is provided for one DB, but the RDBMS server 120 may be clustered. In this case, the information on the components stored in the component information table 310 may treat all the clustered RDBMS servers 120 as one server. For example, the maximum performance value of the network I / F 153 may be a value obtained by adding up the maximum performance values ​​of the network I / Fs 153 of all the RDBMS servers 120 constituting the cluster. In addition, in the case where the RDBMS server 120 can automatically change the number of servers using an auto-scaling function or the like, the maximum performance value may be a value obtained by adding up the performance values ​​of the components of all the servers at the maximum number of servers that can be changed.

[0149] In addition, in the first embodiment, the data on which ETL processing is performed is RDB data, but the data is not limited to this and may be data in file format or object format, and the data may be stored and managed on a file server or object storage.

[0150] In the first embodiment, since the main components that can become a bottleneck in a hybrid cloud environment including the public cloud environment 101 and the on-premise environment 102 are components related to data transfer, the maximum parallel number is derived based on the maximum performance value of the transfer speed of the components related to data transfer and the required load, but the maximum parallel number may be calculated including, for example, the CPU load of the server and the processor load of the storage device. In addition, although an example has been shown in which the transfer speed (for example, the amount of data transferred per second) is used as the monitoring metric type, this is not limiting and IOPS (the number of IOs per second) may also be used. Furthermore, other components and monitoring metric types may be included as long as the load and maximum performance value can be calculated.

[0151] In the first embodiment, the maximum parallel number is determined for a job, but if the data analysis platform 100 can change the parallel number for each process while the job is being executed, the maximum parallel number may be determined for each process by executing a similar process for each process. In this case, the maximum parallel number for each process may be displayed on the output screen 51210.

[0152] In the first embodiment, the registered job is executed immediately upon registration, but it may be started at a specified time by a scheduler function, etc. In this case, the load of each component used in the free resource amount calculation process and the response time value used in the required resource amount calculation process may be calculated using a predicted load or predicted response time at a specified time predicted from past load information or information or response time of other scheduled jobs, or the maximum parallel number may be recalculated by executing each process immediately before the execution of the job.

[0153] In addition, in the first embodiment, the identifier for identifying the data group classified and divided for use by the data analyst and the identifier for the storage destination of that data are the same, but the present invention is not limited to this. The identifier for identifying the data group and the identifier for the storage destination may be different identifiers, and they may be managed in correspondence with each other to identify the correspondence.

[0154] In addition, in the first embodiment, an example is shown in which the required resource amount calculation process is executed immediately before the maximum parallel number calculation process. However, for example, in an environment in which there is little variation in response time for reading and writing data, the required resource amount calculation process may be executed when a job is registered, and the required resource amount per parallel processing unit may be stored, and then the maximum parallel number calculation process may be executed using the stored required resource amount.

[0155] In addition, in the first embodiment, it is assumed that the parallel number of a job cannot be changed while the job is being executed. However, the parallel number may be made changeable while a process is being executed. In this case, for example, the maximum parallel number may be calculated by executing the free resource amount calculation process, maximum parallel number calculation process, etc., at the time when another job or another process is completed.

[0156] In addition, in the first embodiment, it is assumed that one unit of data is read for one parallel processing unit, but depending on the ETL platform, when one process is executed, each job execution server parallelized before the process execution starts reads the assigned data collectively. In order to accommodate such platforms, the characteristics of such platforms may be taken into consideration when calculating the amount of required resources per parallel processing unit. For example, when calculating the load of the transmission transfer speed of the I / O port 131a per parallel processing unit, the calculation may be made excluding the "single processing calculation time" executed by the process.

[0157] Second Embodiment Next, a data analysis platform management system according to the second embodiment will be described. In the following description, the differences from the first embodiment will be mainly described, and the same reference numerals will be used for equivalent components, programs having equivalent functions, and tables having equivalent items, and descriptions thereof will be omitted or simplified.

[0158] In the data analysis platform management system 1 according to the first embodiment, the parallel number of ETL processing jobs is determined according to the load on the data analysis platform 100. In the first embodiment, when a certain ETL processing job is newly executed, if the resources of one component of the data analysis platform have been used to their maximum by other jobs, the parallel number of the new job may become extremely small (for example, 1). However, rather than executing with such a small parallel number, there are cases where the processing can be completed more quickly by waiting for the other jobs to complete and then making maximum use of the resources of the data analysis platform 100.

[0159] Therefore, when executing a registered job, the data analysis platform management system of the second embodiment predicts the completion time of other ETL processing jobs and determines whether to execute the registered job at the specified time or wait until the other jobs are completed before executing it.

[0160] In the management computer 200 according to the second embodiment, the registered job information storage unit 800 stores a registered job information table 850 instead of the registered job information table 810, and the management computer 200 stores a maximum parallel number calculation program 1110 instead of the maximum parallel number calculation program 1100.

[0161] <Registered Job Information Storage Unit 800> The registered job information storage unit 800 stores a registered job information table 850 .

[0162] 15 is a diagram showing the configuration of a registered job information table according to the second embodiment. Note that the same reference numerals are given to fields similar to those in the registered job information table 810, and the description thereof will be omitted.

[0163] An entry in the registered job information table 850 has fields for a job ID 811, a process ID 812, a process type ID 813, parameters 814, a data source 815, an output 816, a start time 851, an estimated completion time 852, and a parallel number 853 to store information about an ETL processing job registered by a data analyst. The start time 851 stores the time when execution of the job starts (start time). The estimated completion time 852 stores a predicted value for the completion time of the job (estimated completion time). The parallel number 853 stores the parallel number of a job that is being executed or is scheduled to be executed.

[0164] For example, entry 14001 of the registered job information table 850 indicates that the registered job A will start at 0:00 on January 1, 2020, the expected completion time is 12:00 on January 1, 2020, and the job will be executed with a parallel count of 20.

[0165] <Maximum parallel processing> The maximum parallel number calculation process is a process performed by CPU 211 executing maximum parallel number calculation program 1110 of management computer 200, and includes a process of calculating the maximum parallel number and estimated completion time when a registered job is started after the estimated completion time of each of the other jobs, and calculating the start time, estimated completion time, and parallel number that result in the earliest estimated completion time.

[0166] FIG. 16 is a flowchart of the maximum parallel number calculation process according to the second embodiment.

[0167] The maximum parallel number calculation process is executed, for example, when the completion of the free resource amount calculation process and the required resource amount calculation process is detected.

[0168] In step S1501, the maximum parallel number calculation program 1110 executes the maximum parallel number calculation process (see FIG. 12) of the first embodiment.

[0169] In step S1502, the maximum parallel number calculation program 1110 executes a scheduled completion time calculation process (see FIG. 18) to predict and store the scheduled completion time for the registered job acquired in step S901 of the free resource amount calculation process when the job is executed with the parallel number calculated in step S1102 for a certain start time (e.g., a time specified by a data analyst, the current time, or any time).

[0170] In step S1503, the maximum parallel number calculation program 1110 acquires other job information from the registered job information table 850. Note that the other job information acquired here may be limited to jobs executed in the same period. The same period indicates, for example, a case where the period indicated by the start time to the estimated completion time of a registered job overlaps with the period indicated by the start time to the estimated completion time of another job. Also, the jobs acquired here may be limited to jobs whose data transfer paths overlap with those of the registered job.

[0171] In step S1504, the maximum parallel number calculation program 1110 sorts the information on the other jobs acquired in step S1503 in order of their expected completion times and stores them in a queue. The queue may be stored in the memory 212, for example.

[0172] In step S1505, the maximum parallel number calculation program 1110 acquires one piece of job information from the queue. Here, the job in the acquired job information is referred to as the target job.

[0173] In step S1506, the maximum parallel number calculation program 1110 calculates the amount of resources required when executing the target job. For example, the maximum parallel number calculation program 1110 calls the required resource amount calculation program 1000 to calculate the amount of resources required per parallel processing unit of the target job, obtains the number of parallel processes in the parallel number 853 of the job information from the registered job information table 850, and calculates the amount of resources required by the following formula (4). Required resource amount = (required resource amount per parallel processing unit) × (number of parallel processes) (4) In this embodiment, the amount of resources required for one job is constant for the entire job. However, for example, in the case of a job having multiple processes that are executed sequentially, the amount of resources required may be calculated for each process.

[0174] In step S1507, the maximum parallel number calculation program 1110 calculates the amount of free resources when the target job is executed. For example, the maximum parallel number calculation program 1110 calls the free resource amount calculation program 900 to calculate the amount of free resources. If the start time of the target job is after the current time, the amount of required resources of other jobs executed after the start time may be calculated as the load and the amount of free resources may be calculated, or the load after the start time may be predicted using a known load prediction algorithm and the amount of free resources may be calculated using the predicted load.

[0175] In step S1508, the maximum parallel number calculation program 1110 subtracts the amount of resources required for the target job calculated in step S1506 from the amount of free resources when the target job is executed calculated in step S1507, to calculate the amount of free resources for each component when the target job is completed.

[0176] In step S1509, the maximum parallel number calculation program 1110 calculates the maximum parallel number when the registered job is started after the target job is completed. The maximum parallel number may be calculated by a process similar to the maximum parallel number calculation process of the first embodiment, based on the amount of free resources when the target job is completed in step S1508 and the amount of required resources per parallel processing unit of the registered job calculated by the required resource amount calculation program 900.

[0177] In step S1510, the maximum parallel number calculation program 1110 calculates the expected completion time when the expected completion time of the target job is set to the start time of the registered job by the expected completion time calculation process (see FIG. 18).

[0178] In step S1511, the maximum parallel number calculation program 1110 judges whether the estimated completion time calculated in step S1510 is earlier than the estimated completion time stored in step S1502. If the result of this judgment is true (S1511: YES), the maximum parallel number calculation program 1110 advances the process to step S1512, and if the result of this judgment is false (S1511: NO), the maximum parallel number calculation program 1110 advances the process to step S1513.

[0179] In step S1512, the maximum parallel number calculation program 1110 updates the estimated completion time of the registered job stored in step S1502 to the estimated completion time calculated in step S1510.

[0180] In step S1513, the maximum parallel number calculation program 1110 judges whether the queue is empty or not. If the result of this judgment is true (S1513: YES), the maximum parallel number calculation program 1110 advances the process to step S1514, and if the result of this judgment is false (S1513: NO), the maximum parallel number calculation program 1110 advances the process to step S1505.

[0181] In step S1514, the maximum parallel number calculation program 1110 outputs to the display unit 51200 an output screen 51220 (see FIG. 19) including a pair of the scheduled completion time of the registered job stored in step S1502 or step S1512, the maximum parallel number at the time the scheduled completion time was stored, and the start time used in step S1502 or S1510 when the scheduled completion time was stored.

[0182] Here, the essence of the processes from S1502 to S1514 in the maximum parallel number calculation process will be described.

[0183] FIG. 17 is a diagram for explaining the essence of the maximum parallel number calculation process according to the second embodiment.

[0184] The process of outputting the start time, expected completion time, and parallel number by steps S1502 to S1514 by the maximum parallel number calculation program 1110 corresponds to a process of searching for a rectangle (e.g., graph 51600 in FIG. 17) indicating the execution period of a registered job that does not exceed the maximum performance value of each component of the data analysis platform 100 and has the earliest expected completion time, among rectangles formed by the load of each component due to other jobs (job B, job C) and the execution period of the job, as shown in FIG. 17. Note that the process of searching for the location of the rectangle indicating the execution period of a registered job is not limited to the above, and for example, the maximum parallel number, start time, and expected completion time when the registered job is executed for each arbitrary interval of time may be calculated, and an optimal interval may be derived.

[0185] In the second embodiment, no description is given of other jobs that start after the start time of the registered job and before the scheduled completion time, but the load of those jobs may be predicted to calculate the maximum parallel number of the registered job.

[0186] Also, a priority may be set for each job, and if other jobs have a lower priority, the maximum parallel number may be calculated without including the loads of those jobs.

[0187] In the second embodiment, as shown in graph 51301 of FIG. 14, the amount of requested resources is ideally calculated based on the assumption that the amount of requested resources increases by the number of parallel jobs as the job is started and decreases as the job is completed. However, in reality, as shown in graph 51302 of FIG. 14, the amount of requested resources increases gradually and then decreases gradually. Here, as shown in graph 51301, instead of the number of parallel jobs that can be the maximum amount of requested resources from the start of the job to the end of the job, a number of parallel jobs less than that number (a number of parallel jobs less by a predetermined percentage (e.g., 20%)) may be set as the maximum number of parallel jobs. In this way, although the maximum processing efficiency is somewhat reduced, it is possible to reduce the amount of wasted resources that are secured without being used immediately after the start of the job or immediately before the end of the job.

[0188] <Estimated completion time calculation process> The estimated completion time calculation process is a process that is performed by the CPU 211 executing the maximum parallel number calculation program 1110, and is a process that calculates the estimated completion time of a registered job for a specified start time and parallel number.

[0189] FIG. 18 is a flowchart of the estimated completion time calculation process according to the second embodiment.

[0190] The estimated completion time calculation process is executed in steps S1502 and S1510 of the maximum parallel number calculation process.

[0191] In step S1701, the maximum parallel number calculation program 1110 acquires the specified registered job information, the start time, and the parallel number of the job.

[0192] After step S1701, the maximum parallel number calculation program 1110 executes the processing of loop 3 (steps S1702 to S1704) for all process IDs 802 of the registered job acquired in step S1701. Here, the process IDs to be processed are referred to as target process IDs.

[0193] In step S1702, the maximum parallel number calculation program 1110 acquires the response time of the data indicated by the data source 815 or the value of the output 816 of the target process ID from the response time information table 510. The acquired response time may be, for example, the latest response time related to the data source 815 or the value of the output 816, or may be the response time measured after the estimated completion time calculation process is started.

[0194] In step S1703, the maximum parallel number calculation program 1110 obtains related entries (one processing calculation time, read unit, write unit, number of reads, and number of writes) from the process type information table 710 based on the process type ID of the process type ID 813 related to the target process ID.

[0195] In step S1704, the maximum parallel number calculation program 1110 calculates the processing time per parallel processing unit of the process based on the response time acquired in step S1702, and the processing calculation time per entry, read unit, write unit, number of reads, and number of writes acquired in step S1703. For example, the processing time per parallel processing unit of the process is calculated using the following formula (5).

[0196] Processing time per parallel processing unit of a process = (Response time of read data × Number of reads + Processing calculation time for one time + Response time of write data × Number of writes) (5)

[0197] In step S1705, the maximum parallel number calculation program 1110 calculates the expected completion time of the job based on the processing time per parallel processing unit of each process calculated in the processing (S1702 to S1704) of loop 3, the start time, and the parallel number. For example, the expected completion time is calculated using the following formula (6). Estimated completion time = start time + job processing time (6) The job processing time is calculated using the following formula (7). Job processing time =Σ(process){(processing time per parallel processing unit of process × number of data reads) / (number of parallel processes × number of reads)} (7) The number of read data items may be the number of times data is transferred from a storage device, which can be calculated based on the read unit in the read unit 713 in the process type table 710 and the value of the data source 815 in the registered job information table 850 .

[0198] A specific example of the estimated completion time calculation process is as follows. For example, the maximum parallel number calculation program 1110 acquires the job A indicated by the entry 8001 of the registered job information table 810, the start time of 12:00 on Jan. 1, 2020, and the parallel number of 5 as inputs in step S1701, and repeats the process of loop 3 (steps S1702 to S1704). In the process of loop 3, the maximum parallel number calculation program 1110 acquires the response time of 3 milliseconds for the data transfer of the data indicated by the data source 815 and the response time of 10 milliseconds for the data transfer of "DB3_Table1" indicated by the output 816 for the process ID "process a" of the entry 8001 from the response time information table 510 (step S1703). In step S1703, the maximum parallel number calculation program 1110 obtains the entry 7001 whose process type ID is “Table_to_Table_Extract_Column” from the process type information table 710, and obtains the processing calculation time per process “30 milliseconds”, the number of reads “1”, the number of writes “1”, the read unit “1 table”, and the write unit “1 table”. In step S1704, the maximum parallel number calculation program 1110 calculates the processing time per parallel processing unit=(3 milliseconds×1+30 milliseconds+10 milliseconds×1)=43 milliseconds.

[0199] After processing loop 3, in step S1705, the maximum parallel number calculation program 1110 calculates that since the read unit is one table and the data source is tables 1 to 999, the number of data to be read is 999, and the job processing time = (43 milliseconds x 999) / (5 x 1) ≒ 8.5 seconds.

[0200] In the second embodiment, the job processing time calculated in step S1705 is an example in which only the processing time required for each process is calculated. However, in reality, the job startup time and preprocessing time are also required when executing a job, so these times may also be added to the calculation.

[0201] In the second embodiment, the calculation is performed on the assumption that the parallel number of the process executed by the job maintains the set parallel number at any time. However, in the actual ETL process, the job may not be executed with the specified parallel number due to the processing load for starting the job, especially immediately after the job is started. That is, in reality, the amount of required resources gradually increases and gradually decreases as shown in the graph 51302 of FIG. 14, and the processing time of the job varies accordingly. Therefore, the fluctuation of the processing time as shown in the graph 51302 of FIG. 14 may be learned by machine learning or the like for each process type, and a model that can derive the processing time of the job may be created, and the estimated completion time may be calculated by using this model in the estimated completion time calculation process. For example, a model that has at least the response time of data transfer based on the process type, the processing calculation time of one parallel processing unit of the process, the number of reads, the number of writes, the number of read data calculated from the data source and the read unit, and the number of parallels may be created to calculate the processing time of the job, and the processing time of the job may be calculated using this model.

[0202] <Output screen 51220> Fig. 19 is a diagram showing an example of an output screen according to the second embodiment. The output screen shown in Fig. 19 shows an example of a case where the output screen is implemented by a GUI. Note that the same reference numerals are used to designate the same parts as those of the output screen 51210 according to the first embodiment.

[0203] The output screen 51220 has a display area 51211 that displays the job name of the registered job, a display area 51212 that displays the recommended number of parallel processes for the job, a display area 51213 that displays the recommended start time for the registered job, and a display area 51214 that displays the estimated completion time of the registered job.

[0204] For example, output screen 51220 in FIG. 19 shows that the processing of “Job A” will be executed with a parallel number of 20, the start time is 0:00 on January 2, 2020, and the scheduled completion time of the job is 1:00 on January 2, 2020.

[0205] In the above embodiment, the maximum parallel number is displayed on the output screen 51220. However, for example, the management computer 200 may have a function for setting the job execution server 110 to execute the job with the maximum parallel number calculated by the maximum parallel number calculation process.

[0206] In addition, using the values ​​calculated in steps S1509 to S1510, the output screen 51220 may display a set of the start time, expected completion time, and parallel number in the case where there is no waiting for the completion of other jobs, for each expected completion time of the other jobs.

[0207] As described above, according to the second embodiment, when executing a registered job, it is determined based on the completion times of other ETL processing jobs whether to execute the registered job at a specified time or wait until the other jobs are completed before executing it, and the start time at which the job can be completed at the earliest is determined.

[0208] In the second embodiment, the estimated completion time of a job is calculated using the process processing time and response time measured in advance, but if the job is already being executed, the execution time and progress of the job may be measured to predict the estimated completion time.

[0209] Third Embodiment Next, a data analysis platform management system according to the third embodiment will be described. In the following description, the differences from the first and second embodiments will be mainly described, and the same reference numerals will be used for equivalent components, programs having equivalent functions, and tables having equivalent items, and descriptions thereof will be omitted or simplified.

[0210] In the data analysis platform management systems according to the first and second embodiments, the number of parallel jobs or the start time of a job that will complete the job at the shortest time is determined according to the load on the data analysis platform 100 and the scheduled completion times of other ETL processing jobs. However, when a data analyst has a specific deadline for the completion time of a job, the methods according to the first and second embodiments may not allow the job to be completed within the deadline because resources of the data analysis platform are being used by other jobs.

[0211] Therefore, in the data analysis platform management system of the third embodiment, an example is described in which a data analyst is allowed to set an allowable deadline for job completion, and when executing a registered job, the scheduled completion time of the job is predicted, and if the scheduled completion time exceeds the allowable deadline, the parallel number of other jobs is changed within the allowable deadline of the other jobs.

[0212] The management computer 200 of the third embodiment displays an input screen 51120 instead of the input screen 51110, the registered job information storage unit 800 of the second embodiment stores a registered job information table 860 instead of the registered job information table 850, and the management computer 200 stores a maximum parallel number calculation program 1120 instead of the maximum parallel number calculation program 1110.

[0213] <Input screen 51120> Fig. 20 is a diagram showing an example of an input screen according to the third embodiment. The input screen shown in Fig. 20 shows an example of a case where the input screen is implemented by a GUI. Note that the same reference numerals are used to designate the same parts as those of the input screen 51110 according to the first embodiment.

[0214] An input area 51111 of an input screen 51120 has a data node 51112, a process node 51113, an output node 51114, and a job completion allowable deadline 51115. The job completion allowable deadline 51115 is an area where a data analyst can define an allowable deadline for the completion time of a registered job. Based on the information entered into this input screen 51120, information regarding the completion allowable deadline of a job that is scheduled to be executed or is currently being executed is stored in a registered job information table 860.

[0215] For example, input screen 51120 indicates that the allowable deadline for the completion time of job A is 4:00 a.m. on Jan. 2, 2020.

[0216] <Registered Job Information Storage Unit 800> The registered job information storage unit 800 stores a registered job information table 860 .

[0217] 21 is a diagram showing the structure of a registered job information table according to the third embodiment. Note that the same fields as those in the registered job information table 850 are given the same reference numerals, and the description thereof will be omitted.

[0218] An entry in the registered job information table 860 has fields for storing information about ETL processing jobs registered by a data analyst, including job ID 811, process ID 812, process type ID 813, parameters 814, data source 815, output 816, start time 851, estimated completion time 852, number of parallel runs 853, requested resource amount 861, allowable deadline 862, minimum number of parallel runs 863, and minimum requested resource amount 864.

[0219] The requested resource amount 861 stores the requested resource amount when the job is executed with the parallel number stored in the parallel number 853. The allowable deadline 862 stores the allowable deadline for completion of the job input by the data analyst. The minimum parallel number 863 stores the minimum parallel number required to meet the allowable completion deadline. The minimum requested resource amount 864 stores the requested resource amount (minimum requested resource amount) for each component of the data analysis platform 100 when executed with the minimum parallel number.

[0220] For example, entry 19001 of registered job information table 860 indicates that registered job A is executed with a parallel number of 20, and the required resource amount at that time is, for example, 2 Gbps for the receiving transfer speed of network I / F 153. Furthermore, it indicates that the job is required to be completed at least by 4:00 on January 2, 2020, the minimum parallel number of the job required for this is 10, and the required resource amount when executed with the minimum parallel number is, for example, 1 Gbps for the receiving transfer speed of network I / F 153.

[0221] The minimum parallel number and the minimum requested resource amount may be calculated when the allowable completion deadline for the job is set. For example, they may be derived by executing an estimated completion time calculation process, inputting a specified value for the start time, changing the parallel number to an arbitrary value, and searching for a value that makes the estimated completion time output by the estimated completion time calculation process closest to the value of the allowable completion deadline. The requested resource amount and the minimum requested resource amount may be calculated based on the requested resource amount per parallel processing unit calculated by the requested resource amount calculation process and the parallel number of the parallel number 853 or the minimum parallel number of the minimum parallel number 863.

[0222] <Maximum parallel processing> The maximum parallel number calculation process is a process performed by CPU 211 executing maximum parallel number calculation program 1120 of management computer 200, and further includes a process of searching for the parallel number (or amount of resources used) of other jobs that satisfies all of the allowable completion deadlines of the registered job and other jobs when the registered job does not meet the allowable completion deadline for the current amount of free resources.

[0223] FIG. 22 is a flowchart of the maximum parallel number calculation process according to the third embodiment.

[0224] The maximum parallel number calculation process is executed, for example, when the completion of the free resource amount calculation process and the required resource amount calculation process is detected.

[0225] In step S2001, the maximum parallel number calculation program 1120 executes the maximum parallel number calculation process (see FIG. 16) of the second embodiment.

[0226] In step S2002, the maximum parallel number calculation program 1120 obtains the permissible completion time limit from the registered job information table 860 for the registered job obtained in step S901 of the free resource amount calculation process.

[0227] In step S2003, the maximum parallel number calculation program 1120 judges whether the estimated completion time derived in step S2001 is later than the allowable completion time limit. If the result of this judgment is true (S2003: YES), the maximum parallel number calculation program 1120 advances the process to step S2004, and if the result of this judgment is false (S2003: NO), the maximum parallel number calculation program 1120 advances the process to step S2012.

[0228] In step S2004, the maximum parallel number calculation program 1120 stores the free resource amounts of the components on the data transfer path of the registered job calculated in the free resource amount calculation process.

[0229] In step S2005, the maximum parallel number calculation program 1120 acquires other job information from the registered job information table 860 and stores it in the queue. The other job information acquired here may be limited to jobs executed in the same period. The same period refers to, for example, a case where the period from the start time of a registered job to the allowable completion time limit overlaps with the period from the start time of another job to the allowable completion time limit. The jobs acquired here may be limited to jobs whose data transfer paths overlap with those of the registered job.

[0230] In step S2006, the maximum parallel number calculation program 1120 judges whether the queue in step S2005 is empty. If the result of this judgment is true (S2006: YES), the maximum parallel number calculation program 1120 advances the process to step S2013, and if the result of this judgment is false (S2006: NO), the maximum parallel number calculation program 1120 advances the process to step S2007.

[0231] In step S2007, the maximum parallel number calculation program 1120 acquires one piece of job information from the queue in step S2005. Here, the job in the acquired job information is referred to as the target job.

[0232] In step S2008, the maximum parallel number calculation program 1120 calculates the amount of free resources of each component when the target job is changed to the minimum parallel number from the amount of free resources stored in step S2004. When reducing the current parallel number setting value of the target job to the minimum parallel number, the amount of resources that can be reduced can be calculated as (requested resource amount - minimum requested resource amount). Then, by adding this value to the amount of free resources, the amount of free resources when changed to the minimum parallel number can be calculated.

[0233] In step S2009, the maximum parallel number calculation program 1120 updates the amount of free resources stored in step S2004, and stores information on the target job (target job information).

[0234] In step S2010, the maximum parallel number calculation program 1120 compares the requested resource amount of the registered job 861 with the free resource amount updated in step S2009, and judges whether the free resource amount satisfies the requested resource amount of the registered job. If the result of this judgment is true (S2010: YES), the maximum parallel number calculation program 1120 proceeds to step S2011, and if the result of this judgment is false (S2010: NO), the parallel number calculation program 1120 proceeds to step S2006.

[0235] In step S2011, the maximum parallel number calculation program 1120 outputs a set of the identification information of the other job (target job) stored in step S2009 and the minimum parallel number. For example, the maximum parallel number calculation program 1120 may display an output screen 51220 and request the data analyst to change the parallel number of the other job, or may request the job execution server 110 to change the parallel number.

[0236] In step S2012, the maximum parallel number calculation program 1120 outputs the maximum parallel number of the registered job (in this example, the same value as the minimum parallel number), the start time, and the expected completion time. For example, the maximum parallel number calculation program 1120 may display an output screen 51220 and request the data analyst to set the execution settings of the registered job, or may request the job execution server 110 to set the execution settings of the registered job.

[0237] In step S2013, the maximum parallel number calculation program 1120 outputs a message indicating that the scheduled completion time is later than the allowable completion time. For example, the maximum parallel number calculation program 1120 displays on the output screen 51220 that the scheduled completion time is later than the allowable completion time.

[0238] As described above, according to the third embodiment, when a registered job is executed and the amount of available resources is insufficient for the allowable completion deadline set by the data analyst, a combination of other jobs that reduces the number of parallel jobs in order to satisfy the allowable completion deadline can be identified.

[0239] In the third embodiment, in the maximum parallel number calculation process, all of the maximum parallel number calculation process of the second embodiment is executed. However, it is also possible to execute only steps S1501 to S1502 without executing the process of searching for the start time of the maximum parallel number calculation process of the second embodiment (steps S1503 to S1514).

[0240] In the third embodiment, an example was shown in which the number of parallel jobs can be changed during job execution, but if the data analysis platform cannot change the number of parallel jobs during job execution, the amount of available resources for a registered job may be increased by changing (reducing) the amount of available resources for the job using a server, storage device, RDBMS software, etc. For example, if the storage device 130 has a function for setting an upper limit on the throughput from a specific server to a specific I / O port, the amount of available resources for the I / O port for other jobs can be reduced, and the amount of resources requested to other components can be reduced accordingly. This allows the registered job to be executed appropriately even if the number of parallel jobs to be executed by the job execution server 110 cannot be changed.

[0241] In this case, in step S2008 of the maximum parallel number calculation process, the maximum parallel number calculation program calculates the amount of free resources that satisfies the minimum required resource amount (i.e., the same as the amount of free resources when executed with the minimum parallel number), not the amount of free resources when executed with the minimum parallel number. Also, for example, when using the I / O port throughput upper limit setting function, this function can set an upper limit only on the throughput between the RDBMS server 120 and the I / O port 131, so in step S2007 of the maximum parallel number calculation process, when other job information is taken out from the queue, it is necessary to group jobs that access the same RDBMS server 120, retrieve the grouped jobs collectively from the queue, and execute subsequent processing on the grouped jobs.

[0242] The present invention is not limited to the above-described embodiment, and can be modified as appropriate without departing from the spirit of the present invention.

[0243] For example, in the above-described embodiment, a part or all of the processing performed by the processor may be performed by a dedicated hardware circuit. Also, the program in the above-described embodiment may be installed from a program source. The program source may be a program distribution server or a storage medium (e.g., a portable storage medium). [Explanation of symbols]

[0244] 1...data analysis platform management system, 100...data analysis platform, 120...public cloud environment, 102...on-premise environment, 110d, 110e...job execution server, 120a, 120b, 120c...RDMS server, 130...storage device, 150a, 150b, 150c, 150d, 150e...server, 200...management computer, 211...CPU, 212...memory, 213...disk

Claims

1. A management computer for managing a data processing infrastructure including a job execution server that executes a job, and a storage device that is connected to the job execution server via a network and stores data used in processing by the job, the management computer comprises a storage device and a processor connected to the storage device; the storage device stores maximum resource amount information which is information on maximum resource amounts of components involved in communication between the job execution server and the storage device of the data processing infrastructure, path information which is information on paths to data in the storage device of the data processing infrastructure, and load information which is information on loads of the components of the data processing infrastructure; The processor, calculating free resource amounts of components constituting a path from the job execution server to data in the storage device, which is involved in the execution of a predetermined job, based on the maximum resource amount information, the path information, and the load information; Based on the amount of free resources, a parallel number is determined, which is the maximum number of parallel executable processing units that can be executed in parallel using the job when the job is executed by the job execution server. Management computer.

2. the storage device stores data capacity information which is information regarding a data capacity per unit of processing that can be performed in parallel in a job; The processor specifies a data capacity of data of a parallelizable processing unit of the job based on the data capacity information, calculates a required resource amount that is a resource amount required for executing one unit of the parallelizable processing unit based on the specified data capacity, and determines the possible parallel number based on the free resource amount and the required resource amount. The management computer according to claim 1 .

3. the storage device further stores response time information which is information on a response time related to data transfer; The processor calculates the required resource amount based on the response time information and the data volume. The management computer according to claim 2.

4. the storage device stores process type information, which is information for each type of process included in a job; The processor calculates the required resource amount based on the process type information and the type of the process included in the predetermined job. The management computer according to claim 2.

5. The processor displays the determined possible parallel number. The management computer according to claim 1 .

6. The processor, Based on the possible parallel number, a parallel number for executing a parallelizable processing unit of a job in the job execution server is set. The management computer according to claim 1 .

7. The processor, Based on the number of parallel jobs possible, the performance of the job execution server required for executing the predetermined job is determined. The management computer according to claim 1 .

8. The processor, predicting a load on the components of the data processing infrastructure used in the specified job; The possible parallel number is determined based on the predicted load. The management computer according to claim 1 .

9. An auto-scaling setting that can automatically change the number of components of the data processing infrastructure is applied to the components, The processor calculates the amount of free resources based on the auto-scaling setting. The management computer according to claim 1 .

10. the storage device stores other job information including a start time and a parallel number of other jobs to be executed on the data processing infrastructure; The processor, The start time and the possible parallel number of the predetermined job are determined based on the other job information. The management computer according to claim 1 .

11. The processor, Calculating a minimum number of parallel jobs that satisfies a completion allowable deadline based on a completion allowable deadline of each job executed on the data processing infrastructure; When the number of parallel jobs required for the execution of the specified job cannot be obtained, a job for which the number of parallel jobs should be reduced is determined from among other jobs. The management computer according to claim 1 .

12. The processor, Calculating a minimum amount of required resources that satisfies an allowable completion deadline based on an allowable completion deadline for each job executed on the data processing infrastructure; When the number of parallel jobs required for the execution of the specified job is not available, a job for which the amount of resources allocated to the job is to be reduced is determined from among other jobs. The management computer according to claim 1 .

13. the predetermined job includes a plurality of processes each including processing for a plurality of parallelizable processing units; The processor, Determine the possible parallel number for each process; Display the number of parallel processes possible for each process The management computer according to claim 1 .

14. A management system comprising: a job execution server that executes a job; and a storage device that is connected to the job execution server via a network and stores data used in processing by the job; and at least one of the job execution server and a storage device in a data processing infrastructure; and a management computer that manages the data processing infrastructure, the management computer stores maximum resource amount information which is information on maximum resource amounts of components involved in communication between the job execution server of the data processing infrastructure and the storage device, path information which is information on paths from the job execution server of the data processing infrastructure to data in the storage device, and load information which is information on loads of the components of the data processing infrastructure; The management computer calculating free resource amounts of components constituting a path to data in the storage device involved in the execution of a predetermined job based on the maximum resource amount information, the path information, and the load information; Based on the amount of free resources, a parallel number is determined, which is the maximum number of parallel executable processing units that can be used in a job when the job is executed by the job execution server. Management system.

15. A management program executed by a computer that manages a data processing infrastructure including a job execution server that executes jobs and a storage device that is connected to the job execution server via a network and stores data used in processing by the jobs, the management program comprising: The computer includes: calculating free resource amounts of components constituting a path to data in the storage device involved in execution of a predetermined job based on maximum resource amount information, which is information on the maximum resource amount of components involved in communication between the job execution server of the data processing infrastructure and the storage device, path information, which is information on a path to data in the storage device of the data processing infrastructure, and load information, which is information on the load of the components of the data processing infrastructure; A parallel number that is a maximum number of parallel executable processing units that can be used in a job when the job is executed in the job execution server is determined based on the amount of free resources. Management program.

Citation Information

Patent Citations

  • Communication server setting value determining device, its program and its method

    JP2006221516A

  • Storage system and its management method

    JP2009294810A

  • Virtualization system, management server, and migration method

    JP2017182435A

  • Management server, calculation system and method

    WO2015198440A1