Environmental Impact Reduction Activity Evaluation System
The environmental load reduction activity evaluation system facilitates goal-setting and quantitative evaluation of construction project impacts by using a point sheet to calculate and display CO2 emissions and other activities, addressing inefficiencies in existing systems.
Patent Information
- Application Number
- JP2020042238
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-03-11
- Publication Date
- 2024-09-18
- Estimated Expiration
- 2040-03-11
AI Technical Summary
Existing systems fail to efficiently quantify and evaluate environmental load reduction activities in construction projects, particularly in terms of CO2 emissions and other impact reduction measures, due to time-consuming surveys and lack of reflection on machine efficiency, making it difficult to set targets and assess implementation results.
An environmental load reduction activity evaluation system that uses a point sheet to input data on construction machinery, resource circulation, and nature coexistence activities, calculating and displaying target and actual values as points for quantitative evaluation.
Enables setting goals, comparing results, and quantitatively evaluating environmental load reduction activities without extensive surveys, allowing for effective emission reduction measures and broader impact assessments.
Smart Images

Figure 0007553251000005 
Figure 0007553251000006 
Figure 0007553251000004
Abstract
Description
[Technical field]
[0001] The present invention relates to an environmental load reduction activity evaluation system. [Background technology]
[0002] As part of activities to reduce environmental impact, various efforts are being made to reduce carbon dioxide (CO2) emissions, which are said to be the cause of global warming. For example, Patent Document 1 discloses an environmental impact calculation system that calculates CO2 emissions based on the quantities of materials used in a building at the design stage. CO2 emissions related to construction projects include those resulting from the use of structures and the manufacture and transportation of materials and equipment used in construction, as well as those from construction machinery and transport vehicles used during construction. Therefore, in construction projects, it is necessary to understand the CO2 emissions from construction machinery and equipment used at construction sites. CO2 emissions at construction sites are generally calculated based on the number of machines used at the construction site and the CO2 emissions of each type of machine. However, it is time-consuming to survey the number of construction machines used at each construction site. In addition, when calculating CO2 emissions, the average fuel efficiency of each model is used, so even if a machine with good fuel efficiency was used, it was not reflected in the CO2 emissions. In addition, the model and number of machines used in construction work are determined according to the work content and quantity, so it is difficult to adopt a measure to reduce the number of machines when reducing CO2 emissions, and it is not possible to set reduction targets in advance and evaluate the results. Furthermore, because activities to reduce environmental impact include not only CO2 reduction activities, but also activities to promote resource circulation (recycling) and activities to coexist with nature, a method was needed to quantitatively evaluate all of these. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2015-56111 A Summary of the Invention [Problem to be solved by the invention]
[0004] The objective of the present invention is to propose a system for evaluating environmental load reduction activities that allows for setting goals for environmental load reduction activities, comparing and evaluating the results of activities against these goals, and easily and quantitatively evaluating the reduction in environmental load. [Means for solving the problem]
[0005] In order to solve the above problems, the present invention provides an input means for inputting data, a storage means for storing target data indicating the target of the degree of effort for each environmental load reduction activity before the start of construction work and performance data indicating the performance of the degree of effort for each environmental load reduction activity after the construction work, and Based on this, the target value is calculated, Based on the above performance data Real The environmental load reduction activity evaluation system includes a calculation means for calculating a performance value, and a display means for displaying the target value and the performance value. Point sheet display To make The data is stored, The point sheet is categorized based on the type, number and performance of the construction machinery, and includes items related to resource circulation promotion activities, nature coexistence activities and environmental safety activities. The target data and the achievement data are input for each item of the point sheet via the input means. The calculation means then calculates the target data or the achievement data, and the points determined for each item. , for each predefined construction machine or CO 2 CO reduction activities 2 Based on the reduction effect and The target value or the actual result value is calculated as a total point value. The display means displays the target value and the actual result value for comparative evaluation in the form of a table or a graph. The calculation means adds up points related to the resource circulation promotion activity, the nature coexistence activity, and the environmental safety activity. With this environmental load reduction activity evaluation system, it is possible to set targets for environmental load reduction activities at each construction site in advance and evaluate their implementation results simply by inputting data into a point sheet before and after construction begins. In other words, environmental load reduction activities can be quantitatively evaluated without the need for the time and effort of conducting a complete survey of the number of construction machines, etc., reducing the burden on site managers.
[0006] The point sheet is categorized based on the type, number and performance of the construction machines, and the calculation means calculates the target value and the actual value based on the predefined CO2 reduction effect for each construction machine (for example, CO2 reduction rate for each construction machine or each CO2 reduction activity based on documents from government agencies or manufacturers, or past performance). This environmental load reduction activity evaluation system makes it possible to quantitatively evaluate specific and effective CO2 emission reduction measures and reduction effects. In addition, if the point sheet includes items related to resource circulation promotion activities, activities for coexistence with nature, etc., and the calculation means adds up the points related to the activities for promoting resource circulation, activities for coexistence with nature, etc., it becomes possible to evaluate the effects of environmental load activities other than CO2 reduction, and as a result, it becomes possible to quantitatively evaluate goal setting and implementation results based on various evaluation axes related to reduction of environmental load. Furthermore, by aggregating the performance data of multiple construction sites based on the performance data entered for each construction site, it is possible to quantitatively confirm the results of environmental load reduction activities for the entire organization when the organization has multiple construction sites. Effect of the Invention
[0007] According to the environmental load reduction activity evaluation system of the present invention, it is possible to set goals for environmental load reduction activities, compare and evaluate the results of the activities against these goals, and easily and quantitatively evaluate the reduction in environmental load. [Brief description of the drawings]
[0008] [Figure 1]1 is a schematic diagram showing an overview of an environmental load reduction activity evaluation system according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a schematic diagram showing an example of a point sheet. [Diagram 3] 1 is a flowchart showing an example of the procedure of a method for evaluating activities to reduce environmental impact. [Figure 4] 13 is a flowchart showing an example of a procedure from point tallying to evaluation. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] In this embodiment, a case will be described in which a company involved in construction business quantitatively evaluates the status of environmental load reduction activities at each construction site, and evaluates the results of the environmental load reduction activities at each construction site or the company as a whole (degree of achievement of goals and reduction effect compared to past performance). An environmental load reduction activity evaluation system 1 is used to evaluate the environmental load reduction activity. FIG. 1 is a schematic diagram of the environmental load reduction activity evaluation system 1 of this embodiment. As shown in FIG. 1, the environmental load reduction activity evaluation system 1 of this embodiment includes a storage means 2, an input means 3, a display means 4, and a calculation means 5. The storage means 2, the input means 3, the display means 4, and the calculation means 5 may be an integrated PC (computer) or a device equivalent thereto, or may be independent devices. In addition, the location where each means (device) constituting the environmental load reduction activity evaluation system 1 is installed is not limited to the construction site or the headquarters office. In this embodiment, a case will be described in which the server 8 includes the storage means 2 and the calculation means 5, and the headquarters computer 6 and the construction site computer 7 are each connected to the server 8. The headquarters computer 6 and the construction site computer 7 include the input means 3 and the display means 4, respectively. The storage means 2 and the calculation means 5 may be included in the headquarters computer 6 or the construction site computer 7.
[0010] The storage means 2 stores target data indicating the target of the degree of effort for each environmental load reduction activity before the start of construction work, and performance data indicating the performance of the degree of effort for each environmental load reduction activity after construction work. In this embodiment, the hard disk of the server 8 is used as the storage means 2. The storage means 2 may be the hard disk of the computer 6 at the headquarters or the computer 7 at the construction site. The storage means 2 may also be something other than a computer (for example, a tablet terminal, a smartphone, etc.). The storage means 2 stores input data and past performance data (for example, existing performance data indicating the performance of the degree of effort for each environmental load reduction activity in past construction work results). The items stored in the storage means 2 are set appropriately according to the purpose of use, and it is not necessary to store all of the contents and items shown here. In addition, necessary contents and items can be added. In addition, the storage means 2 stores data of the point sheet (see FIG. 2) displayed on the display means 4. FIG. 2 is a schematic diagram of the point sheet. As shown in FIG. 2, the point sheet is divided into items based on the type, number, performance, etc. of the construction machine. The storage means 2 stores the items of the point sheet and the points corresponding to each item. The points corresponding to each item are set according to the predefined CO2 reduction effect for each construction machine (for example, the CO2 reduction rate for each construction machine or each CO2 reduction activity based on documents from government agencies or manufacturers, or past performance) and the frequency of use of the construction machine, etc. For example, the points corresponding to the construction machine may be the CO2 emission of the construction machine x the CO2 reduction rate x the frequency of use of the construction machine x a coefficient for converting the points (for example, 10). In Table 2, the frequency of use of the construction machine is evaluated as a rough ratio to the whole (90% for "almost all", 60% for "many", 20% for "some", and 0% for "almost none"). The classification of the frequency of use of the construction machine (for example, almost all: 90%) may be a different expression similar to this, or the numerical value of the corresponding frequency of use (for example, almost all: 90%) may be changed. Table 1 shows an example of the CO2 reduction effect for each construction machine, and Table 2 shows an example of points according to the frequency of use for each construction machine, which are set (calculated) based on the CO2 reduction effect.As shown in Table 2, for example, when the approximate proportion of hybrid types in the total of construction machines A is "almost all," the points are 14 (6.1 x 0.25 x 0.90 x 10 = 14). The point sheet also includes items related to environmental load reduction activities other than CO2 reduction, such as resource circulation promotion activities, nature coexistence activities, and environmental safety activities. Furthermore, the storage means 2 stores existing performance data showing the level of effort for each environmental load reduction activity in past construction performance. Note that each item on the point sheet and the points corresponding to each item are not limited and are determined appropriately. For example, environmental load reduction activities other than CO2 reduction activities, resource circulation promotion activities, nature coexistence activities, and environmental safety activities may be added, items related to these environmental load reduction activities may be increased, or the value of the CO2 reduction effect for each construction machine used to set the points may be updated.
[0011] [Table 1]
[0012] [Table 2]
[0013] The display means 4 is composed of a monitor or the like, and is capable of displaying target values, actual values, etc. The configuration of the display means 4 is not limited, and for example, in addition to a monitor of a computer or the like, a tablet terminal, a smartphone, etc. may be used as the display means 4. The input means 3 is, for example, a keyboard, a mouse, etc., and is used for data input. The input means 3 is not limited to any particular device, and may be, for example, a tablet terminal, a smartphone, etc. Target data and achievement data are input for each item on the point sheet displayed on the display means 4 via the input means 3.
[0014] The calculation means 5 calculates the target value and the actual value based on the target data and the actual data. The calculation means 5 calculates the target value or the actual value as a total point value based on the target data or the actual data and the points set for each item. In this embodiment, a case will be described in which the CPU of the server 8 is used as the calculation means 5, but the calculation means 5 may be the CPU of the computer 6 at the headquarters or the computer 7 at the construction site. The calculation means 5 may also be something other than a computer (for example, a tablet terminal, a smartphone, etc.). The calculation means 5 calculates the target value and the actual value based on the CO2 reduction effect for each construction machine that is specified in advance. In addition, points can be added for activities to reduce environmental load other than CO2 reduction, such as resource circulation promotion activities, nature coexistence activities, and environmental safety activities. The calculation means 5 can also calculate an estimated value, which is a total value of points based on existing performance data indicating the performance of the degree of effort for each environmental load reduction activity in past construction work performance.
[0015] Next, there will be described a method for evaluating environmental load reducing activities using the environmental load reducing activity evaluation system 1. Fig. 3 is a flow chart showing the steps of the method for evaluating environmental load reducing activities. First, at the stage of drawing up a plan for a new construction project, a person in charge, etc., inputs data (target data) for setting target values before construction starts (including before the start of work each fiscal year) into a point sheet displayed on display means 4 from a computer (terminal) at the construction site (workplace) 7 of the new construction project (S12). The person in charge (the person inputting data) inputs the machines, facilities, etc. to be used at the construction site for each item on the point sheet. The input may be performed by someone other than the person in charge. Inputting into the point sheet may be started by the person in charge at the construction site independently, or may be started by sending information prompting input into the point sheet from the computer 6 (terminal) at the construction company headquarters (for example, the company's environmental department, etc.) to the computer 7 (terminal) at the construction site (workplace) of a new construction project. As shown in Fig. 3, the point sheet may be prepared at the headquarters and sent from the headquarters computer 6 to the construction site computer 7 via e-mail, or may be directly obtained (downloaded) by connecting the construction site computer 7 to the storage means 2 of the server 8 (S11).
[0016] The point sheet is configured to allow the user to intuitively answer (input) the degree of implementation of environmental load reduction activities based on a quantitative evaluation. For example, as shown in FIG. 2, the user can select from the items "almost all," "many," "some," "hardly any," and "not applicable" for the rough ratio (frequency of use) of vehicles used in construction work, without having to go to the trouble of actually measuring the number of vehicles used. Here, for example, "almost all" is evaluated as 90% or more, "many" as 60-90%, "some" as 20-60%, and "hardly any" as less than 20%. The classification of the frequency of use of construction machinery (e.g., almost all: 90%) may be a different expression similar to this, or the corresponding frequency of use may be changed (e.g., almost all: 90%). In addition, the point sheet is divided into categories based on the type, number, and performance of construction machinery. That is, for example, in the case of vehicles such as trucks, it is possible to input "vehicles that meet or exceed the fuel efficiency standards for 2015" or "hybrid type." In this way, the user inputs the degree of implementation for each construction machinery that has been previously divided into categories. The point sheet includes items such as construction machinery such as hydraulic excavators and cranes, vehicles such as trucks, and equipment such as generators and compressors, as well as lighting equipment used in offices (whether or not LEDs are used, etc.). There are also items for resource circulation promotion activities, such as the amount of environmentally friendly materials (recycled materials, etc.) used and waste disposal. Items related to nature coexistence activities can also be entered, such as efforts in nature conservation activities and items related to consideration for plants and living things. Items related to nature conservation activities include whether or not there is employee training aimed at raising awareness of the natural environment, and the implementation of plant conservation during construction. Furthermore, items related to environmental safety activities include consideration for environmental accidents (noise, vibration, etc.). Items related to environmental safety activities include whether or not there is employee training aimed at raising awareness of environmental accidents, and the implementation of measures against environmental accidents during construction. In addition, environmental load reduction activities are not limited to CO2 reduction activities, resource circulation promotion activities, activities to coexist with nature, and environmental safety activities. Other environmental load reduction activities may be added or deleted, and the number of items related to those activities may be increased or decreased, or their content may be changed.
[0017] Once input into each item on the point sheet is complete, the input data is sent to server 8 via a wired or wireless communication line (S13), as shown in Fig. 3. When server 8 receives the input data, the input data is stored in storage means 2 within server 8 (S14). At this time, the input data is also stored in computer 7 at the construction site. The input data is also stored in computer 6 at headquarters as necessary.
[0018] When data entry into the point sheet is complete and the server 8 receives the input data, the calculation means 5 (CPU) of the server 8 automatically starts up and calculates the target values for each construction site. It also calculates the points and average value for the entire company. The calculation means 5 may be the CPU of the headquarters computer 6 or the construction site computer 7. The calculation means 5 may also be started manually. When the calculation means 5 is started, it reads data of the construction site from the storage means 2. Fig. 4 is a flow chart showing the procedure from point tallying to evaluation. The calculation means 5 reads the data entered for the construction site from the storage means 2 and also reads the points corresponding to each item, and then uses a tallying and analysis software to add up the points for each item to calculate the target value for each construction site (S21). The calculation results by the calculation means 5 are stored in the storage means 2 and are displayed on the display means 4 in the form of a table, graph, etc. (S22). The calculation means 5 also tally up the target data for multiple construction sites based on the target data input for each construction site, and calculates the total points for the overall environmental load reduction activities (S23). The calculation results are displayed on the display means 4. Also, by displaying past performance values stored in the storage means 2, it is possible to compare past environmental load reduction activities with the target values.
[0019] At the stage of completion of the work (construction completion), the person in charge inputs data (actual data) for calculating actual values into the point sheet displayed on the display means 4 from the computer 7 (terminal) at the construction site (S16). The person in charge (inputter) inputs information about the CO2 reduction activities at the construction site (e.g., the machines and equipment used) and the frequency of use for each item on the point sheet, just as when inputting the target data. Information about environmental load reduction activities other than CO2 reduction activities, such as resource circulation promotion activities, nature coexistence activities, and environmental safety activities, may also be input. Inputting into the point sheet may be started by the person in charge at the construction site independently, or may be started by sending information prompting input into the point sheet from the headquarters computer 6 (terminal) to the construction site (workplace) computer 7 (terminal) as shown in Fig. 3. The point sheet may be prepared at the headquarters and sent from the headquarters computer 6 to the construction site computer 7 via e-mail or the like, or the construction site computer 7 may obtain it directly from the storage means 2 of the server 8 (S15). Once input into each item on the point sheet is complete, the input data is sent to the server 8 via a wired or wireless communication line (S17). When the server 8 receives the input data, the input data is stored in the storage means 2 of the server 8 (S18). At this time, the input data is also stored in the computer 7 at the construction site. The input data is also stored in the computer 6 at headquarters as necessary.
[0020] When data entry into the point sheet is complete, the calculation means 5 is automatically started and calculates the performance value for each construction site. It also calculates the performance value (points) and average value for the entire company. After the performance value is calculated, it is compared with the target value (S19). The calculation means 5 may be started manually. The calculation of the actual value is performed by the calculation means 5. When the calculation means 5 is started, it reads the data of the construction site from the storage means 2. The calculation means 5 reads the data entered for the construction site from the storage means 2 and also reads the points corresponding to each item, and then uses a compilation and analysis software to add up the points for each item to calculate the actual value for each construction site (S21) (see FIG. 4). The calculation results by the calculation means 5 are stored in the storage means 2 and are displayed on the display means 4 in the form of a table, graph, etc. (S22). By checking the target values and actual values at the construction site numerically, the degree of achievement of the target values can be evaluated. The calculation means 5 also tally up the performance data for multiple construction sites based on the performance data entered for each construction site, and calculates the total points for the overall environmental load reduction activities (S23). The calculation results are displayed on the display means 4. In this way, the company as a whole can evaluate the degree of achievement of the goal. Also, by displaying past performance values, it is possible to compare with past environmental load reduction activities.
[0021] According to the environmental load reduction activity evaluation system 1 of this embodiment, by simply inputting data into a point sheet before the start of construction and after the end of construction, it is possible to set targets for environmental load reduction activities at each construction site in advance and evaluate the results of their implementation. Since inputting data into the point sheet allows intuitive response (selecting one of multiple responses that most closely corresponds to the site) based on a quantitative evaluation of the degree of implementation of environmental load reduction activities, environmental load reduction activities can be quantitatively evaluated without the need for the effort of conducting a complete survey of the number of construction machines, etc. Therefore, the amount of work can be significantly reduced compared to the conventional technology that requires inputting information on machines used, etc. every day at each construction site. In addition, since target values and actual values are calculated based on the pre-defined CO2 reduction effect for each construction machine, it is possible to quantitatively evaluate specific and effective CO2 emission reduction measures and their reduction effects. Furthermore, when existing performance data showing the actual level of effort for each environmental load reduction activity in past construction work results is stored in the storage means 2, an estimated value, which is the total value of points based on the existing performance data, may be calculated by the calculation means 5. In this way, it becomes easier to confirm the reduction effect by comparing the estimated value based on past performance (for example, CO2 emission amount based on past construction work results) with the target value or actual value. In addition, since the point sheet includes items related to resource circulation promotion activities, nature coexistence activities, and environmental safety activities, and the calculation means 5 adds up points related to resource circulation promotion activities, nature coexistence activities, and environmental safety activities, it becomes possible to evaluate the effects of environmental load reduction activities other than CO2 reduction, and as a result, goal setting and implementation results can be quantitatively evaluated along a wide range of evaluation axes. Furthermore, by aggregating performance data from multiple construction sites based on the performance data entered for each construction site, it is possible to confirm the quantitative results of environmental impact reduction activities for the entire organization, or for each region or type of construction work, when the organization has multiple construction sites.
[0022] Although an embodiment of the present invention has been described above, the present invention is not limited to the above-described embodiment, and each of the above-described components can be appropriately modified without departing from the spirit of the present invention. For example, the environmental load reduction activity evaluation system 1 does not necessarily need to evaluate CO2 reduction activities, resource circulation promotion activities, nature coexistence activities, and environmental safety activities, and may, for example, add and evaluate new environmental load reduction activities, or may be used only to evaluate CO2 reduction activities. Also, the environmental load reduction activity evaluation system 1 may be used to evaluate the achievement level after construction is completed against the target value of CO2 emission set before the start of construction, or the amount of CO2 reduction may be used instead of the amount of CO2 emission. In addition, in the above embodiment, as an example, an evaluation of environmental load reduction activities for the entire company, or for each region or type of construction work for a company with multiple construction sites has been described. However, the environmental load reduction activity evaluation system 1 does not necessarily have to be limited to evaluation for the entire company, or for each region or type of construction work, and may be used for evaluation based on attributes other than those exemplified, such as by season. In the above embodiment, when the construction site inputs the data, the target values and actual values are automatically calculated and tallied, but the calculation of the target values and actual values may be performed manually by the company headquarters or the construction site. Also, the storage of data and the calculation using the data do not have to be performed by the server 8, and may be performed by the headquarters computer 6 or the construction site computer 7. Although the environmental load reduction activity evaluation system 1 is described as having data input via the input means 3 and having the calculation means 5 automatically start up, it may also be configured to be manually started up and have the target value or actual value calculated. A target value may be calculated before construction begins, and the machinery to be used may be adjusted so as to achieve the target value. [Explanation of symbols]
[0023] 1. Environmental Impact Reduction Activity Assessment System 2 Memory means 3. Input Method 4 Display means 5 Calculation means 6. Headquarters Computer 7. Computers on Construction Sites 8 Server
Claims
1. an input means used for data entry; A storage means for storing target data indicating a target level of effort for each environmental load reduction activity before the start of construction work and performance data indicating a performance level of effort for each environmental load reduction activity after the construction work is started; A calculation means for calculating a target value based on the target data and a performance value based on the performance data; a display means for displaying the target value and the actual result value, The storage means stores data for displaying a point sheet on the display means, The point sheet is categorized based on the type, number and performance of the construction machinery, and includes items related to resource circulation promotion activities, nature coexistence activities and environmental safety activities. The target data and the performance data are input for each item of the point sheet via the input means; The calculation means calculates the target value or the actual result value as a total point value based on the target data or the actual result data, the points determined for each item, and a CO2 reduction effect for each construction machine or each CO2 reduction activity that is determined in advance, the display means displays the target value and the actual value for comparative evaluation in the form of a table or a graph; The system for evaluating activities to reduce environmental load is characterized in that the calculation means adds up points related to the resource circulation promotion activities, the nature coexistence activities, and the environmental safety activities.
2. 2. The environmental load reduction activity evaluation system according to claim 1, characterized in that the performance data of a plurality of construction sites is compiled based on the performance data input for each construction site, and the results of the overall environmental load reduction activities are evaluated in terms of the degree of achievement of the target value.
Citation Information
Patent Citations
Method and apparatus for controlling load of environmental influence and computer-readable recording medium storing environmental influence load control program
JP1999347528A
Environmental impact assessing method
JP2002215781A
Environmental performance evaluation system and environmental performance index calculation program
JP2010286941A
Environmental load calculation system
JP2015056111A
Environmental impact evaluation device, program, and environmental impact evaluation method
JP2016099653A
