Business management computer, business management method and program

The business management computer system addresses data utilization challenges by automatically extracting and summarizing daily work report data, enhancing business management efficiency and profitability through automated data integration and summary generation.

JP7553995B1Active Publication Date: 2024-09-19HIMUKA EISHIN SANGYO CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2023208922
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-12-12
Publication Date
2024-09-19
Estimated Expiration
2043-12-12

AI Technical Summary

Technical Problem

Existing business management systems fail to effectively utilize data from daily work reports for comprehensive management, leading to difficulties in scheduling, cost estimation, safety management, and profitability analysis, resulting in delayed financial understanding and inability to improve business operations.

Method used

A business management computer system that automatically extracts and summarizes data from daily work reports, linking them with a management database to generate summary tables such as output summaries, monthly expense summaries, and budget-actual comparisons, eliminating the need for manual data input.

Benefits of technology

Facilitates improved business management by automating data extraction and summarization, enabling real-time profitability checks and enhanced site management, reducing costs and increasing profits through automated data integration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007553995000001
    Figure 0007553995000001
Patent Text Reader

Abstract

In business management, management improvements are achieved by linking the database managed by the business management side with daily work reports. [Solution] A business management computer that manages a business comprises a reception unit that accepts input of pre-commencement data for the business, an acquisition unit that acquires daily work reports for the business created by workers, an extraction unit that extracts work data entered into the daily work reports, a registration unit that registers the extracted work data for each extracted item, and a creation unit that creates a business management summary sheet for the business based on the received pre-commencement data and the registered work data.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a business management system, a business management method, and a program. [Background technology]

[0002] In business, for example at construction or building sites, workers prepare a daily work report each time they perform a task and report on the work. However, even after all the work for the day is completed, a daily work report must still be prepared, which is a hassle for workers.

[0003] On the other hand, when a business manager is compiling expenses related to the business, he or she usually looks at the daily work reports prepared by the workers and inputs the necessary data into a computer database managed by the business management side.

[0004] Therefore, for example, Patent Document 1 discloses the use of voice recognition technology to generate a daily work report, which is a prerequisite for cost management (Patent Document 1). [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Patent Publication No. 2022-013452 Summary of the Invention [Problem to be solved by the invention]

[0006] However, in the system of Patent Document 1, although the created daily work reports are stored in a database, data necessary for compiling accounting, etc. is not entered from the daily work reports into a database managed by the business management side, making it difficult for the data contained in the daily work reports to be used for management improvement as data that business managers and business managers should be aware of.

[0007] For this reason, unless the project manager inputs the necessary data from the daily work reports into the database, the project manager will not only be unable to manage the schedule, such as on-site arrangements and missed arrangements, but will also be unable to ensure the safety of dangerous work such as the use of heavy machinery, transportation of heavy materials, and working at heights. In addition, the project manager will be unable to grasp the situation of the site underway, income and expenditure, estimates, progress, etc., and will be unable to prevent omissions and omissions such as missed invoices, missed payments, and forgotten schedules.

[0008] As a result, the personnel and travel costs for each site are unclear, making it difficult to calculate the cost of goods sold without a clear basis for estimating the planned execution. Furthermore, without being able to grasp the trend in costs against the budget, measures to balance income and expenditure are put off until later, and the entire business cannot be understood. Therefore, if it is not possible to analyze the cause of the deterioration in profitability, the management issue of being unable to improve the management of the site and the business operator remains.

[0009] Therefore, the inventors realized that by linking the database managed by the business management side with the daily work reports, it would be possible to improve the productivity of the business, for example by considering ways to reduce the labor required from the design to construction of the business and shorten the construction period.

[0010] In view of the above problems, the present invention has an object to provide a system for improving business management by linking a database managed by the business management side with daily work reports. [Means for solving the problem]

[0011] The present invention provides the following solutions.

[0012] The first aspect of the invention is as follows: A business management computer for managing a business, A reception unit that receives input of pre-start data for the project, the pre-start data including a breakdown, a schedule, and an execution budget; An acquisition unit that acquires a daily work report of the business created by a worker by inputting predetermined data; an extraction unit that extracts predetermined items as work data from the predetermined data inputted into the daily work report; Management Database a registration unit that registers the received pre-start data and the extracted work data for each extracted item; a creation unit that creates a work volume summary table, a monthly expense summary table, a budget-to-actual comparison table, and / or an employee work attendance record as a business management summary table showing the on-site situation and income and expenditure based on the pre-start data and the work data registered in the management database; The present invention provides a business management computer comprising:

[0013] According to the invention relating to the first feature, by linking the daily work reports prepared by the workers with a database managed by the business management side, there is no need to manually input the daily work reports into the database, and the summary tables necessary for business management are automatically created, making it easier to improve the management of the sites and businesses that undertake the business, such as reducing expenses and increasing profits.

[0015] According to the second feature of the invention, a production volume summary table, a monthly expense summary table, a budget-actual comparison table, or an employee-specific on-site attendance record is automatically created, so that the on-site situation and income and expenditure can be grasped while the project is underway, making it possible to instantly check the profitability of the business unit.

[0016] A third aspect of the present invention is the first aspect of the present invention, which provides a project management computer, wherein the project is a construction project.

[0017] According to the invention relating to the third feature, even in construction projects where information on costs, expense structures, etc. is complex, there is no need to manually input daily work reports into a database, and the summary tables necessary for project management are automatically created, making it easier to improve the management of the sites and businesses that undertake the projects, such as reducing expenses and increasing profits.

[0018] Although the present invention is in the category of a computer system, similar functions and effects according to the category can be obtained in other categories such as a method and a program. Effect of the Invention

[0019] According to the present invention, it is possible to provide a system for improving business management by linking a database managed by the business management side with daily work reports. [Brief description of the drawings]

[0020] [Figure 1] FIG. 1 is a diagram for explaining an overview of a business management computer 1 according to one embodiment of the present invention. [Diagram 2] 1 is a configuration diagram of a business management computer 1 according to an embodiment of the present invention. [Diagram 3] 11 is a flowchart of a management spreadsheet creation process executed by a business management computer 1 in the present embodiment of the present invention. [Figure 4] FIG. 2 is a diagram showing an example format of a breakdown 110 in the present embodiment of the present invention. [Diagram 5] FIG. 2 is a diagram showing an example format of a process chart 120 in this embodiment of the present invention. [Figure 6] FIG. 2 is a diagram showing an example of the format of an execution budget 130 in the present embodiment of the present invention. [Figure 7] FIG. 2 is a diagram showing an example format of a daily work report 200 in the present embodiment of the present invention. [Figure 8] FIG. 2 is a diagram showing a data flow in the present embodiment of the present invention. [Figure 9] FIG. 4 is a diagram showing an example of the format of a production volume summary table 410 in the present embodiment of the present invention. [Figure 10] FIG. 13 is a diagram showing an example format of a monthly expense summary table 420 in this embodiment of the present invention. [Figure 11] FIG. 13 is a diagram showing an example of the format of a budget / actual comparison table 430 in the present embodiment of the present invention. [Figure 12]FIG. 4 is a diagram showing an example of the format of an employee field attendance record 440 in this embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0021] Hereinafter, the best mode for carrying out the present invention will be described with reference to the drawings. Note that this is merely an example, and the technical scope of the present invention is not limited to this example.

[0022] [Overview of one embodiment] A preferred embodiment of the present invention will be described with reference to Fig. 1. Fig. 1 is a diagram for explaining an overview of a business management computer 1 according to one embodiment. The business management computer 1 is a computer for managing a business.

[0023] The business management computer 1 may include other terminals, devices, etc. For example, a separate computer may be used for each user, in which case the business management computer 1 executes each process described below using the computer and / or the other included terminals, devices, etc.

[0024] Furthermore, the business management computer 1 may be realized, for example, by one terminal device, may be realized by a plurality of terminal devices, or may be realized by a virtual device such as a cloud computer.

[0025] The business management computer 1 is, for example, a computer such as a desktop personal computer, a notebook computer, or a server, a mobile terminal such as a smartphone or a tablet terminal, or a wearable terminal such as a head-mounted display such as smart glasses or a smart watch.

[0026] An overview of the processing executed by the business management computer 1 of this embodiment will be described. The project management computer 1 accepts input of project pre-start data 100 (step S1). Specifically, the project management computer 1 imports the pre-start data 100, including at least a breakdown 110, a schedule 120, and an execution budget 130, from a user such as a project manager into itself as file data.

[0027] The input of pre-commencement data 100 may be accepted by the business management computer 1 directly from external media, etc., or may be accepted by the business management computer 1 receiving the data via the communications network from another terminal, etc. connected to the communications network.

[0028] Next, the business management computer 1 acquires the business daily work report 200 created by the worker (step S2). Specifically, the business management computer 1 imports the daily work report 200 created by the worker into itself as file data. The business management computer 1 may acquire the daily work report 200 directly from an external medium or the like, or may acquire the daily work report 200 by the business management computer 1 receiving it via the communication network from another terminal or the like connected to the communication network. The daily work report 200 will be described later.

[0029] Next, the business management computer 1 extracts the work data entered in the daily work report 200 (step S3). Specifically, data of a predetermined extraction item entered in the daily work report 200 acquired in step S2 is extracted as work data 210. The method of extracting the work data is not particularly limited in the present invention.

[0030] Next, the business management computer 1 registers the extracted task data 210 for each extracted item (step S4). Specifically, the business management computer 1 stores the task data 210 extracted in step S3 in the management database 300 for each predetermined extracted item. The management database 300 will be described later.

[0031] Next, the business management computer 1 creates a business management summary sheet 400 based on the received pre-start data 100 and the registered work data 210 (step S5). Specifically, the business management computer 1 creates a performance summary sheet 410, a performance management document 310, a monthly expense summary sheet 420, a budget-actual comparison table 430, and an employee-specific on-site attendance record 440 based on the itemized statement 110, the process chart 120, and the working budget 130 inputted in step S1, and the work data 210 registered in step S4.

[0032] When creating the management summary sheet 400, the business management computer 1 may create all of the performance summary sheet 410, the performance management book 310, the monthly expense summary sheet 420, the budget-actual comparison table 430, and the on-site attendance record by employee 440, or it may create one or a combination of these in response to the user's selection input, etc.

[0033] The created business management summary table 400 may be displayed on the business management computer 1, may be printed out on a printer or the like, or may be output as file data. The output file data may be stored inside or outside the business management computer 1, or may be transmitted via the communication network to another terminal or the like connected to the communication network.

[0034] The above is an overview of the processing executed by the business management computer 1.

[0035] [System configuration of business management computer 1] The system configuration of the business management computer 1 according to the present embodiment of the present invention will be described with reference to Fig. 2. Fig. 2 is a diagram showing the system configuration of the business management computer 1 according to the present embodiment of the present invention. In Fig. 2, the business management computer 1 is a computer for managing a business.

[0036] The business management computer 1 may include other terminals, devices, etc. For example, a separate computer may be used for each user, in which case the business management computer 1 executes each process described below using the computer and / or the other included terminals, devices, etc.

[0037] Furthermore, the business management computer 1 may be realized, for example, by one terminal device, may be realized by a plurality of terminal devices, or may be realized by a virtual device such as a cloud computer.

[0038] The business management computer 1 is, for example, a computer such as a desktop personal computer, a notebook computer, or a server, a mobile terminal such as a smartphone or a tablet terminal, or a wearable terminal such as a head-mounted display such as smart glasses or a smart watch.

[0039] The business management computer 1 is equipped with a CPU (Central Processing Unit), GPU (Graphics Processing Unit), RAM (Random Access Memory), ROM (Read Only Memory), etc. as a control unit and a processing unit. The control unit issues execution commands to the processing unit, imaging unit, communication unit, input unit, output unit, and memory unit described below, and the processing unit calculates data and determines the calculation results, etc.

[0040] The business management computer 1 includes a device as a communication unit for enabling communication with other terminals, devices, etc. The communication method may be wireless or wired.

[0041] The business management computer 1 is assumed to have, as an input unit, functions necessary for a user to operate the business management computer 1. Examples of input devices that can be provided include an LCD display that provides a touch panel function, a keyboard, a mouse, a pen tablet, hardware buttons on the device, and a microphone for voice recognition. The present invention is not particularly limited in function by the input method.

[0042] The business management computer 1 is an output unit that has the functions necessary for a user to operate the business management computer 1. Examples of output methods include display such as projection on a display unit such as an LCD display, a PC display, or a projector, and audio output. The present invention is not particularly limited in function by the output method.

[0043] The business management computer 1 includes a storage unit for storing data, such as a hard disk, a semiconductor memory, a recording medium, a memory card, etc. The data may be stored in a cloud service, a database, etc.

[0044] The control unit cooperates with the processing unit to realize a reception unit 10, an acquisition unit 11, an extraction unit 12, a registration unit 13, and a creation unit .

[0045] The above is the system configuration of the business management computer 1.

[0046] [Management summary table creation process] The management tally sheet creation process executed by the business management computer 1 of this embodiment will be described with reference to Fig. 3. Fig. 3 is a diagram showing a flowchart of the management tally sheet creation process executed by the business management computer 1 of this embodiment. The processes executed by the above-mentioned respective units will be described together with this process.

[0047] The reception unit 10 of the project management computer 1 receives input of pre-project data 100 (step S11). Specifically, the reception unit 10 imports the pre-project data 100, including at least a breakdown 110, a schedule 120, and an execution budget 130, from a user such as a project manager into its own storage unit as file data. There is no particular limit to the file format of the pre-project data 100, but an Excel format is preferable, and a text (tab-delimited) format is even more preferable.

[0048] The breakdown sheet 110 is a breakdown of the business at the time of the contract, which is recorded in a prescribed format as shown in Fig. 4. There are no particular restrictions on the format as long as it is prescribed. The items and data recorded in the breakdown sheet 110 include the business name of the business at the time of the business contract, the names of the work types related to the business, and various work items and costs, but any items and data may be recorded as long as they are prescribed.

[0049] The schedule 120 describes the process of the contract project in a prescribed format as shown in Fig. 5. There are no particular restrictions on the format as long as it is the prescribed format. The items and data described in the schedule 120 include the number of days required for each process of the project, the schedule until the delivery date, the progress status of each process, etc., but any items and data may be described as long as it is the prescribed format.

[0050] The working budget 130 is a budget prepared based on the estimated costs for each site of the contract project, and is written in a prescribed format as shown in Fig. 6. There is no restriction on the format as long as it is prescribed. The items and data written in the process sheet 120 include the methods and materials to be used at the site, quantities, labor costs, period, etc., but any items and data may be written as long as it is prescribed.

[0051] The input of pre-commencement data 100 may be accepted directly from an external medium or the like in the memory section of the business management computer 1, or may be accepted by the communications section of the business management computer 1 by receiving the data via the communications network from another terminal or the like connected to the communications network.

[0052] The reception unit 10 stores various data included in the received pre-start data 100 in a management database 300 provided in its own storage unit. The management database 300 will be described later.

[0053] Next, the acquisition unit 11 of the business management computer 1 acquires the business daily work report 200 created by the worker (step S12). Specifically, the acquisition unit 11 imports the daily work report 200 created by the worker into its own storage unit as file data. The file format of the daily work report 200 is not particularly important, but the Excel format is preferable, and the text (tab-delimited) format is more preferable.

[0054] The daily work report 200 is a report of daily work by a worker, written in a prescribed format as shown in Fig. 7. There is no particular restriction on the format as long as it is the prescribed format. Items and data written in the daily work report 200 include items and costs related to various work progress such as the business name, work content, work type name, and subcontract labor costs, but any items and data may be written as long as it is the prescribed format.

[0055] The daily work report 200 may be acquired directly from an external medium or the like in the memory unit of the business management computer 1, or it may be acquired by the communication unit of the business management computer 1 receiving it via the communication network from another terminal or the like connected to the communication network.

[0056] Next, the extraction unit 12 of the business management computer 1 extracts the work data entered in the daily work report 200 (step S13). Specifically, data of predetermined extraction items entered in the daily work report 200 acquired in step S12 is extracted as work data 210. The extracted items include, for example, the business name, business category, work content, worker name, work time, labor cost, business name, and expense breakdown. The method of extracting the work data 210 is not particularly limited in the present invention.

[0057] Next, the registration unit 13 of the business management computer 1 registers the extracted task data 210 for each extracted item (step S14). Specifically, the registration unit 13 stores the task data 210 extracted in step S13 in the management database 300 by storing it for each of the above-mentioned predetermined extracted items.

[0058] The management database 300 is a database stored in the storage unit of the project management computer 1. The management database 300 stores various data included in the itemized statement 110, the schedule 120, and the execution budget 130 received in step S11, and the work data 210 extracted from the daily work report 200 in step S13.

[0059] The various data stored in the management database 300 include, but are not limited to, data related to the business such as business number, business name, client, business person in charge, contract date, (scheduled) completion date, business period, contract amount, standard expense rate, and data related to the breakdown of expenses such as labor cost, outsourcing cost, material cost, lease fee, vehicle management cost, fuel cost, travel cost, transportation cost, etc. These various data may be changeable via the input unit of the business management computer 1.

[0060] Next, the creation unit 14 of the project management computer 1 creates a project management summary sheet 400 based on the received pre-start data 100 and the registered task data 210 (step S15). Specifically, as shown in Fig. 8, the creation unit 14 creates a completed volume summary sheet 410, a monthly expense summary sheet 420, a budget / actual performance comparison table 430, and an employee-specific on-site attendance record 440 based on the itemized statement 110, the process chart 120, and the execution budget 130 whose inputs were received in step S11, and the task data 210 registered in step S14.

[0061] The progress report 410 is a detailed breakdown by type of work for any period, and is recorded in a prescribed format as shown in Fig. 9. There is no particular restriction on the format as long as it is prescribed. Items and data recorded in the progress report 410 include items related to the progress of a project for any period, such as the name of the project, specifications and standards, the initial amount at the time of the initial contract, the change amount at the time of change, increase or decrease, the current progress, the cumulative progress, and the balance, but any items and data may be recorded as long as they are prescribed.

[0062] The monthly expense summary table 420 is a summary of various expenses such as labor, expenses, materials, and outsourcing expenses for each month, and is recorded in a prescribed format as shown in Fig. 10. There is no particular restriction on the format as long as it is a prescribed format. Also, the items and data recorded in the monthly expense summary table 420 include items related to expenses for any period of the business, such as sales amount, expenses, and expense breakdown, but any items and data may be recorded as long as it is prescribed.

[0063] Budget-performance comparison table 430 is a compilation of results against budgets for labor, expenses, materials, and labor, and is recorded in a prescribed format as shown in Fig. 11. There are no particular restrictions on the format as long as it is the prescribed format. Items and data recorded in budget-performance comparison table 430 include items related to comparison of results against budgets for any period of the project, such as construction classification, material and labor classification, actual budget, actual amount, and difference, but any items and data may be recorded as long as it is prescribed.

[0064] The employee site attendance record 440 is an employee site attendance record for an arbitrary period, and is recorded in a prescribed format as shown in Fig. 12. There is no particular restriction on the format as long as it is the prescribed format. In addition, the items and data recorded in the employee site attendance record 440 include items related to the attendance records of employees involved in the business for an arbitrary period, such as date, working hours, whether or not overnight stays were performed, construction name, and work content, but any items and data may be recorded as long as they are prescribed.

[0065] When creating the management summary table 400, the creation unit 14 may create all of the performance summary table 410, performance management book 310, monthly expense summary table 420, budget-actual comparison table 430, and employee-specific on-site attendance record 440 at the same time, or may create one or a combination of these in response to a user's selection input from the input unit. Also, in response to a user's input of a summary range period from the input unit, the creation unit 14 may output the management summary table 400 for that summary range.

[0066] The created business management spreadsheet 400 may be displayed on the display unit of the business management computer 1, may be output from the output unit to a printer or the like, may be stored as file data in the memory unit of the business management computer 1, or may be transmitted by the communication unit to another terminal or the like connected to the communication network via the communication network. The data format of the output file data may be any format, such as PDF format.

[0067] The above is the management tally sheet creation process.

[0068] According to the business management computer 1 of this embodiment, the daily work reports prepared by the workers are linked to a database managed by the business management side, eliminating the need to manually input the daily work reports into the database, and the summary tables necessary for business management are automatically created, making it easier to improve the management of the sites and businesses that undertake the business, such as reducing expenses and increasing profits.

[0069] Furthermore, according to the business management computer 1 of this embodiment, a performance summary table, a monthly expense summary table, a budget-actual comparison table, or an employee-specific on-site attendance record is automatically created, so that the on-site situation and income and expenditure can be grasped while the business is underway, making it possible to instantly check the profitability of the business unit.

[0070] Furthermore, according to the project management computer 1 of this embodiment, even in construction projects where information regarding costs, expense structures, etc. is complex, there is no need to manually input daily work reports into a database, and the summary tables necessary for project management are automatically created, making it easier to improve the management of the sites and businesses that undertake the projects, such as reducing expenses and increasing profits.

[0071] The above-mentioned means and functions are realized by a computer (including a CPU, an information processing device, and various terminals) reading and executing a predetermined program. The program is provided, for example, in the form of being provided from one or more computers via a network (cloud service, SaaS: Software as a Service). Also, the program is provided, for example, in the form recorded on a computer-readable recording medium. In this case, the computer reads the program from the recording medium, transfers it to an internal recording device or an external recording device, records it, and executes it. Also, the program may be recorded in advance on a recording device (recording medium) such as a magnetic disk, optical disk, or magneto-optical disk, and provided to the computer from the recording device via a communication line.

[0072] Although the embodiments of the present invention have been described above, the present invention is not limited to these embodiments. Furthermore, the effects described in the embodiments of the present invention are merely a list of the most preferable effects resulting from the present invention, and the effects of the present invention are not limited to those described in the embodiments of the present invention. [Explanation of symbols]

[0073] 1 Business management computer, 10 Reception section, 11 Acquisition section, 12 Extraction section, 13 Registration section, 14 Creation section, 100 Pre-start data, 110 Breakdown, 120 Schedule, 130 Execution budget, 200 Daily work report, 300 Management database, 400 Business management summary table, 410 Output summary table, 420 Monthly expense summary table, 430 Budget-actual comparison table, 440 On-site attendance record by employee

Claims

1. A business management computer for managing a business, A reception unit that receives input of pre-start data for the project, the pre-start data including a breakdown, a schedule, and an execution budget; An acquisition unit that acquires a daily work report of the business created by a worker by inputting predetermined data; an extraction unit that extracts predetermined items as work data from the predetermined data inputted into the daily work report; a registration unit that registers the received pre-start data and the extracted work data for each extracted item in a management database; a creation unit that creates a work volume summary table, a monthly expense summary table, a budget-to-actual comparison table, and / or an employee work attendance record as a business management summary table showing the on-site situation and income and expenditure based on the pre-start data and the work data registered in the management database; A business management computer comprising:

2. The project management computer according to claim 1 , wherein the project is a construction project.

3. A business management method executed by a business management computer that manages a business, comprising: A step of accepting input of pre-start data for the project, the pre-start data including a breakdown, a schedule, and an execution budget; A step of acquiring a daily work report of the business created by a worker by inputting predetermined data; A step of extracting predetermined items as work data from the predetermined data inputted into the daily work report; registering the received pre-start data and the extracted work data for each extracted item in a management database; creating a work volume summary table, a monthly expense summary table, a budget-to-actual comparison table, and / or an employee work attendance record as a business management summary table showing the on-site situation and income and expenditure based on the pre-start data and the registered work data registered in the management database; A business management method that includes:

4. On the computer, A step of accepting input of pre-start data for a project, the pre-start data including a breakdown, a schedule, and an execution budget; A step of acquiring a daily work report of the business created by a worker by inputting predetermined data; A step of extracting predetermined items as work data from the predetermined data inputted into the daily work report; registering the received pre-start data and the extracted work data for each extracted item in a management database; A step of creating a work volume summary table, a monthly expense summary table, a budget-actual comparison table, and / or an employee-specific on-site attendance record as a business management summary table showing the on-site situation and income and expenditure based on the pre-start data and the registered work data registered in the management database; A computer-readable program that causes a computer to execute

Citation Information

Patent Citations

  • Construction management support device, construction management support program and storage medium

    JP2022013452A

  • Performance management apparatus, performance management method and performance management program

    JP2022027251A

  • Construction ledger creation system and construction ledger creation method

    JP2023078750A