The construction system uses automatic control and risk analysis to balance safety and productivity by adjusting machine and worker behaviors, addressing risks from excavators and other working machines.

JP7554053B2Active Publication Date: 2024-09-19HITACHI CONSTRUCTION MACHINERY CO LTD
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
JP2020028022
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-02-21
Publication Date
2024-09-19
Estimated Expiration
2040-02-21

AI Technical Summary

Technical Problem

Construction sites face risks from working machines such as excavators, including worker entanglement, machine tipping, and reduced productivity due to safety measures that restrict movement.

Method used

A construction system with a work machine capable of automatic or semi-automatic control, utilizing sensors and a server computer to analyze risks and adjust control parameters to balance safety and productivity, incorporating real-time and long-term risk feedback loops.

Benefits of technology

Reduces various risks at construction sites by optimizing machine and worker behaviors based on real-time and long-term risk analysis, enhancing safety while maintaining productivity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007554053000001
    Figure 0007554053000001
  • Figure 0007554053000002
    Figure 0007554053000002
  • Figure 0007554053000003
    Figure 0007554053000003
Patent Text Reader

Abstract

To provide a construction system capable of reducing various risks that may occur at construction sites where work machines and workers work together.SOLUTION: A construction system 1 includes a work machine 2 that can be operated by automatic control or semi-automatic control and can acquire information on its own internal state or information on its surroundings, a server computer 7 that collects information in the work environment in which the work machine 2 operates and performs risk analysis, and a communication network 61 that connects the work machine 2 and the server computer 7 in a communicable manner. The work machine 2 receives the risk analysis result from the server computer 7 via the communication network 61, and changes automatic control parameters used for the automatic control or the semi-automatic control according to the risk analysis result.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a construction system using a work machine or the like. [Background technology]

[0002] Workers who work around work machines such as construction machinery and mobile cranes are at risk of being pinched or entangled by the work machine. For this reason, workers can reduce the risk by working at a distance from the work machine, but it is also expected that workers may approach the work machine to assist in work with the work machine. In general, safety and productivity are inversely proportional, and if a worker keeps a distance from the work machine to increase safety, productivity decreases, and if a worker moves closer to the work machine to increase productivity, safety decreases.

[0003] Patent Document 1 provides an excavator that can ensure the safety of nearby workers, and includes a human detection means that detects people within a predetermined range around the excavator, and a controller that determines at each predetermined control period whether the human detection means has detected a person before the hydraulic actuator is operated, and prohibits any of the swinging, traveling, and excavation operations when an obstacle is detected. As a result, when the excavator detects nearby workers, it prohibits operation, ensuring the safety of the workers. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2019-7348 A Summary of the Invention [Problem to be solved by the invention]

[0005] The excavator in Patent Document 1 aims to ensure the safety of surrounding workers by stopping the machine. However, at a construction site where a work machine is in operation, various risks may occur, such as the risk of the work machine tipping over or falling, and the risk of productivity decreasing due to excessive restrictions on the operation of the work machine, in addition to the risk of contact between the work machine and surrounding workers.

[0006] The present invention has been made in consideration of the above-mentioned problems, and its purpose is to provide a construction system that can reduce various risks that occur at construction sites where work machines and workers work together. [Means for solving the problem]

[0007] In order to achieve the above object, the present invention provides a work machine capable of operating under automatic or semi-automatic control and capable of acquiring information on its own internal state or information on its surroundings, and a risk quantified based on information within the work environment in which the work machine operates. information In a construction system including a server computer that performs the calculation of the above and a communication network that communicably connects the work machine and the server computer, the server computer The calculated risk information is stored in chronological order at a certain frequency, and the stored chronological order is The above risks information Based on this, maximize the weighted sum of the function that evaluates the safety in the work environment and the function that evaluates the productivity in the work environment. While reducing risk Candidate values ​​for the automatic control parameters of the work machine are calculated as update automatic control parameters, and the work machine receives the update automatic control parameters via the communications network and updates the automatic control parameters with the update automatic control parameters.

[0008] According to the present invention configured as described above, it is possible to change the behavior of the automatic control or semi-automatic control of a work machine so as to reduce various risks determined based on information within the work environment. Effect of the Invention

[0009] According to the construction system of the present invention, it is possible to reduce various risks that occur at construction sites where work machines and workers work together. [Brief description of the drawings]

[0010] [Figure 1] 1 is an overall view of a construction system according to an embodiment of the present invention. [Diagram 2] 1 is a configuration diagram of a construction system according to an embodiment of the present invention. [Diagram 3] 1 is a functional block diagram of a construction system according to an embodiment of the present invention. [Figure 4] FIG. 4 is a diagram showing an example of collision risk information in the embodiment of the present invention. [Diagram 5] FIG. 11 is a diagram showing an example of fall risk information in the embodiment of the present invention. [Figure 6] FIG. 2 is a diagram showing an example of heat stroke risk information according to an embodiment of the present invention. [Figure 7] FIG. 1 is a diagram showing an example of a situation in which a risk of being pinched occurs in an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] Hereinafter, a hydraulic excavator will be described as an example of a working machine according to an embodiment of the present invention with reference to the drawings. In each drawing, the same elements are given the same reference numerals, and duplicated explanations will be omitted as appropriate.

[0012] Fig. 1 is an overall diagram of a construction system according to the present embodiment. The construction system 1 is made up of a work machine 2, a worker terminal 4 worn by a worker 3, environmental sensors 5, communication equipment 6, a server computer 7 having a calculation device such as a CPU, and the like.

[0013] The work machine 2 includes all kinds of machines that perform work at a construction site, such as construction machines and transport vehicles. The work machine 2 is equipped with communication devices and a control computer, and can be operated under automatic or semi-automatic control by the control computer. Note that FIG. 1 illustrates a hydraulic excavator as an example of the work machine 2.

[0014] The worker 3 is a person who performs work within the construction site, and drives the work machine 2, assists the work of the work machine 2, and performs work independently of the work machine 2. The worker terminal 4 is a device worn by the worker 3, and is equipped with a computer, communication equipment, output devices such as a speaker and a monitor, and input devices such as a touch panel and buttons. In this embodiment, a wristwatch-type terminal is illustrated as an example of the worker terminal 4, but it may be a glass-type terminal or have another shape, and it does not have to be a device worn by the worker. Specifically, it may be a terminal carried by the worker, or may be a terminal located near the worker, such as a monitor in the driver's seat facing the operator.

[0015] The environmental sensor 5 is installed within the construction site and is equipped with a camera, laser sensor, temperature sensor, humidity sensor, etc., to acquire environmental information. It also has communication equipment like the work machine 2 and the worker terminal 4. It may be installed permanently at the site, or it may be installed simply and easily moved to another location. The communication equipment 6 is equipment that allows the construction site to be connected to the same communication network, and is composed of wireless LAN (Local Area Network) access points, etc. The server computer 7 is a computer connected to the communication network of the communication equipment 6.

[0016] The work machine 2, worker terminal 4, and environmental sensor 5 can be connected to a communication network provided by communication equipment 6 via the communication equipment equipped in each of them, and can transmit information via communication with a server computer 7 connected to the same communication network.

[0017] FIG. 2 is a configuration diagram of the construction system 1.

[0018] The work machine 2 is equipped with a work implement 24 that performs various tasks (for example, in the case of a hydraulic excavator, a front mechanism consisting of a boom, arm, bucket, etc.), and the work implement 24 is controlled by a controller 21. The work machine 2 also includes sensors 22 that measure the state of the work machine 2 itself, such as the state of the work implement 24 (internal machine information), and the surrounding conditions (surrounding information), such as the positions of moving objects around the work machine 2, and a communication device 23 that enables the work machine 2 to communicate with the outside. The information measured by the sensor 22 is passed to the controller 21. The controller 21 can also exchange information with the outside of the machine via the communication device 23. The communication device 23 is connected to a communication network 61 provided within the construction site by communication equipment 6.

[0019] The worker terminal 4 includes an input interface (IF) 43 including a touch panel, buttons, switches, etc., an output interface 44 including a monitor, speaker, vibration device, etc., a controller 41 for controlling the input / output interface, a sensor 42 including a GPS (Global Positioning System) for measuring biometric information such as the heart rate and position information of the worker 3 wearing the terminal, and a communication device 45 for communicating with the outside. Information (worker information) measured by the sensor 42 is passed to the controller 41. The controller 41 can also exchange information with the outside of the device via the communication device 45. The communication device 45 is connected to a communication network 61.

[0020] The environmental sensor 5 includes a sensor 52 consisting of a camera or laser sensor that measures the positions of surrounding moving objects and the position and shape of the work target (surrounding information), a thermometer or hygrometer that measures environmental information such as temperature and humidity, a controller 51 that receives the raw information measured by the sensor 52 and performs processing such as converting it into physical values ​​or other information, and a communication device 53 that is connected to a communication network 61 and enables the controller 51 to exchange information with the outside world.

[0021] The server computer 7 is connected to a communication network 61 by wire or wirelessly, and can acquire information from the work machines 2, worker terminals 4, environmental sensors 5, etc. that are connected to the same communication network, and can transmit information within the computer.

[0022] The number of work machines 2, worker terminals 4, and environmental sensors 5 within a construction site is not limited to one, and there may be multiple of each, or none at all. Additionally, the surrounding information, environmental information, and worker information may be acquired by any of the work machines 2, worker terminals 4, and environmental sensors 5. However, at least one of the surrounding information, environmental information, and worker information must be acquired and sent to the server computer 7.

[0023] Figure 3 is a functional block diagram of the construction system 1. The main functions of the construction system 1 are a machine internal information / surrounding information acquisition function 2a and an automatic control function 2b that operate on a work machine 2, a worker information acquisition function 4a and a warning function 4b that operate on a worker terminal 4, a surrounding information / environmental information acquisition function 5a that operates on an environmental sensor 5, and a risk analysis function 7a and a construction system optimization calculation function 7b that operate on a server computer 7.

[0024] The internal machine information / surrounding information acquisition function 2a processes information acquired by the sensors 22 of the work machine 2 in the controller 21 as necessary, and transmits it to the risk analysis function 7a of the server computer 7 via the communication equipment 23 and the communication network 61. The automatic control function 2b calculates a control amount for operating the work machine 24 in the controller 21 of the work machine 2, and controls the work machine 24. Note that the automatic control function 2b can also be replaced with a semi-automatic control function that automates only part of the operation of the work machine 24.

[0025] The worker information acquisition function 4a processes information acquired by the sensor 42 of the worker terminal 4 in the controller 41 as necessary, and transmits the information to the risk analysis function 7a of the server computer 7 via the communication device 45 or the communication network 61. The warning function 4b generates information to be output to the output interface 44 in the controller 41 of the worker terminal 4, and outputs the information to the output interface 44.

[0026] The surrounding information / environmental information acquisition function 5a processes the information acquired by the sensor 52 of the environmental sensor 5 in the controller 51 as necessary, and transmits it to the risk analysis function 7a of the server computer 7 via the communication device 53 and the communication network 61.

[0027] The risk analysis function 7a collects and analyzes various information within the construction site to quantify the risk within the site. For example, the risk of collision between the work machine 2 and the worker 3 can be calculated from the machine's position, operation direction, and operation speed contained in the machine's internal information, and the worker's position, movement direction, and movement speed contained in the surrounding information or worker information. The risk of collision here is the probability of a collision occurring, and can be estimated from the relative positional relationship and operation state between two objects. In addition to collisions, if there is a step in the shape of the work site contained in the surrounding information, and the machine's internal information contains information that the work machine is near the step and is moving in that direction, the risk of the work machine tipping over or falling can be estimated, and the risk of heatstroke of the worker can be estimated from the temperature and humidity information contained in the environmental information and the worker's biological information such as the worker's heart rate contained in the worker information. In a situation where a worker is between a work machine and an obstacle (such as a building) and the work machine is approaching the worker, the risk of being pinched increases, and if the worker is in the direction of travel of the work machine's tires or crawlers, the risk of being run over or caught in the machine can be estimated to be high. In this way, the risk analysis function 7a calculates various risks that may occur at a construction site in a manner that corresponds to each work machine and each worker present at the construction site.

[0028] Fig. 4 shows collision risk information as an example of risk information output by the risk analysis function 7a. If there are three work machines 2 (work machines A to D) and four workers 3 (workers A to D) at a construction site, the risk of collision between each work machine and each worker is calculated. The risk here is expressed, for example, as the probability of the event occurring within a specified time.

[0029] Fig. 5 shows an example of risk information for tipping over of the work machine 2, and Fig. 6 shows an example of risk information for heat stroke of the worker 3. The risk of being pinched or caught in something can be expressed in the same way as the risk of a collision. As shown in Figs. 4 to 6, the risk information is calculated in a form corresponding to each work machine 2 or worker 3.

[0030] Any specific method can be used to calculate the risk information, but for example, various information from the actual construction site can be accumulated while manually creating data on what risks existed at that time, and then using the former as learning data and the latter as teacher data, a risk calculation model can be created and trained using techniques such as machine learning and neural networks, so that when a similar on-site situation occurs, risk information can be output from the trained model.

[0031] Another method of calculating risk information is to calculate risk based on predetermined rules. Here, as an example, a calculation method based on rules for entrapment risk information is described. Figure 7 shows an example of the occurrence of the entrapment risk. If the rules for increasing the entrapment risk are (1) the presence of an obstacle around the work machine, (2) the work machine moving in the direction of the obstacle, and (3) the worker is between the work machine and the obstacle, or is about to be between the work machine and the obstacle, the entrapment risk Rc can be calculated as Rc = fc (Pm, Po, Ph, Vm, Vh) when the work machine position Pm (mx, my), the obstacle position Po (ox, oy), the person position Ph (hx, hy), the work machine movement speed Vm (mvx, mvy), and the person movement speed Vh (hvx, hvy). Here, the work machine position Pm and movement speed Vm are obtained from internal machine information, the obstacle position Po is obtained from surrounding information, and the worker position Ph and speed Vh are obtained from surrounding information or worker information. The function fc calculates the pinch risk Rc from this information, and is configured based on rules to calculate a high value in a situation where an obstacle is present around the machine and the machine is operating in the direction of the obstacle, and in a situation where a person is between the machine and the obstacle or is moving toward the space between the machine and the obstacle.

[0032] The risk analysis function 7a transmits the calculated risk information to the automatic control function 2b and the warning function 4b in real time at short intervals (for example, 0.5 second intervals). The risk analysis function 7a also saves the calculated risk information in chronological order and transmits the time-series risk information at long intervals (for example, several hours to one day). The automatic control function 2b temporarily changes the behavior of the automatic control to reduce the risk based on the risk information, and the warning function 4b temporarily changes the behavior of the warning to reduce the risk based on the risk information. The construction system optimization calculation function 7b permanently changes the behavior of the automatic control by the automatic control function 2b and the behavior of the warning by the warning function 4b using long-term risk information.

[0033] The construction system optimization calculation function 7b calculates parameters for optimizing the safety and productivity of a construction site based on the risk information calculated by the risk analysis function 7a. The parameters referred to here refer to the automatic control parameters (described in detail later) used in the automatic control function 2b and the warning control parameters (described in detail later) used in the warning function 4b. The construction system optimization calculation function 7b updates parameters that are effective in reducing the risk of the obtained risk information. However, since many parameters have a trade-off relationship between safety and productivity, if the parameters are updated only in the direction of reducing risk, safety will improve but productivity may decrease. For this reason, for example, weights are determined to indicate the ratio of importance given to safety and productivity at the site, and optimization is performed by a method such as maximizing the weighted sum of safety and productivity. Specifically, any optimization calculation method may be used, but for example, the objective function may be f(p)=ωF S (p)+(1-ω)F P (p), and then find p that maximizes the objective function f. Here, ω is a variable that determines the priority of safety and productivity and takes values ​​between 0 and 1, and p is a set of parameters including automatic control parameters and warning control parameters. In addition, F S is a function that evaluates the security of p, F Pis a function that evaluates productivity for p. If safety and productivity are in a trade-off relationship, when the risk information obtained from risk analysis function 7a is greater than the allowable value, it is determined that productivity is being prioritized too much, and ω is increased to increase safety. Conversely, when the risk information is smaller than the allowable value, it is determined that safety is being prioritized too much, and ω is decreased to increase productivity. Using the determined ω, p that maximizes the objective function f is calculated. Note that for the long-term risk information sent from risk analysis function 7a to construction system optimization calculation function 7b, methods such as using the average value in the time axis direction or the maximum value can be considered.

[0034] The work machine 2 used in the construction system 1 is a machine that operates manned or unmanned, and is a machine that can perform part or all of its work and the safety operations associated therewith by automatic control. The automatic control function 2b performed by the automatic control is, for example, a function that operates the work machine automatically (automatically controlling the entire work machine) or semi-automatically (automatically controlling part of the work machine by intervening in the operation of the operator) to perform the desired work, or automatically slows down the operation speed or automatically stops the operation when a person approaches. The automatic control is performed based on automatic control parameters held in the controller 21. The automatic control parameters are a set of variables necessary for planning and executing operations, such as enable / disable of the automatic control function 2b, operation conditions, operation range, and operation speed and size.

[0035] The work machine 2 improves work efficiency and contributes to improving construction productivity by performing part or all of the work automatically. However, because it operates against the operator's instructions or unmanned, there is a risk of reducing safety. In addition, by slowing down or stopping its operation when a person approaches, the risk of collision with or entrapment with the person is reduced, contributing to improving construction safety. However, if the operation slows down or stops when the user wishes to perform work, there is a risk of reducing productivity. In this way, the automatic control function 2b may be in a trade-off relationship between productivity and safety, and the balance between safety and productivity is determined by the automatic control parameters.

[0036] The worker terminal 4 can use the output interface 44 and the warning function 4b to give a notice to the worker 3 wearing the terminal. For example, the position information of the worker 3 obtained by the sensor 42 (strictly speaking, it is the position of the worker terminal 4, but here the position of the worker terminal 4 is substituted for the position of the worker 3) is compared in the controller 41 with the position of the work machine 2 transmitted from the work machine 2 via the communication network 61, and when the position of the worker 3 approaches the position of the work machine 2 to a certain extent, the worker terminal 4 can warn the worker 3 of approach to the work machine 2 by the output interface 44 such as a monitor, vibration, or sound. This warning function 4b is performed based on warning control parameters held in the controller 41. The warning control parameters are a set of variables necessary for executing a warning, such as enabling / disabling the warning function 4b, warning conditions, and warning methods.

[0037] The warning function 4b may contribute to improving safety by making the worker 3 aware of the situation, such as when the worker 3 unconsciously approaches the work machine 2, and thereby avoiding risks such as a collision with or being caught in the work machine 2 due to unnecessary approach. On the other hand, if the worker 3 consciously approaches the work machine 2 because there is a need, this warning is unnecessary, and there is a risk of productivity decreasing if the worker 3 is forced to take unnecessary action, such as stopping the warning. In this way, the functions of the worker terminal 4 may be in a trade-off relationship between productivity and safety, and the balance between safety and productivity is determined by the warning control parameters.

[0038] Next, as one of the features of the construction system 1, emergency risk reduction through real-time risk information feedback will be described.

[0039] The risk information calculated by the risk analysis function 7a is fed back in real time to the automatic control function 2b and the warning function 4b.

[0040] The automatic control function 2b acquires risk information corresponding to itself and changes the behavior of the automatic control according to the risk information. Specifically, for example, if information is obtained that the risk of collision between itself and a certain worker is higher than an allowable value, the movement in the direction of the worker is restricted (the maximum speed of the movement is restricted) or stopped. If the risk information falls below an allowable value, the movement restriction and stop control are released, and normal operation is possible. In this way, the automatic control function 2b can improve the safety of the site by controlling its own behavior to be changed so as to reduce the risk according to the risk information. Note that this is equivalent to changing the behavior of the automatic control by temporarily changing the automatic control parameters such as the avoidance range and the avoidance method (deceleration or stopping) when one of the automatic control functions 2b has a function for avoiding collisions with moving objects (collision damage reduction function).

[0041] The warning function 4b acquires risk information corresponding to the wearer (worker) of the worker terminal 4, and changes the warning behavior according to the risk information. Specifically, for example, if information is obtained indicating that the risk of collision between the worker and a certain work machine is higher than a tolerance value, the output interface 44 is used to warn the worker by sound, vibration, or the like, to make the worker aware of the risk of collision. This warning allows the worker to become aware of the possibility of a collision before it occurs, and to avoid the collision, thereby improving the safety of the work site. Note that this is equivalent to changing the warning behavior by temporarily changing control parameters such as the warning range and warning method (warning by sound only, warning by sound and vibration, etc.) when there is a function to warn of approach to a work machine as one of the warning functions.

[0042] Next, the second feature of the construction system 1 will be described, which is the drastic risk reduction using long-term risk information.

[0043] The risk information calculated by the risk analysis function 7a is stored within the risk analysis function 7a for a certain period of time, and the stored time-series risk information is sent collectively to the construction system optimization calculation function 7b. This cycle may be on the order of a few hours to a few days. Based on this time-series risk information, the construction system optimization calculation function 7b calculates automatic control parameters and warning control parameters that optimize safety and productivity within the construction site, as described above. The automatic control parameters are sent to the automatic control function 2b, and the automatic control parameters within the automatic control function 2b are updated. The warning control parameters are sent to the warning function 4b, and the warning control parameters within the warning function 4b are updated.

[0044] Specifically, when there is time-series risk information indicating that the risk of collision between a work machine 2 in a specific location or performing a specific task and a worker 3 frequently increases over a certain period of time, the construction system optimization calculation function 7b calculates automatic control parameters to reduce the risk of collision to below an allowable value by widening the avoidance range of the function for avoiding collision with a moving object, which is one of the automatic control functions 2b, for the work machine 2 in that location or performing that task, or to increase the deceleration rate of the work machine 24 for avoidance. As a result, the automatic control parameters are updated, and for a work machine 2 in a high-risk location or performing high-risk task, automatic control works in a direction that reduces the risk. This parameter update is not temporary, but is carried over until the next update.

[0045] Specifically, when there is time-series risk information indicating that the risk of collision with a work machine of a worker in a specific location or performing a specific task increases frequently over a certain period of time, the construction system optimization calculation function 7b calculates automatic control parameters to widen the warning range of a function that warns of approach to the work machine 2, which is one of the warning functions, or to strengthen the warning level, for workers in that location or performing that task, in order to reduce the risk of collision to below an allowable value. As a result, the warning control parameters are updated, and the worker 3 who is in a high-risk location or performing high-risk tasks is prompted to behave in a way that reduces the risk. This parameter update is not temporary, but is carried over until the next update.

[0046] Parameter updates can also be performed for a specific work machine 2 or worker 3. However, different parameters for different machines or people mean that they behave differently, which may cause confusion for others. Therefore, it is better to have only one type of parameter within a construction site.

[0047] The construction system 1 configured as above has the following overall characteristics.

[0048] In construction using the construction system 1 according to the present embodiment, information on machines, people, and the environment is collected. This information is instantly analyzed by the risk analysis function 7a, and risk information is fed back to the work machine 2 and the worker 3 at the site in real time. This makes it possible to appropriately control the behavior of the worker 3 and the work machine 2 in a high-risk location and reduce the risk. For example, if a worker 3 not wearing the worker terminal 4 is trying to approach the work machine 2 from the blind spot of the work machine 2, it is determined that there is a high risk that the operator of the work machine 2 will not notice the worker 3 and will rear-end the work machine 2, and control such as automatically slowing down the operating speed of the work machine 2 is activated. In this construction system, risk analysis is performed in real time based on various information obtained from the site in this way, and risk information is fed back to the site in sequence, thereby providing a mechanism for temporarily reducing risk. This is called the first risk information feedback loop.

[0049] The risk information analyzed in real time by the risk analysis function 7a is accumulated in the risk analysis function 7a. This accumulated risk information identifies potential and fundamental risks at the construction site, and site-specific risks that were not anticipated at the time of design / planning (for example, poor positional relationship between two construction sites, which inevitably results in many overlaps in the movement paths of people and machines, or incompatibility between operators and workers, which results in frequent near misses, etc.) are extracted. This time-series risk information is delivered to the construction system optimization calculation function 7b. The construction system optimization calculation function 7b calculates parameters that optimize safety and productivity based on this time-series risk information, and reconstructs the system. This construction system thus has a mechanism for extracting potential and fundamental risks at the site that were not anticipated in the original plan, and reconstructing the system to further reduce risk, thereby achieving fundamental risk reduction. This is called the second risk information feedback.

[0050] These two loop structures are: the first risk information feedback loop is for dealing with the risk at that moment as an emergency response, and the second risk information feedback loop is for dealing with the underlying, underlying risk as a fundamental response. By effectively rotating these two loops, this construction system can minimize risk and optimize safety and productivity for each individual worksite.

[0051] Taking the situation in FIG. 7 as an example, a specific example of how this embodiment contributes to optimizing safety and productivity will be described.

[0052] First, emergency risk reduction by real-time risk information feedback will be described. Based on the relative positions of the work machine 2, obstacle 8, and worker 3, and the motion speed and movement speed (speed includes direction) of the work machine 2 and worker 3, the risk analysis function 7a calculates that there is a high possibility of being trapped if the work machine continues moving at the current speed, and high risk information is obtained. This risk information is fed back to the automatic control function of the work machine, and the operation speed limit parameter of the collision damage reduction function, which is one of the automatic control functions 2b of the work machine 2, temporarily increases. Note that it is predetermined how much the parameter is changed depending on the level of risk information. The operation speed limit parameter is a parameter related to how much the operation speed is reduced in the collision damage reduction function when it is about to collide with a person or an obstacle, and the larger the operation speed limit parameter is, the more the speed is reduced (the slower the speed becomes). If the worker 3 is not present in the situation shown in Figure 7, the work machine 2 will use its normal collision damage mitigation function against the obstacle 8, and automatic control will be put into place to avoid colliding with the obstacle 8. However, if the worker 3 is present and moves between the work machine 2 and the obstacle 8, as in the situation shown in Figure 7, the risk of collision is higher than when only the obstacle 8 is present, and the risk of getting caught is reduced by imposing stronger speed restrictions on the operation of the work machine 2.

[0053] Next, a drastic risk reduction using long-term risk information will be described. If the situation in FIG. 7 occurs frequently in the same place, the long-term risk information will show that the risk around the obstacle 8 tends to be high. The cause of the frequent occurrence of the situation in FIG. 7 is that the obstacle 8 is the shortest route to the target point where the worker 3 sometimes passes by, and the worker 3 tends to choose that route from the viewpoint of improving productivity even if it involves some risk. When such long-term risk information is obtained, the construction system optimization calculation function 7b updates the warning control parameters so that when the worker 3 approaches the obstacle 8 that tends to be high risk, a warning or a caution is given to the worker 3 via the worker terminal 4. Specifically, the position information of the obstacle 8 is added to the parameter array indicating the warning target position among the warning control parameters. This is equivalent to the construction system optimization calculation function 7b updating the rules of the site so that the worker should not pass through that route (around the obstacle), or that the worker should check the surrounding conditions of the work machine 2 and the like before passing through that route.

[0054] In this embodiment, in a construction system 1 equipped with a work machine 2 capable of operating under automatic or semi-automatic control and capable of acquiring information on its own internal state or information on its surroundings, a computer 7 that performs risk analysis based on information within the work environment in which the work machine 2 operates, and a communication network 61 that communicatively connects the work machine 2 and the computer 7, the work machine 2 receives the risk analysis results of the computer 7 via the communication network 61, and changes the automatic control parameters used for the automatic control or semi-automatic control in accordance with the risk analysis results.

[0055] According to this embodiment configured as described above, it is possible to temporarily change the behavior of the automatic control or semi-automatic control of the work machine 2 so as to reduce various risks predicted based on information within the work environment. This makes it possible to reduce various risks that occur at a construction site where the work machine 2 and the worker 3 work together.

[0056] Furthermore, based on the risk analysis results, computer 7 calculates candidate values ​​for automatic control parameters that improve construction safety or productivity in the work environment as updated automatic control parameters, and the work machine 2 receives the updated automatic control parameters via communication network 61 and updates the automatic control parameters with the updated automatic control parameters. This makes it possible to permanently change the behavior of the automatic control or semi-automatic control of the work machine 2 so as to reduce the average level of risk to construction safety or productivity predicted based on information within the work environment.

[0057] Furthermore, the construction system 1 according to this embodiment includes a worker terminal 4 capable of performing a warning operation, and the worker terminal 4 receives the risk analysis result of the computer 7 via the communication network 61 and changes the warning control parameters used for the warning operation according to the risk analysis result. This makes it possible to temporarily change the warning behavior of the worker terminal 4 so as to reduce various risks predicted based on information within the work environment.

[0058] Furthermore, the computer 7 calculates candidate values ​​of warning control parameters that improve the safety or productivity of construction work in the work environment as updated warning control parameters based on the risk analysis results, and the worker terminal 4 receives the updated warning control parameters via the communication network 61 and updates the warning control parameters with the updated warning control parameters. This makes it possible to permanently change the warning behavior of the worker terminal 4 so as to reduce the average level of risk to the safety or productivity of construction work predicted based on information within the work environment.

[0059] Furthermore, the worker terminal 4 has a sensor 42 capable of acquiring its own position information or information about its surroundings as worker terminal information, and the computer 7 receives the worker terminal information via the communication network 61 and includes the worker terminal information in the information within the work environment. This makes it possible to temporarily change the behavior of the automatic or semi-automatic control of the work machine 2 or the warning behavior of the worker terminal 4 so as to reduce various risks predicted based on information within the work environment including the information acquired by the worker terminal 4, or to permanently change the behavior of the automatic or semi-automatic control of the work machine 2 or the warning behavior of the worker terminal 4 so as to reduce the average level of these risks.

[0060] Furthermore, the construction system 1 in this embodiment is equipped with environmental sensors 5 that are installed in the work environment and are capable of acquiring surrounding information as environmental information, and the computer 7 receives the environmental information via a communication network 61 and includes the environmental information in the information within the work environment. This makes it possible to temporarily change the behavior of the automatic or semi-automatic control of the work machine 2 or the behavior of the warnings on the worker terminal 4 so as to reduce various risks predicted based on information within the work environment including information acquired by the environmental sensors 5, or to permanently change the behavior of the automatic or semi-automatic control of the work machine 2 or the behavior of the warnings on the worker terminal 4 so as to reduce the average level of these risks.

[0061] Although the embodiment of the present invention has been described above in detail, the present invention is not limited to the above-mentioned embodiment and includes various modified examples. For example, the above-mentioned embodiment has been described in detail to easily explain the present invention, and the present invention is not necessarily limited to the embodiment having all of the described configurations. [Explanation of symbols]

[0062] 1...construction system, 2...work machine, 21...controller, 22...sensor, 23...communication equipment, 24...work machine, 3...worker, 4...worker terminal, 41...controller, 42...sensor, 43...input interface, 44...output interface, 45...communication equipment, 5...environmental sensor, 51...controller, 52...sensor, 53...communication equipment, 6...communication equipment, 61...communication network, 7...server computer, 8...obstacle.

Claims

1. A construction system including a work machine capable of operating under automatic or semi-automatic control and capable of acquiring information on its own internal state or information on its surroundings, a server computer that calculates quantified risk information based on information within the work environment in which the work machine operates, and a communication network that communicatively connects the work machine and the server computer, the server computer stores the calculated risk information in a chronological order at a fixed frequency, and calculates candidate values ​​of automatic control parameters of the work machine as automatic control parameters for update based on the risk information stored in chronological order so as to reduce risk while maximizing a weighted sum of a function for evaluating safety in the work environment and a function for evaluating productivity in the work environment; The work machine receives the update automatic control parameters via the communication network, and updates the automatic control parameters with the update automatic control parameters. A construction system characterized by:

2. In the construction system according to claim 1, Equipped with a worker terminal capable of issuing warnings, the server computer calculates, based on the risk information, a candidate value of a warning control parameter used for a warning operation of the worker terminal as an updated warning control parameter by maximizing a weighted sum of a function for evaluating safety in the work environment and a function for evaluating productivity in the work environment; The operator terminal receives the updated warning control parameters via the communication network, and updates the warning control parameters with the updated warning control parameters. A construction system characterized by:

3. In the construction system according to claim 2, the worker terminal has a sensor capable of acquiring its own position information or information about its surroundings as worker terminal information, The server computer receives the worker terminal information via the communication network and includes the worker terminal information in information within the work environment. A construction system characterized by:

4. In the construction system according to claim 1, An environmental sensor is provided in the work environment and capable of acquiring information about the surroundings as environmental information, The server computer receives the environmental information via the communication network and includes the environmental information in information within the work environment. A construction system characterized by:

Citation Information

Patent Citations

  • Automatic operative shovel

    JP1998183671A

  • Crushed stone treatment system

    JP2000015133A

  • Automatically operated construction machinery

    JP2000291077A

  • Automatic operating shovel, and automatic shovel operating method

    JP2001182091A

  • Stop control method in intrusion-prohibitive region for service car and its controller

    JP2003105807A