Work information management device
The work information management device efficiently estimates work types and calculates material consumption by analyzing vehicle and operation data, addressing the challenges of data communication and input complexity in existing systems.
Patent Information
- Application Number
- JP2023122169
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2023-07-27
- Publication Date
- 2024-09-19
- Estimated Expiration
- 2039-12-02
AI Technical Summary
Existing methods for data communication between a traveling vehicle and a working machine require the installation of a communication device, which is not feasible for older models, and inputting work types on user terminals is time-consuming due to numerous options.
A work information management device that estimates work types using time-by-time position and operation information from a traveling vehicle, presenting candidates for selection, and includes a weight sensor to calculate material consumption.
Reduces the effort required to input work types by narrowing down choices and accurately estimates work types, while also calculating material consumption.
Smart Images

Figure 0007554322000005 
Figure 0007554322000006 
Figure 0007554322000007
Abstract
Description
[Technical field]
[0001] The present invention relates to a work information management device. [Background technology]
[0002] Patent Document 1 discloses a technology in which a vehicle equipped with a work machine is driven within a field, causing the work machine to perform agricultural work, and mechanical information of the work machine, position information of the traveling vehicle, and work content data are stored as work information in a remote server. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2019-109791 A Summary of the Invention [Problem to be solved by the invention]
[0004] In Patent Document 1, the traveling vehicle and the working machine are electrically connected so that the traveling vehicle obtains machine information indicating the type of the working machine and the like and stores it in a memory of the traveling vehicle. In recent years, a method has been proposed in which the traveling vehicle acquires mechanical information about the work machine by wirelessly connecting the traveling vehicle and the work machine. However, in order to realize data communication between the traveling vehicle and the work machine, it is necessary to install communication devices in the traveling vehicle and the work machine. Furthermore, when using an older model of work machine, it may not be possible to install a communication device in the work machine.
[0005] For this reason, the applicant proposes providing an input screen for inputting work information on a user terminal used by a user who owns a traveling vehicle, and having the user input the work type on the input screen, thereby obtaining the work type. However, since there are many different types of work that can be performed using traveling vehicles, there are many options available when inputting the type of work, which results in a problem that inputting the type of work is time-consuming.
[0006] An object of the present invention is to provide a work information management device that can reduce the effort required for inputting a work type. [Means for solving the problem]
[0007] One embodiment of the present invention provides a work information management device including a traveling vehicle side information acquisition unit that acquires traveling vehicle side information including position information at each time and operation information of the traveling vehicle at each time from a traveling vehicle equipped with any of a plurality of types of work machines; a work type estimation unit that performs processing to estimate a work type of work performed by the work machine attached to the traveling vehicle based on the traveling vehicle side information acquired by the traveling vehicle side information acquisition unit, thereby outputting one or more work type candidates; and a work type acquisition unit that presents an input screen for inputting the work type performed by the work machine and acquires the work type input on the input screen as a final work type, wherein the work type acquisition unit is configured to present the one or more work type candidates so that one work type candidate can be selected from the one or more work type candidates output by the work type estimation unit.
[0008] With this configuration, the options available when inputting a work type can be narrowed down, reducing the effort required when inputting a work type. In one embodiment of the present invention, the operation information includes at least vehicle speed information of the traveling vehicle, driving source information regarding the driving state of the driving source of the traveling vehicle, and transmission mechanism information regarding the operating state of a transmission mechanism that transmits the driving force of the driving source to the work machine.
[0009] In one embodiment of the present invention, the work type estimation unit includes a unit period work estimation unit that divides a work period into a plurality of unit periods and estimates, for each unit period, a work type of work performed in that unit period, and a candidate work type output unit that outputs one or more work types based on the work type for each unit period estimated by the unit period work estimation unit. In one embodiment of the present invention, the unit period-based task estimation unit is configured to estimate the task type for each unit period by using a machine learning technique.
[0010] In one embodiment of the present invention, the unit period work estimation unit is configured to generate input information for a machine learning model for each unit period based on the location information and the operation information, and estimate a work type for each unit period using the generated input information and the machine learning model. In one embodiment of the present invention, the driving source information includes the rotation speed of the driving source, the transmission mechanism information includes the rotation speed of a PTO shaft, and the input information includes a pattern of the movement trajectory of the traveling vehicle, at least one basic statistical quantity of the vehicle speed of the traveling vehicle, at least one basic statistical quantity of the rotation speed of the driving source, and at least one basic statistical quantity of the rotation speed of the PTO shaft.
[0011] In one embodiment of the present invention, a weight sensor is provided on the traveling vehicle to detect the weight of a work implement attached to the traveling vehicle, and when the final work type is any one of sowing work, fertilization work, and pesticide spraying work that consumes materials, the system further includes a consumption calculation unit that calculates the consumption of the materials based on the change in weight of the work implement detected by the weight sensor.
[0012] In one embodiment of the present invention, the weight sensor is a load cell interposed between the traveling vehicle and the work machine and detecting the traction force of the work machine being towed by the traveling vehicle, and the consumption calculation unit is configured to calculate the consumption of the material based on the difference between the traction force detected by the load cell at the start of work and the traction force detected by the load cell at the end of work. [Brief description of the drawings]
[0013] [Figure 1] FIG. 1 is a schematic diagram showing the configuration of a work management system to which a work machine identification device according to one embodiment of the present invention is applied. [Diagram 2] FIG. 2 is a block diagram showing the electrical configuration of the tractor and the management server. [Diagram 3] FIG. 3 is a schematic diagram showing an example of the contents of the task classification table. [Figure 4] FIG. 4 is a schematic diagram showing an example of the contents of a user-specific tractor ID table for a certain user. [Diagram 5] FIG. 5 is a schematic diagram showing an example of the contents of a certain user-specific work information table for a certain user. [Figure 6] FIG. 6 is a flowchart showing the procedure of the task type estimation process executed by the task type estimation unit for a certain task period. [Figure 7] FIG. 7A is a schematic diagram showing an example of a task type input screen, and FIG. 7B is a schematic diagram showing a state in which a narrowing down pull-down menu is displayed on the task type input screen. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] Hereinafter, an embodiment of the present invention will be described in detail with reference to the accompanying drawings. FIG. 1 is a schematic diagram showing the configuration of a work management system to which a work information management device according to an embodiment of the present invention is applied. The work management system 1 includes a tractor 2, a work implement 3 attached to the tractor 2, a user terminal 4, and a management server 5. The management server 5 manages work information of pre-registered users, allows each user to input a portion of the work information, and allows each user to view the work information. The management server 5 is an example of a work information management device. The management server 5 is provided in a management center 6. The tractor 2 is able to communicate with the management server 5 via a communication network 7.
[0015] The user terminal 4 is a terminal used by a user who owns the tractor 2. The user terminal 4 is capable of communicating with the management server 5 via a communication network 7. The user terminal 4 is made up of a personal computer (PC) and includes a control device (PC main body) 4A, a display 4B, and operation devices 4C such as a mouse and a keyboard. The control device 4A includes a CPU, memory, a hard disk, etc. The hard disk stores an OS (operation program), other programs such as a browser for viewing Web pages, and other necessary data.
[0016] A number of different types of working machines can be attached to the tractor 2. The working machines 3 attached to the tractor 2 include, for example, spreading machines and tilling machines (including tilling, soil-breaking, and soil-leveling machines). The spreading machines include seed sowing machines, sprayers (pest control machines), and broadcasters (fertilizer applicators). The tilling machines include rotary tillers, soilers, Cambridge rollers, mowers (grass cutters), and the like.
[0017] The tractor 2 has a function of locating the position of the tractor 2 using a positioning satellite 8. The tractor 2 transmits tractor side information including a tractor ID, position information for each time, and operation information for each time to the management server 5. The tractor ID is information for identifying the tractor 2. The tractor ID may be composed of the model and model number of the tractor 2. FIG. 2 is a block diagram showing the electrical configuration of the tractor 2 and the management server 5.
[0018] The tractor 2 includes a tractor control unit 10. The tractor control unit 10 includes a microcomputer equipped with a CPU and a memory (volatile memory, non-volatile memory, etc.) 11. The tractor control unit 10 controls the operation of the tractor 2 (movements such as forward movement, reverse movement, stopping, turning, etc.). A plurality of controllers (controllers 21) for controlling each part of the tractor 2 are electrically connected to the tractor control unit 10. The plurality of controllers include an engine controller that controls the engine speed, etc., a vehicle speed controller that controls the vehicle speed of the tractor 2, a steering controller that controls the steering angle of the front wheels of the tractor 2, a PTO shaft controller that controls the rotation of the PTO shaft, etc.
[0019] The tractor 2 is equipped with a PTO clutch for switching between transmitting and cutting off power to a PTO shaft (power transmission shaft). The PTO shaft controller switches the PTO clutch based on a control signal input from the tractor control unit 10, and can drive or stop the work machine 3 to rotate via the PTO shaft. The tractor control unit 10 is further connected to a position information calculation unit 22, a communication unit 23, a display unit 24, an operation unit 25, a memory unit 26, etc.
[0020] A satellite signal receiving antenna 27 is electrically connected to the position information calculation unit 22. The satellite signal receiving antenna 27 receives signals from positioning satellites 8 (see FIG. 1) constituting a satellite positioning system. The satellite positioning system is, for example, a Global Navigation Satellite System (GNSS). The position information calculation unit 22 calculates the position of the tractor 2 (strictly speaking, the satellite signal receiving antenna 27) based on the positioning signal received by the satellite signal receiving antenna 27. Specifically, the position information calculation unit 22 generates positioning information including time information and position information. The position information is, for example, composed of latitude information and longitude information.
[0021] The communication unit 23 is a communication interface for the tractor control unit 10 to communicate with the management server 5 via the communication network 7. The display unit 24 is, for example, a liquid crystal display. The operation unit 25 is provided with a plurality of levers, switches, etc. The storage unit 26 is configured with a storage device such as a non-volatile memory, etc. The storage unit 26 is provided with a position information storage unit 31, an operation information storage unit 32, etc.
[0022] The tractor control unit 10 includes an information acquisition processing unit 12. The information acquisition processing unit 12 acquires position information calculated by the position information calculation unit 22 at predetermined time intervals and stores it in a position information storage unit 31. The information acquisition processing unit 12 also acquires operation information provided by the tractor control unit 10 at predetermined time intervals and stores it in an operation information storage unit 32. The operation information includes vehicle speed, engine on / off information (hereinafter referred to as "engine on / off information"), engine speed, PTO clutch on / off information (hereinafter referred to as "clutch on / off information"), PTO clutch speed (hereinafter referred to as "PTO shaft speed"), engine load factor, etc. The engine load factor is, for example, the ratio of the deviation between the actual fuel injection amount and the no-load fuel injection amount to the deviation between the maximum fuel injection amount and the no-load fuel injection amount.
[0023] Then, the information acquisition processing unit 12 transmits the position information for each time stored in the position information storage unit 31 and the operation information for each time stored in the operation information storage unit 32 together with the tractor ID to the management server 5 at a predetermined timing (for example, the timing when the power key is turned off). Hereinafter, the "position information and operation information for each time" transmitted to the management server 5 may be referred to as "tractor side information".
[0024] The management server 5 includes a server control unit 40. A communication unit 51, an operation display unit 52, an operation unit 53, a memory unit 54, and the like are connected to the server control unit 40. The communication unit 51 is a communication interface that enables the server control unit 40 to communicate with the tractor 2 and the user terminal 4 via the communication network 7. The operation display unit 52 is, for example, a touch panel display. The operation unit 53 includes, for example, a keyboard, a mouse, and the like. The memory unit 54 is composed of a storage device such as a hard disk, non-volatile memory, and the like.
[0025] The memory unit 54 includes a time-series information memory unit 61, a work classification table 62, a user-specific tractor ID table 63, a user-specific work information table 64, and the like. In the time-series information storage unit 61, the tractor side information received from the tractor control unit 10 is stored in association with the tractor ID received from the tractor control unit 10. The task classification table 62 stores a plurality of task names. Fig. 3 shows an example of the contents of the task classification table 62. In this embodiment, farm tasks are hierarchically classified into major and medium categories, and the task classification table 62 is capable of storing the task names of the major and medium categories. However, there may be tasks for which there is no medium category task name for the major category task name. For such tasks, only the task name of the major category is stored.
[0026] Examples of major work categories include tilling, fertilizing, sowing, planting, spraying chemicals, harvesting, etc. Examples of medium-sized work categories included in tilling include subsoil breaking, ridge filling, plowing, leveling, plowing, leveling, weeding, etc. Examples of medium-sized work categories included in fertilizing include basal fertilizer spreading, top dressing, etc. The tractor IDs of the tractors owned by each user are stored in the user-specific tractor ID table 63. Figure 4 shows an example of the contents of the user-specific tractor ID table 63 for a certain user U1. In the example of Figure 4, user U1 owns three tractors T1, T2, and T3.
[0027] The user-specific work information table 64 stores, for each user, work information on work performed using a tractor owned by that user. Fig. 5 shows an example of the contents of the user-specific work information table 64 for a certain user U1. In the example of Fig. 5, the work information includes a tractor ID, work date (year / month / day), work start time (start time), work end time (end time), a work type (estimated) estimated by a work type estimation unit 44 described later, a final work type (input) input by the user as described later, and the like. The work types (estimated) estimated by the work type estimation unit 44 include a major category name and a medium category name.
[0028] The server control unit 40 includes a microcomputer equipped with a CPU and memory (volatile memory, non-volatile memory, etc.) 41. The control unit 40 includes an information acquisition unit 42, a work period determination unit 43, a work type estimation unit 44, a work information storage processing unit 45, and a work type acquisition unit 46. The information acquisition unit 42 is an example of a "tractor side information acquisition unit" of the present invention. When the information acquisition unit 42 receives the tractor side information together with the tractor ID from the tractor 2, the information acquisition unit 42 associates the received tractor side information with the received tractor ID and stores the information in the time-series information storage unit 61. For ease of explanation, the tractor side information stored in the storage unit 26 (31, 32) of the tractor 2 owned by a certain user on a certain day will be referred to as the "time-series information to be processed." It is assumed that the time-series information to be processed is stored in the time-series information storage unit 61.
[0029] The work period determination unit 43 classifies a period from the earliest time to the latest time in the time-series information to be processed (a processing target period) into a work period and a non-work period. For example, the working period determination unit 43 first estimates whether the tractor 2 is in a working state or a non-working state for each time based on the engine on / off information and clutch on / off information included in the time-series information to be processed. More specifically, the working period determination unit 43 estimates whether a working / non-working determination condition, that is, the engine on / off information is on and the clutch on / off information is on, is satisfied for each time within the processing period.
[0030] If the working / non-working judgment condition is satisfied at a certain judgment target time, the working period judgment unit 43 judges that the tractor 2 is in a working state at that time, and if the working / non-working estimation condition is not satisfied, the working period judgment unit 43 judges that the tractor 2 is in a non-working state at that time. Then, based on the working state judgment result for each time, the processing target period is classified into a working period and a non-working period.
[0031] The work period determination unit 43 may use only the condition that the clutch on / off information is on as the work / non-work estimation condition. The work type estimation unit 44 outputs one or more work type candidates by performing processing to estimate the work type of the work performed by the work implement 3 attached to the tractor 2 for each work period determined by the work period determination unit 43, based on the tractor information acquired by the information acquisition unit 42. The work type estimation unit 44 includes a unit period-based work estimation unit 44A and a work type candidate output unit 44B.
[0032] The unit period-based task estimation unit 44A divides a task period into a plurality of unit periods, and estimates the task type of the task performed in each unit period. In this embodiment, the unit period is set to 5 minutes. In this embodiment, the unit period-based task estimation unit 44A estimates the task type for each unit period using a machine learning technique (machine learning model). Machine learning techniques include, for example, support vector machines, random forests, neural networks, logistic regression, and topological data analysis.
[0033] The task type candidate output section 44B outputs one or more task type candidates based on the task type for each unit period estimated by the unit-period-by-unit-period task estimation section 44A. The work information storage processing unit 45 stores, for each work period, one or more work type candidates output from the work type candidate output unit 44B in the user-specific work information table 64 as work types (estimated) estimated by the work type estimation unit 44. At this time, the work information storage processing unit 45 stores the work type candidates output from the work type candidate output unit 44B in the user-specific work information table 64 in association with the tractor ID, date, start time, end time, etc.
[0034] In addition, after the work information storage processing unit 45 stores the work type candidates output from the work type candidate output unit 44B in the user-specific work information table 64, when a work type is acquired by the work type acquisition unit 46, the work information storage processing unit 45 stores the work type in the user-specific work information table 64 as the final work type (input). The work type acquisition unit 46 presents an input screen for inputting the work type performed by the work implement 3 attached to the tractor 2, and acquires the work type input on the input screen as the final work type. The work type acquisition unit 46 is configured to present multiple work type candidates so that one work type candidate can be selected from the multiple work type candidates output from the work type estimation unit 44.
[0035] FIG. 6 is a flowchart showing the procedure of the task type estimation process executed by the task type estimation unit 44 for a certain task period (hereinafter referred to as a task period of interest). The task type estimation process executed by the task type estimation unit 44 includes estimation process (steps S1 to S5) executed by the unit period task estimation unit 44A and output process (step S6) executed by the task type candidate output unit 44B.
[0036] Referring to FIG. 6, unit-period-based task estimation unit 44A sets the first five minutes of a task period of interest as a unit period of interest (step S1). Next, the unit period-by-unit period work estimation unit 44A generates input information for the machine learning model based on the tractor-side information within the target unit period (step S2). The input information includes a pattern of the movement trajectory of the tractor 2 in the unit period of interest, at least one basic statistical quantity of the vehicle speed of the tractor 2 in the unit period of interest, at least one basic statistical quantity of the engine rotation speed in the unit period of interest, and at least one basic statistical quantity of the PTO shaft rotation speed in the unit period of interest. The basic statistical quantities include a sum, an average, a standard deviation, a minimum value, a maximum value, a median, and a mode. The pattern of the movement trajectory of the tractor 2 in the unit period of interest is a pattern that is closest to the movement trajectory pattern in the unit period of interest among a plurality of predetermined movement trajectory patterns.
[0037] The input information may include, for example, the pattern of the tractor 2's movement trajectory, the average value, standard deviation, maximum value and median value of the vehicle speed, the average value, standard deviation, maximum value and median value of the engine rotation speed, and the average value, standard deviation, maximum value and median value of the PTO shaft rotation speed. The input information may further include at least one basic statistical quantity of the engine load factor, for example, the average, standard deviation, maximum, and median of the engine load factor.
[0038] Next, the unit period-based task estimation unit 44A estimates a task type for the unit period of interest using the input information generated in step S2 and the machine learning model, and stores the estimation result in memory 41 (step S3). In this embodiment, the unit period-based task estimation unit 44A estimates one task type as the task type for the unit period of interest. Next, the unit period-by-unit period task estimation unit 44A determines whether or not a period of 5 minutes or more remains in a period that is later (newer) than the attention unit period in the attention task period (step S4). If a period of 5 minutes or more remains (step S4: YES), the next 5 minutes of the current attention task period is set as a new attention task period (step S5), and the process returns to step S2. As a result, the processes of steps S2 to S4 are executed for the new attention task period.
[0039] In step S4, when it is determined that there is no period of 5 minutes or more remaining in the period later in time than the attention unit period in the attention task period (step S4: YES), the unit period-based task estimation unit 44A proceeds to step S6. In step S6, the work type candidate output unit 44B selects and outputs multiple work type candidates based on the work type estimation results for each 5-minute unit period within the target work section. Specifically, the work type candidate output unit 44B selects and outputs the top multiple (top three in this example) most numerous work types among the work types for each unit period within the target work period as work type candidates for the target work period.
[0040] For example, if the work period of interest contains 10 unit periods, and the work type for four of the 10 unit periods is estimated to be tillage (plowing), the work type for three unit periods is determined to be tillage (plowing), the work type for two unit periods is determined to be tillage (land leveling), and the work type for one unit period is determined to be tillage (weeding), then tillage (plowing), tillage (plowing), and tillage (land leveling) are output as candidate work types.
[0041] When the work type candidates for the target work period are output in this manner, the work information storage processing unit 45 stores the output work type candidates (major classification, medium classification) in the user-specific work information table 64 (see FIG. 5) in association with the tractor ID, date, start time, end time, etc. for the target work period. By repeating this process, work type candidates for all work periods within the processing target period are stored in the user-specific work information table 64 (see FIG. 5).
[0042] The operation of the work type acquisition unit 46 will now be described in detail. The user can operate the user terminal 4 to open a homepage provided by the management server 5 and obtain his / her own dedicated web page by logging in. Then, the user can view a work type input screen on his / her own dedicated web page for inputting a work type for the work performed by the user using the tractor 2.
[0043] Specifically, when the user performs an operation to acquire a task type input screen for a predetermined task performed by the user on the user's own dedicated web page (hereinafter referred to as the "task of interest"), the task type acquisition unit 46 generates a web page including a task type input screen for the task of interest and provides it to the user terminal 4. As a result, a task type input screen 70 such as that shown in Fig. 7A is displayed on the user terminal 4.
[0044] The work type input screen 70 displays an item presentation section 71 having items such as the work date, work start time, work end time, work type, etc. of the work of interest, and an OK button 72. The work date, work start time, and work end time items of the work of interest display the work date, work start time, and work end time specified on the management server 5 side. In the work type field, one or more selectable work type candidates output from the work type estimation unit 44 for the work of interest are displayed. For example, if the work type candidates output from the work type estimation unit 44 for the work of interest are "plowing (puddling)", "plowing (cultivation)", and "plowing (land leveling)", then the work type field displays the name of one of the major categories or one of the medium categories, as shown in FIG. 7A. In this example, "plowing", which is one major category of the multiple work type candidates corresponding to the work of interest, is displayed.
[0045] Then, when the task type item is clicked, a narrowing-down pull-down menu 73 containing task names other than the task name (including major and medium task names) among the multiple task type candidates corresponding to the task of interest and "Other" is displayed below the task name item displayed first in the task type items, as shown in Fig. 7B. From this narrowing-down pull-down menu 73, the user selects one of the major and medium task names included in the multiple task type candidates corresponding to the task of interest or "Other".
[0046] When one task name is selected from the narrowing down pull-down menu 73, that task name is displayed in the task type field. When the OK button 72 is clicked in this state, the task name selected from the narrowing down pull-down menu 73 is sent from the user terminal 4 to the management server 5. When the management server 5 (task information storage processing unit 45) receives the task name from the user terminal 4, it stores the received task name as the final task type (input) in the task information storage area corresponding to the task of interest in the user-specific task information table 64 (see FIG. 5).
[0047] In addition, when "Other" is selected from the narrowing down pull-down menu 73, a general-purpose pull-down menu (not shown) is displayed to allow the user to select one work type from all work types, and the user selects one work type from the general-purpose pull-down menu. In this embodiment, when the user inputs the work type, the user can narrow down the options, thereby reducing the burden on the user.
[0048] Although the embodiment of the present invention has been described above, the present invention can be embodied in other forms. For example, in the above embodiment, the work types are classified hierarchically, such as into major categories and medium categories, but they may also be classified non-hierarchically. In the above embodiment, a narrowing down pull-down menu 73 is displayed so that the user can select the work type that was actually performed from among a plurality of work type candidates. However, the display format for allowing the user to select the work type that was actually performed from among a plurality of work type candidates may be a display format other than a pull-down menu. For example, a plurality of work type candidates may be displayed as a list, and a work type selection list for allowing the user to select one from the list may be displayed in a pop-up window format or the like.
[0049] In this case, only all major category names included in the multiple work type candidates may be displayed in a list, only all medium category names included in the multiple work type candidates may be displayed in a list, or combinations of major category names and medium category names included in the multiple work type candidates may be displayed in a list. In addition, such a work type selection list may be displayed when a pull-down menu is opened.
[0050] Also, in the above-described embodiment, the unit period-based work estimation unit 44A estimates one type of work type as the work type for the attention unit period. However, the unit period-based work estimation unit 44A may obtain one or more work type candidates (hereinafter referred to as "first work type candidates") as the work type for the attention unit period, and the probability that the first work type candidates are the work type for the attention unit period. As described above, when a machine learning method is used to estimate the work type, it is possible to obtain one or more first work type candidates as the work type for the attention unit period, and the probability that the first work type candidates are the work type for the attention unit period.
[0051] In this case, the work type candidate output unit 44B outputs one or more work type candidates for the noted work period (hereinafter referred to as "second work type candidate") based on one or more first work type candidates and their corresponding probabilities determined for each unit period within the noted work period. Specifically, the work type candidate output unit 44B adds up the probabilities of the same first work type candidates in the noted work period. Then, it outputs the first work type candidates with the highest probability addition results (for example, the top three) as the second work type candidates for the noted work period. In this case, the second work type candidate corresponds to the "work type candidate" in this invention.
[0052] As shown by the dashed line 28 in Fig. 2, the tractor 2 may be provided with a weight sensor 28 that detects the weight of the work implement 3 attached to the tractor 2. In this case, as shown by the dashed line 47 in Fig. 2, the management server 5 may include a consumption calculation unit 47. When the final work type is any one of sowing work, fertilization work, and chemical spraying work that consume materials, the consumption calculation unit 47 calculates the consumption amount of materials based on the change in weight of the work implement 3 detected by the weight sensor 28. In this case, it is also possible to identify what the materials are based on the final work type.
[0053] The weight sensor 28 may be a load cell that is interposed between the tractor 2 and the work implement 3 and detects the traction force of the work implement 3 pulled by the tractor 2. In this case, the consumption calculation unit 47 may calculate the consumption of materials based on the difference between the traction force detected by the load cell at the start of work and the traction force detected by the load cell at the end of work.
[0054] If a user has previously registered the consumption amount per unit area for each of multiple materials used in agricultural work, it is possible to automatically estimate what material the material is by calculating the material consumption amount per unit area from the material consumption amount calculated as described above. It should be noted that various modifications can be made within the scope of the claims.
[0055] The work management device described in each embodiment can be described as follows.
[0056] A work management device according to a first aspect of the present invention includes: a tractor-side information acquisition unit that acquires tractor-side information including time-based position information and time-based operation information of the tractor from a tractor to which any one of a plurality of types of working machines is attached; a work type estimation unit that performs processing to estimate a work type of a work performed by a work implement attached to the tractor based on the tractor side information acquired by the tractor side information acquisition unit, and outputs one or more work type candidates; a work type acquisition unit that presents an input screen for inputting a work type performed by the work machine and acquires the work type input on the input screen as a final work type, The work type acquisition unit is configured to present one or more work type candidates output from the work type estimation unit so that one work type candidate can be selected from the one or more work type candidates.
[0057] A work management device according to a second aspect is the work management device according to the first aspect, The operation information includes at least vehicle speed information of the tractor, drive source information relating to the drive state of the tractor's drive source, and transmission mechanism information relating to the operating state of a transmission mechanism that transmits the drive force of the drive source to the work machine.
[0058] A work management device according to a third aspect is the work management device according to the second aspect, The task type estimation unit includes a unit period task estimation unit that divides a task period into a plurality of unit periods and estimates a task type of a task performed during each unit period; The system further includes a candidate task type output unit that outputs one or more task types based on the task type for each unit period estimated by the unit period task estimation unit.
[0059] A work management device according to a fourth aspect is the work management device according to the third aspect, The unit-period task estimation unit is configured to estimate a task type for each unit period by using a machine learning technique.
[0060] A work management device according to a fifth aspect is the work management device according to the fourth aspect, The unit period work estimation unit is configured to generate input information for a machine learning model for each unit period based on the location information and the operation information, and to estimate a work type for each unit period using the generated input information and the machine learning model.
[0061] A work management device according to a sixth aspect is the work management device according to the fifth aspect, the driving source information includes a rotation speed of the driving source, The transmission mechanism information includes a rotation speed of a PTO shaft, The input information includes a pattern of the tractor's movement trajectory, at least one basic statistical quantity of the tractor's vehicle speed, at least one basic statistical quantity of the drive source's rotation speed, and at least one basic statistical quantity of the PTO shaft's rotation speed.
[0062] A work management device according to a seventh aspect is the work management device according to the first aspect, The task type estimation unit includes a unit period task estimation unit that divides a task period into a plurality of unit periods and estimates a task type of a task performed during each unit period; The system further includes a candidate task type output unit that outputs one or more task types based on the task type for each unit period estimated by the unit period task estimation unit.
[0063] A work management device according to an eighth aspect is a work management device according to any one of the first to seventh aspects, a weight sensor is provided on the tractor to detect a weight of a work implement attached to the tractor, The system further includes a consumption calculation unit that calculates the consumption amount of the material based on the change in weight of the work machine detected by the weight sensor when the final work type is any one of sowing work, fertilization work, and pesticide spraying work that consumes materials.
[0064] A work management device according to a ninth aspect is the work management device according to the eighth aspect, the weight sensor is a load cell that is interposed between the tractor and the work implement and detects a traction force of the work implement towed by the tractor, The consumption calculation unit is configured to calculate the consumption of the material based on the difference between the traction force detected by the load cell at the start of work and the traction force detected by the load cell at the end of work. [Explanation of symbols]
[0065] 1 Work Management System 2 Tractor 3. Work equipment 4. User terminal 5 Management Server 10 Tractor control unit 12 Information Acquisition Processing Unit 21 Controllers 22 Location information calculation unit 28 Weight Sensor 31 Location information storage unit 32 Operation information storage unit 40 Server control unit 42 Information Acquisition Department 43 Work Period Estimation Department 44 Work Type Estimation Unit 44A Unit period work estimation section 44B Work type candidate output section 45 Working information storage processing unit 46 Work type acquisition section 47 Consumption calculation part 61 Time series information storage unit 62 Work Classification Table 63 Tractor ID table by user 64 User-specific work information table 70 Work type input screen
Claims
1. a vehicle side information acquisition unit that acquires vehicle side information including time-based position information and time-based operation information of a vehicle mounted with any one of a plurality of types of work machines; a work type estimation unit that uses a machine learning technique to perform processing for estimating a work type of a work performed by a work machine attached to the traveling vehicle based on the traveling vehicle side information acquired by the traveling vehicle side information acquisition unit, and outputs one or more work type candidates; a work type acquisition unit that presents an input screen for inputting a work type performed by the work machine and acquires the work type input on the input screen as a final work type, The work type acquisition unit, presenting a presented work type candidate group including the one or more work type candidates output from the work type estimation unit so that one work type can be selected from the work types of the works performed by the multiple types of work machines; When the presented work type candidate group includes a plurality of work types, the work types are arranged and presented in order of likelihood that they are work types performed by a work machine attached to the traveling vehicle. A work information management device configured as above.
2. The work information management device of claim 1, wherein the operation information includes at least vehicle speed information of the traveling vehicle, driving source information regarding the driving state of the driving source of the traveling vehicle, and transmission mechanism information regarding the operating state of a transmission mechanism that transmits the driving force of the driving source to the work machine.
3. The task type estimation unit includes a unit period task estimation unit that divides a task period into a plurality of unit periods and estimates a task type of a task performed during each unit period; The work information management device according to claim 2 , further comprising: a work type candidate output unit that outputs one or more work types based on the work type for each unit period estimated by the unit-period-based work estimation unit.
4. The work information management device according to claim 3, wherein the unit period work estimation unit is configured to generate input information for a machine learning model for each unit period based on the location information and the operation information, and estimate a work type for each unit period using the generated input information and the machine learning model.
5. the driving source information includes a rotation speed of the driving source, The transmission mechanism information includes a rotation speed of a PTO shaft, The work information management device of claim 4, wherein the input information includes a pattern of the movement trajectory of the traveling vehicle, at least one basic statistical quantity of the vehicle speed of the traveling vehicle, at least one basic statistical quantity of the rotation speed of the drive source, and at least one basic statistical quantity of the rotation speed of the PTO shaft.
6. The task type estimation unit includes a unit period task estimation unit that divides a task period into a plurality of unit periods and estimates a task type of a task performed during each unit period; The work information management device according to claim 1 , further comprising: a work type candidate output unit that outputs one or more work types based on the work type for each unit period estimated by the unit-period-based work estimation unit.
7. a weight sensor is provided on the traveling vehicle to detect a weight of a work machine attached to the traveling vehicle, A work information management device as described in any one of claims 1 to 6, further comprising a consumption calculation unit that calculates the consumption of the materials based on the change in weight of the work machine detected by the weight sensor when the final work type is any one of sowing work, fertilization work, and pesticide spraying work that consumes materials.
8. the weight sensor is a load cell that is interposed between the traveling vehicle and the working machine and detects a traction force of the working machine towed by the traveling vehicle, 8. The work information management device according to claim 7, wherein the consumption calculation unit is configured to calculate the consumption of the material based on a difference between the traction force detected by the load cell at a work start time and the traction force detected by the load cell at a work end time.
Citation Information
Patent Citations
Work recording device, work recording system, and work recording program
JP2010161991A
Daily work report preparation supporting device and daily work report preparation supporting method
JP2011258118A
Agriculture support system and agriculture support device
JP2019109791A
Method for detecting agricultural field work performed by a vehicle
US20190343036A1
