AI Technical Summary
Existing islanding detection devices inject reactive power into the power distribution system, leading to voltage flicker phenomena when connected to systems with multiple power conditioners, violating grid interconnection regulations and potentially causing instability.
An islanding detection sensor and device that detect electrical characteristics to determine the presence of conventional and new active islanding detection devices, adjusting their reactive power injection based on specific frequency and voltage changes to prevent islanding without inducing voltage flicker.
The solution effectively prevents voltage flicker by accurately detecting islanding conditions in power distribution systems with mixed types of power conditioners, ensuring compliance with grid interconnection regulations and maintaining system stability.
Smart Images

Figure 0007554616000001 
Figure 0007554616000003 
Figure 0007554616000002
Abstract
Description
[Technical field]
[0001] The present invention relates to an islanding operation detection sensor, an islanding operation detection device, an analysis device, and an islanding operation detection method. [Background technology]
[0002] When connecting a distributed power source to a power grid, the power conditioner must be equipped with an islanding detection device to prevent islanding. Islanding occurs when a distributed power source continues to supply power to a load in a power distribution system when the power distribution system to which the distributed power source is connected is disconnected from the power system. When an islanding detection device detects islanding, it disconnects the distributed power source from the power distribution system and stops the supply of power from the distributed power source to the load. There are passive and active methods for detecting islanding, and various detection methods have been developed.
[0003] In the Grid Interconnection Regulations (JEAC 9701-2016), the frequency shift method, slip mode frequency shift method, reactive power fluctuation method, and QC mode frequency shift method are recognized as active methods for detecting islanding. These methods are called conventional active methods. In the Grid Interconnection Regulations, it is stipulated that the conventional active method of islanding detection device should disconnect the power conditioner from the distribution system within 0.5 to 1 second (in the case of connection with a low-voltage distribution line) when a power outage occurs and the system enters an islanding state. In addition, the Grid Interconnection Regulations recognize the frequency feedback method with step injection as a method that detects the islanding state faster than the conventional active method. This method is called the new active method. In the Grid Interconnection Regulations, it is stipulated that the new active method of islanding detection device should instantly disconnect the power conditioner from the distribution system when a power outage occurs and the system enters an islanding state, and is generally set to disconnect within 0.1 to 0.2 seconds. Each of these methods actively injects an active signal, which represents reactive power, into the power distribution system and detects islanding according to changes in the detected frequency. Therefore, when many distributed power sources are connected to a power distribution system, a large amount of reactive power is injected into the power distribution system. Furthermore, the amount of reactive power injected is increased according to the frequency deviation. Therefore, when a system disturbance occurs, each distributed power source increases the amount of reactive power injected, which may cause the system voltage to oscillate and result in a voltage flicker phenomenon.
[0004] As a measure to suppress the occurrence of the voltage flicker phenomenon, an islanding detection device capable of suppressing the injection amount of reactive power has been developed. For example, Patent Document 1 discloses an islanding detection device that suppresses the injection amount of reactive power when the possibility of islanding is low. In addition, Patent Document 2 discloses an islanding detection device that can prevent false detection and detection delay of islanding while reducing the injection amount of reactive power by alternately injecting lagging phase reactive power and leading phase reactive power and detecting islanding based on an integrated value obtained by integrating the absolute value of the amount of change in the moving average value of the system frequency. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2017-93020 A [Patent Document 2] JP 2019-92328 A Summary of the Invention [Problem to be solved by the invention]
[0006] However, the islanding detection devices disclosed in Patent Documents 1 and 2 suppress the amount of injection, but still inject reactive power. Therefore, when a power conditioner equipped with such an islanding detection device is newly connected to a power distribution system, the reactive power injected into the power distribution system increases. Therefore, even if such a power conditioner is connected to a power distribution system to which many power conditioners equipped with islanding detection devices are already connected, the voltage flicker phenomenon will be induced.
[0007] The present invention has been devised in light of the above-mentioned circumstances, and has an object to provide an islanding operation detection sensor, an islanding operation detection device, an analysis device, and an islanding operation detection method that do not induce the voltage flicker phenomenon. [Means for solving the problem]
[0008] In order to solve the above problems, the present invention provides the following technical solutions.
[0009] An islanding detection sensor provided by a first aspect of the present invention comprises a detection unit that detects electrical characteristics related to an output of a power conditioner, a first judgment unit that judges whether or not a detection value detected by the detection unit matches a first judgment condition, a second judgment unit that judges whether or not the detection value matches a second judgment condition, and a third judgment unit that judges whether or not the detection value matches a third judgment condition, wherein the first judgment condition is a condition for judging a change in the electrical characteristics caused by only a new active-type islanding detection device arranged in a distribution system to which the power conditioner is connected injecting reactive power into the distribution system, the second judgment condition is a condition for judging a change in the electrical characteristics caused by only a conventional active-type islanding detection device arranged in the distribution system injecting an active signal into the distribution system, and the third judgment condition is a condition for judging a change in the electrical characteristics caused by both the new active-type islanding detection device and the conventional active-type islanding detection device arranged in the distribution system injecting an active signal into the distribution system.
[0010] The "electrical characteristics" include voltage, current, power (active power, reactive power), and frequency. They also include the voltage, current, power, and frequency of a specified harmonic component. The "detected value detected by the detection unit" includes not only the magnitude of the voltage, current, power, and frequency, but also deviation (amount of change from a reference) and rate of change. The "active signal" is a signal that the islanding detection device injects into the power distribution system when it detects an islanding operation using an active method, and includes, for example, reactive power and active power.
[0011] In a preferred embodiment of the present invention, the first judgment condition is that the rate of change of the detection value changes after the first hour and before the second hour after the detection value starts to change, and thereafter, the rate of change does not change after the third hour and before the fourth hour; the second judgment condition is that the rate of change does not change after the fifth hour and before the sixth hour after the detection value starts to change, and thereafter, the rate of change changes after the seventh hour and before the eighth hour; and the third judgment condition is that the rate of change changes after the ninth hour and before the tenth hour after the detection value starts to change, and further changes after the eleventh hour and before the twelfth hour.
[0012] In a preferred embodiment of the present invention, the detection unit detects a frequency of an output voltage of the power conditioner as the detection value.
[0013] In a preferred embodiment of the present invention, the detection unit further detects a second detection value different from the detection value, the first judgment unit judges whether or not the detection value matches the first judgment condition and the second detection value matches a fourth judgment condition, the second judgment unit judges whether or not the detection value matches the second judgment condition and the second detection value matches a fifth judgment condition, and the third judgment unit judges whether or not the detection value matches the third judgment condition and the second detection value matches a sixth judgment condition.
[0014] The islanding detection device provided by the second aspect of the present invention is characterized in that it comprises the islanding detection sensor provided by the first aspect of the present invention, and a judgment unit that judges that an islanding operation state is occurring when the first judgment unit determines that there is a match, the second judgment unit determines that there is a match, or the third judgment unit determines that there is a match.
[0015] An analysis device provided by a third aspect of the present invention is characterized by comprising: an islanding detection sensor provided by the first aspect of the present invention; and an analysis unit that analyzes the placement status of the conventional active type islanding detection device and the new active type islanding detection device in the distribution system based on the judgment result by the first judgment unit, the judgment result by the second judgment unit, and the judgment result by the third judgment unit.
[0016] The islanding detection sensor provided by a fourth aspect of the present invention comprises a detection unit that detects electrical characteristics related to the output of a power conditioner, and a judgment unit that judges whether or not the detection value detected by the detection unit matches a judgment condition, wherein the judgment condition is a condition for determining a change in the electrical characteristics caused by injection of reactive power into the power distribution system by only a new active type islanding detection device arranged in the power distribution system to which the power conditioner is connected.
[0017] The islanding detection sensor provided by a fifth aspect of the present invention comprises a detection unit that detects electrical characteristics related to the output of a power conditioner, and a judgment unit that judges whether or not the detection value detected by the detection unit matches a judgment condition, wherein the judgment condition is a condition for judging a change in the electrical characteristics caused by injection of reactive power into the power distribution system by only a conventional active type islanding detection device arranged in the power distribution system to which the power conditioner is connected.
[0018] The islanding detection sensor provided by a sixth aspect of the present invention comprises a detection unit that detects electrical characteristics related to the output of a power conditioner, and a judgment unit that judges whether or not the detection value detected by the detection unit matches a judgment condition, the judgment condition being a condition for judging a change in the electrical characteristics caused by a new active type islanding detection device and a conventional active type islanding detection device arranged in a power distribution system to which the power conditioner is connected, injecting reactive power into the power distribution system.
[0019] An islanding operation detection method provided by a seventh aspect of the present invention includes a detection step of detecting an electrical characteristic related to an output of a power conditioner, a first determination step of determining whether or not a detection value detected in the detection step matches a first determination condition, a second determination step of determining whether or not the detection value matches a second determination condition, a third determination step of determining whether or not the detection value matches a third determination condition, and a determination step of determining that an islanding operation state exists when it is determined that there is a match in the first determination step, the second determination step, or the third determination step, wherein the first determination condition is a power condition related to a power conditioner to which the power conditioner is connected. the first judgment condition is a condition for determining a change in the electrical characteristics caused by injecting reactive power into the power distribution system only by a new active type islanding detection device arranged in the power distribution system, the second judgment condition is a condition for determining a change in the electrical characteristics caused by injecting an active signal into the power distribution system only by a conventional active type islanding detection device arranged in the power distribution system, and the third judgment condition is a condition for determining a change in the electrical characteristics caused by injecting an active signal into the power distribution system only by the new active type islanding detection device and the conventional active type islanding detection device arranged in the power distribution system.
[0020] An islanding detection method provided by an eighth aspect of the present invention includes a detection step of detecting electrical characteristics related to the output of a power conditioner, a judgment step of judging whether or not the detection value detected in the detection step matches a judgment condition, and a judgment step of judging that the power conditioner is in an islanding state when it is judged in the judgment step that the detection value matches, wherein the judgment condition is a condition for judging a change in the electrical characteristics caused by injection of reactive power into the power distribution system only by a new active type islanding detection device arranged in a power distribution system to which the power conditioner is connected.
[0021] An islanding detection method provided by a ninth aspect of the present invention includes a detection step of detecting electrical characteristics related to the output of a power conditioner, a judgment step of judging whether or not the detection value detected in the detection step matches a judgment condition, and a judgment step of judging that the power conditioner is in an islanding operation state when it is judged in the judgment step that the detection value matches, wherein the judgment condition is a condition for judging a change in the electrical characteristics caused by injecting an active signal into the power distribution system only by a conventional active type islanding detection device arranged in the power distribution system to which the power conditioner is connected.
[0022] An islanding detection method provided by a tenth aspect of the present invention includes a detection step of detecting electrical characteristics related to the output of a power conditioner, a judgment step of judging whether or not the detection value detected in the detection step matches a judgment condition, and a judgment step of judging that the power conditioner is in an islanding state when it is judged in the judgment step that the detection value matches, wherein the judgment condition is a condition for judging a change in the electrical characteristics caused by a new active type islanding detection device and a conventional active type islanding detection device arranged in a power distribution system to which the power conditioner is connected injecting an active signal into the power distribution system. Effect of the Invention
[0023] According to the present invention, the first to third determination units determine changes in electrical characteristics in the power distribution system caused by other islanding detection devices injecting active signals such as reactive power into the power distribution system. The islanding detection sensor according to the present invention does not inject reactive power into the power distribution system, and therefore does not induce a voltage flicker phenomenon.
[0024] Other features and advantages of the present invention will become more apparent from the following detailed description taken in conjunction with the accompanying drawings. [Brief description of the drawings]
[0025] [Figure 1] 1 is a block diagram for explaining a power conditioner including an isolated operation detection device according to a first embodiment, and shows the overall configuration of a power distribution system. [Diagram 2] FIG. 1 is a time chart showing the change in frequency of the output voltage of a power conditioner. (a) shows the case where a power distribution system connected only to new power sources experiences a power outage. (b) shows the case where a power distribution system connected only to conventional power sources experiences a power outage. (c) shows the case where a power distribution system connected to both conventional and new power sources experiences a power outage. [Diagram 3] 1 is a time chart showing a change in frequency of the output voltage of a power conditioner when a grid disturbance occurs. [Figure 4] 13 is an example of a flowchart for explaining a first determination process performed by a first determination unit. [Diagram 5] 13A is an example of a flowchart for explaining a second determination process performed by a second determination unit, and FIG. 13B is an example of a flowchart for explaining a third determination process performed by a third determination unit. [Figure 6] FIG. 11 is a block diagram showing an internal configuration of an isolated operation detection device according to a second embodiment. [Figure 7] FIG. 11 is a block diagram showing an internal configuration of an isolated operation detection device according to a third embodiment. [Figure 8] FIG. 13 is a block diagram for explaining a power conditioner including an analysis device according to a fourth embodiment, showing the overall configuration of a power distribution system. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0026] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.
[0027] [First embodiment] FIG. 1 is a block diagram for explaining a power conditioner including an isolated operation detection device according to a first embodiment, and shows the overall configuration of a power distribution system.
[0028] The power conditioner 1 converts the DC power output by the DC power source A into AC power and outputs it to the power distribution system C to which it is connected. The combination of the power conditioner 1 and the DC power source A is a distributed power source. The power distribution system C is a high-voltage power distribution system to which a load L, a conventional power source B1, and a new power source B2 are connected. The load L is a consumer that receives power supply. The conventional power source B1 is a distributed power source equipped with a power conditioner having an islanding detection device of a conventional active type. In this embodiment, a case in which the islanding detection device of the conventional power source B1 detects islanding operation by a frequency shift method will be described as an example. The detection method of the islanding detection device of the conventional power source B1 is not limited. The new power source B2 is a distributed power source equipped with a power conditioner having an islanding detection device of a new active type. Although multiple loads L, conventional power sources B1, and new power sources B2 are connected to the distribution system C (and the low-voltage distribution system connected to the distribution system C via a transformer), Fig. 1 shows only one of each as representative. The distribution system C is connected to the power system via a circuit breaker. In the event of an accident in the power system, a protective device installed on the power system side opens the circuit breaker, and the distribution system C is isolated from the power system (power outage state). As a result, the power conditioner 1 connected to the distribution system C that has been isolated from the power system goes into an isolated operation state.
[0029] The DC power source A outputs DC power and includes, for example, a solar cell. The solar cell generates DC power by converting solar energy into electrical energy. The DC power source A outputs the generated DC power to the power conditioner 1. Note that the DC power source A is not limited to one that generates DC power using a solar cell. For example, the DC power source A may be a fuel cell or a storage battery, or may be a device that converts AC power generated by a diesel engine generator or a wind turbine generator into DC power and outputs the DC power.
[0030] The power conditioner 1 includes an inverter device 2, an islanding detection device 3, an interconnection breaker 4, and a voltage sensor 5. The power conditioner 1 is connected to a power distribution system C via the interconnection breaker 4.
[0031] The inverter device 2 converts DC power input from the DC power source A into AC power and outputs it. The inverter device 2 includes, for example, an inverter circuit, a filter circuit, and a control circuit, which are not shown. The inverter circuit converts DC power into AC power by switching a switching element (not shown) on and off based on a PWM signal input from the control circuit. The filter circuit removes high-frequency components caused by switching. The control circuit controls the inverter circuit. The control circuit generates a PWM signal for controlling the output current of the inverter device 2 and outputs it to the inverter circuit. When a gate block signal, which will be described later, is input from the isolated operation detection device 3, the control circuit stops generating the PWM signal. In this case, the inverter circuit stops switching, and the inverter device 2 stops the power conversion operation. The configuration of the inverter device 2 is not limited.
[0032] The interconnection circuit breaker 4 cuts off the connection between the power conditioner 1 and the power distribution system C. The interconnection circuit breaker 4 is normally closed, and the power conditioner 1 is connected to the power distribution system C. However, when an opening command, which will be described later, is input from the islanding detection device 3, the interconnection circuit breaker 4 is opened, and the power conditioner 1 is disconnected from the power distribution system C. This prevents the power conditioner 1 from entering an islanding state.
[0033] The voltage sensor 5 detects the output voltage of the power conditioner 1, and inputs the detected voltage signal to the islanding operation detection device 3. The voltage sensor 5 may also be used to control the inverter device 2. In this case, the voltage sensor 5 also inputs the detected voltage signal to the control circuit of the inverter device 2.
[0034] The islanding operation detection device 3 detects the islanding operation of the power conditioner 1. The islanding operation detection device 3 detects the islanding operation based on a voltage signal input from the voltage sensor 5, and when the islanding operation is detected, stops the power conditioner 1 and disconnects it from the power distribution system C. The islanding operation detection device 3 includes a frequency detection unit 31, a first determination unit 32, a second determination unit 33, a third determination unit 34, a judgment unit 35, and a stop processing unit 38.
[0035] The frequency detection unit 31 detects the frequency f of the output voltage of the power conditioner 1. The frequency detection unit 31 detects the frequency f based on the voltage signal input from the voltage sensor 5. The frequency detection unit 31 detects the frequency by, for example, a zero-crossing point counting method. The zero-crossing point counting method is a method of measuring the time between points (zero-crossing points) where the instantaneous value of the AC voltage crosses the zero level, and detecting the frequency from the reciprocal of the measured time. The frequency detection method of the frequency detection unit 31 is not limited. For example, the frequency detection unit 31 may detect the frequency using a multiplication PLL (Phase Locked Loop). In this embodiment, the frequency detection unit 31 calculates the average value of the detected frequency for a predetermined time in order to eliminate minute fluctuations and detection errors, and outputs the calculated average value as the frequency f. The frequency detection unit 31 outputs the detected frequency f to the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34. The frequency detection section 31 corresponds to the "detection section" of the present invention, and the frequency f corresponds to the "detection value" of the present invention.
[0036] The first judgment unit 32, the second judgment unit 33, and the third judgment unit 34 each judge whether or not the frequency f input from the frequency detection unit 31 matches a judgment condition set in advance. When an islanding operation occurs, the islanding detection devices of the conventional power source B1 and the new power source B2 connected to the power distribution system C increase the reactive power to be injected to change the frequency of the voltage of the power distribution system C (hereinafter referred to as the "system frequency"), and detect the islanding operation when the detected frequency exceeds a threshold value. The islanding detection device 3 captures the change pattern of the system frequency at this time and detects the islanding operation. However, the time limit from the occurrence of a power outage to the disconnection, which is specified in the system interconnection regulations, is different between the islanding detection device of the conventional power source B1 and the islanding detection device of the new power source B2. Therefore, the change pattern of the system frequency differs depending on whether or not the conventional power source B1 and the new power source B2 are connected to the power distribution system C. In the first judgment unit 32, a condition for judging whether or not the change pattern of the system frequency is the case when only the new power source B2 is connected to the power distribution system C is set as a first judgment condition. In the second determination unit 33, a condition for determining whether or not the change pattern of the system frequency is a case where only the conventional power source B1 is connected to the power distribution system C is set as a second determination condition. In the third determination unit 34, a condition for determining whether or not the change pattern of the system frequency is a case where both the new power source B2 and the conventional power source B1 are connected to the power distribution system C is set as a third determination condition.
[0037] 2 is a time chart showing the change in the frequency f of the output voltage when the power distribution system C shown in FIG. 1 goes into a power outage and the power conditioner 1 goes into an isolated operation state. The horizontal axis shows the time elapsed since the power outage occurred, which is set to 0 seconds. The vertical axis shows the frequency f. Note that the vertical and horizontal axes of the waveform diagrams and time charts referred to in this specification have been appropriately enlarged or reduced for ease of understanding, and each of the waveforms shown has been simplified, exaggerated, or emphasized for ease of understanding.
[0038] FIG. 2(a) shows a case where a conventional power source B1 is not connected to a power distribution system C, and only a new power source B2 is connected.
[0039] When a power outage occurs, the system frequency of the power distribution system C changes slightly. The new power source B2 detects the frequency change and injects reactive power to raise or lower the system frequency. Figure 2(a) shows the case where the system frequency rises. Note that Figures 2(b), 2(c) and 3 also show the case where the system frequency rises. The new power source B2 generally detects islanding within 0.1 to 0.2 seconds after a power outage and is disconnected from the power distribution system C. Therefore, reactive power is rapidly injected after the power outage occurs, and the system frequency rises rapidly. Since the frequency f of the output voltage of the power conditioner 1 matches the system frequency, as shown in Figure 2(a), the frequency f rises rapidly after the power outage occurs (see point a in Figure 2(a)). In addition, the new power source B2 detects islanding within 0.2 seconds and stops injecting reactive power, so the rate of change of the system frequency changes at this time. Therefore, as shown by the solid line in FIG. 2(a), the frequency f starts to decrease between the elapsed time T1 and the time T2 (see point b in FIG. 2(a)). In this embodiment, the time T1 is 0.1 seconds and the time T2 is 0.2 seconds, but the times T1 and T2 are not limited. They are appropriately set based on the results of experiments, simulations, or on-site investigations. As shown by the dashed line in FIG. 2(a), the frequency f changes in various ways, and may continue to increase rather than decrease from point b. However, the rate of change Δf of the frequency f becomes smaller because any of the new power sources B2 stops injecting reactive power. Then, by 0.2 seconds, all the new power sources B2 stop injecting reactive power, and the frequency f then returns to the frequency that has changed slightly due to the occurrence of the power outage (the frequency before the reactive power was injected).
[0040] FIG. 2(b) shows a case where the new power source B2 is not connected to the power distribution system C, and only the conventional power source B1 is connected.
[0041] When a power outage occurs, the system frequency of the power distribution system C changes slightly. The conventional power source B1 detects the frequency change and injects reactive power, raising or lowering the system frequency. The conventional power source B1 detects islanding within 0.5 to 1 second of the power outage and is disconnected from the power distribution system C. Therefore, reactive power is injected from the occurrence of the power outage, and the system frequency rises. Since the injection of reactive power by the conventional power source B1 is slower than that of the new power source B2, the system frequency also rises relatively slowly. Therefore, as shown in Figure 2(b), the frequency f rises slowly from the occurrence of the power outage (see point a in Figure 2(b)). In addition, the conventional power source B1 detects islanding within 1 second and stops injecting reactive power, so at this time, the rate of change of the system frequency changes. Therefore, as shown by the solid line in Figure 2(b), the frequency f starts to decrease between time T3 and time T4 (see point b in Figure 2(b)). In this embodiment, the time T3 is 0.5 seconds and the time T4 is 1 second, but the time T3 and the time T4 are not limited. They are appropriately set based on the results of experiments, simulations, or on-site investigations. As shown by the dashed line in FIG. 2(b), the frequency f changes in various ways, and may continue to rise instead of falling from point b. However, the rate of change Δf of the frequency f becomes smaller because any of the conventional power sources B1 stops injecting reactive power. Then, by 1 second, all of the conventional power sources B1 stop injecting reactive power, and the frequency f then returns to the frequency that has changed slightly due to the occurrence of the power outage (the frequency before the reactive power was injected).
[0042] FIG. 2(c) shows a case where both a conventional power source B1 and a new power source B2 are connected to the power distribution system C (see FIG. 1).
[0043] When a power outage occurs, the system frequency of the power distribution system C changes slightly. The new power source B2 detects this frequency change and rapidly injects reactive power, while the conventional power source B1 slowly injects reactive power. This causes the system frequency to rise or fall rapidly. Therefore, as shown in Figure 2(c), the frequency f rises rapidly from the occurrence of the power outage (see point a in Figure 2(c)). The new power source B2 detects islanding within 0.2 seconds and stops injecting reactive power, so the rate of change of the system frequency becomes small at this time. However, since the conventional power source B1 continues to inject reactive power, the decrease in the rate of change is limited. Therefore, as shown by the solid line in Figure 2(c), the rate of change Δf of the frequency f becomes small between the elapsed time T1 and time T2 (see point b in Figure 2(c)). And, since the conventional power source B1 detects islanding within 1 second and stops injecting reactive power, the rate of change of the system frequency also changes at this time. Therefore, as shown by the solid line in FIG. 2(c), the frequency f starts to decrease between time T3 and time T4 (see point c in FIG. 2(c)). Note that, as shown by the dashed line in FIG. 2(c), the change in frequency f varies, and in some cases it continues to increase rather than decrease from point c. However, as one of the conventional power sources B1 stops injecting reactive power, the rate of change Δf of frequency f becomes smaller. Then, by 1 second, all conventional power sources B1 stop injecting reactive power, and thereafter, frequency f returns to the frequency that changed slightly due to the occurrence of the power outage (the frequency before reactive power was injected).
[0044] The first determination unit 32 determines whether the change pattern of the frequency f input from the frequency detection unit 31 is the change pattern shown in FIG. 2(a). Specifically, the first determination condition set in the first determination unit 32 is that the change rate Δf changes after time T1 and before time T2 after the frequency f starts to change, and thereafter, the change rate Δf does not change after time T3 and before time T4. The change rate Δf is the amount of change in the frequency f per unit time. The frequency f is determined to have started to change, for example, when it exceeds a range (f0-f1≦f≦f0+f1) set around the reference value f0 of the frequency f. An appropriate value is set for f1 based on an experiment, a simulation result, or an on-site investigation result. In addition, the change rate Δf is determined to have changed, for example, when it exceeds a range (x-Δx≦Δf≦x+Δx) set around the immediately preceding change rate x. An appropriate value is set for Δx based on an experiment, a simulation result, or an on-site investigation result. The method of determining the start of the change in the frequency f is not limited. Furthermore, the method of determining the change in the rate of change Δf is not limited. When the first determination unit 32 determines that the frequency f matches the first determination condition, it outputs a first determination signal, for example a high-level signal, to the determination unit 35. "Time T1" corresponds to the "first time" of the present invention, "time T2" corresponds to the "second time" of the present invention, "time T3" corresponds to the "third time" of the present invention, and "time T4" corresponds to the "fourth time" of the present invention.
[0045] 4 is an example of a flowchart for explaining the first determination process performed by the first determination unit 32. The first determination process is a process for determining whether or not a change in frequency f matches a first determination condition. The first determination process is executed when the inverter device 2 starts a power conversion operation in a state in which the power conditioner 1 is connected to the power distribution system C.
[0046] First, the frequency f detected by the frequency detection unit 31 is acquired (S1), and it is determined whether the frequency f has started to change (S2). Specifically, it is determined whether the frequency f is within a range (f0-f1≦f≦f0+f1) set around a reference value f0. If the frequency f is within the range (S2: YES), it is determined that the frequency f has not changed, and the process returns to step S1, and the processes of steps S1 and S2 are repeated. On the other hand, if the frequency f exceeds the range (S2: NO), it is determined that the frequency f has started to change, and the rate of change Δf at this time is calculated (S3), set as the rate of change x1 (S4), and the measurement of the elapsed time T is started (S5).
[0047] Next, the frequency f is acquired (S6), the rate of change Δf is calculated (S7), and it is determined whether the rate of change Δf has changed (S8). Specifically, it is determined whether the rate of change Δf is within a range (x1-Δx≦Δf≦x1+Δx) set around the rate of change x1 when the frequency f started to change. If it is within the range (S8: YES), it is determined that the rate of change Δf has not changed, and the process returns to step S6, and the processes of steps S6 to S8 are repeated. On the other hand, if it exceeds the range (S8: NO), it is determined that the rate of change Δf has changed, and the process proceeds to step S9.
[0048] Next, it is determined whether the elapsed time T at this time is between time T1 and time T2 (S9). If the elapsed time T is not between time T1 and time T2 (S9: NO), it is determined that the first condition is not met, and the first determination process is terminated. On the other hand, if the elapsed time T is between time T1 and time T2 (S9: YES), the frequency f is acquired (S10), the change rate Δf is calculated (S11), and set as the change rate x2 (S12). Next, it is determined whether the elapsed time T is equal to or greater than time T3 (S13). If the elapsed time T is less than time T3 (S13: NO), the process returns to step S10, and the processes of steps S10 to S13 are repeated. If the elapsed time T is equal to or greater than time T3 (S13: YES), the process proceeds to step S14. That is, the change rate x2 is updated to the latest change rate Δf while waiting until the elapsed time T becomes time T3.
[0049] Next, the frequency f is acquired (S14), the rate of change Δf is calculated (S15), and it is determined whether the rate of change Δf has changed (S16). Specifically, it is determined whether the rate of change Δf is within a range (x2-Δx≦Δf≦x2+Δx) set around the rate of change x2 just before the elapsed time T becomes time T3. If it is within the range (S16: YES), it is determined that the rate of change Δf has not changed, and it is determined whether the elapsed time T is time T4 or more (S17). If the elapsed time T is less than time T4 (S17: NO), the process returns to step S14, and the processes of steps S14 to S17 are repeated. If it is out of the range in step S16 (S16: NO), it is determined that the rate of change Δf has changed even between time T3 and time T4, and the first condition is not met, and the first determination process ends. On the other hand, in step S17, if the elapsed time T is equal to or greater than time T4 (S17: YES), it is determined that the rate of change Δf did not change between time T3 and time T4, and the first condition is met. A first judgment signal is output (S18), and the first judgment process ends.
[0050] It should be noted that the process shown in the flowchart of FIG. 4 is merely an example, and the first determination process performed by the first determination unit 32 is not limited to the above.
[0051] The second judgment unit 33 judges whether the change pattern of the frequency f input from the frequency detection unit 31 is the change pattern shown in FIG. 2(b). Specifically, the second judgment condition set in the second judgment unit 33 is that the rate of change Δf does not change after time T1 and before time T2 after the frequency f starts to change, and then the rate of change Δf changes after time T3 and before time T4. When the second judgment unit 33 judges that the frequency f matches the second judgment condition, it outputs a second judgment signal, for example a high level signal, to the judgment unit 35. "Time T1" corresponds to the "fifth time" of the present invention, "time T2" corresponds to the "sixth time" of the present invention, "time T3" corresponds to the "seventh time" of the present invention, and "time T4" corresponds to the "eighth time" of the present invention. In this embodiment, a case is described in which the times T1 to T4 of the second judgment unit 33 are the same as the times T1 to T4 of the first judgment unit 32, respectively. However, the second judgment unit 33 may be set to a time different from that of the first judgment unit 32.
[0052] 5(a) is an example of a flowchart for explaining the second determination process performed by the second determination unit 33. The second determination process is a process for determining whether or not a change in frequency f matches a second determination condition. The second determination process is executed when the inverter device 2 starts a power conversion operation while the power conditioner 1 is connected to the power distribution system C.
[0053] Steps S1 to S8 are the same as the first determination process shown in Fig. 4, and therefore description thereof will be omitted. In step S8, it is determined that the rate of change Δf has changed (S8: NO), and it is determined whether the elapsed time T at this time is between time T3 and time T4 (S21). If the elapsed time T is not between time T3 and time T4 (S21: NO), it is determined that the second condition is not met, and the second determination process ends. On the other hand, if the elapsed time T is between time T3 and time T4 (S21: YES), it is determined that the second condition is met, a second determination signal is output (S22), and the second determination process ends.
[0054] It should be noted that the process shown in the flowchart of FIG. 5(a) is merely an example, and the second determination process performed by the second determination unit 33 is not limited to the above.
[0055] The third judgment unit 34 judges whether the change pattern of the frequency f input from the frequency detection unit 31 is the change pattern shown in Fig. 2(c). Specifically, the third judgment condition set in the third judgment unit 34 is that the rate of change Δf changes after time T1 and before time T2 after the frequency f starts to change, and that the rate of change Δf also changes after time T3 and before time T4. When the third judgment unit 34 judges that the frequency f matches the third judgment condition, it outputs a third judgment signal, for example a high level signal, to the judgment unit 35. "Time T1" corresponds to the "ninth time" of the present invention, "time T2" corresponds to the "tenth time" of the present invention, "time T3" corresponds to the "eleventh time" of the present invention, and "time T4" corresponds to the "twelfth time" of the present invention. In this embodiment, a case is described in which the times T1 to T4 of the third judgment unit 34 are the same as the times T1 to T4 of the first judgment unit 32, respectively. However, the third judgment unit 34 may be set to a time different from that of the first judgment unit 32.
[0056] 5(b) is an example of a flowchart for explaining the third determination process performed by the third determination unit 34. The third determination process is a process for determining whether or not a change in frequency f matches a third determination condition. The third determination process is executed when the inverter device 2 starts a power conversion operation while the power conditioner 1 is connected to the power distribution system C.
[0057] Steps S1 to S17 are the same as the first determination process shown in Fig. 4, and therefore description thereof will be omitted. In the third determination process, if the elapsed time T is equal to or longer than time T4 in step S17 (S17: YES), it is determined that the rate of change Δf did not change between time T3 and time T4, and the third condition is not met, and the third determination process ends. On the other hand, if the range is exceeded in step S16 (S16: NO), it is determined that the rate of change Δf also changed between time T3 and time T4, and the third condition is met, and a third determination signal is output (S31), and the third determination process ends.
[0058] It should be noted that the process shown in the flowchart of FIG. 5(b) is merely an example, and the third determination process performed by the third determination unit 34 is not limited to the above.
[0059] The first judgment condition set in the first judgment unit 32, the second judgment condition set in the second judgment unit 33, and the third judgment condition set in the third judgment unit 34 are not limited to the above conditions. The first judgment condition may be a condition that can detect the change pattern shown in FIG. 2(a), and may be a condition that can determine that an islanding operation has occurred when only the new power source B2 is connected to the power distribution system C. The second judgment condition may be a condition that can detect the change pattern shown in FIG. 2(b), and may be a condition that can determine that an islanding operation has occurred when only the conventional power source B1 is connected to the power distribution system C. The third judgment condition may be a condition that can detect the change pattern shown in FIG. 2(c), and may be a condition that can determine that an islanding operation has occurred when both the conventional power source B1 and the new power source B2 are connected to the power distribution system C. For example, the first to third judgment conditions may further include a range of the change rate x1 from the occurrence of a power outage until the change rate Δf changes for the first time (from point a to point b shown in each diagram in FIG. 2).
[0060] FIG. 3 is a time chart showing the change in frequency f of the output voltage when power distribution system C is not in a power outage state but a system disturbance occurs. The horizontal axis shows the time that has elapsed since the occurrence of the system disturbance, taken as 0 seconds. The vertical axis shows frequency f. FIG. 3 shows the case where a conventional power source B1 and a new power source B2 are connected to power distribution system C (see FIG. 1). The same applies when only conventional power source B1 and only new power source B2 are connected to power distribution system C.
[0061] When a system disturbance occurs, the system frequency of the power distribution system C changes slightly. The conventional power source B1 and the new power source B2 detect the frequency change and inject reactive power, but since there is no power outage, the frequency f does not increase. Therefore, as shown by the solid line in FIG. 3, the frequency f does not change much from the occurrence of the system disturbance (see point a in FIG. 3). Since the change in the frequency f is small, it does not exceed the range (f0-f1≦f≦f0+f1) set around the reference value f0, and it is not determined that the change has started. Since none of the first to third judgment conditions are met, islanding is not detected. Also, as shown by the dashed line in FIG. 3, even if the frequency f changes to exceed the range, the injection of reactive power by the conventional power source B1 and the new power source B2 does not affect the change in the frequency f, so the frequency f immediately returns to the reference value f0. In this case, since the frequency f starts to decrease by the time elapsed until time T1 (see point b in FIG. 3), none of the first to third judgment conditions are met, and islanding is not detected.
[0062] The determination unit 35 determines whether or not the system is in an isolated operation state based on the determination results of the first determination unit 32, the second determination unit 33, and the third determination unit 34. The determination unit 35 generates a logical sum signal of the signal input from the first determination unit 32, the signal input from the second determination unit 33, and the signal input from the third determination unit 34, and outputs the logical sum signal to the stop processing unit 38. Therefore, when the determination unit 35 receives a first determination signal (high level signal) from the first determination unit 32, a second determination signal (high level signal) from the second determination unit 33, or a third determination signal (high level signal) from the third determination unit 34, the determination unit 35 determines that the system is in an isolated operation state and outputs an isolated operation detection signal, which is a high level signal, to the stop processing unit 38.
[0063] When an islanding operation detection signal is input from the determination unit 35, the stop processing unit 38 performs a process of stopping the power conditioner 1. Specifically, the stop processing unit 38 outputs a gate block signal to the inverter device 2 to stop the power conversion operation of the inverter device 2. In addition, the stop processing unit 38 outputs an opening command to the interconnection breaker 4 to disconnect the power conditioner 1 from the power distribution system C.
[0064] The grid interconnection regulations stipulate that a power conditioner connected to a high-voltage distribution system must be disconnected within three seconds when it goes into an islanding state. The first judgment unit 32, the second judgment unit 33, and the third judgment unit 34 can each make a judgment within a time T4 (e.g., one second) after the frequency f starts to change when the system goes into an islanding state. If an islanding state is detected by the judgment, the stop processing unit 38 immediately performs a process of stopping the power conditioner 1. Therefore, if a new power source B2 or a conventional power source B1 is connected to the distribution system C, the islanding detection device 3 can disconnect the power conditioner 1 from the distribution system C within three seconds.
[0065] The islanding operation detection device 3 may be realized as an analog circuit or a digital circuit. The processing performed by each unit may be designed by a program, and the computer may function as the islanding operation detection device 3 by executing the program. The program may be recorded on a recording medium and read by the computer. Of the islanding operation detection device 3, the combination of the frequency detection unit 31, the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34 corresponds to the "islanding operation detection sensor" of the present invention.
[0066] Next, the effects of the isolated operation detection device 3 according to this embodiment will be described.
[0067] According to this embodiment, the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34 judge the change in the system frequency caused by the other isolated operation detection device injecting reactive power into the distribution system C. Then, the judgment unit 35 judges whether or not the system is in an isolated operation state based on the judgment results of the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34. The isolated operation detection device 3 does not inject reactive power into the distribution system C, so it does not induce the voltage flicker phenomenon. In other words, if the distribution system C does not suffer from the voltage flicker phenomenon, the voltage flicker phenomenon will not occur even if many power conditioners 1 equipped with the isolated operation detection device 3 are added. Also, the voltage flicker phenomenon will not be promoted even if many power conditioners 1 equipped with the isolated operation detection device 3 are added to the distribution system C in which the voltage flicker phenomenon occurs.
[0068] Furthermore, according to this embodiment, the islanding operation detection device 3 detects islanding operation based on the frequency f of the output voltage of the power conditioner 1. In order to detect islanding operation, the islanding operation detection devices of the conventional power source B1 and the new power source B2 further change the system frequency by injecting reactive power according to the frequency deviation. Therefore, the islanding operation detection device 3 can appropriately detect islanding operation.
[0069] Further, according to this embodiment, the first judgment condition is that the rate of change Δf changes after time T1 and before time T2 after the frequency f starts to change, and thereafter, the rate of change Δf does not change after time T3 and before time T4. Therefore, the first judgment unit 32 can appropriately judge that an islanding operation has occurred when only the new power source B2 is connected to the power distribution system C. The second judgment condition is that the rate of change Δf does not change after time T1 and before time T2 after the frequency f starts to change, and thereafter, the rate of change Δf changes after time T3 and before time T4. Therefore, the second judgment unit 33 can appropriately judge that an islanding operation has occurred when only the conventional power source B1 is connected to the power distribution system C. The third judgment condition is that the rate of change Δf changes after time T1 and before time T2 after the frequency f starts to change, and further, the rate of change Δf also changes after time T3 and before time T4. Therefore, the third judgment unit 34 can appropriately judge that an islanding operation has occurred when both the new power source B2 and the conventional power source B1 are connected to the power distribution system C. As a result, when either the new type power source B2 or the conventional type power source B1 is connected to the power distribution system C, the islanding operation detection device 3 can appropriately detect the islanding operation.
[0070] In the present embodiment, the case where the isolated operation detection device 3 detects an isolated operation based on the frequency f of the output voltage of the power conditioner 1 detected by the frequency detection unit 31 has been described, but the present invention is not limited to this. The isolated operation detection device 3 may use the frequency of the output current or output power of the power conditioner 1. The isolated operation detection device 3 may also detect an isolated operation based on electrical characteristics such as the voltage, current, and power (active power, reactive power) output by the power conditioner 1. The isolated operation may also be detected based on the voltage, current, power, and frequency of predetermined harmonic components such as the third, fifth, and seventh orders. The detection values used by the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34 are not limited to detection values that detect the magnitudes of the voltage, current, power, and frequency, and may be deviations (amounts of change from a reference) and change rates. The first judgment condition set in the first judgment unit 32, the second judgment condition set in the second judgment unit 33, and the third judgment condition set in the third judgment unit 34 are set appropriately depending on the detection value used.
[0071] Second Embodiment Fig. 6 is a block diagram showing the internal configuration of the islanding operation detection device according to the second embodiment. In the figure, elements that are the same as or similar to those in the islanding operation detection device 3 according to the first embodiment (see Fig. 1) are given the same reference numerals and redundant explanations will be omitted.
[0072] The isolated operation detection device 3a according to this embodiment differs from the isolated operation detection device 3 in that the first judging unit 32, the second judging unit 33, and the third judging unit 34 make judgments using two types of detection values.
[0073] The isolated operation detection device 3a further includes a voltage detection unit 39. The voltage detection unit 39 detects the effective voltage value v of the output voltage of the power conditioner 1. The voltage detection unit 39 detects the effective voltage value v based on a voltage signal input from the voltage sensor 5. The voltage detection unit 39 outputs the detected effective voltage value v to the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34. In this embodiment, the voltage detection unit 39 also corresponds to the "detection unit" of the present invention, and the effective voltage value v corresponds to the "second detection value" of the present invention. The voltage detection unit 39 may detect the maximum value or average value of the voltage, etc.
[0074] The first determination unit 32 according to the second embodiment performs a determination based on the frequency f input from the frequency detection unit 31 and the effective voltage value v input from the voltage detection unit 39. The first determination unit 32 includes a frequency determination unit 321, a voltage determination unit 322, and an AND unit 323. The frequency determination unit 321 is a functional block similar to that of the first determination unit 32 according to the first embodiment, and determines whether or not the frequency f input from the frequency detection unit 31 matches the first determination condition. When the frequency determination unit 321 determines that the frequency f matches the first determination condition, it outputs a frequency determination signal, which is a high-level signal, to the AND unit 323.
[0075] The voltage determination unit 322 determines whether or not the effective voltage value v input from the voltage detection unit 39 matches a fourth determination condition. The fourth determination condition is set to a condition that determines, based on the effective voltage value v, that islanding has occurred when only new type of power source B2 is connected to the power distribution system C. When the voltage determination unit 322 determines that the effective voltage value v matches the fourth determination condition, it outputs a voltage determination signal that is a high-level signal to the AND unit 323. Note that the fourth determination condition is not limited.
[0076] The AND unit 323 generates a logical AND signal of the signal input from the frequency determination unit 321 and the signal input from the voltage determination unit 322, and outputs the logical AND signal to the determination unit 35. Therefore, when the AND unit 323 receives a frequency determination signal (high level signal) from the frequency determination unit 321 and a voltage determination signal (high level signal) from the voltage determination unit 322, the AND unit 323 outputs a first determination signal, which is a high level signal, to the determination unit 35. That is, the first determination unit 32 according to the second embodiment outputs the first determination signal to the determination unit 35 when it is determined that the frequency f matches the first determination condition and that the effective voltage value v matches the fourth determination condition.
[0077] The second determination unit 33 according to the second embodiment performs a determination based on the frequency f input from the frequency detection unit 31 and the effective voltage value v input from the voltage detection unit 39. The second determination unit 33 includes a frequency determination unit 331, a voltage determination unit 332, and an AND unit 333. The frequency determination unit 331 is a functional block similar to that of the second determination unit 33 according to the first embodiment, and determines whether or not the frequency f input from the frequency detection unit 31 matches the second determination condition. When the frequency determination unit 331 determines that the frequency f matches the second determination condition, it outputs a frequency determination signal, which is a high-level signal, to the AND unit 333.
[0078] The voltage determination unit 332 determines whether or not the effective voltage value v input from the voltage detection unit 39 matches a fifth determination condition. The fifth determination condition is set as a condition for determining that an islanding operation has occurred when only the conventional power source B1 is connected to the power distribution system C, based on the effective voltage value v. When the voltage determination unit 332 determines that the effective voltage value v matches the fifth determination condition, it outputs a voltage determination signal, which is a high-level signal, to the AND unit 333. Note that the fifth determination condition is not limited.
[0079] The AND unit 333 generates a logical AND signal of the signal input from the frequency determination unit 331 and the signal input from the voltage determination unit 332, and outputs the logical AND signal to the determination unit 35. Therefore, when the AND unit 333 receives a frequency determination signal (high level signal) from the frequency determination unit 331 and a voltage determination signal (high level signal) from the voltage determination unit 332, the AND unit 333 outputs a second determination signal, which is a high level signal, to the determination unit 35. That is, the second determination unit 33 according to the second embodiment outputs the second determination signal to the determination unit 35 when it is determined that the frequency f matches the second determination condition and that the effective voltage value v matches the fifth determination condition.
[0080] The third determination unit 34 according to the second embodiment performs a determination based on the frequency f input from the frequency detection unit 31 and the effective voltage value v input from the voltage detection unit 39. The third determination unit 34 includes a frequency determination unit 341, a voltage determination unit 342, and an AND unit 343. The frequency determination unit 341 is a functional block similar to that of the third determination unit 34 according to the first embodiment, and determines whether or not the frequency f input from the frequency detection unit 31 matches the third determination condition. When the frequency determination unit 341 determines that the frequency f matches the third determination condition, it outputs a frequency determination signal, which is a high-level signal, to the AND unit 343.
[0081] The voltage determination unit 342 determines whether or not the effective voltage value v input from the voltage detection unit 39 matches a sixth determination condition. The sixth determination condition is set as a condition for determining that an islanding operation has occurred when both the conventional power source B1 and the new power source B2 are connected to the power distribution system C, based on the effective voltage value v. When the voltage determination unit 342 determines that the effective voltage value v matches the sixth determination condition, it outputs a voltage determination signal, which is a high-level signal, to the AND unit 343. Note that the sixth determination condition is not limited.
[0082] The AND unit 343 generates a logical AND signal of the signal input from the frequency determination unit 341 and the signal input from the voltage determination unit 342, and outputs the logical AND signal to the determination unit 35. Therefore, when the AND unit 343 receives a frequency determination signal (high level signal) from the frequency determination unit 341 and a voltage determination signal (high level signal) from the voltage determination unit 342, the AND unit 343 outputs a third determination signal, which is a high level signal, to the determination unit 35. That is, the third determination unit 34 according to the second embodiment outputs the third determination signal to the determination unit 35 when it is determined that the frequency f matches the third determination condition and that the effective voltage value v matches the sixth determination condition.
[0083] This embodiment can also achieve the same effects as the first embodiment. Moreover, according to this embodiment, the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34 perform judgment under the AND condition of the condition judgment for the frequency f and the condition judgment for the effective voltage value v. Therefore, the isolated operation detection device 3a can reliably detect the isolated operation while speeding up the detection by adjusting the set value of each judgment condition.
[0084] The first judgment unit 32 (second judgment unit 33, third judgment unit 34) may include an OR circuit that generates a logical sum signal of the signal input from the frequency judgment unit 321 (331, 341) and the signal input from the voltage judgment unit 322 (332, 342) instead of the AND unit 323 (333, 343). That is, the first judgment unit 32 (second judgment unit 33, third judgment unit 34) may output a first judgment signal (second judgment signal, third judgment signal) to the judgment unit 35 when it is determined that the frequency f matches the first judgment condition (second judgment condition, third judgment condition) or the effective voltage value v matches the fourth judgment condition (fifth judgment condition, sixth judgment condition).
[0085] Moreover, the detection values used by the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34 for judgment are not limited to the combination of frequency f and effective voltage value v. Moreover, the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34 may use different detection values. Moreover, the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34 may perform judgment based on three or more types of detection values. In other words, the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34 may each use any number of detection values to make judgment.
[0086] Third Embodiment Fig. 7 is a block diagram showing the internal configuration of the isolated operation detection device according to the third embodiment. In the figure, elements that are the same as or similar to those in the isolated operation detection device 3 according to the first embodiment (see Fig. 1) are given the same reference numerals and redundant explanations will be omitted.
[0087] The isolated operation detection device 3b according to this embodiment differs from the isolated operation detection device 3 in that it does not include the first judging unit 32, the second judging unit 33, and the determining unit .
[0088] In the first embodiment, the case has been described in which the isolated operation detection device 3 includes the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34, and detects an isolated operation when the change pattern of the frequency f matches any one of the first to third judgment conditions. However, when it is known in advance that both the new type power source B2 and the conventional power source B1 are connected to the power distribution system C, the judgments by the first judgment unit 32 and the second judgment unit 33 are not necessary, and only the judgment by the third judgment unit 34 is sufficient. The isolated operation detection device 3b according to this embodiment is used when it is known in advance that both the new type power source B2 and the conventional power source B1 are connected to the power distribution system C, and only the judgment by the third judgment unit 34 is performed.
[0089] The isolated operation detection device 3b does not include the first judgment unit 32, the second judgment unit 33, and the judgment unit 35. The frequency detection unit 31, the third judgment unit 34, and the stop processing unit 38 are similar to the frequency detection unit 31, the third judgment unit 34, and the stop processing unit 38 according to the first embodiment. When the third judgment unit 34 according to this embodiment judges that the frequency f matches the third judgment condition, it outputs a third judgment signal to the stop processing unit 38 as an isolated operation detection signal.
[0090] According to this embodiment, the third judgment unit 34 judges the change in system frequency caused by the injection of reactive power into the power distribution system C by another isolated operation detection device, and judges whether or not the power distribution system C is in an isolated operation state. The isolated operation detection device 3b does not inject reactive power into the power distribution system C, and therefore does not induce the voltage flicker phenomenon. In other words, if the power distribution system C does not suffer from the voltage flicker phenomenon, the voltage flicker phenomenon will not occur even if many power conditioners 1 equipped with the isolated operation detection device 3b are added. Furthermore, the voltage flicker phenomenon will not be promoted even if many power conditioners 1 equipped with the isolated operation detection device 3b are added to the power distribution system C in which the voltage flicker phenomenon occurs.
[0091] In the present embodiment, the case where the isolated operation detection device 3b performs the determination only in the third determination unit 34 has been described, but the present invention is not limited to this. When it is known in advance that the conventional power source B1 is not connected to the power distribution system C and only the new power source B2 is connected, the isolated operation detection device 3b may include a first determination unit 32 instead of the third determination unit 34 and perform the determination only in the first determination unit 32. When it is known in advance that the new power source B2 is not connected to the power distribution system C and only the conventional power source B1 is connected, the isolated operation detection device 3b may include a second determination unit 33 instead of the third determination unit 34 and perform the determination only in the second determination unit 33.
[0092] Also, when it is known in advance that the conventional power source B1 is connected to the power distribution system C, and it is unknown whether the new power source B2 is connected, the isolated operation detection device 3 according to the first embodiment may be configured not to include the first judgment unit 32. In this case, the judgment unit 35 judges whether or not the system is in an isolated operation state based on the judgment results of the second judgment unit 33 and the third judgment unit 34. Also, when it is known in advance that the new power source B2 is connected to the power distribution system C, and it is unknown whether or not the conventional power source B1 is connected, the isolated operation detection device 3 according to the first embodiment may be configured not to include the second judgment unit 33. In this case, the judgment unit 35 judges whether or not the system is in an isolated operation state based on the judgment results of the first judgment unit 32 and the third judgment unit 34. Also, when it is known in advance that only the conventional power source B1 or the new power source B2 is connected to the power distribution system C, the isolated operation detection device 3 according to the first embodiment may be configured not to include the third judgment unit 34. In this case, the judgment unit 35 judges whether or not the system is in an isolated operation state based on the judgment results of the first judgment unit 32 and the second judgment unit 33.
[0093] [Fourth embodiment] Fig. 8 is a block diagram for explaining a power conditioner equipped with an analysis device according to the fourth embodiment, and shows the overall configuration of a power distribution system C. In the figure, elements that are the same as or similar to those of the power conditioner according to the first embodiment (see Fig. 1) are given the same reference numerals, and duplicated explanations will be omitted.
[0094] The analysis device 3c according to this embodiment is provided in the power conditioner 1, and analyzes the arrangement state of the conventional power source B1 and the new power source B2 in the power distribution system C when an islanding operation occurs. The analysis device 3c includes a frequency detection unit 31, a first judgment unit 32, a second judgment unit 33, a third judgment unit 34, an analysis unit 36, and a display unit 37. The frequency detection unit 31, the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34 are similar to the frequency detection unit 31, the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34 of the islanding operation detection device 3 according to the first embodiment. The combination of the frequency detection unit 31, the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34 of the analysis device 3c corresponds to the "islanding operation detection sensor" of the present invention.
[0095] The analysis unit 36 analyzes the arrangement state of the conventional power source B1 and the new power source B2 in the power distribution system C, i.e., the arrangement state of the conventional active type islanding detection device and the new active type islanding detection device, based on the judgment result by the first judgment unit 32, the judgment result by the second judgment unit 33, and the judgment result by the third judgment unit 34. When the analysis unit 36 receives a first judgment signal from the first judgment unit 32, it analyzes that only the new power source B2 is connected to the power distribution system C, and when the analysis unit 36 receives a second judgment signal from the second judgment unit 33, it analyzes that only the conventional power source B1 is connected to the power distribution system C. Furthermore, when the analysis unit 36 receives a third judgment signal from the third judgment unit 34, it analyzes that both the conventional power source B1 and the new power source B2 are connected to the power distribution system C. The analysis unit 36 outputs the analysis result to the display unit 37.
[0096] When the third judgment signal is input from the third judgment unit 34, the analysis unit 36 may further calculate the ratio between the total capacity of the conventional power source B1 and the total capacity of the new power source B2. The larger the ratio of the total capacity of the new power source B2 to the total capacity of the conventional power source B1, the larger the change rate x1 from the occurrence of a power outage (point a) to the time when the change rate Δf changes for the first time between time T1 and time T2 (point b) in the time chart shown in FIG. 2(c) becomes, and the change rate Δf at time T2 (after all the new power sources B2 stop injecting reactive power) becomes smaller. Based on these trends, the analysis unit 36 can calculate the ratio between the total capacity of the conventional power source B1 and the total capacity of the new power source B2. The calculation method of the ratio is not limited. The analysis unit 36 does not have to calculate the ratio.
[0097] The display unit 37 is equipped with a display, and displays the analysis results input from the analysis unit 36 on the display.
[0098] According to this embodiment, the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34 judge the change in system frequency caused by the injection of reactive power into the distribution system C by the other isolated operation detection devices. Then, the analysis unit 36 analyzes the arrangement state of the conventional power source B1 and the new power source B2 in the distribution system C based on the judgment results of the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34. The analysis device 3c does not inject reactive power into the distribution system C, and therefore does not induce the voltage flicker phenomenon. In other words, if the distribution system C does not experience the voltage flicker phenomenon, the voltage flicker phenomenon will not occur even if a large number of analysis devices 3c are added. Furthermore, even if a large number of analysis devices 3c are added to the distribution system C in which the voltage flicker phenomenon is occurring, the voltage flicker phenomenon will not be promoted.
[0099] In the present embodiment, the case where the power conditioner 1 includes the islanding operation detection device 3 and the analysis device 3c has been described, but the present invention is not limited to this. The islanding operation detection device 3 may include an analysis unit 36 and a display unit 37 and function as the analysis device 3c. Moreover, the analysis device 3c may not be provided in the power conditioner 1, and may be disposed alone in the power distribution system C together with the voltage sensor 5.
[0100] In the present embodiment, the analysis device 3c includes the first judgment unit 32, the second judgment unit 33, and the third judgment unit 34, but the present invention is not limited to this. As in the third embodiment, when it is known in advance that both the new power source B2 and the conventional power source B1 are connected to the power distribution system C, the analysis device 3c may not include the first judgment unit 32 and the second judgment unit 33, and may perform the judgment only in the third judgment unit 34. In this case, the analysis unit 36 may calculate the connection ratio of the total capacity of the new power source B2 to the total capacity of the entire power distribution system C, and the connection ratio of the total capacity of the conventional power source B1 to the total capacity of the entire power distribution system C. The smaller the connection ratio of the new power source B2 (conventional power source B1), the smaller the ratio of the amount of reactive power injected from the new power source B2 (conventional power source B1), and therefore the smaller the change rate Δf of the frequency. Therefore, the analysis unit 36 can calculate the connection ratio of the new power source B2 based on the magnitude of the change rate Δf from time 0 to time T1. Similarly, the analysis unit 36 can calculate the connection ratio of the conventional power source B1 based on the magnitude of the rate of change Δf from time T2 to time T3. The calculation method of the connection ratio is not limited. The analysis unit 36 may not calculate these connection ratios. If it is known in advance that the conventional power source B1 is not connected to the power distribution system C and only the new power source B2 is connected, the analysis device 3c may not include the second judgment unit 33 and the third judgment unit 34 and may only perform the judgment in the first judgment unit 32. In this case, the analysis unit 36 may calculate the connection ratio of the total capacity of the new power source B2 to the total capacity of the entire power distribution system C. The calculation method of the connection ratio is not limited. The analysis unit 36 may not calculate the connection ratio. If it is known in advance that the new power source B2 is not connected to the power distribution system C and only the conventional power source B1 is connected, the analysis device 3c may not include the first judgment unit 32 and the third judgment unit 34 and may only perform the judgment in the second judgment unit 33. In this case, the analysis unit 36 may calculate the connection ratio of the total capacity of the conventional power source B1 to the total capacity of the entire power distribution system C. The method of calculating the connection ratio is not limited. Moreover, the analysis unit 36 does not have to calculate the connection ratio.
[0101] Moreover, the analysis device 3c may not include the first judgment unit 32 and may perform only the judgments in the second judgment unit 33 and the third judgment unit 34 in order to check only whether the conventional power source B1 is connected to the power distribution system C. Moreover, the analysis device 3c may not include the second judgment unit 33 and may perform only the judgments in the first judgment unit 32 and the third judgment unit 34 in order to check only whether the new power source B2 is connected to the power distribution system C. Moreover, if it is known in advance that only the conventional power source B1 or the new power source B2 is connected to the power distribution system C, the analysis device 3c may not include the third judgment unit 34 and may perform only the judgments in the first judgment unit 32 and the second judgment unit 33. In this case, the analysis unit 36 may calculate the connection ratio of the total capacity of the conventional power source B1 to the total capacity of the entire power distribution system C, or the connection ratio of the total capacity of the new power source B2 to the total capacity of the entire power distribution system C. The method of calculating the connection ratio is not limited. Furthermore, the analysis unit 36 does not need to calculate the connection ratio.
[0102] The islanding operation detection sensor, the islanding operation detection device, the analysis device, and the islanding operation detection method according to the present invention are not limited to the above-mentioned embodiments. The specific configurations of the individual parts of the islanding operation detection sensor, the islanding operation detection device, the analysis device, and the islanding operation detection method according to the present invention can be freely designed in various ways. [Explanation of symbols]
[0103] 1: power conditioner, 3, 3a: isolated operation detection device, 3c: analysis device, 31: frequency detection unit, 32: first judgment unit, 33: second judgment unit, 34: third judgment unit, 35: judgment unit, 36: analysis unit, 39: voltage detection unit
Claims
1. A detection unit that detects an electrical characteristic related to an output of the power conditioner; a first determination unit that determines whether or not a detection value detected by the detection unit matches a first determination condition; a second determination unit that determines whether the detection value matches a second determination condition; a third determination unit that determines whether the detection value matches a third determination condition; Equipped with the first determination condition is that a rate of change of the detection value changes after a first time and before a second time after the detection value starts to change, and thereafter, the rate of change does not change after a third time and before a fourth time; the second determination condition is that the rate of change does not change after a first time and before a second time after the detection value starts to change, and thereafter, the rate of change changes after a third time and before a fourth time; the third determination condition is that the rate of change has changed after a first time and before a second time since the detection value started to change, and has also changed after a third time and before a fourth time since the detection value started to change; An islanding detection sensor comprising:
2. The detection unit detects a frequency of an output voltage of the power conditioner as the detection value. The islanding detection sensor according to claim 1 .
3. The detection unit further detects a second detection value different from the detection value, the first determination unit determines whether or not the detection value matches the first determination condition and the second detection value matches a fourth determination condition; The second determination unit determines whether or not the detection value matches the second determination condition and also matches a fifth determination condition; the third determination unit determines whether or not the detection value matches the third determination condition and the second detection value matches a sixth determination condition; the fourth determination condition is that a second rate of change of the second detection value changes after a first time and before a second time after the second detection value starts to change, and thereafter, the second rate of change does not change after a third time and before a fourth time; the fifth determination condition is that the second rate of change does not change after a first time and before a second time after the second detection value starts to change, and thereafter, the second rate of change changes after a third time and before a fourth time; the sixth determination condition is that the second rate of change changes after a first time and before a second time after the second detection value starts to change, and also changes after a third time and before a fourth time after the second detection value starts to change; The isolated operation detection sensor according to claim 1 or 2.
4. An isolated operation detection sensor according to any one of claims 1 to 3, a determination unit that determines that the power source is in an isolated operation state when the first determination unit, the second determination unit, or the third determination unit determines that the power source is in an identical state; An isolated operation detection device comprising:
5. An isolated operation detection sensor according to any one of claims 1 to 3, an analysis unit that analyzes the placement state of a conventional active type islanding detection device and a new active type islanding detection device in a power distribution system to which the power conditioner is connected, based on a determination result by the first determination unit, a determination result by the second determination unit, and a determination result by the third determination unit; An analytical device comprising:
6. A detection unit that detects an electrical characteristic related to an output of the power conditioner; a determination unit that determines whether or not a detection value detected by the detection unit matches a determination condition; Equipped with The determination condition is that the rate of change of the detection value changes between a first time and a second time after the detection value starts to change, and thereafter, the rate of change does not change between a third time and a fourth time. An islanding detection sensor comprising:
7. A detection unit that detects an electrical characteristic related to an output of the power conditioner; a determination unit that determines whether or not a detection value detected by the detection unit matches a determination condition; Equipped with The determination condition is that the rate of change of the detection value does not change after a first time and before a second time after the detection value starts to change, and thereafter, the rate of change changes after a third time and before a fourth time. An islanding detection sensor comprising:
8. A detection unit that detects an electrical characteristic related to an output of the power conditioner; a determination unit that determines whether or not a detection value detected by the detection unit matches a determination condition; Equipped with The determination condition is that the rate of change of the detection value changes after a first time and before a second time after the detection value starts to change, and further changes after a third time and before a fourth time. An islanding detection sensor comprising:
9. A detection step of detecting an electrical characteristic related to an output of the power conditioner; a first determination step of determining whether or not the detection value detected in the detection step matches a first determination condition; a second determination step of determining whether the detection value matches a second determination condition; a third determination step of determining whether the detection value matches a third determination condition; a determination step of determining that the power plant is in an isolated operation state when it is determined that there is a match in the first determination step, when it is determined that there is a match in the second determination step, or when it is determined that there is a match in the third determination step; Equipped with the first determination condition is that a rate of change of the detection value changes after a first time and before a second time after the detection value starts to change, and thereafter, the rate of change does not change after a third time and before a fourth time; the second determination condition is that the rate of change does not change after a first time and before a second time after the detection value starts to change, and thereafter, the rate of change changes after a third time and before a fourth time; the third determination condition is that the rate of change has changed after a first time and before a second time since the detection value started to change, and has also changed after a third time and before a fourth time since the detection value started to change; 2. An islanding operation detection method comprising:
10. A detection step of detecting an electrical characteristic related to an output of the power conditioner; a determination step of determining whether or not the detection value detected in the detection step matches a determination condition; a determination step of determining that the power plant is in an isolated operation state when it is determined that the two match in the determination step; Equipped with The determination condition is that the rate of change of the detection value changes between a first time and a second time after the detection value starts to change, and thereafter, the rate of change does not change between a third time and a fourth time.
2. An islanding operation detection method comprising:
11. A detection step of detecting an electrical characteristic related to an output of the power conditioner; a determination step of determining whether or not the detection value detected in the detection step matches a determination condition; a determination step of determining that the power plant is in an isolated operation state when it is determined that the two match in the determination step; Equipped with The determination condition is that the rate of change of the detection value does not change after a first time and before a second time after the detection value starts to change, and then the rate of change changes after a third time and before a fourth time.
2. An islanding operation detection method comprising:
12. A detection step of detecting an electrical characteristic related to an output of the power conditioner; a determination step of determining whether or not the detection value detected in the detection step matches a determination condition; a determination step of determining that the power plant is in an isolated operation state when it is determined that the two match in the determination step; Equipped with The determination condition is that the rate of change of the detection value changes after a first time and before a second time after the detection value starts to change, and further changes after a third time and before a fourth time.
2. An islanding operation detection method comprising:
Citation Information
Patent Citations
Detecting method of independent operation in distributed power supply
JP2002199591A
Single operation detector, distributed power supply device, synchronization detection method and system interconnection control method
JP2011200032A
Electric power conversion device, electric power supply system, and charging and discharging device
JP2012231635A
Independent operation detector, controller, power conditioner, power supply system and independent operation detection method
JP2017093020A
System interconnection control device
JP2017229198A