Guard fence post structure

The support structure for protective fences allows for easy replacement of damaged components by inserting the support main body into a buried pipe with reduced adhesion, addressing the inefficiencies of existing systems and reducing replacement costs and time.

JP7555577B2Active Publication Date: 2024-09-25TOA GROUT KOGYO KKAISHI
View PDF 13 Cites 0 Cited by

Patent Information

Application Number
JP2020187017
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-11-10
Publication Date
2024-09-25
Estimated Expiration
2040-11-10

Smart Images

  • Figure 0007555577000001
    Figure 0007555577000001
  • Figure 0007555577000002
    Figure 0007555577000002
  • Figure 0007555577000003
    Figure 0007555577000003
Patent Text Reader

Abstract

To provide a support structure capable of reducing cost and construction period required for replacement work when a support is damaged while being excellent in workability in installing the support, in the support structure used for a guard fence for capturing falling earth and sand, falling rock, or the like.SOLUTION: In a support structure 1 of a guard fence equipped with an embedded pipe 22 which is installed at a predetermined interval to stretch a protective net 12 and is embedded in the ground, a support body 24 which is installed so that its lower part is inserted into the embedded pipe by a predetermined length and its upper part is exposed to the ground, and a filler material 30 injected between the embedded pipe and the support body, the insertion and installation of the support body into the embedded pipe is set so that the fixing force between the support body and the embedded pipe is weaker than the fixing force between the embedded pipe and the surrounding ground.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a support structure used in a protective fence that prevents disasters by capturing collapsed soil, falling rocks, etc. [Background technology]

[0002] Traditionally, protective fences have been installed on mountain slopes to protect nearby roads, railways, and homes from natural disasters such as landslides, falling rocks, and avalanches. In Japan, which is particularly prone to damage from earthquakes and heavy rains, it is extremely important to take measures against disasters by installing protective fences on slopes, etc.

[0003] A protective fence generally comprises a number of posts erected directly on a slope or via a structure, and a protective net attached to the posts and stretched. When this protective fence is installed, for example, near a residence in the lower area of ​​a slope, it is necessary to take appropriate measures regarding the cushioning properties of the posts and the extensibility of the net so that falling rocks and earth and sand captured by the protective fence do not approach the residential structure.

[0004] Generally, a support pillar is composed of a single steel pipe buried in the ground, but since transporting and bringing in a highly rigid, long, and heavy pillar to the site is a complicated task, technology has been developed to separate the pillar into upper and lower parts and assemble them together on site.

[0005] For example, Patent Document 1 discloses a support structure that is composed of a buried pipe that is buried in a vertical hole formed by drilling the ground, a support body that extends from underground to above ground with its lower part inserted into the buried pipe, and a hardening material such as mortar that integrates these. The hardening material is injected into the vertical hole so as to fill the inside of the buried pipe and the gap between the buried pipe and the vertical hole, and after injection, it hardens over time, firmly integrating the buried pipe and the support body.

[0006] In the pillar structure described in Patent Document 1, the buried pipe and the pillar body that make up the pillar can be transported and brought to the site in a separated state, thereby improving workability during construction. [Prior art documents] [Patent documents]

[0007] [Patent Document 1] International Publication No. 2015 / 102032 Summary of the Invention [Problem to be solved by the invention]

[0008] However, when the protective fence described in the above-mentioned patent document is subjected to the load of collapsing soil or falling rocks and the posts are damaged, such as being bent, the posts need to be replaced.

[0009] Normally, a support pillar is damaged at the part exposed above ground, but in the support structure described in Patent Document 1, the support pillar body and the buried pipe are firmly integrated, so they cannot be separated. Therefore, when replacing a support pillar, it is necessary to remove both the support pillar body and the buried pipe and install them anew, and the cost and construction time required for replacing a support pillar is the same as or longer than that for the initial installation.

[0010] The present invention has been made in consideration of the above-mentioned problems, and aims to provide a support structure used in a protective fence for capturing collapsed soil, falling rocks, etc., which is easy to install and can reduce the cost and construction time required for replacement work in the event of damage to the support structure. [Means for solving the problem]

[0011] In order to achieve the above object, the post structure of the protective fence described in claim 1 comprises: A support structure comprising buried pipes which are installed at a predetermined interval and buried in the ground for tensioning a protective net, a support body which is installed so that its lower portion is inserted into the buried pipe by a predetermined length and its upper portion is exposed above ground, and a filler material injected between the buried pipe and the support body, An external filler is injected between the buried pipe and the surrounding ground, has a compressive strength higher than that of the filler, and is made of a mortar that is inelastic in a hardened state; The support body is inserted into the buried pipe so that the adhesive force between the support body and the buried pipe is smaller than the adhesive force between the buried pipe and the surrounding ground; The filler has a time-hardening property, and when hardened, the compressive strength in the axial direction of the support is 0.1 N / mm 2 ~1.5N / mm 2 is in the range The support body is detachably fixed to the buried pipe by a fixing member that is a bolt and nut connection. It is characterized by:

[0012] According to this configuration, the support body is inserted into the buried pipe with a fixing force smaller than the fixing force between the buried pipe buried in the ground and the surrounding ground, so that after the support structure according to the present invention is installed, it is possible to pull out the support body from the buried pipe while keeping it in the ground by applying a predetermined pulling force upward to the support body. This makes it possible to replace only the support body while leaving the buried pipe in place, for example, when the support body is damaged by falling rocks, etc., and reduces the cost and construction time required for the replacement work. In addition, when the protective fence is initially constructed, the buried pipe and the support body can be transported and brought in in a separated state, i.e., the support can be disassembled into a short length, making the construction work easy. In addition, with this configuration, the compressive strength of the filler filled between the buried pipe and the support body is 0.1 N / mm 2 ~1.5N / mm 2 range and normal concrete compressive strength (20N / mm 2 Since the filler is set to be sufficiently smaller than the above-mentioned value, when a pulling force is applied to the support body, the filler can be destroyed with a relatively small force, thereby making it possible to easily pull out the support body from the buried pipe. In addition, with this configuration, the pillar body can be fixed to the buried pipe using the fixing member, and by releasing the fixation by the fixing member, the pillar body can be set free from the buried pipe, thereby making the adhesive force between the pillar body and the buried pipe smaller than the adhesive force between the buried pipe and the surrounding ground, and the pillar body can be easily pulled out.

[0013] The support structure according to claim 2 is the support structure according to claim 1, It is characterized by having a frictional resistance reduction layer provided between the filler and the buried pipe and / or between the filler and the support body, which reduces frictional resistance between the components.

[0014] According to this configuration, it is possible to make the fastening force between the pillar body and the buried pipe weaker than the fastening force between the buried pipe and the surrounding ground with a simple configuration. In other words, by providing a frictional resistance reduction layer between the filling material and the buried pipe and / or between the filling material and the pillar body, it is possible to reduce the resistance force when the pillar body located inside the frictional resistance reduction layer is pulled out from the buried pipe together with the filling material or alone with the buried pipe remaining in the ground, and this makes it possible to facilitate the pulling out operation.

[0015] The support structure according to claim 3 is the support structure according to claim 1 or 2, The filler is , hard It is characterized by containing a large number of bubbles in the cured state.

[0016] According to this configuration, since the hardened filler contains many air bubbles, the filler can be easily destroyed by, for example, applying vibration to the support body, which reduces the pull-out resistance between the buried pipe and the support body, making it easier to pull out the support body.

[0019] Claim 4 The support structure according to claim 1 Any one of ~3 In the support structure described in The filler is , hard It is characterized by having elasticity in the cured state.

[0020] With this configuration, when the pillar body is subjected to a load due to falling rocks, etc., the load acting on the pillar can be absorbed by the elastic filling material, thereby ensuring the ease of pulling out the pillar body while also improving the load-bearing performance of the pillar when subjected to falling rocks, etc.

[0023] Claim 5 The support structure according to claim 1 to 4 In the support structure according to any one of the above, The present invention is characterized in that the length of insertion of the pillar body into the buried pipe is shorter than the total length of the buried pipe.

[0024] According to this configuration, by making the insertion length of the pillar body into the buried pipe shorter than the total length of the buried pipe, the adhesive force between the pillar body and the buried pipe can be made sufficiently smaller than the adhesive force between the buried pipe and the surrounding ground, making it easier to pull out the pillar body. Effect of the Invention

[0027] According to the guardrail post structure of the present invention, the post body is inserted into the buried pipe with a fixing force weaker than that between the buried pipe and the surrounding ground, so that if the post body is damaged, it is possible to pull out the post body from the buried pipe while leaving the buried pipe in the ground. This makes it possible to significantly reduce the cost and construction time required for replacement work. In addition, the buried pipe and the post body that make up the post can be transported and brought in separately. [Brief description of the drawings]

[0028] [Figure 1] 1 is a front view, partially in section, of a safety fence using posts having the support structure of a first embodiment of the present invention. [Diagram 2] FIG. 4 is a cross-sectional view showing a main part of the support structure. [Diagram 3] FIG. [Figure 4] 3 is a cross-sectional view of the support structure shown in FIG. 2 along line AA. [Diagram 5] 3 is a cross-sectional view of the support structure shown in FIG. 2 along line BB. [Figure 6] A cross-sectional view showing the state in which the support body has been removed from the buried pipe. [Figure 7] 5 is a cross-sectional view similar to FIG. 2, showing a main part of a support structure according to a second embodiment. [Figure 8] A cross-sectional view showing the state in which the support body has been removed from the buried pipe. [Figure 9] 3 is a cross-sectional view similar to FIG. 2, showing a modified example of the support structure. [Figure 10] 10 is a cross-sectional view similar to FIG. 2, showing a main part of a support structure according to a third embodiment. [Figure 11]A cross-sectional view showing the state in which the support body has been removed from the buried pipe. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0029] (First embodiment) FIG. 1 is a partial cross-sectional front view of a protective fence 10 using posts 20 having a post structure 1 according to a first embodiment of the present invention. The drawings used in explaining the present invention are schematic diagrams and do not strictly show the dimensions of each component. The protective fence 10 comprises a plurality of posts 20 and a protective net 12 (hereinafter simply referred to as "net 12") stretched between the posts 20. In the illustrated example, four posts 20-1 to 20-4 are shown, but the number of posts 20 is not limited to this and may be two or more.

[0030] The protective fence 10 prevents damage by capturing falling rocks, collapsed earth and sand, etc. with the net 12. The height of the posts 20 from the slope S is, for example, 2 m to 5 m, the depth of the posts 20 underground is, for example, 2 m to 4 m, and the interval between the posts 20 is, for example, 3 m to 5 m, or in some cases, about 5 m to 10 m, which are selected appropriately according to the scale and conditions of the slope S.

[0031] A plurality of pillars 20 are erected at a predetermined interval on the slope S of the mountain to form one pillar row. The pillar row may be installed at approximately the same height on the mountain, or the pillars 20 may be installed with different heights. In the example shown in Fig. 1, the slope S in the central region of the pillar row forms a valley, and the pillars 20-2 and 20-3 located in the central region are installed at a lower position than the pillars 20-1 and 20-4 located at both ends.

[0032] As shown in FIG. 1 and FIG. 2, each support 20 includes a buried pipe 22 buried in the ground, and a support body 24 whose lower part is inserted into the buried pipe 22 and extends from the ground to above ground. The support body 24 is inserted into the buried pipe 22 so that the adhesive force between the support body 24 and the buried pipe 22 is smaller than the adhesive force between the buried pipe 22 and the surrounding ground. In this embodiment, the installation structure of the support body 24 in the buried pipe 24 includes a time-hardening filler 30 injected between the buried pipe 22 and the support body 24, and a pull-out resistance reducing portion provided between the filler 30 and the buried pipe 22 to reduce the pull-out resistance of the support body 24 against the buried pipe 22. In this embodiment, the pull-out resistance reducing portion is composed of a frictional resistance reducing layer 42 that reduces the frictional resistance between the members, and the adhesive force between the support body 24 and the buried pipe 22 is reduced by this frictional resistance reducing layer 42. Each component that constitutes the protective fence 10 will be described in detail below.

[0033] As shown in FIG. 1, the net 12 can be a wire mesh made of a diamond-shaped metal wire 13. For example, as described in Tokkai 2016-37773, this wire mesh can be a diamond-shaped wire mesh formed by arranging a plurality of triangular wave-shaped wires obtained by bending the metal wire 13 in parallel and weaving them together. The metal wire 13 can be made of soft steel, hard steel, spring steel, stainless steel, or the like. The metal wire 13 may be coated as necessary, which can prevent wear and corrosion of the contact portion of the triangular wave-shaped wire. Examples of the coating include zinc plating and polyester coating.

[0034] In order to reduce the maximum deformation amount, the net 12 is preferably formed of metal wires 13 with a small deformation amount. As such metal wires 13, for example, hard steel wires (single wires), particularly wires made from hard steel wires specified in JIS G 3506, hard steel wires (JIS G 3521), galvanized steel wires (JIS G 3548), etc. can be used. The tensile strength of the wires is, for example, 800 to 2500 N / mm 2 , preferably 1000 to 2000N / mm 2, especially 1500~2000N / mm 2 It is advantageous that the net 12 is made of such hard steel wire. By using such hard steel wire for the net 12, it is possible to obtain a net 12 that is high in rigidity and light in weight. It is also preferable to use a hard steel wire having excellent elastic deformability as the metal wire 13. The thickness of this type of single metal wire 13 is, for example, 2 mm to 10 mm, preferably 2.6 mm to 4 mm. The metal wire 13 may also be a twisted wire formed by twisting a plurality of wires, as described in, for example, JP 2014-66054 A.

[0035] The wire used in the net of a conventional protective fence is soft steel wire, i.e., iron wire, which undergoes plastic deformation relatively easily, and the net absorbs little energy but has a large maximum deformation. In contrast, the net 12 made of hard steel wire is lightweight but has high rigidity, so it absorbs a large amount of energy when it deforms. In addition, the net 12 made of hard steel wire has a small maximum deformation when capturing falling rocks, and it also has a small displacement from the set tensioning position relative to the posts 20.

[0036] The shape of the mesh of the net 12 is not limited to a rhombus, and may be any suitable polygon. Alternatively, for example, a ring-type net as described in JP 2014-1584 A may be used for the net 12. It is desirable to bring the lower end of the net 12 as close as possible to the slope S, and to make the gap between them as small as possible.

[0037] In this embodiment, as shown in Fig. 1, a cross member 14 is disposed between the upper ends of adjacent columns 20. The cross member 14 acts as a so-called tension rod, and prevents the columns 20 at both ends from approaching each other. The ends of the cross member 14 and the upper ends of the columns 20 are firmly connected by a connecting structure (not shown). It is preferable that the cross member 14 has the same degree of rigidity as the column body 24.

[0038] In this embodiment, a reinforcing rope 16 is stretched between the supports 20 at both ends in the lateral direction of the slope. The reinforcing rope 16 is preferably arranged at least on the upper and lower sides of the net 12, and in this embodiment, four reinforcing ropes 16-1 to 16-4 including the upper and lower sides are arranged. For example, a high-strength wire rope can be used as the reinforcing rope 16. The wire diameter of the reinforcing rope 16 is, for example, about 12 mm to 30 mm. The reinforcing rope 16 is inserted through or connected to the net 12 to reinforce the net 12. In addition, the reinforcing rope 16 indirectly supports the falling rocks, etc. by supporting the net 12 that captures the falling rocks, etc., and also absorbs the collision energy.

[0039] In this embodiment, one end of the reinforcing rope 16 is fixed to a support 20-1 at one end of the support row via a locking device 17, and the other end of the reinforcing rope 16 is fixed to a support 20-4 at the other end of the support row via a brake device 50. In this embodiment, a plurality of reinforcing ropes 16 are stretched at intervals in the vertical direction, and these reinforcing ropes 16 are threaded through the mesh of the net 12. A brake device 50 is provided at one end of the reinforcing rope 16, which allows the length between both fixed parts of the reinforcing rope 16 to extend with a predetermined braking force.

[0040] FIG. 3 shows an example of a brake device 50, and is a front view of the brake device 50 seen from the slope mountain side. This brake device 50 is configured by winding a metal band 52 having a width in the direction perpendicular to the paper surface around a solid cylindrical member 54, and an end of a reinforcing rope 16 is connected to one end of the metal band 52 in the longitudinal direction, in this case, the end that is shorter from the cylindrical member 54. A stopper 58 is provided at the other end of the metal band 52, and buffer projections 59 are provided in two places in front of the stopper 58, protruding in pairs from both surfaces of the metal band 52. In addition, in this brake device 50, a pressing member 56 that holds the metal band 52 relatively tightly is attached to the outside of the metal band 52 wound around the cylindrical member 54, and this pressing member 56 is fixed to the slope mountain side of the support 20-4 in FIG. 1 via a locking device 51.

[0041] In this brake device 50, tension is applied to the reinforcing rope 16, and when it is pulled in the direction of the arrow in FIG. 3, the metal band 52 is also pulled in the same direction. At this time, the metal band 52 passes through a narrow passage formed by the cylindrical member 54 and the holding member 56, and the part wrapped around the cylindrical member 54 moves. In the part of the metal band 52 wrapped around the cylindrical member 54, plastic deformation occurs continuously with the movement. Since the plastic deformation of the metal band 52 is a deformation resistance, when the length between the two fixed parts of the reinforcing rope 16 expands against this deformation resistance, a braking action, that is, a braking force is generated, and the kinetic energy of the falling rock acting on the reinforcing rope 16 is largely absorbed. The amount of expansion of the reinforcing rope 16 is regulated by the position of the stopper 58. A plurality of brake devices 50 may be provided for one reinforcing rope 16, and in such a case, the magnitude of the braking force of each brake device 50 may be set to a different magnitude.

[0042] Next, the support pillars 20 will be described. The support pillars 20 are installed at a predetermined interval to stretch the net 12. Fig. 2 is a schematic cross-sectional view showing the main part of the support pillar structure 1, Fig. 4 is a cross-sectional view taken along line AA in Fig. 2, and Fig. 5 is a cross-sectional view taken along line BB in Fig. 2. Note that in Fig. 5, the area where the filler 30 is present is marked with dots. The support pillar 20 has a support pillar structure 1 including an embedded pipe 22, a support pillar body 24, a time-hardening filler 30, and a frictional resistance reducing layer 42.

[0043] The buried pipe 22 is a cylindrical pipe buried in the ground of a mountain, and may be, for example, a metal or resin pipe. A ring-shaped casing top 23 is attached to the tip of the buried pipe 22. The ground here refers to a base on which the support 20 can be erected, and is a concept that includes not only the natural ground (natural ground) that forms a mountain, but also structures such as retaining walls. The buried pipe 22 is inserted and installed in a drilled hole 11 formed in the ground. In this embodiment, a steel pipe with a circular cross section is used as the buried pipe 22. The buried pipe 22 extends from the surface layer located on the surface side of the ground to a stable stratum (deep layer) that is a stable ground existing therebelow. The buried pipe 22 in the illustrated example is entirely buried in the ground, but the upper end may protrude above ground. In the buried pipe 22 of this embodiment, a plurality of through holes 21 are formed in the peripheral wall, and the filler 30 injected into the buried pipe 22 through the through holes 21 can be injected to the outside of the buried pipe 22, thereby filling the space between the drilled hole and the buried pipe 22 with the filler 30. The number of through holes 21 may be one or more. The cross-sectional shape of the through hole 21 can be set appropriately, for example, to a circular shape, a rectangular shape, or the like.

[0044] The support body 24 is a rod-shaped member, and is installed so that its lower part is inserted into the buried pipe 22 by a predetermined length and its upper part is exposed above ground. The support body 24 is made of a material with high rigidity so as to withstand the impact of falling rocks, etc., and in this embodiment, as shown in FIG. 4, is made of a steel pipe 25 having a circular cross section and an H-shaped steel 26 inserted into the steel pipe 25. The H-shaped steel 26 has a plate-shaped web portion 26A and a pair of flange portions 26B, 26C provided at both ends of the web portion 26A, and both sides of each of the flange portions 26B, 26C are joined to the inner surface of the steel pipe 25 by welding 38. In this embodiment, the steel pipe 25 and the H-shaped steel 26 are set to approximately the same length, and the entire length of the H-shaped steel 26 is inserted into the steel pipe 25, but the H-shaped steel 26 may be longer than the steel pipe 25, and the lower part of the H-shaped steel 26 may extend downward from the steel pipe 25. However, the support body 24 is not limited to this, and may be, for example, a hollow tube made of resin or metal, the inside of which is filled with a filler material such as concrete or rubber.

[0045] One or more holes 29 are formed on the outer circumferential surface on the ground side of the steel pipe 25. The holes 29 are provided in the ground side region of the pillar body 24 (hereinafter also referred to as the "upper region" of the pillar body 24) near the slope S. In the pillar structure 1 of this embodiment, a time-hardening filler 30 can be injected into the pillar body 24 through the holes 29. The outer diameter D1 of the buried pipe 22 can be, for example, 200 mm to 400 mm. In this embodiment, the difference between the inner diameter D1 of the buried pipe 22 and the outer diameter D2 of the pillar body 24 is set to be in the range of 20 mm to 40 mm. The thicknesses of the buried pipe 22 and the steel pipe 24 can each be, for example, in the range of 5 mm to 12 mm.

[0046] 2, a pair of protrusions 27 that come into contact with the upper edge of the buried pipe 22 is provided on the outer circumferential surface of the pillar body 24. The protrusions 27 come into contact with the upper edge of the buried pipe 22 when the pillar body 24 is installed, and determine the vertical position of the pillar body 24 relative to the buried pipe 22. The number and shape of the protrusions 27 are not limited to those shown in the example, and can be set appropriately. The protrusions 27 are preferably made of a material with high rigidity, such as steel or fiber-reinforced resin, and in this embodiment, the protrusions 27 are made of a steel plate welded to the steel pipe 25.

[0047] As shown in FIG. 5, in this embodiment, in the lower region of the support body 24, a filler 28 is disposed in a gap formed between the support body 24 and the buried pipe 22. The filler 28 is in the shape of an arc plate, and a plurality of fillers 28 are disposed at intervals in the circumferential direction of the support body 24 so as to be located at least on the slope mountain side and the slope valley side. Note that FIG. 2 omits the illustration of the filler 28. In the example shown in FIG. 5, four filler materials 28 having a fan shape in top view are provided at intervals in the circumferential direction, but the number is not limited to this, and it is sufficient that two or more filler materials are provided at the same height position at intervals in the circumferential direction. It is preferable that the filler material 28 is formed in a fan shape with a central angle of about 60 to 90 degrees.

[0048] The filler 28 can be made of a resin material such as fiber-reinforced resin, polyethylene, or hard urethane resin. In this embodiment, the filler 28 is made of a material that is lower in strength than the steel material constituting the column body 24 and higher in compressive strength than the filler 30. The filler 28 is disposed at a depth of 10 cm to 20 cm from the upper opening 22a of the buried pipe 22. Each filler 28 can be inserted from the upper opening 22a of the buried pipe 22 with the lower region of the column body 24 inserted into the buried pipe 22. It is preferable that the filler 28 is formed in a wedge shape with a cross-sectional area decreasing toward the lower side in the vertical cross section shown in FIG. 2 so that the filler 28 can be inserted and removed from the gap. By providing such a filler 28, the gap between the buried pipe 22 and the column body 24 can be filled, and the column body 24 can be prevented from moving radially in the buried pipe 22. In addition, when pulling out the pillar body 24 from the buried pipe 22, the filling material 28 can be pulled out from the upper opening 22a to create a gap, making it easier to pull out the pillar body 24 from the buried pipe 22.

[0049] The length of the lower region of the pillar body 24 that is inserted into the buried pipe 22 is set shorter than the overall length of the buried pipe 22, and the length of this lower region is preferably less than half the overall length of the buried pipe 22, and more preferably less than one-quarter of the overall length of the buried pipe 22.

[0050] The filler 30 is made of a material that hardens over time, and in this embodiment, it fills the bored hole 11 so as to fill the gap between the support body 24 and the buried pipe 22, and between the buried pipe 22 and the surrounding ground. The filler 30 has fluidity when injected into the bored hole 11, and then becomes a solid. For example, a cement-based grout material such as cement milk or mortar, or a resin-based grout material such as epoxy resin can be used as the filler 30. The filler 30 is preferably made of a material that is softer than the support body 24 and the filling material 28 in the hardened state, and can be, for example, a lean concrete that is mixed to reduce strength, or a grout material mainly made of bentonite. In this embodiment, bentonite is used as the filler 30. The compressive strength of the filler 30 after hardening is 20 N / mm 2 It is preferable that it is set to be smaller than

[0051] The frictional resistance reduction layer 42 reduces frictional resistance between members, and is installed adjacent to the inner peripheral surface 22b of the buried pipe 22, and extends from the upper opening 22a of the buried pipe 22 to at least the depth of the lower end edge 24a of the pillar body 24. The frictional resistance reduction layer 42 can be formed, for example, of a resin or metal sheet member or nonwoven fabric arranged in contact with the inner peripheral surface 22b of the buried pipe 22 in a non-bonded state. It is preferable that the sheet member forming the frictional resistance reduction layer 42 has at least a smooth surface that contacts the buried pipe 22. In addition, it is preferable that the sheet member forming the frictional resistance reduction layer 42 is a member having elasticity and / or cushioning properties, such as a foamed resin sheet or a rubber sheet. In this embodiment, a foamed resin sheet having a smooth plastic film laminated on the contact surface with the buried pipe 22 is used as the frictional resistance reduction layer 42. A lubricant such as grease may be further applied between the frictional resistance reduction layer 42 and the buried pipe 22. The grease is preferably applied to the entire outer circumferential surface of the frictional resistance reduction layer 42. By applying grease, the frictional resistance between the frictional resistance reduction layer 42 and the buried pipe 22 can be further reduced.

[0052] The location where the frictional resistance reduction layer 42 is installed is not limited to between the filler 30 and the buried pipe 22. For example, in addition to or instead of between the filler 30 and the buried pipe 22, the frictional resistance reduction layer 42 may be installed between the filler 30 and the pillar body 24, i.e., adjacent to the outer circumferential surface of the pillar body 24. In such a case, grease may be applied between the frictional resistance reduction layer 42 and the pillar body 24. In addition, in such a case, the filler 28 may be inserted between the frictional resistance reduction layer 42 and the buried pipe 22.

[0053] When the filler 30 is injected between the buried pipe 22 and the pillar body 24, as the filler 30 hardens, an adhesive force is generated between the filler 30 and the pillar body 24 or the buried pipe 22 that it comes into contact with. In this embodiment, by interposing the frictional resistance reducing layer 42, the filler 30 and the inner surface of the buried pipe 22 are in a non-adherent state, and the adhesive force between the pillar body 24 and the buried pipe 22 is reduced.

[0054] Next, the procedure for installing the support 20 will be described. First, the ground slope S is drilled, the buried pipe 22 is installed in the drilled hole 11, and the frictional resistance reducing layer 42 is formed on the inner peripheral surface 22a side of the buried pipe 22. The frictional resistance reducing layer 42 may be attached to the inner peripheral surface 22a of the buried pipe 22 on the ground before the buried pipe 22 is inserted into the drilled hole 11. The frictional resistance reducing layer 42 can be attached to the buried pipe 22 at the upper opening of the buried pipe 22 using adhesive tape, for example, to fix the position. The adhesive tape used can be removed after the filler 30 is injected and the frictional resistance reducing layer 42 is pressed against the buried pipe 22.

[0055] Then, the lower region of the support body 24 is inserted into the buried pipe 22. The downward movement of the support body 24 is restricted by the protrusions 27 on the outer periphery coming into contact with the upper edge of the buried pipe 22. As a result, the lower end of the support body 24 is suspended above the lower end of the buried pipe 22.

[0056] Next, a liquid filler 30 is injected between the buried pipe 22 and the support body 24, and between the buried pipe 22 and the drilled hole 11. In this embodiment, the filler 30 is injected into the support body 24 through the hole 29 of the support body 24. The filler 30 injected into the buried pipe 22 from the hole 29 through the support body 24 further flows out of the buried pipe 22 through the through hole 21 formed in the buried pipe 22 and is injected into the gap between the buried pipe 22 and the surrounding ground. The filler 30 can also be injected from the gap between the support body 24 and the buried pipe 22, or the gap between the buried pipe 22 and the drilled hole 11. The filler 30 is filled up to the top of the drilled hole 11. After that, the filler 30 hardens over time, fixing the buried pipe 22 and the support body 24, and the support 20 is completed.

[0057] In this way, in the pillar structure 1 of this embodiment, the buried pipe 22 and the pillar body 24 can be integrated on site to form a single pillar 20, and when constructing the protective fence 10, the buried pipe 22 and the pillar body 24 can be transported and brought into the installation site in a separated state, i.e., the pillar 20 can be disassembled into a short length, resulting in excellent workability during construction.

[0058] In addition, after installation, the space between the buried pipe 22 and the support body 24 of the support post 20 is filled with a hardened filling material 30, so that when the protective fence 10 is hit by a falling rock or the like, the support post 20 is strong enough to resist the impact in the direction in which the protective fence 10 falls.

[0059] In addition, since the gap between the pillar body 24 and the buried pipe 22 is filled with the filler material 28, even if a load is applied to the pillar body 24 due to falling rocks or the like and the filling material 30 is destroyed, the pillar body 24 can be prevented from tilting. Furthermore, in this embodiment, since the frictional resistance reducing layer 42 is made of an elastic material, when the pillar body 24 receives a load due to falling rocks or the like, the frictional resistance reducing layer 42 can absorb the load acting on the pillar, thereby improving the load-bearing performance of the pillar 20 when subjected to falling rocks or the like.

[0060] Next, a method for removing the pillar body 24 from the above-mentioned pillar 20 will be described. As shown in Fig. 6, when a pulling force is applied axially upward to the pillar body 24 using a pillar puller (not shown), the frictional resistance between the buried pipe 22 and the frictional resistance reduction layer 42 is reduced by the frictional resistance reduction layer 42, so that the pillar body 24, the surrounding filling material 30, and the frictional resistance reduction layer 42 can be easily pulled upward with a relatively small force while the buried pipe 22 remains in the ground.

[0061] In this way, the support body 24 is inserted and installed in the buried pipe 22 with a fixing force smaller than the fixing force between the buried pipe 22 buried in the ground and the surrounding ground, so that by applying a predetermined pulling force upward to the support body 24, it is possible to pull out the support body 24 from the buried pipe 22 while keeping the buried pipe 22 in the ground. Therefore, when the support body 24 is damaged, such as being bent, by falling rocks or collapsed earth and sand, it is possible to replace only the support body 24 out of the buried pipe 22 and the support body 24. The buried pipe 22 left in the ground can continue to be used even after the support body 24 is replaced. This makes it possible to significantly reduce the cost and construction period required for the replacement work of the support 20.

[0062] In particular, in this embodiment, the adhesion force between the pillar body 24 and the buried pipe 22 can be reduced by the simple configuration of providing a frictional resistance reduction layer 42 between the outer peripheral surface of the pillar body 24 and the buried pipe 22. As a result, the pillar body 24 and filling material 30 located inside the frictional resistance reduction layer 42 can be pulled out from the buried pipe 22 while keeping the buried pipe 22 underground, thereby facilitating the pulling-out operation.

[0063] Furthermore, since the frictional resistance reduction layer 42 is formed from an elastic material, when the pillar body 24 is subjected to a load due to falling rocks or the like while the pillar 20 is in an installed state, the frictional resistance reduction layer 42 can absorb the load acting on the pillar 20, making it possible to improve the load-bearing performance of the pillar 20 when subjected to falling rocks or the like while ensuring the ease of pulling out the pillar body 24.

[0064] Second Embodiment Fig. 7 is a cross-sectional view similar to Fig. 2, showing a second embodiment of the pillar structure 1. In Fig. 7, the same reference numerals are used for parts corresponding to those in the first embodiment. In the second embodiment described below, detailed description of the same configuration as in the first embodiment will be omitted.

[0065] The pillar structure 1 of this embodiment does not have a scuff resistance reducing layer 42, and the space between the buried pipe 22 and the pillar body 24 is filled with a filler 31 (hereinafter also referred to as the "first filler 31"). This filler 31 is a low-strength filler that has a low compressive strength per unit area in a hardened state, and the compressive strength is, for example, 0.1 N / mm 2 ~3.0N / mm 2 and more preferably in the range of 0.5N / mm 2 ~1.5N / mm 2 The range can be set to:

[0066] The insertion length of the pillar body 24 into the buried pipe 22 is set shorter than the entire length of the buried pipe, and in this embodiment, is set to less than half the entire length. In addition, the external filler 32 (hereinafter also referred to as "second filler 32") injected between the buried pipe 22 and the surrounding ground is set to have a compressive strength equal to or greater than that of the first filler 31, and in this embodiment, the same material is used to make the compressive strengths equal.

[0067] The filler 31 is composed of a hardened material containing a large number of bubbles. As such a filler 31, for example, a grout material containing air bubbles such as air mortar or air milk, aerated concrete, etc. can be used. In this embodiment, air mortar containing a large number of independent bubbles is used as the filler 31. The air amount per unit mass and the compressive strength of this filler 31 can be appropriately changed by changing the design mix of cement, aggregate, foaming agent, water, etc. For example, when the compressive strength of the second filler 32 is made larger than that of the first filler 31, the second filler 32 may be mixed more richly than the first filler 31. In addition, the filler 31 is not limited to a grout material containing a large number of bubbles, and may be, for example, a grout material mainly made of bentonite.

[0068] In the support structure 1 of this embodiment, the higher the compressive strength of the fillers 31 and 32, the higher the density and the higher the adhesion per unit area, and the larger the contact area, the higher the adhesion force, so that the adhesion force generated at the contact portion between the support body 24 and the first filler 31 is equal to or less than the adhesion force generated at the contact portion between the buried pipe 22 and the second filler 32 per unit area. In addition, by making the insertion length of the support body 24 into the buried pipe 24 shorter than the entire length of the buried pipe 22, the contact area between the outer circumferential surface of the support body 24 and the first filler 31 can be made sufficiently smaller than the contact area between the outer circumferential surface of the buried pipe 22 and the second filler 32. This makes it possible to make the fastening force between the support body 24 and the buried pipe 22 smaller than the fastening force between the buried pipe 22 and the surrounding ground.

[0069] The compressive strength of the first filler 31 filled between the buried pipe 22 and the support body 24 is 0.1 to 3 N / mm 2 and the compressive strength of normal concrete (20N / mm 2 Since this is set sufficiently smaller than the above), when a pulling force is applied to the pillar body 24, the first filler 31 can be destroyed with a relatively small force and the adhered state can be eliminated, thereby making it possible to easily pull out the pillar body from the buried pipe.

[0070] In addition, since the first filling material 31 contains many air bubbles in a hardened state, the first filling material 31 can be easily destroyed by, for example, forcibly applying continuous vibrations to the support body 24 and the first filling material 31 using a vibration applying device. This further reduces the pull-out resistance between the buried pipe 22 and the support body 24, and the support body 24 can be separated from the buried pipe 22 and easily pulled out from the buried pipe 22 as shown in FIG. 8.

[0071] It is also possible to apply the filler 31 of the second embodiment to the filler 30 of the first embodiment. In such a case, the pull-out force of the support body 24 against the buried pipe 22 can be made smaller in the first embodiment, making it possible to simplify the replacement work of the support body 24.

[0072] (Modification) FIG. 9 is a cross-sectional view similar to FIG. 2 showing a modified example of the support structure 1. In this support structure 1, the first filler 31 injected between the outer circumferential surface of the support body 24 and the inner circumferential surface of the buried pipe 22, and the second filler 32 injected between the buried pipe 22 and the surrounding ground are made of air mortar with different design mixes, and the first filler 31 is a low-strength filler set to have a lower compressive strength than the second filler 32. In addition, the filler 32 injected below the support body 24 in the buried pipe 22 is made of air mortar with the same design mix as the second filler 32. In the following description, the first filler 31 is also referred to as the low-strength filler 31, and the second filler 32 is also referred to as the high-strength filler 32.

[0073] In this modification, the low-strength filler 31 and the high-strength filler 32 can be injected in the following procedure. First, a ring-shaped partition member 49 is attached to the outer periphery of the lower end of the support body 24. This partition member 49 can be made of a material having sealing properties, such as an O-ring. Alternatively, the partition member 49 may be a metal ring-shaped protrusion integrated with the support body 24. The partition member 49 may be joined to the support body 24 in advance using an adhesive or the like, or may be attached in a non-adhesive state to the lower region of the support body 24, and then pushed down to the lower end of the support body 24 after the support body 24 is inserted into the buried pipe 22.

[0074] 9, with a partition member 49 attached to the lower end of the pillar body 24, high-strength filler 32 is injected through the hole 29 in the pillar body 24. The high-strength filler 32 is filled into the inside of the buried pipe 22 below the pillar body 24, the inside of the pillar body 24, and the gap between the buried pipe 22 and the surrounding ground. Meanwhile, the partition member 49 prevents the high-strength filler 32 from being filled into the gap between the outer circumferential surface of the pillar body 24 and the inner circumferential surface of the buried pipe 22, and this area is filled with low-strength filler 31 from the upper opening of the buried pipe 22.

[0075] As in this modification, by attaching a partition member 49 to the pillar body 24 and filling the area below the lower end of the pillar body 24 in the vertical direction inside the buried pipe 22 with a high-strength filler 32 and filling the area above it (the area where the pillar body 24 exists in the vertical direction) with a low-strength filler 31, it is possible to make the pillar body 24 easier to pull out while increasing the fastening strength of the buried pipe 32. Note that in the modification shown in FIG. 9, the low-strength filler 31 may be a liquid or gel-like lubricant such as grease. By using a lubricant as the low-strength filler 31, it is possible to further improve the ease of pulling out the pillar body 24.

[0076] 9, the low-strength filler 31 is filled only in the gap formed between the outer circumferential surface of the pillar body 24 and the inner circumferential surface of the buried pipe 22, but instead, the entire inside of the buried pipe 22 may be filled with the low-strength filler 31, and the gap between the buried pipe 22 and the surrounding ground may be filled with the high-strength filler 32. When using such a structure, the low-strength filler 31 and the high-strength filler 32 may be injected into the inside and outside of the buried pipe 22, respectively, without providing a through-hole 21 in the buried pipe 22.

[0077] (Third embodiment) Fig. 10 is a cross-sectional view similar to Fig. 2, showing a third embodiment of the pillar structure 1. In Fig. 10, the same reference numerals are used for parts corresponding to those in the first embodiment. In the third embodiment described below, detailed description of the same configuration as in the first embodiment will be omitted.

[0078] The pillar structure 1 of this embodiment is provided with a fixing member 44 between the upper opening of the buried pipe 22 and the pillar body 24, which detachably fixes the pillar body to the buried pipe 22. As in the second embodiment, the inside of the buried pipe 22 and the space between the buried pipe 22 and the surrounding ground are filled with a filler 31. The filler 31 may be the same as that in the second embodiment.

[0079] In this embodiment, the fixing member 44 includes a connecting pipe 46, a bolt 47, and a nut 48. The connecting pipe 46 is a pipe having an outer diameter larger than that of the buried pipe 22, and is installed so as to cover the lower end of the support body 24 on the aboveground side and the upper end of the buried pipe 22. The connecting pipe 46 is fixed to the support body 24 and the buried pipe 22 by a bolt 47 that penetrates the buried pipe 22 and the support body 24 inside the connecting pipe 46, and a nut 48 that is screwed onto the bolt 47, whereby the support body 24 and the buried pipe 22 are fixed and integrated.

[0080] In this way, by fixing the buried pipe 22 and the pillar body 24 with the fixing member 44, the strength of the pillar body 24 during use is increased, and the pillar body 24 can be prevented from tilting due to collision loads such as falling rocks.

[0081] Furthermore, when replacing the support body 24, the fixed state between the buried pipe 22 and the support body 24 by the fixing member 44 can be easily released by removing the bolt 47 and the nut 48.

[0082] In this embodiment, the space between the pillar body 24 and the buried pipe 22 can be filled with a liquid or gel non-hardening filler. For example, oil having anticorrosive properties can be used as such a non-hardening filler. In this case, the time-hardening filler 30, 31 used in the first or second embodiment can be used between the buried pipe 22 and the surrounding ground.

[0083] In this way, by fixing the pillar body 24 and the buried pipe 22 only with the fixing member 44, the pillar body 24 can be set free from the buried pipe 22 when the fixing member 44 is removed. This makes it possible to make the fastening force between the pillar body 24 and the buried pipe 22 smaller than the fastening force between the buried pipe 22 and the surrounding ground, and to easily pull out the pillar body 24.

[0084] The present invention is not limited to the above-described embodiment, and various modifications are possible without departing from the spirit of the invention.

[0085] For example, in each embodiment, the time-hardening filler injected between the buried pipe 22 and the support body 24 may be made of an elastic material. For example, urethane resin, silicone resin, etc. can be used as such a filler. By using such a filler, when the support body 24 receives an impact load, the impact energy can be absorbed by the filler. In such a case, it is preferable that the filler (external filler) injected between the buried pipe 22 and the surrounding ground is a filler (e.g., mortar, etc.) that is inelastic in a hardened state. [Explanation of symbols]

[0086] 10 Protective fence 12. Net 20 pillars 22 Buried Pipes 24 Pillar body 25 Steel pipe 26 H-beam 30,31 Filler 42 Friction resistance reduction layer 44 Fixing member

Claims

1. A support structure comprising buried pipes which are installed at a predetermined interval and buried in the ground for tensioning a protective net, a support body which is installed so that its lower portion is inserted into the buried pipe by a predetermined length and its upper portion is exposed above ground, and a filler material injected between the buried pipe and the support body, An external filler is injected between the buried pipe and the surrounding ground, has a compressive strength higher than that of the filler, and is made of a mortar that is inelastic in a hardened state; The support body is inserted into the buried pipe so that the adhesive force between the support body and the buried pipe is smaller than the adhesive force between the buried pipe and the surrounding ground; The filler has a time-hardening property and has a compressive strength in the axial direction of the support column when hardened in the range of 0.1 N / mm 2 to 1.5 N / mm 2 ; A guardrail support structure, characterized in that the support body is detachably fixed to the buried pipe by a fixing member connected by a bolt and nut.

2. The pillar structure described in claim 1, characterized in that it is provided with a frictional resistance reduction layer between the filler material and the buried pipe and / or between the filler material and the pillar body, which reduces frictional resistance between components.

3. 3. The support structure according to claim 1, wherein the filling material contains a large number of air bubbles in a hardened state.

4. The support structure according to any one of claims 1 to 3, characterized in that the filling material has elasticity in a hardened state.

5. 5. The support structure according to claim 1, wherein the insertion length of the support body into the buried pipe is shorter than the overall length of the buried pipe.

Citation Information

Patent Citations

  • High frequency starting device

    JP1981028459A

  • Method of constructing underground culvert

    JP1994050466A

  • Outdoor hollow post and its installation

    JP1994173504A

  • Impact absorbing stake and construction method thereof

    JP1997203036A

  • Fallen object preventing pile installation structure and fallen object preventing pile

    JP1999303024A