Electric vehicles and operation methods

The electric vehicle, equipped with a power storage and control unit, addresses the limitations of existing technologies by providing flexible use as a school bus and power supplier, optimizing power usage and reducing costs through predicted consumption and surplus management.

JP7558802B2Active Publication Date: 2024-10-01KYUSHU ELECTRIC POWER CO INC +1
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2020218786
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-12-28
Publication Date
2024-10-01
Estimated Expiration
2040-12-28

AI Technical Summary

Technical Problem

Existing technologies focus on school buses for commuting to school but do not utilize them for other purposes, and charging and discharging systems restrict the use of electric vehicles to specific locations like apartment complexes, making it difficult to adapt school buses for diverse functions.

Method used

An electric vehicle equipped with a power storage unit and control unit that supplies stored power to school and off-campus facilities, optimizing power usage based on predicted consumption and surplus periods, allowing flexible operation as a bus or power supplier.

Benefits of technology

Enables the school bus to provide transportation and power supply services to school and off-campus facilities, managing power demand and surplus, and reducing electricity costs by utilizing off-peak power storage and supply.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007558802000001
    Figure 0007558802000001
  • Figure 0007558802000002
    Figure 0007558802000002
  • Figure 0007558802000003
    Figure 0007558802000003
Patent Text Reader

Abstract

To propose an electric vehicle or the like suitable for new use of a school bus.SOLUTION: A school bus 7 is a school bus for learners who use school facilities 9, and is an electric vehicle. The school bus 7 includes a power storage unit 33 for storing electric power and a control unit 29. Off-campus facilities 11 are facilities used by the learners for learning. Under the control of the control unit 29, the power storage unit 33 supplies the stored electric power to the off-campus facilities 11 to suppress increase in electric power charge of the off-campus facilities 11. In addition, the school bus 7 may be used as a measure against surplus electric power or may be operated as a regional bus.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an electric vehicle and an operation method thereof, and in particular to an electric vehicle used as a school bus for students who use school facilities. [Background technology]

[0002] A school bus is a bus operated for the purpose of carrying children, pupils, students and others to and from kindergarten or school. For example, schools and local governments operate them as private buses, or outsource them to bus companies or taxi companies to operate them as designated buses. Patent Document 1 proposes improving services such as using school buses to commute to school.

[0003] Furthermore, as described in Patent Documents 2 and 3, it is described that an electric vehicle is charged and discharged between an apartment building and the like. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent No. 4351919 [Patent Document 2] Patent No. 6202674 [Patent Document 3] JP 2012-135152 A Summary of the Invention [Problem to be solved by the invention]

[0005] However, Patent Document 1 focuses on the use of school buses for commuting to school, etc., and does not address their use at other times.

[0006] In addition, Patent Documents 2 and 3 restrict the use of the bus by residents when charging and discharging between apartment complexes, etc. School buses have fixed purposes, and it is difficult to restrict their use according to those purposes.

[0007] Therefore, an object of the present invention is to propose an electric vehicle or the like that is suitable for new uses for school buses. [Means for solving the problem]

[0008] A first aspect of the present invention is an electric vehicle used as a school bus for students who use school facilities, and is equipped with a storage unit that stores electricity and a control unit, and the control unit supplies the electricity stored in the storage unit to the school facility and also to an off-campus facility different from the school facility.

[0009] A second aspect of the present invention is the electric vehicle of the first aspect, wherein the off-campus facility is used by the learner during his / her learning activities, and the control unit supplies the electricity stored in the storage unit to the off-campus facility where the learner is engaged in learning activities using the off-campus facility.

[0010] A third aspect of the present invention is an electric vehicle of the first or second aspect, wherein the control unit stores electricity in the storage unit by utilizing the off-campus facility to an extent that the predicted electricity cost value of the off-campus facility does not increase relative to a predicted electricity cost value based on the predicted power consumption of the off-campus facility, and / or supplies the electricity stored in the storage unit to the off-campus facility so that the predicted electricity cost value of the off-campus facility does not increase.

[0011] A fourth aspect of the present invention is an electric vehicle of the first or second aspect, wherein the control unit stores power in the storage unit by utilizing the off-campus facility to the extent that predicted power consumption at the off-campus facility does not exceed a target power consumption, and / or supplies power from the storage unit to the off-campus facility such that predicted power consumption at the off-campus facility does not exceed the target power consumption.

[0012] A fifth aspect of the present invention is an electric vehicle of any of the first to fourth aspects, wherein the control unit stores electricity from the grid in the storage unit by utilizing the school facilities and / or the off-campus facilities during a time period when surplus electricity is predicted to occur in the grid.

[0013] A sixth aspect of the present invention is an electric vehicle according to any one of the first to fifth aspects, which is operated as a local bus during at least a portion of the time periods when it is predicted that the learner will not be traveling by electric vehicle.

[0014] A seventh aspect of the present invention is a method for operating an electric vehicle used as a school bus for students who use a school facility, the electric vehicle having a storage unit that stores electricity and a control unit, and including a supply step in which the control unit supplies the electricity stored in the storage unit to the school facility and also to an off-campus facility different from the school facility.

[0015] An eighth aspect of the present invention is a driving method according to the seventh aspect, comprising a schedule determination step in which a schedule determination unit provided in a driving system uses the learner's study timetable to identify a time period during which the learner will engage in learning activities using the off-campus facility, and determines a time period during which the electric vehicle will supply power to the off-campus facility, and in the supply step, the control unit supplies the power stored in the storage unit to the off-campus facility during which the learner is engaging in learning activities using the off-campus facility, using the time period determined by the schedule determination unit.

[0016] The present invention may be understood as an operation plan server including a schedule determination unit for determining a time period for storing electricity in a power storage unit and a time period for supplying electricity from the power storage unit. The present invention may also be understood as a program for realizing each aspect of the present invention in a computer, or as a computer-readable recording medium for recording the program. Effect of the Invention

[0017] According to each aspect of the present invention, a school bus is used as an electric vehicle, and stored electricity is supplied to school facilities and off-campus facilities. For example, a school bus can provide students with a transportation service as well as an electricity supply service. Here, school facilities and off-campus facilities can be distinguished, for example, by the unit of electricity contract. For example, the contracting entity for electricity contracts for off-campus facilities may be different from the operating entity that operates the school.

[0018] Furthermore, the present invention can also be used as a measure to deal with surplus power when the power supply is greater than the power demand. Also, the present invention may be used as a local bus during the hours when it is not used as a school bus. [Brief description of the drawings]

[0019] [Figure 1] 1 is a block diagram showing an example of a configuration of a travel system 1 according to an embodiment of the present invention. [Diagram 2] 2 is a flow diagram showing an example of the operation of the transportation system 1 of FIG. [Diagram 3] FIG. 2 is a diagram showing an example of an operation schedule determined by the operation system 1 of FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0020] Hereinafter, an embodiment of the present invention will be described with reference to the drawings, however, the present invention is not limited to the embodiment. EXAMPLES

[0021] 1 is a block diagram showing an example of the configuration of a transportation system 1 according to an embodiment of the present invention. An example of the configuration of the transportation system 1 will be described with reference to FIG.

[0022] The operation system 1 includes an operation planning server 3, a local bus operation server 5, a school bus 7 (an example of an "electric vehicle" of the present invention), school facilities 9 (an example of a "school facility" of the present invention), a school server 10, off-campus facilities 11 (an example of an "off-campus facility" of the present invention), an off-campus server 12, and a power server 13.

[0023] The operation plan server 3 includes an operation plan communication unit 15, a time period analysis unit 17, a power analysis unit 19, and a schedule determination unit 21.

[0024] The regional bus operation server 5 includes a regional bus communication unit 23 and a regional bus operation decision unit 25 .

[0025] The school bus 7 includes a bus communication unit 27, a control unit 29 (an example of the “control unit” of the present invention), a schedule memory unit 31, a power storage unit 33 (an example of the “power storage unit” of the present invention), a drive unit 35, and a vehicle body connection unit 37.

[0026] The school facility 9 includes a school load unit 39, a school connection unit 41, and a school charge / discharge unit 43. The school server 10 includes a school communication unit 45, a school information storage unit 47, and a school power storage unit 49.

[0027] The off-campus facility 11 includes an off-campus load unit 51, an off-campus connection unit 53, and an off-campus charge / discharge unit 55. The off-campus server 12 includes an off-campus communication unit 57 and an off-campus power storage unit 59.

[0028] The power server 13 includes a power communication unit 61 and a supply and demand analysis unit 63 .

[0029] School facilities 9 are, for example, facilities used as the core of education in schools (elementary schools, junior high schools, etc.), kindergartens, nurseries, etc. under Article 1 of the School Education Act. Off-campus facilities 11 are buildings and equipment different from school facilities 9, and are used by students who use school facilities 9 in their learning activities. For example, a hall in a civic cultural center used for singing recitals at elementary schools. School facilities 9 and off-campus facilities 11 can be distinguished in that, for example, the school facility 9 is contracted for electricity by the school's operating body, while the off-campus facility 11 is contracted for electricity by someone other than the operating body.

[0030] School facilities 9 and off-campus facilities 11 are supplied with electricity from a grid managed by a power company, and the contracted power is set. For example, if an actual metered contract method is adopted and the contracted power is set based on the maximum power demand for each month of the year, if the power demand is extremely high in one month, the charges will be set based on the contracted power for the peak month for the rest of the year, even if the power demand is low. For this reason, it is desirable to use power at an average level throughout the year.

[0031] The school bus 7 is an electric vehicle operated for the purpose of transporting students who use the school facilities 9 to and from school (to and from school, etc.).

[0032] Fig. 2 is a flow diagram showing an example of the operation of the operation system 1 of Fig. 1. With reference to Fig. 2, an example of the operation of the operation system 1 of Fig. 1 will be described.

[0033] In the school server 10, the school information storage unit 47 stores timetable data indicating a timetable of lessons created by a teacher (step ST1). Here, the timetable includes information specifying the time period during which lessons are held, information indicating whether the lessons are held on or off campus, and information indicating the location of the lessons off campus and whether a school bus will be used for transportation.

[0034] The school communication unit 45 transmits the timetable data to the operation plan server 3. The time period analysis unit 17 uses the timetable data to identify the school arrival time period when the school bus is used and the school home time period when the school bus is used. In addition, if the school bus is used for a class held outside the school, the time period analysis unit 17 identifies the school activity transportation time period to be used for the transportation. The other time periods are regarded as the first standby time periods (step ST2). Note that the first standby time periods may be regarded as, for example, the time periods during which the school bus 7 can connect to the on-campus charging / discharging unit 43 in the school facility 9 and / or the off-campus charging / discharging unit 55 in the off-campus facility 11.

[0035] The power analysis unit 19 analyzes the power consumption due to the learning activities of the learners in the timetable data (step ST3). For example, if a similar learning activity was performed last year, the power consumption can be predicted by using this. If it is the first learning activity, the power consumption can be predicted by using the power consumption due to a similar learning activity. If there is no similar learning activity, the value set in the operation plan server 3 can be used.

[0036] In the school server 10, the school power storage unit 49 stores the contract power of the school facility 9. The operation plan communication unit 15 requests the school communication unit 45 to collect the contract conditions and normal power usage state of the school facility 9 stored in the school power storage unit 49 (step ST4). In the off-campus server 12, the off-campus power storage unit 59 stores the contract power of the off-campus facility 11. The operation plan communication unit 15 determines whether the timetable data includes the use of the off-campus facility 11 (step ST5), and if it does, requests the off-campus communication unit 57 to collect the contract conditions and normal power usage state of the school facility 9 stored in the off-campus power storage unit 59 (step ST6), and proceeds to step ST7. If it does not include it, proceeds to step ST7.

[0037] In addition, some or all of the components of the school server 10 and the off-campus server 12 may be realized by, for example, a meter that measures power consumption. Also, if previously collected information can be used as is, that information may be used.

[0038] In step ST7, the schedule determination unit 21 judges whether the electricity charges for the school facilities 9 and off-campus facilities 11 where lessons are held during each time period will be high based on the power consumption during each time period analyzed by the power analysis unit 19, and judges whether power should be supplied from the school bus. If power is to be supplied from the school bus, the power supply time period during which power is to be supplied is determined (step ST8), and the process proceeds to step ST9. If power is not to be supplied from the school bus, the process proceeds to step ST9. For example, if there is a time period during which the power consumption during lessons is predicted to exceed the contracted power, power is supplied from the school bus so that the contracted power of the facility is not exceeded. For example, when the actual metered contract method is adopted and the contracted power is determined based on the maximum demand power for each month of the year, the target power consumption is determined using the maximum demand power, and if the target power consumption is predicted to be exceeded, power is supplied from the power storage unit 33 to the school facilities 9 and / or off-campus facilities 11.

[0039] The power server 13 is usually managed by a power company that manages the grid and supplies power. In the power server 13, the supply and demand analysis unit 63 predicts the amount of power supply and the amount of power demand, and analyzes the time periods when the balance between supply and demand can be controlled and the time periods when it cannot.

[0040] In step ST9, the operation plan communication unit 15 requests the power communication unit 61 to collect surplus time zone data that identifies surplus time zones during which it is difficult to adjust the power supply amount and the power demand is low compared to the power supply amount, resulting in surplus power.

[0041] The schedule determination unit 21 judges whether or not there is a surplus power time period in the first standby time period of the school bus 7 (step ST10). If the first standby time period and the surplus power time period overlap, the schedule determination unit 21 identifies the overlapping time period as a surplus power storage time period in which a portion of the surplus power is stored (step ST11), and proceeds to step ST12. If they do not overlap, the schedule determination unit 21 proceeds to step ST12.

[0042] In step ST12, the operation plan communication unit 15 transmits information to the regional bus operation server 5 to identify the second standby time period, which is the first standby time period excluding the power supply time period and the surplus power storage time period. The regional bus operation server 5 is a server managed by the operating entity that operates the regional bus. The regional bus operation determination unit 25 determines the regional bus time period to be used as a regional bus during the second standby time period. The regional bus operation determination unit 25 determines an operation plan, such as the route to be operated during the regional bus time period (step ST13). The regional bus communication unit 23 transmits information to the operation plan server 3 to identify the regional bus time period.

[0043] Here, a local bus is a bus operated to secure a means of transportation for local residents. For example, a community bus (see the Guidelines for the Introduction of Community Buses) is one such bus, and is usually operated as a public transportation service to supplement conventional route buses.

[0044] The schedule determination unit 21 determines a time period excluding the local bus time period from the second standby time period as a third standby time period. The power analysis unit 19 analyzes the power consumed and charged by the school bus during the school commute time period, the school commute time period, the school activity transportation time period, the power supply time period, the surplus power storage time period, and the local bus time period. The schedule determination unit 21 uses the analysis result of the power usage to identify a standby power storage time period during the third standby time period during which the power storage unit 33 of the school bus is charged (step ST14).

[0045] The schedule determination unit 21 provisionally determines a schedule for each time period, including, for example, the allocation of personnel, and determines a provisional operation schedule (step ST15).

[0046] The schedule determination unit 21 judges whether or not there is a request from the teachers to revise the schedule (step ST16). If there is a request, the tentative operation schedule is adjusted (step ST17) and the process proceeds to step ST18. If there is no request, the process proceeds to step ST18. In step ST18, it is judged whether or not the time to be finally determined has arrived, and if the time to be finally determined has not arrived, the process returns to step ST16. If the time to be finally determined has arrived, the tentative operation schedule is determined as the operation schedule (step ST19). The schedule determination unit 21 specifies a time period related to charging and discharging the power storage unit 33 in the operation schedule, and sets the time period as the charging and discharging schedule. The operation plan communication unit 15 transmits the charging and discharging schedule to the school bus (step ST20).

[0047] In step ST21, the bus communication unit 27 of the school bus 7 stores the received charge / discharge schedule in the schedule storage unit 31.

[0048] The control unit 29 follows the instructions of the driver of the school bus 7 and uses the electricity stored in the power storage unit 33 to move the school bus 7 using the driving unit 35, thereby causing the school bus 7 to function as a bus.

[0049] When the school bus 7 arrives at the school facility 9, it connects the vehicle body connection unit 37 to the on-campus connection unit 41 of the school facility 9. The connection may be wired or wireless. The control unit 29 uses the on-campus charging / discharging unit 43 to supply the power stored in the power storage unit 33 to the on-campus load unit 39 of the school facility 9 according to a charging / discharging schedule, or receives power from the grid to charge the power storage unit 33.

[0050] Similarly, when the school bus 7 arrives at the off-campus facility 11, it connects the vehicle connection unit 37 to the off-campus connection unit 53 of the off-campus facility 11. The connection may be wired or wireless. The control unit 29 uses the off-campus charging / discharging unit 55 to supply the power stored in the power storage unit 33 to the off-campus load unit 51 of the off-campus facility 11 according to a charging / discharging schedule, or receives power from the grid to charge the power storage unit 33.

[0051] If the travel takes a long time and the charge / discharge process cannot be performed according to the charge / discharge schedule, the control unit 29 responds by changing the time period or the amount of charge / discharge, for example.

[0052] FIG. 3 is a diagram showing an example of an operation schedule determined by the operation system 1 of FIG.

[0053] FIG. 3(a) is an example of timetable data stored in the school information storage unit 47. The time period during which the learning activity takes place and whether the learning activity takes place in a school facility 9 (on-campus, symbols 101, 103, 105, 107, 109) or in an off-campus facility 11 (off-campus, symbol 111) are specified. If the learning activity takes place off-campus, whether or not a school bus will be used and the location of the off-campus facility 11 are specified. In FIG. 3(a), the off-campus activity is a club activity, and students who do not belong to a specific club go home before the club activity. Students participating in the club activity travel to the off-campus facility 11 using a school bus 7.

[0054] 3(b) is an example of time periods analyzed by the time period analysis unit 17. A school commuting time period 113, a school commuting time period 115, and travel time periods 117 and 119 to and from off-campus facilities 11 are added. The other time periods 121, 123, 125, and 127 are first waiting time periods.

[0055] 3(c) is an example of a travel time period during which the school bus 7 is moving. The school commuting time period 129 is defined as the travel time period 129. Since the school commuting time period 115 and the travel time period 117 are consecutive travel times, they are collectively defined as the travel time period 131. The travel time period 119 is defined as the travel time period 133.

[0056] FIG. 3(d) is an example of a time period during which the school bus 7 charges and discharges between the school facility 9 and the off-campus facility 11. The schedule determination unit 21 uses the analysis of power consumption by the power analysis unit 19 to identify a supply time period during which power is supplied from the school bus 7 to the school facility 9 and the off-campus facility 11. Since the air conditioning is temporarily operated at high power immediately after arriving at school, and a risk of exceeding the contracted power of the school facility 9 is predicted, power is supplied to the school facility 9 during a time period 135 (supply time period 135). Furthermore, since a lot of power is used in learning activities during an off-campus activity time period 111, and a risk of exceeding the contracted power of the off-campus facility 11 during this time period is predicted, power is supplied to the school facility 9 during the time period 111 (supply time period 137). Furthermore, it is assumed that a time period during which there is a risk of surplus power being generated from the power server 13 is a standby time period in the school facility 9. In this case, it is confirmed that the power consumption of the school facility 9 is less than the contracted power, and this time period is determined as a surplus power charging time period 139 during which the surplus power is charged to the power storage unit 33.

[0057] Fig. 3(e) shows the time period during which the school bus 7 operates as a local bus. The operation plan server 3 transmits data specifying the waiting time period of Fig. 3(d) to the local bus operation server 5. The local bus operation server 5 determines the time period 141 during which the local bus operates during the waiting time period and the operation plan for the local bus. The local bus communication unit 23 transmits the time period 141 during which the local bus operates and the operation plan to the operation plan server 3.

[0058] 3(f) shows the time period for charging in advance, taking into consideration the amount of power used in a day. The power analysis unit 19 uses the local bus operation plan to analyze the power consumption during the time period 141 when the local bus is in operation. The schedule determination unit 21 determines the amount of charging to be performed in advance, and determines the charging time period 143.

[0059] Fig. 3(g) shows an example of a charge / discharge schedule. The schedule determination unit 21 extracts the time periods for charging and discharging from Fig. 3(f) to create a charge / discharge schedule. The operation plan communication unit 15 transmits the charge / discharge schedule to the school bus 7. The control unit 29 of the school bus 7 charges and discharges the power storage unit 33 in accordance with the charge / discharge schedule.

[0060] The surplus power may be charged when the school bus 7 is connected to the school facility 9, or when the school bus 7 is connected to the off-campus facility 11.

[0061] Conventionally, for example, when a local gymnasium is used for learning activities, if a lot of electricity is used for learning activities, the local gymnasium needs to increase the annual contracted amount of electricity in anticipation of this. This can result in extra costs for parts that are not needed for normal electricity use. According to the present invention, focusing on the fact that school buses travel with learners, the school (school bus) can provide electricity used by learners in conjunction with the movement of learners. Therefore, local gymnasiums and the like do not need to increase the contracted amount of electricity due to short-term increases in electricity consumption caused by learners' use. The amount of charging and discharging between school facilities and / or off-campus facilities may be determined based on instantaneous power or the amount of electricity for a specified period, for example, in accordance with the power contract of the school facilities and / or off-campus facilities.

[0062] Off-campus facilities used for learning activities are often managed by public institutions, and are highly likely to be used as evacuation shelters in the event of a disaster. The present invention makes it easier to supply power to off-campus facilities from the outside, making it easier to respond to power outages in the event of a disaster. Power may also be supplied to school facilities from a school bus (see supply time period 135 in FIG. 3). Recently, for example, air conditioning facilities have been installed in school facilities, and power consumption tends to be high in summer and winter and low in spring and autumn. In this case, the contracted power of the school facility is adjusted to match the peak. By supplying power to the school facility from a school bus during peak hours, the amount of power supplied from the grid to the school facility during peak hours can be reduced, and fluctuations in the amount of power used can be suppressed, making the contracted power amount the necessary amount.

[0063] In addition, school buses are used less frequently during summer vacations. On the other hand, there is a high possibility of surplus electricity being generated due to an increase in the supply of electricity, such as solar power generation, whose output cannot be controlled by power companies. In the present invention, the surplus electricity can be stored in school buses to deal with the surplus electricity.

[0064] In this way, introducing the school bus of the present invention brings great benefits to both school facilities and off-campus facilities. [Explanation of symbols]

[0065] 1 Operation system, 3 Operation plan server, 5 Regional bus operation server, 7 School bus, 9 School facility, 10 School server, 11 Off-campus facility, 12 Off-campus server, 13 Power server, 15 Operation plan communication unit, 17 Time period analysis unit, 19 Power analysis unit, 21 Schedule determination unit, 23 Regional bus communication unit, 25 Regional bus operation determination unit, 27 Bus communication unit, 29 Control unit, 31 Schedule memory unit, 33 Power storage unit, 35 Driving unit, 37 Vehicle body connection unit, 39 School load unit, 41 School connection unit, 43 School charging / discharging unit, 45 School communication unit, 47 School information memory unit, 49 School power memory unit, 51 Off-campus load unit, 53 Off-campus connection unit, 55 Off-campus charging / discharging unit, 57 Off-campus communication unit, 59 Off-campus power memory unit, 61 Power communication unit, 63 Supply and demand analysis division, 101, 103, 105, 107, 109 Time periods when learning activities are conducted at school facilities, 111 Time periods when learning activities are conducted at off-campus facilities, 113 School commuting hours, 115 School commuting hours, 117, 119, 129, 131, 133, 145 Travel hours, 121, 123, 125, 127 First standby hours, 135, 137 Supply hours, 139 Surplus power charging hours, 141 Local bus operating hours, 143 Charging hours

Claims

1. A method for operating an electric vehicle used as a school bus for students using school facilities, comprising: the electric vehicle includes a power storage unit that stores electric power and a control unit that supplies the electric power stored in the power storage unit to the school facility; a schedule determination step in which a schedule determination unit of the operation system uses a study timetable of the learner to identify a time period during which the learner will engage in a study activity using an off-campus facility different from the school facility, and determines a time period during which the electric vehicle will supply power to the off-campus facility; a supply step in which the control unit supplies the power stored in the power storage unit to the off-campus facility; In the supply step, the control unit uses the time period determined by the schedule determination unit to supply the electricity stored in the storage unit to the off-campus facility where the learner is engaged in learning activities using the off-campus facility.

2. The operation method described in claim 1, wherein the control unit stores electricity in the storage unit by utilizing the off-campus facility to a degree that does not cause the predicted electricity cost value of the off-campus facility to increase relative to the predicted electricity cost value based on the predicted power consumption of the off-campus facility, and / or supplies the electricity stored in the storage unit to the off-campus facility so that the predicted electricity cost value of the off-campus facility does not increase.

3. The method of operation described in claim 1, wherein the control unit stores electricity in the storage unit by utilizing the off-campus facility to the extent that the predicted power consumption at the off-campus facility does not exceed the target power consumption, and / or supplies electricity from the storage unit to the off-campus facility so that the predicted power consumption at the off-campus facility does not exceed the target power consumption.

4. The method of operation described in any one of claims 1 to 3, wherein the control unit stores electricity from the grid in the storage unit by using the school facilities and / or the off-campus facilities during a time period when surplus electricity is predicted to occur in the grid.

5. An operation method described in any of claims 1 to 4, wherein the electric vehicle is operated as a local bus during at least some of the time periods when it is predicted that the learner will not be traveling by electric vehicle.

6. A system for operating an electric vehicle used as a school bus for students using school facilities, The operation system includes an operation plan server having a schedule determination unit, the electric vehicle includes a power storage unit that stores electric power and a control unit that supplies the electric power stored in the power storage unit to the school facility; the schedule determination unit uses a study timetable of the learner to identify a time period during which the learner will engage in a study activity using an off-campus facility different from the school facility, and determines a time period during which the electric vehicle will supply power to the off-campus facility; The control unit supplies the power stored in the power storage unit to the off-campus facility, An operation system in which the control unit utilizes the time period determined by the schedule determination unit to supply the electricity stored in the storage unit to the off-campus facility where the learner is engaged in learning activities using the off-campus facility.

Citation Information

Patent Citations

  • Photo-interrupter

    JP1987002674A

  • System for controlling charging / discharging to electric vehicle in parking

    JP2012135152A

  • Power supply system for collective housing

    JP2012239260A

  • Traveling means arrangement system

    JP2017167942A

  • Send-off bus management device, pick-up management device, send-off bus management method, and pick-up management method

    JP4351919B2