Production lines, trolleys and processing methods
The trolley-based production line with dustproof compartments and pressurized transport ensures efficient dust prevention and optimized path selection, addressing the challenge of flexible production line dust accumulation during painting steps, thereby enhancing productivity.
Patent Information
- Application Number
- JP2023531557
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-01-12
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2041-01-12
AI Technical Summary
In flexible production lines where workpieces can take different paths, ensuring dust-proofing during transportation between workstations, especially when painting steps are involved, is challenging due to the size of the workpieces and varying paint finishes, which can lead to dust accumulation.
A production line with non-adjacent workstations uses a trolley with a dustproof compartment and pressurized environment to transport workpieces, equipped with a slidable door and independent casters for maneuverability, and an RFID reader to optimize path selection based on workpiece schedules.
This setup minimizes dust ingress, reduces workstation idle time, and maximizes productivity by allowing flexible path selection and simultaneous loading/unloading, enhancing the efficiency of the production process.
Smart Images

Figure 0007559241000001 
Figure 0007559241000002 
Figure 0007559241000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a production line and method for converting workpieces into finished products, and to a trolley for use in the production line or method. [Background technology]
[0002] Since the introduction of the assembly line, for cost-effective mass production, the paradigm has been for workpieces to undergo identical processing steps by being transported from one workstation, where one processing step is performed, to the next workstation, where the next processing step is performed, thus applying identical processing steps to all workpieces and producing an identical finished product at the last one of the workstations. Ideally, such workstations are adjacent to each other so that a workpiece can be processed at one workstation and then sent to the next with minimal time loss.
[0003] Computer control allows for more flexible production schemes in which workpieces can be transported along different paths between workstations, thus allowing the workpieces to bypass workstations where that processing step is not required for that particular workpiece. However, when at least one of the processing steps is a painting step, problems arise, since it must be ensured that the workpieces do not collect dust along the path along which they are transported, both before and after the painting step, while the paint has not yet fully dried or cured, even if that path is used infrequently.
[0004] This problem is particularly relevant when the workpiece is a car body, because, on the one hand, its size makes it difficult to cover all possible paths, and, on the other hand, the increasing demand for individual designs, e.g. different types of colors or finishes in different areas of the car body, increases the number of processing steps that may be required to finish the car body.
[0005] It is therefore an object of the present invention to ensure dust protection of workpieces between workstations, even when the path from one workstation to the next may change from one workpiece to another, and even when such paths cross one another. Summary of the Invention
[0006] According to a first aspect of the invention, this object is achieved by a production line for processing workpieces in successive steps, comprising a plurality of workstations, each of the plurality of workstations adapted to perform an associated one of said steps therein, and transport means for transporting the workpiece from one of said workstations to a next, at least a last one of said steps being a step of painting the workpiece, at least two workstations associated with steps which immediately follow one another in the processing of the workpiece are not adjacent to each other, and the transport means comprises a trolley for transporting the workpiece from a first to a second of said at least two workstations, the trolley comprising a dust-proof compartment for receiving the workpiece.
[0007] In order to protect the workpieces while they are being transported between the trolley and the workstations, the compartment should have at least one port adapted to be coupled in a dust-proof manner to mating ports of the first and second workstations.
[0008] When the trolley comprises means for pressurising the compartment, the ingress of dust into the compartment can be prevented even if the compartment is not hermetically sealed, as air escaping through gaps in the compartment prevents dust from entering through these gaps or through at least one port.
[0009] The trolley and / or workstation ports preferably include slidable doors that can be opened after the trolley and workstation ports are placed in mating relationship, so that ingress of dust through gaps between the ports can be minimized or prevented entirely by a slight positive pressure within the compartment and / or workstation.
[0010] The door should comprise a flexible sheet: by displacing the sheet continuously around the edge of the compartment from the face side facing the workstation to, for example, the side wall or roof of the compartment, the slidable door can fill almost the entire face side and still be able to open without increasing the dimensions of the trolley.
[0011] To facilitate the loading and unloading of the workpieces, the trolley can be provided with a rail section for displaceably supporting the workpieces, which when coupled to the rails of the workstation, can easily and smoothly transport the workpieces along the rails and rail section.
[0012] In a production line, more than two workstations should have ports where workpieces can be transferred to or received from the trolley. Thus, the trolley can pick up a workpiece at the port of one workstation and choose the workstation to which the workpiece should be sent, or collect workpieces from several workstations and send these to the same target workstation.
[0013] The plurality of workstations to which workpieces can be sent or collected may be a subset of the workstations all associated with the same one of the method steps. By providing such workstations in a number proportional to the time required to perform the associated method step, workstation idle time can be minimized and productivity can be maximized.
[0014] Productivity is further improved when the trolley, in its unloading state, is adapted to identify a subset of workstations that have completed or are about to complete a first method step associated therewith, navigate to said workstations, and load a workpiece thereto after said first method step has been completed thereon.
[0015] Similarly, the trolley, when loaded, may be adapted to identify a next method step to be performed on a workpiece, identify a next workstation associated with said next method step, and drive the workpiece to said next workstation.
[0016] Preferably, the trolley is adapted to select as the next workstation, from the subset of workstations associated with the next method step, a workstation that is free or that is about to finish processing another workpiece, so that the workpiece carried by the trolley can be removed therefrom with minimal waiting time.
[0017] In order to minimize the idle time of a workstation, the workstation should have at least two ports to which trolleys can be docked, so that the loading of a processed workpiece onto one trolley and the unloading of the next workpiece to be processed from another trolley can take place simultaneously at different ports.
[0018] For the trolley, it is also advantageous to have multiple ports to minimize the amount of manipulation required to couple to the workstation port. Preferably, there are two ports on either side of the dustproof compartment.
[0019] In order for the trolley to be able to identify the next method step to be performed on a workpiece loaded therein and to identify a target workstation for said workpiece, each workpiece should be associated with a schedule of method steps to be performed thereon that is accessible to the trolley.
[0020] To access the schedule, the trolley can be equipped with a reader, for example an RFID reader, for reading data from the data carriers of the workpieces. The data can include the schedule itself or a reference by which the schedule can be retrieved from a database.
[0021] Each workstation may have a recording device associated with it for writing a record identifying the workstation and / or its associated method step in the schedule of the workpiece to be processed by it, so that when the workpiece is loaded onto the trolley, the trolley can find the next method step to be performed on the workpiece and find the appropriate workstation to send the workpiece to.
[0022] According to a second aspect of the invention, this object is achieved by a trolley for use in the above-mentioned production line, the trolley comprising a steerable chassis and a pressurized compartment having at least one port for loading workpieces into the compartment and unloading the workpieces.
[0023] For good maneuverability, the chassis may be equipped with multiple casters that are independently drivable and rotatable about a vertical axis.
[0024] The trolley may further comprise a mechanical coupling for locking engagement with the workstation.
[0025] According to a third aspect of the invention, this object is achieved by a method for machining a workpiece in successive steps, each method step being performed at an associated workstation, between at least two of said workstations the workpiece being transported by a trolley as described above.
[0026] Further features and advantages of the present invention will become apparent from the following description of embodiments, taken in conjunction with the accompanying drawings. [Brief description of the drawings]
[0027] [Figure 1] FIG. 1 is a schematic diagram of a conventional production line. [Diagram 2] FIG. 2 is a schematic diagram of a first production line according to the present invention. [Diagram 3] FIG. 3 is a schematic diagram of a second production line according to the present invention. [Figure 4] FIG. 4 is a schematic diagram of a third production line according to the present invention. [Diagram 5] FIG. 5 is a diagram of a trolley used in the production lines of FIGS. 2, 3 and 4. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0028] Figure 1 is a schematic diagram of a conventional production line for automotive body painting. The work stations of the production line include painting stations 1 to 6. Painting station 1 is for applying a primer to a white body, stations 2 and 3 are for applying a base coat to the inside and outside of the body, respectively, and stations 5 and 6 are for applying a clear coat to the inside and outside.
[0029] For painting a car body in a single color, painting stations 1 to 3, 5 and 6 are sufficient, but further painting stations are necessary if a customer wish for a multi-colored car body is to be fulfilled, for example if the roof has a different color from the rest of the car body. Integrating such further painting stations into the linear path of the car body would lead to an increase in the processing time of all the car bodies and would leave the further painting stations idle most of the time. The production line of FIG. 1 therefore provides a track switch 7 where a car body can be sent to painting station 4 if required, while all other car bodies go straight to painting stations 5, 6, and a track switch 8 where the paths of the painted and unpainted car bodies at station 4 join.
[0030] When one layer of paint has been applied, the body is flashed, i.e. given time for the volatile components of the layer to evaporate, and baked, before the next layer is applied. Thus, the production line of FIG. 1 has baking station 9 between painting stations 1 and 2, baking station 10 between painting stations 3 and 4, baking station 11 between track switch 8 and painting station 5, and baking station 12 after painting station 6. Flashing stations 13 are provided between stations 1 and 9, between station 9 and station 2, between station 3 and track switch 7, and at various other locations, as shown in FIG. 1.
[0031] Not all stations in the production line are directly adjacent to one another and sealed together by means of track switches 7, 8. Wherever the tracks 14 for transporting the car bodies extend outside the workstations, the tracks 14 must be tightly covered to ensure that dust does not adhere to the car bodies during transport.
[0032] Figure 2 illustrates a production line according to the invention, the workstations of which are the same as in Figure 1, and the steps of the painting process carried out by them are also the same, therefore the workstations are given the same reference numbers as in Figure 1 and will not be described again here.
[0033] As in Figure 1, there are three groups of adjacent workstations, the first group includes painting stations 1, 2, 3 and baking station 9, the second group includes baking station 10 and painting station 4, and the third group includes painting stations 5, 6 and baking stations 11, 12. There are no tracks between the groups; instead, there is a flat floor surface between the groups along which vehicles can move freely in two dimensions without being restrained by tracks.
[0034] The painting station 3 has an exit port 15 for exiting the car body after application of the base coat. A trolley 16 is shown connected to the exit port 15 for receiving the car body. When the car body is loaded onto the trolley 16, the trolley 16 drives the car body to the next station where it is processed. In the example shown, this is the baking station 11 or the baking station 10. There is no flashing station at the exit side of the painting station 3, because the time spent with the car body being transported on the trolley serves the purpose of a flashing stage.
[0035] The trolley 16 has an inlet port 17 for coupling to the outlet port 15 of the painting station 3 and an outlet port 18 opposite the inlet port 17, which can be coupled to an inlet port 19 of the baking station 10 or 11 for removing the vehicle body.
[0036] The ports 15, 19 of the workstations 3, 10 face each other so that the trolley 16 can move from one to the other along a straight line 20, but the movement from the painting station 3 to the baking station 11 involves a U-turn 21. In FIG. 2, the U-turn 21 is wider than necessary to reach the workstation 11, and at the end of the U-turn, a second image 16' of the trolley 16 is shown in a parking position offset laterally with respect to the entrance port 19 so that another trolley 22 can leave after having delivered a body to the workstation 11. This situation may arise because when a body is processed at the painting station 4, it and the next body finished by the painting station 3 will compete for a place at the baking station 11. By using the trolley, one (or more) bodies can be kept waiting to enter the baking station 11 whenever the need arises.
[0037] FIG. 3 illustrates a second embodiment of a production line that utilizes the possibilities offered by the trolleys in a more systematic way than the one in FIG. 2. In this production line, only one flushing station 13 remains, all other flushing stations being replaced by trolleys. Although only two trolleys 16, 22 are shown in FIG. 3, their number can be more if necessary, for example to serve as a temporary storage place for car bodies that have to wait for the next processing step. The number of trolleys is less than the number of flushing stations 13 in FIG. 2, since the time required for flushing is shorter than that required for painting or baking. One trolley can therefore replace more than one flushing station by transporting car bodies between one pair of more stations, saving space and costs.
[0038] Painting stations 1 to 6 are identical to those in Figures 1 and 2 and serve the same purpose. The essential painting stations 1 to 3, 5 and 6 are located on one side of a central aisle 23, the facultative painting station 4 and the baking stations 9 to 12 on the other side. When the primer is applied to the body at painting station 1, one of the trolleys 16, 22 comes and moves back and forth across the aisle 23 to the baking station 9. Trolley 16 is shown carrying the body from the baking station 9 to painting station 2. Since painting stations 2, 3 are arranged in a row, the trolley must take the body, which has been applied with the base coat at stations 2, 3, at the exit port 15 of station 3 facing away from the aisle 23, and transport it from there to the baking station 11 or to the baking station 10 if the body is painted with more than one color.
[0039] The baking station 10, the flashing station 13 and the painting station 4 are located adjacent to one another so that a body sent to the baking station can be transported to the painting station 4 without the use of a trolley. A trolley 22 is shown removing the body from the painting station 4 and sending it to the baking station 11. Alternatively, it may send the body a second time to the baking station 10. By passing the body a second time through the painting station 4 in this way, any desired number of different colours can be applied to the body parts without requiring any additional investment in machinery.
[0040] The trolley 22 comes from the painting station 4 and sends its body to the port 15 of the baking station 11 facing away from the aisle 23, since it is the quickest and most reachable port. That is, all ports 15, 19 of the station 11 can function as both an inlet or an outlet port, as required.
[0041] If, when the trolley 22 has to send its body, the printing station 11 is occupied but the printing station 12 is not, the trolley 22 is adapted to detect that fact and send it to the printing station 12 instead.
[0042] After passing through the painting stations 2, 3 and 4, the car body is removed from the baking station 11 and transported by a trolley (not shown) to the painting station 5. From the exit port 15 of the painting station 6, it is returned to any of the available baking stations 11, 12. After processing at this last baking station, the painting process is finished and the car body is transported to the next part of the assembly line.
[0043] FIG. 4 illustrates a further optimized embodiment of the production line. Here, all transport of the car bodies, from loading the body-in-white at the painting station 1 to removing the fully painted body from one of the baking stations, is carried out by trolleys. The pairs of stations 2, 3 and 5, 6 for painting the inside and outside of the car body are replaced by combined stations 2 / 3 and 5 / 6, respectively, designed to paint the inside and outside. Since the time required to process a car body in each of the combined stations 2 / 3 and 5 / 6 is longer than in the single-function stations 2, 3 and 5, 6 of the previous embodiment, more than one of each type is provided. Thus, a processed car body can be removed, for example, from one of the stations 2 / 3 and replaced with a new one while the other is occupied processing one car body, one trolley 16 or 22 being sufficient to serve both of them.
[0044] Paint stations 1, 2 / 3 and 5 / 6 and baking stations 9 to 12 are located on either side of an aisle 23. All are loaded and unloaded through ports facing the aisle 23. As there is no need to transport bodies through the workstations, the transport means of the workstations can be omitted and it is sufficient if the trolley has a transport means with sufficient range of motion to properly position bodies within and extract them from workstations 1 to 6, 9 to 12.
[0045] At least some of the baking stations 9 to 12, for example stations 9 and 10, have heaters 24 with displaceable or independently controllable segments 25 for locally applying heat to the part of the body that is to receive a further paint layer on top of the base coat at the painting station 4. Thus, when a body is removed from one of the stations 2 / 3 and destined for the painting station 4, a trolley must carry it to one of the stations 9, 10, otherwise it can carry it to any one of the baking stations 9 to 12 that is or becomes immediately available. Also, a body removed from stations 4 or 5 / 6 can be baked at any of the stations 9 to 12.
[0046] Figure 5 is a schematic diagram of one of the trolleys, for example trolley 16. The trolley has a chassis 26 which supports on an undercarriage 29 a box-shaped compartment 27 for housing a car body 28.
[0047] The undercarriage 26 comprises a rectangular chassis 30 having four castors 31 at its corners. Each castor 31 comprises a wheel 32, a first electric motor 33 which drives the wheel 32, and a second motor 34 which rotates the wheel 32 and its associated motor 33 around a vertical axis. The motors 33, 34 of the four castors 31 are independently controlled by an on-board computer 35, enabling the trolley to navigate curves, turn on the spot, or arbitrarily change its direction of displacement while maintaining its orientation.
[0048] The undercarriage further carries means 36 for pressurizing the compartment 27 with dust-free air, and a battery pack 38 for powering the motors 33, 34, the computer 35 and the pressurizing means 36. The pressurizing means 36 may comprise a fan and filter assembly designed to take in outside air, filter it and blow it into the compartment 27. They may comprise air conditioning devices for heating and / or cooling the air supplied in the compartment 27 and / or for controlling its humidity according to the requirements of the immediate coating of the car body that the trolley is carrying. The air supplied in the compartment 27 by the air conditioning devices may be fresh air drawn from outside the compartment or it may be recirculated air from the compartment itself.
[0049] The computer 35 has a wireless interface 37 for communicating with other computers on the production line and with a transponder 39 mounted on the vehicle body 28 .
[0050] The compartment 27 is defined at its four corners by pillars 40, by a roof 41 carried by the pillars 40 and by side walls extending between the pillars 40 along the two longer sides of the chassis 30. At the two shorter sides, slidable doors serve as the inlet port 17 and the outlet port 18. The door leaves are flexible or articulated so that they can be opened without the door leaf protruding beyond the contour of the compartment 27. For example, the door leaves may be formed as roller blinds 42 guided in grooves in the pillars 40 and capable of being raised and lowered by the rotation of a sprocket 43 controlled by the computer 35. The left port 17 is shown in an open state with most of the roller blind 42 extending along the roof 41, while the right port 18 is closed with the end of the roller blind 42 in contact with the chassis 30.
[0051] When the trolley 16 is idle, the computer 35 scans for wireless messages indicating workstations where a vehicle body is or will soon be ready for transport. The requester sending such a message may be the workstation itself or a central computer controlling the operation of the workstation. When the message is received, the trolley 16 calculates the distance or time required to reach the workstation and makes a declaration indicating the result. Among several such declarations, the requester chooses the one from the trolley with the smallest distance or time and sends a return message to said trolley 16 indicating that its declaration has been accepted. The trolley 16 then moves to the indicated workstation and docks one of its ports 17, 18 to the port of the workstation.
[0052] When the opposing ports of the workstation and the trolley are open, the positive pressure in the compartment 27 maintained by the pressurizing means 36 ensures that air blows out through the gap between the ports, so that dust cannot reach the compartment 27 while the body 28 and undercarriage 29 are transferred into the compartment 27. After receiving the body, the port 17 closes again.
[0053] Displacement of the car body 28 within the compartment 27 may be facilitated by a number of rollers 44 rotatably mounted on an upper surface of the chassis 30 for supporting the undercarriage 29. Some of the rollers may be motorized to actively move the car body.
[0054] The instructions as to the destination of the body can be provided directly by the central computer, or the computer 35 retrieves from the transponder 39 an identifier that can be used to query the processing state of the body from the central computer, or retrieves the processing state of the body directly from its transponder 39.
[0055] The processing status identifies the steps of the painting process to be applied to the body 28, the order in which they are performed, the workstations at which they are performed, and, where appropriate, processing data such as the identity of the color to be applied, the area of the body to which the color is to be applied. Whenever a particular step of the painting process has been performed, it is labelled as performed in the processing status. Based on this processing state, the computer 35 identifies the next step to be performed and the workstations that can perform it. It then sends a request to all of these to allocate a processing time slot. The workstations respond by communicating their next available time slot, and the computer 35 chooses the one that requires the least waiting time, sends a response message reserving this time slot and starts transporting the body 28 to the reserved workstation. Meanwhile, the pressing means 36 are continuously running.
[0056] Its docking to the workstation can be by either port 17 or 18. The trolley can be provided with a mechanical coupling 45, for example a pivotable hook, adapted to lock into a mating contour of the workstation by a positive fit when the trolley approaches the workstation, which prevents the trolley from moving relative to the workstation while the car body is being transferred between the two. Furthermore, an electrical connector 46 can be provided, whereby mains power is transferred to the trolley through the workstation while the trolley is docked to the workstation. The energy-intensive tasks of the trolley, such as transferring the car body between the workstation and the trolley and heating or cooling the compartment 27, can be only enabled while the trolley is connected to the power source. This reduces the battery load and improves the productivity of the trolley, since the proportion of its operating time spent charging the battery is reduced. The time the trolley spends connected to the workstation may be used to recharge the battery.
[0057] After the car body 28 has been ejected, the trolley 16 returns to an idle state and the above process is repeated.
[0058] Reference number 1 to 6 Workstations (Painting Stations) 7 to 8 track switch 9 to 12 Workstations (Burning Stations) 13 Workstation (Flushing Station) 14 Tracks 15 Exit Port 16 Trolley 17 Inlet Port 18 Exit Port 19 Inlet Port 20 straight line 21 U-Turn 22 Trolley 23 Passage 24 Heater 25 Segments 26 Chassis 27 Plots 28 Body 29 Undercarriage 30 Chassis 31 Caster 32 Wheels 33,34 Motor 35 Computers 36 Pressurizing means wireless interface 38 Battery Pack 39 Transponder 40 Pillar 41 Roof 42 Roller Blinds 43 Sprocket 44 Lola 45 Mechanical connection 46 Electrical Connectors
Claims
1. A production line for processing a workpiece (28) in successive steps, comprising:
1. A production line comprising a plurality of workstations (1 to 6, 9 to 12), each of which is adapted to perform an associated one of the steps therein, and transport means for transporting a workpiece (28) from one of said workstations (1 to 6, 9 to 12) to a next one, at least a last one of said steps being a step of painting the workpiece (28), at least two workstations (1 to 6, 9 to 12) associated with steps immediately following each other being not adjacent to each other, said transport means comprising a trolley (16, 22) for transporting said workpiece (28) from a first to a second of said at least two workstations, said trolley (16, 22) comprising a dust-proof compartment (27) for receiving said workpiece (28).
2. 2. The production line according to claim 1, wherein the dust-proof compartment (27) has at least one port (17, 18) adapted to be coupled in a dust-proof manner to a mating port (15, 19) of the first and second workstations (1 to 6, 9 to 12).
3. 3. A production line according to claim 1 or 2, wherein the trolley (16, 22) comprises means (36) for pressurizing the dust-proof compartment (27).
4. 3. The production line according to claim 1 or 2, wherein the trolleys (16, 22) and / or the ports (15, 17 to 19) of the workstations (1 to 6, 9 to 12) are provided with slidable doors.
5. The production line of claim 4, wherein the slidable door comprises a flexible sheet.
6. 6. The production line according to claim 1, wherein the trolley (16, 22) comprises a rail portion for displaceably supporting the workpiece, the rail portion being adapted to be coupled to a rail of a workstation.
7. 7. A production line according to any one of claims 1 to 6, wherein more than two workstations (1 to 6, 9 to 12) have ports (15, 19) capable of transferring workpieces (28) to the trolleys (16, 22) or receiving them from the trolleys (16, 22).
8. 8. The production line according to claim 1, wherein the plurality of workstations (1 to 6, 9 to 12) comprises at least a subset of the plurality of workstations (9 to 12) associated with a same one of the method steps.
9. 9. The production line according to claim 8, wherein the trolley (16, 22), when unloaded, is adapted to identify a workstation (9, 12) of the subset which has finished or is about to finish a first method step associated therewith, and to be loaded with the workpiece (28) after the first method step has been finished therefor.
10. 10. The production line according to claim 8 or 9, wherein the trolley (16, 22), when loaded, is adapted to identify a next method step to be performed on the workpiece, to identify a next workstation associated with the next method step, and to drive the workpiece (28) to the next workstation.
11. 11. The production line according to claim 10, wherein the trolley (16, 22) is adapted to select as the next workstation, from a subset of workstations related to the next method step, one that is free or that is about to finish processing another workpiece.
12. At least one of said workstations (1 to 6, 9 to 12) has at least two ports (15, 19) to which said trolleys (16, 22) are coupled; and / or 12. A production line according to any one of claims 1 to 11, wherein the trolley (16, 22) has at least two ports (17, 18) separate from one another.
13. A production line as described in claim 12, wherein the trolley (16, 22) has at least two ports (17, 18) on both sides of the dustproof compartment (27).
14. 14. The production line according to any one of claims 1 to 13, wherein each workpiece (28) is associated with its schedule of method steps to be performed on it, and the trolley (16, 22) is adapted to identify a target workstation for the workpiece (28) it is transporting based on said schedule.
15. 15. The production line according to claim 14, wherein the trolleys (16, 22) are provided with a reader (37) for reading data from data carriers (39) of the workpieces (28), said data including the schedule or a reference from which the schedule can be retrieved.
16. A trolley (16, 22) for use in a production line according to any one of claims 1 to 15, comprising The trolley comprises a steerable chassis (26) and a pressurized dust-proof compartment (27) having at least one port (17, 18) for loading a workpiece (28) into the dust-proof compartment (27) and removing the workpiece (28).
17. 1. A method for machining a workpiece in successive steps, comprising the steps of: A method, wherein each method step is performed at an associated workstation (1 to 6, 9 to 12), and between at least two of said workstations (1 to 6, 9 to 12) the workpieces are transported by a trolley (16, 22) as described in claim 16.
Citation Information
Patent Citations
Body painting plant especially for motor vehicle bodies
DE19630290A1
Isolation spaced conveyer for article
JP1990123022A
Automatic line transport system
JP1992146035A
Automatic assembly / dismantle device that corresponds to compression tight closure type transferable container
JP1995221170A
Method of controlling wet coating film and coating apparatus
JP2003154296A