Tandem Rolling System
The tandem rolling system addresses plate thickness fluctuations by calculating a final target mass flow and adjusting upstream actuators to stabilize the rolling process, ensuring stable and efficient production.
Patent Information
- Application Number
- JP2024500786
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-02-16
- Publication Date
- 2024-10-02
- Estimated Expiration
- 2042-02-16
AI Technical Summary
Existing tandem rolling systems face challenges in quickly and effectively controlling plate thickness fluctuations at the exit side of the final stand, leading to potential material breakage or rolling instability due to excessive tension changes.
A tandem rolling system that calculates a final target mass flow based on product specifications and adjusts the mass flow and plate thickness of upstream stands using actuators to match this target, thereby reducing fluctuations and stabilizing the rolling process.
The system effectively reduces plate thickness deviations at the final stand exit, stabilizes rolling operations, and minimizes the risk of material breakage by adjusting mass flow and tension early in the process.
Smart Images

Figure 0007559995000001 
Figure 0007559995000002 
Figure 0007559995000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a tandem rolling mill system. [Background technology]
[0002] Cold rolling is known in which a material such as metal (hereinafter referred to as "rolled material") is continuously rolled by a plurality of stands. In cold rolling, plate thickness control is performed so that the plate thickness of the rolled material becomes a desired plate thickness. As a plate thickness control method, mass flow AGC is known, which controls the plate thickness at the exit of a stand based on a measured value at the entry of the stand. Mass flow AGC calculates an estimated exit thickness value from the plate speeds at the entry and exit of the stand and the entry thickness, and changes the roll gap or the speed of the upstream stand so that the exit thickness deviation becomes zero.
[0003] Thickness control of the final stand outlet thickness is important because it directly affects the quality of the rolled material. Generally, thickness control of the final stand outlet thickness is performed by manipulating the roll speed of the stand one upstream of the final stand based on the thickness deviation at the outlet of the final stand. Here, the "thickness deviation" is the deviation between the actual thickness value measured by a thickness gauge installed at the outlet of the final stand and a predetermined target thickness value at the outlet of the final stand.
[0004] For this reason, when thickness variation of the base material cannot be sufficiently reduced by thickness control of the upstream stand, or when thickness variation due to acceleration / deceleration is large, the roll speed of the stand one stand upstream of the final stand is greatly adjusted to suppress the thickness deviation at the delivery side of the final stand. As a result, the roll speed of the stand one stand upstream of the final stand is restricted and control becomes impossible, or a sudden change in roll speed can cause the tension between the final stand and the stand one stand upstream to loosen, making rolling unstable and leading to other problems.
[0005] In order to solve such a problem, in Patent Document 1, not only the roll speed of the stand one upstream of the final stand but also the roll speed of the final stand is controlled to avoid the roll speed being restricted. In Patent Document 2, a control gain is adjusted based on the magnitude of the plate thickness deviation to suppress abrupt changes in the roll speed. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] Japanese Patent Publication No. 2002-292415 [Patent Document 2] Japanese Patent Publication No. 2004-268084 Summary of the Invention [Problem to be solved by the invention]
[0007] However, in either method, it takes time to correct the thickness when the thickness deviation at the exit of the final stand is large. In addition, the amount of operation of the roll speed is large, so there is a risk that the tension between the final stand and the stand one upstream will become too high or too low. If the tension becomes too high, it will cause the strip to break, and if the tension becomes too low, rolling will become unstable. Before the tension becomes too high or too low, the tension may be controlled to an appropriate range by tension control, but tension control is performed by opening and closing the gap at the final stand. Therefore, excessive operation will affect the shape. If the shape becomes disturbed, it may be difficult to continue rolling. In order to avoid such a situation, it is desired to be able to more reliably reduce the thickness variation at the exit of the final stand.
[0008] The present invention has been made to solve the above-mentioned problems, and has an object to provide a tandem rolling system capable of reducing thickness variations at the delivery side of the final stand. [Means for solving the problem]
[0009] As a result of intensive research, the inventors of the present application found that a final target mass flow that satisfies the product specifications of the rolled material at the exit of the final stand (Nth stand) is calculated, and the mass flow at the exit of more upstream stands (1st to N-2nd stands) is controlled to match the final target mass flow. According to this, the law of constant mass flow is used to adjust the thickness or the speed of the rolled material at the upstream stands to meet the target thickness value at the exit of the final stand according to the product specifications of the rolled material. Therefore, it is possible to reduce the thickness deviation between the final stand (Nth stand) and the stand immediately upstream (N-1st stand) as much as possible. The mass flow is expressed as the product of the thickness, width, and speed of the rolled material (volumetric flow rate), and is expressed as the product of the thickness and speed of the rolled material if there is no change in width within the rolling mill.
[0010] The first aspect relates to tandem rolling systems. A tandem rolling system has N (N≧3) rolling stands and continuously rolls the material to be rolled. The tandem rolling system includes a final target mass flow calculation unit and an upstream mass flow control unit. The final target mass flow calculation unit multiplies the actual speed value of the rolled material measured at the exit of the final stand, the Nth stand, by a final stand exit thickness target value determined in advance in accordance with the product specifications of the rolled material to calculate the final target mass flow, which is the exit mass flow of the final stand. The upstream mass flow control unit controls an actuator provided in the i-th stand (1≦i≦N-2) or an actuator provided upstream of the i-th stand so as to match the outlet mass flow of the i-th stand with the final target mass flow.
[0011] The second aspect has the same features as the first aspect, as well as the following features. The actuator provided in the i-th stand includes a roll speed actuator. The upstream mass flow control unit calculates the target speed value at the exit of the i-th stand by dividing the final target mass flow by a target thickness value at the exit of the i-th stand, which is predetermined in accordance with the product specifications of the rolled material, or by an actual thickness value at the exit of the i-th stand, which is measured at the exit of the i-th stand. The upstream mass flow control unit controls the work roll speed of the i-th stand using the roll speed actuator so that the actual speed value of the rolled material at the exit of the i-th stand coincides with the target speed value at the exit of the i-th stand.
[0012] The third aspect has the following features in addition to those of the second aspect. The actuators provided in the i-th stand further include a roll gap actuator that controls a roll gap. The tandem rolling system includes a thickness control unit that controls the outlet thickness of the i-th stand using the roll gap actuator so that the actual outlet thickness value of the i-th stand matches the predetermined target outlet thickness value of the i-th stand.
[0013] The fourth aspect has the following features in addition to the second or third aspect. The actual strip thickness value at the delivery side of the i-th stand is a gauge meter strip thickness calculated based on the actual roll gap value and the actual rolling load value in the i-th stand.
[0014] The fifth aspect has the following features in addition to those of the first aspect. The actuators provided in the i-th stand include a roll gap actuator that controls the roll gap. The upstream mass flow control unit calculates a new target thickness value for the exit of the i-th stand by dividing the final target mass flow by the actual exit speed value of the rolled material measured at the exit of the i-th stand. The upstream mass flow control unit controls the roll gap of the i-th stand using the roll gap actuator so that the actual outlet thickness value of the i-th stand measured at the outlet of the i-th stand matches the new target outlet thickness value of the i-th stand.
[0015] The sixth aspect has the same features as the fifth aspect, as well as the following features. The actual strip thickness value at the delivery side of the i-th stand is a gauge meter strip thickness calculated based on the actual roll gap value and the actual rolling load value in the i-th stand.
[0016] The seventh aspect has the same features as the first aspect, as well as the following features. The actuators provided upstream of the i-th stand include a roll speed actuator that controls the work roll speed provided in the i-1th stand (2≦i≦N-2). The tandem rolling system further includes a thickness control unit that controls the outlet thickness of the i-th stand using the roll speed actuator of the i-1 stand so that the actual outlet thickness value of the i-th stand matches a target outlet thickness value of the i-th stand that is predetermined in accordance with the product specifications of the rolled material. The upstream mass flow control unit calculates a new target thickness value for the exit of the i-th stand by dividing the final target mass flow by the actual exit speed value of the i-th stand of the rolled material measured at the exit of the i-th stand. The upstream mass flow control unit updates the predetermined i-th stand delivery thickness target value used by the thickness control unit to the new i-th stand delivery thickness target value.
[0017] The eighth aspect has the same features as the first aspect, as well as the following features. The actuators provided in the i-th stand further include a roll gap actuator that controls a roll gap. The tandem rolling system further includes a thickness control unit that controls the outlet thickness of the i-th stand using the roll gap actuator of the i-th stand so that the actual outlet thickness value of the i-th stand matches a target outlet thickness value of the i-th stand that is predetermined in accordance with the product specifications of the rolled material. The upstream mass flow control unit calculates a new target thickness value for the exit of the i-th stand by dividing the final target mass flow by the actual exit speed value of the i-th stand of the rolled material measured at the exit of the i-th stand. The upstream mass flow control unit updates the predetermined i-th stand delivery thickness target value used by the thickness control unit to the new i-th stand delivery thickness target value.
[0018] A ninth aspect has the same features as the first aspect, as well as the following features. The actuators provided in the ith stand include an ith roll speed actuator that controls the work roll speed. The actuators provided upstream of the i-th stand include an i-1th roll speed actuator that controls the work roll speed provided in the i-1th stand (2≦i≦N-2). The tandem rolling system further includes a thickness control unit that controls the outlet thickness of the i-th stand using the i-1 roll speed actuator so as to match the actual outlet thickness value of the i-th stand with a target outlet thickness value of the i-th stand that is predetermined in accordance with the product specifications of the rolled material. The upstream mass flow control unit calculates the target speed value at the exit of the i-th stand by dividing the final target mass flow by a target thickness value at the exit of the i-th stand, which is predetermined in accordance with the product specifications of the rolled material, or by an actual thickness value at the exit of the i-th stand, which is measured at the exit of the i-th stand. The upstream mass flow control unit controls the work roll speed of the i-th stand using the i-th roll speed actuator so that the actual speed value of the rolled material at the exit of the i-th stand coincides with the target speed value at the exit of the i-th stand. Effect of the Invention
[0019] The tandem rolling system according to the present disclosure calculates a final target mass flow from the product of a target thickness value at the exit of the final stand, which is determined in advance according to the product specifications of the material to be rolled, and the actual speed value of the material to be rolled at the exit of the final stand (Nth stand). The tandem rolling system then controls the thickness so that the mass flow at the exit of the upstream stands (1st to N-2nd stands) coincides with the final target mass flow. According to this, the thickness at the exit of the upstream stand or the speed of the material to be rolled is adjusted to meet the target thickness value at the exit of the final stand according to the product specifications of the material to be rolled. That is, the thickness at the exit of the final stand can be quickly corrected. Therefore, the thickness deviation at the exit of the final stand can be reduced, and the thickness at the exit of the final stand can be well controlled. In addition, the amount of manipulation of the roll peripheral speed of the stand one upstream of the final stand is reduced, so that troubles can be avoided. [Brief description of the drawings]
[0020] [Figure 1] FIG. 1 is a diagram for explaining a case in which the mass flow on the delivery side of the first stand 1 is controlled by the speed when the delivery thickness of the first stand 1 is controlled by the roll gap. [Diagram 2] FIG. 13 is a diagram for explaining a case in which the mass flow on the delivery side of the third stand 3 is controlled by the speed when the delivery thickness of the third stand 3 is not controlled. [Diagram 3] FIG. 1 is a diagram for explaining a case in which the mass flow on the delivery side of the first stand 1 is controlled by the speed when the delivery thickness of the first stand 1 is controlled by the roll gap. [Figure 4] FIG. 13 is a diagram for explaining a case in which the mass flow on the delivery side of the third stand 3 is controlled by the speed when the delivery thickness of the third stand 3 is not controlled. [Diagram 5] 4, and is a diagram for explaining a case in which a gauge meter thickness is used instead of the thickness measured by the thickness gauge 33. FIG. [Figure 6]FIG. 13 is a diagram for explaining a case in which the mass flow on the delivery side of the third stand is controlled by the roll gap when the delivery thickness of the third stand is not controlled. [Figure 7] 6, and is a diagram for explaining a case in which a gauge meter thickness is used instead of the thickness measured by the thickness gauge 33. FIG. [Figure 8] FIG. 13 is a diagram for explaining a case in which the mass flow on the outlet side of the third stand 3 is controlled by the speed when the outlet side thickness of the third stand 3 is controlled by the speed. [Figure 9] FIG. 13 is a diagram for explaining a case in which the mass flow on the delivery side of the first stand is controlled by the roll gap when the delivery side thickness of the first stand is controlled by the roll gap. [Figure 10] FIG. 13 is a diagram for explaining a case in which the mass flow on the delivery side of the third stand is controlled by the roll gap when the delivery thickness of the third stand is controlled by the roll gap. [Figure 11] This is a diagram to explain a case where the mass flow on the outlet side of the third stand 3 is controlled by speed (without changing the target value for thickness control) when the outlet thickness of the third stand 3 is controlled by speed. [Figure 12] This is a diagram to explain a case where the mass flow on the outlet side of the third stand 3 is controlled by speed (without changing the target value for thickness control) when the outlet thickness of the third stand 3 is controlled by speed. [Figure 13] 2 is a block diagram showing an example of the hardware configuration of a control device 101. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0021] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. Note that elements common to the various drawings are designated by the same reference numerals and duplicated explanations will be omitted.
[0022] Prior to describing each embodiment, a basic configuration common to the tandem cold rolling systems of the embodiments will be described with reference to FIG.
[0023] 1. Basic configuration of tandem cold rolling mill The tandem cold rolling system shown in FIG.
[0024] The tandem cold rolling mill 100 has N (N≧3) rolling stands that continuously roll the material 6 to be rolled. In this specification, a "rolling stand" is simply referred to as a "stand." FIG. 1 illustrates five stands (first stand 1 to fifth stand 5) arranged in tandem. Each stand has a work roll and a backup roll.
[0025] Each stand is provided with a roll speed actuator for controlling the work roll speed. The roll speed actuator includes, for example, an electric motor. In FIG. 1, the roll speed actuator 11 of the first stand 1 and the roll speed actuator 14 of the fourth stand 4 are illustrated.
[0026] Each stand is provided with a roll gap actuator that controls the roll gap (reduction amount) of the work roll. The roll gap actuator includes, for example, a reduction device. In FIG. 1, the roll gap actuator 21 of the first stand 1 is illustrated.
[0027] The thickness gauge 30 is provided on the entry side of the first stand 1 and measures the thickness of the rolled material 6 that has passed directly underneath. The thickness gauge 31 is provided on the exit side of the first stand 1 and measures the thickness of the rolled material 6 that has passed directly underneath. The thickness gauge 35 is provided on the exit side of the fifth stand 5, which is the final stand, and measures the thickness of the rolled material 6 that has passed directly underneath.
[0028] Speed meter 40 is provided on the entry side of first stand 1 and measures the transport speed of the rolled material 6 that passes directly underneath. Speed meter 41 is provided on the exit side of first stand 1 and measures the transport speed of the rolled material 6 that passes directly underneath. Speed meter 45 is provided on the exit side of fifth stand 5, which is the final stand, and measures the transport speed of the rolled material 6 that passes directly underneath.
[0029] Although a tandem cold rolling mill is exemplified in this specification, a tandem hot rolling mill may also be used.
[0030] 2. Basic configuration of the control device (plate thickness control) The control device 101 of the tandem cold rolling mill 100 includes a speed control device, a roll gap control device, a FF control device, a FB control device, an upstream stand control device 70, and the like, which are shown in the respective drawings described below, and has functions as a plate thickness control device and an upstream mass flow control device. The material 6 to be rolled is transported from the left side to the right side in FIG. 1, and is rolled to a desired plate thickness by plate thickness control. For example, the plate thickness control is performed as follows.
[0031] The configuration of a thickness control section for controlling the delivery thickness of the first stand 1 by the roll gap will be described with reference to FIG. The FF control device 50 receives as input the actual thickness value at the entrance of the first stand measured by the thickness gauge 30 and the actual speed value at the entrance of the first stand measured by the speed gauge 40. The FF control device 50 outputs an operation amount corresponding to the actual thickness value at the entrance of the first stand at the timing when the position of the rolled material 6 whose thickness has been measured reaches just below the work roll of the first stand 1.
[0032] The FB control device 51 receives as input the first stand delivery side thickness actual value measured by the thickness meter 31 and the first stand delivery side speed actual value measured by the speed meter 41. The FB control device 51 outputs an FB correction operation amount that correlates to a value obtained by multiplying a gain (coefficient) by the difference between the first stand delivery side thickness actual value and a first stand delivery side thickness target value determined in advance according to the product specifications of the rolled material 6. Here, the gain is set to be larger as the first stand delivery side speed actual value measured by the speed meter 41 or the rolling speed of the first stand 1 by the roll speed actuator 11 is larger.
[0033] The operation amounts output from the FF control device 50 and the FB control device 51 are added together and then input to a first roll gap control device 91. The first roll gap control device 91 drives the roll gap actuator 21 to adjust the roll gap between the upper and lower work rolls, thereby controlling the delivery thickness of the first stand 1.
[0034] In this manner, the thickness control unit controls the delivery thickness of the first stand 1 by the roll gap actuator 21 so that the actual delivery thickness value of the first stand coincides with the predetermined target delivery thickness value of the first stand.
[0035] As an advanced thickness control method, there is mass flow thickness control (not shown) in which the thickness of the rolled material 6 directly below the first stand 1 is estimated and calculated from the measurements of the thickness gauges and speed gauges on the entry and exit sides (called mass flow thickness), and the thickness is controlled based on this. Furthermore, in order to suppress fluctuations in the tension on the entry side of the first stand 1 by moving the roll gap actuator 21, multivariable control or non-interference control may be applied in which the entry tension is measured at the same time and an entry bridle (not shown) is operated. With these methods, the dead time due to transportation to the thickness gauge installed on the exit side can be ignored, and highly responsive thickness control can be achieved.
[0036] Next, the configuration of the thickness control unit that controls the delivery thickness of the fifth stand 5 by the speed will be described with reference to FIG. The FB control device 54 inputs the fifth stand delivery side thickness actual value measured by the thickness gauge 35 and the fifth stand delivery side speed actual value measured by the speed meter 45. The FB control device 54 outputs an FB correction operation amount that correlates to a value obtained by multiplying a gain (coefficient) by the difference between the fifth stand delivery side thickness actual value and a fifth stand delivery side thickness target value determined in advance according to the product specifications of the rolled material 6. Here, the gain is set to be larger as the fifth stand delivery side speed actual value measured by the speed meter 45 is larger.
[0037] The fourth speed control device 64 drives the roll speed actuator 14 based on the FB correction operation amount input from the FB control device 54 to adjust the work roll speed of the fourth stand 4, thereby controlling the outlet plate thickness of the fifth stand 5.
[0038] In this way, the plate thickness control unit controls the delivery thickness of the fifth stand 5 using the roll speed actuator 14 of the fourth stand so that the actual delivery thickness value of the fifth stand matches the predetermined delivery thickness target value of the fifth stand.
[0039] Embodiment 1 The first embodiment will be described with reference to FIGS. In the first embodiment, a case will be described in which the mass flow rate at the outlet of the i-th stand is controlled by the speed when the thickness at the outlet of the i-th stand is not controlled by the speed. In the first embodiment, the actuator used for controlling the thickness at the outlet of the i-th stand and the actuator used for controlling the upstream mass flow rate at the outlet of the i-th stand are different (Fig. 1).
[0040] FIG. 1 is a diagram for explaining a case in which the mass flow on the delivery side of the first stand 1 is controlled by the speed when the delivery thickness of the first stand 1 is controlled by the roll gap. FIG. 2 is a diagram for explaining a case in which the mass flow on the delivery side of the third stand 3 is controlled by the speed when the delivery thickness of the third stand 3 is not controlled by the thickness.
[0041] 1-1. Figure 1 (Thickness control: roll gap / Upstream mass flow control: speed) First, the tandem cold rolling system shown in FIG. 1 will be described. The basic configurations of the tandem cold rolling mill 100 and the control device 101 shown in FIG. 1 are as described above, and therefore description thereof will be omitted.
[0042] A description will now be given of the upstream mass flow control, which is a feature of the control device 101. The control device 101 includes an upstream stand control device 70. The upstream stand control device 70 includes a final target mass flow calculation unit 71 and an upstream mass flow control unit 72.
[0043] The final target mass flow calculation unit 71 multiplies the actual speed value of the rolled material 6 measured at the exit of the final stand, the fifth stand 5 (Nth stand), by the final stand exit thickness target value determined in advance according to the product specifications of the rolled material 6 to calculate the final target mass flow, which is the exit mass flow of the final stand. Here, the actual speed value may be a measured value measured by the speedometer 45, or may be a calculated value calculated from the product of the rotational speed of a tension meter roll or a shape meter roll installed at the exit side of the final stand and the roll diameter of the corresponding roll.
[0044] The upstream mass flow control unit 72 controls the actuator provided in the ith stand so that the outlet mass flow of the ith stand (1≦i≦N−2) coincides with the final target mass flow. The upstream mass flow control unit 72 in FIG. 1 controls the roll speed actuator 11 provided in the first stand 1 so as to make the exit mass flow of the first stand 1 coincide with the final target mass flow.
[0045] A specific description will be given of the processing of the upstream mass flow control unit 72. The upstream mass flow control unit 72 includes a first stand outlet speed calculation unit 80 and a first stand speed operation unit 81. The upstream mass flow control unit 72 may include a first speed control device 61.
[0046] The first stand delivery speed calculation unit 80 inputs the final target mass flow from the final target mass flow calculation unit 71. The first stand delivery speed calculation unit 80 divides the final target mass flow by a first stand delivery thickness target value that is determined in advance according to the product specifications of the rolled material 6 to calculate a first stand delivery speed target value.
[0047] The first stand speed operation unit 81 inputs the actual speed value of the material 6 to be rolled at the exit of the first stand 1 from the speedometer 41 and the first stand exit speed target value from the first stand exit speed calculation unit 80. The first stand speed operation unit 81 outputs a correction operation amount corresponding to the difference between the actual speed value and the first stand exit speed target value to the first speed control device 61 so that the actual speed value of the material 6 to be rolled at the exit of the first stand 1 coincides with the first stand exit speed target value. The first speed control device 61 controls the work roll speed of the first stand 1 with the roll speed actuator 11 in accordance with the correction operation amount.
[0048] As described above, according to the tandem cold rolling system shown in Fig. 1, the mass flow rate on the delivery side of the first stand 1 can be made to coincide with the final target mass flow rate on the delivery side of the fifth stand 5. By adjusting the mass flow rate on the delivery side of the most upstream stand early, the thickness fluctuation in the final stand can be reduced, and the delivery thickness of the final stand can be controlled quickly and satisfactorily.
[0049] 1, the actual speed value of the rolled material 6 at the exit side of the fifth stand 5 was a measured value by the speedometer 45, or a calculated value calculated from the product of the rotational speed of the tension meter roll or shape meter roll installed at the exit side of the final stand and the roll diameter of the corresponding roll. In the following explanation, the same applies to the actual speed values of the rolled material 6 at the exit sides of the other stands (1 to 4) and the entry side of the first stand 1.
[0050] 1-2. Figure 2 (Thickness control: None / Upstream mass flow control: Speed) Next, the tandem cold rolling system shown in FIG. 2 will be described. Fig. 2 is a diagram for explaining a case where the mass flow rate on the delivery side of the third stand is controlled by the speed when the delivery thickness of the third stand is not controlled. The basic configurations of the tandem cold rolling mill 100 and the control device 101 shown in Fig. 2 are the same as those in Fig. 1, so the description will be omitted.
[0051] The tandem cold rolling mill 100 shown in Fig. 2 includes a speed meter 43. The speed meter 43 is provided on the outlet side of the third stand 3, and measures the transport speed of the material 6 to be rolled that passes directly below it.
[0052] We will now explain the upstream mass flow control, which is a feature of the control device 101. The control device 101 includes an upstream stand control device 70. The upstream stand control device 70 includes a final target mass flow calculation unit 71 and an upstream mass flow control unit 72. The processing content of the final target mass flow calculation unit 71 is the same as that in FIG. 1 described above.
[0053] The upstream mass flow control unit 72 in FIG. 2 controls the roll speed actuator 13 provided in the third stand 3 so as to make the exit mass flow of the third stand 3 coincide with the final target mass flow.
[0054] A specific description will be given of the processing of the upstream mass flow control unit 72. The upstream mass flow control unit 72 includes a third stand outlet speed calculation unit 82 and a third stand speed operation unit 83. The upstream mass flow control unit 72 may include a third speed control device 63.
[0055] The third stand delivery speed calculation unit 82 inputs the final target mass flow from the final target mass flow calculation unit 71. The third stand delivery speed calculation unit 82 divides the final target mass flow by a third stand delivery thickness target value that is determined in advance according to the product specifications of the rolled material 6, to calculate a third stand delivery speed target value.
[0056] The third stand speed operation unit 83 inputs the actual speed value of the material 6 to be rolled at the exit of the third stand 3 from the speedometer 43 and the target speed value at the exit of the third stand from the third stand exit speed calculation unit 82. The third stand speed operation unit 83 outputs a correction operation amount corresponding to the difference between the actual speed value and the target speed value at the exit of the third stand to the third speed control device 63 so that the actual speed value of the material 6 to be rolled at the exit of the third stand 3 coincides with the target speed value at the exit of the third stand. The third speed control device 63 controls the work roll speed of the third stand 3 by the roll speed actuator 13 in accordance with the correction operation amount.
[0057] As described above, according to the tandem cold rolling system shown in Fig. 2, the mass flow rate on the delivery side of the third stand 3 can be made to coincide with the final target mass flow rate on the delivery side of the fifth stand 5. By adjusting the mass flow rate on the delivery side of the upstream stands early, the thickness fluctuation in the final stand can be reduced, and the delivery thickness of the final stand can be controlled quickly and satisfactorily.
[0058] Embodiment 2 The second embodiment will be described with reference to FIGS. In the second embodiment, a case will be described in which the mass flow at the outlet of the i-th stand is controlled by the speed when the outlet thickness of the i-th stand is not controlled by the speed. This is the same as in the first embodiment. However, the difference is that in the first embodiment, the first stand outlet speed calculation unit 80 (the third stand outlet speed calculation unit 82) uses the first stand outlet thickness target value (the third stand outlet thickness target value), whereas in the second embodiment, the first stand outlet speed calculation unit 80a (the third stand outlet speed calculation unit 82a) uses the actual thickness value.
[0059] In the second embodiment, similarly to the first embodiment, the actuator used for controlling the strip thickness at the outlet of the i-th stand is different from the actuator used for controlling the upstream mass flow at the outlet of the i-th stand (FIG. 3).
[0060] FIG. 3 is a diagram for explaining a case in which the mass flow on the delivery side of the first stand 1 is controlled by the speed when the delivery thickness of the first stand 1 is controlled by the roll gap. FIG. 4 is a diagram for explaining a case in which the mass flow on the delivery side of the third stand 3 is controlled by the speed when the delivery thickness of the third stand 3 is not controlled by the thickness. FIG. 5 is a modified example of FIG. 4, and is a diagram for explaining a case in which a gauge meter thickness is used instead of the thickness measured by the thickness gauge 33. In FIG.
[0061] 2-1. Figure 3 (Thickness control: roll gap / Upstream mass flow control: speed) First, a tandem cold rolling system shown in Fig. 3 will be described. The basic configurations of a tandem cold rolling mill 100 and a control device 101 shown in Fig. 3 are the same as those in Fig. 1, so the description will be omitted.
[0062] We will now explain the upstream mass flow control, which is a feature of the control device 101. The control device 101 includes an upstream stand control device 70. The upstream stand control device 70 includes a final target mass flow calculation unit 71 and an upstream mass flow control unit 72. The processing content of the final target mass flow calculation unit 71 is the same as that in FIG. 1 described above.
[0063] The upstream mass flow control unit 72 in FIG. 3 controls the roll speed actuator 11 provided in the first stand 1 so as to make the exit mass flow of the first stand 1 coincide with the final target mass flow.
[0064] A specific description will be given of the processing of the upstream mass flow control unit 72. The upstream mass flow control unit 72 includes a first stand outlet speed calculation unit 80a and a first stand speed operation unit 81. The upstream mass flow control unit 72 may include a first speed control device 61.
[0065] The first stand delivery speed calculation unit 80a inputs the final target mass flow from the final target mass flow calculation unit 71 and the first stand delivery thickness actual value from the thickness gauge 31. The first stand delivery speed calculation unit 80a divides the final target mass flow by the first stand delivery thickness actual value measured at the delivery side of the first stand 1 to calculate the first stand delivery speed target value.
[0066] 1 described above, the first stand speed operation unit 81 inputs the actual speed value of the material 6 to be rolled at the exit of the first stand 1 from the speedometer 41 and the first stand exit speed target value from the first stand exit speed calculation unit 80a. The first stand speed operation unit 81 outputs a correction operation amount corresponding to the difference between the actual speed value and the first stand exit speed target value to the first speed control device 61 so that the actual speed value of the material 6 to be rolled at the exit of the first stand 1 coincides with the first stand exit speed target value. The first speed control device 61 controls the work roll speed of the first stand 1 by the roll speed actuator 11 in accordance with the correction operation amount.
[0067] As described above, according to the tandem cold rolling system shown in Fig. 3, like the above-mentioned Fig. 1, the mass flow on the delivery side of the first stand 1 can be made to coincide with the final target mass flow on the delivery side of the fifth stand 5. Therefore, the same effect can be achieved.
[0068] 2-2. Figure 4 (Thickness control: None / Upstream mass flow control: Speed) Next, the tandem cold rolling system shown in FIG. 4 will be described. Fig. 4 is a diagram for explaining a case where the mass flow on the delivery side of the third stand 3 is controlled by the speed when the delivery thickness of the third stand 3 is not controlled. The basic configurations of the tandem cold rolling mill 100 and the control device 101 shown in Fig. 4 are the same as those in Fig. 1, so the description will be omitted.
[0069] The tandem cold rolling mill 100 shown in Fig. 4 is equipped with a thickness gauge 33 and a speed gauge 43. The thickness gauge 33 is provided on the delivery side of the third stand 3 and measures the thickness of the material 6 to be rolled that has passed directly below it. The speed gauge 43 is provided on the delivery side of the third stand 3 and measures the transport speed of the material 6 to be rolled that has passed directly below it.
[0070] We will now explain the upstream mass flow control, which is a feature of the control device 101. The control device 101 includes an upstream stand control device 70. The upstream stand control device 70 includes a final target mass flow calculation unit 71 and an upstream mass flow control unit 72. The processing content of the final target mass flow calculation unit 71 is the same as that in FIG. 1 described above.
[0071] The upstream mass flow control unit 72 in FIG. 4 controls the roll speed actuator 13 provided in the third stand 3 so as to make the exit mass flow of the third stand 3 coincide with the final target mass flow.
[0072] A specific description will be given of the processing of the upstream mass flow control unit 72. The upstream mass flow control unit 72 includes a third stand outlet speed calculation unit 82a and a third stand speed operation unit 83. The upstream mass flow control unit 72 may include a third speed control device 63.
[0073] The third stand delivery speed calculation unit 82a inputs the final target mass flow from the final target mass flow calculation unit 71 and the third stand delivery thickness actual value from the thickness gauge 33. The third stand delivery speed calculation unit 82a divides the final target mass flow by the third stand delivery thickness actual value measured at the delivery side of the third stand 3 to calculate the third stand delivery speed target value.
[0074] 2 described above, the third stand speed operation unit 83 inputs the actual speed value of the material 6 to be rolled at the exit of the third stand 3 from the speedometer 43 and the target speed value at the exit of the third stand from the third stand exit speed calculation unit 82a. The third stand speed operation unit 83 outputs a correction operation amount corresponding to the difference between the actual speed value and the target speed value at the exit of the third stand to the third speed control device 63 so that the actual speed value of the material 6 to be rolled at the exit of the third stand 3 coincides with the target speed value at the exit of the third stand. The third speed control device 63 controls the work roll speed of the third stand 3 by the roll speed actuator 13 in accordance with the correction operation amount.
[0075] As described above, according to the tandem cold rolling system shown in Fig. 4, like the above-mentioned Fig. 2, the mass flow on the delivery side of the third stand 3 can be made to coincide with the final target mass flow on the delivery side of the fifth stand 5. Therefore, the same effect can be achieved.
[0076] 2-3. Figure 5 (Thickness control: None / Upstream mass flow control: Speed) Next, the tandem cold rolling system shown in FIG. 5 will be described. Fig. 5 is a modified example of Fig. 4, and is a diagram for explaining a case in which a gauge meter thickness is used instead of the thickness measured by the thickness gauge 33. The basic configurations of a tandem cold rolling mill 100 and a control device 101 shown in Fig. 5 are the same as those in Fig. 1, and therefore will not be described.
[0077] The tandem cold rolling mill 100 shown in Fig. 5 includes a speed meter 43. The speed meter 43 is provided on the outlet side of the third stand 3, and measures the transport speed of the material 6 to be rolled that passes directly below it.
[0078] We will now explain the upstream mass flow control, which is a feature of the control device 101. The control device 101 includes an upstream stand control device 70. The upstream stand control device 70 includes a final target mass flow calculation unit 71 and an upstream mass flow control unit 72. The processing content of the final target mass flow calculation unit 71 is the same as that in FIG. 1 described above.
[0079] The upstream mass flow control unit 72 in FIG. 5 controls the roll speed actuator 13 provided in the third stand 3 so as to make the exit mass flow of the third stand 3 coincide with the final target mass flow.
[0080] A specific description will be given of the processing of the upstream mass flow control unit 72. The upstream mass flow control unit 72 includes a third stand outlet speed calculation unit 82a, a third stand speed operation unit 83, and a third stand gauge meter thickness calculation unit 84. The upstream mass flow control unit 72 may include a third speed control device 63.
[0081] The third stand gauge meter thickness calculation unit 84 inputs the roll gap actual value and the rolling load actual value of the third stand 3. The third stand gauge meter thickness calculation unit 84 calculates the gauge meter thickness using the following formula (1). h = S + P / M (1) Here, h is the delivery thickness (gauge meter thickness), S is the actual roll gap value, P is the actual rolling load value, and M is a predetermined mill constant.
[0082] The third stand delivery speed calculation unit 82a inputs the final target mass flow from the final target mass flow calculation unit 71 and the gauge meter thickness from the third stand gauge meter thickness calculation unit 84. The gauge meter thickness corresponds to the actual thickness value at the third stand delivery. The processing contents of the third stand delivery speed calculation unit 82a and the third stand speed operation unit 83 are the same as those in FIG. 4 described above.
[0083] As described above, according to the tandem cold rolling system shown in Fig. 5, the mass flow on the delivery side of the third stand 3 can be made to coincide with the final target mass flow on the delivery side of the fifth stand 5, similarly to the above-mentioned Fig. 4. Therefore, the same effect can be achieved.
[0084] Embodiment 3 A third embodiment will be described with reference to FIGS. In the third embodiment, a case will be described in which the mass flow rate at the exit of the i-th stand is controlled by the roll gap when the thickness at the exit of the i-th stand is not controlled by the roll gap. The first and second embodiments described above are different in that the mass flow rate at the exit of the i-th stand is controlled by the speed, whereas the third embodiment is different in that the mass flow rate at the exit of the i-th stand is controlled by the roll gap.
[0085] FIG. 6 is a diagram for explaining a case in which the mass flow on the delivery side of the third stand is controlled by the roll gap when the delivery thickness of the third stand is not controlled. FIG. 7 is a modified example of FIG. 6, and is a diagram for explaining a case in which a gauge meter thickness is used instead of the thickness measured by the thickness gauge 33. In FIG.
[0086] 3-1. Figure 6 (Thickness control: None / Upstream mass flow control: Roll gap) First, a tandem cold rolling system shown in Fig. 6 will be described. The basic configurations of a tandem cold rolling mill 100 and a control device 101 shown in Fig. 6 are the same as those in Fig. 1, so the description will be omitted.
[0087] The tandem cold rolling mill 100 shown in Fig. 6 is equipped with a thickness gauge 33 and a speed gauge 43. The thickness gauge 33 is provided on the delivery side of the third stand 3 and measures the thickness of the material 6 to be rolled that has passed directly below it. The speed gauge 43 is provided on the delivery side of the third stand 3 and measures the transport speed of the material 6 to be rolled that has passed directly below it.
[0088] We will now explain the upstream mass flow control, which is a feature of the control device 101. The control device 101 includes an upstream stand control device 70. The upstream stand control device 70 includes a final target mass flow calculation unit 71 and an upstream mass flow control unit 72. The processing content of the final target mass flow calculation unit 71 is the same as that in FIG. 1 described above.
[0089] The upstream mass flow control unit 72 in FIG. 6 controls the roll gap actuator 23 provided in the third stand 3 so as to make the exit side mass flow of the third stand 3 coincide with the final target mass flow.
[0090] The processing of the upstream mass flow control unit 72 will be specifically described. The upstream mass flow control unit 72 includes a third stand delivery thickness target value calculation unit 85, a third stand reduction operation amount calculation unit 86, and a third stand reduction operation unit 87. The upstream mass flow control unit 72 may include a third reduction control device 93.
[0091] The third stand delivery thickness target value calculation unit 85 inputs the final target mass flow from the final target mass flow calculation unit 71 and the actual speed value of the rolled material 6 at the delivery side of the third stand 3 from the speed meter 43. The third stand delivery thickness target value calculation unit 85 divides the final target mass flow by the third stand delivery speed value of the rolled material 6 measured at the delivery side of the third stand to calculate a new third stand delivery thickness target value.
[0092] The third stand reduction operation amount calculation unit 86 inputs the third stand delivery thickness actual value from the thickness gauge 33 and the new third stand delivery thickness target value from the third stand delivery thickness target value calculation unit 85. The third stand reduction operation amount calculation unit 86 calculates a correction operation amount corresponding to the difference between the third stand delivery thickness actual value and the new third stand delivery thickness target value so that the third stand delivery thickness actual value measured at the delivery side of the third stand coincides with the new third stand delivery thickness target value. The third stand reduction operation unit 87 outputs the correction operation amount to the third reduction control device 93. The third reduction control device 93 controls the roll gap of the third stand 3 by the roll gap actuator 23 according to the correction operation amount.
[0093] As described above, according to the tandem cold rolling system shown in Fig. 6, the mass flow on the outlet side of the third stand 3 can be made to coincide with the final target mass flow on the outlet side of the fifth stand 5 by using the roll gap actuator 23 of the third stand 3. By adjusting the mass flow on the outlet side of the upstream stand early, the thickness fluctuation in the final stand can be reduced, and the outlet thickness of the final stand can be controlled quickly and satisfactorily.
[0094] 3-2. Figure 7 (Thickness control: None / Upstream mass flow control: Roll gap) Next, the tandem cold rolling system shown in FIG. 7 will be described. Fig. 7 is a modified example of Fig. 6, and is a diagram for explaining a case in which a gauge meter thickness is used instead of the thickness measured by the thickness gauge 33. The basic configurations of a tandem cold rolling mill 100 and a control device 101 shown in Fig. 7 are the same as those in Fig. 1, and therefore will not be described.
[0095] The tandem cold rolling mill 100 shown in Fig. 7 includes a speed meter 43. The speed meter 43 is provided on the outlet side of the third stand 3, and measures the transport speed of the material 6 to be rolled that passes directly below it.
[0096] We will now explain the upstream mass flow control, which is a feature of the control device 101. The control device 101 includes an upstream stand control device 70. The upstream stand control device 70 includes a final target mass flow calculation unit 71 and an upstream mass flow control unit 72. The processing content of the final target mass flow calculation unit 71 is the same as that in FIG. 1 described above.
[0097] The upstream mass flow control unit 72 in FIG. 7 controls the roll gap actuator 23 provided in the third stand 3 so as to make the exit side mass flow of the third stand 3 coincide with the final target mass flow.
[0098] The processing of the upstream mass flow control unit 72 will be specifically described. The upstream mass flow control unit 72 includes a third stand gauge meter thickness calculation unit 84, a third stand delivery thickness target value calculation unit 85, a third stand reduction operation amount calculation unit 86a, and a third stand reduction operation unit 87. The upstream mass flow control unit 72 may include a third reduction control device 93.
[0099] The processing contents of the third stand gauge meter thickness calculation unit 84 are the same as those in Fig. 5 described above. That is, the third stand gauge meter thickness calculation unit 84 inputs the roll gap actual value and the rolling load actual value of the third stand 3. The third stand gauge meter thickness calculation unit 84 calculates the gauge meter thickness using the above-mentioned formula (1).
[0100] The processing contents of the third stand delivery thickness target value calculation unit 85 are similar to those in FIG.
[0101] The third stand reduction operation amount calculation unit 86a inputs the gauge meter thickness from the third stand gauge meter thickness calculation unit 84 and the new third stand delivery thickness target value from the third stand delivery thickness target value calculation unit 85. The gauge meter thickness corresponds to the third stand delivery thickness actual value. The third stand reduction operation amount calculation unit 86a calculates a correction operation amount corresponding to the difference between the third stand delivery thickness actual value and the new third stand delivery thickness target value so that the third stand delivery thickness actual value measured at the delivery side of the third stand coincides with the new third stand delivery thickness target value. The third stand reduction operation unit 87 outputs the correction operation amount to the third reduction control device 93. The third reduction control device 93 controls the roll gap of the third stand 3 by the roll gap actuator 23 according to the correction operation amount.
[0102] As described above, according to the tandem cold rolling system shown in Fig. 7, similarly to Fig. 6, the roll gap actuator 23 of the third stand 3 can be used to make the mass flow on the delivery side of the third stand 3 coincide with the final target mass flow on the delivery side of the fifth stand 5. Therefore, the same effect can be achieved.
[0103] Embodiment 4 The fourth embodiment will be described with reference to FIG. In the fourth embodiment, a case will be described in which the mass flow on the outlet side of the i-th stand is controlled by the speed when the outlet thickness of the i-th stand is controlled by the speed.
[0104] In the fourth embodiment, unlike the first to third embodiments, the actuator used for controlling the strip thickness at the outlet of the i-th stand and the actuator used for controlling the upstream mass flow at the outlet of the i-th stand are the same.
[0105] 4-1. Figure 8 (Thickness control: speed / Upstream mass flow control: speed) A tandem cold rolling system shown in Fig. 8 will be described. Fig. 8 is a diagram for explaining a case where the mass flow on the delivery side of the third stand 3 is controlled by the speed when the delivery thickness of the third stand 3 is controlled by the speed. The basic configurations of the tandem cold rolling mill 100 and the control device 101 shown in Fig. 8 are the same as those in Fig. 1, so the description will be omitted.
[0106] The tandem cold rolling mill 100 shown in Fig. 8 is equipped with a thickness gauge 33 and a speed gauge 43. The thickness gauge 33 is provided on the delivery side of the third stand 3 and measures the thickness of the material 6 to be rolled that has passed directly below it. The speed gauge 43 is provided on the delivery side of the third stand 3 and measures the transport speed of the material 6 to be rolled that has passed directly below it.
[0107] The configuration of a thickness control section for controlling the delivery thickness of the third stand 3 by controlling the speed will be described with reference to FIG. The FB control device 52 of the control device 101 inputs the third stand delivery side thickness actual value measured by the thickness meter 33 and the third stand delivery side speed actual value measured by the speed meter 43. The FB control device 52 outputs an FB correction operation amount that correlates to a value obtained by multiplying a gain (coefficient) by the difference between the third stand delivery side thickness actual value and a third stand delivery side thickness target value determined in advance according to the product specifications of the rolled material 6. Here, the gain is set to be larger as the third stand delivery side speed actual value measured by the speed meter 43 is larger.
[0108] The second speed control device 62 drives the roll speed actuator 12 of the second stand 2 based on the FB correction operation amount input from the FB control device 52 to adjust the work roll speed of the second stand 2, thereby controlling the outlet plate thickness of the third stand 3.
[0109] In this way, the plate thickness control unit controls the exit thickness of the third stand 3 using the roll speed actuator 12 of the second stand 2 so that the actual plate thickness value at the exit of the third stand matches the target plate thickness value at the exit of the third stand that is predetermined in accordance with the product specifications of the rolled material 6.
[0110] We will now explain the upstream mass flow control, which is a feature of the control device 101. The control device 101 includes an upstream stand control device 70. The upstream stand control device 70 includes a final target mass flow calculation unit 71 and an upstream mass flow control unit 72. The processing content of the final target mass flow calculation unit 71 is the same as that in FIG. 1 described above.
[0111] The upstream mass flow control unit 72 according to the fourth embodiment controls an actuator provided upstream of the ith stand so as to make the outlet mass flow of the ith stand (1≦i≦N−2) coincide with the final target mass flow. The upstream mass flow control unit 72 in FIG. 8 controls the roll speed actuator 12 provided in the second stand 2 so as to make the exit mass flow of the third stand 3 coincide with the final target mass flow.
[0112] A specific description will be given of the processing of the upstream mass flow control unit 72. The upstream mass flow control unit 72 includes a third stand delivery thickness target value calculation unit 85. The upstream mass flow control unit 72 may include a second speed control device 62.
[0113] The processing contents of the third stand delivery thickness target value calculation unit 85 are the same as those in Fig. 6 described above. That is, the third stand delivery thickness target value calculation unit 85 inputs the final target mass flow from the final target mass flow calculation unit 71 and the actual speed value of the rolled material 6 at the delivery side of the third stand 3 from the speed meter 43. The third stand delivery thickness target value calculation unit 85 divides the final target mass flow by the third stand delivery speed actual value of the rolled material 6 measured at the delivery side of the third stand 3 to calculate a new third stand delivery thickness target value.
[0114] The upstream mass flow control unit 72 updates the third stand delivery thickness target value, which is determined in advance and is used by the FB control device 52 (thickness control unit), to the new third stand delivery thickness target value.
[0115] The FB control device 52 outputs an FB correction operation amount for making the actual thickness value of the third stand delivery side coincide with the new target thickness value of the third stand delivery side. The second speed control device 62 drives the roll speed actuator 12 of the second stand 2 based on the FB correction operation amount to control the thickness of the third stand delivery side.
[0116] As described above, according to the tandem cold rolling system shown in Fig. 8, when the same actuator (the roll speed actuator of the i-1st stand) is used for the strip thickness control at the exit of the i-th stand and the upstream mass flow control at the exit of the i-th stand, the mass flow at the exit of the i-th stand can be made to coincide with the final target mass flow. By adjusting the mass flow at the exit of the upstream stands early, the strip thickness fluctuation at the final stand can be reduced, and the strip thickness at the exit of the final stand can be controlled quickly and satisfactorily.
[0117] Embodiment 5. The fifth embodiment will be described with reference to FIGS. In the fifth embodiment, a case will be described in which the mass flow on the delivery side of the i-th stand is controlled by the roll gap when the delivery thickness of the i-th stand is controlled by the roll gap.
[0118] In the fifth embodiment, unlike the first to third embodiments, the actuator used for controlling the strip thickness at the outlet of the i-th stand and the actuator used for controlling the upstream mass flow at the outlet of the i-th stand are the same.
[0119] FIG. 9 is a diagram for explaining a case in which the mass flow on the delivery side of the first stand is controlled by the roll gap when the delivery side thickness of the first stand is controlled by the roll gap. FIG. 10 is a diagram for explaining a case in which the mass flow on the delivery side of the third stand is controlled by the roll gap when the delivery thickness of the third stand is controlled by the roll gap.
[0120] 5-1. Figure 9 (Thickness control: roll gap / Upstream mass flow control: roll gap) A tandem cold rolling system shown in Fig. 9 will be described. The basic configurations of the tandem cold rolling mill 100 and the control device 101 shown in Fig. 9 (including the configuration of the plate thickness control unit (FB control device 51) that controls the delivery plate thickness of the first stand 1 by the roll gap) are the same as those in Fig. 1, so the description will be omitted.
[0121] We will now explain the upstream mass flow control, which is a feature of the control device 101. The control device 101 includes an upstream stand control device 70. The upstream stand control device 70 includes a final target mass flow calculation unit 71 and an upstream mass flow control unit 72. The processing content of the final target mass flow calculation unit 71 is the same as that in FIG. 1 described above.
[0122] An upstream mass flow control unit 72 in FIG. 9 controls the roll gap actuator 21 provided in the first stand 1 so as to make the exit side mass flow of the first stand 1 coincide with the final target mass flow.
[0123] A specific description will be given of the processing of the upstream mass flow control unit 72. The upstream mass flow control unit 72 includes a first stand delivery thickness target value calculation unit 88. The upstream mass flow control unit 72 may include a first screw down control device 91.
[0124] The first stand delivery thickness target value calculation unit 88 inputs the final target mass flow from the final target mass flow calculation unit 71 and the actual speed value of the rolled material 6 at the delivery side of the first stand 1 from the speed meter 41. The first stand delivery thickness target value calculation unit 88 divides the final target mass flow by the first stand delivery speed value of the rolled material 6 measured at the delivery side of the first stand 1 to calculate a new first stand delivery thickness target value.
[0125] The upstream mass flow control unit 72 updates the first stand delivery thickness target value, which is determined in advance and is used by the FB control device 51 (thickness control unit), to the new first stand delivery thickness target value.
[0126] The FB control device 51 outputs an FB correction operation amount for making the first stand delivery thickness actual value coincide with the new first stand delivery thickness target value. The first roll gap control device 91 drives the roll gap actuator 21 of the first stand 1 based on the FB correction operation amount to control the delivery thickness of the first stand 1.
[0127] As described above, according to the tandem cold rolling system shown in Fig. 9, when the same actuator (the roll gap actuator of the i-th stand) is used for the strip thickness control at the exit of the i-th stand and the upstream mass flow control at the exit of the i-th stand, the mass flow at the exit of the i-th stand can be made to coincide with the final target mass flow. By adjusting the mass flow at the exit of the upstream stand early, the strip thickness fluctuation at the final stand can be reduced, and the strip thickness at the exit of the final stand can be controlled quickly and satisfactorily.
[0128] 5-2. Figure 10 (Thickness control: roll gap / Upstream mass flow control: roll gap) Next, the tandem cold rolling system shown in FIG. 10 will be described. Fig. 10 is a diagram for explaining a case where the mass flow rate on the delivery side of the third stand is controlled by the roll gap when the delivery thickness of the third stand is controlled by the roll gap. The basic configurations of a tandem cold rolling mill 100 and a control device 101 shown in Fig. 10 are the same as those in Fig. 1, so the description will be omitted.
[0129] The tandem cold rolling mill 100 shown in Fig. 10 is equipped with a thickness gauge 33 and a speed gauge 43. The thickness gauge 33 is provided on the delivery side of the third stand 3 and measures the thickness of the material 6 to be rolled that has passed directly below it. The speed gauge 43 is provided on the delivery side of the third stand 3 and measures the transport speed of the material 6 to be rolled that has passed directly below it.
[0130] The configuration of the thickness control unit that controls the delivery thickness of the third stand 3 by the roll gap will be described with reference to FIG. The FB control device 53 of the control device 101 inputs the third stand delivery side thickness actual value measured by the thickness gauge 33 and the third stand delivery side speed actual value measured by the speed meter 43. The FB control device 53 outputs an FB correction operation amount that correlates to a value obtained by multiplying a gain (coefficient) by the difference between the third stand delivery side thickness actual value and a third stand delivery side thickness target value determined in advance according to the product specifications of the rolled material 6. Here, the gain is set to be larger as the third stand delivery side speed actual value measured by the speed meter 43 is larger.
[0131] The third roll gap control device 93 drives the roll gap actuator 23 based on the FB correction operation amount input from the FB control device 53 to adjust the roll gap between the upper and lower work rolls of the third stand 3, thereby controlling the delivery thickness of the third stand 3.
[0132] We will now explain the upstream mass flow control, which is a feature of the control device 101. The control device 101 includes an upstream stand control device 70. The upstream stand control device 70 includes a final target mass flow calculation unit 71 and an upstream mass flow control unit 72. The processing content of the final target mass flow calculation unit 71 is the same as that in FIG. 1 described above.
[0133] The upstream mass flow control unit 72 in FIG. 10 controls the roll gap actuator 23 provided in the third stand 3 so as to make the exit side mass flow of the third stand 3 coincide with the final target mass flow.
[0134] A specific description will be given of the processing of the upstream mass flow control unit 72. The upstream mass flow control unit 72 includes a third stand delivery thickness target value calculation unit 85. The upstream mass flow control unit 72 may include a third screw down control device 93.
[0135] The processing contents of the third stand delivery thickness target value calculation unit 85 are the same as those in Fig. 6 described above. That is, the third stand delivery thickness target value calculation unit 85 inputs the final target mass flow from the final target mass flow calculation unit 71 and the actual speed value of the rolled material 6 at the delivery side of the third stand 3 from the speed meter 43. The third stand delivery thickness target value calculation unit 85 divides the final target mass flow by the third stand delivery speed actual value of the rolled material 6 measured at the delivery side of the third stand to calculate a new third stand delivery thickness target value.
[0136] The upstream mass flow control unit 72 updates the third stand delivery thickness target value, which is determined in advance and is used by the FB control device 53 (thickness control unit), to the new third stand delivery thickness target value.
[0137] The FB control device 53 outputs an FB correction operation amount for making the third stand delivery thickness actual value coincide with the new third stand delivery thickness target value. The third roll gap control device 93 drives the roll gap actuator 23 of the third stand 3 based on the FB correction operation amount to control the delivery thickness of the first stand 1.
[0138] As described above, according to the tandem cold rolling system shown in Fig. 10, when the same actuator (the roll gap actuator of the i-th stand) is used for the strip thickness control at the exit of the i-th stand and the upstream mass flow control, the mass flow at the exit of the i-th stand can be made to coincide with the final target mass flow. By adjusting the mass flow at the exit of the upstream stand early, the strip thickness fluctuation at the final stand can be reduced, and the strip thickness at the exit of the final stand can be controlled quickly and satisfactorily.
[0139] Embodiment 6 A sixth embodiment will be described with reference to FIGS. In the sixth embodiment, a case will be described in which the mass flow rate at the outlet of the i-th stand is controlled by the speed when the outlet thickness of the i-th stand is controlled by the speed. This is the same as in the fourth embodiment. However, the sixth embodiment is different in that the target value of the thickness control is not changed, whereas the target value of the thickness control is changed in the fourth embodiment.
[0140] Also, in the sixth embodiment, unlike the first to third embodiments, the actuator used for the strip thickness control at the outlet of the ith stand is the same as the actuator used for the strip thickness control at the outlet of the ith stand. Also, the actuators (roll speed) used for strip thickness control and mass flow control are the same as those in the fourth embodiment, but in the sixth embodiment, the stands for the actuators used for strip thickness control and mass flow control are different.
[0141] Figure 11 is a diagram to explain a case in which the mass flow on the outlet side of the third stand 3 is controlled by speed (without changing the target value for thickness control) when the outlet thickness of the third stand 3 is controlled by speed. FIG. 12 is a modified example of FIG. 11, and is a diagram for explaining a case in which the actual thickness value at the delivery side of the third stand measured by a thickness meter 33 is substituted for the predetermined target thickness value at the delivery side of the third stand.
[0142] 6-1. Figure 11 (Thickness control: speed / Upstream mass flow control: speed) First, a tandem cold rolling system shown in Fig. 11 will be described. The basic configurations of a tandem cold rolling mill 100 and a control device 101 shown in Fig. 11 are the same as those in Fig. 1, so the description will be omitted.
[0143] The tandem cold rolling mill 100 shown in Fig. 11 is equipped with a thickness gauge 33 and a speed gauge 43. The thickness gauge 33 is provided on the delivery side of the third stand 3 and measures the thickness of the rolled material 6 that has passed directly below it. The speed gauge 43 is provided on the delivery side of the third stand 3 and measures the transport speed of the rolled material 6 that has passed directly below it.
[0144] The configuration of a thickness control section for controlling the delivery thickness of the third stand 3 by controlling the speed will be described with reference to FIG. The FB control device 52 of the control device 101 inputs the third stand delivery side thickness actual value measured by the thickness meter 33 and the third stand delivery side speed actual value measured by the speed meter 43. The FB control device 52 outputs an FB correction operation amount that correlates to a value obtained by multiplying a gain (coefficient) by the difference between the third stand delivery side thickness actual value and a third stand delivery side thickness target value determined in advance according to the product specifications of the rolled material 6. Here, the gain is set to be larger as the third stand delivery side speed actual value measured by the speed meter 43 is larger.
[0145] The second speed control device 62 drives the roll speed actuator 12 of the second stand 2 based on the FB correction operation amount input from the FB control device 52 to adjust the work roll speed of the second stand 2, thereby controlling the outlet plate thickness of the third stand 3.
[0146] In this way, the plate thickness control unit controls the exit thickness of the third stand 3 using the roll speed actuator 12 of the second stand 2 so that the actual plate thickness value at the exit of the third stand matches the target plate thickness value at the exit of the third stand that is predetermined in accordance with the product specifications of the rolled material 6.
[0147] We will now explain the upstream mass flow control, which is a feature of the control device 101. The control device 101 includes an upstream stand control device 70. The upstream stand control device 70 includes a final target mass flow calculation unit 71 and an upstream mass flow control unit 72. The processing content of the final target mass flow calculation unit 71 is the same as that in FIG. 1 described above.
[0148] The upstream mass flow control unit 72 in FIG. 11 controls the roll speed actuator 13 provided in the third stand 3 so as to make the exit mass flow of the third stand 3 coincide with the final target mass flow.
[0149] A specific description will be given of the processing of the upstream mass flow control unit 72. The upstream mass flow control unit 72 includes a third stand outlet speed calculation unit 82 and a third stand speed operation unit 83. The upstream mass flow control unit 72 may include a third speed control device 63.
[0150] The processing contents of the third stand outlet speed calculation unit 82 are the same as those in Fig. 2 described above. That is, the third stand outlet speed calculation unit 82 inputs the final target mass flow from the final target mass flow calculation unit 71. The third stand outlet speed calculation unit 82 divides the final target mass flow by a third stand outlet thickness target value that is determined in advance according to the product specifications of the rolled material 6 to calculate the third stand outlet speed target value.
[0151] The processing contents of the third stand speed operation unit 83 are the same as those in Fig. 2 described above. That is, the third stand speed operation unit 83 inputs the actual speed value of the material 6 to be rolled at the exit of the third stand 3 from the speedometer 43 and the target speed value at the exit of the third stand from the third stand exit speed calculation unit 82. The third stand speed operation unit 83 outputs a correction operation amount corresponding to the difference between the actual speed value and the target speed value at the exit of the third stand to the third speed control device 63 so that the actual speed value of the material 6 to be rolled at the exit of the third stand 3 coincides with the target speed value at the exit of the third stand. The third speed control device 63 controls the work roll speed of the third stand 3 by the roll speed actuator 13 in accordance with the correction operation amount.
[0152] As described above, according to the tandem cold rolling system shown in Fig. 11, the mass flow rate on the delivery side of the third stand 3 can be made to coincide with the final target mass flow rate on the delivery side of the fifth stand 5 without changing the target value of the strip thickness control. By adjusting the mass flow rate on the delivery side of the upstream stands early, the strip thickness fluctuation in the final stand can be reduced, and the strip thickness on the delivery side of the final stand can be controlled quickly and satisfactorily.
[0153] 6-2. Figure 12 (Thickness control: speed / Upstream mass flow control: speed) Next, a tandem cold rolling system shown in FIG. 12 will be described. Fig. 12 is a modified example of Fig. 11, and is a diagram for explaining a case in which a third stand delivery side actual thickness value measured by a thickness meter 33 is substituted for a predetermined third stand delivery side thickness target value. The basic configurations of a tandem cold rolling mill 100 and a control device 101 shown in Fig. 12 are the same as those in Fig. 1, and therefore description thereof will be omitted.
[0154] The tandem cold rolling mill 100 shown in Fig. 12 is equipped with a thickness gauge 33 and a speed gauge 43. The thickness gauge 33 is provided on the delivery side of the third stand 3 and measures the thickness of the material 6 to be rolled that has passed directly below it. The speed gauge 43 is provided on the delivery side of the third stand 3 and measures the transport speed of the material 6 to be rolled that has passed directly below it.
[0155] The configuration and processing contents of the thickness control section for controlling the delivery thickness of the third stand 3 by the speed are similar to those in FIG. 11 described above, and therefore will not be described.
[0156] We will now explain the upstream mass flow control, which is a feature of the control device 101. The control device 101 includes an upstream stand control device 70. The upstream stand control device 70 includes a final target mass flow calculation unit 71 and an upstream mass flow control unit 72. The processing content of the final target mass flow calculation unit 71 is the same as that in FIG. 1 described above.
[0157] The upstream mass flow control unit 72 in FIG. 12 controls the roll speed actuator 13 provided in the third stand 3 so as to make the exit mass flow of the third stand 3 coincide with the final target mass flow.
[0158] A specific description will be given of the processing of the upstream mass flow control unit 72. The upstream mass flow control unit 72 includes a third stand outlet speed calculation unit 82a and a third stand speed operation unit 83. The upstream mass flow control unit 72 may include a third speed control device 63.
[0159] The processing contents of the third stand outlet speed calculation unit 82a are the same as those in Fig. 4 described above. That is, the third stand outlet speed calculation unit 82a inputs the final target mass flow from the final target mass flow calculation unit 71 and the third stand outlet thickness actual value from the thickness gauge 33. The third stand outlet speed calculation unit 82a divides the final target mass flow by the third stand outlet thickness actual value measured at the outlet of the third stand 3 to calculate the third stand outlet speed target value.
[0160] The processing contents of the third stand speed operation unit 83 are the same as those in Fig. 2 (Fig. 11) described above. That is, the third stand speed operation unit 83 inputs the actual speed value of the material 6 to be rolled at the exit of the third stand 3 from the speedometer 43 and the target speed value at the exit of the third stand from the third stand exit speed calculation unit 82a. The third stand speed operation unit 83 outputs a correction operation amount corresponding to the difference between the actual speed value and the target speed value at the exit of the third stand to the third speed control device 63 so that the actual speed value of the material 6 to be rolled at the exit of the third stand 3 coincides with the target speed value at the exit of the third stand. The third speed control device 63 controls the work roll speed of the third stand 3 by the roll speed actuator 13 in accordance with the correction operation amount.
[0161] As described above, according to the tandem cold rolling system shown in Fig. 12, like the above-mentioned Fig. 11, the mass flow on the delivery side of the third stand 3 can be made to coincide with the final target mass flow on the delivery side of the fifth stand 5. Therefore, the same effect can be achieved.
[0162] <Hardware configuration example> 13 is a conceptual diagram showing an example of a hardware configuration of a processing circuit included in the control device 101 in each of the above-mentioned embodiments. The functions of the control device are realized by the processing circuit. In one aspect, the processing circuit includes at least one processor 111 and at least one memory 112. In another aspect, the processing circuit includes at least one dedicated hardware 113.
[0163] When the processing circuit includes the processor 111 and the memory 112, each function is realized by software, firmware, or a combination of software and firmware. At least one of the software and firmware is written as a program. At least one of the software and firmware is stored in the memory 112. The processor 111 realizes each function by reading and executing the program stored in the memory 112.
[0164] When the processing circuitry comprises dedicated hardware 113, the processing circuitry may be, for example, a single circuit, multiple circuits, a programmed processor, or a combination thereof. Each function is implemented by the processing circuitry.
[0165] Although the embodiments of the present invention have been described above, the present invention is not limited to the above-mentioned embodiments, and various modifications can be made without departing from the spirit of the present invention. In the above-mentioned embodiments, when the number, quantity, amount, range, etc. of each element is mentioned, the present invention is not limited to the mentioned numbers, unless otherwise specified or clearly specified in principle. Furthermore, the structures, etc. described in the above-mentioned embodiments are not necessarily essential to the present invention, unless otherwise specified or clearly specified in principle. [Explanation of symbols]
[0166] 1. First Stand 2. Second Stand 3. Third Stand 4. Fourth Stand 5. Fifth Stand 6 Rolled material 11~14 Roll speed actuator 21,23 Roll Gap Actuator 30,31,33,35 Plate thickness gauge 40,41,43,45 Speedometer 50 FF control device 51~54 FB control device 61 First speed control device 62 Second speed control device 63 Third speed control device 64 4th speed control device 70 Upstream stand control device 71 Final target mass flow calculation section 72 Upstream mass flow control section 80, 80a First stand exit speed calculation unit 81 First stand speed control unit 82, 82a Third stand exit speed calculation unit 83 3rd stand speed control unit 84 3rd stand gauge meter thickness calculation unit 85 Third stand delivery thickness target value calculation unit 86, 86a 3rd stand pressure drop operation amount calculation unit 87 3rd stand compression operation unit 88 No. 1 stand delivery thickness target value calculation unit 91 First rolling control device 93 3rd rolling control device 100 Tandem Cold Rolling Mill 101 Control device 111 Processor 112 Memory 113 Hardware
Claims
1. A tandem rolling system having N (N≧3) rolling stands for continuously rolling a material to be rolled, a final target mass flow calculation unit that calculates a final target mass flow, which is the mass flow at the exit of the final stand, by multiplying an actual speed value of the rolled material measured at the exit of the Nth stand, which is the final stand, by a final stand exit thickness target value that is predetermined according to the product specifications of the rolled material; an upstream mass flow control unit that controls an actuator provided in an i-th stand (1≦i≦N−2) or an actuator provided upstream of the i-th stand so as to make the outlet mass flow of the i-th stand coincide with the final target mass flow; Equipped with The actuator provided in the i-th stand includes a roll speed actuator that controls a work roll speed, The upstream mass flow control unit is The final target mass flow is divided by a target thickness value at the outlet of the i-th stand, which is determined in advance according to the product specifications of the rolled material, or by an actual thickness value at the outlet of the i-th stand, which is measured at the outlet of the i-th stand, to calculate a target speed value at the outlet of the i-th stand; controlling the work roll speed of the i-stand by the roll speed actuator so that an actual speed value of the rolled material at the exit side of the i-stand coincides with a target speed value at the exit side of the i-stand; The tandem rolling system is characterized by:
2. The actuator provided in the i-th stand further includes a roll gap actuator that controls a roll gap, The tandem rolling system further includes a thickness control unit that controls the outlet thickness of the i stand by the roll gap actuator so that the i stand outlet thickness actual value coincides with the predetermined i stand outlet thickness target value; The tandem rolling system according to claim 1 .
3. The actual thickness value of the i-th stand is a gauge meter thickness calculated based on the actual roll gap value and the actual rolling load value in the i-th stand.
3. The tandem rolling system according to claim 1 or 2.
4. A tandem rolling system having N (N≧3) rolling stands for continuously rolling a material to be rolled, a final target mass flow calculation unit that calculates a final target mass flow, which is the mass flow at the exit of the final stand, by multiplying an actual speed value of the rolled material measured at the exit of the Nth stand, which is the final stand, by a final stand exit thickness target value that is predetermined according to the product specifications of the rolled material; an upstream mass flow control unit that controls an actuator provided in an i-th stand (1≦i≦N−2) or an actuator provided upstream of the i-th stand so as to make the outlet mass flow of the i-th stand coincide with the final target mass flow; Equipped with The actuator provided in the i-th stand further includes a roll gap actuator that controls a roll gap, The tandem rolling system further includes a thickness control unit that controls the delivery thickness of the i stand by the roll gap actuator of the i stand so that the actual delivery thickness value of the i stand coincides with a target delivery thickness value of the i stand determined in advance according to the product specifications of the rolled material; The upstream mass flow control unit is The final target mass flow is divided by the actual speed value of the rolled material measured at the exit of the i-th stand to calculate a new target thickness value of the i-th stand; Updating the predetermined i-th stand delivery thickness target value used by the plate thickness control unit to the new i-th stand delivery thickness target value; The tandem rolling system is characterized by:
5. A tandem rolling system having N (N≧3) rolling stands for continuously rolling a material to be rolled, a final target mass flow calculation unit that calculates a final target mass flow, which is the mass flow at the exit of the final stand, by multiplying an actual speed value of the rolled material measured at the exit of the Nth stand, which is the final stand, by a final stand exit thickness target value that is predetermined according to the product specifications of the rolled material; an upstream mass flow control unit that controls an actuator provided in an i-th stand (1≦i≦N−2) or an actuator provided upstream of the i-th stand so as to make the outlet mass flow of the i-th stand coincide with the final target mass flow; Equipped with The actuator provided upstream of the i-th stand includes a roll speed actuator for controlling a work roll speed provided in an i-1-th stand (2≦i≦N−2), The tandem rolling system further includes a thickness control unit that controls the exit thickness of the i stand by the roll speed actuator of the i-1 stand so that the i stand exit thickness actual value coincides with the i stand exit thickness target value predetermined according to the product specifications of the rolled material; The upstream mass flow control unit is The final target mass flow is divided by the actual speed value of the rolled material measured at the exit of the i-th stand to calculate a new target thickness value of the i-th stand; Updating the predetermined i-th stand delivery thickness target value used by the plate thickness control unit to the new i-th stand delivery thickness target value; The tandem rolling system is characterized by:
Citation Information
Patent Citations
Plate thickness controller in tandem roller
JP1994142739A
Method for controlling threading and rolling control system in tandem mill
JP1998216817A
Method for controlling thickness of material to be rolled and device therefor
JP1999319924A
Control method for plate thickness of tender rolling mill
JP2002292415A
Plate-thickness controlling method in tandem rolling mill
JP2004268084A