Power System

The power system addresses the issue of increased grid power consumption by distributing power from functional storage batteries across different compartments, ensuring stable power supply and reducing costs through compartmentalized power management.

JP7560004B2Active Publication Date: 2024-10-02MURATA MFG CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2024539325
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2022-09-15
Filing Date
2023-08-24
Publication Date
2024-10-02
Estimated Expiration
2043-08-24

AI Technical Summary

Technical Problem

In conventional power storage systems, if there is an unusable power storage unit, the load receiving power from that unit cannot receive power from the commercial power grid, leading to an increase in power consumption from the grid.

Method used

A power system with multiple loads and power conditioners, each installed in different fire compartments, where a control device manages power distribution and switches to functional storage batteries from other compartments to supply power to loads, preventing excessive grid power use.

Benefits of technology

The system effectively suppresses the increase in power consumption from the commercial power system by utilizing functional storage batteries to power loads even when some batteries fail, maintaining stable power supply and reducing installation costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007560004000001
    Figure 0007560004000001
  • Figure 0007560004000002
    Figure 0007560004000002
  • Figure 0007560004000003
    Figure 0007560004000003
Patent Text Reader

Abstract

A power system (10) comprises: a plurality of loads (41-44); a plurality of power conditioners (31-34); a power reception point (P500); and a control device (60). The plurality of loads (41-44) are respectively installed in a plurality of different fireproof compartments in a building. The plurality of power conditioners (31-34) comprise power storage batteries (315, 325, 335, 345) installed in the respective fireproof compartments, and perform charging using power supplied from a commercial power grid or discharging of power from the storage batteries (315, 325, 335, 345) to the loads (41-44). The control device (60): detects a failure in the power storage batteries (315, 325, 335, 345) of the plurality of power conditioners (31-34); and performs control so as to supply power, from a power conditioner (32) located outside a fireproof compartment in which a power conditioner (34) comprising a failed power storage battery (345) is installed, to a load (44) in the fireproof compartment in which the power conditioner (34) comprising the failed power storage battery (345) is installed.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a power system including a plurality of power storage units and a plurality of loads. [Background technology]

[0002] A power storage system is described in Patent Document 1. The power storage system of Patent Document 1 includes a plurality of power storage units and a plurality of power conversion units.

[0003] The power conversion units are arranged corresponding to the power storage units, respectively. The power conversion units convert the DC output of the power storage units connected to each of the power conversion units into AC output and supply the AC output to a load.

[0004] When power is consumed by a load, the power storage system of Patent Document 1 supplies the load with power discharged from the power storage unit as well as power from a commercial power system. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2017-85852 A Summary of the Invention [Problem to be solved by the invention]

[0006] However, in the conventional configuration as shown in Patent Document 1, if there is an unavailable power storage unit among the multiple power storage units, the load that has been receiving power from the unavailable power storage unit receives power from the commercial power grid, which increases the received power from the commercial power grid.

[0007] Therefore, an object of the present invention is to provide a power system that can suppress an increase in power supply from a power grid even when an unavailable storage battery is present. [Means for solving the problem]

[0008] The power system of the present invention includes a plurality of loads, a plurality of power conditioners, a power receiving point, and a control device. The plurality of loads are installed in a plurality of different fire compartments in a building. The plurality of power conditioners include storage batteries installed in each of the plurality of fire compartments, and charge the storage batteries with power supplied from a commercial power system, or discharge power from the storage batteries to the loads. The power receiving point is a point where the outputs of the plurality of power conditioners are collected and connected to the commercial power system. The control device refers to the direction and magnitude of the current at the power receiving point and controls charging and discharging of each of the storage batteries of the plurality of power conditioners.

[0009] The control device detects failures in the storage batteries of multiple power conditioners and controls the supply of power from power conditioners other than the fire compartment in which the power conditioner with the failed storage battery is installed to the load in the fire compartment in which the power conditioner with the failed storage battery is installed.

[0010] In this configuration, even if a power conditioner and a storage battery are normally assigned to each load, if a faulty storage battery is present, power is supplied to the load that was previously served by the faulty storage battery by other non-faulty storage batteries. Effect of the Invention

[0011] According to the present invention, even if an unavailable storage battery exists, an increase in power supply from the power grid can be suppressed. [Brief description of the drawings]

[0012] [Figure 1] FIG. 1 is a diagram illustrating an example of a configuration of a power system according to a first embodiment. [Diagram 2] FIG. 2 is a diagram showing an example of a steady-state power supply state in the power system according to the first embodiment of the present invention. [Diagram 3]FIG. 3 is a diagram showing an example of a power supply state when a failure occurs in a storage battery in the power system according to the first embodiment of the present invention. [Figure 4] FIG. 4 is a diagram illustrating an example of the configuration of a power system according to the second embodiment. [Diagram 5] FIG. 5 is a diagram showing each state in rotation control in the power system according to the second embodiment. [Figure 6] FIG. 6 is a diagram showing each state in rotation control in the power system according to the second embodiment. [Figure 7] FIG. 7 is a diagram showing each state in rotation control in the power system according to the second embodiment. [Figure 8] FIG. 8 is a diagram showing each state in rotation control in the power system according to the second embodiment. [Figure 9] FIG. 9 is a diagram showing an example of a power supply state when a failure occurs in a storage battery in a power system according to the second embodiment of the present invention. [Figure 10] FIG. 10 is a diagram showing an example of a charge / discharge sequence in the power system according to the second embodiment of the present invention. [Figure 11] FIG. 11 is a diagram showing an example of a change in room temperature when the power system according to the second embodiment of the present invention is adopted. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] [First embodiment] A power system according to a first embodiment of the present invention will be described with reference to the drawings. Fig. 1 is a diagram showing an example of the configuration of the power system according to the first embodiment. Note that the number of tiers, the number of power conditioners, and the number of loads in each embodiment including this embodiment are merely examples, and are not limited to these examples as long as there are multiple loads.

[0014] (Schematic configuration of power system 10) As shown in FIG. 1, the power system 10 includes a plurality of power conditioners 31-34, a plurality of loads 41-44, a control device 60, a commercial power interconnection line 500, a power receiving point P500, and a current sensor CT.

[0015] The multiple power conditioners 31-34 include a power conditioner 31, a power conditioner 32, a power conditioner 33, and a power conditioner 34. The multiple loads 41-44 include a load 41, a load 42, a load 43, and a load 44.

[0016] The multiple power conditioners 31-34, the multiple loads 41-44, and the control device 60 are installed in a building having, for example, multiple floors (four floors in the illustrated example). In the illustrated example, the power conditioner 31 and the load 41 are installed on the third floor, and the power conditioner 32 and the load 42 are installed on the second floor. The power conditioner 33 and the load 43 are installed on the first floor, and the power conditioner 34 and the load 44 are installed on the first basement floor. That is, the sets of the power conditioner and the load are installed on different floors of the same building. The control device 60 may be installed on any floor.

[0017] Each floor is set in a different fire compartment, i.e., each set (plural sets) of the power conditioner and the load is installed in a different fire compartment.

[0018] The multiple power conditioners 31-34 are connected to a power receiving point P500, and outputs of the multiple power conditioners 31-34 are collected at the power receiving point P500 and are connected to the commercial power system via a commercial power interconnection line 500.

[0019] The power conditioner 31 includes a PCS control unit 310, a bidirectional inverter 313, a bidirectional DCDC converter 314, a storage battery 315, and a grid interconnection relay 316. The grid interconnection relay 316 is connected to a power receiving point P500. An AC terminal of the bidirectional inverter 313 is connected to the grid interconnection relay 316, and a DC terminal of the bidirectional inverter 313 is connected to the bidirectional DCDC converter 314. The bidirectional DCDC converter 314 is connected to the storage battery 315.

[0020] The PCS control unit 310 controls various operations of the power conditioner 31 in accordance with control instructions from the control device 60. The PCS control unit 310 also detects the operating state of each part of the power conditioner 31, and transmits the detected abnormality to the control device 60.

[0021] The power conditioner 32 includes a PCS control unit 320, a bidirectional inverter 323, a bidirectional DC-DC converter 324, a storage battery 325, and a grid interconnection relay 326. The grid interconnection relay 326 is connected to a power receiving point P500.

[0022] The power conditioner 33 includes a PCS control unit 330, a bidirectional inverter 333, a bidirectional DC-DC converter 334, a storage battery 335, and a grid interconnection relay 336. The grid interconnection relay 336 is connected to a power receiving point P500.

[0023] The power conditioner 34 includes a PCS control unit 340, a bidirectional inverter 343, a bidirectional DC-DC converter 344, a storage battery 345, and a grid interconnection relay 346. The grid interconnection relay 346 is connected to a power receiving point P500.

[0024] The configuration and control of power conditioners 32-34 are similar to those of power conditioner 31, and therefore a description thereof will be omitted.

[0025] The load 41 is connected to a line connecting the power conditioner 31 and the power receiving point P500. The load 42 is connected to a line connecting the power conditioner 32 and the power receiving point P500. The load 43 is connected to a line connecting the power conditioner 33 and the power receiving point P500. The load 44 is connected to a line connecting the power conditioner 34 and the power receiving point P500.

[0026] (Control device 60) The control device 60 receives output (direction and magnitude of current at the power receiving point P500) from a current sensor CT arranged on the commercial power interconnection line 500, and performs various controls, which will be described later, on the multiple power conditioners 31-34.

[0027] (Steady-state control) FIG. 2 is a diagram showing an example of a steady-state power supply state in the power system according to the first embodiment of the present invention.

[0028] When the control device 60 detects that it is receiving power supply from the commercial power grid based on the output of the current sensor CT, it outputs power supply instructions to the multiple power conditioners 31-34 so as to supply operating power to the loads 41-44 while performing discharge assistance using the storage batteries 315, 325, 335, 345, so as to ensure that the power supply (purchased power) per specified time period (e.g., 30 minutes) from the commercial power grid does not exceed a preset upper limit value.

[0029] The multiple power conditioners 31-34 supply power to the loads 41-44 in accordance with a power supply instruction from the control device 60. At this time, the multiple power conditioners 31-34 each supply power to the loads 41-44 installed on the same floor.

[0030] More specifically, the PCS control unit 310 of the power conditioner 31 performs control so that the power consumption of the load 41 is covered by the power from the commercial power grid (purchased power) and the discharged power from the storage battery 315. That is, the PCS control unit 310 discharges the power from the storage battery 315 to supply to the load 41 the power that is insufficient for the power consumption of the load 41 from the commercial power grid (power instructed by the control device 60) allocated to the load 41.

[0031] The PCS control unit 320 of the power conditioner 32 performs control so that the power consumption of the load 42 is covered by the power from the commercial power system (purchased power) and the discharged power from the storage battery 325. That is, the PCS control unit 320 discharges the power from the storage battery 325 to supply to the load 42 the power that is insufficient for the power consumption of the load 42 from the commercial power system (power instructed by the control device 60) allocated to the load 42.

[0032] The PCS control unit 330 of the power conditioner 33 performs control so that the power consumption of the load 43 is covered by the power from the commercial power system (purchased power) and the discharged power from the storage battery 335. That is, the PCS control unit 330 discharges the power from the storage battery 335 to supply to the load 43 the power that is insufficient for the power consumption of the load 43 from the commercial power system (power instructed by the control device 60) allocated to the load 43.

[0033] The PCS control unit 340 of the power conditioner 34 performs control so that the power consumption of the load 44 is covered by the power from the commercial power system (purchased power) and the discharged power from the storage battery 345. That is, the PCS control unit 340 discharges the power from the storage battery 345 to supply to the load 44 the power that is insufficient for the power consumption of the load 44 from the commercial power system (power instructed by the control device 60) allocated to the load 44.

[0034] By performing such control, the power system 10 can utilize power supply from the storage batteries 315, 325, 335, 345 of the multiple power conditioners 31-34 installed on the same floor as the multiple loads 41-44 installed on different floors (fire compartments), and can supply power to the multiple loads 41-44 within a range in which the supply power (purchased power) per specified time period (e.g., 30 minutes) from the commercial power system does not exceed a preset upper limit value.

[0035] Here, when a single storage battery is provided in a building and power is supplied from this single storage battery to multiple loads 41-44, a storage battery with a capacity sufficient to cover the power consumption of the multiple loads 41-44 is required. However, in the power system 10, a storage battery that receives power supply is provided for each load, so the capacity of each storage battery can be made smaller than when only one storage battery is provided. In other words, in the power system 10, the capacity of the storage battery provided for each fire compartment can be made smaller.

[0036] This makes it easier for the power system 10 to meet safety requirements for installing the storage battery, and reduces the installation costs for the storage battery.

[0037] (Control when a battery failure occurs) Fig. 3 is a diagram showing an example of a power supply state when a failure occurs in a storage battery in the power system according to the first embodiment of the present invention. Fig. 3 shows a case where the storage battery 345 of the power conditioner 34 fails, but similar control is also possible when a storage battery of another power conditioner fails.

[0038] As shown in FIG. 3, when the storage battery 345 breaks down and is unable to supply power to the load 44, the PCS control unit 340 detects this and transmits a notification to the control device 60.

[0039] When the control device 60 acquires information about a malfunction of the storage battery 345, it instructs the PCS control unit 320 of the power conditioner 32 to assist in discharging the load 44.

[0040] The PCS control unit 320 performs control to increase the discharge power of the storage battery 325 so as to supply power to the load 42 as well as to the load 44 .

[0041] As a result, the load 44 is supplied with discharged power from the storage battery 325 in addition to the power supplied from the commercial power system, and the power consumption of the load 44 can be fully covered. Therefore, even if the storage battery 345 installed in the same fire compartment as the load 44 breaks down, the power system 10 can perform power assist from the storage battery 325 installed in another fire compartment.

[0042] Moreover, the power system 10 can suppress a stop of operation of the load 44 due to a failure of the storage battery 345. Furthermore, the power system 10 can suppress a sudden increase in the power supply from the commercial power grid, and can control the power supply from the commercial power grid per given time period so as not to exceed an upper limit value.

[0043] Note that the power assist for the faulty storage battery 345 is not limited to the non-faulty storage battery 325. For example, the power assist for the faulty storage battery 345 may be the non-faulty storage battery 315 or the non-faulty storage battery 335, and multiple non-faulty storage batteries can be used simultaneously. Also, the power assist for the faulty storage battery 345 can use multiple non-faulty storage batteries in turn.

[0044] [Second embodiment] A power system according to a second embodiment of the present invention will be described with reference to Fig. 4. Fig. 4 is a diagram showing an example of the configuration of the power system according to the second embodiment.

[0045] 4, the power system 10A according to the second embodiment differs from the power system 10 according to the first embodiment in that the loads 41-44 are air conditioners 41A-44A, respectively, and that the multiple air conditioners 41A-44A are operated in rotation, and in the control corresponding to these different configurations. The other configurations of the power system 10A are the same as those of the power system 10, and a description of similar parts will be omitted.

[0046] The power system 10A includes a plurality of power conditioners 31-34, a plurality of air conditioners 41A-44A, a control device 60, a commercial power interconnection line 500, a power receiving point P500, and a current sensor CT.

[0047] The air conditioner 41A is installed on the same floor as the power conditioner 31. The air conditioner 41A is connected to a line connecting the power conditioner 31 and the power receiving point P500. The air conditioner 42A is installed on the same floor as the power conditioner 32. The air conditioner 42A is connected to a line connecting the power conditioner 32 and the power receiving point P500. The air conditioner 43A is installed on the same floor as the power conditioner 33. The air conditioner 43A is connected to a line connecting the power conditioner 33 and the power receiving point P500. The air conditioner 44A is installed on the same floor as the power conditioner 34. The air conditioner 44A is connected to a line connecting the power conditioner 34 and the power receiving point P500.

[0048] The control device 60 issues control instructions to the multiple power conditioners 31-34, and also controls the operation of the multiple air conditioners 41A-44A.

[0049] (Operation control) (Steady-state control) Figures 5, 6, 7, and 8 are diagrams showing the states of rotation control in the power system according to the second embodiment. Figure 5 shows a case where only the air conditioner on the third floor is operated, Figure 6 shows a case where only the air conditioner on the second floor is operated, Figure 7 shows a case where only the air conditioner on the first floor is operated, and Figure 8 shows a case where only the air conditioner on the B1 floor is operated.

[0050] As shown in Figures 5, 6, 7 and 8, the control device 60 controls the operation of the multiple air conditioners 41A-44A so that they operate in rotation. That is, the control device 60 controls the operation of the multiple air conditioners 41A-44A so that the operating states of the multiple air conditioners 41A-44A do not overlap and each of them operates independently in turn.

[0051] First, as shown in Fig. 5, the control device 60 operates the air conditioner 41A and stops the multiple air conditioners 42A, 43A, and 44A. In this state, the control device 60 issues an instruction to the power conditioner 31 to assist the power consumption of the air conditioner 41A by discharging the storage battery 315. The PCS control unit 310 of the power conditioner 31 controls the discharge of the storage battery 315 and supplies power to the air conditioner 41A.

[0052] More specifically, the control device 60 controls the power supplied from the commercial power system, and the PCS control unit 310 compensates for the shortage of power supplied from the commercial power system relative to the power consumed by the air conditioner 41A with the discharged power of the storage battery 315. For example, when the power consumed by the air conditioner 41A is 5 kWh, the control device 60 controls so that 3 kWh is supplied from the commercial power system to the air conditioner 41A, and the PCS control unit 310 controls so that 2 kWh is supplied to the air conditioner 41A using the discharged power of the storage battery 315.

[0053] At this time, the control device 60 controls the multiple power conditioners 32-34 so that the storage batteries 325, 335, 345 do not discharge electricity.

[0054] Next, as shown in Fig. 6, the control device 60 operates the air conditioner 42A and stops the multiple air conditioners 41A, 43A, and 44A. In this state, the control device 60 issues an instruction to the power conditioner 32 to discharge the storage battery 325 to assist the power consumption of the air conditioner 42A. The PCS control unit 320 of the power conditioner 32 controls the discharge of the storage battery 325 to supply power to the air conditioner 42A. At this time, the control device 60 controls the multiple power conditioners 31, 33, and 34 so that they do not discharge from their respective storage batteries 315, 335, and 345.

[0055] Next, as shown in Fig. 7, the control device 60 operates the air conditioner 43A and stops the multiple air conditioners 41A, 42A, 44A. In this state, the control device 60 issues an instruction to the power conditioner 33 to assist the power consumption of the air conditioner 43A by discharging the storage battery 335. The PCS control unit 330 of the power conditioner 33 controls the discharge of the storage battery 335 and supplies power to the air conditioner 43A. At this time, the control device 60 controls the multiple power conditioners 31, 32, 34 so that they do not discharge from their respective storage batteries 315, 325, 345.

[0056] Next, as shown in Fig. 8, the control device 60 operates the air conditioner 44A and stops the multiple air conditioners 41A, 42A, and 43A. In this state, the control device 60 issues an instruction to the power conditioner 34 to assist the power consumption of the air conditioner 44A by discharging the storage battery 345. The PCS control unit 340 of the power conditioner 34 controls the discharge of the storage battery 345 and supplies power to the air conditioner 44A. At this time, the control device 60 controls the multiple power conditioners 31, 32, and 33 so that they do not discharge from their respective storage batteries 315, 325, and 335.

[0057] After this, the above-mentioned air conditioner 41A is operated alone with assistance from the storage battery 315, the air conditioner 42A is operated alone with assistance from the storage battery 325, the air conditioner 43A is operated alone with assistance from the storage battery 335, and the air conditioner 44A is operated alone with assistance from the storage battery 345, and this is repeated in that order.

[0058] (Control when a battery failure occurs) Fig. 9 is a diagram showing an example of a power supply state when a failure occurs in a storage battery in a power system according to the second embodiment of the present invention. Fig. 9 shows a case where the storage battery 345 of the power conditioner 34 fails, but similar control is also possible when a storage battery of another power conditioner fails.

[0059] First, in the rotational operation of multiple air conditioners 41A-44A, the control in the case where the air conditioners 41A, 42A, and 43A are operated with power assist from the storage batteries 315, 325, and 335 that are not malfunctioning is the same as the steady-state control described above, and therefore a description thereof will be omitted.

[0060] In the rotation operation, when the operation period of the air conditioner 44A begins, the control device 60 receives the detection result of the failure of the storage battery 345 and controls the air conditioner 44A to provide power assist from the other storage battery. For example, in the case of Fig. 9, the control device 60 instructs the power conditioner 32 to provide power assist from the storage battery 325. The PCS control unit 320 of the power conditioner 32 controls the discharge of the storage battery 325, and the power conditioner 32 supplies power to the air conditioner 44A.

[0061] As a result, the air conditioner 44A is supplied with power discharged from the storage battery 325 in addition to power supplied from the commercial power system, and the power consumption of the air conditioner 44A can be fully covered. Therefore, even if the storage battery 345 installed in the same fire compartment as the air conditioner 44A breaks down, the power system 10A can perform power assist from the storage battery 325 installed in another fire compartment.

[0062] Moreover, the power system 10A can prevent the operation of the air conditioner 44A from being stopped due to a failure of the storage battery 345. This allows the power system 10A to prevent people in a space where the air conditioning is controlled by the air conditioner 44A from feeling uncomfortable. Furthermore, the power system 10A can prevent a sudden increase in the power supply from the commercial power system, and can control the power supply from the commercial power system per given time period so as not to exceed an upper limit value.

[0063] (Charge / discharge sequence) FIG. 10 is a diagram showing an example of a charge / discharge sequence in a power system according to a second embodiment of the present invention. FIG. 10 shows a case where one storage battery (storage battery 345 on floor B1) is faulty, and the horizontal axis of each graph in FIG. 10 indicates time, and the vertical axis indicates the remaining capacity of the storage battery. FIG. 11 is a diagram showing an example of changes in room temperature when a power system according to a second embodiment of the present invention is adopted. FIG. 11 shows a case where cooling is performed by an air conditioner, and the horizontal axis indicates time, and the vertical axis indicates room temperature.

[0064] The power system 10A rotates the operation of a plurality of air conditioners 41A, 42A, 43A, and 44A. As a result, as shown in Figures 10 and 11, the room temperature of the third floor, which is air-conditioned by the air conditioner 41A, drops to Td41 when the air conditioner 41A is operating, and the room temperature of the second floor, which is air-conditioned by the air conditioner 42A, drops to Td42 when the air conditioner 42A is operating. The room temperature of the first floor, which is air-conditioned by the air conditioner 43A, drops to Td43 when the air conditioner 43A is operating, and the room temperature of the B1 floor, which is air-conditioned by the air conditioner 44A, drops to Td44 when the air conditioner 44A is operating.

[0065] Here, as described above, when storage battery 345 fails and storage battery 325 assists, as shown in FIG. 10, the remaining capacity of storage battery 315 decreases at Td41 when air conditioner 41A is operating, the remaining capacity of storage battery 325 decreases at Td42 when air conditioner 42A is operating and at Td44 when air conditioner 44A is operating, and the remaining capacity of storage battery 335 decreases at Td43 when air conditioner 43A is operating.

[0066] When such control is performed, charging control is performed on the non-faulty storage batteries 315, 325, 335. More specifically, the power system 10A performs charging through the following control.

[0067] As shown in Fig. 11, the control device 60 controls the operation and stop of the multiple air conditioners 41A-44A based on the room temperature on each floor. For example, when the room temperature on the third floor reaches the cooling upper limit temperature tct, the control device 60 starts the operation of the air conditioner 41A using the discharge assist of the storage battery 315, and when the room temperature on the third floor reaches the cooling lower limit temperature tcb, the control device 60 stops the operation of the air conditioner 41A and stops the discharge of the storage battery 315. The cooling upper limit temperature tct and the cooling lower limit temperature tcb are set within a predetermined temperature range based on the set temperature (target room temperature) of the air conditioner. This temperature range is a temperature range in which the set temperature causes almost no discomfort.

[0068] Next, when the room temperature on the second floor reaches the upper limit temperature for cooling tct, the control device 60 starts operating the air conditioner 42A using the discharge assist of the storage battery 325, and when the room temperature on the second floor reaches the lower limit temperature for cooling tcb, it stops the operation of the air conditioner 42A and stops discharging the storage battery 325.

[0069] Next, when the room temperature on the first floor reaches the upper limit temperature for cooling tct, the control device 60 starts operating the air conditioner 43A using the discharge assist of the storage battery 335, and when the room temperature on the first floor reaches the lower limit temperature for cooling tcb, it stops the operation of the air conditioner 43A and stops discharging the storage battery 335.

[0070] Next, when the room temperature on floor B1 reaches the upper limit temperature for cooling tct, the control device 60 starts operating the air conditioner 44A using the discharge assistance of the storage battery 325, and when the room temperature on floor B1 reaches the lower limit temperature for cooling tcb, it stops the operation of the air conditioner 44A and stops discharging from the storage battery 325.

[0071] In this rotation control, by operating and stopping a plurality of air conditioners 41A-44A according to temperature, there are a period (gap time) between the stop of operation of air conditioner 41A and the start of operation of air conditioner 42A, a period (gap time) between the stop of operation of air conditioner 42A and the start of operation of air conditioner 43A, a period (gap time) between the stop of operation of air conditioner 42A and the start of operation of air conditioner 43A, and a period (gap time) between the stop of operation of air conditioner 44A and the start of operation of air conditioner 41A. These periods (gap times) are periods during which discharging of all the storage batteries 315, 325, 335 is stopped.

[0072] The control device 60 detects periods (gap times) during which all of the air conditioners 41A-44A and the storage batteries 315, 325, 335 are stopped. Then, the control device 60 controls the charging of one of the storage batteries 315, 325, 335 during these periods (gap times). For example, the control device 60 controls the charging of the storage battery 315 during the charging period Tc315 in Fig. 10, controls the charging of the storage battery 325 during the charging period Tc325, and controls the charging of the storage battery 335 during the charging period Tc335. This allows the power system 10A to appropriately recover the remaining capacity of the storage batteries 315, 325, 335 whose remaining capacity has decreased due to discharge assistance.

[0073] At this time, as shown in FIG. 10, the control device 60 sets the number of charging periods Tc325 (total charging time) of the storage battery 325 that assists the discharge of the air conditioners 42A and 44A to be greater than the number of charging periods Tc315 (total charging time) of the storage battery 315 that assists the discharge of the air conditioner 41A and the number of charging periods Tc335 (total charging time) of the storage battery 335 that assists the discharge of the air conditioner 43A.

[0074] This allows the power system 10A to effectively recover the remaining capacity of the storage battery 325, which has a larger discharge amount than the storage batteries 315 and 335, during one cycle of the rotation control.

[0075] The storage battery performing the power assist may be a storage battery on a floor different from the floor on which the air conditioner receiving the power assist is installed. However, it is preferable that the storage battery performing the power assist is a storage battery installed on the same floor as the air conditioner that is not immediately before or immediately after the rotation of the air conditioner receiving the power assist. This allows the power system 10A to prevent the storage battery performing the power assist from continuously providing power assistance to successive air conditioners in rotation. Therefore, the remaining capacity of the storage battery is unlikely to become 0, and the power system 10A can continue more stable power assist when there is a faulty storage battery.

[0076] In the above explanation, the case where cooling is performed by the air conditioner is shown, but the same control can be applied to the case where heating is performed. However, in the case of heating, the control device 60 starts the operation of the air conditioner when the room temperature reaches the lower limit temperature for heating, and stops the operation of the air conditioner when the room temperature reaches the upper limit temperature for heating.

[0077] (Parallel-off control) In the above-mentioned control during normal operation and control when a failure occurs in the storage battery, when the control device 60 detects a reverse power flow to the commercial power grid based on the output of the current sensor CT, it controls so as to disconnect only the grid interconnection relays 316, 326, 336, 346 of the power conditioners 31-34 that have a discharging storage battery among the storage batteries 315, 325, 335, 345. The power conditioners that receive this disconnection control disconnect their own grid interconnection relays.

[0078] This allows power systems 10, 10A to prevent the occurrence of reverse power flow to the commercial power grid.

[0079] Furthermore, in the power systems 10 and 10A, the power conditioner including the failed storage battery may disconnect the grid interconnection relay.

[0080] Furthermore, in the power system 10A, a power conditioner other than the power conditioner including the storage battery that performs the power assist may disconnect the grid interconnection relay during a period in which the power assist is being performed.

[0081] <1> A plurality of loads installed in different fire compartments in a building, respectively; A plurality of power conditioners each including a storage battery installed in each of the plurality of fire compartments, the power conditioners charging electric power supplied from a commercial power system or discharging electric power from the storage battery to the load; a power receiving point at which outputs of the plurality of power conditioners are collected and connected to the commercial power system; A control device that controls charging and discharging of each of the storage batteries of the plurality of power conditioners by referring to a direction and a magnitude of a current at the power receiving point; A power system comprising: The control device includes: Detecting a failure in a storage battery of the plurality of power conditioners; A power system that controls power supply to the load in the fire compartment in which the power conditioner having the failed storage battery is installed from the power conditioner in a compartment other than the fire compartment in which the power conditioner having the failed storage battery is installed.

[0082] <2> The plurality of fire compartments are a plurality of floors in a building, The plurality of loads are air conditioning devices installed on each of the plurality of floors, The control device includes: The air conditioners are controlled so that their operating times do not overlap with each other, When the failed storage battery is not present, the power conditioner is controlled so that the storage power of the storage battery of the power conditioner installed on the same floor as the air conditioner in operation is supplied to the air conditioner in operation. <1> power system.

[0083] <3> The control device includes: When the faulty storage battery is present, control is performed so that the stored power of the storage battery of the power conditioner installed on a floor different from that of the air conditioner in operation is supplied to the air conditioner in operation. <2> power system.

[0084] <4> The control device includes: Control is performed so that the storage power of the storage battery of the power conditioner installed on the same floor as the air conditioner in a different order from the air conditioner immediately before and immediately after the rotation operation is supplied to the air conditioner on the same floor as the failed storage battery. <3> power system.

[0085] <5> The control device includes: When a reverse power flow to the commercial power grid is detected, Among the plurality of power conditioners, control is performed so that only a grid interconnection relay of a power conditioner discharging from the storage battery is disconnected. <2> ~ <4> Either of the power systems.

[0086] <6> The control device includes: When the temperatures of the plurality of floors reach a cooling upper limit temperature, the air conditioner of the floor where the cooling upper limit temperature has been reached is operated; When the temperatures of the plurality of floors reach a lower limit temperature for cooling, the air conditioners in operation are controlled to be stopped. <2> ~ <5> Either of the power systems.

[0087] <7> The control device includes: When the temperature of the plurality of floors reaches a lower limit temperature for heating, the air conditioner of the floor where the temperature reaches the lower limit temperature for heating is operated; When the temperatures of the plurality of floors reach an upper heating limit temperature, the air conditioner in operation is controlled to stop. <2> ~ <5> Either of the power systems.

[0088] <8> The control device includes: controlling the storage batteries to be charged when all of the air conditioning devices on the plurality of floors are stopped; <2> ~ <7> Either of the power systems. [Explanation of symbols]

[0089] 10, 10A: Power system 31, 32, 33, 34: Power conditioner 41, 42, 43, 44: Load 41A, 42A, 43A, 44A: Air conditioning equipment 60: Control device 310, 320, 330, 340: PCS control unit 313, 323, 333, 343: Bidirectional inverter 314, 324, 334, 344: Bidirectional DC-DC converter 315, 325, 335, 345: Storage battery 316, 326, 336, 346: Grid-connected relays 500: Commercial power grid connection line CT: Current sensor P500: Power receiving point

Claims

1. A plurality of loads installed in different fire compartments in a building, respectively; A plurality of power conditioners each including a storage battery installed in each of the plurality of fire compartments, the power conditioners charging electric power supplied from a commercial power system or discharging electric power from the storage battery to the load; a power receiving point at which outputs of the plurality of power conditioners are collected and connected to the commercial power system; A control device that controls charging and discharging of each of the storage batteries of the plurality of power conditioners by referring to a direction and a magnitude of a current at the power receiving point; A power system comprising: The control device includes: Detecting a failure in a storage battery of the plurality of power conditioners; Controlling to supply power from the power conditioner other than the fire compartment in which the power conditioner including the failed storage battery is installed to the load in the fire compartment in which the power conditioner including the failed storage battery is installed; Power system.

2. The plurality of fire compartments are a plurality of floors in a building, The plurality of loads are air conditioning devices installed on each of the plurality of floors, The control device includes: The air conditioners are controlled so that their operating times do not overlap with each other, When the failed storage battery is not present, the power conditioner is controlled so that the storage power of the storage battery of the power conditioner installed on the same floor as the air conditioner in operation is supplied to the air conditioner in operation. The power system of claim 1 .

3. The control device includes: When the faulty storage battery is present, control is performed so that the stored power of the storage battery of the power conditioner installed on a floor different from that of the air conditioner in operation is supplied to the air conditioner in operation. The power system of claim 2 .

4. The control device includes: Control is performed so that the storage power of the storage battery of the power conditioner installed on the same floor as the air conditioner in a different order from the air conditioner immediately before and immediately after the rotation operation is supplied to the air conditioner on the same floor as the failed storage battery. The power system of claim 3 .

5. The control device includes: When a reverse power flow to the commercial power grid is detected, Among the plurality of power conditioners, control is performed so that only a grid interconnection relay of a power conditioner discharging from the storage battery is disconnected. The power system of claim 2 .

6. The control device includes: When the temperatures of the plurality of floors reach a cooling upper limit temperature, the air conditioner of the floor where the cooling upper limit temperature has been reached is operated; When the temperatures of the plurality of floors reach a lower limit temperature for cooling, the air conditioners in operation are controlled to be stopped. The power system of claim 2 .

7. The control device includes: When the temperature of the plurality of floors reaches a lower limit temperature for heating, the air conditioner of the floor where the temperature reaches the lower limit temperature for heating is operated; When the temperatures of the plurality of floors reach an upper heating limit temperature, the air conditioner in operation is controlled to stop. The power system of claim 2 .

8. The control device includes: controlling the storage batteries to be charged when all of the air conditioning devices on the plurality of floors are stopped; The power system of claim 2 .

Citation Information

Patent Citations

  • Power distributing system

    JP1980074321A

  • Fireproof door

    JP2001220963A

  • Distributed power storage system

    JP2003299251A

  • Switchboard, and power receiving and distributing equipment using switchboard

    JP2004236453A

  • Power feed system

    JP2011160596A