Operation control device for hydroelectric power generation facility

The operation control device in hydroelectric power facilities uses sensors and a neural network to enhance the accuracy of gabbing control, addressing unnecessary control and improving efficiency by detecting debris in water turbines.

JP7560964B2Active Publication Date: 2024-10-03THE CHUGOKU ELECTRIC POWER CO INC +2
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2020094791
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-05-29
Publication Date
2024-10-03
Estimated Expiration
2040-05-29

AI Technical Summary

Technical Problem

Conventional gabbing control in hydroelectric power generation facilities is often performed unnecessarily, leading to decreased power generation efficiency due to the lack of accurate detection of debris in water turbines.

Method used

An operation control device equipped with sensors and an information processing unit that utilizes a neural network to determine the need for gabbing control based on sensor data, adjusting the operation of guide vanes to prevent unnecessary control and improve accuracy.

Benefits of technology

The system accurately performs gabbing control, reducing unnecessary operations and enhancing power generation efficiency by effectively detecting and responding to debris in water turbines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007560964000001
    Figure 0007560964000001
  • Figure 0007560964000002
    Figure 0007560964000002
  • Figure 0007560964000003
    Figure 0007560964000003
Patent Text Reader

Abstract

To provide an operation controller of a hydraulic power generation facility capable of more accurately performing gaburi control.SOLUTION: An operation controller of a hydraulic power generation facility comprises a detection unit including a plurality of sensors installed in a water turbine of the hydraulic power generation facility, and an information processing unit that makes a determination regarding the implementation of gaburi control of a guide vane of the water turbine based on the output of the detection unit. The information processing unit comprises: a storage unit that stores teacher data corresponding to the output from the plurality of sensors indicating that the water turbine is in a state where gaburi control should be performed; and an arithmetic unit that generates a neural network for determining whether data corresponding to new output from the plurality of sensors is the data indicating that the gaburi control should be performed, based on the teacher data.SELECTED DRAWING: Figure 8
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an operation control device for a hydroelectric power plant. [Background technology]

[0002] In hydroelectric power generation facilities, garbage control is performed by opening and closing guide vanes in order to eliminate garbage getting caught in the water turbine (for example, Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Publication No. 01-087876 Summary of the Invention [Problem to be solved by the invention]

[0004] Conventionally, the gargling control has been performed periodically using a timer control, etc. Therefore, there is a possibility that unnecessary gargling control is performed even when there is no dust adhesion, and the power generation efficiency is reduced due to such unnecessary gargling control.

[0005] An object of the present invention is to provide an operation control device for a hydroelectric power generation facility that can perform scavenge control more accurately. [Means for solving the problem]

[0006] In order to solve the above-mentioned problems and achieve the objective, the operation control device for a hydroelectric power generation facility of the present invention comprises a detection unit including a plurality of sensors provided on a water turbine of the hydroelectric power generation facility, and an information processing unit that makes a determination regarding the implementation of garbage control of the guide vanes of the water turbine based on the output of the detection unit, and the information processing unit comprises a memory unit in which teacher data corresponding to outputs from the plurality of sensors indicating that the water turbine is in a state where the garbage control should be implemented, and a calculation unit that generates a neural network based on the teacher data for determining whether data corresponding to new outputs from the plurality of sensors is data indicating that the water turbine is in a state where the garbage control should be implemented.

[0007] In a preferred aspect of the present invention, the calculation unit adds the data corresponding to the new output to the teacher data when it determines that the data corresponding to the new output is data indicating a state in which the gab control should be implemented.

[0008] In a preferred aspect of the present invention, when the calculation unit determines that data corresponding to the new output obtained immediately after the implementation of the garbage collection control is data indicating a state in which the garbage collection control should be implemented, the calculation unit does not add data corresponding to the new output obtained immediately before the implementation of the garbage collection control to the teacher data.

[0009] In a preferred embodiment of the present invention, the water turbine includes a runner that rotates in response to the supply of water, a casing that guides water to the runner, guide vanes provided in a flow path through which water in the casing is supplied to the runner, and a draft that guides water supplied to the runner and discharged, and the multiple sensors include at least a first sensor that detects the opening of the guide vanes, a second sensor that detects the water pressure in a pipe that supplies water to the casing, a third sensor that detects the water level of a water tank that stores the water to be supplied to the pipe, a fourth sensor that detects the water pressure in the draft, and a fifth sensor that detects the output of a generator that generates electricity in response to the rotation of the runner, and the information processing unit considers data in which a predetermined condition is met as data indicating that the garbage control should be implemented, and the predetermined condition is that the outputs of the first sensor, the second sensor, and the third sensor are within a normal output range in which no garbage is caught in the water turbine, and the output of at least one of the fourth sensor and the fifth sensor is an abnormal output that exceeds the normal output range.

[0010] In a preferred embodiment of the present invention, the plurality of sensors includes a sixth sensor that detects the opening degree of an inlet valve that opens and closes the water flow path between the pipe and the casing, and the information processing unit treats sensing data in which any of the plurality of sensors other than the first sensor, the second sensor, the third sensor and the sixth sensor is producing an output during the abnormal state as data indicating that the gabble control should be implemented.

[0011] In a preferred embodiment of the present invention, the number of times the gag control is performed within a predetermined period is determined in advance. Effect of the Invention

[0012] According to the present invention, it is possible to perform more accurate gagging control. [Brief description of the drawings]

[0013] [Figure 1] FIG. 1 is a schematic diagram showing a specific configuration example of a hydroelectric power generation facility. [Diagram 2] FIG. 2 is a schematic diagram showing a specific configuration example of a hydroelectric power generation facility. [Diagram 3] FIG. 3 is a schematic diagram of a guide vane. [Figure 4] FIG. 4 is a schematic diagram of a guide vane. [Diagram 5] FIG. 5 is a block diagram showing a functional configuration related to the guide vane gab control. [Figure 6] FIG. 6 is a diagram showing an example of changes and correlations in the sensor output when an abnormality occurs that may require the execution of gagging control. [Figure 7] FIG. 7 is a diagram showing a comparison example of the sensor output in a normal state where no debris has been caught in the water turbine and in an abnormal state where debris has been caught in the water turbine. [Figure 8] FIG. 8 is a flowchart showing a process flow relating to gab control for each predetermined period. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] Next, an embodiment of the present invention will be described in detail with reference to the drawings.

[0015] 1 and 2 are schematic diagrams showing a specific configuration example of a hydroelectric power generation facility 100. Fig. 1 shows a configuration example of an iron pipe 71 that guides water W to a runner 74 of the hydroelectric power generation facility 100, an inlet valve 80, a casing 72, and a guide vane 73. Fig. 2 shows a draft 75 through which the water W supplied from the casing 72 to the runner 74 flows out, and various configurations related to the connection between the runner 74 and a generator 79.

[0016] In the hydroelectric power generation facility 100, a casing 72 that surrounds a runner 74 so as to guide water W to be supplied to the runner 74 is connected to an iron pipe 71 via an inlet valve 80. The iron pipe 71 is a tubular member that is provided so as to be able to pass water W. The inlet valve 80 includes, for example, a rotating shaft 81, a valve 82, and a housing 83. The rotating shaft 81 rotatably supports the valve 82. The valve 82 is provided so as to be able to change its rotation angle with respect to the water flow direction in a waterway that continues between the iron pipe 71 and the casing 72, with the rotating shaft 81 as the rotation center axis, and opens and closes the waterway. The housing 83 is a tubular housing that forms the waterway.

[0017] The casing 72 has a housing that forms an annular water passage that spirals around the central axis of rotation of a runner 74, which is, for example, a Francis turbine. A guide vane 73 is provided in the flow passage of water W that flows from the outer periphery of the runner 74 toward the runner 74 inside the casing 72.

[0018] 3 and 4 are schematic diagrams of the guide vane 73. The guide vane 73 has a plurality of blades 73a arranged to surround the runner 74. Each of the plurality of blades 73a is provided to be rotatable. The guide vane 73 is provided to be capable of adjusting the opening and closing and the degree of opening of the gap between the adjacent blades 73a by the rotation of the plurality of blades 73a. When the guide vane 73 is open as shown in FIG. 3, the water W supplied to the runner 74 flows through the gap between the blades 73a. In FIG. 1, the water W supplied to the runner 74 is diagrammatically illustrated by an arrow. Also, when the guide vane 73 is closed as shown in FIG. 4, the gap between the blades 73a is closed and there is no gap, and the water W does not flow. Note that the illustration of the blades 73a is simplified in FIG. 1, but in reality, as illustrated in FIG. 4, the blades 73a adjacent to each other in the circumferential direction are brought into contact with each other to close the flow path of the water W.

[0019] Also, by changing the opening degree of the guide vanes 73, it is possible to change the pressure on the water W. By intentionally causing such a change in pressure, it is possible to induce the garbage that has flowed into and remains in the water turbine, which will be described later, to flow out. The opening and closing operation control of the guide vanes 73 for the purpose of flowing out such garbage is called garbage control.

[0020] The water W etc. supplied to the runner 74 applies a force that rotates the runner 74 and flows out into the draft 75. The draft 75 functions as a flow path for the water W that flows out through the runner 74. The draft 75 shown in Fig. 2 has a nozzle shape that diverges from the runner 74 side toward the opposite side, and generates a pressure difference that accelerates the water W toward the opposite side.

[0021] The runner 74 is connected to a shaft 76 via a support portion 74a that supports blades for rotating when water W is received. The shaft 76 is rotatably supported above the runner 74 by a plurality of bearings such as bearings 77 and 78, and functions as a rotating shaft of the runner 74. The shaft 76 shown in FIG. 2 has a lower end connected to the runner 74 and an upper end connected to a generator 79. The generator 79 generates electricity in response to the rotation of the runner 74 transmitted via the shaft 76.

[0022] 5 is a block diagram showing a functional configuration related to the gab control of the guide vanes 73. The hydroelectric power generation facility 100 includes a guide vane operation control unit 10, a guide vane driving unit 21, a detection unit 50, and the like.

[0023] The guide vane operation control unit 10, which functions as an operation control device for the hydroelectric power generation facility 100, includes, for example, a calculation unit 11, a storage unit 12, a guide vane control unit 13, etc., and functions as an information processing unit that processes information related to the gaburi control. The calculation unit 11 has a calculation circuit such as a CPU (Central Processing Unit), and reads out software programs and data (hereinafter referred to as programs, etc.) stored in the storage unit 12 to perform various processes.

[0024] The storage unit 12 has a hard disk drive (HDD), a solid state drive (SSD), a flash memory, or other storage device, and stores programs, etc. The storage unit 12 shown in FIG. 5 stores an operating system (not shown) for the guide vane operation control unit 10 to function as an information processing device, in addition to a gabble control unit management program 121 and sensing log data 122. The gabble control unit management program 121 is a program for performing processing related to gabble control, and the details of the program will be described later. The sensing log data 122 is data generated based on the output from the detection unit 50 and used for processing the gabble control unit management program 121, and the details of the program will be described later. The storage unit 12 also has a storage device such as a semiconductor memory that functions as a RAM (Random Access Memory) for temporarily storing programs, etc. read by the calculation unit 11, and data, parameters, etc. generated in association with the execution processing of the programs, etc.

[0025] Note that the specific aspect of the configuration functioning as the information processing unit in guide vane operation control unit 10 is not limited to this. For example, instead of calculation unit 11 and storage unit 12 that stores gabble control unit management program 121, an integrated circuit such as an FPGA (Field Programmable Gate Array) in which a function corresponding to gabble control unit management program 121 is pre-implemented may be provided in guide vane operation control unit 10. Note that even in this case, it is preferable to provide a separate storage device such as storage unit 12 for storing sensing log data 122 that can be referenced from the integrated circuit.

[0026] Guide vane control unit 13 includes a driver circuit and the like that controls the operation of guide vane drive unit 21, and controls the operation of guide vane drive unit 21 under control of processing performed by calculation unit 11. Guide vane drive unit 21 includes an electric drive system (electric motor, etc.) that is provided so as to be able to change the opening degree of guide vanes 73. The opening degree of guide vane 73 is changed in response to the operation of guide vane drive unit 21.

[0027] 5 also illustrates inlet valve operation control unit 30 and inlet valve drive unit 31. Inlet valve operation control unit 30 is similar to guide vane operation control unit 10 except that the control target is inlet valve 80 instead of guide vane 73, but does not include configurations corresponding to gabble control unit management program 121 and sensing log data 122. Inlet valve drive unit 31 is similar to guide vane drive unit 21 except that the control target is inlet valve 80 instead of guide vane 73.

[0028] The detection unit 50 includes sensors provided in various parts of the hydroelectric power generation facility 100. Specifically, the detection unit 50 includes, for example, an iron pipe water pressure sensor 51, a casing water pressure sensor 52, a runner side pressure sensor 53, a runner back pressure sensor 54, a draft water pressure sensor 55, a shaft vibration sensor 56, a bearing vibration sensor 57, an inlet valve opening sensor 58, a guide vane opening sensor 59, an inlet valve drive current sensor 60, a guide vane drive current sensor 61, a water tank water level sensor 62, a generator output sensor 63, and the like.

[0029] The iron-pipe water pressure sensor 51, functioning as the second sensor, detects the water pressure of the water W flowing inside the iron pipe 71. The iron-pipe water pressure sensor 51 is provided, for example, inside the iron pipe 71, but the arrangement and size shown in Fig. 1 are merely schematic and are not limited to this. The specific aspects of the various sensors included in the detection unit 50 that are shown in Figs. 1 and 2, including the iron-pipe water pressure sensor 51, can be changed as appropriate within the scope of their functions.

[0030] The iron pipe water pressure sensor 51 and other water pressure sensors are so-called pressure sensors, and examples thereof include, but are not limited to, resistance wire type sensors that use alloys containing nickel, chromium, etc., semiconductor sensors that use silicon (diffusion type, film formation type, capacitance type, etc.), capacitance type sensors that use ceramics, and mechanical types that use sliding resistance, etc. Appropriate pressure sensors are selected and used depending on the conditions of use, such as the structure and conditions of each part of the hydroelectric power generation facility.

[0031] The casing water pressure sensor 52 detects the water pressure of the water W flowing inside the casing 72. The runner side pressure sensor 53 detects the pressure (runner side pressure) in a gap SP1 between the blades of the runner 74 and the casing 72 that covers the runner 74 from the side and forms a flow path for the water W. The runner back pressure sensor 54 detects the pressure (runner back pressure) in a gap SP2 between the support part 74a and a lid part 72a of the casing 72 that is provided so as to cover the support part 74a from above. The draft water pressure sensor 55 functioning as a fourth sensor detects the water pressure of the water W flowing inside the draft 75.

[0032] The shaft vibration sensor 56 detects the presence or absence of vibration and the magnitude of vibration of the shaft 76. The bearing vibration sensor 57 detects the presence or absence of vibration and the magnitude of vibration of bearings such as bearings 77 and 78. The bearing vibration sensor 57 shown in Fig. 2 is provided on the bearing 77, but it may also be provided on the bearing 78 or on the bearings 77 and 78. When three or more bearings are provided to rotatably support the shaft 76, it is sufficient that the sensor is provided to be able to detect the presence or absence of vibration and the magnitude of vibration of one or more of the three or more bearings.

[0033] The axial vibration sensor 56 and other vibration sensors are, for example, sensors that use strain gauges to detect the displacement of an object due to vibration, but are not limited to this and may also use mechanical oscillators or acceleration sensors, with the appropriate sensor being selected and used depending on the structure, conditions, and other usage conditions of each part of the hydroelectric power generation facility.

[0034] The inlet valve opening sensor 58 functioning as the sixth sensor detects the opening of the inlet valve 80. The inlet valve opening sensor 58 shown by the dashed line in Fig. 1 is exemplified as a sensor that detects the rotation angle of the valve 82, but is not limited to this and may be any sensor that is capable of detecting the opening of the inlet valve 80. The same applies to a specific embodiment of the guide vane opening sensor 59 described later. The guide vane opening sensor 59 functioning as the first sensor detects the opening of the guide vane 73.

[0035] More specifically, guide vane 73 is provided so that the rotation angles of the multiple blades 73a can be controlled collectively, for example, by connecting a guide link (not shown) connected to each of the multiple blades 73a via a crank to guide vane drive unit 21. Guide vane opening sensor 59 can detect the opening of guide vane 73, i.e., the rotation angle of blades 73a, by detecting the rotation angle of the guide link, the operating position of a movable part of the guide link, or the operating position of a movable part of guide vane drive unit 21 that operates the guide link. Guide vane opening sensor 59 is provided as, for example, a potentiometer that detects the operating position of a linear servo motor that functions as guide vane drive unit 21.

[0036] The inlet valve drive current sensor 60 detects the drive current of the inlet valve drive unit 31 associated with the operation of the inlet valve 80. The guide vane drive current sensor 61 detects the drive current of the guide vane drive unit 21 associated with the operation of the guide vane 73. The water tank water level sensor 62 functioning as a third sensor detects the transition of a water tank (not shown) provided upstream of the iron pipe 71. The iron pipe 71 forms a flow path for water W continuing from the water tank, and allows the water W supplied from the water tank to flow. The generator output sensor 63 functioning as a fifth sensor detects the output (power generation) of the generator 79.

[0037] Examples of the inlet valve drive current sensor 60 and other current sensors include, but are not limited to, those based on a Hall element system, those based on an AC / DC zero flux system, and those based on an integrated circuit, and an appropriate one is selected and used depending on the magnitude of the current to be measured and other installation conditions. Examples of the water tank water level sensor 62 include, but are not limited to, a float system that uses a float, a displacer system, an electrode system that uses an electrical action, a capacitance system, a differential pressure system that uses the water pressure in the water tank, and other various systems, and an appropriate one is selected and used depending on the installation conditions. The generator output sensor 63 may use a volt-ampere (VA) meter or a facility having such a measurement function that is provided in advance in the generator 79, or a dedicated VA sensor may be provided.

[0038] Next, the operation of each part related to the gabble control will be described. The calculation part 11 reads and executes the gabble control part management program 121, and performs various processes related to the gabble control. Specifically, the calculation part 11 obtains signals corresponding to the outputs of various sensors included in the detection part 50, and judges whether there is any abnormality in the state of the hydroelectric power generation facility 100 that can be grasped from the outputs.

[0039] Fig. 6 is a diagram showing an example of changes and correlations in sensor output when an abnormality occurs that may require garbage control. Note that the water turbine in the configuration (large) of Fig. 6 includes various components included within the range from the casing 72 to the draft 75 in the flow path of the water W that supplies the water W to the runner 74 in the hydroelectric power generation facility 100. Hereinafter, when there is a reference to garbage getting inside the water turbine, it refers to garbage getting inside the water W flow path within the range from the casing 72 to the draft 75.

[0040] When debris gets stuck inside the turbine, the output of various sensors installed in the turbine changes compared to normal conditions when debris is not stuck. Specifically, for example, the amplitude of the water pressure in the casing 72 detected by the casing water pressure sensor 52 increases. In the flow path of the water W, such as inside the casing 72, the output values ​​of various sensors such as water pressure are not constant and show a certain degree of amplitude due to the flow of water. When debris gets stuck, the flow of the water W becomes turbulent and the amplitude of the output value increases compared to normal conditions when debris is not stuck. In FIG. 6, the sensor output in an abnormal state indicating the increase in the amplitude of the water pressure in the casing 72 is shown as "increased amplitude" of "water pressure" of "casing". The following description of the case where debris gets stuck inside the turbine is related to the change in output compared to normal conditions when debris is not stuck.

[0041] When debris gets stuck inside the turbine, the up and down amplitudes of the runner side pressure detected by the runner side pressure sensor 53 and the runner back pressure detected by the runner back pressure sensor 54, as well as the water pressure value in the draft 75 detected by the draft water pressure sensor 55, increase, as shown by the "increase in amplitude" of the "side pressure" and "back pressure" of the "runner" and the "water pressure" of the "draft" in Fig. 6. Also, when debris gets stuck inside the turbine, the magnitude (amplitude of fluctuation of the output value) of the vibration of the shaft 76 detected by the shaft vibration sensor 56 and the vibration of the bearing (e.g., bearing 77) detected by the bearing vibration sensor 57 increases, as shown by the "increase in amplitude" of the "vibration" of the "shaft" and "bearing" in Fig. 6.

[0042] FIG. 7 is a diagram showing a comparison example of the output of the sensor in a normal state where no dirt is caught in the water turbine and in an abnormal state where dirt is caught in the water turbine. For example, as shown in the "draft water pressure" column in FIG. 7, the amplitude increases in an "abnormal state" compared to the up and down amplitude of a graph showing the change in the water pressure value in the draft 75 in the "normal state". In FIG. 7, the amplitude of the water pressure in the draft 75 after the increase is shown typically by a bidirectional arrow R1. Also, as shown in the "shaft (or bearing) vibration" column in FIG. 7, the amplitude increases in an "abnormal state" compared to the up and down amplitude of a graph showing the change in the degree of vibration of the shaft 76 (or a bearing such as the bearing 77) in the "normal state". Also, in an "abnormal state", the upper runout value of the vibration increases compared to the "normal state". In FIG. 7, the increase in the upper runout value of the vibration is shown by an arrow Ra. Also, in FIG. 7, the amplitude after the increase is shown typically by a bidirectional arrow Rb.

[0043] In addition, when debris gets stuck inside the turbine, as shown by the "current increase" of the "current" of the "inlet valve" and "guide vane" in FIG. 6, the drive current increases when the inlet valve 80 is operating as detected by the inlet valve drive current sensor 60 and when the guide vane 73 is operating as detected by the guide vane drive current sensor 61. However, even if debris gets stuck inside the turbine, the opening of the inlet valve 80 and the guide vane 73 is not directly changed, and in this respect, there is no change compared to normal. This is shown in FIG. 6 as "no full open / full closed limit" for the "opening" of the "inlet valve" and the "guide vane". However, as shown by the example of the closing opening change P2 in "abnormal" that progresses slower than the closing opening change P1 in "normal" of the "guide vane opening" in FIG. 7, if debris gets stuck so that the blade 73a directly abuts against it, the debris will affect the opening change speed of the guide vane 73. Furthermore, when debris gets caught, which affects the change in the opening degree, the load caused by the debris increases the drive current of the guide vanes 73. However, the effect on the opening degree control is only an effect when the guide vanes 73 are operated, and debris getting caught inside the turbine does not actively change the opening degree of the guide vanes 73.

[0044] Furthermore, if debris gets stuck inside the turbine, the output of the generator 79 detected by the generator output sensor 63 drops, as shown by the "output drop" of the "output" of the "generator" in Fig. 6. In the "generator output" of Fig. 7, the drop in the output of the generator 79 in the "abnormal" graph compared to the "normal" state is illustrated by the arrow R2.

[0045] As indicated by the hyphens (-) next to the "water pressure" of the "iron pipe" and the "water level" of the "tank" in Figure 6, even if debris gets caught in the water turbine, there will be no significant change in the water pressure in the iron pipe 71 detected by the iron pipe water pressure sensor 51 and the water level in the tank detected by the tank water level sensor 62 compared to normal times.

[0046] In the unlikely event that something goes wrong, abnormalities that can occur in the hydroelectric power generation facility 100 are not limited to debris getting caught in the turbine. Therefore, even if the water pressure in each part of the turbine, the runner side pressure, the runner back pressure, the increase in the amplitude of vibration of the shaft and bearings, the increase in the drive current of the inlet valve and guide vanes, and the decrease in the output of the generator occur as described with reference to Fig. 6, it is not necessarily the case that all of these are caused by debris getting caught in the turbine. On the other hand, when debris gets caught in the turbine, a tendency specific to debris getting caught in the turbine appears in terms of the correlation indicated by a specific combination of outputs from the various sensors included in the detection unit 50.

[0047] One example of a tendency specific to debris getting stuck inside the turbine is that even if debris gets stuck inside the turbine, the output of the generator 79 tends to decrease even though the water pressure in the iron pipe 71, the opening of the guide vanes 73, and the water level in the water tank do not change significantly compared to normal. Figure 7 shows such an example as "Format 1." In "Format 1," the "water pressure" of the "iron pipe," the "opening" of the "guide vanes," and the "water level" of the "water tank" are "normal," while the "output" of the "generator" is "reduced."

[0048] Another example of a tendency specific to debris getting stuck inside the turbine is that even if debris gets stuck inside the turbine, the amplitude of the water pressure value in the draft 75 tends to increase, even though the water pressure in the iron pipe 71, the opening of the guide vane 73, and the water level in the water tank do not change enough to notice a significant difference compared to normal. Figure 7 shows such an example as "Format 2." In "Format 2," the "water pressure" of the "iron pipe," the "opening" of the "guide vane," and the "water level" of the "water tank" are "normal," while the "water pressure" of the "draft" has an "increased amplitude."

[0049] The calculation unit 11, which has executed the gab control unit management program 121, acquires signals corresponding to the outputs of various sensors included in the detection unit 50. The calculation unit 11 generates sensing data indicating the outputs of the various sensors from the signals for each sensor. The sensing log data 122 also includes a plurality of sensing data acquired in the past. Specifically, the sensing log data 122 is stored in the memory unit 12 in a state in which the sensing data based on the outputs of the various sensors output from the detection unit 50 in the hydroelectric power generation facility 100 under normal conditions described with reference to Figs. 6 and 7 can be distinguished from the sensing data based on the outputs of the various sensors output from the detection unit 50 in the hydroelectric power generation facility 100 under abnormal conditions.

[0050] In addition, in the sensing log data 122 prepared in advance for performing machine learning described later, sensing data in normal times and sensing data in abnormal times are distinguished in advance. Such distinction is made, for example, by prior measurement, simulation, manual distinction based on sensing data acquired and stored in the past, or the like, but any other method can be adopted.

[0051] An example of distinguishing between normal sensing data and abnormal sensing data in the sensing log data 122 prepared in advance will be described. When the abnormal sensing data corresponds to "amplitude increase" in FIG. 6, for example, based on the amplitude reference data indicating the amplitude range of "normal", the sensing data in which the amplitude exceeds the amplitude range is treated as abnormal sensing data. Such amplitude reference data is provided for each sensor. In addition, the normal / abnormal judgment of the sensing data related to the water pressure based on the output from the iron pipe water pressure sensor 51 is also performed based on the amplitude reference data. When the abnormal sensing data corresponds to "current increase" in FIG. 6, for example, based on the current reference data indicating the current value range of "normal", the sensing data in which the drive current exceeding the current value range is given is treated as abnormal sensing data. Such current reference data is provided separately for the guide vane drive unit 21 and the inlet valve drive unit 31. In the case where the sensing data indicating an abnormality corresponds to “output reduction” in FIG. 6, for example, based on the power generation reference data indicating the lower limit of the output value of the generator 79 under “normal conditions”, the sensing data having an output below the lower limit is treated as sensing data indicating an abnormality.

[0052] The normal / abnormal judgment of the sensing data indicating the opening of the inlet valve 80 and the guide vane 73 is performed based on the opening reference data indicating a predetermined normal opening range. The opening range itself is subject to physical constraints, and the standard opening reference data is based on the physical constraints. However, for the abnormality judgment, the opening reference data may be set to indicate "the expected opening range when the hydroelectric power generation facility 100 continues to operate without terminating the operation (when the supply of water W to the runner 74 continues)" which is narrower than the physical constraints. The normal / abnormal judgment of the sensing data indicating the water level of the water tank is performed based on the opening reference data indicating a predetermined normal water level range. The upper and lower water level limits are subject to physical constraints imposed by the water tank, and the standard opening reference data will be based on such physical constraints; however, when determining an abnormality, the water level reference data may be set to a value narrower than the physical constraints, indicating "the water level range expected when the hydroelectric power generation facility 100 continues to operate without approaching the end of operation (when water W continues to be supplied to the runner 74)."

[0053] In the embodiment, as described with reference to FIG. 6 and FIG. 7, one of the sensing data indicating an abnormality includes sensing data indicating that the amplitude of the water pressure value in the casing 72 detected by the casing water pressure sensor 52 is increased compared to normal. Also, one of the sensing data indicating an abnormality includes sensing data indicating that the amplitude of the water pressure value in the runner side pressure detected by the runner side pressure sensor 53 is increased compared to normal. Also, one of the sensing data indicating an abnormality includes sensing data indicating that the amplitude of the water pressure value in the runner back pressure detected by the runner back pressure sensor 54 is increased compared to normal. Also, one of the sensing data indicating an abnormality includes sensing data indicating that the amplitude of the water pressure value in the draft 75 detected by the draft water pressure sensor 55 is increased compared to normal. Also, one of the sensing data indicating an abnormality includes sensing data indicating that the magnitude of vibration of the shaft 76 detected by the shaft vibration sensor 56 (amplitude of the output value) is increased compared to normal. Moreover, one type of sensing data indicating an abnormality includes sensing data indicating that the magnitude (amplitude of output value) of vibration of a bearing (for example, bearing 77) detected by the bearing vibration sensor 57 is increased compared to normal. Another type of sensing data indicating an abnormality includes sensing data indicating that the drive current of the inlet valve 80 during operation detected by the inlet valve drive current sensor 60 is increased compared to normal. Another type of sensing data indicating an abnormality includes sensing data indicating that the drive current of the guide vane 73 during operation detected by the guide vane drive current sensor 61 is increased compared to normal. Another type of sensing data indicating an abnormality includes sensing data indicating that the output of the generator 79 detected by the generator output sensor 63 is decreased compared to normal.

[0054] In the embodiment, in terms of the correlation indicated by a combination of specific sensing data, it is also considered whether there is a particular tendency of dirt getting caught in the water turbine. Specifically, at least one of the first and second combinations is considered. The first combination is a combination of sensing data in which the sensing data based on the output from the iron pipe water pressure sensor 51, the sensing data based on the output from the guide vane opening sensor 59, and the sensing data based on the output from the water tank water level sensor 62 are normal, and the sensing data based on the output from the water tank water level sensor 62 is abnormal. The first combination is based on the same concept as in the explanation of "Format 1" in FIG. 7. The second combination is based on the same concept as in the explanation of "Format 2" in FIG. 7.

[0055] In the embodiment, when the latest sensing data includes one or more sensing data indicating the above-mentioned abnormality and one or more of the first combination and the second combination are established, it is regarded that the condition for performing the gab control is established. The following will be described based on such conditions.

[0056] As described above, in the determination as to whether or not to perform the gab control, not only the sensing data based on the output from one sensor included in the detection unit 50 but also the sensing data generated based on the output from a plurality of sensors is referenced. Therefore, the sensing data generated based on the output from the plurality of sensors is stored in association with the state of the hydroelectric power generation facility 100 at a certain time. Specifically, the plurality of sensing data based on the output from various sensors is stored in a format that allows the sensing data related to the state of the hydroelectric power generation facility 100 at a certain time to be managed collectively based on, for example, information (date and time information, etc.) indicating the time when the sensor output or the sensing data was generated. In addition, the distinction between normal and abnormal is managed by, for example, adding a management flag value (two or more values) for distinguishing between normal and abnormal times to the sensing data. By referring to the sensing log data 122 managed in this manner, it becomes possible to determine the state of the hydroelectric power generation facility 100 based on the sensing data indicating the state of the hydroelectric power generation facility 100 at a certain time in the past and the newly obtained sensing data.

[0057] The management flag value may be set to distinguish between a case where the individual sensing data is abnormal but the gabbling control is not performed (based on other sensing data) and a case where the individual sensing data is abnormal and the gabbling control is performed. In a similar way, the management flag value may be set to distinguish between a case where the individual sensing data is normal but the gabbling control is performed and a case where the individual sensing data is abnormal but the gabbling control is not performed.

[0058] 5, sensing data in which the condition for performing gabbling control is satisfied and sensing data at a time when the condition for performing gabbling control was satisfied in the past and gabbling control was performed appropriately are distinguished within the sensing log data 122 as gabbling control implementation condition satisfaction data 123. In other words, data that does not belong to the gabbling control implementation condition satisfaction data 123 is sensing data at a time when the condition for performing gabbling control was not satisfied.

[0059] In order to make a judgment based on the sensing data related to the implementation of the gabble control as described above, the calculation unit 11 uses a neural network algorithm. Specifically, the gabble control unit management program 121 is a program for generating a neural network for making a judgment based on the sensing data related to the implementation of the gabble control. According to the configuration of this embodiment including the calculation unit 11 that uses a neural network algorithm by executing the gabble control unit management program 121, the accuracy of judgment regarding the implementation of the gabble control based on the sensing data can be further improved by so-called machine learning. For example, the input in the so-called neural network is the latest sensing data, the output is the judgment result regarding the implementation of the gabble control based on the sensing data, and the teacher data is various data included in the sensing log data 122. Here, the calculation unit 11 executing the gabble control unit management program 121 generates a neural network to be interposed between the input and the output. The gabble control unit management program 121 functions as a hidden layer that performs weighting to derive an output from an input by determining whether each of the latest sensing data corresponds to a normal state or an abnormal state and whether a combination of sensing data indicating dirt in the water turbine is established, as described with reference to Figures 6 and 7. The calculation unit 11 as the hidden layer performs weighting processing based on how similar the latest sensing data is to the abnormal state, i.e., the past sensing data included in the gabble control implementation condition establishment data 123. Note that the weighting processing may be performed by a method of deriving a weighting value derived by subtracting a score based on how similar the latest sensing data is to the past sensing data excluding the gabble control implementation condition establishment data 123 from a predetermined maximum value in a counterargumentative manner.

[0060] The weighting process as described above may be performed individually for each of the multiple sensing data generated based on the output from each of the multiple sensors included in the detection unit 50, or may be based on a combination of the multiple sensing data, or may be both. To give an example of the weighting process performed individually for each of the multiple sensing data, a neuron that outputs a high value or an added value when the sensing data based on the output of the iron pipe water pressure sensor 51 is likely to correspond to the abnormal sensing data included in the gabble control unit management program 121, a neuron that outputs a low value or a subtracted value when the sensing data based on the output of the iron pipe water pressure sensor 51 is likely to correspond to the abnormal sensing data included in the gabble control unit management program 121 but is likely to correspond to sensing data in the case where gabble control is not implemented based on a judgment including other sensing data, and a neuron that outputs a higher value or a larger added value when the sensing data based on the output of the iron pipe water pressure sensor 51 is likely to correspond to the abnormal sensing data included in the gabble control unit management program 121 and is also likely to correspond to sensing data in the case where gabble control is implemented based on a judgment including other sensing data, etc., neurons that make judgments corresponding to each type of data included in the sensing log data 122 and derive values ​​are generated by the calculation unit 11 while executing the gabble control unit management program 121. Various neurons are generated in a similar manner for sensing data based on the output of sensors other than the iron pipe water pressure sensor 51 included in the detection unit 50. As an example of weighting processing performed based on a combination of multiple sensing data, a neuron that outputs a high value or an added value when "correlation 1" in Fig. 6 is established in the latest sensing data, a neuron that outputs a high value or an added value when "correlation 2" is established, and so on, are generated by the calculation unit 11 executing the gabble control unit management program 121 when the sensing log data 122 corresponds particularly to the gabble control implementation condition establishment data 123.The high and low values ​​and the degree of weighting are merely relative values ​​exemplified, and the specific way in which they are handled can be adjusted as desired when implementing the sensing log data 122. The value derived by the neuron is treated as a value indicating the degree of weighting based on the latest sensing data.

[0061] The calculation unit 11 determines the result of the judgment regarding the implementation of the garbage control based on the sensing data, based on the value indicating the degree of weighting based on the latest sensing data. Specifically, a predetermined threshold value is set for the value indicating the degree of weighting to judge whether or not to implement the garbage control. The predetermined threshold value may be included in the garbage control unit management program 121, or may be stored separately in the storage unit 12 or other storage device that the calculation unit 11 can refer to. The calculation unit 11 compares the value indicating the degree of weighting based on the latest sensing data with the predetermined threshold value to judge whether or not to implement the garbage control. To give a more specific example, when the latest sensing data includes sensing data indicating an abnormality in the water turbine and the latest sensing data indicating the presence of dirt in the water turbine is combined, the value indicating the degree of weighting derived is equal to or greater than the predetermined threshold value. In this case, the storage unit 12 causes the garbage control to be implemented.

[0062] When garbage control is to be performed, the calculation unit 11 outputs a command to execute garbage control to the guide vane control unit 13. The guide vane control unit 13 operates the guide vane drive unit 21 according to the command, and executes garbage control by changing the opening degree of the guide vane 73. The command includes a content for controlling the opening degree of the guide vane 73 after garbage control to be the same as the opening degree before garbage control. Note that, if garbage control is not performed but the latest sensing data includes sensing data indicating an abnormality, some abnormality may have occurred in the hydroelectric power generation facility 100, and in this case, other abnormality countermeasure control may be performed.

[0063] Note that a plurality of predetermined thresholds may be set. For example, a first threshold for determining that the latest sensing data includes sensing data indicating an abnormality inside the water turbine, and a second threshold for determining whether a combination of the latest sensing data indicating dirt in the water turbine is established may be set separately. In this case, the determination of whether to perform the gargling control based on the value indicating the degree of weighting may be weighted more heavily on the determination based on the second threshold. In other words, even if a determination that gargling control should be performed is derived based on the first threshold, a determination that gargling control should be performed may not be derived based on the second threshold.

[0064] When it is determined that the gabbling control is to be performed based on the latest sensing data, the calculation unit 11 executing the gabbling control unit management program 121 adds the latest sensing data to the gabbling control execution condition satisfaction data 123 and stores it in the storage unit 12. After that, the sensing log data 122 including the data treated as the latest sensing data at a certain point in time functions as teacher data from that point onward. That is, the more the latest sensing data is generated, the more diverse the sensing log data 122 is and functions as "teacher data after learning" for obtaining a more accurate determination result regarding the execution of the gabbling control. Note that when it is determined that the gabbling control is not to be performed based on the latest sensing data, the calculation unit 11 executing the gabbling control unit management program 121 may add the latest sensing data to the sensing log data 122 in a range not included in the gabbling control execution condition satisfaction data 123 and store it in the storage unit 12, or may discard it.

[0065] As described above, it is possible to determine whether or not to perform gabbling control by machine learning using a neural network. That is, the gabbling control unit management program 121 functions as a machine learning program. Moreover, a configuration including the calculation unit 11 executing the gabbling control unit management program 121 functions as a so-called machine learning system.

[0066] Furthermore, when the sensing log data 122 and the data 123 on whether or not gabbling control is performed include sensing data from a plurality of past points in time, the gabbling control unit management program 121 includes an algorithm for generating and hierarchizing neurons that individually derive values ​​based on a comparison with the sensing data from each point in time, so that higher accuracy can be expected in determining whether or not gabbling control is performed using a neural network. These may be further developed to determine whether or not gabbling control is performed based on sensing data obtained by so-called deep learning.

[0067] If the conditions for implementing gabbage control continue to be satisfied in the latest sensing data obtained immediately after implementing gabbage control, there is a possibility that another abnormality that cannot be resolved by gabbage control has occurred in the hydroelectric power generation facility 100. In consideration of this possibility, if the conditions for implementing gabbage control are not satisfied in the latest sensing data obtained immediately after implementing gabbage control, the calculation unit 11 may add the sensing data immediately before the trigger for implementing gabbage control to the gabbage control implementation condition satisfaction data 123. In other words, the hydroelectric power generation facility 100 may be treated as being in a state where "it was appropriate to implement gabbage control" at the time when the immediately previous sensing data was obtained.

[0068] Furthermore, even if there is an error in the judgment result, for example, an input unit (e.g., a configuration including input devices such as a keyboard and mouse) that enables manual input by an administrator of the guide vane operation control unit 10 can be provided in the guide vane operation control unit 10, and the administrator can correct the error and set the correct judgment result, thereby giving the calculation unit 11 an opportunity to correct the weighting of the hidden layer by the gabble control unit management program 121.

[0069] The number of times that the gab control is executed may be set to an upper limit number of times per predetermined period. The predetermined period may be, for example, one day, but is not limited to this and may be changed as appropriate. The upper limit number of times may be any number (K) of times greater than or equal to one.

[0070] 8 is a flowchart showing a process flow related to the gagging control for each predetermined period. The calculation unit 11, which executes the gagging control unit management program 121, sets the initial value of a counter (N) for managing the number of times gagging control is executed (the number of times gagging control is executed) to 0 (step S1).

[0071] The calculation unit 11 acquires signals corresponding to the outputs of various sensors included in the detection unit 50, and generates and acquires sensing data indicating the outputs of the various sensors from the signals for each sensor (step S2). The calculation unit 11 determines whether to perform the gabble control using the neural network described above, using the sensing data acquired in step S2 as the latest sensing data (step S3).

[0072] If the sensing data obtained in the process of step S2 is determined to be sensing data for which gagging control should be performed in the process of step S3 (step S4; Yes), gagging control is performed (step S5). In addition, the calculation unit 11 increments the value of the counter (N) set in step S1 by +1 (step S6).

[0073] The calculation unit 11 obtains signals corresponding to the outputs of various sensors included in the detection unit 50, as in the process of step S2, and generates and obtains sensing data indicating the outputs of various sensors from the signals for each sensor (step S7). The calculation unit 11 determines whether the sensing data obtained in the process of step S7 is sensing data for which it is not necessary to perform the gabbling control. Specifically, the calculation unit 11 performs the same process as in step S3 described above. Here, if it is determined that the sensing data obtained is sensing data for which it is not necessary to perform the gabbling control (step S8; Yes), the calculation unit 11 adds the sensing data obtained in the process of step S2, that is, the sensing data at the time of performing the gabbling control, to the gabbling control implementation condition satisfaction data 123 (step S9). On the other hand, if it is determined that the sensing data obtained in step S7 is sensing data for which the gabbling control should be performed (step S8; No), the process of step S9 is not performed. In this case, the sensing data at the time of performing the gabbling control may be data of the sensing log data 122 that is not included in the gabbling control implementation condition satisfaction data 123.

[0074] The calculation unit 11 judges whether the value of the counter (N) is equal to a predetermined number of times (K) (step S10). If it is judged that the value of the counter (N) is equal to the predetermined number of times (K) (step S10; Yes), the calculation unit 11 ends the process. After that, the process is performed again from step S1 after a predetermined period of time has elapsed.

[0075] If the sensing data obtained in the process of step S2 is determined by the process of step S3 to be sensing data for which gab control does not need to be performed (step S4; No), or if the value of the counter (N) is determined by the process of step S10 to be not equal to the predetermined number of times (K) (step S10; No), the calculation unit 11 determines whether the sequence for ending the operation of the hydroelectric power generation facility 100 has started (step S11). If it is determined that the sequence for ending the operation of the hydroelectric power generation facility 100 has not started (step S11; No), the calculation unit 11 proceeds to step S2.

[0076] On the other hand, if it is determined that the sequence is moving to the end of the operation of the hydroelectric power generation facility 100 (step S11; Yes), the calculation unit 11 ends the processing. In this case, the processing is performed again from step S1 after the operation of the hydroelectric power generation facility 100 is restarted.

[0077] As described above, according to the embodiment, the hydroelectric power generation facility 100 includes a detection unit 50 including a plurality of sensors provided on the water turbine, and an information processing unit (guide vane operation control unit 10) that performs a judgment on the implementation of gabbage control of the guide vanes 73 of the water turbine based on the output of the detection unit 50. The information processing unit includes a memory unit 12 that stores teacher data (gabbage control implementation condition satisfaction data 123) corresponding to the output from the plurality of sensors indicating that the water turbine is in a state where gabbage control should be performed, and a calculation unit 11 that generates a neural network for judging whether data corresponding to new output from the plurality of sensors (latest sensing data) is data indicating that the water turbine is in a state where gabbage control should be performed, based on the teacher data. This makes it possible to control the guide vanes 73 to perform gabbage control when data corresponding to new output from the plurality of sensors (latest sensing data) is data indicating that the water turbine is in a state where gabbage control should be performed. Therefore, gabbage control can be performed more accurately.

[0078] Furthermore, when the calculation unit 11 determines that the data corresponding to the new output (latest sensing data) is data indicating that the gabbage control should be performed, the calculation unit 11 adds the data corresponding to the new output to the teacher data (gabbage control performance condition satisfaction data 123). This allows the accuracy of the determination regarding the gabbage control to be further improved by utilizing so-called machine learning. Therefore, the gabbage control can be performed more accurately.

[0079] Furthermore, when the calculation unit determines that the data corresponding to the new output obtained immediately after the implementation of the gabbage control is data indicating that the gabbage control should be implemented, the calculation unit does not add the data corresponding to the new output obtained immediately before the implementation of the gabbage control to the teacher data. This reduces the possibility that the gabbage control will be unnecessarily implemented when data similar to the data in the case where the state of the hydroelectric power generation facility 100 does not improve even if the gabbage control is implemented is generated later. Therefore, the gabbage control can be implemented more accurately.

[0080] The water turbine also includes a runner 74 that rotates in response to the supply of water W, a casing 72 that guides the water W to the runner 74, a guide vane 73 provided in a flow path through which the water W in the casing 72 is supplied to the runner 74, and a draft 75 that guides the water W supplied to the runner 74 and discharged. The multiple sensors include at least a first sensor (guide vane opening sensor 59) that detects the opening of the guide vane 73, a second sensor (iron pipe water pressure sensor 51) that detects the water pressure in a pipe (iron pipe 71) that supplies the water W to the casing 72, a third sensor (water tank water level sensor 62) that detects the water level of a tank that stores the water W to be supplied to the pipe, and a water pressure sensor 63 that detects the water pressure in the draft 75. The controller determines that the data (latest sensing data) corresponding to the new output is data indicating that the gabu-control should be performed when a predetermined condition is satisfied, and the predetermined condition is that the outputs of the first, second and third sensors are within the range of normal output when no debris is caught in the turbine, and at least one of the outputs of the fourth and fifth sensors is an abnormal output that exceeds the normal output range. This allows the gabu-control to be performed after confirming that at least one of the causes of the abnormality in the output of the generator 79 and the abnormality in the water pressure of the draft water pressure sensor 55 is not due to an abnormality in the iron pipe 71, an abnormality in the opening of the guide vane 73, or an abnormality in the water level stored in the water tank. That is, it is possible to prevent choking control from being implemented when an abnormality in the output of the generator 79 and an abnormality in the water pressure of the draft water pressure sensor 55 occurs due to causes other than debris getting stuck inside the turbine (at least one of the following: an abnormality due to breakage or narrowing of the iron pipe 71, an abnormality in the opening due to failure or the like of the guide vane 73, and an abnormal rise or fall in the water level stored in the water tank). Therefore, choking control can be implemented when at least one of an abnormality in the output of the generator 79 and an abnormality in the water pressure of the draft water pressure sensor 55 occurs due to debris getting stuck inside the turbine. Therefore, choking control can be implemented more accurately.

[0081] Also provided is a sixth sensor (inlet valve opening sensor 58) that detects the opening of the inlet valve 80 that opens and closes the flow path of the water W between the pipe (iron pipe 71) and the casing 72, and the control unit (calculation unit 11) determines that when any of the multiple sensors other than the first sensor (guide vane opening sensor 59), the second sensor (iron pipe water pressure sensor 51), the third sensor (water tank water level sensor 62) and the sixth sensor produces an abnormal output, the data corresponding to the new output (latest sensing data) is data indicating that garbage control should be performed. This makes it easier to detect abnormalities caused by debris getting stuck inside the turbine.

[0082] In addition, the number of times that the garbage control is performed within a predetermined period is determined in advance, which makes it possible to suppress a decrease in power generation efficiency caused by the garbage control being performed too frequently.

[0083] The above embodiment is merely an example, and can be modified as appropriate without departing from the technical features of the present invention. For example, when either the first combination or the second combination is omitted, the sensor dedicated to the determination that is omitted can be omitted. That is, when the first combination is omitted, the generator output sensor 63 can be omitted. Also, when the second combination is omitted, the draft water pressure sensor 55 can be omitted.

[0084] In addition, one or more of the casing water pressure sensor 52, the runner side pressure sensor 53, the runner back pressure sensor 54, the shaft vibration sensor 56, the bearing vibration sensor 57, the inlet valve drive current sensor 60, and the guide vane drive current sensor 61 may be omitted.

[0085] Furthermore, management of the number of times gagging control is performed in a predetermined period using a counter (N) and a predetermined number of times (K) is not essential and can be omitted. [Explanation of symbols]

[0086] 10 Guide vane operation control unit 11 Arithmetic section 12 Storage section 121 Gabriel Control Management Program 122 Sensing log data 123 Data on the satisfaction of the conditions for implementing gabby control 13 Guide vane control section 21 Guide vane drive unit 50 Detection unit 51 Iron pipe water pressure sensor 55 Draft water pressure sensor 58 Inlet valve opening sensor 59 Guide vane opening sensor 62 Water tank water level sensor 63 Generator output sensor 71 Iron Pipe 72 Casing 73 Guide vane 74 Runner 75 Draft 80 Inlet valve 100 Hydroelectric Power Plants

Claims

1. A detection unit including a plurality of sensors provided on a water turbine of a hydroelectric power generation facility; and an information processing unit that determines whether or not to perform a gabbing control of the guide vanes of the water turbine based on an output of the detection unit. The information processing unit includes: A storage unit in which teacher data corresponding to outputs from the plurality of sensors indicating that the water turbine is in a state in which the scuff control should be performed is stored; A calculation unit that generates a neural network for determining whether data corresponding to new outputs from the plurality of sensors is data indicating a state in which the gabble control should be performed based on the teacher data, and determines whether data for which a predetermined condition is satisfied is data indicating a state in which the gabble control should be performed, The water turbine includes a runner that rotates in response to the supply of water, a casing that guides water to the runner, the guide vanes that are provided in a flow path through which the water in the casing is supplied to the runner, and a draft that guides the water that is supplied to and discharged from the runner, The plurality of sensors include A first sensor for detecting an opening degree of the guide vane; a second sensor for detecting a water pressure in a pipe for supplying water to the casing; a third sensor for detecting a water level in a water tank that stores water to be supplied to the pipe; at least one of a fourth sensor that detects a water pressure in the draft and a fifth sensor that detects an output of a generator that generates electricity in response to rotation of the runner; The predetermined condition is that the outputs of the first sensor, the second sensor, and the third sensor are within a range of normal outputs in which no debris is caught in the water turbine, and that the output of at least one of the fourth sensor and the fifth sensor is an abnormal output that exceeds the range of the normal outputs. An operation control device for hydroelectric power generation facilities.

2. The calculation unit adds the data corresponding to the new output to the teacher data when it is determined that the data corresponding to the new output is data indicating a state in which the gab control should be performed. The operation control device for a hydroelectric power facility according to claim 1 .

3. The calculation unit does not add the data corresponding to the new output obtained immediately before the implementation of the gabbling control to the teacher data when it is determined that the data corresponding to the new output obtained immediately after the implementation of the gabbling control is data indicating a state in which the gabbling control should be implemented. The operation control device for a hydroelectric power facility according to claim 2.

4. the plurality of sensors includes a sixth sensor that detects an opening degree of an inlet valve that opens and closes a water flow path between the pipe and the casing; The information processing unit regards sensing data, in which sensors other than the first sensor, the second sensor, the third sensor, and the sixth sensor among the plurality of sensors produce an output during the abnormal state, as data indicating a state in which the gab control should be performed. The operation control device for a hydroelectric power facility according to any one of claims 1 to 3.

5. The number of times the gab control is performed within a predetermined period is determined in advance. The operation control device for a hydroelectric power facility according to any one of claims 1 to 4.

Citation Information

Patent Citations

  • Method of controlling cross flow water turbine

    JP1989087876A

  • Soundeness diagnostic unit for rotary machine

    JP1994066241A

  • Accumulated foreign matter removal control device for water turbine

    JP1994080865U

  • Foreign matter removing device for valve of hydraulic power station

    JP1995243553A

  • Device and method for controlling monitoring of hydraulic turbine

    JP2012197703A