Construction management system, construction management method, and computer program for construction management

The construction management system addresses communication gaps between workers and supervisors by integrating information sharing and aggregation, reducing labor in supervisory tasks through synchronized data exchange.

JP7561414B2Active Publication Date: 2024-10-04INFINITI
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2020157998
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-09-21
Publication Date
2024-10-04
Estimated Expiration
2040-09-21

AI Technical Summary

Technical Problem

Conventional construction management systems lack an efficient mechanism for easy communication between workers and supervisors at construction sites, leading to increased labor in supervisory work.

Method used

A construction management system and method that enables seamless information sharing between worker and supervisor terminals, incorporating work information addition, meeting information distribution, work information aggregation, and safety information transmission to reduce labor in site management and supervisory tasks.

Benefits of technology

Facilitates smooth and efficient exchange of construction-related information, reducing labor in meetings and risk prediction activities by synchronizing data across terminals, thereby enhancing site management efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007561414000001
    Figure 0007561414000001
  • Figure 0007561414000002
    Figure 0007561414000002
  • Figure 0007561414000003
    Figure 0007561414000003
Patent Text Reader

Abstract

To provide a construction management system that allows workers and supervisors to smoothly and easily exchange information related to construction work, which in turn capable of reducing a labor involved in site management and supervision work.SOLUTION: In a worker terminal 3 that can be operated by a worker and a supervisor terminal 4 that can be operated by a supervisor, a construction management system A for sharing various information is provided with work information adding means 12 for adding work information input via the worker terminal 3 or the supervisor terminal 4 to drawing information of a construction site, and meeting information distribution means 13 for distributing meeting information including the drawing information to which the work information is added to the worker terminal 3 or the supervisor terminal 4.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a construction management system, a construction management method, and a computer program for construction management that can be used by people involved in construction work such as building or civil engineering. [Background technology]

[0002] As this type of construction management system, systems suitable for, for example, order and delivery management, approval management associated with construction, and report creation have been proposed in the past (see, for example, Patent Documents 1 to 3). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2002-215854 A [Patent Document 2] JP 2009-134685 A [Patent Document 3] JP 2010-140103 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, none of the above conventional construction management systems were configured to facilitate communication between the supervisor and the many workers who work as foremen at the construction site, and therefore had the drawback of being unable to reduce the labor involved in site management and supervisory work.

[0005] The present invention has been made in consideration of the above points, and aims to provide a construction management system, a construction management method, and a computer program for construction management that enable workers and supervisors to smoothly and easily exchange information related to construction work, thereby reducing the labor associated with site management and supervisory work. [Means for solving the problem]

[0006] (1) A construction management system for sharing various types of information between a worker terminal that can be operated by a worker at a construction site of architecture or civil engineering and a supervisor terminal that can be operated by a supervisor at the construction site, a work information adding means for adding the work information inputted via the worker terminal or the supervisor terminal to drawing information of the construction site; The drawing information to which the work information is added is included. This is information that records the contents of work meetings held between workers and supervisors before the day of work. Meeting information is sent to the worker's terminal and On the supervisor terminal Synchronize A meeting information distribution means for distributing the meeting information; A construction management system comprising:

[0007] In the invention of (1), the construction management system is for sharing various information between the worker terminal and the supervisor terminal, and includes a work information adding means and a meeting information distribution means. The work information adding means adds the work information inputted via the worker terminal or the supervisor terminal to the drawing information of the construction site. The meeting information distribution means includes drawing information to which work information is added. This is information that records the contents of work meetings held between workers and supervisors before the day of work. Meeting information on worker's terminal and On the supervisor terminal Synchronize To distribute.

[0008] According to the invention of (1), workers and supervisors can smoothly and easily exchange meeting information including drawing information to which work information has been added using the worker terminal and supervisor terminal, respectively, thereby reducing the labor required for meeting work in site management and supervisory work.

[0009] (2) a work information consolidation means for consolidating the plurality of pieces of work information added by the work information adding means via the plurality of worker terminals or the supervisor terminals into one piece of drawing information; a communication information distribution means for distributing communication information including the one piece of drawing information generated by aggregating the plurality of pieces of work information by the work information aggregation means to the plurality of worker terminals and the supervisor terminal; The construction management system according to (1) above, characterized in that it comprises:

[0010] According to the invention of (2), communication information including a single drawing information consolidating multiple work information can be shared between multiple worker terminals and a supervisor terminal, thereby reducing the effort required for overall communication work in site management and supervisory work.

[0011] (3) a signature receiving means for receiving signatures of a plurality of field workers inputted via the worker terminal; a worker number calculation means for calculating the number of field workers based on the signatures of the field workers received by the signature reception means; a safety information transmission means for transmitting the worker attribute information inputted via the worker terminal, the safety inspection information related to the safety of the work, and the worker number information indicating the number of on-site workers calculated by the worker number calculation means as safety information to the supervisor terminal, The construction management system described in (2), characterized in that the contact information distribution means generates attribute-specific total number of workers information indicating the total number of on-site workers for each attribute information based on the worker number information obtained by the worker number calculation means via the multiple worker terminals, and distributes the attribute-specific total number of workers information by including it in the contact information.

[0012] According to the invention of (3), in addition to worker attribute information and safety inspection information, safety information including information on the number of workers obtained based on the signatures of multiple on-site workers is transmitted to the supervisor terminal. Furthermore, attribute-specific total number of workers information indicating the total number of on-site workers for each attribute information is included in the contact information and distributed to multiple worker terminals and the supervisor terminal, thereby reducing the effort required for risk prediction activities in on-site management and supervisory work.

[0013] (4) A construction management system for sharing various information between a worker terminal that can be operated by a worker at a construction site of a building or civil engineering construction and a supervisor terminal that can be operated by a supervisor at the construction site. The system executes 1. A method comprising: a work information adding step of adding the work information inputted via the worker terminal or the supervisor terminal to drawing information of the construction site; The drawing information to which the work information is added is included. This is information that records the contents of work meetings held between workers and supervisors before the day of work. Meeting information is sent to the worker's terminal and On the supervisor terminal Synchronize a meeting information delivery step; A construction management method comprising:

[0014] According to the invention of (4), by executing each step in sequence, it is possible to obtain the same effect as the invention of (1).

[0015] (5) To share various information between a worker terminal that can be operated by a worker at a construction site of an architectural or civil engineering project and a supervisor terminal that can be operated by a supervisor at the construction site. Control the construction management system computer of , A work information adding means for adding the work information inputted via the worker terminal or the supervisor terminal to drawing information of the construction site. Step, The drawing information to which the work information is added is included. This is information that records the contents of work meetings held between workers and supervisors before the day of work. Meeting information is sent to the worker's terminal and On the supervisor terminal Synchronize Meeting information distribution method 、 To function as Noko Computer program.

[0016] According to the invention of (5), by having the computer of the worker terminal or the supervisor terminal execute each program, it is possible to obtain the same effect as the invention of (1). Effect of the Invention

[0017] According to the present invention, it is possible to provide a construction management system, a construction management method, and a computer program for construction management that enable workers and supervisors to smoothly and easily exchange information related to construction work, thereby reducing the labor associated with site management and supervisory work. [Brief description of the drawings]

[0018] [Figure 1] 1 is a block diagram showing a functional configuration of a construction management system according to an embodiment of the present invention. [Diagram 2] 4 is a flowchart showing a process performed by a construction management system according to an embodiment of the present invention. [Diagram 3] FIG. 2 is an explanatory diagram for explaining a display example of a menu screen by the construction management system according to one embodiment of the present invention. [Figure 4] FIG. 11 is an explanatory diagram for explaining a display example of a meeting screen by the construction management system according to one embodiment of the present invention. [Diagram 5] FIG. 11 is an explanatory diagram for explaining a display example of a meeting screen by the construction management system according to one embodiment of the present invention. [Figure 6] FIG. 11 is an explanatory diagram for explaining a display example of a KY screen by the construction management system according to one embodiment of the present invention. [Figure 7] FIG. 11 is an explanatory diagram for explaining a display example of a KY screen by the construction management system according to one embodiment of the present invention. [Figure 8] FIG. 11 is an explanatory diagram for explaining a display example of a morning meeting screen by the construction management system according to one embodiment of the present invention. [Figure 9] FIG. 11 is an explanatory diagram for explaining a display example of a morning meeting screen by the construction management system according to one embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In the following description, the same or similar components are denoted by the same reference numerals, and the description thereof will be omitted or simplified.

[0020] FIG. 1 is a block diagram showing the functional configuration of a construction management system according to one embodiment of the present invention. The construction management system A according to one embodiment of the present invention is a system for sharing various information between foreman-class workers working at construction sites such as building sites or civil engineering sites and the supervisor of the prime contractor who supervises the site. In the following description, the foreman is referred to as the worker, and the on-site worker engaged in construction work other than the foreman is simply referred to as the worker. The construction management system A is configured with a server 1, a network 2, a plurality of worker terminals 3, and a supervisor terminal 4. The server 1 is a cloud server with a file sharing function and a communication function managed by the prime contractor or a third party company. The network 2 is the so-called Internet, and enables communication of various information between the server 1, the worker terminal 3, and the supervisor terminal 4. The worker terminal 3 is basically operated by the worker, and a tablet or smartphone that can be connected to the network 2 is preferably used. The supervisor terminal 4 is operated by the supervisor of the prime contractor or subcontractor, and a tablet or smartphone can be applied like the worker terminal 3, but a laptop or desktop computer that can be connected to the network 2 can also be applied.

[0021] The server 1 mainly comprises a communication means 10, an information storage means 11, a work information adding means 12, a meeting information distribution means 13, a safety information transmission means 14, a work information collecting means 15, and a contact information distribution means 16. The server 1 includes a program for executing the construction management process described later.

[0022] The communication means 10 exchanges various information with the worker terminal 3 or the supervisor terminal 4.

[0023] The information storage means 11 stores various information transmitted from the worker terminal 3 or the supervisor terminal 4. The various information includes, for example, worker information, supervisor information, new entrant information, drawing information, work information, meeting information, contact information, safety information (attribute information of the worker, safety inspection information, information on the number of workers), total number of people by attribute, etc. The worker information is information on the worker registered in association with the worker terminal 3. The supervisor information is information on the supervisor registered in association with the supervisor terminal 4. The new entrant information is personal information of a worker who newly enters the construction site, and a QR code (registered trademark), for example, is generated and issued in response to this. The drawing information is data on the drawing of the construction site, and corresponds to, for example, vector data such as CAD data or image data of the drawing. The work information is information indicating various work contents at the construction site, and is basically character information input via the worker terminal 3. The meeting information is information recording the contents of the work meeting held between the worker and the supervisor before the day of work (for example, the day before work). The contact information indicates the items that workers and supervisors should check at the morning meeting on the day of work, and can be distributed to the worker terminal 3 and the supervisor terminal 4. The safety information indicates the items that workers and supervisors should check for safety during risk prediction activities (hereinafter, abbreviated as KY activities) conducted before the morning meeting on the day of work, and can be distributed to the worker terminal 3 and the supervisor terminal 4. The safety information includes attribute information indicating the company to which the worker belongs, safety inspection information indicating the inspection items that should be checked in advance before construction work, worker number information indicating the number of workers engaged in construction work on the day of work, etc. The attribute-specific total number information indicates the total number of workers engaged in work on that day for each company to which the worker belongs, and is included in the contact information corresponding to the morning meeting.

[0024] When a meeting is held between a specific worker and a supervisor, the work information adding means 12 mainly creates work information input via the worker terminal 3 by adding it to the corresponding portion of the drawing information. The drawing information to which the work information has been added in this way is stored in the information storage means 11 as partial drawing information corresponding to the worker terminal 3 to which the work information has been input. The work information adding means 12 can also add work information input via the supervisor terminal 4 to the drawing information.

[0025] When a meeting is held between a specific worker and a supervisor, the meeting information distribution means 13 distributes the partial drawing information created by the work information addition means 12 together with other information to the supervisor terminal 4 and the worker terminal 3 as meeting information.

[0026] The safety information transmission means 14 transmits the safety information inputted via the worker terminal 3 to the supervisor terminal 4 when KY activities are carried out between the worker and the supervisor.

[0027] The work information aggregation means 15 aggregates a plurality of partial drawing information, to which a plurality of pieces of work information have been added, into one piece of drawing information, and creates integrated drawing information. The integrated drawing information thus aggregated with the plurality of pieces of work information is stored in the information storage means 11.

[0028] When a morning meeting is held, the contact information distribution means 16 distributes contact information including the integrated drawing information and the attribute-specific total number of people information to the supervisor terminal 4 and the worker terminal 3.

[0029] The worker terminal 3 is configured to have a signature acceptance means 30 and a worker number calculation means 31 in addition to basic communication functions and display operation functions that a tablet or smartphone has.

[0030] The signature receiving means 30 receives signatures (signatures) of a plurality of workers, which are input by handwriting via the worker terminal 3, when KY activities are carried out between the worker and the supervisor.

[0031] The worker number calculation means 31 calculates the number of workers engaged in the construction work on that day from the number of signatures of the workers signed via the worker terminal 3 when KY activities are carried out between the worker and the supervisor. The number of workers calculated in this way is transmitted to the server 1 as worker number information, and the worker number information is further included in safety information and transmitted from the server 1 to the supervisor terminal 4. In addition, based on the multiple worker number information transmitted from the multiple worker terminals 3, the server 1 creates attribute-specific total number information, and distributes contact information including the attribute-specific total number information to the supervisor terminal 4 and the worker terminal 3 when a morning meeting is held. The supervisor terminal 4 is also basically configured to have the same functions as the worker terminal 3. Such worker terminals 3 and supervisor terminals 4 include a native application for executing the construction management process described later.

[0032] The above-mentioned functional configuration of the present system is merely an example, and one functional block (database and function processing unit) may be divided, or multiple functional blocks may be combined into one functional block. Each functional processing unit is realized by a computer program executed by a CPU (Central Processing Unit) built into the device, which reads out a computer program (e.g., a core software or an application that causes the CPU to execute the above-mentioned various processes) stored in a storage device (storage unit) such as a ROM (Read Only Memory), a flash memory, an SSD (Solid State Drive), or a hard disk. That is, each functional processing means is realized by the computer program reading and writing necessary data such as a table from a database (DB; Data Base) stored in the storage device or a storage area on the memory, and, in some cases, controlling related hardware (e.g., an input / output device, a display device, a communication interface device). In addition, the database (DB) in the embodiment of the present invention may be a commercial database, but it also means a simple collection of tables and files, and the internal structure of the database itself is not important.

[0033] Next, the construction management process will be described with reference to Fig. 2. Fig. 2 is a flowchart showing the construction management process by the server 1. Note that programs related to the construction management process are mainly executed by the server 1, but some programs are executed by native applications in response to operations of the worker terminal 3 or the supervisor terminal 4.

[0034] First, in the construction management process, for example, a meeting icon 100 is selected from the menu screen (see FIG. 3) of the worker terminal 3 or the supervisor terminal 4, and a command related to the meeting process is transmitted to the server 1. As shown in FIG. 2, the server 1 that has received the command related to the meeting process performs the meeting process (step S1). In this meeting process, based on the operation of the worker at the worker terminal 3 or the operation of the supervisor at the supervisor terminal 4, meeting information including work-related information 110 and drawing information 111 as shown in FIG. 4 is generated, and this meeting information is distributed by the meeting information distribution means 13 to the worker terminal 3 and the supervisor terminal 4 while being synchronized. As a result, even if the worker and the supervisor are apart from each other at a construction site and a desk in an office, they can hold a meeting as appropriate using the meeting information (meeting screen) displayed in synchronization on the worker terminal 3 and the supervisor terminal 4.

[0035] In such a meeting process, when a meeting screen is displayed on the worker terminal 3 or the supervisor terminal 4, the work-related information 110 and the drawing information 111 are displayed as meeting information (see FIG. 4). When an operation to select the drawing information 111 is performed, the display screen turns to a landscape screen and only the drawing information 111 is displayed. When a pinch operation is performed in the screen area where the drawing information 111 is displayed, the drawing information 111 is enlarged or reduced. Then, as shown in FIG. 5, when a drag operation is performed to specify a desired area in the drawing information 111 so as to surround it and the work content, for example, "ceiling and wall piping work", is input as text, the work information 111a indicating the corresponding work area and work content is displayed overlapping the drawing information 111. At this time, the text input can be handwritten. When a drag operation is performed to draw a straight line from a desired point to another point in the drawing information 111, the distance information 111b indicating the straight line distance between these points is displayed overlapping the drawing information 111. Commands corresponding to these operations are transmitted to the server 1, and in the server 1, the work information adding means 12 adds the work information 111a and the distance information 111b to the designated location in the drawing information 111 (step S2). The drawing information 111 to which the work information 111a and the distance information 111b have been added in this way is distributed as meeting information to the worker terminal 3 and the supervisor terminal 4 by the meeting information distribution means 13 (step S3). As a result, the drawing information 111 (partial drawing information) to which the work information 111a and the distance information 111b have been added is displayed synchronously on the worker terminal 3 and the supervisor terminal 4 (see FIG. 5), and the worker and the supervisor can hold a smooth meeting without any misunderstandings by using the synchronously displayed drawing information 111 (partial drawing information).

[0036] Next, for example, a KY icon 200 is selected from the menu screen (see FIG. 3) of the worker terminal 3, and a command related to the KY processing is transmitted to the server 1. As shown in FIG. 2, the server 1 that has received the command related to the KY processing performs the KY processing (step S4). In this KY processing, safety information including attribute information 210, safety inspection information 220, and worker number information 230 as shown in FIG. 6 and FIG. 7 is generated based on the operation of the worker or worker on the worker terminal 3, and this safety information is transmitted and received synchronously to the worker terminal 3 and the supervisor terminal 4 by the safety information transmitting means 14. In this way, the worker and supervisor can confirm safety inspection items with each other by using the safety information (KY screen) displayed synchronously on the worker terminal 3 and the supervisor terminal 4.

[0037] In such KY processing, when the KY screen is displayed on the worker terminal 3, as shown in Fig. 6, worker attribute information 210 and safety inspection information 220 showing the contents of the inspection items checked by the worker are displayed, and the necessary items can be entered into each piece of information. Also, as shown in Fig. 7, when each worker signs in the signature field 240 by handwriting input, the signature acceptance means 30 accepts each person's signature in the worker terminal 3, and worker number information 230 is automatically generated based on the number of signatures by the worker number calculation means 31. Then, when safety information including the attribute information 210, safety inspection information 220, and worker number information 230 is transmitted to the server 1, the server 1 that has received this safety information also transmits the same safety information to the supervisor terminal 4 by the safety information transmission means 14 (step S5). As a result, the safety information required for KY activities is displayed synchronously on the worker terminal 3 and the supervisor terminal 4 (see Figs. 6 and 7), and the worker and the supervisor can smoothly perform safety inspections using the safety information displayed on the synchronized KY screen.

[0038] Next, when a morning assembly icon 300 is selected from the menu screen (see FIG. 3) of the supervisor terminal 4, for example, a command related to the morning assembly process is transmitted to the server 1. As shown in FIG. 2, the server 1 that has received the command related to the morning assembly process interconnects the corresponding worker terminals 3 and supervisor terminal 4 to perform the morning assembly process (step S6). In this morning assembly process, the contact information distribution means 16 distributes contact information including drawing information (integrated drawing information) 310 and attribute-specific total number of people information 320 as shown in FIG. 8 and FIG. 9 to the worker terminal 3 and supervisor terminal 4 in a synchronous manner. This allows the worker and supervisor to hold a morning assembly while checking the contact information displayed in a synchronous manner on the worker terminal 3 and supervisor terminal 4.

[0039] In such morning assembly processing, the work information aggregation means 15 aggregates the multiple pieces of work information 111a, etc. (including the straight line information 111b) added to one drawing information 111 in step S2, and generates integrated drawing information 310 in which the multiple pieces of work information 111a, etc. are collectively shown on one drawing (step S7). In addition, in the morning assembly processing, attribute-specific total number of people information 320 indicating the number of workers by company is generated based on the attribute information 210 and worker number information 230 included in the safety information received in step S5. When such integrated drawing information 310 and attribute-specific total number of people information 320 are obtained, the server 1 distributes contact information including the integrated drawing information 310 and attribute-specific total number of people information 320 to the worker terminal 3 and the supervisor terminal 4 by the contact information distribution means 16 (step S8). As a result, the work information required for the morning meeting and the number of workers by company are displayed synchronously on the worker terminal 3 and the supervisor terminal 4 (see Figures 8 and 9), and the workers and supervisors can hold the morning meeting smoothly using the contact information displayed on the synchronized morning meeting screen.

[0040] Although not shown in the figure, in the construction management process, it is also possible to register a new entrant (worker) in advance. For example, when a new registration icon 400 is selected from the menu screen (see FIG. 3) of the worker terminal 3, personal information (such as name, address, emergency contact, terminal address, etc.) regarding the new entrant can be input via the worker terminal 3. When the personal information is input, the personal information is transmitted to the server 1, and a QR code (registered trademark) corresponding to the personal information is generated in the server 1. The generated QR code (registered trademark) is transmitted to, for example, the terminal of the new entrant (not shown) or the supervisor terminal 4. The supervisor can confirm the personal information regarding the new entrant by selecting a code reading icon 500 from the menu screen (see FIG. 3) of the supervisor terminal 4 and reading the QR code (registered trademark) displayed on the presented terminal of the new entrant with the supervisor terminal 4.

[0041] According to such a construction management system A, in a meeting held individually between a worker and a supervisor on the day before work, the meeting information including drawing information (partial drawing information) 111 with added work information 111a, etc. can be exchanged smoothly and easily using the worker terminal 3 and the supervisor terminal 4, respectively, thereby reducing the labor required for meeting work in site management and supervisory work.

[0042] In addition, at the morning meeting held on the day of work among multiple workers and supervisors, communication information including one integrated drawing information 310 in which multiple pieces of work information 111a, etc. are consolidated can be shared among the multiple worker terminals 3 and the supervisor terminal 4, thereby reducing the labor required at the morning meeting, which involves overall communication work necessary for site management and supervisory work.

[0043] In addition, in the KY activities conducted by workers and supervisors before the morning meeting on the day of work, safety information including worker number information 230 obtained based on the signatures of multiple workers, in addition to worker attribute information 210 and safety inspection information 220, is transmitted to the supervisor terminal 4, and further, attribute-specific total number information 320 indicating the total number of workers for each attribute information 210 is included in the contact information and distributed to multiple worker terminals 3 and the supervisor terminal 4, thereby reducing the effort required for risk prediction activities required for site management and supervisory work.

[0044] It should be noted that the present invention is not limited to the above-described embodiments and examples.

[0045] In the above embodiment, information is basically exchanged via the server 1, but it is also possible to provide basic information processing functions in the worker terminal 3 and the supervisor terminal 4, and to register and exchange only the necessary information to be exchanged with each other through so-called cloud computing in the cloud server. [Explanation of symbols]

[0046] A Construction management system 1 Server 3. Worker terminal 4 Supervisor terminal 12. Method of adding work information 13. Means of distributing meeting information 14 Means of transmitting safety information 15. Means of collecting work information 16 Means of contact information delivery 30 Signature acceptance method 31 Means for calculating the number of workers 111a Work Information 111 Drawing Information 210 Attribute information 220 Safety Inspection Information 230 Number of workers information 320 Total number of people by attribute

Claims

1. A construction management system for sharing various information between a worker terminal that can be operated by a worker at a construction site of a building or civil engineering construction and a supervisor terminal that can be operated by a supervisor at the construction site, a work information adding means for adding the work information inputted via the worker terminal or the supervisor terminal to drawing information of the construction site; a meeting information distribution means for synchronously distributing meeting information, the meeting information including the drawing information to which the work information has been added, which is information recording the contents of a work meeting held between a worker and a supervisor before the day of the work, to the worker terminal and the supervisor terminal; A construction management system comprising:

2. a work information consolidation means for consolidating the plurality of pieces of work information added by the work information adding means via the plurality of worker terminals or the supervisor terminals into one piece of drawing information; a communication information distribution means for distributing communication information including the one piece of drawing information generated by aggregating the plurality of pieces of work information by the work information aggregation means to the plurality of worker terminals and the supervisor terminal; The construction management system according to claim 1 , further comprising:

3. a signature receiving means for receiving signatures of a plurality of field workers inputted via the worker terminal; a worker number calculation means for calculating the number of field workers based on the signatures of the field workers received by the signature reception means; a safety information transmission means for transmitting the worker attribute information inputted via the worker terminal, the safety inspection information related to the safety of the work, and the worker number information indicating the number of on-site workers calculated by the worker number calculation means as safety information to the supervisor terminal, The construction management system according to claim 2, characterized in that the contact information distribution means generates attribute-specific total number of workers information indicating the total number of on-site workers for each of the attribute information based on the worker number information obtained by the worker number calculation means via the multiple worker terminals, and distributes the attribute-specific total number of workers information by including it in the contact information.

4. A method executed by a construction management system for sharing various information between a worker terminal operable by a worker at a construction site of a building or civil engineering construction and a supervisor terminal operable by a supervisor at the construction site, a work information adding step of adding the work information inputted via the worker terminal or the supervisor terminal to drawing information of the construction site; a meeting information distribution step of synchronously distributing meeting information, the meeting information including the drawing information to which the work information is added and recording the contents of a work meeting held between a worker and a supervisor before the day of the work, to the worker terminal and the supervisor terminal; A construction management method comprising:

5. A computer that controls a construction management system for sharing various information between a worker terminal that can be operated by a worker at a construction site of a building or civil engineering construction and a supervisor terminal that can be operated by a supervisor at the construction site, a work information adding means for adding the work information inputted via the worker terminal or the supervisor terminal to drawing information of the construction site; a meeting information distribution means for synchronously distributing meeting information, which includes the drawing information to which the work information has been added and is information recording the contents of a work meeting held between a worker and a supervisor before the day of the work, to the worker terminal and the supervisor terminal; A computer program that functions as a

Citation Information

Patent Citations

  • System for management construction of housing

    JP2002215854A

  • Civil engineering support system

    JP2006268765A

  • Management system for construction site

    JP2007164741A

  • Construction management system of building

    JP2009134685A

  • House construction management system

    JP2010140103A