Concrete member, concrete member joint structure, and concrete member joining method
By employing convex and recessed joint surfaces with a binding material and fastening mechanism, the method efficiently joins precast concrete slabs, reducing construction time and enabling early bridge reopening, while absorbing impacts and preventing damage.
Patent Information
- Application Number
- JP2021004014
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-01-14
- Publication Date
- 2024-10-04
- Estimated Expiration
- 2041-01-14
AI Technical Summary
Existing methods for joining precast concrete slabs in bridge deck replacement work require complex structures and lengthy construction times, necessitating the development of a more efficient and simpler method to allow for early reopening of bridges to traffic.
The method involves fitting convex and recessed portions on the joint surfaces of precast concrete slabs with a binding material that allows for efficient joining without loop reinforcements, enabling tension application between the slabs using a fastening mechanism that can be secured with a single-push type nut or through sliding and tightening processes.
This approach allows for quicker joining of concrete slabs, reducing construction time, preventing defects from uneven loads, and enabling bridges to reopen sooner, while also allowing for movement and impact absorption, thus minimizing damage.
Smart Images

Figure 0007561635000001 
Figure 0007561635000002 
Figure 0007561635000003
Abstract
Description
[Technical field]
[0001] The present invention relates to the joining of concrete members such as precast concrete decks, and more specifically, to a technique for joining concrete members by engaging convex and concave portions on the joining surfaces. [Background technology]
[0002] It has been pointed out that the construction infrastructure (hereafter referred to as "construction infrastructure"), which was developed intensively during the period of high economic growth, is already showing signs of considerable deterioration. In 2014, the Council for Social Capital Development compiled a "Proposal for Full-Scale Implementation of Measures to Counter Aging Roads," which cited the example of the Sasago Tunnel in 2012 and sounded the alarm that "in the near future, this will lead to fatal incidents involving human lives and social infrastructure, such as the collapse of bridges," and strongly advocated the importance of maintaining and managing construction infrastructure.
[0003] On the other hand, the "Specifications for Highway Bridges," which are the standards for designing road bridges, have been reviewed from time to time since the 1939 edition was published, and especially after the Hyogo-ken Nanbu Earthquake, major revisions were made. As a result, there are many cases where bridges that were deemed to have sufficient strength before the revision of the design standards are found to have insufficient strength in light of the current design standards.
[0004] Due to these two reasons, deterioration and insufficient strength, bridges are now often reinforced or rebuilt. For example, deck replacement work, in which deteriorated concrete or steel decks are removed and new decks are installed, is frequently carried out on many bridges.
[0005] However, current road bridges secure a large amount of traffic, which means that they support the movement of people and the distribution industry, and they cannot be easily taken out of service. In particular, viaducts for expressways and other roads for automobiles only carry tens of thousands of vehicles per day, and if they were to be closed to traffic, the economic loss would be immeasurable, and if emergency patients could not be transported, it could become a social problem. For this reason, when construction is carried out on a road bridge that is in service, it is always required to open it to traffic as soon as possible, and contractors are working hard to shorten the construction period in order to achieve this.
[0006] In bridge deck replacement work, in order to reopen bridges to traffic as soon as possible, precast concrete decks are often used for the new decks, as this shortens the on-site construction time. After removing the deteriorated existing deck, the entire deck can be completed simply by arranging the precast concrete decks on the girders, which significantly shortens the on-site construction time compared to, for example, installing decks using cast-in-place concrete, which means that it is possible to reopen bridges to traffic as soon as possible.
[0007] The numerous precast concrete slabs arranged on the girders are of course connected to each other. Conventionally, the mainstream method for connecting adjacent precast concrete slabs was to use loop reinforcement protruding from the joint surface of the precast concrete slabs. More specifically, the loop reinforcement of adjacent precast concrete slabs in the bridge axis direction is overlapped, reinforcing steel bars perpendicular to the bridge axis are placed inside the loop reinforcement, and after assembling the formwork, concrete is poured into the gap between the left and right precast concrete slabs.
[0008] This method of connecting the bridge using loop reinforcement requires many steps, and the concrete must be allowed to harden before the formwork can be removed, meaning that the site is occupied for a considerable period of time. In other words, although the process can be completed quickly up to the point where the precast concrete deck is placed on the girders, the effectiveness of the method is greatly reduced by the subsequent connecting work. Therefore, a technology that can open the bridge to traffic more quickly was desired.
[0009] Technologies have been proposed in the past to more quickly connect precast concrete decks together. For example, Patent Document 1 proposes a joining technology that uses joint bars that are embedded in the precast concrete decks in advance. [Prior art documents] [Patent documents]
[0010] [Patent Document 1] JP 2018-119333 A Summary of the Invention [Problem to be solved by the invention]
[0011] The technology disclosed in Patent Document 1 connects a male joint on one side to a female joint on the other side. Therefore, it is necessary to embed the male joint and the female joint in advance in the precast concrete slab, and moreover, it is necessary to provide many parts such as a case, intermediate material, wedge material, and disc spring on the female joint side. Therefore, the precast concrete slab of Patent Document 1 requires a lot of effort and a variety of materials to manufacture, which results in a rise in manufacturing costs.
[0012] The object of the present invention is to solve the problems inherent in the conventional technology, namely to provide a concrete member and concrete member joint structure and a concrete member joining method that can join adjacent precast concrete decks without using conventional loop reinforcement and without providing a complex structure as in Patent Document 1. [Means for solving the problem]
[0013] The present invention was made with a focus on the fact that precast concrete decks are efficiently joined by fitting a convex portion formed on one joint surface into a concave portion formed on the other joint surface, and by the interaction with a fastener installed between the precast concrete decks, and is an invention based on an unprecedented idea.
[0014] The concrete member of the present invention has a first joint side surface and a second joint side surface facing each other at both ends, and is joined to another member at the first joint side surface and the second joint side surface, and is a member having a convex portion protruding in a curved shape, a concave portion recessed in a curved shape, a first joint portion, a second joint portion, and a rod-shaped fastener having a screw at its end. Of these, the convex portion is formed on the first joint side surface (or the second joint side surface), and one of the concave portions is formed on the second joint side surface (or the first joint side surface). The first joint portion is formed on the first joint side surface, and one of the second joint portions is formed on the second joint side surface. The convex portion and the concave portion are sized and shaped so that they fit together with a gap being generated.
[0015] The concrete member of the present invention may have a first joint portion having a first insertion hole, a first working space, and a storage hole, and a second joint portion having a second insertion hole and a second working space. The first insertion hole opens on the first joint side surface and is formed from the first joint side surface toward the center of the body, the first working space is formed at the end of the first insertion hole toward the center of the body, communicates with the first insertion hole, and opens on the upper surface, and the storage hole is formed in the extension direction of the first insertion hole from the first working space toward the center of the body. The second insertion hole opens on the second joint side surface and is formed from the second joint side surface toward the center of the body, and the second working space is formed at the end of the second insertion hole toward the center of the body, communicates with the second insertion hole, and opens on the upper surface. The first joint portions are arranged at predetermined intervals along the first joint side surface, and the second joint portions are arranged at predetermined intervals along the second joint side surface. The fastening material is movable between the storage hole and the first insertion hole, and is capable of being inserted into another second insertion hole.
[0016] The concrete member of the present invention may also be provided with a curved fastening material. In this case, a first insertion hole and a first working space are formed in the first joint. When the first insertion hole and the second insertion hole are connected, the shape corresponds to the curved shape of the fastening material.
[0017] The concrete members of the present invention may have a fastening material embedded in the first joint and a one-way push nut embedded in the second joint. The fastening material is embedded so that the threads at its end protrude from the first joint side. This one-way push nut has both threads that screw together just by inserting the bolt without rotating, so that when the fastening material is pushed into the one-way push nut, the threads of the fastening material and the one-way push nut screw together.
[0018] The concrete member joint structure of the present invention is a structure for joining the concrete members of the present invention together. Adjacent concrete members are arranged so that the first joint side of one member faces the second joint side of the other member, and the convex portion and the concave portion fit together with a gap formed, and then a part of the fastening material is inserted into the other second joint portion to apply tension to the concrete members.
[0019] The method of joining concrete members of the present invention is a method of joining concrete members of the present invention, and includes a subsequent member installation step and a tensioning step. In the subsequent member installation step, the subsequent concrete member is installed so that the first joint side of the concrete member faces the second joint side of the concrete member, and the convex portion and the concave portion fit together with a gap being generated. In the tensioning step, tension is applied to the adjacent concrete members by inserting a part of the fastening material into the other second joint portion.
[0020] The method for joining concrete members of the present invention may further include a fastening material moving step and a nut setting step, and may be a method in which a first joint side of a previously installed concrete member and a second joint side of a subsequently installed concrete member are joined. In this case, in the subsequent member setting step, a subsequent concrete member is set up so that the first joint side of the previously installed concrete member and the second joint side of the subsequently installed concrete member face each other, with a part of the fastening material stored in the storage hole of the previously installed concrete member. In the fastening material moving step, the fastening material is slid and moved using the first working space so that one end of the fastening material is placed in the first working space and the other end is placed in the second working space. In the nut setting step, a nut is attached to an end of the fastening material in the first working space using the first working space, and a nut is attached to an end of the fastening material in the second working space using the second working space. In the tensioning step, tension is applied to the members between the first working space and the second working space by tightening the nut in the first working space and the nut in the second working space.
[0021] The method for joining concrete members of the present invention may further include a fastening material moving step and a nut setting step, and may be a method in which the second joint side of the previously installed concrete member and the first joint side of the subsequently installed concrete member are joined. In this case, in the subsequent member setting step, the subsequent concrete member is set so that the second joint side of the previously installed concrete member and the first joint side of the subsequently installed concrete member face each other, with a part of the fastening material stored in the storage hole of the subsequently installed concrete member. In the fastening material moving step, the fastening material is slid and moved using the second working space so that one end of the fastening material is placed in the second working space and the other end is placed in the first working space. In the nut setting step, the second working space is used to attach a nut to the end of the fastening material in the second working space, and the first working space is used to attach a nut to the end of the fastening material in the first working space. In the tensioning step, tension is applied to the member between the second working space and the first working space by tightening the nut in the second working space and the nut in the first working space.
[0022] The method for joining concrete members of the present invention may further include a work space filling step, in which a filler material is filled into the first work space and the second work space after the tensioning step.
[0023] The method for joining concrete members of the present invention can also be a method for joining concrete members of the present invention that are equipped with a one-way push nut. In this case, in the subsequent member installation step, the subsequent concrete member is arranged so that the second joint side of the previously installed concrete member faces the first joint side of the subsequently installed concrete member. In the tensioning step, the subsequent concrete member is slid so as to push the fastening material into the one-way push nut, and tension is applied to adjacent concrete members by screwing the threads of the fastening material pushed into the one-way push nut and the threads of the one-way push nut together.
[0024] The method for joining concrete members of the present invention may further include a step of filling a gap between the first joining side surface and the second joining side surface with a filler. In this case, in the step of installing a subsequent member, a subsequent concrete member is installed so that a gap is formed between the first joining side surface and the second joining side surface. Effect of the Invention
[0025] The concrete members, the joint structure for concrete members, and the method for joining concrete members according to the present invention have the following advantages. (1) Adjacent concrete members can be joined together without using conventional loop reinforcement and with a relatively simple structure. (2) The fastening material applies tension in the axial direction between the concrete members, so that defects such as unevenness and breakage can be prevented even if uneven vertical loads are applied near the joints after the bridge is put into service. (3) The convex and concave parts are curved and fit together to create a gap, allowing the concrete member to rotate (i.e. not restricting rotation) and allowing some movement (i.e. not restricting movement completely). As a result, shocks from wheel loads, for example, can be dispersed or absorbed, which also helps prevent damage to the concrete member. (4) Concrete members can be joined together more efficiently than with conventional techniques, resulting in shorter on-site construction times and shorter site occupancy periods. (5) When applied to bridge deck replacement work, it will be possible to reopen bridges to traffic more quickly. [Brief description of the drawings]
[0026] [Figure 1] FIG. 2 is a perspective view showing a schematic diagram of a concrete deck according to the present invention being placed on the main girder BG of a bridge. [Diagram 2](a) is a plan view showing the concrete deck as viewed from above, (b) is a cross-sectional view showing the concrete deck cut by a vertical plane in the bridge axis direction, (c) is a side view showing one side facing in the bridge axis direction, and (d) is a side view showing the other side facing in the bridge axis direction. [Diagram 3] 1A is a partial side view showing a schematic representation of a recess formed on a side of a concrete deck, and FIG. 1B is a partial side view showing a schematic representation of a protrusion formed on a side of a concrete deck. [Figure 4] (a) is a partial cross-sectional view showing a schematic of the first joint of the sliding concrete deck cut by a vertical plane in the bridge axis direction, and (b) is a partial plan view showing a schematic of the first joint of the sliding concrete deck as viewed from above. [Diagram 5] (a) is a partial cross-sectional view showing a schematic of the second joint of the sliding-type concrete deck cut by a vertical plane in the bridge axis direction, and (b) is a partial plan view showing a schematic of the second joint of the sliding-type concrete deck viewed from above. [Figure 6] (a) is a partial cross-sectional view showing a schematic of the first joint of a sliding-type concrete deck formed on the first joint side having a convex portion, and (b) is a partial cross-sectional view showing a schematic of the second joint of a sliding-type concrete deck formed on the second joint side having a concave portion. [Figure 7] FIG. 2 is a step diagram showing the procedure for constructing the concrete member joint structure of the present invention when a sliding type concrete floor slab is used. [Figure 8] (a) A partial cross-sectional view showing a schematic of a first joint of a sliding type concrete deck having a curved fastening member, (b) A partial cross-sectional view showing a schematic of a second joint of a sliding type concrete deck having a curved fastening member, and (c) A partial cross-sectional view showing the concrete member joint structure of a sliding type concrete deck having a curved fastening member. [Figure 9] 1(a) is a partial cross-sectional view showing a schematic diagram of a first joint of a buried concrete deck, and (b) is a partial cross-sectional view showing a schematic diagram of a second joint of a buried concrete deck. [Figure 10]A flow chart showing the flow of main steps of the concrete member joining method of the present invention in the case where a sliding type concrete floor slab is used. [Figure 11] A step diagram showing the main procedures of the concrete member joining method of the present invention in the case where the second joint side of a subsequent concrete floor slab is joined to the first joint side of a preceding concrete floor slab. [Figure 12] A step diagram showing the main procedures of the concrete member joining method of the present invention in the case where the first joint side of a subsequent concrete floor slab is joined to the second joint side of a preceding concrete floor slab. [Figure 13] FIG. 2 is a step diagram showing the main steps of the method for joining concrete members of the present invention in the case where a curved fastening material is used. [Figure 14] FIG. 2 is a flow chart showing the flow of main steps of the concrete member joining method of the present invention in the case where a buried concrete floor slab is used. [Figure 15] A step diagram showing the main procedures of the concrete member joining method of the present invention in the case where a buried concrete floor slab is used. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0027] Examples of concrete members, concrete member joint structures, and concrete member joining methods of the present invention will be described with reference to the drawings. The present invention can be applied to various concrete members that are joined together and used, such as box culvert ceiling slabs, concrete wall slabs (especially horizontal walls), and precast pavement slabs, but for convenience, the present invention will be described using an example of a precast concrete slab for a bridge deck (hereinafter simply referred to as a "concrete slab").
[0028] 1.Overview FIG. 1 is a perspective view showing a state where the concrete member (concrete floor slab 100) of the present invention is arranged on the main girder BG of a bridge. In this figure, two concrete floor slabs 100 have already been installed, and the third concrete floor slab 100 is about to be arranged in a predetermined position. In this way, the entire deck of the bridge is completed by arranging multiple concrete floor slabs 100 on the main girder BG and joining the concrete floor slabs 100 adjacent in the bridge axis direction. Hereinafter, when describing the direction of the concrete floor slab 100, the direction will be expressed as the direction when it is arranged on the main girder BG. That is, in the case of FIG. 1, the short side direction of the concrete floor slab 100 is expressed as the "bridge axis direction" and the long side direction is expressed as the "direction perpendicular to the bridge axis".
[0029] 2. Concrete members and concrete member joint structure The concrete member (concrete floor slab 100) and concrete member joint structure of the present invention will be described in detail with reference to the drawings. The concrete member joining method of the present invention is a method for constructing a concrete member joint structure by joining concrete members. Therefore, the concrete member and concrete member joint structure of the present invention will be described first, and then the concrete member joining method of the present invention will be described.
[0030] (First joining side and second joining side) FIG. 2 is a schematic diagram of a concrete slab 100, in which (a) is a plan view from above, (b) is a cross-sectional view cut along a vertical plane in the bridge axis direction, (c) is a side view of one side (the "first joint side" described later) facing the bridge axis direction, and (d) is a side view of the other side (the "second joint side" described later) facing the bridge axis direction. As shown in FIG. 2(a) and FIG. 2(b), the concrete slab 100 has two side surfaces facing the bridge axis direction, and these side surfaces are butted against the side surfaces of other concrete slabs 100 to join two adjacent concrete slabs 100. For convenience, one side surface facing the bridge axis direction (the upper side in FIG. 2(a)) will be referred to as the "first joint side surface 110," and the other side surface (the lower side in FIG. 2(a)) will be referred to as the "second joint side surface 120."
[0031] As shown in Figures 2(a) and 2(c), the first joint side 110 has joints (hereinafter referred to as "first joints 130") for joining to other concrete slabs 100 (particularly the second joint side 120) provided at multiple locations (14 in the figures) along the first joint side 110 (i.e., in the direction perpendicular to the bridge axis). Also, as shown in Figures 2(a) and 2(d), the second joint side 120 has joints (hereinafter referred to as "second joints 140") for joining to other concrete slabs 100 (particularly the first joint side 110) provided at multiple locations (14 in the figures) along the second joint side 120 (i.e., in the direction perpendicular to the bridge axis), similar to the first joints 130.
[0032] (Concave and convex) A series of recesses 150 are formed along the first joining side 110 (i.e., in the direction perpendicular to the bridge axis) as shown in Fig. 2(c), while a series of protrusions 160 are formed along the second joining side 120 (i.e., in the direction perpendicular to the bridge axis) as shown in Fig. 2(d). These recesses 150 are curved and recessed toward the center of the main body (the center of the plate's plane) as shown in Fig. 3(a), while the other protrusions 160 protrude outward in a curved shape as shown in Fig. 3(b).
[0033] The recess 150 of the concrete slab 100 fits into the protrusion 160 of another concrete slab 100, and the protrusion 160 of the concrete slab 100 fits into the recess 150 of another concrete slab 100. However, the protrusion 160 and the recess 150 do not fit into each other so that they are in close contact with each other, but fit into each other with a slight gap between them. In other words, the shapes and dimensions of the protrusion 160 and the recess 150 are designed so that the space formed by the recess 150 is slightly larger than the space dominated by the protrusion 160. In this way, by fitting the protrusion 160 and the recess 150 with a "play" as it were, some movement of the concrete slab 100 is allowed (i.e., the movement is not completely restricted). In addition, since the protrusion 160 and the recess 150 each have a curved surface, the rotation of the concrete member is also allowed (i.e., the rotation is not restricted). As a result, the shear resistance of the concrete and the tensile force of the fastening material connecting it effectively interact with each other, so that even if an impact force caused by a wheel load is applied, the energy can be dissipated or absorbed, effectively preventing damage to the concrete floor slab 100. Also, by providing unevenness in the concrete floor slab, the specifications for the fastening material can be further simplified.
[0034] In Fig. 2, the recess 150 is formed on the first joining side surface 110, and the protrusion 160 is formed on the second joining side surface 120, but it is also possible to form the protrusion 160 on the first joining side surface 110 and the recess 150 on the second joining side surface 120. In other words, the concrete floor slab 100 has the recess 150 formed on one of the first joining side surface 110 and the second joining side surface 120, and the protrusion 160 formed on the other. In Fig. 2, the recess 150 and the protrusion 160 are formed in a straight line over the entire side surface, but this is not limited to this, and the recess 150 and the protrusion 160 can also be formed in multiple places with intervals (i.e., at intervals).
[0035] (Concrete floor slab type) The concrete slab 100 of the present invention is provided with a "fastening material" that connects adjacent concrete slabs 100. The fastening material can be attached in two ways. That is, the concrete slab 100 of the present invention can be roughly divided into a concrete slab 100 in which the fastening material is attached so as to be slidable within the first joint 130 (hereinafter referred to as "sliding type concrete slab 100") and a concrete slab 100 in which the fastening material is embedded within the first joint 130 (hereinafter referred to as "embedded type concrete slab 100"). However, the sliding type concrete slab 100 and the embedded type concrete slab 100 have the above-mentioned first joint side 110 and second joint side 120, and the recessed portion 150 and the protruding portion 160 are formed, which are common to both. Below, the sliding type concrete slab 100 and the embedded type concrete slab 100 will be described in order.
[0036] (Sliding concrete floor slab) FIG. 4 is a diagram showing the first joint 130, where (a) is a partial cross-sectional view cut along a vertical plane in the bridge axis direction, and (b) is a partial plan view seen from above. In FIG. 4(b), structures that are not directly visible are shown by dashed lines. As shown in FIG. 4, the first joint 130 includes a first insertion hole 131, a first working space 132, a storage hole 133, and an air hole 134. Among these, the first insertion hole 131 is a small hole located near the center of the thickness of the sliding concrete deck 100, opens into the first joint side surface 110, and is formed approximately horizontally (including horizontally) from this first joint side surface 110 toward the center of the main body (left side in the figure). The first working space 132 is a working space formed near the end of the first insertion hole 131 on the center side of the main body (left side in the figure) and opens to the upper surface. The storage hole 133, like the first insertion hole 131, is a small hole located near the center of the thickness of the sliding concrete floor slab 100, and is formed approximately horizontally (including horizontally) from the first working space 132 toward the center of the main body (left side in the figure). The storage hole 133 is formed so as to be in the extension direction of the first insertion hole 131, that is, so that the storage hole 133 and the first insertion hole 131 are arranged on an approximately straight line (including on a straight line). The air hole 134 is a small hole formed in the vertical direction that opens on the upper surface of the sliding concrete floor slab 100 and communicates with the storage hole 133. The first insertion hole 131 communicates with the first working space 132, and the storage hole 133 also communicates with the first working space 132, that is, it penetrates from the opening of the first insertion hole 131 (right side in FIG. 4) to the end of the storage hole 133 on the center side of the main body (left side in the figure).
[0037] FIG. 5 is a diagram showing the second joint 140 in a schematic manner, where (a) is a partial cross-sectional view cut along a vertical plane in the bridge axis direction, and (b) is a partial plan view seen from above. However, in FIG. 5(b), structures that are not directly visible are shown by dashed lines. As shown in FIG. 5, the second joint 140 includes a second insertion hole 141 and a second working space 142. The second insertion hole 141 is a small hole located near the center of the thickness of the sliding concrete floor slab 100, and opens into the second joint side surface 120, and is formed approximately horizontally (including horizontally) from the second joint side surface 120 toward the center of the main body (the right side in the figure). The second working space 142 is a working space formed near the end of the second insertion hole 141 on the center side of the main body (the right side in the figure), and opens to the upper surface. The second insertion hole 141 is connected to the second working space 142.
[0038] Incidentally, in Fig. 4(a), a recess 150 is provided on the first joint side surface 110 side where the first joint portion 130 is formed, and in Fig. 5(a), a protrusion 160 is provided on the second joint side surface 120 side where the second joint portion 140 is formed. However, the concrete floor slab 100 may also be provided with a protrusion 160 on the first joint side surface 110 side where the first joint portion 130 is formed as shown in Fig. 6(a), and with a recess 150 on the second joint side surface 120 side where the second joint portion 140 is formed as shown in Fig. 6(b).
[0039] The concrete member joint structure of the present invention is a joint structure for joining two adjacent concrete floor slabs 100. Hereinafter, with reference to Fig. 7, a procedure for constructing the concrete member joint structure in the case where the sliding type concrete floor slab 100 is used will be described.
[0040] First, as shown in FIG. 7(a), two sliding concrete slabs 100 are arranged so as to be aligned in the bridge axis direction. At this time, the first joint side 110 of one (left side in the figure) sliding concrete slab 100 and the second joint side 120 of the other (right side in the figure) sliding concrete slab 100 are arranged so as to face each other. Also, a rod-shaped fastening material 135 (e.g., a bolt or the like) with screws at both ends is installed in advance in the first joint portion 130 of the left sliding concrete slab 100. More specifically, a part of the fastening material 135 (left side part in the figure) is accommodated in the storage hole 133, and the other part (right side part in the figure) is accommodated in the first working space 132 and the first insertion hole 131. Then, the outer end of the fastening material 135 (right side end part in the figure) is accommodated in the first joint portion 130 without protruding from the first joint side 110 so as not to become an obstacle when arranging the right sliding concrete slab 100. Therefore, it is preferable that the storage hole 133 is formed with a length equal to or greater than half the length of the fastening material 135 .
[0041] When installing the two sliding concrete slabs 100, as described above, the convex portion 160 and the concave portion 150 are fitted together with a slight gap, and the first joint side surface 110 and the second joint side surface 120 are arranged so that a slight gap (for example, about 2 to 3 mm) is generated between them. By providing this gap, a water-stopping material (for example, epoxy resin, etc.) can be filled between the first joint side surface 110 and the second joint side surface 120. When the left and right sliding concrete slabs 100 are arranged, the fastening material 135 is slid toward the second joint portion 140 as shown in FIG. 7(b). At this time, the worker may insert his hand into the first working space 132 to grab the fastening material 135 and move the fastening material 135 in the bridge axis direction so as to be inserted into the second insertion hole 141. The fastening material 135 is moved while being visually inspected through the upper openings of the first working space 132 and the second working space 142, and when it is confirmed that one end (threaded portion) of the fastening material 135 is positioned within the first working space 132 and the other end (threaded portion) of the fastening material 135 is positioned within the second working space 142, the sliding movement of the fastening material 135 is stopped.
[0042] When both ends (threaded portions) of the fastening material 135 are placed in the first working space 132 and the second working space 142, respectively, nuts 136 and support plates 137 are attached to both ends of the fastening material 135 as shown in Fig. 7(c). At this time, it is preferable for a worker to insert his / her hand into the first working space 132 to attach the nut 136 and the support plate 137, and also insert his / her hand into the second working space 142 to attach the nut 136 and the support plate 137. Then, the nuts 136 on both sides are tightened using tools or the like. As a result, tension is applied to the concrete member sandwiched between the first working space 132 and the second working space 142 via the support plates 137 on both sides. In this way, tension in the bridge axis direction is applied between the sliding concrete decks 100 by the fastening material 135, so even if an uneven vertical load acts near the joint after use, it is possible to prevent problems such as a step occurring between adjacent sliding concrete decks 100 or damage to parts of the sliding concrete decks 100. When the nuts 136 on both sides are tightened, the gap between the first joint side 110 and the second joint side 120 is filled with a water-stopping material EP (e.g., epoxy resin, etc.).
[0043] So far, the sliding type concrete slab 100 in which the fastening material 135 is linear has been described, but the fastening material 135 of the sliding type concrete slab 100 can also be curved. Figure 8 is a schematic diagram of the sliding type concrete slab 100 having the curved fastening material 135, where (a) is a partial cross-sectional view showing the first joint 130, (b) is a partial cross-sectional view showing the second joint 140, and (c) is a partial cross-sectional view showing the concrete member joint structure.
[0044] When a curved fastening material 135 (e.g., a bent bolt) is used, the first joint portion 130 includes a first insertion hole 131 and a first working space 132 as shown in Fig. 8(a). In other words, the storage hole 133 and the air hole 134, which are provided when a straight fastening material 135 is used, can be omitted. Among these, the first insertion hole 131 is a small hole that opens to the first joint side surface 110 and is formed in a curved shape from the first joint side surface 110 upward toward the center of the main body (left side in the figure). The first working space 132 is a working space that is formed near the end of the first insertion hole 131 toward the center of the main body (left side in the figure) and opens to the upper surface.
[0045] The second joint portion 140 in the case where the curved fastening material 135 is used is configured to include a second insertion hole 141 and a second working space 142. Of these, the second insertion hole 141 is a small hole that opens to the second joint side surface 120 and is formed in a curved shape from the second joint side surface 120 upward toward the center of the main body (the right side in the figure). The second working space 142 is a working space that is formed near the end of the second insertion hole 141 toward the center of the main body (the right side in the figure) and opens to the upper surface.
[0046] As can be seen from FIG. 8(c), when the first insertion hole 131 and the second insertion hole 141 are connected, a shape corresponding to the curved fastening material 135 is formed. This allows the fastening material 135 to be inserted from the first working space 132 (or the second working space 142) and inserted into the second working space 142 (or the first working space 132). As in FIG. 7, both ends (threaded portions) of the fastening material 135 are placed in the first working space 132 and the second working space 142, respectively, and nuts 136 and support plates 137 are attached to both ends of the fastening material 135, and the nuts 136 on both sides are tightened using tools or the like. As a result, tension is applied to the concrete member sandwiched between the first working space 132 and the second working space 142.
[0047] (buried concrete floor slab) 9 is a schematic diagram of an embedded concrete slab 100, where (a) is a partial cross-sectional view showing the first joint 130 and (b) is a partial cross-sectional view showing the second joint 140. As shown in FIG. 9(a), a fastening material 135 is embedded in the first joint 130 of the embedded concrete slab 100. However, the tip (on the right side in the figure) where the screw is provided protrudes from the first joint side surface 110. Also, as shown in FIG. 9(b), a one-sided nut 143 is embedded in the second joint 140 of the embedded concrete slab 100.
[0048] The one-way push nut 143 is a nut in which the threads of the one-way push nut 143 and the threads of the bolt are screwed together by simply inserting the bolt through the nut, that is, the bolt can be screwed without turning the nut. For example, the "SB joint" manufactured by Joint Kogyo Co., Ltd. and the nuts disclosed in JP 2020-143429 and JP 2020-143426, etc., have been used in recent years as the one-way push nut 143. Therefore, the one-way push nut 143 is also buried in the second joint 140 of the buried concrete floor slab 100. Note that FIG. 9(b) shows an example in which the "SB joint" manufactured by Joint Kogyo Co., Ltd. is used as the one-way push nut 143, but of course it is not limited to this and one-way push nuts 143 of various shapes and standards can be used.
[0049] When installing the two buried concrete slabs 100, the two buried concrete slabs 100 are arranged so that the first joint side 110 and the second joint side 120 face each other, and one of the buried concrete slabs 100 is moved so that the first joint side 110 approaches the second joint side 120. Then, the tip (threaded portion) of the fastening material 135 is inserted into the one-way push nut 143, and the thread of the one-way push nut 143 and the thread of the fastening material 135 are screwed together. At this time, as described above, the convex portion 160 and the concave portion 150 are fitted together with a slight gap provided, and the first joint side 110 and the second joint side 120 are arranged so that a slight gap is generated between them.
[0050] 3. Concrete member joining method Next, the concrete member joining method of the present invention will be described with reference to the drawings. The concrete member joining method of the present invention is a method for constructing a concrete member joint structure by joining the concrete members (concrete floor slab 100) described so far. Therefore, we will avoid explanations that overlap with the contents explained in the concrete members (concrete floor slab 100) and concrete member joint structure, and will only explain the contents unique to the concrete member joining method of the present invention. In other words, the contents not described here are the same as those explained in "2. Concrete members and concrete member joint structure".
[0051] The method of joining concrete members of the present invention is a method of joining the joint side of a concrete floor slab 100 to be subsequently placed (hereinafter simply referred to as the "subsequent concrete floor slab 100") to the joint side of a previously placed concrete floor slab 100 (hereinafter simply referred to as the "previous concrete floor slab 100"). Note that the concrete member joining method when using a sliding type concrete floor slab 100 and the concrete member joining method when using a buried type concrete floor slab 100 differ in terms of procedures, etc. Therefore, the cases when using a sliding type concrete floor slab 100 and when using a buried type concrete floor slab 100 will each be explained in turn.
[0052] (For sliding concrete floor slabs) In the case of sliding type concrete slabs, they are broadly divided into a case where the second joint side 120 of the following sliding type concrete slab 100 is joined to the first joint side 110 of the preceding sliding type concrete slab 100 (hereinafter referred to as the "first case"), a case where the first joint side 110 of the following sliding type concrete slab 100 is joined to the second joint side 120 of the preceding sliding type concrete slab 100 (hereinafter referred to as the "second case"), and a case where a curved fastening material 135 is used (hereinafter referred to as the "third case"). The first case, the second case, and the third case will be described below.
[0053] First, the "first case" will be described. FIG. 10 is a flow diagram showing the flow of the main steps of the concrete member joining method of the present invention in the case where a sliding concrete slab 100 is used, and FIG. 11 is a step diagram showing the main procedure of the concrete member joining method in the first case. As shown in FIG. 11(a), in a state where the preceding sliding concrete slab 100 (left side in the figure) is already placed, the following sliding concrete slab 100 (right side in the figure) is lowered to the adjacent position. Note that the preceding sliding concrete slab 100 is placed so that the first joint side 110 is its joint surface, and the following sliding concrete slab 100 is placed so that the second joint side 120 is its joint surface, that is, each sliding concrete slab 100 is placed so that the first joint side 110 and the second joint side 120 face each other (Step 10 in FIG. 10).
[0054] When the succeeding sliding concrete slab 100 is lowered to the installation surface, the second joint side 120 is abutted against the first joint side 110 so that the concave portion 150 on one side (left side in the figure) and the convex portion 160 on the other side (right side in the figure) fit together. For example, as shown in FIG. 11(b), the succeeding sliding concrete slab 100 is temporarily installed at a position slightly back from the preceding sliding concrete slab 100, and then the succeeding sliding concrete slab 100 is slid so that the second joint side 120 abuts against the first joint side 110. At this time, the convex portion 160 and the concave portion 150 are fitted together with a slight gap between them, without being in close contact. Also, the first joint side 110 and the second joint side 120 are installed so that a slight gap (hereinafter referred to as a "joint gap") is generated between them.
[0055] When the succeeding sliding concrete slab 100 is placed in a predetermined position, the fastening material 135 is slid toward the second joint 140 of the succeeding sliding concrete slab 100 as shown in Fig. 11(c) (Step 20 in Fig. 10). At this time, a worker may insert his / her hand into the first working space 132 to grasp the fastening material 135, and move the fastening material 135 in the bridge axis direction so that it is inserted into the second insertion hole 141.
[0056] The fastening material 135 is moved while being visually checked from the upper openings of the first working space 132 and the second working space 142, and when it is confirmed that both ends (threaded parts) of the fastening material 135 are located in the first working space 132 and the second working space 142 as shown in FIG. 11(d), nuts 136 and support plates 137 are attached to both ends of the fastening material 135 as shown in FIG. 11(e) (Step 30 in FIG. 10). At this time, it is preferable that the worker inserts his / her hand into the first working space 132 to attach the nut 136 and the support plate 137, and also inserts his / her hand into the second working space 142 to attach the nut 136 and the support plate 137. Then, the nuts 136 on both sides are tightened using tools or the like (Step 40 in FIG. 10). As a result, tension is applied to the concrete member sandwiched between the first working space 132 and the second working space 142 via the support plates 137 on both sides.
[0057] When the nuts 136 on both ends of the fastening material 135 are tightened, as shown in FIG. 11(f), the filler is filled from the upper opening of the first working space 132, and the filler is filled from the upper opening of the second working space 142 (Step 50 in FIG. 10). The joint gap is filled with a water-stopping material EP such as epoxy resin (Step 60 in FIG. 10). The filler used here is preferably concrete having a strength equivalent to that of the concrete used in the sliding type concrete slab 100. Due to the effect of providing the air hole 134 in the first joint 130, the filler introduced from the upper opening of the first working space 132 is filled into the storage hole 133 and further into the air hole 134. The first joint 130 (first insertion hole 131 and first working space 132, storage hole 133, and air hole 134) is filled with filler material, and the second joint 140 (second insertion hole 141 and second working space 142) is filled with filler material, and then the filling material is left to harden. When the filler material hardens and exhibits a predetermined strength, the concrete member joint structure of the present invention is completed.
[0058] Next, the "second case" will be described. FIG. 12 is a step diagram showing the main steps of the concrete member joining method in the second case. As shown in FIG. 12(a), in a state where the preceding sliding type concrete slab 100 (left side in the figure) is already placed, the following sliding type concrete slab 100 (right side in the figure) is lowered to the adjacent position. The preceding sliding type concrete slab 100 is placed so that the second joint side 120 is its joint surface, and the following sliding type concrete slab 100 is placed so that the first joint side 110 is its joint surface, that is, each sliding type concrete slab 100 is placed so that the second joint side 120 and the first joint side 110 face each other (Step 10 in FIG. 10).
[0059] When the succeeding sliding concrete slab 100 is lowered to the installation surface, the first joint side 110 is abutted against the second joint side 120 so that the concave portion 150 on one side (left side in the figure) and the convex portion 160 on the other side (right side in the figure) fit together. For example, as shown in FIG. 12(b), the succeeding sliding concrete slab 100 is temporarily installed at a position slightly back from the preceding sliding concrete slab 100, and then the succeeding sliding concrete slab 100 is slid to abut the first joint side 110 against the second joint side 120. At this time, the convex portion 160 and the concave portion 150 are not in close contact with each other, but are fitted together with a slight gap between the convex portion 160 and the concave portion 150. Also, the first joint side 110 and the second joint side 120 are installed so that a joint gap is generated between them.
[0060] When the succeeding sliding type concrete deck 100 is placed in a predetermined position, the fastening material 135 is slid toward the second joint 140 of the preceding sliding type concrete deck 100 as shown in Fig. 12(c) (Step 20 in Fig. 10). At this time, a worker may insert his / her hand into the first working space 132 to grasp the fastening material 135, and move the fastening material 135 in the bridge axis direction so that it is inserted into the second insertion hole 141.
[0061] The fastening material 135 is moved while being visually checked from the upper openings of the second working space 142 and the first working space 132, and when it is confirmed that both ends (threaded parts) of the fastening material 135 are located in the second working space 142 and the first working space 132 as shown in FIG. 12(d), nuts 136 and support plates 137 are attached to both ends of the fastening material 135 as shown in FIG. 12(e) (Step 30 in FIG. 10). At this time, it is preferable that the worker inserts his / her hand into the first working space 132 to attach the nut 136 and the support plate 137, and also inserts his / her hand into the second working space 142 to attach the nut 136 and the support plate 137. Then, the nuts 136 on both sides are tightened using tools or the like (Step 40 in FIG. 10). As a result, tension is applied to the concrete member sandwiched between the first working space 132 and the second working space 142 via the support plates 137 on both sides.
[0062] When the nuts 136 on both ends of the fastening material 135 are tightened, as shown in FIG. 12(f), the filler is filled from the upper opening of the first working space 132, and the filler is filled from the upper opening of the second working space 142 (Step 50 in FIG. 10). The joint gap is filled with a water-stopping material EP such as epoxy resin (Step 60 in FIG. 10). The filler used here is preferably concrete having a strength equivalent to that of the concrete used in the sliding type concrete slab 100. Due to the effect of providing the air hole 134 in the first joint 130, the filler introduced from the upper opening of the first working space 132 is filled into the storage hole 133 and further into the air hole 134. The first joint 130 (first insertion hole 131 and first working space 132, storage hole 133, and air hole 134) is filled with filler material, and the second joint 140 (second insertion hole 141 and second working space 142) is filled with filler material, and then the filling material is left to harden. When the filler material hardens and exhibits a predetermined strength, the concrete member joint structure of the present invention is completed.
[0063] Next, the "third case" will be described. FIG. 13 is a step diagram showing the main steps of the concrete member joining method in the third case. As shown in FIG. 13(a), in a state where the preceding sliding type concrete slab 100 (left side in the figure) is already placed, the following sliding type concrete slab 100 (right side in the figure) is lowered to the adjacent position. The preceding sliding type concrete slab 100 is placed so that the first joint side 110 (or the second joint side 120) becomes its joint surface, and the following sliding type concrete slab 100 is placed so that the second joint side 120 (or the first joint side 110) becomes its joint surface, that is, each sliding type concrete slab 100 is placed so that the first joint side 110 and the second joint side 120 face each other (Step 10 in FIG. 10).
[0064] When the succeeding sliding concrete slab 100 is lowered to the installation surface, the second joint side 120 is abutted against the first joint side 110 so that the concave portion 150 on one side (left side in the figure) and the convex portion 160 on the other side (right side in the figure) fit together. For example, as shown in FIG. 13(b), the succeeding sliding concrete slab 100 is temporarily installed at a position slightly back from the preceding sliding concrete slab 100, and then the succeeding sliding concrete slab 100 is slid to abut the second joint side 120 against the first joint side 110. At this time, the convex portion 160 and the concave portion 150 are not in close contact with each other, but are fitted together with a slight gap between the convex portion 160 and the concave portion 150. Also, the first joint side 110 and the second joint side 120 are installed so that a joint gap is generated between them.
[0065] When the succeeding sliding concrete slab 100 is installed in a predetermined position, a curved fastening material 135 (for example, a curved bolt) is inserted from the first working space 132 into the first insertion hole 131 and the second insertion hole 141 as shown in FIG. 13(c). Of course, the fastening material 135 can also be inserted from the second working space 142. When it is confirmed that both ends (threaded parts) of the fastening material 135 are located in the first working space 132 and the second working space 142 as shown in FIG. 13(d), a nut 136 and a support plate 137 are attached to both ends of the fastening material 135 as shown in FIG. 13(e) (Step 30 in FIG. 10). At this time, it is preferable that a worker inserts his / her hand into the first working space 132 to attach the nut 136 and the support plate 137, and also inserts his / her hand into the second working space 142 to attach the nut 136 and the support plate 137. Then, using a tool or the like, the nuts 136 on both sides are tightened (Step 40 in FIG. 10). As a result, tension is applied to the concrete member sandwiched between the first working space 132 and the second working space 142 via the support plates 137 on both sides.
[0066] When the nuts 136 on both ends of the fastening material 135 are tightened, as shown in FIG. 13(e), the filler is filled from the upper opening of the first working space 132 and from the upper opening of the second working space 142 (Step 50 in FIG. 10). The joint gap is filled with a water-stopping material EP such as epoxy resin (Step 60 in FIG. 10). The filler used here is preferably concrete having a strength equivalent to that of the concrete used in the sliding concrete floor slab 100. When the filler is filled in the first joint 130 (the first insertion hole 131 and the first working space 132) and in the second joint 140 (the second insertion hole 141 and the second working space 142), the filler is allowed to harden. When the filler hardens and develops a predetermined strength, the concrete member joint structure of the present invention is completed.
[0067] (For buried concrete floor slabs) FIG. 14 is a flow diagram showing the flow of the main steps of the concrete member joining method of the present invention in the case where an embedded concrete slab 100 is used, and FIG. 15 is a step diagram showing the main steps. In FIG. 15, an example is shown in which an "SB joint" manufactured by Joint Kogyo Co., Ltd. is used as the one-side push nut 143, but of course, one-side push nuts 143 of various shapes and standards can be used. As shown in FIG. 15(a), with the preceding embedded concrete slab 100 (left side in the figure) already placed, the following embedded concrete slab 100 (right side in the figure) is lowered to the adjacent position. The preceding embedded concrete slab 100 is placed so that the second joint side 120 is its joint surface, and the following embedded concrete slab 100 is placed so that the first joint side 110 is its joint surface, that is, the respective embedded concrete slabs 100 are placed so that the first joint side 110 and the second joint side 120 face each other (Step 10 in FIG. 14).
[0068] When the subsequent embedded concrete slab 100 is lowered to the installation surface, the subsequent embedded concrete slab 100 is moved so that the first joint side surface 110 approaches the second joint side surface 120 (Step 70 in FIG. 14). For example, as shown in FIG. 15(b), the subsequent embedded concrete slab 100 may be temporarily installed at a position slightly away from the preceding embedded concrete slab 100, and then the subsequent embedded concrete slab 100 may be slid. Then, the tip (threaded portion) of the fastening material 135 is inserted into the one-way pushing nut 143 to screw the thread of the one-way pushing nut 143 and the thread of the fastening material 135 together. Also, as shown in FIG. 15(c), the second joint side surface 120 is abutted against the first joint side surface 110 so that the recessed portion 150 on one side (left side in the figure) and the protruding portion 160 on the other side (right side in the figure) fit together. At this time, the convex portion 160 and the concave portion 150 are not in close contact with each other, but are fitted together with a slight gap between the convex portion 160 and the concave portion 150. In addition, the first joining side surface 110 and the second joining side surface 120 are disposed so that a joining gap is generated between them.
[0069] When the tip (threaded portion) of the fastening material 135 and the one-way pushing nut 143 are screwed together, the joining gap is filled with a water-stopping material EP such as epoxy resin as shown in FIG. 15(e) (Step 60 in FIG. 14). [Industrial Applicability]
[0070] The concrete member, concrete member joint structure, and concrete member joining method of the present invention can be used in various construction works for joining precast concrete slabs, such as bridge deck replacement work, new bridge deck construction work, box culvert ceiling slab installation work, etc. According to the present invention, reinforcement and reconstruction of road bridges in service can be efficiently carried out, which will ultimately lead to a longer life for road bridges. Considering this, it can be said that the invention can be expected to not only be used industrially, but also to make a great contribution to society. [Explanation of symbols]
[0071] 100 Concrete floor slab of the present invention 110 (Concrete slab) First joint side 120 (Concrete slab) Second joint side 130 (Concrete slab) First joint 131 (First joint) first insertion hole 132 First working space (at first joint) 133 (First Joint) Storage Hole 134 (First joint) air hole 135 (First joint) fastening material 136 (Connection) Nut 137 (Joint) Bearing Plate 140 (Concrete slab) Second joint 141 (Second joint) second insertion hole 142 Second working space (at the second joint) 143 (Second joint) one-sided push nut 150 (Concrete floor slab) recess 160 (Concrete floor slab) convex part BG main girder EP Water Stopping Material
Claims
1. A concrete member having a first joint side surface and a second joint side surface opposed to each other at both ends, the first joint side surface and the second joint side surface being joined to another concrete member, a convex portion formed on one of the first joining side surface and the second joining side surface and protruding in a curved shape; a recess formed on the other of the first joining side surface and the second joining side surface and recessed in a curved shape; a first bonding portion formed on the first bonding side surface; a second bonding portion formed on the second bonding side surface; A rod-shaped fastening material having a screw at an end, The convex portion fits into the concave portion so as to create a gap, and thereby the other concrete member is joined in a manner allowing rotation. A concrete member characterized by:
2. the first joint portion has a first insertion hole that opens to the first joint side surface and is formed from the first joint side surface toward a center of the main body, a first working space that is formed at an end of the first insertion hole on the main body center side, communicates with the first insertion hole, and opens to an upper surface, and a storage hole that communicates with the first working space and is formed in an extension direction of the first insertion hole from the first working space toward the center of the main body, the second joint portion has a second insertion hole that opens to the second joint side surface and is formed from the second joint side surface toward a center of the main body, and a second working space that is formed at an end of the second insertion hole on the main body center side, communicates with the second insertion hole, and opens to an upper surface, A plurality of the first joint portions are arranged at predetermined intervals along the first joint side surface, and a plurality of the second joint portions are arranged at predetermined intervals along the second joint side surface, The fastening material is movable within the storage hole and the first insertion hole and is insertable into another of the second insertion holes.
2. The concrete member according to claim 1 .
3. the first joint portion has a first insertion hole that opens to the first joint side surface and is formed from the first joint side surface toward a center of the main body, and a first working space that is formed at an end of the first insertion hole on the main body center side, communicates with the first insertion hole, and opens to an upper surface, the second joint portion has a second insertion hole that opens to the second joint side surface and is formed from the second joint side surface toward a center of the main body, and a second working space that is formed at an end of the second insertion hole on the main body center side, communicates with the second insertion hole, and opens to an upper surface, the fastener has a curved shape, and when the first insertion hole and the second insertion hole are connected, the shape corresponds to the curved shape of the fastener; A plurality of the first joint portions are arranged at predetermined intervals along the first joint side surface, and a plurality of the second joint portions are arranged at predetermined intervals along the second joint side surface, The fastening material is movable within the first insertion hole and is insertable into another of the second insertion holes.
2. The concrete member according to claim 1 .
4. The fastening material is embedded in the first joint portion, and a one-way pressing nut is embedded in the second joint portion, The fastener is embedded such that a screw at an end thereof protrudes from the first joining side surface, When the fastening material is pushed into the one-way push nut, the threads of the fastening material and the threads of the one-way push nut are screwed together.
2. The concrete member according to claim 1.
5. A concrete member joint structure for joining adjacent concrete members, The concrete member includes a first joint side surface and a second joint side surface facing each other at both ends, a convex portion formed on one of the first joint side surface and the second joint side surface and protruding in a curved shape, a concave portion formed on the other of the first joint side surface and the second joint side surface and recessed in a curved shape, a first joint portion formed on the first joint side surface, a second joint portion formed on the second joint side surface, and a rod-shaped fastener having a screw at an end, Adjacent concrete members are arranged so that the first joint side of one concrete member faces the second joint side of the other concrete member and so that the convex portion and the concave portion fit together, and then a part of the fastening material is inserted into the other second joint portion and tension is applied between the concrete members by tightening the bearing plates attached to both ends of the fastening material with nuts; The convex portion fits into the other concave portion so as to create a gap, thereby joining the concrete members in a manner that allows rotation. A concrete member joint structure characterized by the above.
6. 1. A method for joining adjacent concrete members, comprising: The concrete member has a first joint side surface and a second joint side surface facing each other at both ends, a convex portion formed on one of the first joint side surface and the second joint side surface and protruding in a curved shape, a concave portion formed on the other of the first joint side surface and the second joint side surface and recessed in a curved shape, a first joint portion formed on the first joint side surface, a second joint portion formed on the second joint side surface, and a rod-shaped fastener having a screw at an end, A subsequent member installation process of installing the subsequent concrete member so that the first joint side surface of the concrete member and the second joint side surface of the concrete member face each other and so that the convex portion and the concave portion fit together; and a tensioning step of inserting a part of the fastening material into the other second joint and fastening plates attached to both ends of the fastening material with nuts to apply tension between adjacent concrete members, In the subsequent member installation step, the convex portion is fitted into another concave portion so as to create a gap, thereby joining the concrete members in a manner allowing rotation. A method for joining concrete members comprising the steps of:
7. the first joint portion of the concrete member has a first insertion hole that opens on the first joint side surface and is formed from the first joint side surface toward a center of the main body, a first working space that is formed at an end of the first insertion hole on the main body center side, communicates with the first insertion hole and opens to an upper surface, and a storage hole that communicates with the first working space and is formed in an extension direction of the first insertion hole from the first working space toward the center of the main body, the second joint portion of the concrete member has a second insertion hole that opens to the second joint side surface and is formed from the second joint side surface toward a center of the main body, and a second working space that is formed at an end of the second insertion hole on the main body center side, communicates with the second insertion hole, and opens to an upper surface, In the subsequent member installation step, a subsequent concrete member is installed such that the first joint side of the previously installed concrete member faces the second joint side of the subsequently installed concrete member in a state in which a portion of the fastening material is stored in the storage hole of the previously installed concrete member, a fastening material moving step of sliding and moving the fastening material by utilizing the first working space so that one end of the fastening material is disposed in the first working space and the other end is disposed in the second working space; and a nut installation step of attaching a support plate and a nut to the fastening material in the first working space by using the first working space, and attaching a support plate and a nut to the fastening material in the second working space by using the second working space, In the tensioning step, a nut in the first working space and a nut in the second working space are tightened to apply tension to a member between the first working space and the second working space.
7. The method for joining concrete members according to claim 6.
8. the first joint portion of the concrete member has a first insertion hole that opens on the first joint side surface and is formed from the first joint side surface toward a center of the main body, a first working space that is formed at an end of the first insertion hole on the main body center side, communicates with the first insertion hole and opens to an upper surface, and a storage hole that communicates with the first working space and is formed in an extension direction of the first insertion hole from the first working space toward the center of the main body, the second joint portion of the concrete member has a second insertion hole that opens to the second joint side surface and is formed from the second joint side surface toward a center of the main body, and a second working space that is formed at an end of the second insertion hole on the main body center side, communicates with the second insertion hole, and opens to an upper surface, In the subsequent member installation step, a subsequent concrete member is installed such that the second joint side of the previously installed concrete member and the first joint side of the subsequently installed concrete member face each other in a state in which a portion of the fastening material is stored in the storage hole of the subsequently installed concrete member; a fastening material moving step of sliding and moving the fastening material by utilizing the second working space so that one end of the fastening material is disposed in the second working space and the other end is disposed in the first working space; and a nut installation step of attaching a support plate and a nut to the fastening material in the second working space by using the second working space, and attaching a support plate and a nut to the fastening material in the first working space by using the first working space, In the tensioning step, a nut in the second working space and a nut in the first working space are tightened to apply tension to a member between the second working space and the first working space.
7. The method for joining concrete members according to claim 6.
9. The method further includes a work space filling step of filling the first work space and the second work space with a filling material after the tension applying step.
9. The method for joining concrete members according to claim 7 or 8.
10. The fastener is embedded in the first joint portion of the concrete member such that a screw at an end thereof protrudes from the first joint side, and a one-way push nut is embedded in the second joint portion of the concrete member, In the subsequent member installation step, a subsequent concrete member is installed so that the second joint side of the previously installed concrete member faces the first joint side of the subsequently installed concrete member; In the tensioning step, the subsequent concrete member is moved so as to push the fastening material into the one-way push nut, and tension is applied between the adjacent concrete members by screwing the threads of the fastening material pushed into the one-way push nut into the threads of the one-way push nut.
7. The method for joining concrete members according to claim 6.
11. In the subsequent member installation step, the subsequent concrete member is installed so that a gap is formed between the first joint side surface and the second joint side surface, The method further includes a joining gap filling step of filling a gap between the first joining side surface and the second joining side surface with a filler. The method for joining concrete members according to any one of claims 6 to 10.
Citation Information
Patent Citations
Floor slab by precast slab of bridge and its installing device
JP1991087407A
Connection structure of precast structural body and connection method
JP1995042245A
Connecting structure for precast floor slab
JP2005090124A
Jointing structure for precast member
JP2009209600A
Precast floor slab system, bridge structure, precast floor slab system design method, and bridge structure manufacturing method
JP2016205098A
