Server system, behavior planning system, behavior planning method and program
The server system optimizes autonomous mobile object routes by analyzing detection information to adapt to obstacles and service overlaps, reducing managerial effort and enhancing robot efficiency.
Patent Information
- Application Number
- JP2022199439
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-12-14
- Publication Date
- 2024-10-07
- Estimated Expiration
- 2042-12-14
AI Technical Summary
Conventional systems require significant managerial effort to pre-plan detailed travel routes and plans for autonomous mobile objects with different purposes, leading to inefficiencies.
A server system connected via a network that generates dynamic routes for autonomous mobile objects by analyzing detection information from cameras, avoiding obstacles, and adjusting routes based on real-time conditions, while also managing overlapping service purposes and obstacle clearance.
Reduces managerial workload and enhances the efficient utilization of multiple robots by dynamically adapting routes to avoid obstacles and manage overlapping services, ensuring continuous operation with reduced manual intervention.
Smart Images

Figure 0007562625000001 
Figure 0007562625000002 
Figure 0007562625000003
Abstract
Description
[Technical field]
[0001] An embodiment of the present invention relates to a server system, a behavior planning system, a behavior planning method, and a program. [Background technology]
[0002] Conventionally, autonomous mobile objects such as robots that move autonomously within a building provide various services within the building. The services within such a building have different purposes, such as cleaning, inspection, security, and delivery, and different autonomous mobile objects are used for each purpose. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-166321 A [Patent Document 2] JP 2018-197731 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, such conventional technology requires a building manager or the like to plan in advance detailed driving routes and driving plans for each autonomous moving body with a different purpose, which requires a great deal of effort from the manager. [Means for solving the problem]
[0005] The server system of the embodiment includes a storage unit that receives detection information from each of a plurality of autonomous mobile bodies that are connected to the server system via a network, are capable of traveling for the purpose of providing services, travel along a first route in a building during a first time period, capture images of a surrounding situation of the first route while traveling along the first route, and transmit detection information including captured image information to the server system, the detection information being received from each of the plurality of autonomous mobile bodies, an analysis unit that analyzes the image information included in each of the plurality of detection information, and a display unit that displays a result of the analysis. As a resultbased on ,before for the autonomous moving body to travel during the second time period. a path having an overlap with the first path; a route generating unit that generates a second route; and a route generating unit that generates a route according to the second route and a behavior time in the second time period, the route according to the second route and the behavior time in the second time period. body a transmission unit that transmits to the autonomous moving body a service having a purpose different from the purpose of the service; The route generation unit identifies obstacles that may impede travel in the vicinity of the first route based on the analysis result, and generates the second route so as to avoid the identified obstacles, and further identifies dirt, graffiti, or damaged objects in the vicinity of the first route based on the analysis result and generates the second route, searches for a position of a tag attached to the obstacle by wireless communication with the tag, and determines whether the identified obstacle has been moved from the vicinity of the first route between the first time period and the second time period based on the searched position of the tag, and if the identified obstacle has been moved from the vicinity of the first route, generates the second route while ignoring the moved obstacle. . [Brief description of the drawings]
[0006] [Figure 1] FIG. 1 is a diagram illustrating an example of a configuration of a behavior planning system according to an embodiment. [Diagram 2] FIG. 2 is a diagram illustrating an example of a functional configuration of the robot according to the embodiment. [Diagram 3] FIG. 3 is a diagram illustrating an example of a data structure of the detection information according to the embodiment. [Figure 4] FIG. 4 is a block diagram illustrating an example of the functional configuration of a storage server and an analysis server that constitute the cloud according to the embodiment. [Diagram 5] FIG. 5 is a diagram illustrating an example of a patrol time for each robot according to the embodiment. [Figure 6] FIG. 6 is a diagram illustrating the overlapping degree of paths for each objective of the robot according to the embodiment. [Figure 7] FIG. 7 is a sequence diagram illustrating an example of an overall flow of a behavior planning process by the behavior planning system according to the embodiment. [Figure 8] FIG. 8 is a flowchart illustrating an example of a procedure of a route generation process according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0007] Hereinafter, an embodiment will be described with reference to the drawings.
[0008] (Embodiment) (Configuration of Action Planning System) FIG. 1 is a diagram illustrating an example of a configuration of a behavior planning system according to an embodiment. As shown in FIG. 1, the behavior planning system 1 according to this embodiment includes a cloud 100, a plurality of robots 210, a management device 300, a plurality of wireless tags 250, and a terminal 400, all of which are connected via a network.
[0009] The cloud 100 is provided with a storage server 110 and an analysis server 130. The storage server 110 and the analysis server 130 are also connected via a network. The storage server 110 is a device that receives and accumulates detection information from multiple robots 210. The analysis server 130 is a device that analyzes multiple pieces of detection information stored in the storage server 110, generates a path for the robot 210, and generates a behavior plan for the robot 210. The storage server 110 and the analysis server 130 are an example of a server system. The storage server 110 and the analysis server 130 may be configured as a single device.
[0010] Each of the multiple robots 210 autonomously moves along a route on each floor of a building. The robot 210 is an example of an autonomous moving body. Each of the multiple robots 210 autonomously moves for various purposes and performs services within the building. Such purposes include, for example, cleaning, inspection, security, delivery, etc., but are not limited to these.
[0011] Each of the wireless tags 250 is attached to a facility in the building. The wireless tags 250 have a GS function, can communicate with the robot 210 and the analysis server 130 of the cloud 100, and can transmit their own position to the robot 210 and the analysis server 130.
[0012] The management device 300 is configured as a normal computer installed in, for example, a manager's office of a building.
[0013] The terminal 400 is a device such as a mobile terminal carried by a worker, and is equipped with a display unit (not shown) capable of displaying various messages from the analysis server 130. There are a plurality of terminals 400 according to the number of workers.
[0014] (Robot configuration) First, the robot 210 of this embodiment will be described. FIG. 2 is a diagram illustrating an example of a functional configuration of a robot 210 according to an embodiment.
[0015] 2, the robot 210 of this embodiment mainly includes a camera 219, a microphone 221, a speaker 223, a communication unit 211, a traveling control unit 213, a control unit 215, and a storage unit 217. The robot 210 of this embodiment is capable of traveling according to the purpose of the service.
[0016] The storage unit 217 is a storage medium such as a hard disk drive (HDD) or a solid state drive (SSD). The storage unit 217 stores route data. This route data indicates the movement route of each robot 210 within the building, and is stored together with the movement time. The route data includes route data for daytime hours and route data for nighttime hours. In addition, each route data exists for each floor.
[0017] Here, the daytime period is an example of a first period, and the nighttime period is an example of a second period. Also, the route data for the daytime period is an example of a first route, and the route data for the nighttime period is an example of a second route.
[0018] The traveling control unit 213 drives a driving unit (not shown) in accordance with the route data stored in the memory unit 217 to control the traveling of the robot 210. The communication unit 211 controls communication with the storage server 110 and the analysis server 130.
[0019] The daytime route data and nighttime route data are transmitted from the analysis server 130 and received by the communication unit 211 , and the control unit 215 stores the received route data in the storage unit 217 .
[0020] The camera 219 captures images of the surroundings of the robot 210. The microphone 221 inputs surrounding sound. The speaker 223 outputs sound and the like to the outside. The control unit 215 controls the camera 219, microphone 221, speaker 223, and the like.
[0021] In this embodiment, while the robot 210 is traveling according to route data for daytime hours, the control unit 215 transmits an image (e.g., a video) captured by the camera 219 of the situation around the robot 210, i.e., the situation around the route, as detection information to the storage server 110 via the communication unit 211.
[0022] FIG. 3 is a diagram illustrating an example of a data structure of the detection information according to the embodiment. The detection information is composed of the robot ID, the route of each floor, the patrol start time and end time, the detection date and time, the detection result, and an image, as shown in Fig. 3. The detection information may include items other than these.
[0023] The robot ID is information for identifying the robot. The route of each floor is identification information of the route data of each floor along which the robot traveled when the image of the detection information was captured. The patrol start time and end time are the start and end times of the patrol when the robot traveled along the route data, i.e., patroled. The detection date and time is the date and time when the image was captured by the camera 219. The detection result is information indicating whether or not the image capture was completed normally. The image is an image captured by the camera 219, and in this embodiment, a video is used. However, a still image can also be used as the image.
[0024] (Configuration of storage server 110 and analysis server 130) Next, the storage server 110 and the analysis server 130 that constitute the cloud 100 will be described in detail. FIG. 4 is a block diagram showing an example of the functional configuration of the storage server 110 and the analysis server 130 that constitute the cloud 100 according to the embodiment.
[0025] 4, the storage server 110 mainly includes a communication unit 111 and a memory unit 113. The communication unit 111 controls communication with a plurality of robots 210 and communication with the analysis server .
[0026] The storage unit 113 is a storage medium such as an HDD, an SSD, etc. The storage unit 113 stores a plurality of pieces of detection information received from a plurality of robots 210, and daytime route data for each floor and nighttime route data for each floor generated by the analysis server 130.
[0027] As shown in FIG. 4, the analysis server 130 mainly includes an image analysis unit 131, a path generation unit 133, and a communication unit 135.
[0028] The image analysis unit 131 acquires multiple pieces of detection information stored in the memory unit 113 of the storage server 110 via the communication unit 135, and analyzes the image data included in each of the multiple pieces of detection information using a known method.
[0029] The path generating unit 133 identifies obstacles that may impede travel around the route indicated by the route data for the daytime hours on each floor, based on the analysis result of the image data by the image analyzing unit 131. Then, the path generating unit 133 generates path data for the robot 210 to travel on the floor during the nighttime hours so as to avoid the identified obstacles.
[0030] Furthermore, the route generating unit 133 identifies stains, graffiti, or damaged objects in the vicinity of the route indicated by the route data for the daytime hours for each floor based on the analysis results of the image data by the image analyzing unit 131, and generates nighttime route data for the floor. The route generating unit 133 transmits instruction messages to remove the identified stains and graffiti and to repair the identified damaged objects to the worker's terminal 400 via the communication unit 135. The worker who sees the instruction messages to remove the stains and graffiti and to repair the identified damaged objects on the terminal 400 will remove the stains and graffiti and repair the identified damaged objects identified along the route.
[0031] In addition, the route generation unit 133 determines whether or not the identified obstacle has been moved from the periphery of the route during the daytime hours to the nighttime hours based on information received from a tag attached to the obstacle, and if the identified obstacle has been moved from the periphery of the route during the daytime hours, generates route data for the nighttime hours, ignoring the moved obstacle.
[0032] In addition, the route generation unit 133 determines whether or not the identified dirt or graffiti has been removed or the damaged item has been repaired from the daytime to the nighttime based on other detection information, and if the identified dirt or graffiti has been removed or the damaged item has been repaired, generates route data for the nighttime including an instruction to capture and record the location of the identified dirt or graffiti or the damaged item after repair.
[0033] The route generating unit 133 acquires drawing information showing the structure of the building 10, and generates route data for the nighttime hours based on the drawing information so as to avoid identified obstacles. Here, the drawing information includes BIM (Building Information Modeling) data of the building.
[0034] Here, the path generating unit 133 generates the path data by determining the patrol time of each robot 210 so as to cover all time periods according to the purpose of the robot 210. In addition, the path generating unit 133 generates the path data so that the paths of the robot 210 for each purpose partially overlap.
[0035] Fig. 5 is a diagram showing an example of the patrol time for each robot 210 according to the embodiment. As shown in Fig. 5, the service objectives of the robot 210 in this embodiment include security, cleaning, equipment inspection, mail delivery, and food delivery. However, the service objectives are not limited to these. In addition, multiple robots 210 may be assigned to each objective.
[0036] As shown in FIG. 5, the patrol times of the robots 210 for each objective are determined widely distributed in two-hour increments.
[0037] 6 is a diagram showing the overlapping degree of the paths for each objective of the robot 210 according to the embodiment. As shown in FIG. 6, the path traveled by the robot 210 for each objective is determined so as to partially overlap with the paths of the robots 21 for other objectives.
[0038] The path generating unit 133 generates a path for each objective of the robot 210 in the time periods shown in Fig. 5 according to the overlapping degree shown in Fig. 6. Therefore, it is possible to generate a behavior plan for the robot 210 such that all paths cover the travel of the multiple robots 210 in all time periods, both in the daytime and in the nighttime.
[0039] 4, the communication unit 135 controls communication with the storage server 110 and communication with the plurality of robots 21. More specifically, the communication unit 135 receives a plurality of pieces of detection information stored in the memory unit 113 of the storage server 110 from the storage server 110. Furthermore, the communication unit 135 transmits the route data for the nighttime hours generated by the route generation unit 133 to the robot 210 together with the action time of the robot 210. Here, the communication unit 135 transmits the route data for the nighttime hours to the robot 210 having the same service purpose as the robot 210 that traveled the route in the daytime hours used when generating the route for the nighttime hours, as well as to the robot 210 having a different service purpose. Furthermore, the communication unit 135 transmits the route data for the nighttime hours to the storage server 110.
[0040] The storage server 110 and analysis server 130 of this embodiment are equipped with a control device such as a CPU, a storage device such as a ROM (Read Only Memory) or RAM, an external storage device such as an HDD, SSD, or CD drive device, a display device such as a display device, and input devices such as a keyboard and a mouse, and have a hardware configuration that utilizes a normal computer.
[0041] The action plan program executed by the storage server 110 and the analysis server 130 of this embodiment is provided as a file in an installable or executable format recorded on a computer-readable recording medium such as a CD-ROM, a flexible disk (FD), a CD-R, or a DVD (Digital Versatile Disk).
[0042] The action plan program executed by the storage server 110 and the analysis server 130 of this embodiment may be stored on a computer connected to a network such as the Internet and provided by being downloaded via the network. The action plan program executed by the storage server 110 and the analysis server 130 of this embodiment may be provided or distributed via a network such as the Internet.
[0043] Furthermore, the action plan program executed by the storage server 110 and the analysis server 130 of this embodiment may be provided by being pre-installed in a ROM or the like.
[0044] The behavior planning program executed by the storage server 110 and the analysis server 130 in this embodiment has a modular structure including the above-mentioned units (communication units 111, 135, image analysis unit 131, and path generation unit 133), and in terms of actual hardware, the CPU (processor) reads out and executes the behavior planning program from the above-mentioned storage medium, thereby loading the above-mentioned units onto the main memory device, and the communication units 111, 135, image analysis unit 131, and path generation unit 133 are generated on the main memory device.
[0045] The robot 210 of this embodiment has a hardware configuration including a control device such as a CPU, a storage device such as a ROM or RAM, an external storage device such as an HDD, SSD, or CD drive, a display device such as a display device, and a touch-type input device.
[0046] The behavioral planning program executed by the robot 210 of this embodiment is provided as a file in an installable or executable format recorded on a computer-readable recording medium such as a CD-ROM, a flexible disk (FD), a CD-R, or a DVD (Digital Versatile Disk).
[0047] The behavior planning program executed by the robot 210 of this embodiment may be stored in a computer connected to a network such as the Internet and provided by being downloaded via the network. The behavior planning program executed by the robot 210 of this embodiment may be provided or distributed via a network such as the Internet.
[0048] The behavior planning program executed by the robot 210 of this embodiment may be provided by being pre-installed in a ROM or the like.
[0049] The behavior planning program executed by the robot 210 of this embodiment has a modular structure including the above-mentioned units (communication unit 211, driving control unit 213, control unit 215), and in terms of actual hardware, the CPU (processor) reads out the behavior planning program from the above-mentioned storage medium and executes it, thereby loading the above-mentioned units onto the main memory device, and the communication unit 211, driving control unit 213, and control unit 215 are generated on the main memory device.
[0050] (Action Plan Processing) Next, a behavior planning process performed by the behavior planning system 1 according to the present embodiment configured as above will be described. FIG. 7 is a sequence diagram showing an example of an overall flow of the behavior planning process by the behavior planning system 1 according to the embodiment.
[0051] Each of the multiple robots 210 (referred to as robots (day) in FIG. 7) patrolling within the building 200 during the daytime hours performs its patrol at each hour during the daytime hours, and transmits detection information including image data captured during that time to the storage server 110 (S101a to S101c). In the storage server 110, the communication unit 111 receives each of the detection information from the multiple robots 210 and stores it in the memory unit 113.
[0052] Next, in the analysis server 130, the image analysis unit 131 and the path generation unit 133 execute a path generation process to generate path data for the robot 210 during the nighttime hours using the detection information stored in the memory unit 113 of the storage server 110 (S103).
[0053] Here, the route generation process in S103 will be described in detail. FIG. 8 is a flowchart illustrating an example of a procedure of a route generation process according to the embodiment.
[0054] First, the communication unit 135 receives a plurality of pieces of detection information stored in the memory unit 113 of the storage server 110 (S201). The image analysis unit 131 performs image analysis on the image data included in each of the acquired plurality of pieces of detection information (S203).
[0055] Next, if there is an obstacle that impedes the travel of the robot 210 on the route during the daytime based on the image analysis result by the image analysis unit 131, the route generation unit 133 identifies the position of the obstacle (S205). Then, the route generation unit 133 searches for the position of the wireless tag 250 attached to the obstacle, and checks whether the obstacle has been moved from the periphery of the route during the daytime (S207).
[0056] If there is dirt, graffiti, or damage on the route during the daytime based on the image analysis results by the image analysis unit 131, the route generation unit 133 identifies the location of the dirt, graffiti, or damage (S209). Then, the route generation unit 133 transmits work instructions for removing the dirt and graffiti and repairing the damage to the worker's terminal 400 via the communication unit 135 (S210). Here, if there are multiple such locations, the analysis server 130 efficiently determines the personnel allocation and order for multiple workers, and transmits removal and repair instructions together with the determined order to the terminal 400 of the determined worker.
[0057] When the worker completes the work of removing stains or graffiti or repairing damaged items, the worker inputs a message to the terminal 400 indicating that the work has been completed, and transmits the message to the analysis server 130. Alternatively, the worker may be configured to transmit a message to the management device 300 indicating that the work has been completed.
[0058] Then, after a certain period of time has elapsed, the route generating unit 133 checks whether the stains and graffiti have been removed and the damaged items have been repaired based on a notification of the completion of the work by the worker or other detection information (S211). If the stains and graffiti have been removed or the damaged items have been repaired, the route generating unit 133 includes an instruction to capture an image of the location in the nighttime route data as a record of the removal of the stains and graffiti and the repair of the damaged items (S212). As a result, the robot 210 traveling along the route at night captures an image of the location specified by the instruction with a camera or the like as a record of the removal of the stains and graffiti and the repair of the damaged items.
[0059] The path generation unit 133 receives and acquires drawing information (including BIM information) of the building 200 from the management device 300 of the building 200 via the communication unit 135 (S213).
[0060] Then, the path generation unit 133 refers to the drawing information and BIM information, and generates path data for the nighttime hours for each of the multiple robots 210 patrolling during the nighttime hours so as to avoid the obstacles identified in S205 (S215).
[0061] Here, the route generating unit 133 determines a route so as not to avoid an obstacle that has been confirmed in S207 to have been moved from the periphery of the route during the daytime, and generates route data.
[0062] Returning to FIG. 7, when the path generation process is completed, the communication unit 135 transmits the path data for the nighttime period generated by the path generation unit 133 to each of the multiple robots 210 (referred to as robots (night) in FIG. 7) patrolling the building 200 during the nighttime period together with the action time of each robot 210 (S105a to S105c). Here, in this embodiment, the communication unit 135 also transmits the path data for the nighttime period to the robots 210 having a different purpose of service from the robots 210 that traveled the daytime route used when generating the nighttime route. Note that the communication unit 135 can also transmit the path data for the nighttime period to the robots 210 having the same purpose of service as the robots 210 that traveled the daytime route used when generating the nighttime route.
[0063] Thus, in this embodiment, the behavior planning system includes a plurality of robots 210 that travel within the building 200, and a cloud 100 that is connected to the plurality of robots 210 via a network and generates routes for the plurality of robots 210 to plan behavior, and each of the plurality of robots 210 is capable of traveling for the purpose of providing a service, travels along a route within the building 200 during the daytime, captures images of the surrounding conditions of the route while traveling along the route during the daytime, and transmits detection information including captured image information to a storage server 1100 of the cloud 100. The storage server 110 of the cloud 100 has a memory unit 113 that receives detection information from each of the plurality of robots 210 and stores the received detection information. The analysis server 130 of the cloud 100 analyzes the image data contained in each of the multiple pieces of detection information using the image analysis unit 131, and the route generation unit 133 generates a route for the robot 210 to travel during the nighttime hours based on the image analysis results, and the communication unit 135 transmits the generated route data for the nighttime hours, together with the activity times during the nighttime hours, to a robot 210 with a different purpose for providing a service to the robot 210 that traveled the route during the daytime hours used when generating the route for the nighttime hours.
[0064] Therefore, according to this embodiment, by using the multiple robots 210 for purposes other than the original purpose of the service, detection information around the route can be shared, and a travel plan including the route and activity time for the multiple robots 210 to avoid obstacles can be created, thereby reducing the labor of managers, etc., and enabling efficient use of the multiple robots 210.
[0065] Furthermore, in this embodiment, the path generating unit 133 identifies obstacles that may impede travel in the vicinity of the route during daytime hours based on the image analysis results, and generates a path for the robot 210 to travel during nighttime hours so as to avoid the identified obstacles.
[0066] Therefore, according to this embodiment, a travel plan can be created that includes routes and activity times for multiple robots 210 to avoid obstacles, thereby reducing the workload of managers and others and enabling efficient utilization of multiple robots 210.
[0067] In addition, in this embodiment, the route generation unit 133 of the analysis server 130 further identifies dirt, graffiti, or damaged objects around the route during the daytime based on the image analysis results, and transmits work instructions to the worker's terminal 400 to remove the identified dirt or graffiti or repair the damaged objects.
[0068] Therefore, according to this embodiment, dirt, graffiti, and damage can be removed and repaired early rather than left unattended, which is convenient for building users and reduces the workload of managers and others.
[0069] In addition, in this embodiment, if dirt or graffiti has been removed or damage has been repaired, the route generation unit 133 of the analysis server 130 further includes in the generated nighttime route data an instruction to capture an image of the location where the dirt, graffiti, or damage was present as a record of the removal or repair.
[0070] Therefore, according to this embodiment, since the robot 210 captures images of the location while traveling along the route at night, the manager can reliably know the completion of the work of removing dirt or graffiti or repairing damaged items through the records, and the labor of the manager can be reduced. Also, the robot 210 can be utilized efficiently.
[0071] Furthermore, in this embodiment, the route generation unit 133 of the analysis server 130 determines, based on the wireless tag 250 attached to the obstacle, whether the obstacle has been moved from the vicinity of the route during the daytime hours to the nighttime hours, and if the identified obstacle has been moved from the vicinity of the route during the daytime hours, generates route data for the nighttime hours, ignoring the moved obstacle.
[0072] Therefore, according to this embodiment, even if there are obstacles around the route during the daytime, if the obstacles have been moved by nighttime, there is no need to avoid them, which further reduces the workload of managers, etc., and enables more efficient use of multiple robots 210.
[0073] In this embodiment, the route generation unit 133 of the analysis server 130 acquires drawing information and BIM information that indicate the structure of the building 200, and generates route data for the nighttime hours based on the drawing information and BIM information.
[0074] Therefore, route data can be generated by taking into consideration information about the building 200, which further reduces the workload of managers and the like and enables more efficient use of multiple robots 210.
[0075] In this embodiment, the robots 210 include robots 210 that have different activity times during the daytime and nighttime for each service purpose. Therefore, according to this embodiment, it is possible to provide services by patrolling the robots 210, covering all time periods for each service purpose.
[0076] (Modification) Various modifications of the above embodiment are possible. For example, while multiple robots 210 are patrolling, images of the area around the route captured by the camera 219 of the robot 210 and audio collected by the microphone 221 can be sequentially transmitted to the management device 300 in the manager's room, and the captured images and audio can be output in real time on the management device 300 side. In this case, the situation around the route can be grasped in real time on the management device 300 side.
[0077] In the above embodiment, routes for nighttime hours were generated from detection information about the surrounding area of the route during daytime hours, but the analysis server 130 may be configured to generate routes for times other than nighttime hours from detection information about the surrounding area of the route during times other than daytime hours.
[0078] In the above embodiment, the cloud 100 includes two servers, the storage server 110 and the analysis server 130, but the present invention is not limited to this. The functions of the storage server 110 and the analysis server 130 may be implemented by a single server device. Also, the functions of the storage server 110 and the analysis server 130 may be distributed among three or more devices.
[0079] Furthermore, when the robot 210 detects a person nearby using the camera 219 or the like while the robot 210 is moving, the robot 210 can be configured to notify the surroundings of the presence of the robot 210 by sound output, light emission, or the like.
[0080] Furthermore, a configuration is also possible in which multiple robots 210 communicate with each other to share detection information, routes, and the like.
[0081] Although some embodiments of the present invention have been described, these embodiments are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. These embodiments and their modifications are included in the scope and spirit of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]
[0082] 1...behavior planning system, 100...cloud, 110...storage server (server system), 130...analysis server (server system), 111...communication unit, 113...memory unit, 131...image analysis unit (analysis unit), 133...path generation unit, 135...communication unit, 200...building, 210...robot (autonomous moving body), 211...communication unit, 213...travel control unit, 215...control unit, 217...memory unit, 250...wireless tag.
Claims
1. 1. A server system, comprising: a storage unit that receives detection information from each of a plurality of autonomous moving bodies that are connected to the server system via a network, are capable of traveling for the purpose of providing a service, travel along a first route within a building during a first time period, capture images of a surrounding situation of the first route while traveling along the first route, and transmit detection information including captured image information to the server system, and stores the received detection information; an analysis unit that analyzes the image information included in each of the plurality of pieces of detection information; a route generating unit that generates a second route for the autonomous moving body to travel in a second time period based on a result of the analysis, the second route having an overlapping portion with the first route; a transmission unit that transmits the second route together with an action time in the second time period to the autonomous mobile body having a purpose different from the purpose of the service of the autonomous mobile body that traveled the first route, the route generation unit identifies an obstacle that is an impediment to travel in the vicinity of the first route based on the analysis result, and generates the second route so as to avoid the identified obstacle; further, identifies dirt, graffiti, or damage in the vicinity of the first route based on the analysis result, and generates the second route; searches for a position of a tag attached to the obstacle by wireless communication with the tag; determines whether the identified obstacle has been moved from the vicinity of the first route between the first time period and the second time period based on the searched position of the tag; and, if the identified obstacle has been moved from the vicinity of the first route, generates the second route while ignoring the moved obstacle. Server system.
2. The route generation unit determines whether the identified stains or graffiti have been removed or the damaged objects have been repaired from the first time period to the second time period based on other detection information, and generates the second route including an instruction to record if the identified stains or graffiti have been removed or the damaged objects have been repaired. The server system according to claim 1 .
3. The route generation unit acquires drawing information indicating a structure of the building, and generates the second route based on the drawing information.
3. The server system according to claim 1 or 2.
4. The drawing information includes BIM (Building Information Modeling) information of the building, The server system according to claim 3.
5. the first time period is a daytime time period; The second time period is a nighttime period. The server system according to claim 4.
6. A behavior planning system including: a plurality of autonomous mobile objects that travel within a building; and a server system that is connected to the autonomous mobile objects via a network and generates routes for the autonomous mobile objects, Each of the plurality of autonomous moving bodies is capable of traveling for the purpose of providing a service, travels along a first route within a building during a first time period, captures an image of a surrounding situation of the first route while traveling along the first route, and transmits detection information including captured image information to the server system; The server system includes: a storage unit that receives the detection information from each of the plurality of autonomous moving bodies and stores the received detection information; an analysis unit that analyzes the image information included in each of the plurality of pieces of detection information; a route generating unit that generates a second route for the autonomous moving body to travel in a second time period based on a result of the analysis, the second route having an overlapping portion with the first route; a transmission unit that transmits the second route together with an action time in the second time period to the autonomous mobile body having a purpose different from the purpose of the service of the autonomous mobile body that traveled the first route, the route generation unit identifies an obstacle that is an impediment to travel in the vicinity of the first route based on the analysis result, and generates the second route so as to avoid the identified obstacle; further, identifies dirt, graffiti, or damage in the vicinity of the first route based on the analysis result, and generates the second route; searches for a position of a tag attached to the obstacle by wireless communication with the tag; determines whether the identified obstacle has been moved from the vicinity of the first route between the first time period and the second time period based on the searched position of the tag; and, if the identified obstacle has been moved from the vicinity of the first route, generates the second route while ignoring the moved obstacle. Action planning system.
7. the plurality of autonomous moving bodies include autonomous moving bodies having different activity times in the first time period for each purpose of the service; The behavior planning system of claim 6.
8. 1. A behavior planning method executed in a server system connected to a plurality of autonomous moving objects via a network, comprising: receiving detection information from each of the plurality of autonomous moving bodies, the plurality of autonomous moving bodies being capable of traveling for the purpose of providing a service, traveling along a first route within a building during a first time period, capturing images of a surrounding situation of the first route while traveling along the first route, and transmitting detection information including captured image information to the server system; and storing the received plurality of pieces of detection information in a storage unit; analyzing the image information included in each of the plurality of pieces of detection information; a route generating step of generating a second route for the autonomous moving body to travel in a second time period based on a result of the analysis, the second route having an overlapping portion with the first route; and transmitting the second route, together with an action time in the second time period, to the autonomous mobile body having a purpose different from the purpose of the service of the autonomous mobile body that traveled the first route, The route generation step includes identifying an obstacle that is an impediment to travel in the vicinity of the first route based on the analysis result, and generating the second route so as to avoid the identified obstacle, identifying dirt, graffiti or damage in the vicinity of the first route based on the analysis result, searching for a position of a tag attached to the obstacle by wireless communication with the tag, determining whether the identified obstacle has been moved from the vicinity of the first route between the first time period and the second time period based on the searched position of the tag, and generating the second route while ignoring the moved obstacle if the identified obstacle has been moved from the vicinity of the first route. Action planning methods.
9. A program for causing a computer of a server system to execute the program, receiving detection information from each of a plurality of autonomous moving bodies capable of traveling for the purpose of providing a service, traveling along a first route in a building during a first time period, capturing images of a surrounding situation of the first route while traveling along the first route, and transmitting detection information including captured image information to the server system; and storing the received detection information in a storage unit; analyzing the image information included in each of the plurality of pieces of detection information; a route generating step of generating a second route for the autonomous moving body to travel in a second time period based on a result of the analysis, the second route having an overlapping portion with the first route; transmitting the second route, together with an action time in the second time period, to the autonomous mobile body having a purpose different from the purpose of the service of the autonomous mobile body that traveled the first route; The route generation step includes identifying an obstacle that is an impediment to travel in the vicinity of the first route based on the analysis result, and generating the second route so as to avoid the identified obstacle, identifying dirt, graffiti or damage in the vicinity of the first route based on the analysis result, searching for a position of a tag attached to the obstacle by wireless communication with the tag, determining whether the identified obstacle has been moved from the vicinity of the first route between the first time period and the second time period based on the searched position of the tag, and generating the second route while ignoring the moved obstacle if the identified obstacle has been moved from the vicinity of the first route. program.
Citation Information
Patent Citations
System, method and server for supporting traffic congestion decrease and onboard terminal
JP2006209416A
Robot control program and robot control device
JP2009116455A
Disaster prevention cooperation system
JP2018197731A
Automatic patrol system
JP2020166321A
Information processing device, information processing system, and information processing method
JP2021144399A
