Work support device and work support method

The work support device optimizes part arrangement by using projection guidance and detection sensors, addressing the cost and time inefficiencies of multiple serving mats, thereby enhancing assembly line efficiency.

JP7564075B2Active Publication Date: 2024-10-08HITACHI LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2021165539
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-10-07
Publication Date
2024-10-08
Estimated Expiration
2041-10-07

AI Technical Summary

Technical Problem

Existing systems require multiple serving mats for each shelf, increasing costs and prolonging the time needed for workers to locate and arrange parts on a serving table.

Method used

A work support device that uses a system with a projection unit to guide workers in arranging parts based on part size, assembly order, and detection sensors to optimize part placement and tracking, reducing the need for multiple mats and enhancing efficiency.

Benefits of technology

Efficiently arranges parts in storage areas, improving worker productivity by minimizing search time and reducing material costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007564075000001
    Figure 0007564075000001
  • Figure 0007564075000002
    Figure 0007564075000002
  • Figure 0007564075000003
    Figure 0007564075000003
Patent Text Reader

Abstract

To efficiently arrange components at a component placing place by a placing worker of the components.SOLUTION: A work support device 1 comprises: an arrangement position information generating part 13 for generating arrangement position information showing an arrangement position of each component P in a component placing place 3 based on information relating to the size of each of the plurality of components P assembled into a product and information of assembly order of each component P; and an arrangement position determination part 14 for specifying the arrangement positions in the component placing place 3 of the components P from which component information is read based on the component information of the components P read by a component information reading part 2 and the arrangement position information, and outputting an instruction to show the specified arrangement position by an image to a projection part 5.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical Field]

[0001] The present invention relates to a work assistance device and a work assistance method. [Background technology]

[0002] In manufacturing sites where products are manufactured by assembling various parts, the parts that workers assemble are loaded onto a parts supply cart and provided to the workers. Parts for each product are generally grouped together on a parts supply cart. Therefore, when assembling parts, workers had to find and pick up the parts they needed from the parts supply cart while checking the work instruction drawings. This meant that picking up the parts took a lot of time.

[0003] For example, Patent Document 1 describes a serving mat having an electronic display medium that displays the placement locations of multiple parts that make up a product based on display data for placing the multiple parts that make up the product. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent No. 5743747 Summary of the Invention [Problem to be solved by the invention]

[0005] However, the technology described in Patent Document 1 requires the same number of serving mats as the number of shelves on the serving table used as parts storage areas, which results in high costs for the serving mats, especially when there are a large number of parts. Also, with the technology described in Patent Document 1, when a worker who serves (places) parts on the serving table places the parts on the serving mats, he or she must search for the serving positions of the parts displayed on the serving mats, which means that the work of arranging the parts takes time.

[0006] The present invention has been made in consideration of the above circumstances, and an object of the present invention is to enable a delivery worker to efficiently arrange parts in a parts storage area. [Means for solving the problem]

[0007] A work assistance device according to one aspect of the present invention includes: a placement position information generation unit that generates placement position information indicating the placement position of each part in a parts storage area where the parts are stored before assembly, based on information about the size of each of a plurality of parts to be assembled into a product and information about the assembly order of the parts into the product; a placement position determination unit that identifies the placement position in the parts storage area of ​​the part whose information has been read, based on the part information of the part read by the part information reading unit and the placement position information, and outputs an instruction to a projection unit that projects the image to indicate the identified placement position. a work information acquisition unit that detects an action of an assembly worker who assembles the parts into a product taking out a part from the parts storage area based on detection information from an area sensor arranged near the parts storage area, and acquires information relating to the correspondence between the taken out part and the product to which the part is attached based on the detection information of the take-out action and information on a work instruction that instructs the assembly work; Equipped with. The placement position and placement direction of each part in the parts storage area indicated in the placement position information are associated with each order in the assembly sequence, and the work information acquisition unit acquires work information indicating the progress of the assembly work based on the assembly work time per part calculated based on information on the date and time when the removal operation was detected and information on the work instruction that instructed the assembly work.

[0008] The work support method according to one aspect of the present invention further includes: generating placement position information indicating a placement position of each part in a parts storage area based on information on the size of each of a plurality of parts to be assembled into a product and information on the assembly order of the parts into the product; The placement position information generation unit The part information reading unit generates the part information based on the part information and the placement position information of the part, and the part information reading unit reads the part information and the placement position information, and the part information reading unit outputs an instruction to the projection unit that projects the image to indicate the specified placement position by an image. The placement position determination unit The output procedure and a step of detecting an action of an assembly worker who assembles the parts into a product removing a part from the parts storage area based on detection information from an area sensor arranged near the parts storage area, and having a work information acquisition unit acquire correspondence information between the removed part and the product to which the part is attached based on the detection information of the removal action and information on a work instruction that instructs the assembly work; Includes. The placement position and placement direction of each part in the parts storage area indicated in the placement position information are associated with each order in the assembly sequence, and the work information acquisition unit acquires work information indicating the progress of the assembly work based on the assembly work time per part calculated based on information on the date and time when the removal operation was detected and information on the work instruction that instructed the assembly work. [Effects of the Invention]

[0009] According to at least one aspect of the present invention, a part distribution worker can efficiently distribute parts to a parts storage area. Problems, configurations, and effects other than those described above will become apparent from the following description of the embodiments. [Brief explanation of the drawings]

[0010] [Figure 1] 1 is a schematic diagram illustrating an example of the configuration of a work support system according to an embodiment of the present invention. [Figure 2] 1 is a diagram showing an example of the configuration of a component shelf push-out mechanism according to an embodiment of the present invention, and the positions of a component supply cart, a component shelf push-out mechanism, and a projection unit. FIG. [Figure 3] 1 is a block diagram showing an example of the configuration of hardware that constitutes a work assistance device according to an embodiment of the present invention. [Figure 4] FIG. 2 is a diagram showing an example of the configuration of an assembly sequence DB according to an embodiment of the present invention. [Figure 5] FIG. 2 is a diagram illustrating an example of the configuration of a part information DB according to an embodiment of the present invention. [Figure 6] FIG. 1 is a diagram showing an example of the configuration of a component layout diagram according to an embodiment of the present invention. [Figure 7] 10A and 10B are diagrams illustrating an example of a projection image of a component onto a component shelf according to an embodiment of the present invention. [Figure 8] 10A and 10B are diagrams illustrating an example of a projection image of a component onto a component shelf according to an embodiment of the present invention. [Figure 9] 1 is a flowchart illustrating an example of the procedure of a method for assisting a food delivery operation using a operation assistance device according to an embodiment of the present invention. [Figure 10] 1 is a flowchart illustrating an example of the procedure of an assembly work support method using a work support device according to an embodiment of the present invention. [Figure 11] 10A and 10B are diagrams showing examples of projection of a three-dimensional projected image according to a modified example of the present invention. [Figure 12] 10A and 10B are diagrams showing examples of projection of a projection image by a pointer according to a modified example of the present invention. DETAILED DESCRIPTION OF THE INVENTION

[0011] Hereinafter, examples of modes for carrying out the present invention (hereinafter referred to as "embodiments") will be described with reference to the accompanying drawings. The present invention is not limited to the embodiments, and various numerical values ​​in the embodiments are merely examples. Furthermore, in this specification and drawings, identical components or components having substantially the same functions will be designated by the same reference numerals, and redundant explanations will be omitted.

[0012] <Work support system configuration> First, the configuration of a task support system 100 according to this embodiment will be described with reference to Fig. 1. Fig. 1 is a schematic diagram showing an example of the configuration of the task support system 100.

[0013] The work support system 100 is a system that supports the work of distributing each part P that constitutes a product to a part supply cart 3, and the work of assembling the parts P taken out from the part supply cart 3. As shown in FIG. 1 , the work support system 100 includes a work support device 1, a barcode reader 2 that reads a shipping tag Tg attached to the part P, the part supply cart 3, a part shelf push-out mechanism 4, and a projection unit 5.

[0014] The work support device 1 is configured by, for example, a PC (Personal Computer) or the like, and is installed on a work table (not shown) used by a work worker (not shown) who works to arrange parts P on part supply carts 3.

[0015] In this embodiment, the delivery worker takes out parts P, which are grouped by product, from a cart or box (not shown), and reads the shipping tag Tg of the part P with the barcode reader 2. Then, the delivery worker places the part P at the position of the projected image Ip of the part P projected by the projection unit 5 onto the part shelves 31 (31a to 31c) of the part supply cart 3.

[0016] After all the parts P that make up the product have been placed on the parts shelf 31 of the parts supply cart 3 by the delivery worker, an assembly worker (not shown) takes out the parts P placed on the parts shelf 31 of the parts supply cart 3 in the order in which they were placed on the parts shelf 31 (from left to right, top to bottom, etc.) and assembles them (assembles them into a product).

[0017] The work support device 1 also includes an assembly sequence DB (Database) 11, a parts information DB 12, a placement position information generation unit 13, a placement position determination unit 14, and a work information acquisition unit 15. These units constituting the work support device 1 are connected to each other so as to be able to communicate with each other via a network N constituted by a LAN (Local Area Network) or the like.

[0018] The assembly sequence DB 11 is a database that stores information on the assembly sequence of each part P in the assembly work process. The assembly sequence DB 11 will be described in detail later with reference to FIG.

[0019] The part information DB 12 is a database that stores information about the part P, such as a part code that identifies the part P, the outer dimensions of the part P (an example of size, hereinafter simply referred to as "dimensions"), and the orientation of the part P when it is distributed to the part supply cart 3. The part information DB 12 will be described in detail later with reference to FIG. 5.

[0020] The placement position information generation unit 13 refers to the assembly sequence DB 11 and the component information DB 12 to determine the placement position of each component P on the component shelves 31a to 31c of the component supply cart 3. Then, the placement position information generation unit 13 generates a component placement drawing Lo (an example of component placement information, see FIG. 6) that indicates the placement position of each component P on the component shelves 31a to 31c.

[0021] Specifically, the placement position information generation unit 13 determines the placement positions of the components P on the component shelves 31a to 31c based on information on the sizes of the components shelves 31a to 31c, information on the dimensions of the components P (an example of size), information on the placement spacing of the components P on the component shelves 31a to 31c, and information on the assembly order when the components are assembled into a product.

[0022] The placement positions of the components P on the component shelves 31a to 31c correspond to the respective orders in the assembly sequence for the product. Specifically, the placement positions are defined so that the components P are placed from left to right and from top to bottom in the order of earliest assembly. Information such as the placement intervals of the components P and the placement sequence of the components P is assumed to be stored in a setting information DB (not shown) or the like.

[0023] The correspondence between the placement positions of components P on component shelf 31 and the assembly order is not limited to this example. For example, the placement positions may be defined so that components P are placed in order of earliest assembly order, from left to right and bottom to top.

[0024] The placement position determination unit 14 determines the placement position on the component shelves 31a to 31c of the component P whose component information has been read (the component P to be placed on the component shelf 31) based on the information (an example of component information) about the component P read by the barcode reader 2 from the shipping label Tg and the information on the component placement drawing Lo. Then, the placement position determination unit 14 outputs an instruction to the component shelf pushing mechanism 4 to push out the shelf that includes the placement position of the component P from among the component shelves 31a to 31c. Furthermore, the placement position determination unit 14 outputs an instruction to the projection unit 5 to project a projection image onto the placement position.

[0025] The work information acquisition unit 15 acquires correspondence information between parts P and products, indicating which parts P are incorporated into which products, based on the detection information from the area sensors 32a and 32b provided on the parts supply cart 3, information from the assembly sequence DB 11, and information from the work instructions that instructed the assembly.

[0026] Furthermore, the work information acquisition unit 15 acquires progress information about the assembly work of the assembly worker for the parts P, based on the detection information from the area sensors 32a and 32b and the information in the assembly sequence DB 11. Specifically, the work information acquisition unit 15 calculates the assembly work time for each part P, based on information about the timestamp (an example of date and time) when the assembly worker picks up the part P from the parts shelves 31a to 31c of the parts supply cart 3. This allows the work information acquisition unit 15 to acquire information about the work efficiency of the assembly work of the assembly worker and information indicating the progress of the work.

[0027] The timing at which the assembly worker picks up a component P from one of the component shelves 31a to 31c is the timing at which the area sensors 32a and 32b detect the component P being taken out from the component shelves 31a to 31c.

[0028] The barcode reader 2 (an example of a part information reading unit) is connected to the work support device 1 via the network N and is placed, for example, at a predetermined position on a distributing work table (not shown). The barcode reader 2 reads barcodes on part shipping tags Tg attached to parts P to be distributed on the part supply cart 3, and transmits the information of the read barcodes to the work support device 1. The barcodes on the part shipping tags Tg contain identification information such as a part code that identifies the part P, and information about the product into which the part P is to be incorporated.

[0029] In the present embodiment, an example has been given in which the identification information of the component P is indicated by a barcode, but the present invention is not limited to this. The identification information of the component P may be incorporated into a two-dimensional code such as a QR code (registered trademark), an IC (Integrated Circuit) tag, an RF (Radio Frequency), or the like.

[0030] The component supply cart 3 (an example of a component storage area) is a cart on which components P are placed before being assembled into products. The component supply cart 3 is equipped with component shelves 31a to 31c. The component shelves 31a to 31c are arranged vertically from top to bottom at predetermined equal intervals from one another in the order of the component shelves 31a to 31c. Hereinafter, when it is not necessary to distinguish between the component shelves 31a to 31c, they will be collectively referred to as component shelf 31.

[0031] The two short end faces of parts shelf 31 are supported by frames 30a and 30b, respectively. Of the two long end faces of parts shelf 31, one end face is supported by frame 30c. The parts P distribution worker and assembly worker perform distribution or assembly work while positioned in the direction of the opening of parts supply cart 3, where the end face not supported by frame 30c is located.

[0032] The component supply cart 3 also has area sensors 32a and 32b provided on the tops of the frames 30a and 30b, respectively. One of the area sensors 32a and 32b has a light-emitting unit (not shown), and the other has a light-receiving unit (not shown). The area sensors 32a and 32b detect the assembly worker's pick-up (removal) of a component P based on information on changes in the amount of light received by the light-receiving unit from the light-emitting unit.

[0033] When the area sensors 32a and 32b detect the assembly worker's action of picking up a component P, they also output information about the position of the picked up component P (coordinates on the plane of the component shelf 31). In the following description, when there is no need to distinguish between the area sensors 32a and 32b, they will be collectively referred to as the area sensor 32.

[0034] The work information acquisition unit 15, which receives information from the area sensor 32, identifies the part P picked up by the assembly worker based on the information on the position of the picked up part P and the information on the coordinates of the part in the part placement drawing Lo (see Figure 6) generated by the placement position information generation unit 13.

[0035] The component shelf pushing mechanism 4 is connected to the network N by wire or wirelessly, and pushes the component shelf 31 that has been instructed to be pushed out toward the assembly worker (toward the opening of the component supply cart 3) based on instructions output from the placement position determination unit 14. The configuration of the component shelf pushing mechanism 4 will be described in detail with reference to the following FIG. 2.

[0036] The projection unit 5 is configured, for example, by a projector, and is supported by a rod-shaped support 51 arranged in the direction of the opening of the component supply cart 3. The projection unit 5 projects a two-dimensional projection image Ip showing the shape of the component P onto the placement position of the component P on the plane of the component shelf 31 indicated by the placement position determination unit 14.

[0037] 1 shows a state in which a projection image Ip is projected by the projection unit 5 near the center of the front side of the component shelf 31b. By projecting such a projection image Ip by the projection unit 5, the arrangement worker can arrange (place) the component P in an appropriate position on the component shelf 31.

[0038] Next, the configuration of the component shelf push-out mechanism 4 and the positions of the component supply cart 3, component shelf push-out mechanism 4, and projection unit 5 will be described with reference to Fig. 2. Fig. 2 is a diagram showing an example of the configuration of the component shelf push-out mechanism 4 and the positions of the component supply cart 3, component shelf push-out mechanism 4, and projection unit 5, with Fig. 2A being a top view and Fig. 2B being a side view. The x direction in Fig. 2 indicates the width direction of the component supply cart 3, the y direction indicates the depth direction, and the z direction indicates the height direction.

[0039] 2A and 2B, when the opening of the component supply cart 3 is defined as the front of the component supply cart 3, the component shelf push-out mechanism 4 is disposed behind the component supply cart 3 (to the right in FIGS. 2A and 2B). The component shelf push-out mechanism 4 includes guide rails 44a and 44b arranged in parallel at a predetermined interval in the x direction, two rod-shaped sliders 42a and 42b that support the guide rail cylinders 44a and 44b, and supports 43a to 43d that support both ends of the sliders 42a and 42b, respectively.

[0040] The guide rails 44a and 44b movably support rod-shaped cylinders 41a and 41b, respectively. The cylinders 41a and 41b are mechanisms that move horizontally (y direction) along the guide rails 44a and 44b, respectively, to push the component shelves 31 of the component supply cart 3 from rear to front. The sliders 42a and 42b are arranged parallel to each other at a predetermined distance in the y direction, perpendicular to the guide rail cylinders 44a and 44b. One end of the slider 42a arranged on the component supply cart 3 side is supported by a support column 43a, and the other end is supported by a support column 43c. Furthermore, one end of the slider 42b is supported by a support column 43b, and the other end is supported by a support column 43d. The sliders 42a and 42b are supported by the support columns 43a, 43c, and the support columns 43b, 43d, respectively, so as to be movably in the vertical direction (z direction).

[0041] The projection unit 5 is disposed at a predetermined position in front of the component supply cart 3, and projects a projection image Ip of the component P onto the plane of the component shelf 31 at a position designated by the placement position determination unit .

[0042] <Computer hardware configuration> Next, the hardware configuration of the work support device 1 shown in Fig. 1 will be described with reference to Fig. 3. Fig. 3 is a block diagram showing an example of the hardware configuration of the work support device 1.

[0043] 3 is hardware used as a computer in the task assistance device 1. The computer 50 includes a CPU (Central Processing Unit) 501, a ROM (Read Only Memory) 502, and a RAM (Random Access Memory) 503. The computer 50 further includes a non-volatile storage 504, an operation input unit 505, a display unit 506, and a network interface 507. These blocks are connected to each other via a bus B so that they can communicate with each other.

[0044] The CPU 501 reads out from the ROM 502 a software program that realizes each function of the work support device 1 according to this embodiment, and loads and executes the program into the RAM 503. The functions of the arrangement position information generation unit 13, the arrangement position determination unit 14, and the work information acquisition unit 15 (all of which are shown in FIG. 1 ) of the work support device 1 are realized by the CPU 501 executing the program.

[0045] The ROM 502 is used as an example of a computer-readable non-transitory recording medium that stores a program executed by the computer 50. The ROM 502 stores an operating system (OS), various parameters, a program for causing the computer 50 to function, and the like.

[0046] Variables, parameters, and the like generated during the arithmetic processing of the CPU 501 are temporarily written to the RAM 503. The variables, parameters, and the like written to the RAM 503 are read by the CPU 501 as appropriate.

[0047] The nonvolatile storage 504 is configured with a hard disk drive (HDD), a solid state drive (SSD), a flexible disk, an optical disk, a magneto-optical disk, a CD-ROM, a CD-R, a magnetic tape, a nonvolatile memory, etc. The functions of the assembly sequence DB 11 and the parts information DB 12 (both see FIG. 1 ) of the task assistance device 1 are realized by the nonvolatile storage 504. The programs stored in the ROM 502 may also be stored in the nonvolatile storage 504. In this case, the nonvolatile storage 504 is used as an example of a computer-readable non-transitory recording medium that stores the programs executed by the computer 50.

[0048] The operation input unit 505 is configured with, for example, a mouse, a keyboard, etc. The operation input unit 505 generates an operation signal according to the content of an operation input by a user such as a food distribution worker or an assembly worker, and outputs the operation signal to the CPU 501.

[0049] The display unit 506 is a display device configured by, for example, an LCD (Liquid Crystal Display), an organic EL (Electro Luminescence) display, etc. The operation input unit 505 and the display unit 506 may be integrally formed as a touch panel.

[0050] The network interface 507 is configured by, for example, a network interface card (NIC).

[0051] <Configuration of assembly order DB> Next, the configuration of the assembly sequence DB 11 will be described with reference to Fig. 4. Fig. 4 is a diagram showing an example of the configuration of the assembly sequence DB 11. As shown in Fig. 4, the assembly sequence DB 11 has the following fields: "product name," "part code," "part name," "assembly sequence," and "quantity."

[0052] The "product name" field stores the name of the product to which part P is attached (assembled). The "product name" field is associated with product name information in a work instruction sheet (not shown). The "part code" field stores part code information (an example of part information) as identification information for the part. The "part name" field stores the name of part P. The "assembly order" field stores information on the assembly order of part P when assembling the product. The "quantity" field stores information on the required number of part P in the product.

[0053] For example, the top record of the assembly sequence DB 11 indicates that a part P with a part code of "1234567" and a part name of "relay" is a part that makes up a product with a product name of "control panel 1," that the part is "first" in the assembly sequence, and that the number of parts is "6." Note that the items that make up the assembly sequence DB 11 are not limited to the example shown in Fig. 4, and other items may be included.

[0054] <Component information DB configuration> Next, the configuration of the part information DB 12 will be described with reference to Fig. 5. Fig. 5 is a diagram showing an example of the configuration of the part information DB 12. As shown in Fig. 5, the part information DB 12 has the following items: "part code," "part name," "dimension W," "dimension D," "dimension H," "weight," and "orientation."

[0055] The "part code" item stores information about the part code of the part P. The "part code" item is associated with the "part code" item in the assembly sequence DB 11. The "part name" item stores the name of the part P. The "dimension W" item stores the width ( mm ) information is stored in the "Dimension D" field, information on the depth length (mm) of part P is stored in the "Dimension H" field, information on the height (mm) of part P is stored in the "Weight" field. g ) is stored, and the "orientation" item stores information about the orientation of the part P when the part P is attached to a product.

[0056] For example, the top record in the part information DB 12 indicates that the part code is "1234567" and the part name is "relay," that the part has a width of "32 mm," a depth of "28 mm," a height of "46 mm," and a weight of "105 g." It also indicates that the orientation of part P when attached to a product is "portrait."

[0057] A distribution worker who distributes parts P to parts shelf 31 (see FIG. 1) of parts supply cart 3 places parts P on parts shelf 31 in the same orientation as the orientation indicated in the "orientation" field of parts information DB 12. This enables an assembly worker who takes parts P from parts shelf 31 and performs assembly work to attach parts P to a product in the correct orientation.

[0058] <Component layout diagram configuration> Next, the component placement drawing Lo generated by the placement position information generating unit 13 (see FIG. 1) will be described with reference to Fig. 6. Fig. 6 is a diagram showing an example of the configuration of the component placement drawing Lo.

[0059] As shown in Fig. 6, the component layout drawing Lo (an example of component position information) includes component layout drawings Lo1 to Lo3. The component layout drawing Lo1 shown at the top of Fig. 6 is a drawing showing the layout positions of components P on the topmost component shelf 31a of the component supply cart 3, and the component layout drawing Lo2 shown second from the top in Fig. 6 is a drawing showing the layout positions of components P on the second top component shelf 31b of the component supply cart 3. The component layout drawing Lo3 shown at the bottom of Fig. 6 is a drawing showing the layout positions of components P on the bottommost component shelf 31c of the component supply cart 3.

[0060] In each of the component layout drawings Lo1 to Lo3, a component drawing indicated by a rectangular frame indicates the size, placement position, and placement orientation of the component P. Each component drawing shown in the component layout drawings Lo1 to Lo3 is managed in association with information about the component P.

[0061] When the barcode reader 2 (see FIG. 1) outputs read information of the part shipping tag Tg, the placement position determination unit 14 determines the placement position of the part P based on the information of the part placement drawings Lo1 to Lo3 and the assembly order information associated with the read information. The placement position determination unit 14 also outputs a projection instruction to the projection unit 5 (see FIG. 1) to project the projected image of the part P onto the determined placement position.

[0062] <Example of projection of a part image by the projection unit> Next, an example of projection of a projected image Ip of a component P onto the component shelf 31 by the projection unit 5 will be described with reference to Fig. 7 and Fig. 8. Fig. 7 and Fig. 8 are diagrams showing an example of projection of a projected image Ip of a component P onto the component shelf 31. Fig. 7A and Fig. 8A are diagrams showing an example of the configuration of a component layout drawing Lo, and Fig. 7B and Fig. 8B are diagrams showing an example of projection of a projected image Ip of a component P.

[0063] 7A, the part drawing Pp1 located at the top of the second column from the right on the part layout drawing Lo1 corresponding to the top part shelf 31a of the part supply cart 3 is highlighted. The size, layout position, and orientation of the part drawing Pp1 respectively indicate the size, layout position, and orientation of the part P whose label Tg (see FIG. 1) has been read by the delivery worker.

[0064] The placement position determination unit 14 associates the component P, whose shipping tag Tg has been read, with the component drawing Pp1 on the component placement drawing Lo based on the component information DB 12 (see FIG. 5), and then outputs an instruction to project the projection image Ip onto the position of the component drawing Pp1 to the projection unit 5. As a result, as shown in FIG. 7B, the projection image Ip1 of the component P associated with the component drawing Pp1 is projected onto the position on the component placement drawing Lo1 corresponding to the component drawing Pp1.

[0065] 7B, the component shelf 31a on which the component P corresponding to the component drawing Pp1 should be placed is pushed toward the arrangement worker (not shown) (toward the opening of the component supply cart 3) by the component shelf pushing mechanism 4 (see FIGS. 1 and 2) based on instructions from the arrangement position determination unit 14. By performing such processing, the arrangement worker can place the component P, whose shipping tag Tg has been read by the barcode reader 2, in an appropriate position on the component shelf 31a of the component supply cart 3.

[0066] After placing a component P at the position where the projection image Ip1 is projected, when the feeder reads the shipping tag Tg of the next component P with the barcode reader 2, the placement position determination unit 14 identifies the placement position of the next component P in the component placement drawing Lo. In the component placement drawing Lo shown in FIG. 8A, the component drawing Pp2 corresponding to the next component P is highlighted. The component drawing Pp2 is located on the component placement drawing Lo2 corresponding to the second component shelf 31b from the top of the component supply cart 3.

[0067] 8B shows a state in which a projection image Ip2 of a component P is projected onto a position on the component layout drawing Lo2 corresponding to the component drawing Pp2. In the following description, when there is no need to distinguish between the projection image Ip1 and the projection image Ip2, they will be collectively referred to as the "projection image Ip."

[0068] In this way, every time the parts distributor reads the shipping tag Tg of a new part P using the barcode reader 2, a projection image Ip indicating the placement position of the part P is projected onto the parts shelf 31, so that the distributor can correctly place the part P he or she has picked up in the appropriate position on the parts shelf 31.

[0069] <Work support method using work support device> [Method for supporting food serving work using a work support device] Next, a method for assisting in food delivery work using the work assistance device 1 (see FIG. 1) will be described with reference to Fig. 9. Fig. 9 is a flowchart showing an example of the procedure of the method for assisting in food delivery work using the work assistance device 1.

[0070] First, the placement position determination unit 14 (see FIG. 1) of the work support device 1 accepts input of a product name via the operation input unit 505 (see FIG. 3) or the like (step S1). Next, the placement position information generation unit 13 generates a component placement drawing Lo based on the information stored in the assembly sequence DB 11 (see FIG. 4) and the component information DB 12 (see FIG. 5) (step S2).

[0071] For example, suppose that the user inputs the product name "control panel 1" into the task support device 1. In this case, the placement position information generation unit 13 extracts records in which the "product name" is "control panel 1" from the assembly sequence DB 11, and determines the placement position on the component shelf 31 (see FIG. 1) of each component P associated with "control panel 1." The placement position information generation unit 13 determines the placement position of the component P based on information on the size of each component shelf 31a to 31c, information on the dimensions of the component P, information on the placement intervals and placement order of the components P on the component shelves 31a to 31c, etc. Then, a component placement drawing Lo is generated based on the determined component positions.

[0072] Next, the placement position determination unit 14 determines whether or not the read information of the label Tg (see FIG. 1) has been input from the barcode reader 2 (step S3). If it is determined in step S3 that the read information of the label Tg has not been input (if the determination in step S3 is NO), the placement position determination unit 14 repeats the determination in step S3.

[0073] On the other hand, if it is determined in step S3 that the read information of the shipping label Tg has been input (if step S3 is determined to be YES), the placement position determination unit 14 identifies the placement position of the component P on the component shelf 31 based on the read information of the shipping label Tg (step S4). For example, assume that the component code included in the read information of the shipping label Tg is "1234567." In this case, the placement position determination unit 14 extracts information on the assembly order of the component having the component code "1234567" ("1" in the example shown in FIG. 4) from the assembly order DB 11 (see FIG. 4), and determines the position on the component shelf 31 corresponding to "1" in the assembly order as the placement position of the component P.

[0074] Next, the placement position determination unit 14 outputs an instruction to the component shelf pushing mechanism 4 to push out the component shelf 31 on which the component P is to be placed (step S5). As a result, the component shelf 31 on which the component P is to be placed is pushed out in the direction of the food distribution worker.

[0075] Next, the placement position determination unit 14 outputs an instruction to the projection unit 5 (see FIG. 1) to project the projection image Ip of the component P identified in step S4 onto the component shelf 31 (step S6). Next, the projection unit 5 projects the projection image Ip onto the placement position of the component P (step S7). Next, the placement worker places the component P at the position where the projection image Ip is projected (step S8). The placement work of the component P by the placement worker ends when there are no more components P to be placed on the component shelf 31.

[0076] In the above-described embodiment, the placement position information generation unit 13 generates a component placement diagram Lo indicating the placement position of each component P on the component supply cart 3 on which the component P is placed before assembly, based on information about the size of each of the multiple components P to be assembled into the product and information about the assembly order of the components P into the product. Furthermore, the placement position determination unit 14 specifies the placement position on the component supply cart 3 of the component P, whose component identification information has been read, based on the identification information (component information) of the component P read by the barcode reader 2 and the information on the component placement diagram Lo. Furthermore, the placement position determination unit 14 outputs an instruction to the projection unit 5 to show the specified placement position by video (an instruction to project a projection image Ip at the placement position).

[0077] Therefore, according to this embodiment, the part P arrangement worker simply places the part P whose shipping tag Tg has been read by the barcode reader 2 at the position where the projection image Ip is projected, allowing the part arrangement worker to efficiently arrange the parts in the part storage area.

[0078] Furthermore, in this embodiment, the arrangement position of each component P on the component shelf 31 of the component supply cart 3 shown in the component arrangement drawing Lo corresponds to each order in the assembly sequence. Therefore, by repeating the arrangement work of arranging the components P in the positions shown by the projection image Ip, the components P to be assembled into the product are arranged on the component shelf 31 in the assembly sequence. Therefore, according to this embodiment, the component P assembly worker only needs to pick up each component P arranged in the assembly sequence in the order in which it was arranged and perform the assembly work, eliminating the need to consider the pickup position and order, thereby improving the assembly efficiency of the assembly worker.

[0079] According to this embodiment configured as described above, the delivery worker can randomly pick up parts P from carts or boxes (not shown) in which the parts to be delivered are grouped by product, without worrying about the placement position or assembly order, and then deliver the parts to the delivery worker. Therefore, according to this embodiment, the work efficiency of the delivery worker can be improved.

[0080] [Assembly work support method using work support device] Next, a method for supporting assembly work using the work support device 1 according to this embodiment will be described with reference to Fig. 10. Fig. 10 is a flowchart showing an example of the procedure of the method for supporting assembly work using the work support device 1.

[0081] First, the area sensor 32 (see FIG. 1) provided on the component supply cart 3 detects the removal of a component P from the component shelf 31 by an assembly worker (step S11). Next, the work information acquisition unit 15 (see FIG. 1) identifies the component P removed from the component shelf 31 based on the detection information of the area sensor 32 (step S12). Specifically, the work information acquisition unit 15 identifies the component P removed from the component shelf 31 based on information about the position of the picked-up component P and information about the coordinates of the component P in the component layout drawing Lo (see FIG. 6).

[0082] Next, the work information acquisition unit 15 acquires timestamp information indicating the time when the component P was taken out from the component shelf 31 (step S13). Next, the work information acquisition unit 15 associates the timestamp information and component P information acquired in step S13 with the content of the work instruction to assemble the component P, and stores them in the non-volatile storage 504 (see FIG. 3) or the like (step S14).

[0083] By managing the information about the parts P picked up from the parts shelf 31 in association with the contents of the work instructions for assembling the parts P, the work information acquisition unit 15 can grasp the information about which parts P are used in which products, making it possible to ensure traceability of the manufacturing process.

[0084] Furthermore, in the above-described embodiment, the work information acquisition unit 15 manages information about the part P in association with information about the timestamp when the part P was taken out from the parts shelf 31. Therefore, the work information acquisition unit 15 can also obtain information about the assembly work time per part P. This enables the work information acquisition unit 15 to grasp the degree of progress of the assembly work, such as the number of the part P that is being assembled out of all the parts P for which work instructions have been issued.

[0085] Furthermore, the work information acquisition unit 15 can calculate information on the assembly time per part P, making it possible to determine whether an abnormality has occurred in the assembly work and to acquire information on the work efficiency of the food delivery worker. Furthermore, the work information acquisition unit 15 can use the acquired information on the work efficiency of the food delivery worker as feedback and take measures to improve work efficiency.

[0086] It should be noted that the present invention is not limited to the above-described embodiments, and it goes without saying that various other applications and modifications are possible as long as they do not deviate from the gist of the present invention as set forth in the claims.

[0087] For example, in the above-described embodiment, an example was given in which the projection unit 5 projects a two-dimensional iso-mapped image Ip onto the component shelf 31 of the component supply cart 3, but the present invention is not limited to this. The projection image that the projection unit 5 projects onto the component shelf 31 may be a three-dimensional projection image Ip'.

[0088] Fig. 11 is a diagram showing a projection example of a three-dimensional projection image Ip'. The shape, placement position, and orientation of the three-dimensional projection image Ip' shown in Fig. 11 reflect the shape, placement position, and placement orientation of the component P, respectively. This allows the food delivery worker to more intuitively and appropriately place the component P on the component shelf 31a.

[0089] Furthermore, the projected image Ip does not have to reflect the shape of the component P. For example, the center of the placement position of the component P may be projected using a pointer or the like.

[0090] Fig. 12 is a diagram showing an example of a projection image Ip'' using a pointer. As shown in Fig. 12, even when the projection image Ip'' is pointed to by the pointer, the food server can grasp the placement position of the component P and place the component P in that position.

[0091] Furthermore, in the above-described embodiment, an example was given in which the projection unit 5 projects the projection image Ip of the component P onto the component shelf 31, but the present invention is not limited to this. For example, the food preparation worker may wear a wearable device such as smart glasses, and an image of the component shelf 31 and the component P to be placed may be displayed on the screen of the device. This allows the food preparation worker to perform the food preparation work more intuitively.

[0092] In the above-described embodiment, an example was given in which the component shelf pushing mechanism 4 pushes the component shelves 31 toward the worker, but the present invention is not limited to this. A configuration may be adopted in which the component supply cart 3 is provided with self-propelled rails or the like, and the component shelves 31 are automatically pushed toward the worker based on instructions from the placement position determining unit 14.

[0093] Furthermore, for example, the above-described embodiment examples provide detailed and specific explanations of the configurations of the device (work support device) and system (work support system) in order to clearly explain the present invention, and are not necessarily limited to those having all of the configurations described.

[0094] In addition, the control lines or information lines indicated by solid arrows in Figure 1 are those considered necessary for explanation, and do not necessarily show all control lines or information lines in the product. In reality, it can be considered that almost all components are interconnected.

[0095] Furthermore, in this specification, processing steps describing chronological processing include not only processing that is performed chronologically in the order described, but also processing that is not necessarily performed chronologically but is performed in parallel or individually (for example, parallel processing or processing by objects).

[0096] Furthermore, each of the components of the analysis result information output device according to the embodiment of the present disclosure described above may be implemented in any hardware as long as the respective hardware can transmit and receive information to and from each other via a network. Furthermore, the processing performed by a certain processing unit may be realized by a single piece of hardware, or may be realized by distributed processing using multiple pieces of hardware. [Explanation of symbols]

[0097] 1...work support device, 2...barcode reader, 3...component supply cart, 4...component shelf push-out mechanism, 5...projection unit, 11...assembly sequence DB, 12...component information DB, 13...placement position information generation unit, 14...placement position determination unit, 15...work information acquisition unit, 31...component shelf, 100...work support system

Claims

1. an arrangement position information generating unit that generates arrangement position information indicating an arrangement position of each part in a parts storage area where the parts before assembly are placed, based on information on the size and arrangement orientation of each of a plurality of parts to be assembled into a product and information on the assembly order of the parts into the product; a placement position determination unit that specifies a placement position in the part storage area of ​​the part whose information has been read, based on the part information of the part read by the part information reading unit and the placement position information, and outputs an instruction to a projection unit that projects an image to project the specified placement position and orientation onto the part storage area using a two-dimensional or three-dimensional image; a work information acquisition unit that detects an action of removing the part from the part storage area by an assembly worker who assembles the part into the product based on detection information by an area sensor arranged in the vicinity of the part storage area, and acquires correspondence information between the removed part and the product to which the part is attached based on the detection information of the removal action and information of a work instruction that instructs the assembly work, the arrangement position and arrangement direction of each part in the part storage area indicated in the arrangement position information are associated with each order of the assembly sequence; The work information acquisition unit acquires work information indicating a progress of the assembly work based on an assembly work time per one of the parts calculated based on information on a date and time when the pick-up operation was detected and information on a work instruction instructing the assembly work. Work support equipment.

2. The image projected by the projection unit is an image displayed on a screen of a wearable device worn by an installation worker who installs the components in the component storage area. The work support device according to claim 1 .

3. a step of generating, by a position information generating unit, position information indicating a position of each part in a part storage area, based on information on the size and orientation of each part to be assembled into a product, and information on the assembly sequence of each part into the product; a step of determining a placement position of the part, whose information is read, in the part storage area based on the part information of the part read by the part information reading unit and the placement position information, and outputting an instruction from the placement position determining unit to a projection unit that projects an image to project the determined placement position and orientation onto the part storage area using a two-dimensional or three-dimensional image; a step of detecting an action of removing the part from the parts storage area by an assembly worker who assembles the part into the product based on detection information by an area sensor arranged in the vicinity of the parts storage area, and a work information acquisition unit acquiring information relating to a correspondence between the removed part and the product to which the part is attached based on the detection information of the removal action and information of a work instruction instructing the assembly work, the arrangement position and arrangement direction of each part in the part storage area indicated in the arrangement position information are associated with each order of the assembly sequence; The work information acquisition unit acquires work information indicating a progress of the assembly work based on an assembly work time per one of the parts calculated based on information on a date and time when the pick-up operation was detected and information on a work instruction instructing the assembly work. Work support method.

Citation Information

Patent Citations

  • Solidification method

    JP1980075699A

  • Manufacture of artificial internal organ

    JP1982043747A

  • Marshaling support system

    JP2010128646A

  • Feeder arrangement support system and feeder arrangement support method

    JP2018056252A

  • Information processing device, production navigation system, information processing method and program

    JP2020132385A