Pile driving device and pile driving method

The pile press-in device with a movable pedestal and rail system addresses installation challenges in confined spaces by enabling precise, low-emission pile installation using a hydraulic jack, enhancing construction efficiency and accuracy.

JP7566384B1Active Publication Date: 2024-10-15AKEBONO IND CO LTD
View PDF 13 Cites 0 Cited by

Patent Information

Application Number
JP2024032913
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2024-03-05
Publication Date
2024-10-15
Estimated Expiration
2044-03-05

AI Technical Summary

Technical Problem

Conventional pile press-in devices face challenges in narrow or low-head environments due to equipment size, construction inefficiency, environmental pollution, and noise/vibration issues, especially in urban or residential areas with obstacles.

Method used

A pile press-in device with a movable pedestal unit and rail system that allows horizontal movement, using a hydraulic jack for press-fitting piles, and a connecting mechanism to facilitate precise pile installation without rotating the equipment, reducing noise and emissions.

Benefits of technology

Enables efficient pile installation on narrow sites and under low-head environments with minimal noise and emissions, ensuring high precision and construction accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007566384000001_ABST
    Figure 0007566384000001_ABST
Patent Text Reader

Abstract

To provide a pile driving device and a pile driving method capable of performing work accurately and easily even in a narrow site or in an environment with a low headroom. [Solution] The pile driving-in device 1 of the present invention comprises a mount unit 10, two rail units 20, a press-in unit 30, and a connecting means 40, and is characterized in that by connecting the mount unit 10 and the rail unit 20, the loads of the mount unit 10 and the rail unit 20 can be used as a reaction force of the driving-in of the pile P by the press-in unit 40. The pile driving-in method of the present invention comprises a moving process S1 of moving the mount unit 10 along the rail unit 20, a connecting process S2 of connecting the mount unit 10 and the rail unit 20 by the connecting means 40, a pressing process S3 of driving the pile P into the ground by the press-in unit 30 using the loads of the mount unit 10 and the rail unit 20 as a reaction force, and a releasing process S4 of releasing the connection between the mount unit 10 and the rail unit 20 by the connecting means 40.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a pile driving-in device and a pile driving-in method, and more particularly to a pile driving-in device and a pile driving-in method that enable accurate and easy construction even in a narrow site or in a low headroom environment. [Background technology]

[0002] When constructing buildings or structures on soft ground with insufficient bearing capacity, the steel pipe pile method has been widely used to ensure the stability of the foundation. In the steel pipe pile method, small-diameter structural carbon steel pipe piles are usually used, and the tip of the steel pipe pile reaches the bearing layer deep in the ground by rotating and pressing the steel pipe pile into the ground with a construction machine, and the stability of the foundation is ensured by the tip bearing capacity and circumferential friction force of the steel pipe pile. Patent Document 1 discloses a steel pipe pile driving-in device that grips a steel pipe pile with a plurality of support claws and rotates and drives the steel pipe pile in without clamping the pile. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2000-064282 A Summary of the Invention [Problem to be solved by the invention]

[0004] The conventional technology has the following problems. <1> Because the equipment is large, it is difficult to work in narrow construction areas such as urban areas and residential areas where the depth or width is insufficient because the working radius is insufficient. <2> Since the piles are erected above the equipment, in low-headroom environments where there are obstacles above, such as bridges or high-voltage lines, construction may not be possible due to insufficient height. <3> Even when pressing in a large number of piles in a linear arrangement, the device must be rotated and positioned each time it is moved, resulting in poor construction efficiency and low construction accuracy. <4> Because it uses an internal combustion engine for power, exhaust gases contain carbon dioxide (CO2) and nitrogen oxides (NOx), which put a strain on the global environment. In addition, the rotation and pressure injection generates vibrations and noise, which is a burden on neighbors, especially in residential areas.

[0005] An object of the present invention is to provide a pile driving device and a pile driving method that can solve the above problems. [Means for solving the problem]

[0006] The pile driving device of the present invention comprises two long rail units arranged approximately parallel to one another, a base unit mounted on the rail units so as to be movable along the rail units, a press-in unit attached facing downward to the lower part of the base unit, and connecting means capable of connecting the base unit and the rail units, and is characterized in that by connecting the base unit and the rail units, the load of the base unit and the rail units can be used as a reaction force for driving the piles in by the press-in unit.

[0007] The pile driving device of the present invention has a mounting unit which has a roughly gate-like shape when viewed from the front and which comprises a reaction mount, a plurality of support legs which support the reaction mount, and movable wheels which are provided at the bottom of the support legs, and the driving unit may be attached to the bottom surface of the reaction mount.

[0008] In the pile driving device of the present invention, the rail unit may comprise a long base and a rail material installed on the base, and the connecting means may connect the support leg and the base.

[0009] The pile driving device of the present invention may have a mounting unit including a connecting member protruding laterally from the support leg, the connecting member including a first connecting hole connecting the connecting members in a height direction, the base including a second connecting hole connecting the bases in a height direction, and the connecting means including a connecting bar having a threaded groove and a nut that can be screwed onto the connecting bar, the connecting bar being connected to the first connecting hole and the second connecting hole, and the support leg and the base being connected by screwing the nut.

[0010] In the pile driving device of the present invention, the connecting members may protrude laterally from both sides of the support leg.

[0011] The pile driving method of the present invention is characterized by comprising a moving step of moving the mount unit along the rail unit using a pile driving device, a connecting step of connecting the mount unit and the rail unit with a connecting means, a pressing step of using the loads of the mount unit and the rail unit as a reaction force to press the pile into the ground with the pressing unit, and a releasing step of releasing the connection between the mount unit and the rail unit by the connecting means.

[0012] In the connecting step of the pile driving method of the present invention, horizontal movement of the frame unit may be restricted by clamping the frame unit from the front and rear with a plurality of wheel stoppers fixed on the rail unit.

[0013] In the pile driving method of the present invention, in the driving-in step, the lower end of the upper split pile may be connected to the upper end of the lower split pile driven into the ground, thereby extending the pile length while driving in the pile. Effect of the Invention

[0014] The pile driving device and pile driving method of the present invention have at least one of the following effects. <1> Since the piles are pressed into place while moving horizontally along the rail unit, by arranging the rail unit along the length of the site, construction can be easily carried out even on narrow sites with insufficient depth or width. <2> The piles are pressed downward from the bottom of the mounting unit using the reaction force of the mounting unit and rail unit, so construction can be carried out without any problems even in low-headroom environments where there are obstacles such as bridges and high-voltage lines. <3> By moving the rail unit horizontally along the guide, a large number of piles can be pressed into the piles in succession with high precision. <4> It does not emit gases such as carbon dioxide during injection and generates almost no vibration or noise, making it friendly to the global and local environments. [Brief description of the drawings]

[0015] [Figure 1] Illustration of pile driving device [Diagram 2] Explanation of the stand unit [Diagram 3] Illustration of connecting material and connecting means [Figure 4] Illustration of pile pressing method [Figure 5A] Illustration of the transfer process [Figure 5B] Explanation of the connection process [Figure 5C] Explanation of the press-fitting process [Figure 5D] Explanation of the release process DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0016] The pile driving device and pile driving method of the present invention will be described in detail below with reference to the drawings. In the present invention, directional terms such as "length," "width," "height," "side," "upper," and "lower" refer to the direction in which the rail units extend as the length direction and the direction in which the rail units are arranged side by side as the width direction. EXAMPLES

[0017] [Pile press-in device] <1> Overall configuration (Figure 1) The pile driving device 1 of the present invention is a device that drives a pile P into the ground while moving within a construction area. The pile driving device 1 includes at least a mount unit 10, a rail unit 20, a press-in unit 30, and a connecting means 40. In detail, the mount unit 10 is mounted on two rail units 20 arranged substantially parallel to each other, and the press-in unit 30 is attached facing downward to the lower part of the mount unit 10. The connecting means 40 connects or disconnects the mount unit 10 and the rail unit 20. When the gantry unit 10 is to be moved, the connection by the connection means 40 is released. When the pile P is pressed into the press-in unit 30, the mount unit 10 and the rail unit 20 are connected by the connecting means 40. This allows the load of the mount unit 10 and the rail unit 20 to be used as a reaction force for pressing in the pile P.

[0018] <2> Mounting unit (Fig. 2) The mounting unit 10 is a movable mounting unit. In this example, the mount unit 10 includes a reaction mount 11, a plurality of support legs 12, a plurality of moving wheels 13, and a plurality of connecting members 14. In detail, for example, both sides of the reaction base 11 are supported by a total of six support legs 12, three on each side, to construct a tower structure that is generally gate-shaped when viewed from the front, and the reaction base 11 and the support legs 12 and the adjacent support legs 12 are reinforced with brace materials (not shown). Connecting materials 14 are attached to the middle parts of the support legs 12. Moving wheels 13 are attached to the lower parts of the support legs 12. Also, to increase the weight of the base unit 10, weight materials 15 such as iron plates or shaped steel may be mounted on the reaction base 11. The structure of the stand unit 10 is not limited to the above, and for example, the number of support legs 12 may be four or eight or more. In short, it is sufficient that the stand unit 10 can move on the rail unit 20, can be connected to the rail unit 20 by the connecting means 40, and can be used as a reaction force of the pile P by the press-in unit 30.

[0019] <2.1>Reaction mount The reaction mount 11 is the upper structure of the mount unit 10 . In this example, the reaction frame 11 is made of a plurality of beams 11a made of shaped steel and a plurality of girders 11b made of shaped steel assembled in a lattice pattern. Since shaped steel has high strength and is heavy, it is particularly suitable as a reaction member for press-fitting. In detail, for example, five beams 11a (middle tier) are arranged in parallel in the length direction on top of two beams 11b (lower tier) arranged in parallel in the width direction, and five beams 11b (upper tier) are arranged in parallel in the width direction on top of the five beams 11a, and the various components are interconnected. In this example, the reaction frame 11 can be assembled on-site from shaped steel, so there is no need to transport a large finished product from a factory to the site, and transportation costs are low.

[0020] <2.2> Support legs The support leg 12 is a member that supports the reaction base 11 . In this example, the support leg 12 is formed by connecting a plurality of shaped steel members in the height direction, and a height adjustment device 12a such as a support jack is inserted between the upper and lower members. The upper part of the support leg 12 is connected to the lower beam 11 b of the reaction base 11 . A connecting member 14 is attached to the middle portion of the support leg 12 . A moving wheel 13 is attached to the lower part of the support leg 12.

[0021] <2.3> Connector (Fig. 3) The connecting member 14 is a member for connecting to the connecting means 40 . In this example, a channel steel material with the flange side facing upward is used as the connecting material 14, and the connecting material 14 is connected in the width direction to the inside of the upper member of the support leg 12, with both ends of the connecting material 14 protruding from both sides of the support leg 12. First connecting holes 14a that communicate with each other in the height direction of the connecting material 14 are provided on both ends of the connecting material 14. The inner diameter of the first connecting holes 14a is set to a diameter that allows a connecting bar 41, which will be described later, to be inserted therethrough. The structure of the connecting member 14 is not limited to the above, and for example, it may be a part of the structure of the support leg 12 instead of being a separate member from the support leg 12. Also, it may be provided on the reaction base 11 or the moving wheel 13 instead of on the support leg 12.

[0022] <3> Rail Unit The rail unit 20 is a unit that guides the movement of the stand unit 10. In this example, the rail unit 20 includes a long base 21 and a rail material 22 installed on the base 21. In detail, a steel rail having a generally I-shaped cross section is welded to the upper surface of the base 21 made of shaped steel. A second connecting hole 21a that communicates with the base 21 in the height direction is provided in the flange of the base 21. The inner diameter of the second connecting hole 21a is set to a diameter that allows a connecting bar 41, which will be described later, to be inserted therethrough.

[0023] <4> Press-fit unit The pressing unit 30 is a unit for pressing the pile P into the ground. In this example, the press-in unit 30 is composed of a hydraulic jack equipped with a cylinder 31 installed facing downward from the bottom surface of the beam 11a and a rod 32 that can be extended and retracted downward from within the cylinder 31. In this example, two press-fit units 30 are attached to each of the bottom surfaces of the two beams 11a, totaling four press-fit units 30. However, the number and arrangement of the press-fit units 30 are not limited to the above.

[0024] <5> Connection means (Fig. 3) The connecting means 40 is a means for connecting the stand unit 10 and the rail unit 20 . In this example, the connecting means 40 is composed of a long connecting bar 41 having a threaded groove and a nut 42 that can be screwed onto the connecting bar 41 . With the position of the first connecting hole 14a of the connecting material 14 corresponding to the position of the second connecting hole 21a of the base 21, the connecting bar 41 can be connected to the first connecting hole 14a and the second connecting hole 21a and nuts 42 can be screwed onto both the upper and lower ends, thereby connecting the support leg 12 and the base 21. The connecting means 40 is not limited to the combination of the connecting bar 41 and the nut 42, but may be, for example, a clamping metal fitting engaged with the support leg 12 and the base 21, a combination of a chain and a lever hoist wound around the support leg 12 and the base 21, or a combination of a wire and a turnbuckle connecting the support leg 12 and the base 21. In short, any means capable of restraining the stand unit 10 and the rail unit 20 in the height direction may be used.

[0025] <6> Pile pressing method (Figure 4) The pile driving method of the present invention is a method for continuously driving piles P into the ground using a pile driving device 1. The pile driving method includes at least a moving process S1, a connecting process S2, a driving process S3, and a releasing process S4. The following description will be given from the state where the releasing process S4 of the pre-construction cycle has been completed.

[0026] <6.1> Transfer step (Figure 5A) The moving step S1 is a step of pulling the rack unit 10 laterally along the rail unit 20. The moving step S1 is performed, for example, as follows. The tip of the support leg 12 and the base 21 in the direction of travel are connected by a chain, and the chain is wound up by a towing device such as a lever hoist. By winding up the chain, the platform unit 10 is pulled toward the tip side of the base 21 by the reaction force of the rail unit 20, and moves horizontally toward the tip side along the rail material 22. The same operation is repeated to pull the stand unit 10 sideways until the position of the press-in unit 30 reaches the next press-in position of the pile P. Note that the means for pulling the stand unit 10 sideways is not limited to the lever hoist, and an electric winch, hydraulic jack, or the like may also be used.

[0027] <6.2> Ligation step (Figure 5B) The connecting step S2 is a step of connecting the stand unit 10 and the rail unit 20. The connecting step S2 is performed, for example, as follows. The connecting bar 41 with a nut 42 screwed near the upper end is dropped into the first connecting hole 14a from above the connecting material 14, and the lower end is inserted into the second connecting hole 21a of the base 21. The nut 42 is screwed onto the lower end of the connecting bar 41 protruding downward from the second connecting hole 21a, connecting the support leg 12 and the base 21. The same procedure is repeated for all the support legs 12 to secure the platform unit 10 to the rail unit 20. In addition, in this example, wheel stoppers 23 are installed on the rail members 21 at the front and rear of the frame unit 10 and fixed with bolts, so that the frame unit 10 is sandwiched between the wheel stoppers 23 from the front and rear to strengthen the fixation.

[0028] <6.3> Press-fitting process (Fig. 5C) The pressing step S3 is a step of pressing the pile P into the ground by the pressing unit 30. The pressing step S3 is performed, for example, as follows. The reaction base 11 is adjusted to the horizontal position by operating the height adjuster 12a of the support leg 12. The pile P is erected at a driving position on the ground, and the rod 32 of the press-in unit 30 is extended so that the tip of the rod 32 comes into contact with the head of the pile P. The press-in unit 30 is operated to hydraulically push out the rod 32, penetrating the tip of the pile P into the ground. At this time, the base unit 10 is pushed up by the press-in unit 30 due to the reaction force of the press-in, but the load of the base unit 10 and the rail unit 20 prevents it from floating up. In this example, the pile P is constructed from a combination of split piles whose entire length is divided into multiple parts. In detail, first, the first divided pile P is pressed into the press-in unit 30. 1 After pressing in to a specified depth, the first split pile P 1 The second split pile P is placed at the top end of 2 The lower end of each pile is abutted against the other pile, and the joint is welded all around to form the first split pile P 1 and the second split pile P 2 Connect in the height direction. Next, the second divided pile P is pressed into the press-in unit 30. 2 By supporting the head of the second pile P 2 The first split pile P 1 The tip of the pile is pressed into the ground. In this way, a pile P consisting of the entire length of the multiple split piles is constructed in the ground.

[0029] <6.4> Release step (Figure 5D) The release step S4 is a step of releasing the connection between the stand unit 10 and the rail unit 20. The release step S4 is performed, for example, as follows. The nut 42 screwed onto the lower end of the connecting bar 41 is removed, and the connecting bar 41 is pulled upward from the second connecting hole 21a of the base 21 and the first connecting hole 14a of the connecting member 14. The same procedure is repeated for all the support legs 12 to release the fixation between the stand unit 10 and the rail unit 20. Next, the bolts of the wheel stoppers 23 fixed to the rail material 21 are loosened and removed, thereby allowing the frame unit 10 to move along the rail material 21. [Explanation of symbols]

[0030] 1 Pile press-in device 10 Mounting unit 11 Reaction mount 11a Beam material 11b Girder material 12 Support legs 12a Height adjustment tool 13 Mobile Wheel 14 Connecting material 14a 1st connection hole 15 Weight material 20 Rail Unit 21 Foundation 21a 2nd connection hole 22 Rail material 23 Wheel stopper 30 Press-in unit 31 Cylinder 32 Rod 40 Connection means 41 Connecting bar 42 Nut P pile S1 Moving process S2 connection process S3 Press-in process S4 release process

Claims

1. A pile driving device for driving a pile into the ground, Two long rail units arranged approximately parallel to each other; a platform unit mounted on the rail unit so as to be movable along the rail unit; a press-fitting unit attached downward to a lower portion of the stand unit; a connecting means for connecting the rack unit and the rail unit, The mount unit has a generally gate-like shape in front view and includes a reaction mount, a plurality of support legs supporting the reaction mount, a movable wheel provided at a lower portion of the support legs, and a connecting member protruding laterally from the support legs; The rail unit includes a long base and a rail member installed on the base, The connecting material includes a first connecting hole that connects the connecting material in a height direction, The base includes a second connecting hole that connects the base in a height direction, The connecting means includes a connecting bar having a threaded groove and a nut that can be screwed onto the connecting bar, The connecting bar is connected to the first connecting hole and the second connecting hole, and a nut is screwed to connect the support leg and the base, so that the load of the mounting unit and the rail unit can be used as a reaction force of the pile pressing-in by the pressing-in unit. Pile press-in equipment.

2. The press-in unit is attached to a bottom surface of the reaction stand. The pile driving device according to claim 1 .

3. The connecting members protrude laterally from both sides of the support legs. The pile driving device according to claim 1 .

4. A pile driving method using the pile driving device according to any one of claims 1 to 3, a moving step of moving the rack unit along the rail unit; a connecting step of connecting the rack unit and the rail unit by the connecting means; a pressing step of pressing the pile into the ground by the pressing unit using the loads of the mounting unit and the rail unit as a reaction force; and a release step of releasing the connection between the rack unit and the rail unit by the connection means. Pile press-in method.

5. In the connecting step, the horizontal movement of the rack unit is restricted by clamping the rack unit from the front and rear with a plurality of wheel stoppers fixed on the rail unit. The pile driving method according to claim 4.

6. In the pressing step, the lower end of the upper split pile is connected to the upper end of the lower split pile pressed into the ground, thereby extending the pile length while pressing in. The pile driving method according to claim 4.

Citation Information

Patent Citations

  • Sheettpile pressure driving apparatus

    JP1977135507A

  • Noiseless sheettpile driving apparatus

    JP1977155809A

  • Steel pipe sheet pile facility

    JP1979060705A

  • JP1979085705U

  • Device for tightly driving sheet pile etc*

    JP1979086904A