Floor structure
The floor construction method allows for early use and long-term durability by installing flooring on a support structure with pillars and integrating it with a filler material and side wall, addressing the delay in conventional methods.
Patent Information
- Application Number
- JP2023155656
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2023-09-21
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2038-03-05
AI Technical Summary
Conventional floor construction methods require a long time before the flooring can be used due to the sequence of filling filler material and then installing flooring material.
A floor construction method where flooring is installed on a support structure with pillars, filled with a filler material, and integrated with a side wall to create a stable and early-useable floor.
The floor can be used early in the construction process and supports long-term use by integrating the flooring with a support and filler material, allowing for rapid installation and durability.
Smart Images

Figure 0007567004000001 
Figure 0007567004000002 
Figure 0007567004000003
Abstract
Description
[Technical field]
[0001] The present invention 、 Long-term use possible So, Installed at a position higher than the board surface was done Floor structure Regarding. [Background technology]
[0002] Conventional floor Structure In the construction method, as shown in Patent Document 1, a filler material is filled into the space surrounded by the side walls, and then a flooring material is placed on top of the filler material. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent No. 2775693 (paragraph
[0002] , Figure 2) Summary of the Invention [Problem to be solved by the invention]
[0004] The above-mentioned conventional floor Structure With this construction method, the flooring was installed after the filler was applied, so it took a long time before the floor was ready for use.
[0005] The present invention has been made in consideration of the above circumstances, and provides a floor that can be used from an early stage. structure The purpose is to provide. [Means for solving the problem]
[0006] The first aspect of the invention made to achieve the above object is a floor construction method for constructing a floor at a position higher than a base surface, comprising forming a support having a plurality of supports on the base surface, This is a floor construction method in which a floor material is placed on the support, and a filler material is filled into the space between the base surface and the floor material, thereby integrating the filler material and the support material.
[0007] A second aspect of the invention is a method for constructing a floor according to the first aspect, further comprising forming a side wall surrounding the support, and filling the filling material into the space enclosed by the floor material and the side wall.
[0008] A third aspect of the invention is the floor construction method according to the second aspect, in which the side walls are connected to the supports when forming the side walls.
[0009] A fourth aspect of the invention is a method for constructing a floor as described in the first aspect, in which the bottom surface of an underground space having an opening in the ground is used as the base surface, the floor material is placed on the support so as to close the opening, and the filling material is filled into the space closed by the floor material and the wall of the underground space.
[0010] A fifth aspect of the invention is the method for constructing a floor according to any one of the first to fourth aspects, in which a rigid polyurethane foam is used as the filler.
[0011] A sixth aspect of the invention is a floor construction method according to any one of the first to fifth aspects, in which, in forming the support body, a cross member is horizontally placed between the upper ends of the multiple pillars and a joist is fixed to the cross member, the joist having a main body portion with a gate-shaped cross section and flange portions extending outward from the lower end of each leg of the main body portion, and the floor material is fixed to the top of the main body portion.
[0012] A seventh aspect of the invention is a floor construction method as described in the sixth aspect, in which the cross member has a circular cross section, a connecting fitting is prepared which comprises an annular fitting portion that fits into the cross member from the outside and a protruding piece that protrudes outward from the fitting portion, and when fixing the floor joist to the cross member, the fitting portion of the connecting fitting is fitted into the cross member from the outside, and the protruding piece of the connecting fitting and the flange portion of the floor joist are overlapped and fixed. Effect of the Invention
[0013] [First to fifth aspects of the invention] According to the first aspect of the invention, the floor can be used from an early stage because the simple structure of placing the flooring on the support is constructed first. Then, by filling the space between the flooring and the base surface with a filler, the flooring is supported by the filler integrated with the support. This allows the floor to be used for a long period of time.
[0014] The construction of the floor may be carried out as follows. That is, as in the second embodiment of the invention, side walls are formed to surround the support, and the space closed by the floor material and the side walls is filled with a filler. Alternatively, as in the fourth embodiment of the invention, the floor material is installed on the support so as to close the opening, and the space closed by the floor material and the wall of the underground space is filled with a filler, using the bottom surface of an underground space having an opening in the ground as the base surface. Examples of the former type of floor include platform floors and stage floors. Examples of the latter type of floor include a floor formed in the opening of an underground passage or basement by filling the passage or basement.
[0015] Furthermore, when forming a side wall surrounding the support body, if the side wall is structured to be connected to the support, the side wall can be stably fixed (third aspect of the invention).
[0016] The filler may be a rigid polyurethane foam (fifth aspect of the invention), concrete, earth and sand, or air-foamed lightweight soil. Examples of the rigid polyurethane foam used as the filler include a block made of a rigid polyurethane foam previously foamed, crushed material of a rigid polyurethane foam previously foamed, and a rigid polyurethane foam (rigid polyurethane foam foamed in situ) formed by reacting and spraying two liquid raw materials consisting of a base agent (liquid A) and a hardener (liquid B) on-site. If a rigid polyurethane foam foamed in situ is used as the filler, the filler can be filled without gaps even in narrow gaps in the space between the base surface and the floor material. The filler may be composed of a block made of a rigid polyurethane foam previously foamed or crushed material thereof in combination with a rigid polyurethane foam foamed in situ.
[0017] [Sixth aspect of the invention] According to the sixth aspect of the invention, the flooring can be stably fixed to the top of the joists, since the joists have a main body with a gate-shaped cross section. Furthermore, the joists have flanges that extend from the lower end of each leg of the main body, so the joists can be easily fixed to the cross members by using the flanges.
[0018] [Seventh aspect of the invention] According to the seventh aspect of the invention, the connecting fitting is structured so that the protruding piece protrudes outward from the annular mating portion, so that even if the cross member has a circular cross section, it is possible to fix the protruding piece to the joist material by mating the mating portion with the cross member. [Brief description of the drawings]
[0019] [Figure 1] FIG. 1 is a perspective view of a platform with a floor according to a first embodiment; [Diagram 2] AA cross section of platform [Diagram 3] BB cross section of platform [Figure 4] Cross-sectional side view of the connecting fitting [Diagram 5] (A) Perspective view of panel material, (B) Enlarged view showing the end of the strip material [Figure 6] (A) Perspective view of the side wall fixing part, (B) Side cross-sectional view [Figure 7] Side cross-sectional view to explain the floor construction process [Figure 8] Side cross-sectional view to explain the floor construction process [Figure 9] FIG. 13 is a perspective view illustrating the fixing of the wall material fixing portion to the wall material; [Figure 10] Schematic diagram for explaining filling of a filler [Figure 11] (A) is a side cross-sectional view of an underground filling body having a floor according to a second embodiment, and (B) is an enlarged side cross-sectional view of the lifting section and its surroundings. [Figure 12] CC cross section of underground filling body [Figure 13] Side cross-sectional view to explain the floor construction process [Figure 14] Schematic diagram for explaining filling of a filler [Figure 15] 1A is a side cross-sectional view of a connecting fitting according to another embodiment, FIG. 1B is a side view of the connecting fitting, and FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0020] As shown in Fig. 1, the floor 10 of this embodiment is the floor of a platform 100 where passengers of trains and the like get on and off, and is constructed at a position higher than the ground G on which the tracks R are laid. Specifically, as shown in Fig. 2, in the platform 100, a floor material 11 constituting the floor 10 is supported from below by a support 20 erected on the ground G. In this embodiment, the ground G serves as a base surface that supports the support 20.
[0021] The platform 100 also includes side walls 30 surrounding the four sides (front side, back side, left and right sides) of the support 20, and a filler 40 filled in the space enclosed by the floor material 11 and the side walls 30. The floor material 11 is also supported from below by the filler 40 integrated with the support 20. The filler 40 is made of hard polyurethane foam foamed in situ.
[0022] As shown in Fig. 2, the support 20 includes a plurality of columns 21 and a cross member 22 horizontally disposed between the plurality of columns 21. The columns 21 are formed by attaching a column body 21B to a jack 21A for adjusting the height of the columns 21. The jack 21A is, for example, a screw jack. The column body 21B has a circular cross section and is, for example, a circular pipe. In the support 20, a plurality of sets of columns 21, each set including a predetermined number of columns 21 arranged in the width direction of the platform 100, are arranged in the longitudinal direction of the platform 100.
[0023] There are two types of cross members 22: a first cross member 22A extending along the longitudinal direction of the platform 100, and a second cross member 22B extending along the width direction of the platform 100. The first cross member 22A and the second cross member 22B are each fixed to the support 21 by a fixing metal fitting such as a clamp. Both the first cross member 22A and the second cross member 22B are formed to have a circular cross section, and are formed of, for example, a circular pipe.
[0024] 4, the first horizontal member 22A includes an upper-end horizontal member 22J that spans between the upper ends of the multiple pillars 21. A joist material 24 is fixed to the upper-end horizontal member 22J via a connecting metal fitting 23.
[0025] The connecting fitting 23 is composed of a fitting portion 23A formed in an annular shape and a protruding piece 23B protruding radially outward from the fitting portion 23A. The inner diameter of the fitting portion 23A is approximately the same as the outer diameter of the upper-end horizontal member 22J, and the fitting portion 23A is fitted to the upper-end horizontal member 22J from the outside. The protruding piece 23B protrudes from two points 180 degrees apart in the circumferential direction of the fitting portion 23A, and both of the two protruding pieces 23B, 23B are arranged horizontally. The fitting portion 23A is fixed to the upper-end horizontal member 22J by screw fastening.
[0026] The floor joist 24 has a structure in which a flange portion 24F projects outward from the lower end of each of a pair of legs 24K, 24K of a main body 24H having a gate-shaped cross section. The flange portion 24F is fixed to overlap the protruding piece 23B of the connecting metal fitting 23. The floor material 11 is fixed to the top portion 24T of the main body 24H with screws. The flange portion 24F and the protruding piece 23B are fixed by screw fastening.
[0027] As shown in Fig. 1, floor material 11 is formed by arranging a plurality of panel materials 12 in the longitudinal direction of platform 100. As shown in Fig. 5, panel material 12 is formed by connecting a plurality of strip materials 13 in the width direction by connecting members 14. Specifically, connecting member 14 has an L-shaped cross section and extends in the width direction of strip materials 13 with one side of the L-shape facing downward. Then, with the other side of the L-shape of connecting member 14 abutting against the lower surfaces of the plurality of strip materials 13, connecting member 14 is fastened to the plurality of strip materials 13 with screws.
[0028] 5, the strip 13 has a structure in which a pair of main walls 13A, 13A facing each other in the thickness direction are connected by a plurality of connecting walls 13B. The connecting walls 13B extend along the longitudinal direction of the strip 13.
[0029] 2, the side wall 30 is formed by arranging a plurality of vertically arranged wall materials 31 in the height direction and the longitudinal direction of the platform 100. The wall materials 31 have the same structure as the above-mentioned belt material 13, and are formed by a pair of main walls 31A, 31A connected by a plurality of connecting walls 31B. The wall materials 31 are arranged so that the width direction of the main wall 31A is vertical.
[0030] Each wall material 31 of the side wall 30 is connected to a support pillar 21 of the support body 20 by a side wall connecting part 50. This stabilizes the side wall 30. As shown in Fig. 6(A), the side wall connecting part 50 is formed by connecting a support pillar fixing part 51 fixed to the support pillar 21 and a wall material fixing part 52 fixed to the wall material 31.
[0031] Specifically, the post fixing part 51 has a structure similar to that of the connecting metal fitting 23 described above, and has a projection 51B projecting outward from a fitting part 51A that fits into the post 21 from the outside. The wall material fixing part 52 has a structure in which a screw shaft 52S stands upright from a base plate 52P. Here, a slit 31S extending inward from the outer edge of the main wall 31A is formed in the main wall 31A of the wall material 31 facing the support body 20, and the base plate 52P of the wall material fixing part 52 is received inside the wall material 31, and the screw shaft 52S is inserted into the slit 31S. The base plate 52P is fixed to the main wall 31A by screw fastening, and the screw shaft 52S is fixed to the projection 51B by screw fastening.
[0032] The spaces between the floor material 11 and the side wall 30, between the side wall 30 and the ground G, between the multiple strip materials 13, between the multiple wall materials 31, etc. are sealed with sealing materials such as gaskets (not shown).
[0033] The floor 10 of this embodiment is constructed as follows. First, as shown in FIG. 7(A), the support 20 is erected on the ground G (support formation step), and the floor material 11 is installed on the support 20 (floor installation step). Next, as shown in FIG. 7(B), the side wall 30 surrounding the support 20 is formed (side wall construction step). After the side wall 30 is formed, the filler material 40 is filled into the space S1 closed by the floor material 11 and the side wall 30 as shown in FIG. 8(A) (filling step). Then, when the filler material 40 is integrated with the support 20, the platform 100 is completed as shown in FIG. 8(B), and the floor 10 supported from below by the support 20 and the filler material 40 is completed.
[0034] The support formation process is described in detail below. In the support formation process, first, a plurality of pillars 21 are erected on the ground G, and cross members 22 are laid between the plurality of pillars 21. The plurality of pillars 21 are arranged along the extension direction of the railway tracks R (see FIG. 1) and along a direction perpendicular to the extension direction. The height of each pillar 21 is adjusted by a jack 21A as necessary. Prior to the work of erecting the pillars 21, pillar fixing parts 51 (see FIG. 6(A)) are fixed to the pillars 21 arranged in the row closest to the railway tracks R and the pillars 21 arranged in the row furthest from the railway tracks R.
[0035] The cross members 22 are fixed to the pillars 21 by fixing metal fittings (not shown), such as clamps, which are fixed to the pillars 21 in advance. The cross members 22 arranged along the direction in which the tracks R extend are the first cross members 22A, and the cross members 22 arranged along the direction perpendicular to the tracks R are the second cross members 22B. Among the cross members 22 that become the first cross members 22A, the cross member 22 that spans the upper ends of the pillars 21 is the upper-end cross member 22J. Here, the cross member 22 that becomes the upper-end cross member 22J has a connecting metal fitting 23 (see FIG. 4) fixed in advance, and the cross member 22 that becomes the upper-end cross member 22J is arranged so that the protruding piece 23B of the connecting metal fitting 23 is horizontal.
[0036] When the upper-end horizontal member 22J is spanned between the multiple supports 21, the joist material 24 is fixed to the connecting fitting 23. Specifically, the flange portion 24F of the joist material 24 is placed on the protruding piece 23B of the connecting fitting 23, and the flange portion 24F and the protruding piece 23B are screwed together. This completes the support body forming process. As described above, in this embodiment, the connecting fitting 23 interposed between the upper-end horizontal member 22J and the joist material 24 has a structure in which the protruding piece 23B protrudes outward from the annular fitting portion 23A. Therefore, even if the horizontal member 22 has a circular cross section, the joist material 24 can be fixed to the protruding piece 23B with the fitting portion 23A fitted to the horizontal member 22.
[0037] Details of the flooring installation process are as follows. In the flooring installation process, a plurality of panel materials 12 are arranged on joists 24 of the support body 20 and screwed to the joists 24 (specifically, the tops 24T of the joists 24). Here, since the main body 24H of the joists 24 has a gate-shaped cross section, it becomes possible to stably fix the flooring material 11 to the joists 24.
[0038] The multiple panel materials 12 are lined up in the extension direction of the railway line R. Each panel material 12 is arranged with the connecting members 14 (see FIG. 5) facing downwards and such that the width direction of the strip material 13 is approximately parallel to the railway line R. In order to shorten the time required for the floor material installation process, the multiple panel materials 12 are prepared prior to the floor material installation process. The panel material 12 is formed by lining up the multiple strip materials 13 in the width direction and connecting these multiple strip materials 13 with the connecting members 14.
[0039] When the plurality of panel materials 12 are fixed to the joists 24, the floor material 11 constituting the floor 10 is installed on the support 20, and the floor material installation process is completed. The floor 10 at the end of the floor material installation process is supported from below only by the support 20, and the support 20 has a strength sufficient to withstand the short-term use of the floor 10. Here, short-term use refers to a use in which a structure is constructed for the purpose of existing only for a specific period of time and dismantled after the specific period, that is, use as a so-called temporary structure. The specific period depends on the purpose, use, frequency of maintenance, etc., but is generally about six months to one year. In contrast, long-term use refers to a use in which a structure is constructed for the purpose of continuous use without a set usage limit, that is, use as a so-called permanent structure or permanent structure.
[0040] Details of the side wall forming process are as follows. In the side wall forming process, a plurality of wall materials 31 are arranged to surround the support 20 from all sides, and each wall material 31 is fixed to the support 21. The wall materials 31 are arranged so that the main wall 31A in which the slits 31S are formed faces the support 20 side, and the main wall 31A is vertical. In detail, the plurality of wall materials 31 are lined up around the support 20 and stacked up and down. Gaps between the wall materials 31, the gap between the wall material 31 and the ground G, and the gap between the wall material 31 and the floor material 11 are sealed with a sealant.
[0041] A wall material fixing portion 52 is fixed to the wall material 31 in advance, and a screw shaft 52S of the wall material fixing portion 52 is screwed to the overhanging piece 51B of the support fixing portion 51 fixed to the support 21. When the screw shaft 52S is screwed to the overhanging piece 51B, the wall material 31 is fixed to the support 21. When a plurality of wall materials 31 are fixed to the support 21, the side wall 30 is completed and the side wall forming process is completed. Then, when the side wall forming process is completed, a space S1 closed by the floor material 11 and the side wall 30 is formed below the floor material 11. An entrance to the space S1 is secured in the side wall 30. The entrance is arranged, for example, at one end of the side wall 30 in the extension direction of the track R.
[0042] The wall material fixing part 52 is fixed to the wall material 31 as follows. That is, as shown in Fig. 9, the base plate 52P of the wall material fixing part 52 is inserted between the pair of main walls 31A, 31A, and the screw shaft 52S is passed through the slit 31S. Then, the base plate 52P is fastened to the main wall 31A having the slit 31S.
[0043] Details of the filling process are as follows. In the filling process, a foaming liquid of rigid polyurethane foam as the filling material 40 is sprayed into the space S1. The filling material 40 is filled from the side farther from the entrance of the space S1 (for example, the other end in the extending direction of the track R) toward the side closer to the entrance. Then, when the entire space S1 is filled with the filling material 40, the support 20 is buried in the filling material 40. This completes the filling process. Since the filling material 40 is filled into the space S1 closed by the floor material 11 and the side wall 30, no curing is required to prevent the filling material 40 from scattering. Furthermore, a process of finishing the upper surface of the filling material 40 flat for the installation of the floor material 11 is not required. In addition, since the filling material 40 is made of rigid polyurethane foam, rust prevention is achieved for the members (for example, the panel material 12 and the support 21) constituting the floor material 11, the support 20, and the side wall 30. In this embodiment, the spraying is performed on-site by discharging (mixing) two liquids at high pressure: a base liquid (liquid A) mainly composed of polyol, crosslinking agent, foaming agent, etc., and a hardener (liquid B) mainly composed of isocyanate. Both liquids A and B are liquid at room temperature.
[0044] Here, since heat is generated in the process in which the foaming raw liquid foams and hardens to become a hard polyurethane foam, the foaming raw liquid is sprayed in a predetermined amount at a time. Therefore, the filling material 40 is formed in layers from the end of the space S1 far from the entrance toward the entrance. The foaming raw liquid is preferentially sprayed onto the lower surface of the floor material 11 and the inner surface of the side wall 30. Specifically, the first layer 40K1 of the filling material 40 formed first is formed in a shell shape that contacts the lower surface of the floor material 11 and the inner surface of the side wall 30 (FIG. 10(A)), and the second layer 40K2 and the third layer 40K3 of the filling material 40 formed second or later are formed in a vertical wall shape inside the first layer 40K1 (see FIG. 10(B)). Then, when the inner part of the first layer 40K1 is filled with the filling material 40, a shell-shaped layer similar to the first layer 40K1 is formed on the filling material 40 from the side closer to the entrance, and multiple vertical wall-shaped layers are formed on the inner part of that layer.
[0045] When the filling process is completed and the filler 40 is integrated with the support 20, the platform 100 (see Fig. 1) is completed, and the floor 10 shown in Fig. 2 is completed. Then, the floor 10 is supported not only by the support 20 but also by the filler 40, so that the floor 10 can be used for a long time (becoming a permanent structure).
[0046] In the construction method of the floor 10 of this embodiment, after the support formation step is completed, a floor material installation step is performed before the side wall formation step and the filling step. In the floor material installation step, the floor 10 is formed simply by installing the floor material 11 on the support 20, and the floor 10 can be used for a short period of time. This allows the floor 10 to be used early without waiting until construction is completed. Moreover, in this embodiment, the floor material 11 is supported from below not only by the support 20 but also by the filling material 40 in the filling step, so that the floor 10 can be used for a long period of time when construction is completed.
[0047] In addition, in this embodiment, the filler 40 is formed by directly spraying on-site hard polyurethane foam, so that the filler 40 can be easily filled in the gaps between the components constituting the support 20 in the space S1 (for example, the gaps between the cross members 22 or joists 24 and the floor material 11, and the gaps between the posts 21 and the side walls 30). As a result, the space S1 is filled with the filler 40 without any gaps, and the support of the floor material 11 is stabilized.
[0048] In addition, since the filler 40 is formed by directly spraying the hard polyurethane foam by on-site foaming, it is possible to fill the filler 40 from the underside of the floor material 11 downward, and the occurrence of voids in the filler 40 is suppressed, and the filler 40 can be filled without gaps. Therefore, the floor material 11, the support 20, and the side wall 30 are integrated by the filler 40, and the floor material 11 is supported in a state in which the floor material 11, the support 20, and the side wall 30 are integrated via the filler 40. This allows the platform 100 to be a strong permanent structure, and the floor 10 can be used for a long time. In addition, when the filler 40 is made of hard polyurethane foam, the filler 40 is lightweight, and the platform 100 itself is also light-weighted. This makes it possible to prevent the platform 100 from tilting or deforming due to ground subsidence or the like after construction.
[0049] In this embodiment, the connecting metal fitting 23 and the post fixing part 51 have the same structure, so that it is possible to standardize the connecting metal fitting 23 and the post fixing part 51. Furthermore, the band material 13 and the wall material 31 constituting the panel material 12 have the same structure, so that it is possible to standardize the band material 13 and the wall material 31.
[0050] [Second embodiment] As shown in Fig. 11(A), the floor 10V of this embodiment is formed by an underground filling material 200 that fills an underground passage 210. The underground passage 210 includes a plurality of openings 211A that open to the ground G at entrances 211 provided at a plurality of points, an elevator section 230 that leads from the openings 211A to the underground, and a passage body 220 that extends approximately parallel to the ground G and connects the elevator sections 230 to each other. In the example of Fig. 11(B), a staircase 230K is formed in the elevator section 230, but a slope may also be formed.
[0051] The underground filler 200 fills the entire underground passage 210 (i.e., the entire lift section 230 and the passage body 220). The upper part of the underground filler 200 closes the opening 211A, and the upper surface of the underground filler 200 is flush with the ground G. The part of the underground filler 200 exposed from the opening 211A forms the floor 10V.
[0052] As shown in Fig. 12, the underground filler 200 is common to the platform 100 of the first embodiment in that it includes a floor material 11, a support 20, and a filler 40, but differs from the platform 100 in that it does not include a side wall 30. The structures of the floor material 11, the support 20, and the filler 40 in the underground filler 200 are the same as those in the first embodiment, so the same reference numerals are used and the description will be omitted.
[0053] The floor material 11 in the underground filling body 200 closes the opening 211A of the underground passage 210. The support 20 in the underground filling body 200 is erected on the underground floor surface BF of the underground passage 210. The underground floor surface BF is composed of the floor surface BF1 of the passage body 220 and the floor surface BF2 of the lifting section 230, and serves as a base surface that supports the support 20. In the example shown in FIG. 11(B), the support 20 is erected only on the floor surface BF2 of the lifting section 230, and the support 21 is erected on the tread surface (i.e., the surface facing upward) of the staircase 230K.
[0054] The construction method for floor 10V of this embodiment is common to the construction method for floor 10 of the above-mentioned first embodiment in that it includes a support forming step, a floor material installing step, and a filling step, but differs from the construction method for floor 10 in that it does not include a side wall forming step. Below, the support forming step, floor material installing step, and filling step in the construction method for floor 10V will be mainly described in terms of the differences from the support forming step, floor material installing step, and filling step in the construction method for floor 10 of the above-mentioned first embodiment.
[0055] In the support body forming process, a plurality of pillars 21 are erected on the underground floor surface BF of the underground passage 210 (floor surface BF2 of the lift section 230) (see FIG. 13(A)). In this embodiment, the plurality of pillars 21 are erected on the treads of the stairs 230K. The upper ends of the plurality of pillars 21 are aligned in height and positioned slightly below the opening 211A of the underground passage 210.
[0056] In the flooring installation process, a plurality of panel materials 12 are arranged so as to close a plurality of openings 211A of the underground passage 210. Then, the flooring 11 that closes the opening 211A is formed by the plurality of panel materials 12, and a space S2 is formed that is closed by the flooring 11 and the walls of the underground passage 210 (specifically, the floor wall 212, the side wall 213, and the ceiling wall 221 of the underground passage 210). At this time, an entrance (not shown) for workers to enter and exit in the filling process is formed in the flooring 11 that closes a specific opening 211A. When the flooring installation process is completed, a floor 10V supported only by the support body 20 is simply formed.
[0057] In the filling step, the space S2 is filled with a filler 40 formed by in-situ foaming of rigid polyurethane foam from an opening 211A other than the specific opening 211A toward the specific opening 211A. The filler 40 is formed in layers in a plurality of times. Specifically, the first layer 40L1 of the filler 40 formed first is formed horizontally so as to cover the entire lower surface of the flooring 11 that blocks the opening 211A other than the specific opening 211A (see FIG. 14(A)), and the second layer 40L2, the third layer 40L3, and the fourth layer 40L4 of the filler 40 formed second or later are formed in a vertical wall shape below the first layer 40L1 (see FIG. 14(B)). Then, when the lower portion of the first layer 40L1 is filled with the filler 40, a vertical wall-shaped layer similar to the second layer 40L2 is formed on the filler 40 from the side closer to the specific opening 211A.
[0058] According to the construction method of the floor 10V of this embodiment, at the end of the floor material installation step, the floor material 11 forming the floor 10V is supported only by the support 20, so that the floor 10V can be used early without waiting until the completion of construction. Furthermore, according to the filling step, the floor material 11 is supported from below not only by the support 20 but also by the filling material 40, so that the floor 10V can be used for a long time at the end of construction. Furthermore, according to the construction method of the floor 10V of this embodiment, since a side wall formation step is not included, the construction period can be shortened.
[0059] [Other embodiments] (1) The filler 40 may be made of concrete, earth and sand, or air-filled lightweight soil. In this case, in the filling step, the filler 40 made of concrete or earth and sand is piled upward.
[0060] The filler 40 may be formed by combining a block of pre-foamed rigid polyurethane foam or its pulverized material with a rigid polyurethane foam foamed in situ. In this case, in the filling step, a plurality of blocks of rigid polyurethane foam or its pulverized material are placed in the spaces S1 and S2, and a foaming liquid of rigid polyurethane foam is sprayed into the gaps between the blocks or their pulverized material and the floor material 11 and the side wall 30. In this case, the rigid polyurethane foam foamed in situ becomes hot due to an exothermic reaction, so by using a block of pre-foamed material or its pulverized material in combination, it is possible to suppress the amount of heat generated by the rigid polyurethane foam in the filling step.
[0061] (2) In the first embodiment described above, the floor 10 formed at a position higher than the ground G was the floor of the platform 100, but it may be any floor formed at a position higher than the ground G, for example, it may be the floor of a stage.
[0062] (3) In the first embodiment, an existing side wall erected on the ground G (for example, a side wall of an outdoor pool constructed at a position higher than the ground G, a fence, etc.) may be used as the side wall 30. If the existing side walls surrounding the support 20 on all sides are used as the side wall 30, the side wall formation process becomes unnecessary. The existing side wall may be used as a part of the side wall 30. Even in this case, the construction period of the side wall formation process can be shortened.
[0063] (4) In the above second embodiment, the underground passage 210 was given as an example of something that is filled with the underground filling material 200, but any underground space may be used, such as a basement, an underground storehouse, an underground pit, etc.
[0064] (5) In the above embodiment, the protrusion piece 23B of the connecting fitting 23 protrudes from two points of the fitting portion 23A, but as shown in Figure 15 (A), the protrusion piece 23B of the connecting fitting 23 may protrude from only one point of the fitting portion 23A.
[0065] (6) In the above embodiment, the joist material 24 is connected to the upper end horizontal member 22J via the connecting metal fitting 23. However, as shown in FIG. 15(B), a U-bolt may be used instead of the connecting metal fitting 23. In this case, the upper end horizontal member 22J is disposed inside the U-bolt, and both ends of the U-bolt are screwed to a pair of flanges of the joist material 24. As shown in FIG. 15(C), the joist material 24 may be connected to the upper end horizontal member 22J extending in the width direction of the platform 100 via a U-bolt. In this case, the U-bolt is screwed to the flange portion 24F of the joist material 24. In addition, the flange portion 24F of the joist material 24 may be directly screwed to the upper end horizontal member 22J extending in the width direction of the platform 100. In this way, the joist material 24 can be easily fixed to the upper end horizontal member 22J by using the flange portion 24F of the joist material 24.
[0066] (7) In the above embodiment, the first horizontal member 22A and the second horizontal member 22B are formed to have a circular cross section, but the first horizontal member 22A and the second horizontal member 22B may be formed to have a square cross section, for example, may be composed of a square pipe. In this case, it is possible to fix the flange portion 24F of the joist material 24 directly to the upper end horizontal member 22J without using the connecting metal fitting 23. Also, the support body 20 may not include the joist material 24, and the floor material 11 may be directly screwed to the upper end horizontal member 22J. [Explanation of symbols]
[0067] 10,10V floor 11 Flooring 20 Support 30 side wall 40 Filler 100 Platform 200 Underground filling body 210 Underground passage
Claims
[Claim 1] A floor structure constructed at a position higher than the basement surface of an underground space having an opening in the ground, the basement surface being the bottom surface of the underground space, A support body having a plurality of support columns formed on the base surface; A floor material placed on the support so as to close the opening; A filling material is filled in an area enclosed by the base surface, the floor material, and the wall of the underground space, and is integrated with the support, The floor structure wherein the filler is a rigid polyurethane foam.
Citation Information
Patent Citations
Rope seal for floor installation device -
JP1984074248U
Filling method of underground cavity
JP1999323904A
Filler for construction work
JP2002068799A
Construction method for structure, temporary footing, and structure
JP2004116062A
Filling method for horizontal hole hollow part
JP2006002562A