Underground space development method for underpinning existing building by using foundation pit reverse construction system

Through the foundation pit reverse construction system and vertical support system, the stable underpinning of existing buildings and the development of underground space are realized, which solves the problem of limited number of layers and depth of underground space development in the existing technology, and reduces the cost and difficulty of construction. , ensuring building stability and elevation flexibility.

CN118774448APending Publication Date: 2024-10-15EAST CHINA ARCHITECTURE DESIGN AND RESEARCH INSTITUTE CO LTD +1

Patent Information

Application Number
CN202411141322.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

In the existing technology, the temporary underpinning pile foundations of existing buildings are densely arranged, which limits the number and depth of underground space development, and the construction is difficult, affecting the stability of the building.

Method used

The foundation pit reverse construction system is adopted, and through one foundation conversion and underpinning, the vertical support system is used to achieve stable support of the existing building and underground space development, including the construction of the first batch of foundation underpinning structures, the vertical pile system in the underground space, Cut off the original foundation, lift the building, reverse the basement roof and floor structure, and finally connect the new foundation.

Benefits of technology

It achieves the expansion of the depth and scale of underground space development, reduces construction costs and difficulties, ensures the stability and elevation flexibility of the building, and avoids the problem of dense pile foundations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774448A_ABST
    Figure CN118774448A_ABST
Patent Text Reader

Abstract

The invention belongs to the field of urban renewal and underground space development, and relates to an underground space development method for underpinning an existing building by using a foundation pit reverse construction system. The method comprises the steps that firstly, an underpinning structure and a temporary reinforcing component of an existing building are constructed, and then a vertical supporting pile system of the underpinning structure is constructed and connected with a foundation underpinning structure; the existing building is lifted to the elevation capable of meeting the construction space through a lifting device, shallow earth excavation is conducted, and a newly-built basement top plate is constructed; constructing a falling new foundation of the existing building on the top plate; the existing building falls back to the final state and is connected with the new foundation; the basement floor slab structure is further excavated downwards and subjected to reverse construction; and all basement top-down construction is completed. According to the method, the existing building can be underpinned only through one-time foundation conversion, foundation underpinning vertical supporting is also used as reverse structure beam plate vertical supporting at the same time, the existing building has effective supporting and stability in the underpinning process, and the elevation of the existing building can be flexibly adjusted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of urban renewal and underground space development, and in particular relates to an underground space development method for underpinning existing buildings by utilizing a foundation pit reverse construction system in the reconstruction of existing buildings. Background Art

[0002] Improving the underground space environment is an important part of my country's current urban renewal process. Developing underground space under existing buildings and organically integrating the new underground space with existing buildings is an effective means to expand space, ease urban traffic, improve the living environment and enhance regional quality while maintaining the urban texture. It is an important way to achieve organic renewal and sustainable revitalization of existing building areas.

[0003] Due to the limitations of a series of objective conditions such as the environment and policies, the development of underground space under many existing buildings needs to be carried out under the condition that the existing buildings are kept in situ. The common practice in the industry is to develop underground space underneath the buildings after they are replaced in situ. After the basement construction is completed, the foundation of the existing building and the new basement structure are connected and placed in place.

[0004] In the current existing technologies and related projects, temporary underpinning piles for existing buildings usually use anchor static pressure piles. Due to the limitation of the bearing capacity of the anchor piles, the number of underground space development floors will be limited, and the spacing between the underpinning pile foundations is very close. During the development of the underground space under the existing buildings, the construction is very inconvenient. At the same time, the temporary underpinning structure needs to be underpinned and converted many times during and after the development of the underground space. The conversion process is likely to affect the stability and deformation of the existing buildings. Summary of the invention

[0005] In order to solve the above technical problems, the present invention provides an underground space development method for underpinning existing buildings by utilizing a foundation pit reverse construction system, which can realize underpinning of existing buildings through only one foundation conversion, and complete the development of the underground space below by using the reverse construction method. At the same time, the vertical support of the reverse construction structure beams and slabs also serves as the vertical support for the foundation underpinning. The existing buildings have effective support and stability during the underpinning process, and the height of the existing buildings can be flexibly adjusted.

[0006] A method of developing underground space by using a foundation pit reverse construction system to underpin existing buildings. There is an existing building above the proposed basement. The specific implementation method is as follows: Step 1: Construct the first batch of foundation replacement structures and reinforce the superstructure of the existing building; the first batch of foundation replacement structures includes wall support beams; the wall support beams support the retained walls of the existing building; construct a temporary reinforcement structure of the superstructure above the wall support beams.

[0007] Step 2: Construct the underground space vertical pile column system and the second batch of underpinning structures; the underground space vertical pile column system is the vertical support of the basement reverse structure, and also serves as the underpinning structure support of the existing building; the underground space vertical pile column system includes basement reverse vertical supporting columns; the second batch of underpinning structures include joists, which are fixed horizontally to the supporting wall beams, and the basement reverse vertical supporting columns pass through holes in the joists, and are vertically connected to the joists through lifting devices, so that the joists can slide up and down along the basement reverse vertical supporting columns.

[0008] Step 3: Cut off the original foundation of the existing building; lift the existing building to an intermediate state through a lifting device, leaving construction space between the bottom of the existing building and the planned basement top structure.

[0009] Step 4: Excavate the shallow soil and build the basement top slab structure in reverse; fix the basement top slab structure and the basement with reverse vertical support columns; then, construct a new foundation at the position where the basement top slab structure corresponds to the original foundation.

[0010] Step 5: Connect the existing building lowering to the new foundation.

[0011] Step 6: Dig further downwards and construct the basement floor structure in reverse.

[0012] Step 7: Complete all basement reverse construction, dismantle the first batch of foundation replacement structures, the second batch of foundation replacement structures, and temporary reinforcement structures; cut off the protruding parts of the basement reverse vertical support columns that are higher than the basement top plate structure.

[0013] Based on the above technical features: in step one, the wall supporting beams include clamping beams and through-wall beams; the clamping beams are fixed on both sides of the retained wall; the through-wall beams pass through the retained wall at intervals and connect the clamping beams on both sides of the retained wall.

[0014] Based on the above technical features: in step one, the wall supporting beam is a wall underbeam, which is arranged below the retained wall and passes through the original foundation.

[0015] Based on the above technical features: in step 2, a basement reverse-built vertical supporting column which also serves as a supporting column is constructed at the structural column position of the basement; the lifting device is a reaction beam set above the basement reverse-built vertical supporting column, the reaction beam and the supporting beam are connected by tension anchor bolts, and a hydraulic jack is set between the reaction beam and the top of the basement reverse-built vertical supporting column.

[0016] Based on the above technical features: In step three, the lifting device uses the reverse vertical support columns of the basement as reaction supports, and drives the supporting wall beams, existing buildings, and temporary reinforcement structures as a whole for vertical lifting through the supporting beams.

[0017] Based on the above technical features: In step five, a lifting device is used to lower the vertical elevation of the existing building until the bottom of the existing building is consistent with the elevation of the new foundation.

[0018] Based on the above technical features: the reverse vertical supporting columns of the basement are bored cast-in-place piles, bored cast-in-place piles with inserted angle steel lattice columns or steel pipe piles.

[0019] Based on the above technical features: Step five and step six are interchanged, step six is ​​implemented first, and then step five.

[0020] Based on the above technical features: when there are multiple existing buildings, each existing building implements step one and step two independently, and then performs steps three to seven simultaneously.

[0021] As a special case of the above technical solution, when the original elevation of the existing building meets the conditions for the reverse construction of the proposed basement top plate structure, it is not necessary to raise the elevation, and there is no need to set up a lifting device. The vertical support columns of the reverse construction of the basement are fixedly connected with the joists. The construction steps are: Step 1: Construct the first batch of foundation replacement structures and reinforce the superstructure of the existing building; the first batch of foundation replacement structures includes wall support beams; the wall support beams support the retained walls of the existing building; construct a temporary reinforcement structure of the superstructure above the wall support beams.

[0022] Step 2: Construct the underground space vertical pile column system and the second batch of underpinning structures; the underground space vertical pile column system is the vertical support of the reverse-built structure of the basement, and also serves as the underpinning structure support of the existing building; the underground space vertical pile column system includes the reverse-built vertical supporting columns of the basement; the second batch of underpinning structures include joists, which are fixed horizontally to the supporting wall beams, and the reverse-built vertical supporting columns of the basement are vertically fixedly connected to the joists.

[0023] Step 3: Cut off the original foundation of the existing building.

[0024] Step 4: Excavate the earth below the existing building and build the basement roof structure in reverse; fix the basement roof structure and the basement with reverse vertical support columns; then, construct a new foundation at the position where the basement roof structure corresponds to the original foundation.

[0025] Step 5: Connect the existing building to the new foundation.

[0026] Step 6: Dig further downwards and construct the basement floor structure in reverse.

[0027] Step 7: Complete the reverse construction of all basements and dismantle the first batch of foundation replacement structures, the second batch of foundation replacement structures, and temporary reinforcement structures.

[0028] Due to the adoption of the above scheme, the beneficial effects of the present invention are: (1) Only one set of vertical support system is required to realize the foundation replacement of the existing building and the vertical support of the reverse-construction structural system of the basement, avoiding the dense pile foundation caused by setting up two sets of independent vertical components during the basement excavation process. This can greatly reduce the development cost of the underground space under the existing building and reduce the difficulty of basement construction.

[0029] (2) The vertical support system can adopt bored cast-in-place piles and other pile types with strong bearing capacity, which can effectively solve the problem of limited bearing capacity and stability of conventional anchor static pressure piles. The number of floors and depth of underground space development can be further increased.

[0030] (3) The elevation of the existing building can be flexibly adjusted. During the reverse construction phase of the basement, it can be raised to create more favorable construction space conditions for the excavation of earthwork and structural floor construction under the existing building. The elevation of the permanent use state can be lowered according to the elevation of the proposed basement top slab, avoiding the limitation of the basement elevation design due to the current elevation of the existing building; (4) During the process of completing the basement top plate and further excavating downward, the existing buildings have been connected to the basement top plate structure, forming a foundation state with better stability and integrity, which can ensure the safety of existing buildings during the development of large-scale, deep underground space. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a cross-sectional schematic diagram of the positional relationship between the proposed underground space and the existing building in the technology of the present invention.

[0032] Figure 2 It is a schematic diagram of the underpinning structure of an existing building and the temporary reinforcement structure of an existing building in the technology of the present invention.

[0033] Figure 3 It is a schematic diagram of the connection between the existing building support structure and the vertical pile column system in the underground space in the technology of the present invention.

[0034] Figure 4 It is a schematic diagram of the elevation of an existing building being raised to an intermediate state in the technology of the present invention.

[0035] Figure 5 It is a schematic diagram of the process of basement excavation and reverse construction of the basement top plate in the technology of the present invention.

[0036] Figure 6 It is a schematic diagram of adjusting the elevation of an existing building to a final state in the technology of the present invention.

[0037] Figure 7 It is a schematic diagram of the process of further excavating the basement downward and reverse construction of the basement floor in the technology of the present invention.

[0038] Figure 8It is a schematic diagram of the process of dismantling temporary systems such as in-situ foundation support and structural reinforcement of existing buildings in the technology of the present invention, and completing the reverse construction of the basement.

[0039] Fig. 9 It is a partial schematic diagram of the basic underpinning structure in the technology of the present invention.

[0040] Fig.10 It is a partial schematic diagram of the lifting device in the technology of the present invention.

[0041] The numbers in the figure are as follows: existing building 1; basement 2; original foundation 3; wall beam 4; through-wall beam 5; temporary reinforcement structure 6; vertical support column of basement 7; support beam 8; reaction beam 9; basement top plate structure 10; new foundation 11; floor structure of basement 12; basement foundation bottom plate 13; protruding part 14; tension anchor bolt 15; hydraulic jack 16. DETAILED DESCRIPTION

[0042] The specific embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings. These embodiments are only used to illustrate the present invention, but not to limit the present invention.

[0043] In the description of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0044] The present invention is a method for developing underground space by using a foundation pit reverse construction system to underpin existing buildings. It can realize the underpinning of existing buildings by only setting a single set of vertical components, and can flexibly adjust the vertical elevation of the existing building through a lifting device connected to the underpinning structure, and finally complete the excavation of the soil below and the construction of the reverse construction basement. Combined with the accompanying drawings, the specific description is as follows.

[0045] like Figure 1 As shown, the existing building 1 is located above the planned basement 2 .

[0046] Step 1: If Figure 2As shown, the first batch of underpinning structures are constructed and the upper structure of the existing building 1 is reinforced. The first batch of foundation underpinning structures includes wall support beams; the wall support beams support the retained walls of the existing building 1; and a temporary reinforcement structure 6 is constructed above the wall support beams. The wall support beams include wall clamping beams 4 and wall penetration beams 5. The specific implementation method of this step can be as follows: Fig. 9 As shown, firstly, the sandwich wall beams 4 are constructed on both sides of the retained wall of the existing building 1, and the surface of the contact area between the sandwich wall beams 4 and the retained wall is roughened to increase the friction between the two, and the through-wall beams 5 are constructed by digging holes in the load-bearing wall at intervals to connect the sandwich wall beams 4 on both sides of the wall. When constructing the sandwich wall beams 4, it is also necessary to reserve connecting steel bars for the subsequent second batch of supporting beams 8 for easy connection later. After the sandwich wall beams 4 are constructed, they can play a role in reinforcing the foundation of the existing building in the subsequent construction process, and a temporary reinforcement structure 6 can be constructed on them. After the temporary reinforcement structure 6 is constructed, it can play a role in reinforcing the upper structure of the existing building in the subsequent construction process. The temporary reinforcement structure 6 can adopt the relevant technology in the existing building wall reinforcement technology field. The figure shows the construction of steel columns and steel trusses to reinforce the wall, which is only a schematic diagram of the wall reinforcement method. Specifically, any mature wall temporary reinforcement structure can be adopted.

[0047] Wall joists can also be located under the wall and pass through the existing foundation. Wall joists can be concrete rectangular beams or steel joists.

[0048] The forms of supporting wall beams are not limited to the above two methods, and other mature technologies for dragging and replacing walls can also be used.

[0049] Step 2 Figure 3 As shown, the underground space vertical pile column system and the second batch of underpinning structures are constructed. The specific implementation method of this step is: construct the basement reverse vertical support column 7 which also serves as the underpinning column at the basement structure column position. Its specific specifications and dimensions are determined according to the force calculation, and it is necessary to meet the bearing capacity requirements of the basement reverse vertical support column and the bearing capacity requirements of the existing building underpinning column at the same time. The basement reverse vertical support column 7 can adopt any pile foundation that can meet the vertical bearing capacity requirements, such as bored cast-in-place piles, bored cast-in-place piles with angle steel lattice columns and steel pipe piles. The elevation of the top of the column is determined according to the elevation of the existing building after the reverse construction stage, and it needs to be higher than the top of the underpinning structure after the elevation. For the basement reverse vertical support column 7 which also serves as the underpinning column inside the building, miniaturized construction equipment and technology can be selected according to the indoor space and clear height; then, construct the joist 8, the joist 8 is fixed in the horizontal direction with the supporting wall beam, and a hole is left in the joist 8 at the position where the basement reverse vertical support column 7 passes through. The lifting device is vertically connected to the joist 8 so that the joist 8 can slide up and down along the vertical support column 7 in the basement. Examples of the lifting device are: Fig.10As shown, a reaction beam 9 is arranged above the vertical support column 7 of the basement, the reaction beam 9 is connected to the supporting beam 8 by a tension anchor bolt 15, and a hydraulic jack 16 is arranged between the reaction beam 9 and the top of the vertical support column 7 of the basement.

[0050] The lifting device may also adopt other mature technologies in the existing jacking technology field.

[0051] Step 3 Figure 4 As shown, the original foundation 3 of the existing building 1 is cut off; the existing building 1 is lifted to the intermediate state by the lifting device. The specific implementation method of this step is: the lifting device uses the vertical support column 7 of the reverse construction of the basement, which also serves as the underpinning column, as the reaction force support, and drives the supporting wall beam, the existing building 1 and the temporary reinforcement structure as a whole to adjust the vertical elevation through the supporting beam 8; the specific elevation adjustment amount is determined according to the elevation of the proposed basement top plate and the operating space required for its reverse construction, that is, after the existing building is lifted to the intermediate state, sufficient construction space is left between the bottom of the building and the proposed basement top plate structure 10.

[0052] Step 4 Figure 5 As shown, shallow earthwork is excavated and reverse construction of the basement top slab is carried out. The specific implementation method of this step is: excavate below the existing building 1 to a certain depth below the proposed basement top slab structure 10, that is, excavate shallow earthwork to form a construction space for the reverse construction of the proposed basement top slab structure 10; then, construct the basement top slab structure 10, and the basement top slab structure 10 is connected to the reverse construction vertical support column 7 of the basement that also serves as a support column; then, the new foundation 11 of the existing building is constructed at the position of the basement top slab structure 7 corresponding to the original foundation 3 of the existing building.

[0053] Step 5 Figure 6 As shown, the existing building 1 is lowered to the final state and connected to the new foundation 11. The specific implementation method of this step is: using the same lifting device as in step 3, the existing building 1 is lowered vertically, and after falling to the final state, the bottom of the building is consistent with the elevation of the new foundation 11 of the existing building, and the existing building 1 is connected to the new foundation 11 of the existing building.

[0054] Step 6 Figure 7 As shown, further excavation is performed downwards and reverse construction is performed on the basement floor structure. The specific implementation method of this step is: continue to excavate the lower earthwork downwards to a certain depth below the basement floor structure 12, and construct the basement floor structure 12, the basement floor structure 12 is connected to the reverse construction vertical support column 7 of the basement which also serves as the underpinning column; when there are multiple layers of basement floor structures, this step can be repeated, and the earthwork can be excavated downwards in turn and the structural floors of each layer of the basement can be constructed reversely.

[0055] Step 7 Figure 8As shown, the reverse construction of the entire basement is completed, and the existing building foundation support structure, temporary reinforcement structure 6 and protruding part 14 are removed. The specific implementation method of this step is: continue to excavate the lower earthwork downward to the basement to be built, construct the basement foundation slab 13, and complete the reverse construction of the basement; sequentially remove temporary reinforcement structure 6, support beam 8, support wall beam and other temporary components, and cut off the protruding part 14 of the reverse vertical support column 7 of the basement that is higher than the basement top plate structure, that is, the protruding part of the vertical support column that can be broken during the normal use stage of the building.

[0056] In addition, in the above technical solution, after the construction of the new foundation 11 in step 4 is completed, the existing building 1 is ready for retreat, and the retreat timing can be relatively flexible. It can be retreated first to connect with the newly built basement top plate structure 10, and then continue to excavate downward to construct the structural floor slabs of each floor of the basement. Steps 5 and 6 can be interchanged. After the reverse construction of the basement top plate structure 10 and the new foundation 11 is completed, the existing building 11 will not be retreated temporarily, and step 6 will be implemented normally before step 5.

[0057] When it is necessary to develop underground space under multiple existing buildings 1, the foundation replacement structure, building reinforcement structure and vertical pile column system of each existing building 1 need to be completed before the overall underground space development can be carried out. That is, after each existing building 1 is implemented independently, the steps 3 to 7 are carried out simultaneously. Steps 1 and 2 can be implemented synchronously or in batches between each existing building 1.

[0058] In actual projects, if the original elevation of the existing building meets the conditions for the reverse construction of the proposed basement top plate structure, it is also possible not to raise the elevation. In this special case, there is no need to set up a lifting device, and the reverse vertical support columns of the basement are fixedly connected to the joists. The construction steps are: Step 1: Construct the first batch of foundation replacement structures and reinforce the superstructure of the existing building; the first batch of foundation replacement structures includes wall support beams; the wall support beams support the retained walls of the existing building; construct a temporary reinforcement structure of the superstructure above the wall support beams.

[0059] Step 2: Construct the underground space vertical pile column system and the second batch of underpinning structures; the underground space vertical pile column system is the vertical support of the basement reverse structure, and also serves as the underpinning structure support of the existing building; the underground space vertical pile column system includes the basement reverse vertical supporting columns; the second batch of underpinning structures include supporting beams, which are fixed horizontally to the supporting wall beams, and the basement reverse vertical supporting columns 7 and the supporting beams 8 are vertically fixedly connected.

[0060] Step 3: Cut off the original foundation 3 of the existing building 1.

[0061] Step 4: excavate the earth below the existing building 1 and reverse construct the basement top plate structure 10; fix the basement top plate structure 10 to the reverse vertical support columns 7 of the basement; then, construct a new foundation 11 at the position corresponding to the basement top plate structure 10 and the original foundation 3.

[0062] Step 5: Connect the existing building 1 to the new foundation 11.

[0063] Step 6: Further excavate downwards and construct the floor structure of basement 2 in reverse.

[0064] Step 7: Complete the reverse construction of all basements 2, and dismantle the first batch of foundation replacement structures, the second batch of foundation replacement structures, and the temporary reinforcement structure 6.

[0065] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.

Claims

1. A method for developing underground space by using a foundation pit reverse construction system to replace an existing building, wherein an existing building (1) exists above a proposed basement (2); the method is characterized by: Step 1: constructing the first batch of foundation replacement structures and reinforcing the upper structure of the existing building (1); the first batch of foundation replacement structures includes wall support beams; the wall support beams support the retained walls of the existing building (1); constructing a temporary reinforcement structure (6) of the upper structure above the wall support beams; Step 2: constructing an underground space vertical pile column system and a second batch of underpinning structures; the underground space vertical pile column system is a vertical support for the reverse construction structure of the basement (2), and also serves as a support structure for the existing building (1); the underground space vertical pile column system includes a basement reverse construction vertical support column (7); the second batch of underpinning structures includes a joist (8), the joist (8) is fixed to the wall support beam in the horizontal direction, the basement reverse construction vertical support column (7) is penetrated through a hole in the joist (8), and is vertically connected to the joist (8) through a lifting device, so that the joist (8) can slide up and down along the basement reverse construction vertical support column (7); Step 3: cutting off the original foundation (3) of the existing building (1); lifting the existing building (1) to an intermediate state by means of the lifting device, leaving a construction space between the bottom of the existing building (1) and the proposed basement top plate structure (10); Step 4: excavating the shallow earthwork and constructing the basement top plate structure (10); fixing the basement top plate structure (10) and the basement top plate structure (7) by constructing a vertical support column; then, constructing a new foundation (11) at a position corresponding to the basement top plate structure (10) and the original foundation (3); Step 5: The existing building (1) is lowered and connected to the new foundation (11); Step 6: Further excavating downwards and reverse construction of the floor structure of the basement (2); Step 7: Complete the reverse construction of the entire basement (2), dismantle the first batch of foundation underpinning structures, the second batch of foundation underpinning structures, and the temporary reinforcement structure (6); and cut off the protruding portion (14) of the reverse construction vertical support column (7) of the basement that is higher than the basement roof structure (10).

2. According to claim 1, a method for developing underground space by using a foundation pit reverse construction system to underpin existing buildings is characterized by: In step 1, the wall supporting beams include a wall clamping beam (4) and a wall penetrating beam (5); the wall clamping beams (4) are fixed on both sides of the retained wall; and the wall penetrating beams (5) pass through the retained wall at intervals to connect the wall clamping beams (4) on both sides of the retained wall.

3. The underground space development method for underpinning existing buildings by using a foundation pit reverse construction system according to claim 1 is characterized by: In the step 1, the wall supporting beam is a wall underbeam, and the wall underbeam is arranged below the retained wall body; and passes through the original foundation (3).

4. The underground space development method for underpinning existing buildings by using a foundation pit reverse construction system according to claim 1 is characterized by: In the second step, the reverse-built vertical support column (7) of the basement, which also serves as a support column, is constructed at the structural column position of the basement (2); the lifting device is a reaction beam (9) arranged above the reverse-built vertical support column (7) of the basement, the reaction beam (9) and the support beam (8) are connected by tension anchor bolts (15), and a hydraulic jack (16) is arranged between the reaction beam (9) and the top of the column of the reverse-built vertical support column (7) of the basement.

5. The underground space development method for replacing existing buildings by using a foundation pit reverse construction system according to claim 1, characterized in that; In the step three, the lifting device uses the reverse vertical support column (7) of the basement as a reaction force support, and drives the supporting wall beam, the existing building (1), and the temporary reinforcement structure (6) to be lifted vertically as a whole through the supporting beam (8).

6. The underground space development method for underpinning existing buildings by using a foundation pit reverse construction system according to claim 1 is characterized by: In the step five, the lifting device is used to lower the vertical elevation of the existing building (1) until the bottom of the existing building (1) is aligned with the elevation of the new foundation (11).

7. The underground space development method for underpinning existing buildings by using a foundation pit reverse construction system according to claim 1 is characterized by: The reverse vertical support columns (7) of the basement are bored cast-in-place piles, bored cast-in-place piles with inserted angle steel lattice columns or steel pipe piles.

8. The underground space development method for underpinning existing buildings by using a foundation pit reverse construction system according to claim 1 is characterized by: The step five and the step six are interchanged, and the step six is ​​implemented first, and then the step five is implemented.

9. The underground space development method for underpinning existing buildings by using a foundation pit reverse construction system according to claim 1 is characterized by: When there are multiple existing buildings (1), each existing building (1) independently implements step one and step two, and then simultaneously performs steps three to seven.

10. A method for developing underground space by using a foundation pit reverse construction system to replace an existing building, wherein an existing building (1) exists above a proposed basement (2); the method is characterized by: Step 1: constructing the first batch of foundation replacement structures and reinforcing the upper structure of the existing building (1); the first batch of foundation replacement structures includes wall support beams; the wall support beams support the retained walls of the existing building (1); constructing a temporary reinforcement structure (6) of the upper structure above the wall support beams; Step 2: constructing an underground space vertical pile column system and a second batch of underpinning structures; the underground space vertical pile column system is a vertical support for the reverse-construction structure of the basement (2), and also serves as a support structure for the existing building (1); the underground space vertical pile column system includes a basement reverse-construction vertical support column (7); the second batch of underpinning structures includes a joist (8), the joist (8) is horizontally fixed to the wall support beam, and the basement reverse-construction vertical support column (7) is vertically fixedly connected to the joist (8); Step 3: cutting off the original foundation (3) of the existing building (1); Step 4: excavating earth below the existing building (1) and constructing the basement top plate structure (10); fixing the basement top plate structure (10) and the basement top plate structure (7) with the vertical support columns (7); then, constructing a new foundation (11) at a position where the basement top plate structure (10) corresponds to the original foundation (3); Step 5: connecting the existing building (1) to the new foundation (11); Step 6: Further excavating downwards and reverse construction of the floor structure of the basement (2); Step 7: Complete the reverse construction of all the basements (2), and dismantle the first batch of foundation underpinning structures, the second batch of foundation underpinning structures, and the temporary reinforcement structure (6).

Citation Information

Patent Citations

  • Existing building concentrated underpinning structure and method for developing underground space

    CN111021398A

  • Reverse construction method for existing building development basement structure

    CN114134931A

  • Jacking deviation rectifying construction method based on underpinned pile

    CN116145744A

  • Foundation underpinning structure and method for reversed basement below existing building

    CN117266228A

  • Building supporting structure for constructing foundation pit and underground structure below in-situ building and construction method

    CN118390577A

Cited By

  • Electric spiral existing building overall lifting method and system

    CN119956990A

  • Electric spiral type whole building lifting method and system for existing building

    CN119956990B

  • Construction method for in-situ jacking and falling underpinning protection and underground storey adding of existing building

    CN121183973A

  • Construction method for in-situ jacking and falling of existing building, underpinning protection and underground storey addition

    CN121183973B